KR100487574B1 - Method and apparatus for lifting upper structure using girder type bracket supported by steel stranded wires and saddles - Google Patents
Method and apparatus for lifting upper structure using girder type bracket supported by steel stranded wires and saddles Download PDFInfo
- Publication number
- KR100487574B1 KR100487574B1 KR10-2002-0022208A KR20020022208A KR100487574B1 KR 100487574 B1 KR100487574 B1 KR 100487574B1 KR 20020022208 A KR20020022208 A KR 20020022208A KR 100487574 B1 KR100487574 B1 KR 100487574B1
- Authority
- KR
- South Korea
- Prior art keywords
- girder
- bracket
- upper structure
- saddle
- bridge
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
본 발명은 각종 교량의 교좌장치 교체 공사시 상부 구조의 인상을 위한 가설 공법으로 현장에서 교좌면의 좌, 우측에 새들을 설치하고 강연선을 설치한 후 양측을 거더에 연결하여 간단하게 상부 구조를 인상할 수 있는 공법으로, 구성은 거더형 브라켓과 거더형 브라켓을 교각에 지지하는 강연선 및 새들로 이루어진다. 거더형 브라켓은 교각의 전, 후에 각각 위치하게 되고 교각의 교좌부를 가로 질러 강연선이 새들위에 거치하게 된다. 잭에 작용된 하중은 거더 단부의 브라켓에서 강연선을 통해 하중이 전달되어 새들을 지점으로 균형을 이루게 되어 하중을 지지하게 된다. 연직하중은 교좌면 상에 설치된 새들 지지점에서 주로 받게 되며, 브라켓 상단의 걸침용 플레이트(Plate)는 편심하중에 의한 거더의 기울어짐을 방지하게 된다. 본 공법은 강연선으로 균형을 이루어 상부 구조를 지지하는 공법으로 기존의 가벤트나 콘크리트 브라켓 공법에 비해 시공이 간편하고 경제성 및 시공속도가 우수할 뿐만 아니라 뛰어난 안전성이 확보되어 기존의 콘크리트 브라켓이나 강재 브라켓으로 작업이 곤란한 고하중 교좌장치 교체공사에 적용이 가능하다.The present invention is a temporary construction method for the impression of the upper structure during the replacement of the bridge device of various bridges to install the birds on the left and right sides of the bridge at the site and install the strands and then connect both sides to the girders to simply raise the upper structure In a possible construction, the construction consists of girders and girder brackets and saddles supporting the piers. Girder brackets are placed before and after the piers, and the strand is mounted on the saddle across the piers. The load acting on the jack is transferred from the bracket at the end of the girder through the strand to balance the saddle to the point to support the load. The vertical load is mainly received at the saddle support point installed on the surface of the bridge, and the mounting plate (Plate) at the top of the bracket prevents the girder from tilting due to the eccentric load. This method is a method that supports the upper structure by balancing the strands, and is simpler to construct than the existing gasket or concrete bracket method, has excellent economical efficiency and construction speed, and secures excellent safety. It can be applied to the replacement of high load bridge device, which is difficult to work with.
Description
본 발명은 상부구조물 인상공법 및 장치에 관한 것으로, 보다 상세하게는 기존의 가벤트나 콘크리트 브라켓 공법에 비해 시공이 간편하고 경제성 및 시공속도가 우수할 뿐만 아니라 뛰어난 안전성이 확보되어 기존의 콘크리트 브라켓이나 강재 브라켓으로 작업이 곤란한 고하중 교좌장치 교체공사에 적용이 가능한 강연선과 새들로 지지되는 거더형 브라켓을 이용한 상부구조물 인상공법 및 인상장치에 관한 것이다.The present invention relates to an upper structure lifting method and apparatus, and more specifically, the construction is simpler than the existing gasket or concrete bracket method, and is excellent in economics and construction speed as well as excellent safety is secured by the existing concrete bracket or The present invention relates to an upper structure lifting method and a lifting device using a girder-type bracket supported by a stranded wire and a saddle that can be applied to a replacement of a heavy load bridge device that is difficult to work with a steel bracket.
교좌장치 교체시 종래의 인상 공법은 교각 전면부에 강재 가벤트를 설치하거나 콘크리트 브라켓을 설치한 후 잭을 놓고 상부구조를 인상하였다. 도로교나 하천교인 경우에는 교량하부를 통과하는 차량이나 유수에 의한 방해로 강재 가벤트의 설치가 곤란한 경우가 발생하게 되며, 교각 전면에 일체로 콘크리트 브라켓을 설치할 경우 기존 교각의 열화로 인하여 표면 강도가 현격히 저하되거나 표면손상이 심각할 경우에는 일체 거동을 기대할 수가 없으며, 상부 하중이 큰 경우도 적용에 어려움이 따른다.Conventional impression method when replacing the bridge device is to install a steel gage on the front of the piers or concrete brackets after placing the jack to raise the upper structure. In the case of road bridges or river bridges, it is difficult to install steel gages due to obstruction by vehicles or running water under the bridge, and when the concrete brackets are integrally installed on the front of the pier, surface strength is increased due to deterioration of existing bridge piers. If it is significantly lowered or the surface damage is serious, no behavior can be expected, and even if the upper load is large, it is difficult to apply.
상술한 바와 같이, 종래의 공법인 가벤트 공법이나 콘크리트 브라켓 공법은 도심을 통과하는 육교형식이나 하천 횡단교인 경우 가설물의 설치가 곤란하게 되고, 또한 콘크리트 브라켓의 경우는 거푸집 설치와 콘크리트의 타설, 양생등 공종이 복잡하고 작업여건이 불량하므로 안전사고에도 각별한 주의를 기울여야 한다.As described above, in the case of the conventional construction method, the construction method or the concrete bracket method, it is difficult to install the temporary products in the case of an overpass type or a river crossing bridge passing through the city, and in the case of the concrete bracket, formwork, concrete pouring, curing, etc. Due to the complexity of the work and poor working conditions, special attention must be paid to safety accidents.
본 발명이 이루고자 하는 기술적 과제는 상술한 종래 기술의 단점을 해결하기 위하여, 강연선과 새들을 이용하여 교각의 중심부에서 연직력을 지지하게 되므로 안전성이 우수하고, 이에 따라서 고 하중의 상부구조 인상에 적용이 가능하며, 기 제작된 철물을 현장에서 간편하게 교각위에 거치하여 설치 한 후 상부구조를 인상하게 되므로 기존의 공법에 비해 공사 속도가 빠르고 또한 강재 사용량이 적어 경제적이며 교각 구체 콘크리트의 손상이 없는 강연선과 새들로 지지되는 거더형 브라켓을 이용한 상부구조물 인상공법 및 장치를 제공함을 그 목적으로 한다. The technical problem to be achieved by the present invention is to solve the above-mentioned disadvantages of the prior art, it is excellent in safety because it supports the vertical force in the center of the piers using the strands and saddles, and thus applied to the lifting of the superstructure of high load It is possible to install the pre-fabricated hardware on the pier easily and then raise the upper structure. Therefore, the construction speed is faster and less steel is used compared to the existing construction method. It is an object of the present invention to provide a superstructure lifting method and apparatus using a girder bracket supported by a saddle.
본 발명은 상기 기술적 과제를 달성하기 위하여, 교량의 교좌장치를 교체하기 위하여, 교량의 교좌장치를 교체하기 위하여, 유압 잭을 이용하여 상부구조물을 인상하는 인상공법에 있어서, 상기 교좌장치가 놓여있는 교좌면의 좌우측에 새들을 설치하는 단계; 강연선을 새들위에 거치하는 단계; 상기 강연선과 새들로 지지되는 거더형 브라켓을 상기 새들의 양측에 설치하는 단계; 상기 일측의 거더형 브라켓과 타측의 거더형 브라켓의 사이에 유압잭을 받쳐줄 유압잭 받침부를 고정 설치하는 단계; 강연선을 새들위에 거치한 후 새들의 중앙을 교각의 상단에 고정앙카로 고정하고 그 양측을 상기 거더형 브라켓에 연결하는 단계; 및 상기 유압 잭을 이용하여 상부구조물을 인상하는 단계를 포함하여, 교각 상단에 설치된 새들 지지점에서 연직하중을 주로 받게 한 강연선과 새들로 지지되는 거더형 브라켓을 이용한 상부구조물 인상공법을 제공한다.The present invention, in order to achieve the above technical problem, in order to replace the bridge device of the bridge, in order to replace the bridge device of the bridge, using a hydraulic jack to raise the upper structure, the bridge device is placed Installing birds on the left and right sides of the abutment surface; Mounting the strand on the saddle; Installing girder brackets supported by the strand and the saddles on both sides of the birds; Fixing a hydraulic jack support portion to support the hydraulic jack between the girder bracket on the one side and the girder bracket on the other side; Mounting the strand on the saddle and fixing the center of the birds to the top of the pier with a fixed anchor and connecting both sides to the girder bracket; And including the step of raising the upper structure by using the hydraulic jack, provides an upper structure lifting method using a girder-type bracket supported by the strand and the saddle mainly subjected to the vertical load at the saddle support point installed on the top of the pier.
본 발명은 상기 기술적 과제를 달성하기 위하여, 교량의 교좌장치를 교체하기 위하여, 상부구조물을 인상하는 인상장치에 있어서, 상기 교좌장치가 놓여있는 교좌면의 좌우측에 설치되는 새들; 교각의 전후에 각각 위치하여 상기 새들의 양측에 설치되는 거더형 브라켓; 상기 일측의 거더형 브라켓과 타측의 거더형 브라켓의 사이에 유압잭을 받쳐줄 유압잭 받침부; 교각의 교좌부를 가로질러 상기 새들 위에 거치하는 강연선; 및 상기 교좌면의 좌우에 설치되어 상부구조물을 인상하는 유압 잭을 포함하며, 상기 잭에 작용된 하중은 거더 단부의 브라켓에서 강연선을 통해 하중이 전달되어 새들을 지점으로 균형을 이루게 되어 상기 상부구조물의 하중을 지지하는 인상장치를 제공한다.The present invention, in order to achieve the above technical problem, in order to replace the bridge device of the bridge, the lifting device for raising the upper structure, saddles are installed on the left and right sides of the bridge surface on which the bridge device is placed; A girder bracket positioned at both sides of the piers and installed at both sides of the birds; A hydraulic jack support portion for supporting the hydraulic jack between the girder bracket on the one side and the girder bracket on the other side; A strand that rests on the birds across the pier's pier; And a hydraulic jack installed on the left and right sides of the bridge surface to raise the upper structure, and the load applied to the jack is transferred to the saddle by the load from the bracket at the end of the girder to balance the saddle point. To provide an impression device for supporting the load of.
바람직하기로는 상기 브라켓의 상단에 걸침용 플레이트를 설치하여 편심 하중에 의한 거더의 기울어짐을 방지함을 특징으로 한다.Preferably, it is characterized in that the mounting plate on the top of the bracket to prevent the inclination of the girder due to the eccentric load.
이하, 본 발명의 실시예를 첨부도면에 의하여 상세히 설명하기로 한다.Hereinafter, embodiments of the present invention will be described in detail by the accompanying drawings.
본 발명의 상부구조물의 인상공법은 상술한 종래 기술의 문제점들을 해결할 수 있는 경제적인 공법으로, 본 발명은 기존 교량의 교좌장치 교체시 적용되는 공법이 교량의 구조물에 손상을 줄 뿐만 아니라 공기 지연 및 경제적인 측면에서 발생되는 문제점을 해결하기 위해 창안한 것이다. 본 발명에서 적용된 역학 구조 개념은 현수교의 주탑이 케이블로서 교량을 지탱하는 원리와 유사한 것으로 트러스교의 주탑 역할을 기존 교각이 수행하도록 하고, 케이블은 강연선이 수행하도록 구성하였다.Impression method of the upper structure of the present invention is an economical method that can solve the above-mentioned problems of the prior art, the present invention is a method applied when replacing the bridge device of the existing bridge not only damages the structure of the bridge but also delays the air and It was created to solve economic problems. The concept of mechanics structure applied in the present invention is similar to the principle that the main tower of suspension bridge supports the bridge as a cable, so that the existing pier plays the role of the main tower of the truss bridge, and the cable is configured to perform the strand.
본 발명은 지지부를 견고한 교각 상단의 중앙부에 위치시켜서 연직 반력의 지지력이 아주 우수하게 하였다. 따라서 강재 브라켓이나 콘크리트 브라켓보다 고 하중에 대한 안정성이 뛰어나 고하중의 교좌장치 교체에 적용이 가능하며, 기 제작된 간단한 철물을 교각 상단에 설치하므로써 경제적인 상부 구조물의 인상을 가능하게 하였다.The present invention places the support at the center of the top of a solid piers, making the bearing capacity of the vertical reaction force very good. Therefore, it is more stable than the steel bracket or concrete bracket, so it can be applied to the replacement of the high load bridge device, and the simple structure of the prefabricated steel is installed on the top of the bridge to make the economical impression of the upper structure possible.
도 1은 강연선을 이용한 거더형 브라켓의 설치개념 정면도이고, 도 2는 설치개념 측면도, 도 3은 설치개념 평면도, 도 4a 내지 도 4d는 새들 상세도이다.1 is a front view of the installation concept of the girder bracket using a stranded wire, FIG. 2 is a side view of the installation concept, FIG. 3 is a plan view of the installation concept, Figures 4a to 4d is a detailed saddle.
본 발명의 상부구조물의 인상방법은 현장에서 교좌면의 좌우측에 새들(2)을 설치하고 강연선(3)을 거치한 후 양측을 거더(1)에 연결하여 간단하게 상부 구조물을 인상할 수 있는 공법으로, 거더형 브라켓(1), 강연선(3), 새들(2), 유압잭을 받쳐줄 H-빔형 받침부(4) 및 유압 잭(7)을 구비하여 이루어진다. 거더형 브라켓(1)은 교각(10)의 전후에 각각 위치하게 되고 교각(10)의 교좌부를 가로 질러 강연선(3)이 새들(2)과 함께 각각 설치된다. 잭(7)에 작용된 하중은 거더 단부의 브라켓(1)에서 강연선(3)을 통해 하중이 전달되어 새들(2)을 지점으로 균형을 이루게 되어 상부구조물의 하중을 지지한다.The lifting method of the upper structure of the present invention is a method that can simply raise the upper structure by installing the saddle (2) on the left and right sides of the bridge surface in the field and through the strand (3) to connect both sides to the girder (1). In addition, the girder bracket (1), the strand (3), saddle (2), the H-beam type support portion (4) and the hydraulic jack (7) to support the hydraulic jack is made. The girder bracket 1 is positioned before and after the piers 10, respectively, and the strand 3 is provided with the saddle 2 across the piers 10, respectively. The load applied to the jack 7 is transferred from the bracket 1 at the end of the girder through the strand 3 to balance the saddle 2 to the point to support the load of the superstructure.
도 1 내지 도 4d를 참조하여 상술한 본 발명의 구성에 따르는 동작을 설명하기로 한다. 본 발명의 상부구조물의 인상장치는 거더형 브라켓(1), 강연선(3), 새들(2), 상부 인상용 유압잭(7)을 포함하여 구성된다. 거더형 브라켓(1)은 교각의 전후에 각각 위치하게 되고 교각(10) 상부를 가로 질러 강연선(3)이 새들(2) 위에 거치하게 된다. 잭(7)에 작용된 하중은 거더 단부의 브라켓(1)에서 강연선(3)을 통해 하중이 전달되어 새들(2)을 지점으로 균형을 이루게 되어 하중을 지지하게 된다. 연직하중은 교각 상단(10)에 설치된 새들(2) 지지점에서 주로 받게 되고, 브라켓(1)상단의 걸침용 플레이트(5)는 편심하중에 의한 거더의 기울어짐을 방지하며 새들(2)은 고정앙카(6)로 교각상부(10)에 고정된다. An operation according to the configuration of the present invention described above with reference to Figures 1 to 4D will be described. The lifting device of the upper structure of the present invention comprises a girder bracket (1), strand (3), saddle (2), hydraulic jack (7) for the upper impression. The girder bracket 1 is positioned before and after the piers, respectively, and the strand 3 is mounted on the saddle 2 across the top of the piers 10. The load acting on the jack 7 is transferred from the bracket 1 at the end of the girder through the strand 3 to balance the saddle 2 to the point to support the load. The vertical load is mainly received at the support points of the saddles (2) installed on the top of the piers (10), the fastening plate (5) on the top of the bracket (1) prevents the girder from tilting due to the eccentric load and the saddle (2) is fixed anchor It is fixed to the pier upper part 10 by (6).
본 공법은 현수교에서와 같이 새들(2)위에 거치되어 거더(1)의 양측에 고정되는 강연선(3)으로 균형을 이루어 상부 구조물(빔)(8)의 연직하중을 지지하고, 거더의 상단에 걸침용 플레이트(5)를 설치하여 편심하중에 의한 거더의 기울어짐을 방지하는 기법이다.This method supports the vertical load of the upper structure (beam) 8 by balancing it with the strand 3 which is mounted on the saddle 2 and fixed to both sides of the girder 1 as in the suspension bridge, and on the top of the girder. It is a technique to prevent the inclination of the girder by the eccentric load by installing the hook plate (5).
이상에서 설명한 바와 같이 본 발명은 긴급 공사나 하천교나 도로교와 같이 지장물이 있어 시공이 곤란할 경우 교각 상부에서 지지하는 형태로 간편하게 적용 할 수 있다. 본 공법은 지지부가 교각 상단면의 중앙부가 되므로 기존 콘크리트 브라켓이나 강재 브라켓으로 인상이 곤란한 고하중에 대한 적용이 가능하며, 또한 강재의 사용을 최소로 하여 경제성이 우수하고, 종래의 기술을 적용 시 발생되는 교각 손상 등의 문제를 해결하였다. 또한 시공성을 향상시켜 신속한 시공과 명료한 구조계로 안전성을 도모하였다. As described above, the present invention can be easily applied in the form of supporting from the top of the pier when the construction is difficult because of obstacles such as emergency construction or river bridge or road bridge. In this method, since the supporting part becomes the center part of the top of the pier, it is possible to apply to the heavy load that is difficult to raise with the existing concrete bracket or steel bracket, and it is economical by minimizing the use of the steel and occurs when applying the conventional technology. Problems such as pier damage were solved. In addition, by improving the workability, safety was achieved through rapid construction and a clear structure system.
이상 본 발명의 바람직한 실시예에 대해 상세히 기술하였지만, 본 발명이 속하는 기술분야에 있어서 통상의 지식을 가진 사람이라면, 첨부된 청구범위에 정의된 본 발명의 정신 및 범위를 벗어나지 않으면서 본 발명을 여러 가지로 변형 또는 변경하여 실시할 수 있음을 알 수 있을 것이다. 따라서 본 발명의 실시예들의 변경은 본 발명의 기술을 벗어날 수 없을 것이다.Although the preferred embodiments of the present invention have been described in detail above, those of ordinary skill in the art to which the present invention pertains may make various changes without departing from the spirit and scope of the present invention as defined in the appended claims. It will be appreciated that modifications or variations may be made. Therefore, changes of the embodiments of the present invention will not be able to escape the technology of the present invention.
도 1은 본 발명에 적용되는 거더형 브라켓의 설치 정면도이다.Figure 1 is an installation front view of the girder bracket applied to the present invention.
도 2는 도 1의 거더형 브라켓의 설치 측면도이다.FIG. 2 is an installation side view of the girder bracket of FIG. 1. FIG.
도 3은 도 1의 거더형 브라켓의 설치 평면도이다.3 is a plan view of the installation of the girder bracket of FIG.
도 4a는 본 발명에 적용되는 새들의 상세 정면도이다.Figure 4a is a detailed front view of the birds applied to the present invention.
도 4b는 도 4a의 새들의 상세 평면도이다.4B is a detailed plan view of the birds of FIG. 4A.
도 4c는 도 4a의 A-A선 상세 단면도이다.4C is a detailed cross-sectional view taken along the line A-A of FIG. 4A.
도 4d는 도 4a의 B-B선 상세 단면도이다.4D is a detailed cross-sectional view taken along the line B-B in FIG. 4A.
<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>
1...거더형 브라켓, 2...새들1 ... girder bracket, 2 ... saddle
3...강연선, 4...H-빔3 ... strand, 4 ... H-beam
5...상단 걸침용 플레이트, 6...고정앙카5 ... upper plate, 6 ... fixed anchor
7...유압잭, 8...빔7 ... hydraulic jack, 8 ... beam
9...교좌장치, 10...교각9 ... stool, 10 ... pier
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2002-0022208A KR100487574B1 (en) | 2002-04-23 | 2002-04-23 | Method and apparatus for lifting upper structure using girder type bracket supported by steel stranded wires and saddles |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2002-0022208A KR100487574B1 (en) | 2002-04-23 | 2002-04-23 | Method and apparatus for lifting upper structure using girder type bracket supported by steel stranded wires and saddles |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020020012338U Division KR200283142Y1 (en) | 2002-04-23 | 2002-04-23 | Apparatus for lifting upper structure using girder type bracket supported by steel stranded wires and saddles |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20020038652A KR20020038652A (en) | 2002-05-23 |
KR100487574B1 true KR100487574B1 (en) | 2005-05-06 |
Family
ID=19720467
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-2002-0022208A KR100487574B1 (en) | 2002-04-23 | 2002-04-23 | Method and apparatus for lifting upper structure using girder type bracket supported by steel stranded wires and saddles |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100487574B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100981875B1 (en) | 2008-06-16 | 2010-09-10 | 김경운 | Device for lifting upper structure of bridge |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101824801B (en) * | 2010-05-07 | 2011-09-28 | 中铁大桥局集团第五工程有限公司 | Non-in-situ prepressing method of self-anchored type support frame and self-anchored type support frame thereof |
CN104594206B (en) * | 2014-12-22 | 2017-01-04 | 中铁大桥局集团有限公司 | Steel truss girder longitudinal moving hanging type dragging anchor seat and method |
CN114059451B (en) * | 2021-11-16 | 2024-04-05 | 中交第二公路勘察设计研究院有限公司 | Rope strand arranging method of suspension bridge rotary main cable |
CN114214919A (en) * | 2021-12-16 | 2022-03-22 | 中铁十一局集团有限公司 | Counter-force prepressing construction method and system for oversized zero-block bracket of cable-stayed bridge in water area |
-
2002
- 2002-04-23 KR KR10-2002-0022208A patent/KR100487574B1/en not_active IP Right Cessation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100981875B1 (en) | 2008-06-16 | 2010-09-10 | 김경운 | Device for lifting upper structure of bridge |
Also Published As
Publication number | Publication date |
---|---|
KR20020038652A (en) | 2002-05-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110042769B (en) | Auxiliary span full-cantilever assembling construction method for composite beam cable-stayed bridge | |
KR20080017240A (en) | J.k bracket method | |
KR100985139B1 (en) | Reinforcement method and apparatus for upper concrete structure by using reinforcement members having reinforcement fibers thereon | |
CN110644349A (en) | Superstructure for wide box girder and short tower cable-stayed bridge and construction method | |
KR101527782B1 (en) | Management and reverse displacement of composite bridge composite inclined support installation method | |
KR100487574B1 (en) | Method and apparatus for lifting upper structure using girder type bracket supported by steel stranded wires and saddles | |
CN203866711U (en) | Large span cable-stayed bridge tower beam three-way temporary consolidation structure | |
KR100592196B1 (en) | large number bracket in which supporter was installed is used and it is a bridge, multiplex point installed so that support might be carried out support bracket and its installation method | |
EP0861354B1 (en) | Method for building a bridge and bridge built according to said method | |
CN211815595U (en) | Lower tower column tension and compression structure for cable tower | |
KR200283142Y1 (en) | Apparatus for lifting upper structure using girder type bracket supported by steel stranded wires and saddles | |
CN111441251A (en) | Construction method for folding steel box girder striding over existing steel girder | |
JP2744955B2 (en) | Reinforcement structure and reinforcement method of hinge part of gel bar bridge | |
CN103835238B (en) | A kind of high pier cable stayed bridge No. 0 block non-stand construction method and the structure in constructing | |
KR20020074130A (en) | Methodology in one united body for pre-fabrication upper part of bridge using lifting System with push pull mechanism. | |
KR20060017949A (en) | Field-fabricated prestressing steel-composed girder and construction method of continuous bridge using the girder | |
CN111501516A (en) | Pedestrian overpass and frame pier | |
CN113969538A (en) | Cable-stayed bridge construction system and construction method | |
KR100454387B1 (en) | Support-type temporary bent for jacking-up upper structure and forming method thereof and upper structure jack-up method using the same | |
KR100469638B1 (en) | Support construction for slab of prestressed concrete beam of bridge | |
CN219951665U (en) | External prestress reinforcement repair concrete capping beam | |
CN216405153U (en) | Attached type cast-in-place concrete overline bridge column type support dismantling device | |
CN212404770U (en) | Pedestrian overpass and frame pier | |
CN116356723A (en) | Construction method for repairing concrete cover beam by external prestress reinforcement | |
CN220166687U (en) | Cast-in-situ construction arch frame for upper beam of cable tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20090407 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20120418 Year of fee payment: 10 |
|
LAPS | Lapse due to unpaid annual fee |