KR100550457B1 - Execution method of waterproof execution structure of concrete wall - Google Patents

Execution method of waterproof execution structure of concrete wall Download PDF

Info

Publication number
KR100550457B1
KR100550457B1 KR1020050076050A KR20050076050A KR100550457B1 KR 100550457 B1 KR100550457 B1 KR 100550457B1 KR 1020050076050 A KR1020050076050 A KR 1020050076050A KR 20050076050 A KR20050076050 A KR 20050076050A KR 100550457 B1 KR100550457 B1 KR 100550457B1
Authority
KR
South Korea
Prior art keywords
waterproof
plate
construction
heat insulating
concrete
Prior art date
Application number
KR1020050076050A
Other languages
Korean (ko)
Inventor
홍창선
Original Assignee
주식회사 진솔엔지니어링건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 진솔엔지니어링건축사사무소 filed Critical 주식회사 진솔엔지니어링건축사사무소
Priority to KR1020050076050A priority Critical patent/KR100550457B1/en
Application granted granted Critical
Publication of KR100550457B1 publication Critical patent/KR100550457B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/64Insulation or other protection; Elements or use of specified material therefor for making damp-proof; Protection against corrosion
    • E04B1/644Damp-proof courses
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)
  • Finishing Walls (AREA)

Abstract

구조가 간단하고 콘크리트벽에 안정된 고정이 가능하며 콘크리트벽의 시공과 동시에 방수시공구조체를 동시에 시공할 수 있도록 한 콘크리트벽의 방수시공 구조체의 시공방법에 관한 것이다.It is related to the construction method of waterproof construction of concrete wall, which is simple in structure, stable fixing to concrete wall and construction of waterproof wall at the same time as construction of concrete wall.

이 시공방법은 일면에 복수의 매몰돌기(22)가 형성되고 일정간격으로 복수의 결합공(21)이 형성된 고무재질의 방수판(20)과, 일면에 상기 결합공(21)에 결합되고 상기 방수판(20)과 일정간격으로 유지시켜 공기층(60)을 형성시키는 단열판(30)을 준비하여,In this construction method, a plurality of investment projections 22 are formed on one surface and a rubber waterproof plate 20 in which a plurality of coupling holes 21 are formed at a predetermined interval, and the coupling holes 21 are coupled to one surface of the rubber plate 20. By maintaining the waterproof plate 20 and a predetermined interval to prepare a heat insulating plate 30 to form an air layer 60,

상기 방수판(20)의 결합공(21)에 상기 단열판(30)의 스페이서(31)를 결합시킨 후, 상기 단열판(30)의 타면에 거푸집(40)을 밀착시키고, 상기 결합공(21)을 통하여 고정못(50)으로 방수판(20)과 단열판(30) 및 거푸집(40)이 일체로 되도록 고정시킨 후, 상기 방수판(20)과 단열판(30)이 일체화된 거푸집(40)으로 콘크리트 타설을 위한 공간을 형성시키고, 상기 공간에 콘크리트를 타설하여 상기 매몰돌기(22)들이 콘크리트에 매몰되도록 하고, 상기 콘크리트가 양생되어 굳은 후 상기 거푸집(40)을 제거하여서, 상기 방수판(20)과 단열판(30)으로 이루어지는 방수시공 구조체가 상기 콘크리트벽의 시공과 동시에 시공되도록 한다.After coupling the spacer 31 of the heat insulating plate 30 to the coupling hole 21 of the waterproof plate 20, the die 40 is in close contact with the other surface of the heat insulating plate 30, the coupling hole 21 After fixing the waterproof plate 20 and the heat insulating plate 30 and the formwork 40 by the fixing nail 50 to be integrated, the waterproof plate 20 and the heat insulating plate 30 are integrated into the formwork 40. Forming a space for concrete casting, and the concrete is poured in the space so that the investment projections 22 are buried in concrete, and after the concrete is cured and hardened by removing the formwork 40, the waterproof plate 20 ) And a waterproof construction consisting of a heat insulating plate 30 to be constructed at the same time as the construction of the concrete wall.

이와 같은 본 발명은 종래 방수판의 구조가 방수골재를 부직포에 일정간격으로 충진시키고 재봉되는 구조와 같이 복잡한 구조를 가지는 것과는 달리, 본 발명 실시예의 방수시공 구조체는 방수판(20)과 단열판(30)의 간단한 구조로 가능해진다.The present invention, unlike the conventional waterproof plate structure having a complex structure, such as a structure that is filled and sewn a waterproof aggregate in a non-woven fabric at a predetermined interval, the waterproof construction of the embodiment of the present invention is the waterproof plate 20 and the heat insulating plate (30) It is possible with a simple structure.

또한, 방수시공구조체가 콘크리트벽의 시공과 동시에 시공되므로 공기단축을 가능하게 한다.In addition, since the waterproof construction is constructed at the same time as the construction of the concrete wall, it is possible to shorten the air.

콘크리트벽, 방수, 단열, 공기층 Concrete wall, waterproof, insulation, air layer

Description

콘크리트벽의 방수시공 구조체의 시공방법{execution method of waterproof execution structure of concrete wall}Execution method of waterproof execution structure of concrete wall

도 1은 종래 방수구조체를 나타낸 단면도.1 is a cross-sectional view showing a conventional waterproof structure.

도 2는 본 발명 실시예의 방수시공 구조체를 나타낸 분리 사시도,Figure 2 is an exploded perspective view showing a waterproof construction of an embodiment of the present invention,

도 3 내지 도 6은 본 발명 방수시공방법을 설명하는 개략 단면도이다.3 to 6 is a schematic cross-sectional view illustrating the waterproof construction method of the present invention.

* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

20...방수판 30...단열판20.Waterproof plate 30 ... Insulation plate

40...거푸집 100...콘크리트벽40 ... formwork 100 ... concrete wall

본 발명은 콘크리트벽의 방수시공 구조체의 시공방법에 관한 것으로서, 특히 구조가 간단하고 콘크리트벽에 안정된 고정이 가능하며 콘크리트벽의 시공과 동시에 방수시공구조체를 동시에 시공할 수 있도록 한 콘크리트벽의 방수시공 구조체의 시공방법에 관한 것이다.The present invention relates to a construction method of a waterproof construction of concrete walls, in particular, the structure is simple, stable fixing to the concrete wall, and the waterproof construction of the concrete wall to be able to construct the waterproof construction structure at the same time as the construction of the concrete wall It relates to a construction method of the structure.

일반적으로 건축물의 콘크리트벽은 외부와 내부의 온도차이에 의해서 결로(結露)현상이 발생된다. 이에 따라서 실내의 벽지 등의 마감재가 물기 등에 의해서 얼룩지거나 훼손되어서 보수가 빈번하게 이루어지고 있다.In general, condensation occurs in concrete walls of buildings due to temperature differences between the exterior and the interior. Accordingly, the finishing material such as wallpaper in the room is stained or damaged by moisture, and the repair is frequently performed.

최근에는 구조물의 표면에 우레탄 고무계나 아크릴 고무계 내지는 클로로프렌 고무계 등의 액상재료를 롤러, 솔 또는 분무기 등의 공구를 사용하여 덧씌우는 도막방수공법이 널리 이용되고 있다.Recently, the coating film waterproofing method of overlaying a liquid material such as urethane rubber, acrylic rubber or chloroprene rubber on the surface of a structure by using a tool such as a roller, brush or sprayer has been widely used.

그러나 이와 같은 도막방수 공법은 그 공사방법이 간단하여 공기가 단축되는 등의 장점을 가지는 반면에, 구조물의 표면과 직접 접촉됨으로써 방수도막의 표면에 여전히 온도차이에 의한 결로현상이 발생되고 있다.However, while the coating film waterproofing method has advantages such as shortening the air due to its simple construction method, condensation phenomenon is still generated due to temperature difference on the surface of the waterproof coating film by being in direct contact with the surface of the structure.

이러한 문제점을 해결하는 종래의 방수구조가 도 1에 도시되어 있다.A conventional waterproof structure that solves this problem is shown in FIG.

이는 구조물(1)의 표면에 방수소재로 이루어진 통기성 방수판(13)을 접합하고, 이 방수판(13)의 상부에 경량충진재(7)를 타설시공하는 구조이다.This is a structure in which a breathable waterproof plate 13 made of a waterproof material is bonded to the surface of the structure 1, and the lightweight filler 7 is poured on top of the waterproof plate 13.

즉, 방수골재(17)가 충진된 상하부직포(15)를 격자형으로 재봉하여 통기성 방수판(13)이 주름진 매트 구조를 이루도록 한 것이다. 이에 따라 통기성 방수판(13)의 저부는 일정간격으로 연속되는 골(14)을 갖게 되어 공기통로(16)가 형성되게 된다.That is, the upper and lower nonwoven fabric 15 filled with the waterproof aggregate 17 is sewn in a lattice shape so that the breathable waterproof plate 13 forms a corrugated mat structure. Accordingly, the bottom of the breathable waterproof plate 13 has a valley 14 that is continuous at a predetermined interval so that the air passage 16 is formed.

이와 같은 구조는 방수시공 후에 구조물과 방수층 사이에 공기통로가 형성됨으로써 결로현상이 발생치 않게 되므로 결로현상으로 인한 구조물의 훼손 및 누수문제를 해결할 수 있게 한다.Such a structure prevents condensation from occurring due to the formation of an air passage between the structure and the waterproof layer after waterproofing, thereby solving the problem of damage and leakage of the structure due to condensation.

그러나 상기와 같은 방수구조는 구조물을 시공한 후에 별도로 시공함으로써 공사기간의 단축에 불리하다.However, the waterproof structure as described above is disadvantageous in shortening the construction period by constructing separately after constructing the structure.

또한, 공기통로 형성을 위하여 부직포에 방수골재를 충진하고 이를 재봉하는 작업등 방수판(13)의 제작작업이 번거롭다.In addition, it is cumbersome to produce a waterproof plate 13 such as filling the waterproof aggregate in the nonwoven fabric and sewing it to form the air passage.

또한, 구조물(1)의 표면과 방수판(13)이 어떠한 접착재에 의하지 아니하고 단지 그 외측에 시공되는 경량충진재(7)에 의해서 구조물(1)의 표면에 유지되므로 외부의 약한 충격에 의해서도 방수판(13)이 탈락되는 문제점이 있다.In addition, since the surface of the structure 1 and the waterproof plate 13 are maintained on the surface of the structure 1 by means of a lightweight filler 7 which is constructed outside only without any adhesive material, the waterproof plate is also affected by a weak external impact. There is a problem that (13) is eliminated.

본 발명은 상기와 같은 문제점을 해결하기 위하여 창출된 것으로서, 공기(工期)가 대폭 단축되고 콘크리트벽에 안정되게 유지가능하며 콘크리트벽의 시공과 동시에 시공 가능하도록 한 콘크리트벽의 방수시공 구조체의 시공방법을 제공하는 데 그 목적이 있다.The present invention was created in order to solve the above problems, the method of construction of a waterproof construction of a concrete wall, which allows the air is greatly shortened and can be stably maintained on the concrete wall and at the same time the construction of the concrete wall The purpose is to provide.

본 발명의 다른 목적은 단열효과가 증진된 방수시공구조체의 시공방법을 제공하는데 있다. It is another object of the present invention to provide a method for constructing a waterproof construction having an enhanced thermal insulation effect.

상기 목적을 달성하는 본 발명은 콘크리트벽의 실외와 실내측의 온도차에 의해서 실내측의 벽면에 발생되는 결로를 방지하기 위하여 콘크리트벽의 실내측 벽면에 방수시공 구조체를 시공하는 시공방법에 있어서,In the present invention to achieve the above object in the construction method for constructing a waterproof construction structure on the interior wall surface of the concrete wall in order to prevent condensation generated on the wall surface of the interior by the temperature difference between the outdoor and the indoor side of the concrete wall,

삭제delete

삭제delete

삭제delete

삭제delete

일면에 복수의 매몰돌기가 형성되고 일정간격으로 복수의 결합공이 형성된 고무재질의 방수판과, 일면에 상기 결합공에 결합되고 상기 방수판과 일정간격으로 유지시켜 공기층을 형성시키는 단열판을 준비하여,Preparing a waterproof plate of a rubber material formed with a plurality of investment projections on one surface and a plurality of coupling holes at a predetermined interval, and a heat insulating plate coupled to the coupling hole on one surface and maintained at a predetermined interval with the waterproof plate to form an air layer,

상기 방수판의 결합공에 상기 단열판의 스페이서를 결합시킨 후, 상기 단열판의 타면에 거푸집을 밀착시키고, 상기 결합공을 통하여 고정못으로 방수판과 단열판 및 거푸집이 일체로 되도록 고정시킨 후,After coupling the spacer of the heat insulating plate to the coupling hole of the waterproof plate, the formwork is in close contact with the other surface of the heat insulating plate, and through the coupling hole to fix the waterproof plate, the heat insulating plate and the form to be integral,

상기 방수판과 단열판이 일체화된 거푸집으로 콘크리트 타설을 위한 공간을 형성시키고,Forming a space for concrete pouring into the formwork in which the waterproof plate and the insulation plate are integrated,

상기 공간에 콘크리트를 타설하여 상기 매몰돌기(22)들이 콘크리트에 매몰되도록 하고,Placing concrete in the space so that the investment projections 22 are buried in concrete,

상기 콘크리트가 양생되어 굳은 후 상기 거푸집을 제거하여서,By removing the formwork after the concrete is cured and hardened,

상기 방수판과 단열판으로 이루어지는 방수시공 구조체가 상기 콘크리트벽의 시공과 동시에 시공되도록 하는 것을 특징으로 한다.The waterproof construction consisting of the waterproof plate and the heat insulating plate is characterized in that the construction at the same time as the construction of the concrete wall.

이하 첨부된 도면을 참조하면서 본 발명에 따른 바람직한 실시예를 상세 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

본 발명 실시예의 방수시공 구조체는 콘크리트벽의 실외와 실내측의 온도차에 의해서 실내측의 벽면에 발생되는 결로를 방지하기 위하여 콘크리트벽의 실내측 벽면에 시공되는 것으로서, 콘크리트벽에 안정적으로 부착되고 간단한 구조로 콘크리트벽에 발생된 결로(結露)에 의한 마감재의 얼룩짐 등 훼손을 방지할 수 있게 한다. Waterproof construction of the embodiment of the present invention is to be installed on the interior wall of the concrete wall to prevent condensation generated on the interior wall by the temperature difference between the outdoor and the indoor side of the concrete wall, it is stably attached to the concrete wall and simple As a structure, it is possible to prevent damage such as staining of the finishing material due to condensation generated on the concrete wall.

또한, 방수시공 구조체의 시공방법은 콘크리트벽의 시공과 동시에 시공가능하게 함으로써 공사기간을 대폭 단축시킨다.In addition, the construction method of the waterproof construction structure significantly shortens the construction period by enabling construction at the same time as the construction of the concrete wall.

본 발명 실시예의 방수시공 구조체 및 이의 시공상태를 나타낸 도 2 및 도 6을 참조하면, 이는 일면에 상기 콘크리트벽(100)에 일정간격으로 매몰되는 복수의 매몰돌기(22)가 형성되고 일정간격으로 복수의 결합공(21)이 형성된 고무재질의 방수판(20)과, 일면에 상기 결합공(21)에 결합되고 상기 방수판(20)과 일정간격으로 유지시켜 공기층(60)을 형성시키는 단열판(30)과, 상기 방수판(20)과 상기 단열판(30)을 고정유지시키는 고정못(50)을 구비한 구조를 가진다.Referring to Figures 2 and 6 showing the waterproof construction and the construction state of the embodiment of the present invention, which is formed with a plurality of investment projections 22 are buried at a predetermined interval on the concrete wall 100 on one surface and at a predetermined interval Rubber plate waterproof plate 20 formed with a plurality of coupling holes 21, and a heat insulating plate coupled to the coupling hole 21 on one surface and maintained at a predetermined interval with the waterproof plate 20 to form an air layer 60 30 and a fixing nail 50 for fixing and holding the waterproof plate 20 and the heat insulating plate 30.

이와 같은 구조의 방수시공 구조체는 방수판(20)의 매몰돌기(22)에 의해서 콘크리트벽(100)에 안정적으로 고정된다.The waterproof construction structure of this structure is stably fixed to the concrete wall 100 by the investment projection 22 of the waterproof plate (20).

또한, 방수판(20)과 단열판(30)이 스페이서(31)에 의해서 공기층(60)이 형성되는 구조를 가짐으로써, 콘크리트벽(100)의 내벽면에 결로가 발생됨에도 불구하고 단열판(30)에는 결로의 영향이 미치지 아니하므로 벽지(미도시) 등의 훼손을 방지할 수 있게 한다.In addition, the waterproof plate 20 and the heat insulating plate 30 has a structure in which the air layer 60 is formed by the spacer 31, despite the condensation generated on the inner wall surface of the concrete wall 100, the heat insulating plate 30 Since it does not affect the condensation, it is possible to prevent damage such as wallpaper (not shown).

또한, 종래 방수판의 구조가 방수골재를 부직포에 일정간격으로 충진시키고 재봉되는 구조와 같이 복잡한 구조를 가지는 것과는 달리, 본 발명 실시예의 방수시공 구조체는 방수판(20)과 단열판(30)의 간단한 구조로 가능해진다.In addition, unlike the structure of the conventional waterproof plate has a complex structure, such as a structure that is filled with a waterproof aggregate in a non-woven fabric at a predetermined interval, the waterproof construction structure of the embodiment of the present invention is a simple of the waterproof plate 20 and the heat insulating plate 30 It becomes possible with structure.

또한, 방수판(20)과 단열판(30) 사이에 공기층(60)이 형성됨으로써 단열효과가 증진된다.In addition, since the air layer 60 is formed between the waterproof plate 20 and the heat insulating plate 30, the heat insulating effect is enhanced.

한편, 본 발명 실시예의 방수시공 구조체를 시공하는 방법은 다음과 같다.On the other hand, the method of constructing the waterproof construction of the embodiment of the present invention is as follows.

먼저, 일면에 복수의 매몰돌기(22)가 형성되고 일정간격으로 복수의 결합공(21)이 형성된 고무재질의 방수판(20)과, 일면에 상기 결합공(21)에 결합되고 상기 방수판(20)과 일정간격으로 유지시켜 공기층(60)을 형성시키는 단열판(30)을 준비한다.First, a plurality of investment projections 22 are formed on one surface and a waterproof plate 20 made of rubber material having a plurality of coupling holes 21 formed at predetermined intervals, and the coupling hole 21 is coupled to one surface of the waterproof plate. It is prepared to maintain the insulating plate 30 to form an air layer 60 by maintaining a constant interval with the (20).

이어서 도 3에 도시된 바와 같이, 상기 방수판(20)의 결합공(21)에 상기 단열판(30)의 스페이서(31)를 결합시킨 후, 상기 단열판(30)의 타면에 거푸집(40)을 밀착시키고, 상기 결합공(21)을 통하여 고정못(50)으로 방수판(20)과 단열 판(30) 및 거푸집(40)이 일체로 되도록 고정시킨다.Subsequently, as shown in FIG. 3, after coupling the spacer 31 of the heat insulating plate 30 to the coupling hole 21 of the waterproof plate 20, the mold 40 is formed on the other surface of the heat insulating plate 30. In close contact with the fixing hole 50, the waterproof plate 20, the heat insulation plate 30, and the formwork 40 are fixed to each other through the coupling hole 21.

이어서 상기 방수판(20)과 단열판(30)이 일체화된 거푸집(40)으로 콘크리트 타설을 위한 공간을 형성시킨다.Subsequently, a space for placing concrete is formed by the formwork 40 in which the waterproof plate 20 and the heat insulation plate 30 are integrated.

이때 상기 공간에 콘크리트를 타설하게 되면 도 4에 도시된 바와 같이 상기 매몰돌기(22)들이 콘크리트에 매몰된다.At this time, when the concrete is poured into the space, the investment projections 22 are embedded in the concrete as shown in FIG.

상기 콘크리트가 양생되어 굳은 후 도 5에 도시된 바와 같이 상기 거푸집(40)을 제거하고, 도 6에 도시된 바와 같이 돌출된 고정못(50)을 잘라내어 마무리한다.After the concrete is cured and hardened, the mold 40 is removed as shown in FIG. 5, and the protruding fixing nail 50 is cut and finished as shown in FIG. 6.

이와 같은 시공방법은 상기 방수판(20)과 단열판(30)으로 이루어지는 방수시공 구조체가 상기 콘크리트벽(100)의 시공과 동시에 시공되도록 한다.Such a construction method is such that the waterproof construction consisting of the waterproof plate 20 and the heat insulating plate 30 is constructed at the same time as the construction of the concrete wall 100.

상술한 바와 같은 본 발명은 다음과 같은 이점을 가진다.The present invention as described above has the following advantages.

첫째, 방수판(20)의 매몰돌기(22)에 의해서 콘크리트벽(100)에 안정적으로 고정됨으로써, 종래 방수판이 구조물 표면에 별도의 부착재없이 시공된 것과는 달리 안정된 시공을 가능하게 한다.First, it is stably fixed to the concrete wall 100 by the investment projection 22 of the waterproof plate 20, thereby allowing a stable construction unlike the conventional waterproof plate is constructed without a separate attachment to the structure surface.

둘째, 방수판(20)과 단열판(30)이 스페이서(31)에 의해서 공기층(60)이 형성되는 구조를 가짐으로써, 콘크리트벽(100)의 내벽면에 결로가 발생됨에도 불구하고 단열판(30)에는 결로의 영향이 미치지 아니하므로 벽지(미도시) 등의 훼 손을 방지할 수 있게 한다.Second, the waterproof plate 20 and the heat insulating plate 30 has a structure in which the air layer 60 is formed by the spacer 31, despite the condensation generated on the inner wall surface of the concrete wall 100, the heat insulating plate 30 Since it does not affect the condensation, it is possible to prevent damage such as wallpaper (not shown).

셋째, 종래 방수판의 구조가 방수골재를 부직포에 일정간격으로 충진시키고 재봉되는 구조와 같이 복잡한 구조를 가지는 것과는 달리, 본 발명 실시예의 방수시공 구조체는 방수판(20)과 단열판(30)의 간단한 구조로 가능해진다.Third, unlike the structure of the conventional waterproof plate has a complex structure, such as the structure of filling the waterproof aggregate at a certain interval to the nonwoven fabric and sewn, the waterproof construction of the embodiment of the present invention is a simple of the waterproof plate 20 and the heat insulating plate 30 It becomes possible with structure.

넷째, 방수시공구조체가 콘크리트벽의 시공과 동시에 시공되므로 공기단축을 가능하게 한다.Fourth, since the waterproof construction is constructed at the same time as the construction of the concrete wall, it is possible to shorten the air.

다섯째, 또한, 방수판(20)과 단열판(30) 사이에 공기층(60)이 형성됨으로써 단열효과가 증진된다.Fifth, the heat insulating effect is enhanced by forming an air layer 60 between the waterproof plate 20 and the heat insulating plate 30.

Claims (2)

삭제delete 콘크리트벽의 실외와 실내측의 온도차에 의해서 실내측의 벽면에 발생되는 결로를 방지하기 위하여 콘크리트벽의 실내측 벽면에 방수시공 구조체를 시공하는 시공방법에 있어서,In the construction method of constructing a waterproof construction structure on the interior wall of the concrete wall to prevent condensation generated on the interior wall by the temperature difference between the outdoor and indoor side of the concrete wall, 일면에 복수의 매몰돌기(22)가 형성되고 일정간격으로 복수의 결합공(21)이 형성된 고무재질의 방수판(20)과, 일 면에 상기 결합공(21)에 결합되고 상기 방수판(20)과 일정간격으로 유지시켜 공기층(60)을 형성시키는 단열판(30)을 준비하여,A plurality of investment projections 22 are formed on one surface and a rubber waterproof plate 20 having a plurality of coupling holes 21 formed at predetermined intervals, and the coupling hole 21 is coupled to one surface of the waterproof plate ( 20) to prepare a heat insulating plate 30 to maintain a predetermined interval to form an air layer 60, 상기 방수판(20)의 결합공(21)에 상기 단열판(30)의 스페이서(31)를 결합시킨 후, 상기 단열판(30)의 타면에 거푸집(40)을 밀착시키고, 상기 결합공(21)을 통하여 고정못(50)으로 방수판(20)과 단열판(30) 및 거푸집(40)이 일체로 되도록 고정시킨 후,After coupling the spacer 31 of the heat insulating plate 30 to the coupling hole 21 of the waterproof plate 20, the die 40 is in close contact with the other surface of the heat insulating plate 30, the coupling hole 21 After fixing the waterproof plate 20 and the heat insulating plate 30 and the formwork 40 through the fixing nail 50 to be integrated, 상기 방수판(20)과 단열판(30)이 일체화된 거푸집(40)으로 콘크리트 타설을 위한 공간을 형성시키고,Forming a space for concrete pouring into the formwork 40 in which the waterproof plate 20 and the heat insulating plate 30 are integrated, 상기 공간에 콘크리트를 타설하여 상기 매몰돌기(22)들이 콘크리트에 매몰되도록 하고,Placing concrete in the space so that the investment projections 22 are buried in concrete, 상기 콘크리트가 양생되어 굳은 후 상기 거푸집(40)을 제거하여서,By removing the formwork 40 after the concrete is cured and hardened, 상기 방수판(20)과 단열판(30)으로 이루어지는 방수시공 구조체가 상기 콘크리트벽의 시공과 동시에 시공되도록 하는 것을 특징으로 하는 콘크리트벽의 방수시공 구조체의 시공방법.Construction method of the waterproof construction of the concrete wall, characterized in that the waterproof construction consisting of the waterproof plate 20 and the heat insulating plate 30 to be installed at the same time as the construction of the concrete wall.
KR1020050076050A 2005-08-19 2005-08-19 Execution method of waterproof execution structure of concrete wall KR100550457B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050076050A KR100550457B1 (en) 2005-08-19 2005-08-19 Execution method of waterproof execution structure of concrete wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050076050A KR100550457B1 (en) 2005-08-19 2005-08-19 Execution method of waterproof execution structure of concrete wall

Publications (1)

Publication Number Publication Date
KR100550457B1 true KR100550457B1 (en) 2006-02-08

Family

ID=37178717

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050076050A KR100550457B1 (en) 2005-08-19 2005-08-19 Execution method of waterproof execution structure of concrete wall

Country Status (1)

Country Link
KR (1) KR100550457B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105986658A (en) * 2015-03-20 2016-10-05 侑精产业株式会社 Waterproof protective structure of building structures

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105986658A (en) * 2015-03-20 2016-10-05 侑精产业株式会社 Waterproof protective structure of building structures

Similar Documents

Publication Publication Date Title
TWI418690B (en) Composite panel for rooftop surface and method of making the same
JP4273766B2 (en) Form unit for construction of concrete building, manufacturing apparatus therefor, and method for construction of concrete building
KR101928041B1 (en) Construction method of building structure using exterior insulation material wall module
KR100550457B1 (en) Execution method of waterproof execution structure of concrete wall
KR101311880B1 (en) Prefabricating wall shaped mold unit and manufacturing method thereof
KR101061241B1 (en) Multi-functional board and structures for waterproof and afforestation of rooftop using the same
KR101275273B1 (en) apparatus for draining subsurface water
JP6166593B2 (en) Formwork panel for concrete and method for curing concrete
KR101326242B1 (en) Heat insulating and waterproofing method for the ground floor or basement of building
KR101140809B1 (en) Tile attaching panel for bathroom
JP4672444B2 (en) Waterproof pan for renovation
KR101555260B1 (en) Clearance insulating materials using heat insulation method of window frame for warm house construction
KR20060106785A (en) Mount method of heat insulation wall of indoor forappartment house
JP6667805B2 (en) Concrete formwork
KR100542380B1 (en) Structure of Expansion Joint Filler for Concrete Slab, and Method for Carrying Out Thereof
KR102008627B1 (en) Insulating material attached to outer wall of apartment to prevent dew condensation and attach a covering material to the same, and exterior insulation wall construction method using the same
KR102573166B1 (en) Functional tile construction method
JP6426784B2 (en) Concrete formwork panel
KR102387380B1 (en) Floor system for bathroom
JP3686346B2 (en) Outer insulation structure and construction method
KR102575096B1 (en) Functional tile construction method
KR102199755B1 (en) Insulation panel for building and manufacturing method of the same that
KR200428841Y1 (en) a mold of building outer wall
KR101252808B1 (en) Waterproof system
KR200364366Y1 (en) The interior and exterior for using architecture

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130214

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20131209

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20141215

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20160126

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20161125

Year of fee payment: 12

LAPS Lapse due to unpaid annual fee