KR100671323B1 - Protecting construction of slope for park - Google Patents

Protecting construction of slope for park Download PDF

Info

Publication number
KR100671323B1
KR100671323B1 KR1020060099819A KR20060099819A KR100671323B1 KR 100671323 B1 KR100671323 B1 KR 100671323B1 KR 1020060099819 A KR1020060099819 A KR 1020060099819A KR 20060099819 A KR20060099819 A KR 20060099819A KR 100671323 B1 KR100671323 B1 KR 100671323B1
Authority
KR
South Korea
Prior art keywords
slope
park
insertion rods
rods
rod
Prior art date
Application number
KR1020060099819A
Other languages
Korean (ko)
Inventor
최한순
Original Assignee
(주)케이지엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)케이지엔지니어링 filed Critical (주)케이지엔지니어링
Priority to KR1020060099819A priority Critical patent/KR100671323B1/en
Application granted granted Critical
Publication of KR100671323B1 publication Critical patent/KR100671323B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/205Securing of slopes or inclines with modular blocks, e.g. pre-fabricated
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

A structure for preventing loss of soil in a slope of a park is provided to prevent accidents by actively draining water and shutting off collapse of earth on the slope of the park in the rain or flood, and to construct easily by simplifying structure. A structure for preventing loss of soil includes first and second front insertion rods(10,20) installed in a slope of a park, first and second rear insertion rods(30,40), and a rectangular net(60) combined with the first and second front and rear insertion rods. Cut portions(1) are formed in the first and second front and rear insertion rods to contain corners of the rectangular net by decreasing the diameter in the center of the insertion rod. A thread(1a) is formed in an upper inner part of the insertion rod and combined with a bolt(5) assembling a connecting ring(7). A bolt(12) is integrally formed in the first front insertion rod to fix connecting rods(50) made of artificial stone or wood. The rectangular net is formed by assembling steel wires, and installed on the slope of the park. The filler is charged in the rectangular net, and upper and lower parts of the rectangular net are communicated. The rectangular nets are zigzagged in the upper and lower parts of the slope to easily drain rainwater.

Description

공원 비탈면 토사유실방지 구조물{Protecting Construction of Slope for Park}Protecting Construction of Slope for Park

도 1은 본 발명의 일실시예에 따른 공원 비탈면 토사유실방지 구조물을 나타내는 결합 사시도,1 is a perspective view showing a combination of park slope slope loss prevention structure according to an embodiment of the present invention,

도 2는 본 발명의 일실시예에 따른 공원 비탈면 토사유실방지 구조물을 나타내는 분해 사시도,Figure 2 is an exploded perspective view showing the soil slope loss prevention structure of the park slope according to an embodiment of the present invention,

도 3은 본 발명의 일실시예에 따른 공원 비탈면 토사유실방지 구조물이 연결링 및 연결봉에 의하여 서로 결합된 상태를 나타내는 평면도,3 is a plan view showing a state in which the slope of the park slope preventing soil loss structure according to an embodiment of the present invention is coupled to each other by a connecting ring and a connecting rod,

도 4는 본 발명의 일실시예에 따른 토사유실방지 구조물이 서로 결합되어 공원 비탈면 상에 지그재그 형태로 배치된 상태를 나타내는 평면도,Figure 4 is a plan view showing a state in which the earth and sand loss prevention structures according to an embodiment of the present invention is coupled to each other arranged in a zigzag form on the slope of the park,

도 5는 본 발명의 일실시예에 따른 토사유실방지 구조물이 서로 결합되어 공원 비탈면 상에 설치된 상태를 나타내는 측면도.Figure 5 is a side view showing a state installed on the slope of the park coupled to each other soil loss structure according to an embodiment of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

1 : 절개부 7 : 연결링1: incision 7: connection ring

9 : 공원의 비탈면 10 : 전방 제1 삽입봉9: slope side of park 10: front first insertion rod

12 : 볼트체 20 : 전방 제2 삽입봉12: bolt body 20: front second insertion rod

30 : 후방 제1 삽입봉 40 : 후방 제2 삽입봉30: rear first insertion rod 40: rear second insertion rod

50 : 연결봉 60 : 사각망체50: connecting rod 60: square mesh

본 발명은 공원 비탈면의 토사유실을 방지하기 위한 구조물에 관한 것으로서, 더욱 상세하게는 공원 비탈면에 설치되어 우기(雨期) 또는 홍수 발생 시 상기 공원 비탈면의 토사가 밀려 내려오는 것을 차단하는 동시에 배수가 원활하게 이루어지도록 함으로써 안전사고의 위험을 방지할 수 있는 공원 비탈면 토사유실방지 구조물에 관한 것이다.The present invention relates to a structure for preventing soil loss on the slope of the park, and more particularly, it is installed on the slope of the park to prevent the sediment of the slope of the park to be pushed down during rainy season or flooding and at the same time drainage smoothly. The present invention relates to a structure for preventing slope loss of a park slope, which can prevent the risk of a safety accident.

일반적으로, 비탈면에는 토사유실을 방지하기 위한 구조물로써, 보호블럭이 설치되어 있다. 상기 보호블럭은 통상 콘크리트로 성형 제작되고, 제작된 보호블럭은 비탈면의 토사 위에 격자형으로 위치되어, 보호블럭의 자중에 의해 토사에 압착되어 상기 비탈면을 보호하였다.In general, a protection block is installed on the slope as a structure for preventing soil loss. The protective block is usually manufactured by molding the concrete, and the produced protective block is located in a lattice shape on the soil of the slope, and is pressed onto the soil by the weight of the protection block to protect the slope.

근래에는 합성수지재를 이용하여 여러가지 형태의 보호블록을 형성하고 있으며, 상기 합성수지재 보호블록은 철근 등으로 이루어진 고정핀에 의해 비탈면에 고정시켜 비탈면을 보호하고 있다.Recently, various types of protective blocks are formed using synthetic resin materials, and the synthetic resin protective blocks are fixed to slopes by fixing pins made of reinforcing bars to protect the slopes.

그러나, 상기 콘크리트재 보호블럭이나 합성수지재 보호블록은 모두 압착식이나 자중에 의한 비탈면의 보호역할만 수행할뿐 우기의 표면수 배수 처리가 전혀 이루어지지 않아 비탈면의 토사가 쉽게 유실되고, 이로 인하여 안전사고의 위험이 항시 존재하는 문제점이 있었다.However, both the concrete protection block and the synthetic resin protection block perform only the protection role of the slope on the surface of the slope by pressing or self-weight, so that the surface water drainage treatment of the rainy season is not performed at all, so that the soil on the slope is easily lost, and thus the safety There was a problem that the risk of an accident always exists.

한편, 상기한 방법들에 더하여 비탈면에 잔디를 식재하는 경우도 있으나, 상기 식재된 잔디 또한 우기에 많은 양의 물이 한꺼번에 빠른 속도로 흘러내릴 경우, 비탈면의 토사유실을 방지하기는 어려운 문제점이 있다.On the other hand, in addition to the above-described methods, the grass is planted on the slope, but the planted grass also has a problem that it is difficult to prevent soil loss on the slope when a large amount of water flows at a rapid rate at the same time in the rainy season. .

본 발명은 상기한 종래의 문제점을 개선하기 위하여 안출된 것으로서, 공원 비탈면에 설치되어 우기 또는 홍수 발생 시 상기 공원 비탈면의 토사가 밀려 내려오는 것을 차단하는 동시에 배수가 원활하게 이루어지도록 함으로써, 안전사고의 위험을 방지할 수 있는 공원 비탈면 토사유실방지 구조물을 제공하는데 그 목적이 있다.The present invention has been made in order to improve the above-mentioned conventional problems, it is installed on the slopes of the park to prevent the sewage of the slopes of the park to be pushed down during the rainy season or flooding, so that the drainage is made smoothly, the safety accident The purpose is to provide a park slope preventing soil loss structure that can prevent the risk.

상기한 목적을 달성하기 위한 수단으로서, 본 발명의 공원 비탈면 토사유실방지 구조물은, 공원의 비탈면에 압입 설치되는 전방의 제1 및 제2 삽입봉과, 후방의 제1 및 제2 삽입봉과, 상기 전후방 제1 및 제2 삽입봉에 각각의 모서리부가 끼워져 설치되는 사각망체로 이루어지되,As a means for achieving the above object, the park slope surface soil loss prevention structure of the present invention, the first and second insertion rods, the first and second insertion rods of the front, which is press-installed on the slope of the park, and the front and rear Each of the corners of the first and second insertion rods are made of a square mesh fitted to be installed,

전후방 제1 및 제2 삽입봉에는 사각망체의 각 모서리부를 수용할 수 있도록, 각 삽입봉의 중앙부로 갈 수록 감소된 직경을 갖는 절개부가 길이방향으로 각각 형성되고,The front and rear first and second insertion rods each have a cutout portion having a diameter reduced toward the center of each insertion rod so as to accommodate each corner portion of the quadrangular mesh,

전후방 제1 및 제2 삽입봉의 상측 내경부에는, 서로 인접하는 삽입봉을 연결하는 연결링 결합용 볼트의 체결이 가능하도록, 나사산이 형성되며,Threads are formed at upper inner diameter portions of the front and rear first and second insertion rods so that the connection ring coupling bolts connecting the insertion rods adjacent to each other can be fastened.

전방의 제1 삽입봉에는, 서로 동일 수평선상에 위치하는 전방의 제1 삽입봉 을 서로 결속시키기 위해 인조석이나 인조나무로 이루어진 연결봉을 고정시키기 위하여, 적어도 하나 이상의 볼트체가 일체로 형성되고,At least one bolt body is integrally formed in the front first insertion rod to fix the connecting rod made of artificial stone or artificial wood to bind the first insertion rods positioned on the same horizontal line to each other.

사각망체는 상부 및 하부가 연통되어 형성되고, 강선이 그물구조로 결합되어 이루어진 것으로서, 공원 비탈면에 설치 후 그 내부에 채움재가 충진되는 것을 특징으로 한다.Square mesh is formed by communicating the upper and lower, the steel wire is made of a combined net structure, characterized in that the filling material is filled therein after installation on the slope of the park.

바람직하게, 상기 구성에 있어서, 전방의 제1 및 제2 삽입봉과, 후방의 제1 및 제2 삽입봉, 그리고 전후방 제1 및 제2 삽입봉에 각각의 모서리부가 끼워져 설치되는 사각망체가, 공원의 비탈면을 따라 상부 및 하부에 설치되되, 우수의 배출을 용이하게 하기 위하여 공원의 비탈면 상부 및 하부에서 지그재그 형태로 설치되는 것을 특징으로 한다.Preferably, in the above configuration, the square net body in which the respective corner portions are fitted into the first and second insertion rods in the front, the first and second insertion rods in the rear, and the front and rear first and second insertion rods is installed in the park. It is installed on the top and bottom along the slope of the, characterized in that it is installed in a zigzag form at the top and bottom of the slope of the park to facilitate the discharge of rain.

상술한 목적, 특징들 및 장점은 첨부된 도면과 관련한 다음의 상세한 설명을 통하여 보다 분명해 질 것이다. 우선 각 도면의 구성요소들에 참조 번호를 부가함에 있어서, 동일한 구성요소들에 한해서는 비록 다른 도면상에 표시되더라도 가능한 한 동일한 번호를 가지도록 하고 있음에 유의하여야 한다.The above objects, features and advantages will become more apparent from the following detailed description taken in conjunction with the accompanying drawings. First of all, in adding reference numerals to the components of each drawing, it should be noted that the same components have the same number as much as possible even if displayed on different drawings.

이하, 본 발명의 바람직한 실시예를 첨부된 도면을 참고로 하여 상세히 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 일실시예에 따른 공원 비탈면 토사유실방지 구조물을 나타내는 결합 사시도이고, 도 2는 본 발명의 일실시예에 따른 공원 비탈면 토사유실방지 구조물을 나타내는 분해 사시도이다.1 is a perspective view showing a combination of park slope soil loss prevention structure according to an embodiment of the present invention, Figure 2 is an exploded perspective view showing a park slope surface soil loss prevention structure according to an embodiment of the present invention.

도면에 나타낸 바와 같이, 본 발명의 일실시예에 따른 공원 비탈면 토사유실 방지 구조물은, 공원의 비탈면에 압입 설치되는 전방의 제1 및 제2 삽입봉(10, 20)과, 후방의 제1 및 제2 삽입봉(30, 40) 및, 상기 전후방 제1 및 제2 삽입봉(10~40)에 각각의 모서리부가 끼워져 설치되는 사각망체(60)로 이루어진다.As shown in the figure, the park slope surface soil loss prevention structure according to an embodiment of the present invention, the first and second insertion rods (10, 20) in the front press-installed on the slope of the park, and the first and second rear It consists of a second insertion rod (30, 40), and the square mesh 60 is inserted into the respective corner portions to the front and rear first and second insertion rod (10-40).

상기 전후방 제1 및 제2 삽입봉(10~40)에는, 상기 사각망체(60)의 각 모서리부를 수용할 수 있도록, 각 삽입봉(10~40)의 중앙부로 갈 수록 감소된 직경을 갖는 절개부(1)가 각각 길이방향으로 형성되되, 상기 후방의 제1 및 제2 삽입봉(30, 40)에 형성된 절개부(1)는 대략 삽입봉의 전체 길이에 형성되고, 상기 전방의 제2 삽입봉(20)에 형성된 절개부(1)는 대략 2/3 길이에 걸쳐 형성되며, 전방의 제1 삽입봉(10)에 형성된 절개부(1)는 대략 1/2 길이에 걸쳐 형성된다.The front and rear first and second insertion rods 10 to 40 have an incision having a reduced diameter toward the center portion of each of the insertion rods 10 to 40 so as to accommodate each corner portion of the square mesh 60. The portions 1 are formed in the longitudinal direction, respectively, and the cutouts 1 formed in the rear first and second insertion rods 30 and 40 are formed in approximately the entire length of the insertion rods, and the front second insertion The incision 1 formed in the rod 20 is formed over approximately 2/3 length, and the incision 1 formed in the front first insertion rod 10 is formed over approximately 1/2 length.

상기와 같이 삽입봉(10~40)에 형성된 절개부(1)의 길이를 서로 다르게 한 이유는 도 5에 도시된 바와 같이, 공원의 비탈면에 위치하는 사각망체(60)를 수평 상태로 유지시킬 수 있도록 하기 위한 것이다.The reason why the lengths of the cutouts 1 formed in the insertion rods 10 to 40 as described above are different from each other is as shown in FIG. 5, so that the square mesh 60 positioned on the slope of the park can be maintained in a horizontal state. It is to make it possible.

한편, 상기와 같은 절개부(1)를 갖는 4개의 삽입봉(10~40) 상측 내경부에는, "8"자형 연결링(7)을 결합시키기 위한 볼트(5)의 체결이 가능하도록, 나사산(1a)이 형성된다. 상기 볼트(5) 및 "8"자형 연결링(7)은, 도 3 및 도 4에 도시된 바와 같이, 서로 인접하는 토사유실방지 구조물의 삽입봉을 서로 연결하여 본 발명의 구조물들을 더욱 견고히 하기 위한 것이다.On the other hand, the four insertion rods (10 to 40) upper inner diameter portion having the above-described cutout portion 1, so that the bolt (5) for engaging the "8" shaped connection ring 7 can be fastened, the thread (1a) is formed. The bolt 5 and the "8" shaped connecting ring 7, as shown in Figures 3 and 4, to connect the insertion rods of the soil loss prevention structure adjacent to each other to further strengthen the structures of the present invention It is for.

그리고, 상기 전방의 제1 삽입봉(10)에는 적어도 하나 이상의 볼트체(12)가 일체로 형성된다. 상기 볼트체(12)는, 서로 인접하는 토사유실방지 구조물을 연결하여 서로의 결합력을 증대시키기 위해 인조석이나 인조나무로 형성된 연결봉 (50)(도 3 내지 도 5에 도시)을 결합시키기 위한 것이며, 상기 연결봉(50)에 의하여 본 발명의 토사유실방지 구조물의 공원 비탈면 토사의 지지력이 증대되는 것이다. 이에 대한 것은 하기의 결합관계에서 다시 설명하기로 한다.At least one bolt body 12 is integrally formed on the front first insertion rod 10. The bolt body 12 is for coupling the connecting rods 50 (shown in FIGS. 3 to 5) formed of artificial stone or artificial wood to increase mutual bonding strength by connecting adjacent soil loss prevention structures. By the connecting rod 50 is to increase the bearing capacity of the slope of the park slope of the earth and sand loss prevention structure of the present invention. This will be described again in the following coupling relationship.

상기 사각망체(50)는 상부 및 하부가 연통되어 이루어지고, 강선이 그물구조로 결합되어 이루어진 것으로서, 비탈면에 설치 후 그 내부에 자갈이나 토사 등의 채움재가 충진된다.The square net 50 is made by communicating the upper and lower, the steel wire is made of a combination of the net structure, after the installation on the slope is filled in the filling material such as gravel or soil.

이하, 상기한 구성을 갖는 본 발명의 일실시예에 따른 공원 비탈면 토사유실방지 구조물에 대한 설치와 결합관계 및 작용효과에 대해 도 2 및 아래의 도면을 참고로 하여 설명하면 다음과 같다.Hereinafter, the installation relationship and the coupling effect and the effect of the park slope slope preventing soil loss structure according to an embodiment of the present invention having the above configuration will be described with reference to FIG. 2 and the drawings below.

도 3은 본 발명의 일실시예에 따른 공원 비탈면 토사유실방지 구조물이 연결링 및 연결봉에 의하여 서로 결합된 상태를 나타내는 평면도이고, 도 4는 본 발명의 일실시예에 따른 토사유실방지 구조물이 서로 결합되어 공원 비탈면 상에 지그재그 형태로 배치된 상태를 나타내는 평면도이며, 도 5는 본 발명의 일실시예에 따른 토사유실방지 구조물이 서로 결합되어 공원 비탈면 상에 설치된 상태를 나타내는 측면도이다.Figure 3 is a plan view showing a state in which the slope slope prevention structure of the park slope coupled to each other by the connecting ring and the connecting rod according to an embodiment of the present invention, Figure 4 is a soil loss prevention structure in accordance with an embodiment of the present invention 5 is a plan view illustrating a state in which the soil is disposed in a zigzag form on the slope of the park, and FIG. 5 is a side view illustrating a state in which the soil loss preventing structures according to an embodiment of the present invention are coupled to each other and installed on the slope of the park.

본 발명의 일실시예에 따른 토사유실방지 구조물을 공원의 비탈면(9)에 설치함에 있어서, 도 3 내지 도 5에 도시된 바와 같이, 공원의 비탈면(9) 전방이나 측면에서 봤을 때, 전후방 제1 및 제2 삽입봉(10~40)이 마름모꼴 형상을 이루도록, 상기 전후방 제1 및 제2의 4개 삽입봉(10~40)을 각각 공원의 비탈면(9)에 압입 설치한다.When installing the soil loss prevention structure according to an embodiment of the present invention on the slope 9 of the park, as shown in Figures 3 to 5, when viewed from the front or side of the slope 9 of the park, front and rear agents The first and second four insertion rods 10 to 40 are press-fitted to the slope 9 of the park, respectively, so that the first and second insertion rods 10 to 40 form a rhombic shape.

즉, 공원의 비탈면(9) 상부에는 후방의 제2 삽입봉(40)을 압입 설치하고, 상기 후방의 제2 삽입봉(40) 하부에는 동일 수평선상에 위치하도록 후방의 제1 삽입봉(30) 및 전방의 제2 삽입봉(20)을 압입 설치한다.That is, the rear second insertion rod 40 is press-installed on the sloped surface 9 of the park, and the rear first insertion rod 30 is positioned on the same horizontal line under the rear second insertion rod 40. And press-fit the second insertion rod 20 in front.

상기와 같이 동일 수평선상에 위치한 후방의 제1 삽입봉(30) 및 전방의 제2 삽입봉(20) 하부에는, 상기 제2 삽입봉(40)과 동일 수직선상에 위치하도록 전방의 제1 삽입봉(10)을 압입 설치하여, 상기 전후방 제1 및 제2의 4개 삽입봉(10~40)이 마름모꼴 형상을 이루도록 하는 것이다.As described above, the lower portion of the rear first insertion rod 30 and the front second insertion rod 20 positioned on the same horizontal line as the second insertion rod 40 is positioned on the same vertical line as the second insertion rod 40. The rod 10 is press-fitted so that the front and rear first and second four insertion rods 10 to 40 form a rhombic shape.

상기 전후방 4개의 삽입봉(10~40)에 각각 형성된 절개부(1) 측에 사각망체(60)의 각 모서리부를 수용시켜 상기 사각망체(60)가 상기 전후방 4개의 삽입봉(10~40) 내에서 수평 설치되도록 한다. 따라서, 상기 사각망체(60) 또한 마름모꼴 형상을 이루도록 배치된 전후방 제1 및 제2의 4개 삽입봉(10~40) 내에서 마름모꼴 형상으로 설치된다.Each of the corners of the square mesh 60 is accommodated in the cutout portions 1 formed on the front and rear four insertion rods 10 to 40, respectively, so that the square mesh 60 is inserted into the front and rear four insertion rods 10 to 40. Ensure horizontal installation within Therefore, the square net 60 is also installed in a rhombus shape in the front and rear four insertion rods 10 to 40 arranged to form a rhombus shape.

이어서, 도 3에 도시된 바와 같이, 또 다른 토사유실방지 구조물을 상기와 같이 설치된 토사유실방지 구조물의 옆에 인접시켜 상기와 마찬가지로 설치한다.Subsequently, as shown in FIG. 3, another earth and sand loss prevention structure is installed adjacent to the side of the earth and sand loss prevention structure installed as described above.

상기한 설치에 의하여 본 발명의 토사유실방지 구조물 중 후방의 제1 삽입봉(30)이 각각 인접하게 되고, 서로 인접한 후방의 제1 삽입봉(30) 상부에는 "8"자형 연결링(7)을 위치시키고, 상기 연결링(7)에 볼트(5)를 체결하여 서로 인접한 후방의 제1 삽입봉(30)을 서로 결속시킨다.By the above installation, the first insertion rods 30 at the rear of the earth and sand loss prevention structures of the present invention are adjacent to each other, and the "8" shaped connection ring 7 is disposed on the upper portions of the first insertion rods 30 adjacent to each other. Position and fasten the bolts 5 to the connection ring 7 to bind the first insertion rods 30 to the rear adjacent to each other.

그리고, 서로 동일 수평선상에 위치한 양측 전방의 제1 삽입봉(10)에 각각 형성된 적어도 하나 이상의 볼트체(12)에는 연결봉(50)을 결합시키고, 상기 연결 봉(50)이 볼트체(12)로부터 이탈되는 것을 방지하기 위하여 상기 볼트체(12)에는 너트(13)를 결합시켜, 서로 동일 수평선상에 위치한 전방의 제1 삽입봉(10)을 서로 결속시킨다. 이에 따라 서로 인접하여 설치된 본 발명의 토사유실방지 구조물과 구조물 간의 결속력이 증대되고, 따라서 공원 비탈면(9)의 토사 지지력이 증대된다.Then, the connecting rod 50 is coupled to at least one or more bolt bodies 12 respectively formed on the first insertion rods 10 on both sides located on the same horizontal line, and the connecting rod 50 is the bolt body 12. The nut 13 is coupled to the bolt body 12 to prevent it from being separated from each other, thereby binding the first insertion rods 10 positioned on the same horizontal line to each other. As a result, the binding force between the earth and sand loss prevention structure and the structure of the present invention installed adjacent to each other is increased, thus increasing the soil support of the park slope 9.

상기한 결속작업의 완료 후 사각망체(60) 내부에는 자갈이나 토사 등의 채움재(65)를 충진하여 공원의 비탈면(9) 토사유실을 방지하게 된다.After completion of the binding operation, the filling material 65 such as gravel or earth and sand is filled in the rectangular network 60 to prevent the soil slope 9 of the park.

한편, 도 4에 도시된 바와 같이, 공원의 비탈면(9)을 따라 상부 및 하부에 설치되는 본 발명의 토사유실방지 구조물은 동일 수직선상에 설치되지 않고, 지그재그 형태로 설치되는 것이 바람직하다. 이는 우수의 배출을 용이하게 하기 위한 것이다.On the other hand, as shown in Figure 4, the earth and sand loss prevention structure of the present invention is installed on the top and bottom along the slope 9 of the park is not installed on the same vertical line, it is preferably installed in a zigzag form. This is to facilitate the discharge of rainwater.

도 4에 도시된 화살표는 우수 배출방향을 나타낸 것이다.The arrow shown in FIG. 4 shows the rain discharge direction.

이상에서 설명한 본 발명은 전술한 실시예 및 첨부된 도면에 의해 한정되는 것이 아니고, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 여러가지 치환, 변형 및 변경이 가능하다는 것이 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 있어 명백할 것이다.The present invention described above is not limited to the above-described embodiment and the accompanying drawings, and it is common in the art that various substitutions, modifications, and changes can be made without departing from the technical spirit of the present invention. It will be evident to those who have knowledge of.

이상에서와 같이 본 발명의 공원 비탈면 토사유실방지 구조물에 의하여, 우기 또는 홍수 발생 시 상기 공원 비탈면의 토사가 밀려 내려오는 것을 효과적으로 차단할 수 있는 효과가 있고, 배수가 원활하게 이루어짐으로써 상기 공원 비탈면의 유실로 인한 안전사고의 위험을 방지할 수 있는 효과가 있으며, 비교적 간단한 구 조를 가짐으로써 시공성을 향상시킬 수 있는 효과가 있다.As described above, by the park slope surface soil loss prevention structure of the present invention, when the rainy season or flood occurs, the soil slope of the park slope surface can be effectively prevented from being pushed down, the drainage is made smoothly the loss of the park slope surface There is an effect that can prevent the risk of safety accidents due to, and has a relatively simple structure has the effect of improving the workability.

Claims (2)

공원의 비탈면에 압입 설치되는 전방의 제1 및 제2 삽입봉과, 후방의 제1 및 제2 삽입봉과, 상기 전후방 제1 및 제2 삽입봉에 각각의 모서리부가 끼워져 설치되는 사각망체로 이루어지되,The first and second insertion rods in front of the inclined surface of the park is installed, the first and second insertion rods in the rear, and the square net is installed in each corner portion is fitted to the front and rear first and second insertion rods, 상기 전후방 제1 및 제2 삽입봉에는 상기 사각망체의 각 모서리부를 수용할 수 있도록, 각 삽입봉의 중앙부로 갈 수록 감소된 직경을 갖는 절개부가 길이방향으로 각각 형성되고,The front and rear first and second insertion rods each have a cutout portion having a reduced diameter toward the center of each insertion rod so as to accommodate each corner portion of the rectangular mesh body in the longitudinal direction, 상기 전후방 제1 및 제2 삽입봉의 상측 내경부에는, 서로 인접하는 삽입봉을 연결하는 연결링 결합용 볼트의 체결이 가능하도록, 나사산이 형성되며,Threads are formed at upper inner diameter portions of the front and rear first and second insertion rods so that the connection ring coupling bolts connecting the insertion rods adjacent to each other can be fastened. 상기 전방의 제1 삽입봉에는, 서로 동일 수평선상에 위치하는 전방의 제1 삽입봉을 서로 결속시키기 위해 인조석이나 인조나무로 이루어진 연결봉을 고정시키기 위하여, 적어도 하나 이상의 볼트체가 일체로 형성되고,At least one bolt body is integrally formed in the front first insertion rod to fix the connecting rod made of artificial stone or artificial wood to bind the first insertion rods located on the same horizontal line to each other. 상기 사각망체는 상부 및 하부가 연통되어 형성되고, 강선이 그물구조로 결합되어 이루어진 것으로서, 공원 비탈면에 설치 후 그 내부에 채움재가 충진되는 것을 특징으로 하는 공원 비탈면 토사유실방지 구조물.The quadrangular network is formed by communicating the upper and lower portions, the steel wire is made of a combined net structure, park slope surface soil loss prevention structure, characterized in that the filling material is filled therein after installation on the park slope surface. 청구항 1에 있어서,The method according to claim 1, 상기 전방의 제1 및 제2 삽입봉과, 후방의 제1 및 제2 삽입봉, 그리고 상기 전후방 제1 및 제2 삽입봉에 각각의 모서리부가 끼워져 설치되는 사각망체가, 공원 의 비탈면을 따라 상부 및 하부에 설치되되, 우수의 배출을 용이하게 하기 위하여 공원의 비탈면 상부 및 하부에서 지그재그 형태로 설치되는 것을 특징으로 하는 공원 비탈면 토사유실방지 구조물.The first and second insertion rods at the front, the first and second insertion rods at the rear, and the rectangular nets, each of which has corner portions fitted to the front and rear first and second insertion rods, are arranged along the slope of the park. It is installed in the lower portion, the slope slope prevention structure of the park slope, characterized in that installed in a zigzag form on the upper and lower slopes of the park to facilitate the discharge of rain.
KR1020060099819A 2006-10-13 2006-10-13 Protecting construction of slope for park KR100671323B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060099819A KR100671323B1 (en) 2006-10-13 2006-10-13 Protecting construction of slope for park

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060099819A KR100671323B1 (en) 2006-10-13 2006-10-13 Protecting construction of slope for park

Publications (1)

Publication Number Publication Date
KR100671323B1 true KR100671323B1 (en) 2007-01-19

Family

ID=38014233

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060099819A KR100671323B1 (en) 2006-10-13 2006-10-13 Protecting construction of slope for park

Country Status (1)

Country Link
KR (1) KR100671323B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1181270A (en) * 1997-09-10 1999-03-26 Tootetsu:Kk Mattress shaped gabion for revetment
KR200279871Y1 (en) 2002-03-06 2002-07-02 (주)일산금속 block for stone mesh bag
KR20060004413A (en) * 2004-07-09 2006-01-12 유성개발(주) Building-up type frame construction kit for riparian works or construction preventing landslide, and pro-environmental construction riparian works thereof
KR200408157Y1 (en) 2005-11-22 2006-02-07 (주)화신엔지니어링 fish inhabitation block fo rivers

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1181270A (en) * 1997-09-10 1999-03-26 Tootetsu:Kk Mattress shaped gabion for revetment
KR200279871Y1 (en) 2002-03-06 2002-07-02 (주)일산금속 block for stone mesh bag
KR20060004413A (en) * 2004-07-09 2006-01-12 유성개발(주) Building-up type frame construction kit for riparian works or construction preventing landslide, and pro-environmental construction riparian works thereof
KR200408157Y1 (en) 2005-11-22 2006-02-07 (주)화신엔지니어링 fish inhabitation block fo rivers

Similar Documents

Publication Publication Date Title
KR101126658B1 (en) Assembly type of structure for drainage and construction method using the same
KR100919759B1 (en) A sparse mat and that of method
KR20200009620A (en) fixing and draining plate assembly for constructing vegetation block
KR101055635B1 (en) The bio-stone structure for protecting slope and the construction method thereof
KR100671323B1 (en) Protecting construction of slope for park
KR100523965B1 (en) Landscape block
KR100458928B1 (en) Reinforced Earth Retaining-Wall for using Steel-Frame and Geogrid
CN212956382U (en) Ecological gabion retaining wall
KR101018903B1 (en) Stabilizing assembly for preventing soil-flow of slope and greening
CN107090759A (en) Two-stage road slope ditch component and two-stage road slope ditch structure
KR100542888B1 (en) Structure of sloped surface
JP4851501B2 (en) Slope collapse prevention structure
KR20060011086A (en) Fixing method of a construction stone and fixing structure of the same for it
CN210288008U (en) Two-stage road slope ditch component and two-stage road slope ditch structure
KR100483967B1 (en) Wire block for reinforcing and protecting the slope
KR100918195B1 (en) Slope reinforcement method
KR100659926B1 (en) The stairway the stabilization reinforcement infrastructure which when it buys
CN217399661U (en) Side slope supporting structure
CN211228447U (en) Grid for preventing and treating water and soil loss
KR100562225B1 (en) Slope construction of building
KR200299545Y1 (en) Mounting structure of concrete reinforcement block of reinforcement soil section for road
KR200354767Y1 (en) Slope safeguard member structure for road
JP5211010B2 (en) Vertical collapse prevention structure
KR920007982Y1 (en) Protecting block of slope
KR100731930B1 (en) Institution for preventing sliding of road&#39;s slope

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
N231 Notification of change of applicant
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130102

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20131224

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20141226

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20151229

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20170105

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20180103

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20191220

Year of fee payment: 14