KR100484519B1 - Safetu measurement system of underground member of appartment house - Google Patents

Safetu measurement system of underground member of appartment house Download PDF

Info

Publication number
KR100484519B1
KR100484519B1 KR1020040085586A KR20040085586A KR100484519B1 KR 100484519 B1 KR100484519 B1 KR 100484519B1 KR 1020040085586 A KR1020040085586 A KR 1020040085586A KR 20040085586 A KR20040085586 A KR 20040085586A KR 100484519 B1 KR100484519 B1 KR 100484519B1
Authority
KR
South Korea
Prior art keywords
underground
pipe
buried
safety diagnosis
diagnosis system
Prior art date
Application number
KR1020040085586A
Other languages
Korean (ko)
Inventor
김민호
Original Assignee
(주)원건설건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)원건설건축사사무소 filed Critical (주)원건설건축사사무소
Priority to KR1020040085586A priority Critical patent/KR100484519B1/en
Application granted granted Critical
Publication of KR100484519B1 publication Critical patent/KR100484519B1/en

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B7/00Measuring arrangements characterised by the use of electric or magnetic techniques
    • G01B7/16Measuring arrangements characterised by the use of electric or magnetic techniques for measuring the deformation in a solid, e.g. by resistance strain gauge
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B21/00Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant
    • G01B21/32Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring the deformation in a solid
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B5/00Measuring arrangements characterised by the use of mechanical techniques
    • G01B5/30Measuring arrangements characterised by the use of mechanical techniques for measuring the deformation in a solid, e.g. mechanical strain gauge

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

A safety diagnosis system of an underground structure in an apartment house complex is provided to detect cause of subsidence of an underground pipe, and to maintain the structure by measuring change of the underground structure easily with an underground support pile, an intermediate assembling frame member and an emergency lamp terminal box. A safety diagnosis system of an underground structure in an apartment house complex is composed of an underground support pile(400) installed under the ground, vertically mounted at a side of an underground pipe(300) and composed of a lower needle supported by base rock, a measuring wire connected to a connecting link of a connecting bar and combined with a link coupler of an anchor link, an intermediate assembling frame member(500) combined with the underground support pile, formed by integrally forming a horizontal frame at a side of a vertical pipe and composed of the connecting bar expanding or contracting in the horizontal frame and a sensor detecting displacement, and an emergency lamp terminal box(600) connected to the sensor of the intermediate assembling frame member by a cable, fixed to an upper part of the underground support pile and composed of an assembling clip.

Description

공동주택 단지 지중매설물 안전진단 시스템{SAFETU MEASUREMENT SYSTEM OF UNDERGROUND MEMBER OF APPARTMENT HOUSE}SAFETU MEASUREMENT SYSTEM OF UNDERGROUND MEMBER OF APPARTMENT HOUSE}

본 발명은 공동주택 단지 지중 매설관 안전진단 장치에 에 관한 것으로서, 특히 지중 매설관의 변화 현상을 손쉽게 감지할 수 있도록 지중 지지대 말뚝, 중간 체결틀 부재 및 비상등 단자함으로 구성된 안전진단 장치를 통해 지중 매설관의 침하 등에 따른 문제점을 확실하게 파악할 수 있도록 하는 공동주택 단지 지중매설물 안전진단 시스템에 관한 것이다.The present invention relates to a safety diagnosis device for underground buried pipe in an apartment complex, and in particular, underground buried through a safety diagnosis device composed of an underground support pile, an intermediate fastening frame member, and an emergency light terminal box so that a change in the underground buried pipe can be easily detected. It relates to the underground construction safety diagnosis system for apartment complexes, which can clearly identify the problems caused by the settlement of pipes.

일반적으로 공동주택 단지를 조성하기 위해서는 단지 전체에 대한 토목 공사를 실시하고, 지하 구조물을 시공한 후 상부로 공동주택을 시공하게 된다.In general, in order to build a multi-family housing complex, civil engineering works for the whole complex are carried out, and underground structures are constructed, and then multi-family housing is constructed at the top.

상기 공동 주택 단지에는 많은 지중 매설관이 많이 설치되는 바, 지중 매설관의 침하 정도를 확실하게 파악하면 효율적인 관리가 가능하게 된다.Since many underground buried pipes are installed in the multi-family housing complex, it is possible to efficiently manage the grading degree of the underground buried pipe.

그러나, 대부분의 공동주택 단지에는 지중 매설관의 변형 상태를 정확하게 측정할 만한 장치가 설치되는 경우는 극히 드물고, 침하 변형을 측정하기 위한 장치가 설치되는 경우에도 설치 및 유지 관리가 용이하지 못한 단점을 갖는 경우가 많다.However, most apartment complexes are rarely equipped with a device capable of accurately measuring the deformation of underground buried pipes, and even when a device for measuring settlement deformation is installed, installation and maintenance are difficult. There are many cases.

본 발명은 상술한 내용을 감안하여 안출된 것으로서, 본 발명은, 지중 매설관의 변화 현상을 손쉽게 감지할 수 있도록 지중 지지대 말뚝, 중간 체결틀 부재 및 비상등 단자함으로 구성된 안전진단 장치를 통해 지중 매설관의 침하 등에 따른 문제점을 확실하게 파악할 수 있도록 하는 공동주택 단지 지중매설물 안전진단 시스템을 제공함을 그 목적으로 한다.The present invention has been made in view of the above-described contents, the present invention, underground buried pipe through the safety diagnostic device consisting of the underground support pile, the intermediate fastening frame member and the emergency light terminal box to easily detect the phenomenon of underground buried pipe The purpose of this study is to provide a system for the diagnosis of underground property safety in underground housing complexes, which can clearly identify problems caused by settlements.

본 발명은 상술한 목적 달성을 위해, 본 발명은, 토공층 지중에 매설된 지중 매설관의 침하를 측정할 수 있도록 구성된 공동주택 단지의 안전진단 시스템에 있어서, 상기 토공층 지중에 매설되며, 일측에 앵커 고리가 형성된 지중 매설관의 측면에 입설되는 한편, 암반층에 하부 봉침부가 지지되고, 상부에 계측 눈금이 도시되는 지중 지지대 말뚝; 상기 지중 매설관의 앵커 고리에 하부에 형성된 고리 연결구가 체결되어 체결핀으로 고정되며, 연결대의 연결대 고리에 상부가 연결되는 계측 와이어; 상기 지중 지지대 말뚝의 중간부에 결합되며, 파이프형 부재로 형성된 수직관의 측면에 수평틀이 일체로 형성되고, 그 수평틀의 내부에서 확장 및 축소될 수 있도록 연결대가 형성되며, 그 수평틀의 측면에 유동을 감지할 수 있는 센서가 설치된 중간 체결틀 부재; 및 상기 중간 체결틀 부재의 센서에 케이블로 연결되는 한편, 직사각형 형태의 박스 형태로, 전방에 비상등이 설치되고, 후방에 체결 클립이 형성되며, 그 체결 클립의 볼트홀을 통해 체결 볼트가 관통되어 너트가 체결되므로 지중 지지대 말뚝의 상부에 고정되는 비상등 단자함;으로 구성됨을 특징으로 하는 공동주택 단지 지중매설물 안전진단 시스템을 제공한다. The present invention, in order to achieve the above object, the present invention, in the safety diagnosis system of the multi-family housing complex configured to measure the settlement of the underground buried pipe buried in the ground layer, buried in the ground layer, one side An underground support pile, which is placed on the side of the underground buried pipe having an anchor ring formed thereon, the lower bevel needle is supported on the rock layer, and a measurement scale is shown on the top; A measuring wire connected to an anchor ring formed at the bottom of the buried underground pipe to be fastened by fastening pins and connected to an upper part of a connecting rod ring of a connecting rod; Is coupled to the middle portion of the underground support pile, the horizontal frame is integrally formed on the side of the vertical pipe formed of a pipe-like member, the connecting rod is formed so that it can be expanded and contracted inside the horizontal frame, An intermediate fastening frame member provided with a sensor capable of sensing flow on the side; And a cable connected to the sensor of the intermediate fastening frame member, in the form of a rectangular box, an emergency light is installed at the front, a fastening clip is formed at the rear, and a fastening bolt is penetrated through the bolt hole of the fastening clip. An emergency light terminal box is fixed to the upper part of the underground support piles so that the nut is fastened; to provide the underground property safety diagnosis system for an apartment complex.

이하, 첨부 도면을 참조하여 본 발명의 구성을 설명한다.EMBODIMENT OF THE INVENTION Hereinafter, the structure of this invention is demonstrated with reference to an accompanying drawing.

도 1은 본 발명의 공동주택 단지 지중매설물 안전진단 상태를 나타내는 도면이고, 도 2는 본 발명의 공동주택 단지 지중매설물 안전진단 시스템의 분해 상태를 나타내는 도면이다.1 is a view showing a state of safety diagnosis underground buried land buried in the multi-unit housing complex of the present invention, Figure 2 is a view showing an exploded state of the system of underground buried property safety diagnosis in the multi-family housing complex of the present invention.

공동 주택 단지는 다양한 종류의 지중 매설관이 많이 설치되고 있는 바, 특히 지중 매설관을 설치시키기 위해서는 터파기를 실시하는 경우가 많이 발생된다.In the multi-family housing complex, many kinds of underground burial pipes are installed, and in order to install underground burial pipes, many burrows occur.

이러한 지중 매설관(300)을 매설하기 위해 지중 매설관의 상부에 토공층(100)이 형성되고, 상기 토공층(100)에는 안전진단 시스템(900)이 설치되어 지중 매설관(300)의 침하 변형을 측정하게 된다.In order to bury the underground buried pipe 300, an earthwork layer 100 is formed on the underground buried pipe, and the earthquake layer 100 is provided with a safety diagnosis system 900 to settle the underground buried pipe 300. The strain is measured.

상기 지중 매설관(300)은, 콘크리트 흄관 등을 이용하여 설명하기로 하며, 일측에 앵커 고리(310)가 형성되어 상부에 계측 와이어(350)가 연결되게 된다.The underground buried pipe 300 will be described using a concrete fume pipe, etc., anchor ring 310 is formed on one side is connected to the measurement wire 350 on the top.

상기 안전진단 시스템(900)은, 지중 지지대 말뚝(400), 중간 체결틀 부재(500) 및 비상등 단자함(600)으로 구성되는 한편, 상기 지중 지지대 말뚝(400)은, 암반층(200)에 하부가 지지되는 부재로, 하부 봉침부(410)가 뾰족하게 형성되어 암반층(200)에 적절하게 지지되며, 상부에 계측 눈금(420)이 도시되며, 상기 계측 눈금(420)은 밀리미터(MM) 단위로 기재됨이 정확한 측정을 할 수 있게 된다.The safety diagnosis system 900 is composed of an underground support pile 400, an intermediate fastening frame member 500, and an emergency light terminal box 600, while the underground support pile 400 has a lower portion in the rock layer 200. As a supporting member, the lower sewing needle 410 is pointed to be appropriately supported by the rock layer 200, and a measurement scale 420 is shown at the top, and the measurement scale 420 is in millimeter (MM) units. The description enables accurate measurement.

상기 중간 체결틀 부재(500)는, 수직관(510), 수평틀(520) 및 연결대(530)가 일체로 형성된 부재로, 수직하게 형성된 수직관(510)이 지중 지지대 말뚝(400)의 상부에 결합되고, 그 수직관(510)에 수평하게 수평틀(520)이 연접되며, 그 수평틀(520)의 측면에 센서(570)가 설치되고, 그 수평틀(520)에 연결대(530)가 삽입되어 길이조절이 가능하도록 설치된다.The intermediate fastening frame member 500 is a member in which the vertical pipe 510, the horizontal frame 520, and the connecting table 530 are integrally formed, and the vertical pipe 510 vertically formed is an upper portion of the underground support pile 400. It is coupled to, the horizontal frame 520 is connected to the horizontal pipe 510 horizontally, the sensor 570 is installed on the side of the horizontal frame 520, the connecting frame 530 to the horizontal frame 520 Is inserted to install the length adjustable.

즉, 상기 중간 체결틀 부재(500)는, 수평틀(520)과 연결대(530)가 삽입되어 수평한 방향으로 연결대(530)의 길이를 확장 및 축소시킬 수 있는 구조로 구성되며, 연결대(530)의 하부에 연결대 고리(532)가 형성되어 계측 와이어(350)가 고정된다.That is, the intermediate fastening frame member 500 has a structure in which the horizontal frame 520 and the connecting table 530 are inserted to expand and reduce the length of the connecting table 530 in the horizontal direction, and the connecting table 530. Connecting rod ring 532 is formed in the lower portion of the) and the measurement wire 350 is fixed.

상기 계측 와이어(350)에는 하부에 고리 연결구(352)가 형성되어 체결핀(356)에 의해 지중 매설관(300)의 앵커 고리(310)에 고정되게 된다.A ring connector 352 is formed at the lower portion of the measurement wire 350 to be fixed to the anchor ring 310 of the underground buried pipe 300 by the fastening pin 356.

상기 중간 체결틀 부재(500)는, 센서(570)에 케이블(580)이 연결되어 비상등 단자함(600)에 연결되며, 그 지중 매설관(300)이 침하되는 유동 상태, 즉 침하 상태를 측정할 수 있는 센서(570)에 의해 비상등(610)이 깜박이는 구조로 지중 매설관(300)의 침하 상태를 확인할 수 있게 된다.The intermediate fastening frame member 500, the cable 580 is connected to the sensor 570 is connected to the emergency light terminal box 600, the underground buried pipe 300 is settled to measure the flow state, that is, the settlement state Emergency light 610 by the sensor 570 that can be blinked structure can be checked the settlement state of the underground buried pipe (300).

상기 비상등 단자함(600)은, 직사각형 형태의 박스 구조로, 전방에 비상등(610)이 설치되고, 후방에 체결 클립(620)이 형성되어, 지중 지지대 말뚝(400)의 최상부에 체결 볼트(630)와 너트(640)로 체결되게 된다.The emergency light terminal box 600 is a rectangular box structure, the emergency light 610 is installed in the front, the fastening clip 620 is formed at the rear, fastening bolt 630 at the top of the underground support pile 400 And nuts 640 to be fastened.

상술한 구성에서 알 수 있듯이, 상기 안전진단 시스템(900)은, 지중에 매설된 하수관과 같은 지중 매설관(300)의 침하 상태를 비상등 단자함(600)의 비상등(610)이 점멸되는 신호로 확인할 수 있도록 설치되므로 지중 매설관(300)에 대한 유지 관리가 효율적으로 이루어질 수 있도록 시스템이 구성된다.As can be seen in the above configuration, the safety diagnosis system 900, the sedimentation state of the underground buried pipe 300, such as sewage pipes buried in the ground to check the emergency light 610 of the emergency light terminal box 600 is flashing signal Since it is installed so that the maintenance of the underground buried pipe 300 can be efficiently configured system.

상기 안전진단 시스템(900)은, 중간 체결틀 부재(500)에 설치된 센서(570)를 통해 지중 매설관(300)의 침하 상태를 확인할 수 있는 바, 종래와 같이 지중에 매설된 지중 구조물에 대한 확인 여부를 위해 터파기를 실시하던 방식을 완전히 배제할 수 있게 된다.The safety diagnosis system 900 can determine the settlement state of the underground buried pipe 300 through the sensor 570 installed in the intermediate fastening frame member 500, for underground structures buried underground It is possible to completely rule out the method of digging for confirmation.

또한, 상기 안전진단 시스템(900)은, 지중 지지대 말뚝(400), 중간 체결틀 부재(500) 및 비상등 단자함(600)을 효율적으로 관리하기 위해 상부에 우수에 의한 부식을 방지하기위한 시설물을 설치할 수도 있지만, 이러한 시설물에 대한 내용은 여기서 설명하지 않기로 한다.In addition, the safety diagnosis system 900, to install the facilities to prevent corrosion by rain on the top to efficiently manage the underground support pile 400, the intermediate fastening frame member 500 and the emergency light terminal box 600. It is possible, however, that these facilities will not be described here.

또한, 상기 안전진단 시스템(900)을 구성하는 비상등 단자함(600)의 비상등(610)은, 최초에 불이 적색등이 켜진 상태를 유지하고, 센서(570)의 작동에 따라 2개의 비상등(610)이 깜박거림되도록 작동되어 육안관측이 이루어지게 되는 구조로 설치된다.In addition, the emergency light 610 of the emergency light terminal box 600 constituting the safety diagnosis system 900, the red light is first kept on, and the two emergency lights 610 according to the operation of the sensor 570. ) Is flickering so that visual observation can be made.

상술한 본 발명의 구성에 의한 효과를 하기에 설명한다.The effect by the structure of this invention mentioned above is demonstrated below.

본 발명의 안전진단 시스템은, 지중 매설관의 변화 현상을 손쉽게 감지할 수 있도록 지중 지지대 말뚝, 중간 체결틀 부재 및 비상등 단자함으로 구성된 안전진단 장치를 통해 지중 매설관의 침하 등에 따른 문제점을 확실하게 파악할 수 있어 공동 주택 단지에 설치된 지중 매설관 및 지하 구조물을 보호할 수 있는 효과을 얻을 수 있다.Safety diagnosis system of the present invention, through the safety diagnosis device consisting of the underground support pile, the intermediate fastening frame member and the emergency light terminal box to easily detect the change phenomenon of the underground buried pipe to be sure to grasp the problems due to the settlement of underground buried pipe It can be used to protect underground buried pipes and underground structures installed in multi-family housing complexes.

특히, 상기 비상등 단자함에 설치된 비상등은, 지중 매설관의 침하가 발생되면 주기적으로 점멸하게 되므로 지중 매설관의 침하 상태를 관리자가 손쉽게 파악할 수 있어 유지 관리의 효율을 향상시킬 수 있다. In particular, the emergency light installed in the emergency light terminal box, and when the settlement of the underground buried pipe is periodically flashed, the manager can easily grasp the settlement of the underground buried pipe can improve the efficiency of maintenance.

도 1은 본 발명의 공동주택 단지 지중매설물 안전진단 상태를 나타내는 도면.1 is a view showing a state of safety diagnosis underground buried underground housing complex of the present invention.

도 2는 본 발명의 공동주택 단지 지중매설물 안전진단 시스템의 분해 상태를 나타내는 도면.Figure 2 is a view showing an exploded state of the underground construction site safety diagnosis system of the multi-unit housing complex of the present invention.

< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>

100: 토공층 200: 암반층100: earth layer 200: rock bed

300: 지중 매설관 400: 지중 지지대 말뚝300: underground burial pipe 400: underground support pile

500: 중간 체결틀 부재 600: 비상등 단자함500: intermediate fastening frame member 600: emergency light terminal box

900: 안전진단 시스템900: safety diagnosis system

Claims (2)

토공층 지중에 매설된 지중 매설관의 침하를 측정할 수 있도록 구성된 공동주택 단지의 안전진단 시스템에 있어서, In the safety diagnosis system of the multi-family housing complex configured to measure the settlement of the underground buried pipe buried in the earthworks, 상기 토공층 지중에 매설되며, 일측에 앵커 고리가 형성된 지중 매설관의 측면에 입설되는 한편, 암반층에 하부 봉침부가 지지되고, 상부에 계측 눈금이 도시되는 지중 지지대 말뚝; Underground support piles which are buried in the earth layer, buried in the side of the underground buried pipe having an anchor ring formed at one side thereof, the lower bent needle is supported on the rock layer, and a measurement scale is shown at the top; 상기 지중 매설관의 앵커 고리에 하부에 형성된 고리 연결구가 체결되어 체결핀으로 고정되며, 연결대의 연결대 고리에 상부가 연결되는 계측 와이어; A measuring wire connected to an anchor ring formed at the bottom of the buried underground pipe to be fastened by fastening pins and connected to an upper part of a connecting rod ring of a connecting rod; 상기 지중 지지대 말뚝의 중간부에 결합되며, 파이프형 부재로 형성된 수직관의 측면에 수평틀이 일체로 형성되고, 그 수평틀의 내부에서 확장 및 축소될 수 있도록 연결대가 형성되며, 그 수평틀의 측면에 유동을 감지할 수 있는 센서가 설치된 중간 체결틀 부재; 및Is coupled to the middle portion of the underground support pile, the horizontal frame is integrally formed on the side of the vertical pipe formed of a pipe-like member, the connecting rod is formed so that it can be expanded and contracted inside the horizontal frame, An intermediate fastening frame member provided with a sensor capable of sensing flow on the side; And 상기 중간 체결틀 부재의 센서에 케이블로 연결되는 한편, 직사각형 형태의 박스 형태로, 전방에 비상등이 설치되고, 후방에 체결 클립이 형성되며, 그 체결 클립의 볼트홀을 통해 체결 볼트가 관통되어 너트가 체결되므로 지중 지지대 말뚝의 상부에 고정되는 비상등 단자함;으로 구성됨을 특징으로 하는 공동주택 단지 지중매설물 안전진단 시스템.The cable is connected to the sensor of the intermediate fastening frame member, in the form of a rectangular box, an emergency light is installed at the front, a fastening clip is formed at the rear, and a fastening bolt penetrates through a bolt hole of the fastening clip, thereby providing a nut. The emergency light terminal box is fixed to the upper part of the underground support piles are fastened; apartment building underground construction safety diagnosis system, characterized in that consisting of. 제 1 항에 있어서, The method of claim 1, 상기 비상등 단자함의 비상등은, 최초에 불이 적색등이 켜진 상태를 유지하고, 센서의 작동에 따라 2개의 비상등이 깜박거림되도록 작동되어 육안관측이 이루어짐을 특징으로 하는 공동주택 단지 지중매설물 안전진단 시스템.The emergency light of the emergency terminal of the emergency light terminal box, the underground light safety diagnosis system, characterized in that the first operation is maintained so that the red light is turned on and the two emergency lights blink according to the operation of the sensor. .
KR1020040085586A 2004-10-26 2004-10-26 Safetu measurement system of underground member of appartment house KR100484519B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040085586A KR100484519B1 (en) 2004-10-26 2004-10-26 Safetu measurement system of underground member of appartment house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040085586A KR100484519B1 (en) 2004-10-26 2004-10-26 Safetu measurement system of underground member of appartment house

Publications (1)

Publication Number Publication Date
KR100484519B1 true KR100484519B1 (en) 2005-04-20

Family

ID=37302310

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040085586A KR100484519B1 (en) 2004-10-26 2004-10-26 Safetu measurement system of underground member of appartment house

Country Status (1)

Country Link
KR (1) KR100484519B1 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100667581B1 (en) 2006-09-16 2007-01-11 주식회사 한국종합기술 Measurement apparatus for underground water supply pipe of smooth ground
KR100667585B1 (en) 2006-09-15 2007-01-11 주식회사 한국종합기술 The instrumentation apparatus waterwork pipe
KR100723013B1 (en) 2006-11-18 2007-05-30 (주) 장맥엔지니어링 The instrumentation structure of underground-device
KR100725140B1 (en) 2006-12-29 2007-06-13 주식회사 한국종합기술 Measurement apparatus for railway box-tunnel
KR100983015B1 (en) 2010-04-14 2010-09-17 (주)부호엔지니어링 Damaged perceiving equipment underground
KR101312502B1 (en) 2012-08-21 2013-10-01 삼성물산 주식회사 Measuring structure of column or wall shortening
KR101326290B1 (en) 2013-02-28 2013-11-11 주식회사 한국코아엔지니어링 Burying location indicator of cable
KR20200084526A (en) 2019-01-03 2020-07-13 주식회사은성헬스빌 a handstand device that can measure and set the amount of motion
KR20230025261A (en) 2021-08-13 2023-02-21 한국전력공사 Measuring device for displacement measurement in underground transmission line

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100667585B1 (en) 2006-09-15 2007-01-11 주식회사 한국종합기술 The instrumentation apparatus waterwork pipe
KR100667581B1 (en) 2006-09-16 2007-01-11 주식회사 한국종합기술 Measurement apparatus for underground water supply pipe of smooth ground
KR100723013B1 (en) 2006-11-18 2007-05-30 (주) 장맥엔지니어링 The instrumentation structure of underground-device
KR100725140B1 (en) 2006-12-29 2007-06-13 주식회사 한국종합기술 Measurement apparatus for railway box-tunnel
KR100983015B1 (en) 2010-04-14 2010-09-17 (주)부호엔지니어링 Damaged perceiving equipment underground
KR101312502B1 (en) 2012-08-21 2013-10-01 삼성물산 주식회사 Measuring structure of column or wall shortening
KR101326290B1 (en) 2013-02-28 2013-11-11 주식회사 한국코아엔지니어링 Burying location indicator of cable
KR20200084526A (en) 2019-01-03 2020-07-13 주식회사은성헬스빌 a handstand device that can measure and set the amount of motion
KR20230025261A (en) 2021-08-13 2023-02-21 한국전력공사 Measuring device for displacement measurement in underground transmission line

Similar Documents

Publication Publication Date Title
KR100484519B1 (en) Safetu measurement system of underground member of appartment house
CN102162234B (en) Device and method for monitoring surface displacement of rock-soil body in real time
CN108180938A (en) A kind of deep basal pit real-time system for monitoring and pre-warning
CN104596405A (en) Real-time deformation contact monitoring device and method of underground rainfall-sewage pipeline
CN211080332U (en) Foundation pile detects displacement measurement device for static test
CN113482068A (en) Foundation pit support automatic monitoring system
CN109029338B (en) Embedded concrete strain measurement device and construction method thereof
CN108517872A (en) A kind of measurement method of foundation pit deformation
KR20030079504A (en) Device and method for measuring ground subsidence
KR102151530B1 (en) Perpendiculatity measuring instrument and steel pile construction methid thereof
CN112187843A (en) BIM-based system and method for automatically monitoring capital construction risks of deep foundation pit
CN103105308A (en) In-situ test method for cross-fault buried pipeline
CN2567545Y (en) Rigid counter-force device for soil pressure gauge
CN216791179U (en) Automatic monitoring system for longitudinal differential settlement of underground structure
CN210513098U (en) Buried drain pipe inner diameter deformation measuring device
KR100520889B1 (en) Measure method of slope in building area
CN115596025A (en) Foundation pit displacement monitoring system and method
CN209689603U (en) Underground piping settlement monitoring device
KR100501041B1 (en) Device and method for measuring ground settlement using a reflection sheet
CN207832108U (en) A kind of earth and rockfill dam inner horizontal displacement monitor
CN113137945A (en) Tunnel segment deformation monitoring sensor arrangement method and monitoring system
KR100468385B1 (en) Ground sinking measurement system of appartment house
CN218060451U (en) Foundation pit supporting structure horizontal displacement monitoring device
CN211340835U (en) Stand foundation structure with sinkage detects
KR102282059B1 (en) Natural stone retaining wall structure and its construction method

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
N231 Notification of change of applicant
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee