KR100515244B1 - Opening valve pressure a testing device for air breather - Google Patents
Opening valve pressure a testing device for air breather Download PDFInfo
- Publication number
- KR100515244B1 KR100515244B1 KR10-2002-0081632A KR20020081632A KR100515244B1 KR 100515244 B1 KR100515244 B1 KR 100515244B1 KR 20020081632 A KR20020081632 A KR 20020081632A KR 100515244 B1 KR100515244 B1 KR 100515244B1
- Authority
- KR
- South Korea
- Prior art keywords
- air
- air breather
- breather
- air supply
- main body
- Prior art date
Links
- 230000003028 elevating effect Effects 0.000 claims description 7
- 238000000034 method Methods 0.000 claims 3
- 230000005540 biological transmission Effects 0.000 description 8
- 238000010586 diagram Methods 0.000 description 2
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M13/00—Testing of machine parts
- G01M13/02—Gearings; Transmission mechanisms
- G01M13/021—Gearings
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N3/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N3/08—Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
- G01N3/10—Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces generated by pneumatic or hydraulic pressure
- G01N3/12—Pressure testing
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
Abstract
본 발명은 에어 브리더용 개변압 시험장치에 관한 것으로서, 에어 브리더의 개변압 시험을 실시할 때 정밀성 및 신뢰도가 향상되도록 한 것이다.The present invention relates to an open pressure test apparatus for an air breather, and to improve precision and reliability when performing the open pressure test of the air breather.
본 발명은 외부의 에어 컴프레셔(2)와 라인(4)을 통해 연결되는 본체(100)와, 상기 본체(100)의 일측에 설치되어 에어 브리더(10)의 캡(12)을 자동적으로 코킹(calking)하는 코킹부재(200)와, 상기 코킹부재(200)의 측부에 설치되어 조작 스위치(6)의 조작에 따라 에어가 공급되는 에어 공급수단(300)과, 상기 본체(100)의 타측 상부에 설치됨과 아울러 에어 공급에 따라 작동되고, 에어브리더(10)를 탑재시키는 탑재부(430)를 포함하는 에어 브리더 승강수단(400)과, 상기 에어 공급수단(300) 및 에어 브리더 승강수단(400)을 자동(반자동/수동)적으로 콘트롤하는 제어기(500)로 이루어진 것이다.The present invention is installed on one side of the main body 100 and the main body 100 is connected to the external air compressor (2) and the line (4) to automatically caulk the cap 12 of the air breather (10) The caulking member 200 to be calking, the air supply means 300 is provided on the side of the caulking member 200 to supply air in accordance with the operation of the operation switch 6, and the other upper portion of the main body 100 Air breather lifting means 400, which is installed in the air supply and is operated according to the air supply, mounting the air breather 10, and the air supply means 300 and the air breather lifting means 400 It consists of a controller 500 that controls automatically (semi-automatic / manual).
Description
본 발명은 에어 브리더용 개변압 시험장치에 관한 것이다.The present invention relates to an open pressure test apparatus for an air breather.
일반적으로 알려진 바와 같이 에어 브리더(Air Breather)는 수동 변속기의 하우징 일측에 설치되어 수동 변속기 내부의 공기압을 조절하기 위한 것으로서, 상기 변속기 내부에 존재하는 변속기어의 회전 마찰력에 의해서 변속기 내부의 온도와 압력이 과도하게 상승될 때 변속기 내부의 에어를 대기중으로 자동 배출시킴으로써 변속기 내부의 과압 현상을 방지하게 되는 것이다.As is generally known, an air breather is installed at one side of a housing of a manual transmission to adjust air pressure inside the manual transmission, and the temperature and pressure inside the transmission are controlled by the rotational frictional force of the transmission gear inside the transmission. When excessively raised, the air inside the transmission is automatically discharged into the atmosphere to prevent overpressure in the transmission.
상기한 에어 브리더는 변속기에 설치된 상태에서 내부 압력에 따라 개폐되면서 그 기능을 수행할 수 있도록 하기 위하여 제품 제작시에 개변압 시험 등을 실시하는 것이다.The air breather is to perform an opening pressure test during the production of the product in order to be able to perform the function while opening and closing according to the internal pressure in the state installed in the transmission.
상기 에어 브리더를 시험할 때 종래에는 수작업 등으로 실시하는 것으로서, 상기 에어 브리더의 캡을 작업자가 직접적으로 눌러 바디 내측의 스프링과 패드가 존재하는지 일차적으로 확인(시험)하고, 상기 캡에 압력을 가할 때 적정 이상의 압력이 소요되는지를 판별함으로써 개변압 시험을 완료하는 것이다.When the air breather is tested, it is conventionally performed by hand or the like, and the operator first presses the cap of the air breather directly to check whether there is a spring and a pad inside the body, and apply pressure to the cap. The open pressure test is completed by determining if a pressure above the proper level is required.
그러나 상기한 에어 브리더 시험은, 작업자가 직접적으로 캡을 누르면서 개변압 시험을 실시하기 때문에 개변압 시험의 정밀성이 저하됨과 아울러 제품의 품질 신뢰도가 현저하게 저하되는 문제점이 있었다.However, the air breather test described above has a problem in that the open pressure test is performed while the operator directly presses the cap, thereby reducing the precision of the open pressure test and significantly lowering the quality reliability of the product.
본 발명은 상기한 문제점을 시정하여, 에어 브리더의 개변압 시험을 실시할 때 정밀성 및 신뢰도가 향상되도록 한 에어 브리더용 개변압 시험장치를 제공하는 것을 목적으로 한다. SUMMARY OF THE INVENTION An object of the present invention is to provide an air breather open pressure test apparatus which corrects the above problems and improves precision and reliability when performing the air pressure breath test.
상기한 목적을 달성하기 위하여, 본 발명은 본체와, 상기 본체의 일측에 설치되는 코킹부재와, 상기 코킹부재의 측부에 설치되는 에어 공급수단과, 상기 본체의 타측 상부에 설치됨과 아울러 에어 공급에 따라 작동되고, 에어브리더를 탑재시키는 탑재부를 포함하는 에어 브리더 승강수단과, 상기 에어 공급수단 및 에어 브리더 승강수단을 콘트롤하는 제어기로 이루어진 것이다.In order to achieve the above object, the present invention, the main body, the caulking member is installed on one side of the main body, the air supply means is installed on the side of the caulking member, and the other side of the main body and the air supply The air breather lifting means including a mounting portion which is operated according to and mounts the air breather, and a controller for controlling the air supply means and the air breather lifting means.
본 발명은 도 1 내지 도 5에 도시한 바와 같이, 외부의 에어 컴프레셔(2)와 라인(4)을 통해 연결되는 본체(100)와, 상기 본체(100)의 일측에 설치되어 에어 브리더(10)의 캡(12)을 자동적으로 코킹(calking)하는 코킹부재(200)와, 상기 코킹부재(200)의 측부에 설치되어 조작 스위치(6)의 조작에 따라 에어가 공급되는 에어 공급수단(300)과, 상기 본체(100)의 타측 상부에 설치됨과 아울러 에어 공급에 따라 작동되고, 에어브리더(10)를 탑재시키는 탑재부(430)를 포함하는 에어 브리더 승강수단(400)과, 상기 에어 공급수단(300) 및 에어 브리더 승강수단(400)을 자동(반자동/수동)적으로 콘트롤하는 제어기(500)로 이루어진 것이다.1 to 5, the main body 100 is connected to an external air compressor 2 through a line 4, and an air breather 10 is installed at one side of the main body 100. Caulking member 200 for automatically caulking the cap 12 of the () and air supply means 300 is installed on the side of the caulking member 200 to supply air in accordance with the operation of the operation switch (6) And an air breather elevating means (400) installed at the other upper portion of the main body (100) and operated according to air supply, and including a mounting portion (430) for mounting the air breather (10). 300 and the air breather lifting means 400 consists of a controller 500 for automatically (semi-automatic / manual) control.
상기 에어 공급수단(300)은 에어 컴프레셔(2)와 연결된 라인(4)에 설치됨과 아울러 공급되는 에어의 가압 속도를 제어하는 미소 유량계(310)와, 상기 미소 유량계(310)의 후미측 라인(4)에 설치되어 가압력의 급상승을 지연하는 서지탱크(320)와, 상기 서지탱크(320)의 후미측 라인(4)에 연결됨과 아울러 본체(100)에 설치되어 에어 브리더(10)로 에어를 공급하는 안착겸 공기 공급부재(330)와, 상기 라인(4)의 특정 지점에 각각 설치되어 공급되는 에어의 압력을 설정 및 조정하는 압력 레귤레이터(340)·제 1 전자밸브(350)·제 2 전자밸브(360)로 이루어진 것이다.The air supply means 300 is installed in the line 4 connected to the air compressor 2 and the micro flow meter 310 for controlling the pressurization rate of the supplied air, and the rear side line of the micro flow meter 310 ( 4) is connected to the rear end line 4 of the surge tank 320 and the surge tank 320 to delay the increase of the pressing force, and is installed in the main body 100 to supply air to the air breather 10. The pressure regulator 340, the first solenoid valve 350, and the second, which set and adjust the pressure of the seating and air supply member 330 to supply and the air supplied and provided in the specific point of the said line 4, respectively. It consists of a solenoid valve 360.
상기 에어 브리더 승강수단(400)은 본체(100)에 고정되는 가이드 부재(410)와, 상기 가이드 부재(410)에 설치되어 안착겸 공기 공급부재(330)와 대향됨과 아울러 상하방향으로 이동하는 승강 작동부재(420)와, 상기 승강 작동부재(420)의 단부에 설치됨과 아울러 에어 브리더(10)가 결합되는 탑재부(430)로 이루어진 것이다.The air breather elevating means 400 is a guide member 410 is fixed to the main body 100, is installed on the guide member 410 is opposed to the seating and air supply member 330, and is moved up and down The operating member 420, and the mounting portion 430 is installed at the end of the lifting operation member 420 and the air breather 10 is coupled.
상기 탑재부(430)는 에어 브리더(10)의 캡(12)이 안내되게 중심 부분에 내부 공간이 형성되는 캡 수용홈(432)과, 상기 캡 수용홈(432)의 하측에 형성되어 에어 브리더(10)의 지지편(14)이 걸림되게 하는 지지편 걸림홈(434)으로 이루어진 것이다.The mounting portion 430 is a cap receiving groove 432, the inner space is formed in the center portion to guide the cap 12 of the air breather 10, and formed on the lower side of the cap receiving groove 432 air breather ( 10 is made of a support piece engaging groove 434 to be locked to the support piece (14).
상기 본체(100)의 후방측에는 제어기(500)의 제어패널(510)이 설치됨과 아울러 상기 제어패널(510)에 연결되게 디지탈 압력 스위치(520)가 설치되고, 상기 제어기(500)의 신호에 따라 작동되게 타이머(530)가 설치되며, 상기 제어기(500)의 신호 및 에어 공급수단(300)과 에어 브리더 승강수단(400)의 작동 상태를 확인할 수 있도록 디스플레이부(540)가 설치되는 것이다.At the rear side of the main body 100, a control panel 510 of the controller 500 is installed, and a digital pressure switch 520 is installed to be connected to the control panel 510, and according to a signal of the controller 500. The timer 530 is installed to operate, and the display unit 540 is installed to check the signal of the controller 500 and the operation state of the air supply means 300 and the air breather lifting means 400.
미설명 부호 16은 에어 브리더(10)의 바디이고, 210은 코킹부재(200)를 작동시키는 액추에이터이다.Reference numeral 16 is a body of the air breather 10, 210 is an actuator for operating the caulking member 200.
이상과 같은 본 발명은 에어 브리더의 개변압 시험을 실시할 때 정밀성 및 신뢰도가 향상되도록 하는 것으로서, 본체(100)의 일측에 코킹부재(200)를 설치하고, 상기 코킹부재(200)의 측부에 에어 공급수단(300)을 설치하며, 상기 에어 공급수단(300)의 안착겸 공기 공급부재(330)와 대향되게 에어 브리더 승강수단(400)을 설치하고, 상기 에어 공급수단(300) 및 에어 브리더 승강수단(400)을 콘트롤할 수 있게 제어기(500)를 설치하는 것이다.The present invention as described above is to improve the precision and reliability when performing the air pressure test of the air breather, the caulking member 200 is installed on one side of the main body 100, the side of the caulking member 200 The air supply means 300 is installed, and the air breather lifting means 400 is installed to face the seating and air supply member 330 of the air supply means 300, and the air supply means 300 and the air breather are installed. The controller 500 is installed to control the lifting means 400.
상기와 같은 상태에서 에어 브리더(10)의 개변압을 시험하기 위해서는 먼저, 코킹부재(200)의 중앙에 에어 브리더(10)의 캡(12)과 바디(16)를 인서트함과 동시에 조작 스위치(6)를 조정하여 캡(12)이 코킹되게 하고, 상기 코킹 처리된 에어 브리더(10)를 탑재부(430)에 결합하는 것이다. 상기 탑재부(430)에 에어 브리더(10)를 결합시킬 때는 탑재부(430)의 캡 수용홈(432) 및 지지편 걸림홈(434)에 에어 브리더(10)의 캡(12)과 지지편(14)을 동시에 인서트시킴으로써 그 결합이 완료되게 하는 것이다.In order to test the opening pressure of the air breather 10 in the above state, first, the cap 12 and the body 16 of the air breather 10 are inserted into the center of the caulking member 200 and the operation switch ( 6) is adjusted so that the cap 12 is caulked, and the caulked air breather 10 is coupled to the mounting part 430. When the air breather 10 is coupled to the mounting part 430, the cap 12 and the support piece 14 of the air breather 10 are connected to the cap receiving groove 432 and the support piece locking groove 434 of the mounting part 430. ) By simultaneously inserting) to complete the joining.
상기한 에어 브리더(10)의 결합 및 탑재 전후에 에어 공급수단(300)과 에어 브리더 승강수단(400) 및 제어기(500) 등을 설정하는 것으로서, 제 1, 2 전자밸브(350,360)를 개방한 후 에어 컴프레셔(2)를 통한 에어가 안착겸 공기 공급부재(330)로 공급되게 하고, 상기 에어를 공급시킬 때 타이머(530)를 통해서 적정 시간 동안 에어를 공급하며, 상기 에어가 공급될 때 디지탈 압력 스위치(520)상에 설정 압력이 형성되게 하는 것이다. 상기 에어를 공급하여 설정 압력이 이루어지면 설정(세팅)을 완료하는 것으로서, 상기 설정을 완료한 후 제 2 전자밸브(360)는 항상 개방을 함과 아울러 제 1 전자밸브(350)를 제어기(500)로 자동 조정하면서 시험 세팅값을 조정하는 것이다. 상기한 설정이 이루어질 때 압력 레귤레이터(340)와 미소 유량계(310) 등을 조정함으로써 에어 공급 및 압력 조정이 간편하게 이루어지는 것이다.The air supply means 300, the air breather lifting means 400, the controller 500, and the like are set before and after coupling and mounting of the air breather 10, and the first and second solenoid valves 350 and 360 are opened. After the air through the air compressor (2) is supplied to the seating and air supply member 330, supplying the air for a suitable time through the timer 530 when supplying the air, digital when the air is supplied The set pressure is formed on the pressure switch 520. When the set pressure is supplied by setting the air, the setting (setting) is completed. After the setting is completed, the second solenoid valve 360 is always open and the first solenoid valve 350 is controlled by the controller 500. To adjust the test settings. When the above setting is made, by adjusting the pressure regulator 340 and the micro flow meter 310 and the like, the air supply and the pressure adjustment are easily performed.
상기 탑재부(430)에 에어 브리더(10)를 결합시킨 후 조작 스위치(6)를 작동시키면, 승강 작동부재(420)가 하향 이동하는 것이고, 상기 승강 작동부재(420)가 하향 이동하여 탑재부(430)에 결합된 에어 브리더(10)의 바디(16) 하단이 안착겸 공기 공급부재(330)에 대응되는 것이며, 상기 안착겸 공기 공급부재(330)에 에어 브리더(10)가 완전하게 안착되면 승강 작동부재(420)의 하향 이동이 정지되는 것이다.When the operation switch 6 is operated after the air breather 10 is coupled to the mounting unit 430, the lifting operation member 420 moves downward, and the lifting operation member 420 moves downward to mount the mounting unit 430. The lower end of the body 16 of the air breather 10 coupled to) corresponds to the seating and air supply member 330, and is lifted when the air breather 10 is completely seated on the seating and air supply member 330. The downward movement of the operation member 420 is stopped.
상기 승강 작동부재(420)의 이동이 정지된 후 안착겸 공기 공급부재(330) 내측으로 공기가 공급되는 것으로서, 상기 안착겸 공기 공급부재(330)로 공급된 공기는 에어 브리더(10)의 바디(16) 내측으로 이동하는 것이고, 상기 바디(16) 내측으로 이동된 공기는 지속적인 공급으로 인해서 내부 압력이 상승되는 것이며, 상기 바디(16) 내측의 압력이 점차적으로 상승되게 됨과 아울러 설정 압력에 도달되면 내부 압력이 저하되는 것이다.After the movement of the elevating operation member 420 is stopped, air is supplied into the seating and air supply member 330, and the air supplied to the seating and air supply member 330 is the body of the air breather 10. (16) to move inward, the air moved into the body (16) is to increase the internal pressure due to the continuous supply, the pressure inside the body (16) gradually rises and reaches the set pressure When the internal pressure is lowered.
상기한 설정 압력에 도달된 후 에어 브리더(10)의 내부 압력이 급격하게 저하되는 경우에는 에어 브리더(10)의 개변압이 적정하게 이루어지는 것이며, 상기 개변압이 적정하게 이루어지면 정상(합격)으로 판정되는 것이다.(상기 판정은 압력 상승이 정지된 상태를 개변으로 함)When the internal pressure of the air breather 10 rapidly decreases after reaching the set pressure, the opening pressure of the air breather 10 is appropriately set. When the opening pressure is appropriately set, it is normal (passed). (The determination is performed by changing the state in which the pressure rise is stopped.)
만약, 상기한 설정 압력에 도달되기 전 및 설정 압력 이상에서 에어 브리더(10)의 내부 압력이 급격하게 저하되는 경우에는 에어 브리더(10)의 개변압이 적정하게 이루어지지 않는 것이며, 상기 개변압이 적정하게 이루어지지 않으면 불량으로 판정되는 것이다.If the internal pressure of the air breather 10 is drastically lowered before reaching the set pressure and above the set pressure, the opening pressure of the air breather 10 is not appropriately achieved. If it is not made properly, it is determined to be defective.
상기 에어 브리더(10)의 내부 압력 저하는 에어 브리더(10)의 캡(12) 내부에 결합된 스프링(미도시)과 패드(미도시)의 반발력이 바디(16) 내측의 공기 압력보다 저하된 경우에 이루어지는 것이며, 상기 바디(16) 내측의 공기 압력이 스프링과 패드의 반발 압력보다 작은 경우에는 바디(16) 내측의 압력이 점차적으로 상승되는 것이다.The internal pressure drop of the air breather 10 is lower than the air pressure inside the body 16 of the spring (not shown) and the pad (not shown) coupled to the inside of the cap 12 of the air breather 10. If the air pressure inside the body 16 is less than the repulsive pressure of the spring and the pad, the pressure inside the body 16 is gradually increased.
상기와 같이 에어 브리더(10)의 개변압 판정을 완료한 후 제어기(500)는 에어 공급수단(300)과 에어 브리더 승강수단(400)을 원래의 상태로 복귀시키는 것으로서, 상기 에어 공급수단(300)의 안착겸 공기 공급부재(330)로 공급하던 에어를 단속하고, 상기 에어 브리더 승강수단(400)의 승강 작동부재(420)를 상승 이동시키는 것이다. 상기 승강 작동부재(420)가 원래의 상태로 복귀한 후 캡 수용홈(432) 및 지지편 걸림홈(434)에 위치된 에어 브리더(10)를 제거한 후 신규 에어 브리더(10)를 수용시켜 상술한 바와 같이 에어 브리더(10)의 개변압 시험을 실시하는 것이다.After completing the opening pressure determination of the air breather 10 as described above, the controller 500 returns the air supply means 300 and the air breather elevating means 400 to their original state, and the air supply means 300. The air supplied to the seating and air supply member 330 of the) is intermittent, and the lifting operation member 420 of the air breather lifting means 400 is moved upward. After the lifting operation member 420 returns to its original state, the air breather 10 located in the cap receiving groove 432 and the support piece engaging groove 434 is removed, and then, the new air breather 10 is accommodated. As described above, the open pressure test of the air breather 10 is performed.
이상과 같이 본 발명은 코킹부재가 설치된 본체에 에어 공급수단을 설치하고, 상기 에어 공급수단의 안착겸 공기 공급부재와 대향되게 에어 브리더 승강수단을 설치하는 것으로서, 안착겸 공기 공급부재와 에어 브리더 승강수단의 승강 작동부재를 통해서 에어 브리더의 개변압을 자동적으로 시험(실시)할 수 있음에 따라 에어 브리더의 정밀성 및 신뢰도가 향상되는 것이다. As described above, the present invention is to provide an air supply means to the main body on which the caulking member is installed, and to install the air breather lifting means opposite to the seating and air supply member of the air supply means, the seating and air supply member and the air breather lifting As the opening pressure of the air breather can be automatically tested (implemented) through the lifting operation member of the means, the precision and reliability of the air breather is improved.
그리고 미소 유량계와 서지탱크 등을 단계적으로 설치함과 아울러 제 1, 2 전자밸브와 안착겸 공기 공급부재를 설치함으로써 안착겸 공기 공급부재를 통해서 에어 브리더로 점차적인 공급 공급 및 개변시의 압력 상태를 정확하게 판별할 수 있는 것이다.In addition, the micro flowmeter and the surge tank are installed in stages, and the first and second solenoid valves and the seating and air supply members are installed to provide a pressure supply for gradually supplying and modifying the air breather through the seating and air supply members. It can be accurately determined.
또한 가이드 부재에 승강 작동부재를 설치함과 아울러 상기 승강 작동부재의 단부에 탑재부를 설치함으로써 에어 브리더의 승강이동이 자동적으로 신속하게 이루어지는 것이고, 상기 탑재부에 캡 수용홈과 지지편 걸림홈을 형성함으로써 에어 브리더의 결합이 적정하게 이루어지는 것이다.In addition, the elevating operation member is installed on the guide member, and the mounting portion is installed at the end of the elevating operation member to automatically move up and down by the air breather. The air breather is properly combined.
도 1은 에어 브리더를 나타낸 사시도,1 is a perspective view showing an air breather,
도 2는 본 발명의 실시예의 사시도,2 is a perspective view of an embodiment of the present invention,
도 3은 본 발명의 실시예의 요부 확대도,3 is an enlarged view illustrating main parts of an embodiment of the present invention;
도 4는 본 발명의 실시예의 작동 상태도,4 is an operating state diagram of an embodiment of the present invention;
도 5는 본 발명의 실시예의 개념도이다.5 is a conceptual diagram of an embodiment of the present invention.
<도면의 주요부분에 사용된 부호의 설명><Description of the code used in the main part of the drawing>
10: 에어 브리더 100: 본체10: air breather 100: main body
200: 코킹부재 300: 에어 공급수단200: caulking member 300: air supply means
310: 미소 유량계 320: 서지탱크310: micro flow meter 320: surge tank
330: 안착겸 공기 공급부재 400: 에어 브리더 승강수단330: seating and air supply member 400: air breather lifting means
410: 가이드 부재 420: 승강 작동부재410: guide member 420: lifting operation member
500: 제어기500: controller
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2002-0081632A KR100515244B1 (en) | 2002-12-20 | 2002-12-20 | Opening valve pressure a testing device for air breather |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2002-0081632A KR100515244B1 (en) | 2002-12-20 | 2002-12-20 | Opening valve pressure a testing device for air breather |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20-2002-0037896U Division KR200306376Y1 (en) | 2002-12-20 | 2002-12-20 | Opening valve pressure a testing device for air breather |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20040055055A KR20040055055A (en) | 2004-06-26 |
KR100515244B1 true KR100515244B1 (en) | 2005-09-20 |
Family
ID=37347793
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-2002-0081632A KR100515244B1 (en) | 2002-12-20 | 2002-12-20 | Opening valve pressure a testing device for air breather |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100515244B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200471117Y1 (en) * | 2013-08-23 | 2014-02-05 | 현대밋숀주식회사 | air breather test apparatus |
KR102130639B1 (en) * | 2019-01-17 | 2020-07-06 | (주)영성테크 | Inspection device for pressure control cap |
-
2002
- 2002-12-20 KR KR10-2002-0081632A patent/KR100515244B1/en active IP Right Grant
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200471117Y1 (en) * | 2013-08-23 | 2014-02-05 | 현대밋숀주식회사 | air breather test apparatus |
KR102130639B1 (en) * | 2019-01-17 | 2020-07-06 | (주)영성테크 | Inspection device for pressure control cap |
Also Published As
Publication number | Publication date |
---|---|
KR20040055055A (en) | 2004-06-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6668639B2 (en) | Plunger assembly having a preset spring force pre-load | |
US8561966B2 (en) | Cam valve | |
KR101151610B1 (en) | A valve tester valve of pressure rice cooker | |
KR100515244B1 (en) | Opening valve pressure a testing device for air breather | |
KR20030071457A (en) | Control valve for compressors and manufacturing method thereof | |
KR200306376Y1 (en) | Opening valve pressure a testing device for air breather | |
CN101116905B (en) | A differential pressure control valve and an anti-gravity casting pressure control method using the valve | |
CN115112365A (en) | Self-closing valve testing device and self-closing valve testing method applied by same | |
CN109738173A (en) | Multifunctional performance testing device | |
CN113447261B (en) | Detection system and detection method for safety valve | |
CN208206416U (en) | A kind of air leakage of valve nozzles detection device | |
KR100597501B1 (en) | Safety device for oxygen supply | |
CN114088382B (en) | Gas self-closing valve under-pressure and over-pressure measurement tool and measurement method thereof | |
US4896698A (en) | Pressure adjusting device for controlling liquid gas flow rate | |
KR100210036B1 (en) | Air Spring Leaking Tester | |
KR100800592B1 (en) | Automobile Vacuum Injection Gun Vacuum Tester | |
JPH10299940A (en) | Regulating valve | |
CN210664997U (en) | Pressing device for mute test of keyboard | |
KR101042327B1 (en) | Pilot Valves Using Hydraulic Actuators | |
KR20210033089A (en) | Testing Apparatus For Safety Valve | |
KR100478154B1 (en) | A testing device for oil jet valve opening pressure | |
KR200158528Y1 (en) | Control device of air pressure in tire | |
JP3844035B2 (en) | Liquid filling nozzle with internal throttle mechanism | |
CN115060433B (en) | Bubble water machine air tightness detection and debugging system and automatic debugging method | |
CN217560938U (en) | Portable calibration equipment of idle call pressure switch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20021220 |
|
PA0201 | Request for examination | ||
PG1501 | Laying open of application | ||
E902 | Notification of reason for refusal | ||
PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20041124 Patent event code: PE09021S01D |
|
E701 | Decision to grant or registration of patent right | ||
PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 20050720 |
|
GRNT | Written decision to grant | ||
PR0701 | Registration of establishment |
Comment text: Registration of Establishment Patent event date: 20050908 Patent event code: PR07011E01D |
|
PR1002 | Payment of registration fee |
Payment date: 20050909 End annual number: 3 Start annual number: 1 |
|
PG1601 | Publication of registration | ||
PR1001 | Payment of annual fee |
Payment date: 20080617 Start annual number: 4 End annual number: 4 |
|
PR1001 | Payment of annual fee |
Payment date: 20090707 Start annual number: 5 End annual number: 5 |
|
PR1001 | Payment of annual fee |
Payment date: 20100908 Start annual number: 6 End annual number: 6 |
|
PR1001 | Payment of annual fee |
Payment date: 20110909 Start annual number: 7 End annual number: 7 |
|
FPAY | Annual fee payment |
Payment date: 20120911 Year of fee payment: 8 |
|
PR1001 | Payment of annual fee |
Payment date: 20120911 Start annual number: 8 End annual number: 8 |
|
FPAY | Annual fee payment |
Payment date: 20130910 Year of fee payment: 9 |
|
PR1001 | Payment of annual fee |
Payment date: 20130910 Start annual number: 9 End annual number: 9 |
|
FPAY | Annual fee payment |
Payment date: 20150309 Year of fee payment: 10 |
|
PR1001 | Payment of annual fee |
Payment date: 20150309 Start annual number: 10 End annual number: 10 |
|
FPAY | Annual fee payment |
Payment date: 20150908 Year of fee payment: 11 |
|
PR1001 | Payment of annual fee |
Payment date: 20150908 Start annual number: 11 End annual number: 11 |
|
FPAY | Annual fee payment |
Payment date: 20160829 Year of fee payment: 12 |
|
PR1001 | Payment of annual fee |
Payment date: 20160829 Start annual number: 12 End annual number: 12 |
|
FPAY | Annual fee payment |
Payment date: 20170908 Year of fee payment: 13 |
|
PR1001 | Payment of annual fee |
Payment date: 20170908 Start annual number: 13 End annual number: 13 |
|
FPAY | Annual fee payment |
Payment date: 20180817 Year of fee payment: 14 |
|
PR1001 | Payment of annual fee |
Payment date: 20180817 Start annual number: 14 End annual number: 14 |
|
PC1903 | Unpaid annual fee |
Termination category: Default of registration fee Termination date: 20200619 |