KR100533860B1 - Belt sheet supply apparatus of greentire - Google Patents

Belt sheet supply apparatus of greentire Download PDF

Info

Publication number
KR100533860B1
KR100533860B1 KR10-2004-0022312A KR20040022312A KR100533860B1 KR 100533860 B1 KR100533860 B1 KR 100533860B1 KR 20040022312 A KR20040022312 A KR 20040022312A KR 100533860 B1 KR100533860 B1 KR 100533860B1
Authority
KR
South Korea
Prior art keywords
belt
reinforcement
forming drum
drum
supply
Prior art date
Application number
KR10-2004-0022312A
Other languages
Korean (ko)
Other versions
KR20050097199A (en
Inventor
정선종
Original Assignee
한국타이어 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국타이어 주식회사 filed Critical 한국타이어 주식회사
Priority to KR10-2004-0022312A priority Critical patent/KR100533860B1/en
Publication of KR20050097199A publication Critical patent/KR20050097199A/en
Application granted granted Critical
Publication of KR100533860B1 publication Critical patent/KR100533860B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29DPRODUCING PARTICULAR ARTICLES FROM PLASTICS OR FROM SUBSTANCES IN A PLASTIC STATE
    • B29D30/00Producing pneumatic or solid tyres or parts thereof
    • B29D30/06Pneumatic tyres or parts thereof (e.g. produced by casting, moulding, compression moulding, injection moulding, centrifugal casting)
    • B29D30/38Textile inserts, e.g. cord or canvas layers, for tyres; Treatment of inserts prior to building the tyre
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29DPRODUCING PARTICULAR ARTICLES FROM PLASTICS OR FROM SUBSTANCES IN A PLASTIC STATE
    • B29D30/00Producing pneumatic or solid tyres or parts thereof
    • B29D30/06Pneumatic tyres or parts thereof (e.g. produced by casting, moulding, compression moulding, injection moulding, centrifugal casting)
    • B29D30/08Building tyres
    • B29D30/20Building tyres by the flat-tyre method, i.e. building on cylindrical drums
    • B29D30/24Drums
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29DPRODUCING PARTICULAR ARTICLES FROM PLASTICS OR FROM SUBSTANCES IN A PLASTIC STATE
    • B29D30/00Producing pneumatic or solid tyres or parts thereof
    • B29D30/06Pneumatic tyres or parts thereof (e.g. produced by casting, moulding, compression moulding, injection moulding, centrifugal casting)
    • B29D30/38Textile inserts, e.g. cord or canvas layers, for tyres; Treatment of inserts prior to building the tyre
    • B29D2030/385Textile inserts, e.g. cord or canvas layers, for tyres; Treatment of inserts prior to building the tyre made by winding and joining a continuous reinforced rubber band onto a mandrel, to obtain a tubular article as an intermediate element in the manufacture of the insert

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Tyre Moulding (AREA)

Abstract

본 발명은 차량용 타이어 제조시 그린타이어 혹은 비 가황처리 타이어의 벨트 보강재를 벨트 성형드럼에 공급하는 장치로서, 특히 공급되는 벨트 보강재의 센터링, 길이 측정 및 절단 등이 정확하게 수행되면서 이 벨트 보강재를 벨트 성형드럼에 자동 스플라이스(Splice) 작업할 수 있도록 이루어지는 그린타이어의 벨트 보강재 공급장치에 관한 것이다.The present invention is a device for supplying the belt reinforcement of the green tires or non-vulcanized tires to the belt forming drum in the manufacture of vehicle tires, and in particular, the belt reinforcement is belt-formed while centering, measuring and cutting the supplied belt reinforcement accurately The present invention relates to a belt reinforcing material supply device for a green tire configured to automatically splice a drum.

이러한 본 발명은 성형공정에서 그린타이어 또는 비 가황처리 타이어의 벨트 보강재를 벨트 성형드럼에 공급하는 장치에 있어서, 상기 벨트 성형드럼(1)을 기준으로 벨트 보강재(2a,2b)를 공급하는 제 1,2 벨트 보강재 공급부(3a,3b) 들은 상하로 배치되면서 어플리케이터(8,8')가 일정 간격으로 전, 후진 작동이 이루어지고 텍스타일 보강재 공급부(4)는 이 벨트 성형드럼(1)의 수평 센터라인(H) 상에 배치되어 있으며 벨트 성형드럼(1)은 수평이동이 이루어지는 구조로 되어 있다.The present invention is a device for supplying the belt reinforcing material of the green tire or unvulcanized tire to the belt forming drum in the molding process, the first belt supplying the belt reinforcing material (2a, 2b) based on the belt forming drum (1) The belt reinforcement supply parts 3a and 3b are arranged up and down while the applicators 8 and 8 'are moved forward and backward at regular intervals and the textile reinforcement supply part 4 is the horizontal center of the belt forming drum 1. It is arrange | positioned on the line H, and the belt shaping | drum drum 1 has a structure which makes a horizontal movement.

Description

그린타이어의 벨트 보강재 공급장치{BELT SHEET SUPPLY APPARATUS OF GREENTIRE}Green Tire Belt Reinforcement Feeder {BELT SHEET SUPPLY APPARATUS OF GREENTIRE}

본 발명은 차량용 타이어 제조시 그린타이어 혹은 비 가황처리 타이어의 벨트 보강재를 벨트 성형드럼에 공급하는 장치로서, 특히 공급되는 벨트 보강재의 센터링, 길이 측정 및 절단 등이 정확하게 수행되면서 이 벨트 보강재를 벨트 성형드럼에 자동 스플라이스(Splice) 작업할 수 있도록 이루어지는 그린타이어의 벨트 보강재 공급장치에 관한 것이다.The present invention is a device for supplying the belt reinforcement of the green tires or non-vulcanized tires to the belt forming drum in the manufacture of vehicle tires, and in particular, the belt reinforcement is belt-formed while centering, measuring and cutting the supplied belt reinforcement accurately The present invention relates to a belt reinforcing material supply device for a green tire configured to automatically splice a drum.

주지된 바와 같이 차량용 타이어 제조공정 중 성형공정은 타이어에 사용되는 모든 구성 재료를 성형기(Building Machine)에서 순차적으로 붙여서 원통형의 그린타이어를 만드는 작업으로 타이어의 품질을 거의 좌우하는 중요한 공정이라 할 수 있는바, 이러한 성형공정의 작업은 1차 성형기에서 카카스, 비드, 사이드 월을 붙인 다음, 2차 성형기로 옮겨져 일정한 형상으로 포밍(Forming)을 시켜서 그 위에 벨트나 캡 트레드를 붙여서 그린타이어를 완성 시키도록 되어 있다.As is well known, the molding process of the tire manufacturing process for a vehicle is an important process that almost determines the quality of tires by attaching all the constituent materials used for the tires sequentially in a building machine to create a cylindrical green tire. The work of this molding process is to attach carcass, bead, and sidewall in the primary molding machine, and then transfer to the secondary molding machine to form a certain shape, and then attach a belt or cap tread on it to complete the green tire. It is supposed to be.

한편, 상기와 같은 성형공정 중 벨트 보강재를 공급하는 종래 장치는 크게 2가지로 구분되는데, 그 중 도 4(g),(h)로 도시된 벨트 보강재 공급장치는 벨트 성형드럼(101)에 벨트 보강재 공급부(103)가 수직 방향으로 상하 나란히 배치되어 있다.On the other hand, the conventional apparatus for supplying the belt reinforcement in the molding process as described above are largely divided into two, wherein the belt reinforcement supply device shown in Figure 4 (g), (h) is a belt to the belt forming drum 101 The reinforcing material supply part 103 is arrange | positioned up and down in the vertical direction.

즉 첫번째 스틸 벨트 보강재를 공급하는 하부 공급부(103a)는 센터링과 길이측정, 절단이 이송 콘베이어(105) 및 도면에 표기되지 않은 커팅장치와 함께 이루어진다.That is, the lower supply part 103a for supplying the first steel belt reinforcement is made with the conveying conveyor 105 and the cutting device not shown in the figure for the centering, the length measurement, and the cutting.

따라서 길이측정 및 절단이 이루어진 벨트 보강재(102)는 이송 콘베이어(105)에 이미 이루어진 센터링을 이송 콘베이어(105) 내의 마그네틱의 자력에 의해서 유지되며 대기 위치까지 이송된다.Accordingly, the belt reinforcement 102 having the length measurement and the cutting is maintained by the magnetic force of the magnetic in the conveying conveyor 105 and the centering made on the conveying conveyor 105 is transferred to the standby position.

그런 다음 공지의 PLC 제어에 의해 벨트 보강재의 권취 신호를 받으면 어플리케이터(108)가 벨트 성형드럼(101) 측으로 실린더(115)에 의해 전진하게 되는데, 이때 상기 어플리케이터(108)와 벨트 성형드럼(101) 사이에는 귄취를 위한 일정한 간격을 유지하게 되고, 이 간격을 필요에 따라 수동으로 그린타이어의 시방에 의거 조절할 수 있거나 자동으로 모터와 같은 작동부를 이용하여 조절할 수 있도록 되어 있다.Then, when the winding signal of the belt reinforcing material is received by the known PLC control, the applicator 108 is advanced by the cylinder 115 toward the belt forming drum 101, wherein the applicator 108 and the belt forming drum 101 are used. Maintain a constant interval for the odor between, and can be adjusted according to the specification of the green tire manually or if necessary, it can be adjusted automatically using the operating unit, such as a motor.

여기서 상기 벨트 보강재(102)가 이송 콘베이어(105)에서 어플리케이터(108)의 하면으로 이동시 필요한 일정거리가 중요한 요소로 제기 되었다.Here, a certain distance required when the belt reinforcement 102 is moved from the conveying conveyor 105 to the lower surface of the applicator 108 has been raised as an important factor.

이와 같이 첫번째 벨트 보강재(102)가 벨트 성형드럼(101)에 귄취 완료되면, 두번째 벨트 보강재(102)가 상부 공급부(103b)에 의해 앞서 서술한 공급방식과 같이 이 벨트 성형드럼(101)에 권취 완료되는데, 벨트 보강재가 벨트 성형드럼에 모두 권취 완료되면, 그 다음 텍스타일 보강재를 이의 공급부(104)에서 공급하여 권취하게 되었다.When the first belt reinforcement 102 is finished to the belt forming drum 101 in this manner, the second belt reinforcement 102 is wound around the belt forming drum 101 as described above by the upper supply part 103b. When the belt reinforcement was all wound up in the belt forming drum, the textile reinforcement was then supplied from its supply portion 104 to be wound up.

이때 사이 텍스타일 보강재 공급부(104)는 공간제약으로 경사지게 배치되어 벨트 성형드럼(101) 접근시에 제품의 품질 확보를 전제로 속도조절이 어렵고, 또한 접근속도가 늦은 문제점 등이 제기 되어 왔었다.At this time, the textile reinforcement supply unit 104 is disposed to be inclined due to the space constraint, it is difficult to control the speed on the premise of securing the quality of the product when approaching the belt forming drum 101, and the problem has been raised late access speed.

또한 스틸 벨트 보강재의 센터링 유지 정도가 곤란하고, 정확한 이송을 위한 세팅이 어려우며 설비가 복잡하여 제작비의 상승, 설비의 보존의 어려움, 설비 정도 유지의 곤란함도 있었다.In addition, it is difficult to maintain the centering of the steel belt reinforcement, difficult to set up for accurate transfer, and complicated equipment, so that there is an increase in manufacturing cost, difficulty in preserving the equipment, and difficulty in maintaining the equipment.

한편, 도 5(i),(j)는 종래 벨트 보강재를 공급하는 장치의 다른 기술로서, 스틸 벨트 공급부(203)가 벨트 성형드럼(201)에 대하여 나란히 배치되고 이 벨트 성형드럼(201)으로의 접근 및 공급은 하측에서 이루어지도록 되어 있다.5 (i) and (j) show another technique of a device for supplying a conventional belt reinforcement, in which a steel belt supply unit 203 is disposed side by side with respect to the belt forming drum 201, and the belt forming drum 201 is provided. Access and supply are to be made from the lower side.

이러한 종래 벨트 보강재 공급장치는 앞서 설명한 종래 벨트 보강재의 기술과는 별도의 이송 콘베이어 없이 길이 측정과 벨트 성형드럼으로 공급이 하나의 어플리케이터(208)에 의해 이루어지고, 텍스타일 보강재 공급부(204)도 이 벨트 성형드럼(201)의 상부에 위치하는 설비구조의 차이점이 있으나, 이와 같은 종래 벨트 공급장치는 종래 전자인 벨트 보강재 공급장치의 기술보다는 보존과 설비의 제작적 측면에서 유리한 장점을 갖추고 있는데 반하여, 수동으로 어플리케이터(208)와 벨트 성형드럼(201)의 접선각, 즉 높이를 조정해야 하는 문제점이 있었다.This conventional belt reinforcement supply device is provided by a single applicator 208, the length measurement and supply to the belt forming drum without a conveying conveyor separate from the technique of the conventional belt reinforcement described above, the textile reinforcement supply unit 204 is also this belt Although there is a difference in the structure of the equipment located on the upper part of the forming drum 201, such a conventional belt supply device has an advantage in terms of preservation and manufacturing of the equipment, compared to the technology of the conventional belt reinforcement supply device, whereas, As a result, there was a problem in that the tangential angle of the applicator 208 and the belt forming drum 201 must be adjusted.

또한, 벨트 보강재의 컷팅부에서 이송 콘베이어(205)가 타이밍 벨트로 구성되고 그 내부에 전자석이 배열되어 있는데 길이 측정의 완료신호를 받으면, 구동모터(215)가 정지하고 커팅부의 커터가 하강하여 벨트 보강재(202)를 절단하게 된다. 이때 이 벨트 보강재의 유동을 방지하기 위하여 전자석을 작동시키면서 커터가 작동하게 되는데, 이때 이 벨트 보강재를 구성하는 스틸 코드를 커터가 정확하게 절단하지 못하는 문제점도 제기되어 왔다.In addition, at the cutting portion of the belt reinforcement, the conveying conveyor 205 is composed of a timing belt and an electromagnet is arranged therein. Upon receiving the completion signal of the length measurement, the driving motor 215 stops and the cutter of the cutting portion is lowered. The reinforcement 202 is cut. At this time, the cutter is operated while operating the electromagnet to prevent the flow of the belt reinforcement, the problem that the cutter does not cut the steel cord constituting the belt reinforcement accurately.

이에 본 발명은 상기와 같은 종래 문제점을 해결하기 위해 발명된 것으로, 그린타이어 성형을 구성하는 벨트 보강재를 벨트 성형드럼에 공급하기 위하여 센터링을 하면서 이 그린타이어의 시방서에 의거 일정한 길이로 측정 절단 및 이송하여 벨트 성형드럼에 자동으로 공급 및 스플라이스를 실현함에 따라 차량용 그린타이어의 품질을 향상시키고 설비의 최적화로 작업 사이클 타임을 단축할 수 있는 그린타이어의 벨트 보강재 공급장치를 제공함에 그 목적이 있다.Accordingly, the present invention has been invented to solve the conventional problems as described above, while cutting and transporting to a certain length in accordance with the specifications of the green tire while centering to supply the belt reinforcement constituting the green tire molding to the belt forming drum Therefore, the object of the present invention is to provide a belt reinforcement supply device for green tires that can improve the quality of the green tires for vehicles and shorten the work cycle time by optimizing the equipment by automatically supplying and splicing the belt forming drum.

상기와 같은 목적을 달성하기 위한 본 발명은 성형공정에서 그린타이어 또는 비 가황처리 타이어의 벨트 보강재를 벨트 성형드럼에 공급하는 장치에 있어서, 상기 벨트 성형드럼을 기준으로 벨트 보강재를 공급하는 제 1, 2 벨트 보강재 공급부들은 상하로 배치되면서 어플리케이터가 일정 간격으로 전, 후진 작동이 이루어지고 텍스타일 보강재 공급부는 이 벨트 성형드럼의 수평 센터라인 상에 배치되어 있으며 벨트 성형드럼은 수평 이동이 이루어지는 구조로 되어 있다.In order to achieve the above object, the present invention provides a belt reinforcing material of a green tire or a non-vulcanized tire to a belt forming drum in a molding process, comprising: a belt reinforcing material for supplying a belt reinforcing material based on the belt forming drum; 2 Belt reinforcement supply parts are arranged up and down, applicator is moved forward and backward at regular intervals, textile reinforcement supply part is arranged on the horizontal center line of the belt forming drum, the belt forming drum is configured to move horizontally .

이하, 본 발명을 첨부된 예시도면에 의거 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 1(a),(b)는 본 발명에 따른 벨트 보강재 공급장치를 나타낸 전체 측면도와 부분 정면도이고, 도 2(c),(d)는 도 1에서 상측인 제 1 벨트 보강재 공급부의 측면도와 부분 정면도 및, 도 3(e),(f)는 도 1에서 하측인 제 2 벨트 보강재와 텍스타일 보강재 공급부를 나타낸 측면도와 부분 정면도이다.Figure 1 (a), (b) is a full side view and a partial front view showing a belt reinforcement supply apparatus according to the present invention, Figure 2 (c), (d) is a side view of the first belt reinforcement supply portion of the upper side in FIG. 3 (e), (f) are a side view and a partial front view showing a second belt reinforcement and a textile reinforcement supply part which are lower in FIG. 1.

본 발명을 설명하기에 앞서 스틸 벨트 보강재를 제 1, 2로 구분하여 설명하지만, 이는 설명의 이해를 돕기 위해 설명한 순서이지 필요에 따라 벨트 보강재를 공급하는 순서는 이에 한정되지 않고 변경되어 이루어질 수 있음을 미리 밝혀둔다.Prior to describing the present invention, the steel belt reinforcement will be described by dividing it into first and second, but this is the order described to help the understanding of the description, and the order of supplying the belt reinforcement as necessary may be changed without being limited thereto. Reveal in advance.

본 발명은 성형공정에서 그린타이어 또는 비 가황처리 타이어의 벨트 보강재를 벨트 성형드럼에 공급하는 장치에 있어서, 상기 벨트 성형드럼(1)을 기준으로 벨트 보강재(2a,2b)를 공급하는 제 1, 2 벨트 보강재 공급부(3a,3b) 들은 상하로 배치되면서 어플리케이터(8,8')가 일정 간격으로 전, 후진 작동이 이루어지고 텍스타일 보강재 공급부(4)는 이 벨트 성형드럼(1)의 수평 센터라인(H)상에 배치되어 있으며 벨트 성형드럼(1)은 수평이동이 이루어지는 구조로 되어 있다.The present invention provides a belt reinforcing material of a green tire or a non-vulcanized tire in a molding process, wherein the belt reinforcing material (2a, 2b) is supplied based on the belt forming drum (1). 2 Belt reinforcement supply (3a, 3b) is arranged up and down while the applicator (8,8 ') is made to move forward and backward at regular intervals and the textile reinforcement supply (4) is the horizontal centerline of the belt forming drum (1) It is arrange | positioned on (H), and the belt shaping | drum drum 1 has a structure which makes a horizontal movement.

상기와 같은 구조를 갖는 본 발명의 작동을 살펴보면, 먼저 상기 벨트 성형드럼(1)의 상측인 제 1 벨트 보강재 공급부(3a)를 통하여 공급되는 첫번째 스틸 벨트 보강재(2a)의 공급에 대하여 설명한다.Looking at the operation of the present invention having the structure as described above, first the supply of the first steel belt reinforcing material (2a) supplied through the first belt reinforcing material supply portion (3a) of the belt forming drum (1) will be described.

도 2(c),(d)에 도시된 바와 같이 스틸 벨트 보강재(2a)는 롤러로 구성되는 벨트 콘베이어(5)에 위치해 있거나 위치시키고 이때 그린타이어 제조 시방서에 명시된 벨트 보강재의 폭은 이미 정해져 있고 그 폭에 의거 핸들(6)을 조작하면 스틸 보강재에 대하여 수직으로 배치된 가이드 롤러(7)가 보강재의 폭에 맞게 위치하게 된다. As shown in Figs. 2 (c) and (d), the steel belt reinforcement 2a is located or positioned on the belt conveyor 5 consisting of rollers, wherein the width of the belt reinforcement specified in the green tire manufacturing specification is already defined. By operating the handle 6 based on the width, the guide roller 7 disposed perpendicular to the steel reinforcement is positioned in accordance with the width of the reinforcement.

그리고 호스트 컴퓨터에서 길이 측정의 명령을 받으면 보강재를 롤러 콘베이어(5)의 롤러가 회전함으로써 이송하게 되고 스틸 보강재가 어플리케이터(8)에 진입하게 되면, 카메라(9)가 재료의 위치 및 폭을 인식하여 벨트 성형드럼(1)의 센터에 맞는 위치로 센터링을 실시한다. When a length measurement command is made by the host computer, the reinforcement is transferred by rotating the roller of the roller conveyor 5, and when the steel reinforcement enters the applicator 8, the camera 9 recognizes the position and width of the material. Centering is performed at a position corresponding to the center of the belt forming drum (1).

이어 어플리케이터(8)에서의 재료의 위치는 센서부(10)에 의해서 이루어진다.The position of the material in the applicator 8 is then made by the sensor part 10.

길이 측정이 완료되면 스틸 벨트 보강재 절단부(11)가 보강재를 절단하게 되는데 이미 종래 기술에서 언급한 컷팅 불량에 대해서는 이 장치에서는 롤로 구성되고 컷터 받침대가 스틸 보강재(2a)의 각도에 적합한 위치에 위치하며 그 위에 나이프가 컷팅을 실시하게 되는데, 이때 벨트 보강재(2a)가 횡 방향으로 밀릴 수 있으나 약간의 밀림으로 불완전 스틸 보강재의 스틸 코드 각도를 적합하게 코드간의 사이를 경유하여 컷팅이 이루어지고 극단적인 밀림은 가이드 롤러(7)에 의해서 방지된다.When the length measurement is completed, the steel belt reinforcement cut portion 11 cuts the reinforcement. For the cutting defects already mentioned in the prior art, the device consists of a roll, and the cutter stand is positioned at a suitable position for the angle of the steel reinforcement 2a. The knife cuts on it, where the belt reinforcement 2a may be pushed in the transverse direction, but with a slight push, the cut is made between the cords to suit the angle of the steel cord of the incomplete steel reinforcement and between the cords. Is prevented by the guide roller 7.

상기 어플리케이터(8)에 스틸 보강재가 완전하게 위치하게 모터(12)는 계속 구동되고 일정한 길이로 절단된 스틸 보강재는 그 위치를 감지한 센서부(10)를 경유한 다음 일정한 위치에 이미 프로그램화된 거리에 위치하게 된다.The motor 12 continues to be driven so that the steel reinforcement is completely positioned in the applicator 8, and the steel reinforcement cut to a certain length is already programmed at a predetermined position via the sensor unit 10 which detects the position. It is located in the street.

어플리케이터(8)와 벨트 성형드럼(1)간의 접선각을 위한 어플리케이터(8)의 위치는 높이 조절부(13)에 의해서 결정된다. 이 때 이의 위치 조절은 수동 혹은 자동으로 가능하다.The position of the applicator 8 for the tangential angle between the applicator 8 and the belt forming drum 1 is determined by the height adjustment 13. At this time, its position can be adjusted manually or automatically.

스틸 보강재의 권취를 위하여 어플리케이터(8)는 공압 실린더(14)에 의해서 성형 드럼으로 전진하게 되고 그 다음에 모터(12)의 구동으로 스틸 벨트 보강재(2a)가 성형드럼에 권취하게 된다.In order to wind up the steel reinforcement, the applicator 8 is advanced by the pneumatic cylinder 14 to the forming drum, which is then driven by the motor 12 so that the steel belt reinforcement 2a is wound around the forming drum.

여기서 상기 스틸 벨트 보강재(2a)는 롤러 콘베이어(5)에서는 콘베이어의 상측에 위치하고 어플리케이터(8)에서는 하측에 위치하여 이송 및 공급이 이루어지게 된다.Wherein the steel belt reinforcement (2a) is located on the upper side of the conveyor in the roller conveyor (5) is located in the lower side in the applicator (8) is to be transported and supplied.

두번째 벨트 보강재의 공급은 이미 언급한 첫번째 벨트 보강재의 방법과 동일하게 이루어지지만 단지 장치에 있어서는 약간의 차이가 있다.The supply of the second belt reinforcement is done in the same way as the first belt reinforcement already mentioned, but only slightly different in the apparatus.

도 3(e),(f)에 도시된 바와 같이 벨트 성형드럼(1)의 위치에 나란히 배치되고 어플리케이터(8)는 성형드럼의 하측에 위치, 스틸 벨트 보강재(2b)의 벨트 성형드럼(1)으로의 권취가 이루어진다.3 (e) and (f) are arranged side by side at the position of the belt forming drum 1 and the applicator 8 is located below the forming drum, the belt forming drum 1 of the steel belt reinforcing material 2b. Winding) is done.

또한 스틸 벨트 보강재(2b)는 롤러 콘베이어(5')에서와 어플리케이터(8') 공기 각각의 하측에 위치하여 이송 및 공급이 이루어지게 된다.In addition, the steel belt reinforcing material (2b) is located in the roller conveyor (5 ') and the lower side of each of the applicator (8') air is to be transported and supplied.

그 다음에 이 발명 기술에서 텍스타일 공급부(4)는 두번째 벨트 보강재 공급부(3b)의 상측에 벨트 성형드럼(1)의 위치(B)에 대하여 나란히 그리고 측면에서는 벨트 성형드럼(1)의 수평 센터라인(H) 상에 위치하게 된다.The textile supply 4 is then in this invention technique parallel to the position B of the belt forming drum 1 on the upper side of the second belt reinforcement supply 3b and to the horizontal centerline of the belt forming drum 1 on the side. It is located on (H).

그 이외의 작동은 앞서 설명한 첫번째 벨트 보강재 공급부(3a)와 동일하므로 자세한 설명은 생략한다.Since other operations are the same as the first belt reinforcement supply portion 3a described above, detailed description thereof will be omitted.

상기와 같은 본 발명의 그린타이어의 벨트 보강재 공급장치는 그린타이어의 품질 향상이 이루어지면서 설비의 최적화 배치로 제품의 생산 사이클 타임을 단축할 수 있는 잇점 등을 갖추게 된다.The belt reinforcement supply device of the green tire of the present invention as described above has the advantage that the production cycle time of the product can be shortened by the optimized arrangement of the equipment while the quality of the green tire is made.

도 1(a)는 본 발명에 따른 그린타이어의 벨트 보강재 공급장치 전체를 나타낸 측면도,Figure 1 (a) is a side view showing the entire belt reinforcement supply apparatus of the green tire according to the present invention,

도 1(b)는 도 1(a)의 부분 정면도,1 (b) is a partial front view of FIG. 1 (a),

도 2(c),(d)는 본 발명의 상측인 제 1 벨트 보강재 공급부의 측면도와 부분 정면도,Figure 2 (c), (d) is a side view and a partial front view of the first belt reinforcement supply portion of the upper side of the present invention,

도 3(e),(f)는 본 발명의 하측인 제 2 벨트 보강재 공급부의 측면도와 부분 정면도,Figure 3 (e), (f) is a side view and a partial front view of the second belt reinforcement supply portion that is the lower side of the present invention,

도 4(g),(h)는 종래 벨트 보강재 공급장치의 측면도와 부분 정면도,Figure 4 (g), (h) is a side view and a partial front view of a conventional belt reinforcement supply device,

도 5(i),(j)는 종래 다른 벨트 보강재 공급장치의 측면도와 부분 정면도를 나타낸 도면이다.5 (i), (j) is a view showing a side view and a partial front view of another conventional belt reinforcement supply device.

-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing

1 : 벨트 성형드럼, 2a,2b : 벨트 보강재,1: belt forming drum, 2a, 2b: belt reinforcing material,

3a,3b : 벨트 보강재 공급부, 4 : 텍스타일 보강재 공급부,3a, 3b: belt reinforcement supply, 4: textile reinforcement supply,

5 : 롤러 콘베이어, 6 : 핸들,5: roller conveyor, 6: handle,

7 : 가이드 롤러, 8,8': 어플리케이터,7: guide roller, 8,8 ': applicator,

9 : 카메라, 10 : 센서부,9: camera, 10: sensor unit,

11 : 절단부, 12 : 모터,11: cutting part, 12: motor,

13 : 높이 조절부, 14 : 공압 실린더.13: height adjustment part, 14: pneumatic cylinder.

Claims (1)

성형공정에서 그린타이어 또는 비 가황처리 타이어의 벨트 보강재를 벨트 성형드럼에 공급하는 장치에 있어서, In the device for supplying the belt reinforcing material of the green tire or unvulcanized tire in the molding process to the belt forming drum, 상기 벨트 성형드럼(1)을 기준으로 벨트 보강재(2a,2b)를 공급하는 제 1,2 벨트 보강재 공급부(3a,3b) 들은 상하로 배치되면서 어플리케이터(8,8')가 일정 간격으로 전, 후진 작동이 이루어지고 텍스타일 보강재 공급부(4)는 이 벨트 성형드럼(1)의 수평 센터라인(H) 상에 배치되어 수평이동이 이루어지는 구조로 이루어진 것을 특징으로 하는 그린타이어의 벨트 보강재 공급장치.The first and second belt reinforcement supply parts 3a and 3b for supplying the belt reinforcement materials 2a and 2b based on the belt forming drum 1 are arranged up and down while the applicators 8 and 8 'are moved at regular intervals. The belt reinforcement supply device of the green tire, characterized in that the reverse operation is made and the textile reinforcement supply unit (4) is arranged on the horizontal center line (H) of the belt forming drum (1) to perform a horizontal movement.
KR10-2004-0022312A 2004-03-31 2004-03-31 Belt sheet supply apparatus of greentire KR100533860B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2004-0022312A KR100533860B1 (en) 2004-03-31 2004-03-31 Belt sheet supply apparatus of greentire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2004-0022312A KR100533860B1 (en) 2004-03-31 2004-03-31 Belt sheet supply apparatus of greentire

Publications (2)

Publication Number Publication Date
KR20050097199A KR20050097199A (en) 2005-10-07
KR100533860B1 true KR100533860B1 (en) 2005-12-06

Family

ID=37277055

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2004-0022312A KR100533860B1 (en) 2004-03-31 2004-03-31 Belt sheet supply apparatus of greentire

Country Status (1)

Country Link
KR (1) KR100533860B1 (en)

Also Published As

Publication number Publication date
KR20050097199A (en) 2005-10-07

Similar Documents

Publication Publication Date Title
US6979378B2 (en) Tire forming system and tire forming method
US7455002B2 (en) Method for cutting elastomeric materials and the article made by the method
US8561511B2 (en) Anvil with vacuum width adjustment
US20060070504A1 (en) Apparatus for cutting elastomeric materials
EP2978596B1 (en) Process and apparatus for manufacturing tyres for vehicle wheels
US11951703B2 (en) Process and apparatus for building tyres for vehicle wheels
JPS6311140B2 (en)
US5135601A (en) Ply material server apparatus
EP2720858B1 (en) Process and apparatus for building tyres for vehicle wheels
US4552602A (en) High--speed splicing system for preparing ply stock
US4961813A (en) Servicer for tire building machine
KR100533860B1 (en) Belt sheet supply apparatus of greentire
GB2090234A (en) Guiding cut strips along roller centreline during tyre formation
EP0109475B1 (en) Length correcting device for rubber strips in the building of tyres
KR100593036B1 (en) Belt cutting device for tire building machine
JP4544719B2 (en) Method and apparatus for cutting vulcanized tread member
JPH0261384B2 (en)
JP2001232695A (en) Method for molding unvulcanized tire belt
KR100451969B1 (en) Component centering unit for tire building machine
KR101769678B1 (en) Winding device of successively centering tyre-semiproduct
US4913018A (en) Apparatus to cut and align material in a tire building machine
US4933033A (en) Second stage tire building machine and method
JP4605556B2 (en) Retrending method
JP2001232694A (en) Method for molding unvulcanized tire carcass
EP3089931B1 (en) Method for guiding an elongated element for a process for obtaining vehicle wheel tyres and apparatus for obtaining vehicle tyres

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20081031

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20120316

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20141029

Year of fee payment: 12

LAPS Lapse due to unpaid annual fee