KR100530616B1 - Concrete cover mounting structure for safeguard of sea bottom cable - Google Patents

Concrete cover mounting structure for safeguard of sea bottom cable Download PDF

Info

Publication number
KR100530616B1
KR100530616B1 KR10-2003-0075356A KR20030075356A KR100530616B1 KR 100530616 B1 KR100530616 B1 KR 100530616B1 KR 20030075356 A KR20030075356 A KR 20030075356A KR 100530616 B1 KR100530616 B1 KR 100530616B1
Authority
KR
South Korea
Prior art keywords
synthetic
mesh
cover
cable
mat
Prior art date
Application number
KR10-2003-0075356A
Other languages
Korean (ko)
Other versions
KR20050040215A (en
Inventor
조상근
Original Assignee
주식회사 한국종합기술개발공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 한국종합기술개발공사 filed Critical 주식회사 한국종합기술개발공사
Priority to KR10-2003-0075356A priority Critical patent/KR100530616B1/en
Publication of KR20050040215A publication Critical patent/KR20050040215A/en
Application granted granted Critical
Publication of KR100530616B1 publication Critical patent/KR100530616B1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/08Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G9/00Installations of electric cables or lines in or on the ground or water
    • H02G9/02Installations of electric cables or lines in or on the ground or water laid directly in or on the ground, river-bed or sea-bottom; Coverings therefor, e.g. tile

Abstract

본 발명은 해저 케이블 보호를 위한 합성 그물망 콘크리트 덮개에 관한 것으로서, 특히 해저 케이블 덮개를 프리스트레스트 콘크리트 덮개를 이용하여 설치하므로 케이블의 설치시 하자를 예방하도록 하는 해저 케이블 보호용 합성 그물망 콘크리트 덮개 설치구조에 관한 것이다.The present invention relates to a synthetic mesh concrete cover for protecting the submarine cable, and in particular, to install the submarine cable cover using a prestressed concrete cover to the installation structure of the synthetic mesh concrete cover for submarine cable protection to prevent defects when installing the cable will be.

본 발명은, 바다 등과 같은 해저면에 설치되는 케이블에 있어서, 상기 해저면(100)의 상부에 안착되는 합성 매트(150); 상기 합성 매트(150)의 상부에 안착되는 한편, 상부가 라운딩지도록 형성되고, 하부 중앙에 내측으로 요입지게 ㄷ홈부(210)가 형성된 합성 우레탄 덮개(200); 상기 합성 매트(150)의 합성 우레탄 덮개(200)의 사이 ㄷ홈부(210)에 설치되는 케이블(130); 상기 합성 우레탄 덮개(200)의 상부에 일정간격 이격되어 안착되는 한편, 폭 방향 양측에 다수개의 체결 앵커(310)가 형성되고, 그물망 구조로 형성된 합성 그물망(300); 상기 합성 그물망(300)의 체결 앵커(310)에 체결되어 그 합성 그물망(300)을 고정하는 한편, 중앙은 절곡되게 돌출되고, 그 양측에 플랜지부(410)가 형성되며, 그 플랜지부(410)의 내측에 체결 앵커(420)가 형성되어 합성 그물망(300)의 체결 앵커(310)와 체결되고, 중앙 상부에 인양 고리(430)가 형성된 콘크리트 덮개(400); 및 상기 합성 매트(150)와 콘크리트 박스(400)를 해저면(100)에 견고하게 고정시키는 앵커 말뚝(500);으로 구성됨을 특징으로 하는 해저 케이블 보호용 합성 그물망 콘크리트 덮개 설치구조를 제공한다.The present invention, in the cable installed on the sea bottom, such as the sea, synthetic mat 150 which is seated on the top of the sea bottom (100); The synthetic urethane cover 200 is seated on the upper portion of the synthetic mat 150, the upper portion is formed to be rounded, the c groove portion 210 is formed to be recessed inward in the lower center; Cable 130 is installed between the groove portion 210 between the synthetic urethane cover 200 of the synthetic mat 150; The synthetic urethane cover 200 is spaced apart at a predetermined interval on the upper portion, while a plurality of fastening anchors 310 are formed on both sides in the width direction, the synthetic mesh 300 formed of a mesh structure; It is fastened to the fastening anchor 310 of the synthetic mesh 300 to fix the synthetic mesh 300, while the center protrudes bent, the flange portion 410 is formed on both sides thereof, the flange portion 410 Fastening anchor 420 is formed on the inner side of the fastening anchor 310 of the synthetic mesh 300 is fastened, the concrete cover 400 is formed with a lifting ring 430 in the upper center; And an anchor pile 500 for firmly fixing the composite mat 150 and the concrete box 400 to the bottom surface 100. The composite mesh concrete cover installation structure for subsea cable protection is provided.

Description

해저 케이블 보호용 합성 그물망 콘크리트 덮개 설치구조{CONCRETE COVER MOUNTING STRUCTURE FOR SAFEGUARD OF SEA BOTTOM CABLE}CONCRETE COVER MOUNTING STRUCTURE FOR SAFEGUARD OF SEA BOTTOM CABLE}

본 발명은 해저 케이블 보호를 위한 합성 그물망 콘크리트 덮개에 관한 것으로서, 특히 해저 케이블 덮개를 프리스트레스트 콘크리트(PRESTRESSED CONCRETE; P.C) 덮개를 이용하여 설치하므로 케이블의 설치시 하자를 예방하도록 하는 해저 케이블 보호용 합성 그물망 콘크리트 덮개 설치구조에 관한 것이다.The present invention relates to a synthetic mesh concrete cover for protecting the submarine cable, in particular, the submarine cable cover is installed using a prestressed concrete (PRESTRESSED CONCRETE; PC) cover, so that the cable undersea synthetic cable protection for installing the cable to prevent defects It relates to a concrete cover installation structure.

일반적으로 해저에는 전기선, 통신선 및 다양한 종류의 케이블이 설치되므로, 그러한 케이블의 파손을 방지하고 보호할 수 있도록 하는 여러 부재가 설치된다.In general, since electric lines, communication lines and various kinds of cables are installed on the seabed, various members are installed to prevent and protect the breakage of such cables.

그러나, 해저면의 상부에 케이블이 설치되는 경우, 매트가 그 케이블이 설치된 상부에 설치되고, 그 매트를 누름 사석으로 눌러 고정하는 방식으로 마무리하는 경우가 대부분이라 할 수 있다.However, when the cable is installed on the upper part of the sea bottom, the mat is installed on the upper part where the cable is installed, and it can be said that most of the cases are finished by pressing and pressing the mat with pressing stones.

상술한 바와 같이, 상기의 해저면 케이블을 설치시, 그 케이블은, 조류의 유속에 따라 매트와 누름 사석이 파헤쳐지는 경우가 많고, 그로 인하여 해저면 케이블에 대한 파손이 빈번하게 발생되는 단점을 갖는다.As described above, when the above-mentioned bottom cable is installed, the cable has a disadvantage in that the mat and the pushed stone are often dug according to the flow rate of the tidal stream, thereby causing damage to the bottom cable frequently. .

본 발명은 상술한 문제점을 해결하기 위하여, 본 발명은, 합성 우레탄 덮개와 콘크리트 덮개를 이용하여 케이블을 보호함과 아울러, 합성 매트와 콘크리트 덮개를 앵커 말뚝으로 해저면에 견고하게 고정하여 케이블의 파손을 예방함과 아울러, 하자를 방지하도록 하는 해저 케이블 보호용 합성 그물망 콘크리트 덮개 설치구조를 제공함을 그 목적으로 한다.The present invention, in order to solve the above problems, the present invention, while protecting the cable by using a synthetic urethane cover and concrete cover, while fixing the synthetic mat and concrete cover firmly to the bottom surface with anchor piles of the cable breakage The purpose of the present invention is to provide a synthetic mesh concrete cover installation structure for protecting the submarine cable and preventing the defects.

본 발명은 상술한 목적 달성을 위하여, 본 발명은, 바다 등과 같은 해저면에 설치되는 케이블에 있어서, 상기 해저면의 상부에 안착되는 합성 매트; 상기 합성 매트의 상부에 안착되는 한편, 상부가 라운딩지도록 형성되고, 하부 중앙에 내측으로 요입지게 ㄷ홈부가 형성된 합성 우레탄 덮개; 상기 합성 매트의 합성 우레탄 덮개의 사이 ㄷ홈부에 설치되는 케이블; 상기 합성 우레탄 덮개의 상부에 일정간격 이격되어 안착되는 한편, 폭 방향 양측에 다수개의 체결 앵커가 형성되고, 그물망 구조로 형성된 합성 그물망; 상기 합성 그물망의 체결 앵커에 체결되어 그 합성 그물망을 고정하는 한편, 중앙은 절곡되게 돌출되고, 그 양측에 플랜지부가 형성되며, 그 플랜지부의 내측에 체결 앵커가 형성되어 합성 그물망의 체결 앵커와 체결되고, 중앙 상부에 인양 고리가 형성된 콘크리트 덮개; 및 상기 합성 매트와 콘크리트 박스를 해저면에 견고하게 고정시키는 앵커 말뚝;으로 구성됨을 특징으로 하는 해저 케이블 보호용 합성 그물망 콘크리트 덮개 설치구조를 제공한다.The present invention, in order to achieve the above object, the present invention, in the cable installed on the sea bottom, such as the sea, a synthetic mat seated on the top of the sea bottom; A synthetic urethane cover seated on an upper portion of the synthetic mat, the upper portion being rounded, and having a c-groove portion recessed inward at a lower center thereof; A cable installed in the groove portion between the synthetic urethane cover of the synthetic mat; Synthetic net is formed on the upper portion of the synthetic urethane cover spaced apart at a predetermined interval, a plurality of fastening anchors are formed on both sides of the width direction, the mesh structure; It is fastened to the fastening anchor of the synthetic mesh to fix the synthetic net, while the center is bent protruding, the flange portion is formed on both sides, the fastening anchor is formed on the inner side of the flange to fasten with the fastening anchor of the synthetic mesh A concrete cover with a lifting ring formed at the center top; And an anchor pile for firmly fixing the composite mat and the concrete box to the bottom of the seam.

이하, 첨부 도면을 참조하여 본 발명의 구성을 설명한다.EMBODIMENT OF THE INVENTION Hereinafter, the structure of this invention is demonstrated with reference to an accompanying drawing.

도 1은 본 발명의 해저 케이블 보호용 합성 그물망 콘크리트 덮개의 일측 단면을 나타내는 도면이고, 도 2는 본 발명의 해저 케이블 보호용 합성 그물망 콘크리트 덮개의 개략적인 분해 상태를 나타내는 도면이다.1 is a view showing one side cross-section of the synthetic mesh concrete cover for submarine cable protection of the present invention, Figure 2 is a view showing a schematic decomposition state of the synthetic mesh concrete cover for submarine cable protection of the present invention.

바다(S)에는, 해저면(100)에 합성 매트(150)가 안착되고, 그 합성 매트(150)의 상부에 합성 우레탄 덮개(200)가 안착되며, 상기 합성 매트(100)와 합성 우레탄 덮개(200)의 사이에 케이블(130)이 안착된다.In the sea (S), a synthetic mat 150 is seated on the sea bottom 100, a synthetic urethane cover 200 is seated on the upper portion of the synthetic mat 150, the synthetic mat 100 and the synthetic urethane cover The cable 130 is seated between the 200.

상기 합성 우레탄 덮개(200)는, 상부가 라운딩되도록 형성되고, 하부가 평판 형태로 형성됨과 아울러, 하부 중앙이 내측으로 절곡되도록 요입지게 ㄷ홈부(210)가 형성된다.The synthetic urethane cover 200 is formed so that the upper portion is rounded, the lower portion is formed in a flat shape, and the c-groove 210 is formed to be concave so that the lower center thereof is bent inwardly.

한편, 상기 합성 우레탄 덮개(200)에는 상부에 합성 그물망(300)을 내측에 결합하고 있는 콘크리트 덮개(400)가 안착되어 케이블(130)을 보호하게 되며, 상기 합성 매트(150)와 콘크리트 덮개(400)는 앵커 말뚝(500)에 의하여 고정되게 된다.On the other hand, the synthetic urethane cover 200 is a concrete cover 400 that is coupled to the inside of the synthetic mesh 300 on the top is seated to protect the cable 130, the synthetic mat 150 and the concrete cover ( 400 is fixed by the anchor pile 500.

도 3은 본 발명의 해저 케이블 보호용 합성 그물망 콘크리트 덮개의 분해 상태를 상세하게 나타내는 도면으로서, 상기 누름 매트(150)에는, 상부에 케이블 드럼(140)에 감겨진 케이블(130)이 안착되어 설치되고, 상기 케이블(130)에는 상부에 합성 우레탄 덮개(200)가 안착된다.3 is a view showing in detail the disassembled state of the synthetic mesh concrete cover for protecting the submarine cable of the present invention, the pressing mat 150, the cable 130 wound on the cable drum 140 is installed on the upper seat The synthetic urethane cover 200 is seated on the cable 130.

또한, 상기 합성 우레탄 덮개(200)는, ㄷ홈부에 케이블(130)이 삽입되어 설치되는 한편, 상기 합성 그물망(300)은 폭 방향에 체결 앵커(310)가 설치되어 콘크리트 덮개(400)의 하부 내측에 설치된 체결 앵커(420)와 체결되게 된다.In addition, the synthetic urethane cover 200, the cable 130 is inserted into the c groove portion is installed, while the synthetic mesh 300 is a fastening anchor 310 is installed in the width direction of the lower portion of the concrete cover 400 It is fastened to the fastening anchor 420 installed on the inside.

상기 콘크리트 덮개(400)는, 합성 그물망(300)과 유사한 형태로, 중앙이 볼록하게 형성되고, 양측에 플랜지부(410)가 형성되며, 상부에 인양 고리(430)가 형성되고, 그 플랜지부(410)에 다수개의 관통홀(412)이 형성됨과 아울러, 절곡되는 플랜지부(410)의 내측에 체결 앵커(420)가 형성된다.The concrete cover 400, similar to the synthetic mesh 300, the center is convex, the flange portion 410 is formed on both sides, the lifting ring 430 is formed on the upper, the flange portion A plurality of through holes 412 are formed in the 410, and a fastening anchor 420 is formed inside the flange portion 410 that is bent.

상기 콘크리트 덮개(400)의 체결 앵커(420)는, 일측이 오픈(OPEN)되어 있어, 합성 그물망(300)의 체결 앵커(310)와 체결되게 된다.The fastening anchor 420 of the concrete cover 400, one side is open (OPEN), is to be fastened with the fastening anchor 310 of the synthetic mesh 300.

상술한 구성에서 알 수 있듯이, 상기 합성 그물망(300)과 콘크리트 덮개(400)는, 각각의 체결 앵커(310)(420)가 체결되어 결합됨과 아울러, 상기 콘크리트 덮개(400)는, 합성 매트(150)를 관통하며 설치되는 앵커 말뚝(500)에 의하여 해저면(100)에 견고하게 고정된다.As can be seen in the above configuration, the synthetic mesh 300 and the concrete cover 400, the respective fastening anchors 310, 420 are fastened and coupled, and the concrete cover 400, the composite mat ( It is firmly fixed to the bottom surface 100 by the anchor pile 500 is installed penetrating through 150.

특히, 상기 합성 매트(150)에는, 상부에 합성 우레탄 덮개(200)가 안착되어 케이블(130)을 이중으로 보호하는 구조를 이루게 된다.In particular, the synthetic mat 150, the synthetic urethane cover 200 is mounted on the top to form a structure to protect the cable 130 double.

상술한 구성에 의한 본 발명의 구성을 설명한다.The structure of this invention by the structure mentioned above is demonstrated.

본 발명의 합성 그물망과 콘크리트 덮개를 이용한 케이블 보호 구조는, 합성 우레탄 덮개와 콘크리트 덮개가 이중으로 케이블을 보호는 구조로 설치되는 관계로, 케이블의 파손을 최대한 예방할 수 있음은 물론, 해저면 상부에 케이블을 설치하는 경우에도 합성 매트와 콘크리트 덮개가 앵커 말뚝에 의하여 견고하게 고정되므로 케이블이 외부 요인에 의하여 파손되는 일이 거의 없어 하자를 최대한 예방할 수 있는 효과를 갖는다. The cable protection structure using the synthetic mesh and concrete cover of the present invention, since the synthetic urethane cover and the concrete cover is installed in a structure that protects the cable double, as well as can prevent the damage of the cable as much as possible, on the top of the bottom Even when the cable is installed, the synthetic mat and the concrete cover are firmly fixed by the anchor pile, so that the cable is hardly damaged by external factors, thereby preventing the defect as much as possible.

도 1은 본 발명의 해저 케이블 보호용 합성 그물망 콘크리트 덮개의 일측 단면을 나타내는 도면.1 is a view showing one side cross-section of a synthetic mesh concrete cover for protecting the submarine cable of the present invention.

도 2는 본 발명의 해저 케이블 보호용 합성 그물망 콘크리트 덮개의 개략적인 분해 상태를 나타내는 도면.Figure 2 is a view showing a schematic decomposition state of the synthetic mesh concrete cover for protecting the submarine cable of the present invention.

도 3은 본 발명의 해저 케이블 보호용 합성 그물망 콘크리트 덮개의 분해 상태를 상세하게 나타내는 도면.Figure 3 is a view showing in detail the disassembled state of the synthetic mesh concrete cover for submarine cable protection of the present invention.

< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>

100: 해저면 130: 케이블100: bottom 130: cable

150: 합성 매트 200: 합성 우레탄 덮개150: synthetic mat 200: synthetic urethane cover

300: 합성 그물망 400: 콘크리트 덮개300: synthetic mesh 400: concrete cover

500: 앵커 말뚝500: anchor stakes

Claims (1)

바다 등과 같은 해저면에 설치되는 케이블에 있어서, In the cable installed on the sea bottom such as the sea, 상기 해저면(100)의 상부에 안착되는 합성 매트(150); A synthetic mat 150 seated on an upper portion of the sea bottom surface 100; 상기 합성 매트(150)의 상부에 안착되는 한편, 상부가 라운딩지도록 형성되고, 하부 중앙에 내측으로 요입지게 ㄷ홈부(210)가 형성된 합성 우레탄 덮개(200); The synthetic urethane cover 200 is seated on the upper portion of the synthetic mat 150, the upper portion is formed to be rounded, the c groove portion 210 is formed to be recessed inward in the lower center; 상기 합성 매트(150)의 합성 우레탄 덮개(200)의 사이 ㄷ홈부(210)에 설치되는 케이블(130); Cable 130 is installed between the groove portion 210 between the synthetic urethane cover 200 of the synthetic mat 150; 상기 합성 우레탄 덮개(200)의 상부에 일정간격 이격되어 안착되는 한편, 폭 방향 양측에 다수개의 체결 앵커(310)가 형성되고, 그물망 구조로 형성된 합성 그물망(300); The synthetic urethane cover 200 is spaced apart at a predetermined interval on the upper portion, while a plurality of fastening anchors 310 are formed on both sides in the width direction, the synthetic mesh 300 formed of a mesh structure; 상기 합성 그물망(300)의 체결 앵커(310)에 체결되어 그 합성 그물망(300)을 고정하는 한편, 중앙은 절곡되게 돌출되고, 그 양측에 플랜지부(410)가 형성되며, 그 플랜지부(410)의 내측에 체결 앵커(420)가 형성되어 합성 그물망(300)의 체결 앵커(310)와 체결되고, 중앙 상부에 인양 고리(430)가 형성된 콘크리트 덮개(400); 및 It is fastened to the fastening anchor 310 of the synthetic mesh 300 to fix the synthetic mesh 300, while the center protrudes bent, the flange portion 410 is formed on both sides thereof, the flange portion 410 Fastening anchor 420 is formed on the inner side of the fastening anchor 310 of the synthetic mesh 300 is fastened, the concrete cover 400 is formed with a lifting ring 430 in the upper center; And 상기 합성 매트(150)와 콘크리트 박스(400)를 해저면(100)에 견고하게 고정시키는 앵커 말뚝(500);으로 구성됨을 특징으로 하는 해저 케이블 보호용 합성 그물망 콘크리트 덮개 설치구조.A synthetic mesh concrete cover installation structure for submarine cable protection, characterized in that consisting of; anchor pile (500) for firmly fixing the synthetic mat 150 and the concrete box 400 to the bottom surface (100).
KR10-2003-0075356A 2003-10-28 2003-10-28 Concrete cover mounting structure for safeguard of sea bottom cable KR100530616B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2003-0075356A KR100530616B1 (en) 2003-10-28 2003-10-28 Concrete cover mounting structure for safeguard of sea bottom cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2003-0075356A KR100530616B1 (en) 2003-10-28 2003-10-28 Concrete cover mounting structure for safeguard of sea bottom cable

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2003-0033686U Division KR200340962Y1 (en) 2003-10-28 2003-10-28 Concrete cover mounting structure for safeguard of sea bottom cable

Publications (2)

Publication Number Publication Date
KR20050040215A KR20050040215A (en) 2005-05-03
KR100530616B1 true KR100530616B1 (en) 2005-11-23

Family

ID=37242069

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2003-0075356A KR100530616B1 (en) 2003-10-28 2003-10-28 Concrete cover mounting structure for safeguard of sea bottom cable

Country Status (1)

Country Link
KR (1) KR100530616B1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100913814B1 (en) * 2008-09-04 2009-08-26 최성락 Device for protecting submarine high tension cable
KR101271087B1 (en) * 2011-12-15 2013-06-04 한국전력공사 Subsea cable laying device
KR102621830B1 (en) * 2018-07-11 2024-01-08 한국전력공사 Protection Device for Sea Water Cable
CN113937708B (en) * 2021-09-30 2022-11-11 浙江舟山海洋输电研究院有限公司 Submarine cable anchor damage prevention device with protection plate and working method thereof

Also Published As

Publication number Publication date
KR20050040215A (en) 2005-05-03

Similar Documents

Publication Publication Date Title
KR101130148B1 (en) Offshore structure and construction method using the same
US20090126943A1 (en) Cable-Protective Pipe Section, a Method of Protectively Arranging at Least One Cable on the Outside of the Pipe Section and Use of a Device for Protecting the Cable
KR101183080B1 (en) Mattress block for sea-bottom cable protection
JP6616959B2 (en) Laying anti-scouring material
KR100530616B1 (en) Concrete cover mounting structure for safeguard of sea bottom cable
KR101825739B1 (en) Submarine protection block assembly
KR200340962Y1 (en) Concrete cover mounting structure for safeguard of sea bottom cable
KR100913814B1 (en) Device for protecting submarine high tension cable
KR101137560B1 (en) install way of a silt protect using a anchor of arm type
KR100499791B1 (en) Underwater construction mount method of high temsion cable
KR20110004717A (en) The safety fence of balcony
KR101480757B1 (en) Safety structure of submarine cable distribution line
KR100485194B1 (en) Interception device of pollution matter and construction method of it
KR100836016B1 (en) An anchor of the branch type for install the silt potector
KR101499155B1 (en) Undersea cable protective cover
KR0132756Y1 (en) Cable protection covering on the sea-bottom
KR200340961Y1 (en) Jacket anchor block mounting structure for protection of electric cable
KR100481969B1 (en) Ecological embankment construction for river
KR102617305B1 (en) Concrete Mattress for Underwater Cable Protection and Its Construction Method
RU202001U1 (en) Sewer well body
JP4344868B2 (en) Intrusion prevention fence
KR100765454B1 (en) Drain structure for wall outside of a underground building
KR200285830Y1 (en) Digging prevention structure of pier basis using hexagon concrete block and carbon band
KR100511828B1 (en) Underwater construction mount method of cable using netron and concrete cover
KR100794765B1 (en) Apparatus of protecting submarine cable used waste electric pole

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121116

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20131118

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20141118

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20151117

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20161116

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20171114

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20181101

Year of fee payment: 14