KR100475104B1 - Structure for slope and shore protection, and it's construction method - Google Patents

Structure for slope and shore protection, and it's construction method Download PDF

Info

Publication number
KR100475104B1
KR100475104B1 KR1020040022769A KR20040022769A KR100475104B1 KR 100475104 B1 KR100475104 B1 KR 100475104B1 KR 1020040022769 A KR1020040022769 A KR 1020040022769A KR 20040022769 A KR20040022769 A KR 20040022769A KR 100475104 B1 KR100475104 B1 KR 100475104B1
Authority
KR
South Korea
Prior art keywords
slope
support
rake
retaining wall
wall structure
Prior art date
Application number
KR1020040022769A
Other languages
Korean (ko)
Inventor
김달환
Original Assignee
주식회사 우일 이알에스
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 우일 이알에스 filed Critical 주식회사 우일 이알에스
Priority to KR1020040022769A priority Critical patent/KR100475104B1/en
Application granted granted Critical
Publication of KR100475104B1 publication Critical patent/KR100475104B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/40Miscellaneous comprising stabilising elements

Abstract

PURPOSE: A retaining wall for a slope and a shore and a construction method thereof are provided to prevent collapse, soil erosion and flood by forming a honeycomb structure filled with natural stone and gravel, and to reduce construction period by assembling light simple blocks easily. CONSTITUTION: A slope and shore retaining wall is composed of a front member(10) having a linear part(12) including a flat plane and an inclination part(14) bent downward and outward at both sides of the linear part, and a supporting member(20) having a support part(22) integrally extended from a center of the linear part to a rear part and a support foot(24) holding the support part by enlarging an end section. An iron mesh is fixed to the linear part and the inclination part of the front member to prevent filler loss. Assembling holes(30,31) are formed in ends of the linear part and the inclination part, and distance between two assembling holes are equalized.

Description

사면 및 호안옹벽용 구조물 및 그의 시공방법{Structure for slope and shore protection, and it's construction method} Structure for slope and shore protection, and it's construction method

본 발명은 사면 및 호안옹벽용 구조물 및 그의 시공방법에 관한 것으로, 특히 사면, 하안 및 해안의 붕괴, 침식 등의 방지 및 붕괴, 침식 등 후의 조기수복에 사용되는 사면 및 호안옹벽용 구조물 및 그의 시공방법에 관한 것이다.TECHNICAL FIELD The present invention relates to a structure for a slope and a rake retaining wall and a construction method thereof, and particularly a slope and rake retaining wall structure used for preventing and collapsing a slope, riverbank and coast, erosion, etc., and early restoration after erosion. It is about a method.

일반적으로 사면 및 하안 및 해안의 붕괴, 침식 등은 지형, 지질, 강우, 지하수, 식생, 등의 붕괴 원인이 얽혀 발생하며, 이것에 대처하는 붕괴, 침식 방지 및 녹화 등의 공사공법도 다종 다양하다.In general, the slope, erosion and coastal collapse and erosion are caused by the cause of the collapse of terrain, geology, rainfall, groundwater, vegetation, etc., and there are various construction methods such as collapse, erosion prevention and greening to cope with this. .

공법의 실시에 즈음해서는 충분한 현지조사를 하여 붕괴기구를 해명하며, 공법의 안전성, 경제성에 대해 검토하여 최적 공법을 선택하는 것이 필요한 바, 상기한 공법으로는 식생공법(식생매트공법, 식생대공법 등 ), 모르타르 분사공법, 콘크리트 분사공법, 콘크리트 블록공법, 돌쌓기공법 등의 사면보호공법이 있다.In carrying out the public method, it is necessary to conduct sufficient on-site investigation to clarify the decay mechanism, and to select the optimal method by reviewing the safety and economic feasibility of the public method. The above method includes the vegetation method (vegetation mat method, vegetation method, etc.). ), There are slope protection methods such as mortar spraying method, concrete spraying method, concrete block method, and stone stacking method.

여기서, 사면 및 호안 등의 시공에 있어서는 최초에 기초공사를 실시하지만, 통상 행해지는 콘크리트, 모르타르 분사공법 등의 기초공사에서는 어느 쪽도 기초 구조부가 건조 경화한 후에 사면 등을 형성하는 공법이기 때문에 기상조건에 영향을 받기 쉽고, 공사완료까지 장시간을 필요하며, 또한 집중호수 및 홍수로 인한 재해복구 공사 등에 신속히 대처할 수 없는 문제점이 있다.Here, in the construction of slopes, lakes, and the like, the basic construction is first performed, but in the basic construction such as concrete, mortar spraying, etc., which is usually performed, since the foundation structural portion is a method of forming slopes after drying and curing, It is easy to be affected by the conditions, it takes a long time to complete the construction, and also there is a problem that can not quickly cope with disaster recovery construction due to the concentrated lake and flood.

또한, 콘크리트, 모르타르 등의 분사공법 및 각 공법의 기초부 등의 시공에는 반드시 물을 필요로 하기 때문에, 용수 확보가 곤란한 지역에서는 시공지까지 물을 수송하지 않으면 안되어, 시공비가 고가로 되는 등의 문제점이 있다.In addition, since water is always required for the construction of spraying methods such as concrete and mortar, and the foundation of each construction method, water must be transported to the construction site in areas where water is difficult to secure, resulting in high construction costs. There is a problem.

더욱, 종래의 호안공법은 우수가 침투하지 않는 공법이므로 식재녹화를 하는 것이 사실상 불가능한 문제점이 있다. In addition, the conventional revetment method is a method that does not penetrate rainwater has a problem that it is virtually impossible to plant the plant.

또한, 자연경관 및 어패류, 생물 등의 생식 환경에 부적절한 환경을 제공하는 문제점이 있다.In addition, there is a problem of providing an environment that is inappropriate for the reproductive environment, such as natural scenery and shellfish, organisms.

이에, 본 발명은 상기한 바와 같은 제문제점을 해결하기 위해 안출된 것으로써, 사면 및 호안옹벽을 효율적으로 형성할 수 있을 뿐만 아니라 우수배수 기능 및 녹화 기능을 가지는 생태 조화형 사면 및 호안옹벽용 구조물 및 그의 시공방법을 제공하는데 그 목적이 있다.Therefore, the present invention has been devised to solve the problems described above, it is possible to efficiently form the slopes and rake retaining wall, as well as eco-harmonic slope and rake retaining structure having excellent drainage function and greening function. And its construction method.

상기한 목적을 달성하기 위한 본 발명에 따른 사면 및 호안옹벽용 구조물은 소정의 길이의 평활면을 갖는 직선부와 상기 직선부의 양단으로부터 하향 외측으로 소정의 각도를 갖도록 꺾여 형성된 경사부로 이루어지는 전면부재와; 상기 전면부재의 직선부의 가운데로부터 배면으로 일체로 소정의 단면으로 연장되는 지지부와 상기 지지부를 지탱하도록 끝단에 일체로 형성된 지지발로 이루어지는 지지부재로 구성됨을 특징으로 한다.Slope and arc retaining wall structure according to the present invention for achieving the above object is a front member consisting of a straight portion having a smooth surface of a predetermined length and the inclined portion bent to have a predetermined angle downwardly outward from both ends of the straight portion and ; Characterized in that the support member consisting of a support portion integrally formed at the end to support the support portion and the support portion extending integrally from the center to the back surface from the center of the straight portion of the front member.

또한, 상기한 목적을 달성하기 위한 본 발명에 따른 사면 및 호안옹벽용 구조물 시공방법은 청구항 1 기재의 구조물의 전면부재를 표층으로 하며, 인접 구조물의 전면부재를 볼트와 너트로 체결공에 연결하여 벌집형상으로 조립함과 동시에 구조물의 공극부에 자연석, 깬돌, 식생토낭, 토사 등으로 이루어지는 내부채움재를 충전하여 사면 및 호안옹벽을 형성함을 특징으로 한다. In addition, the construction method for the slope and rake retaining wall structure according to the present invention for achieving the above object is to make the front member of the structure of claim 1 as the surface layer, by connecting the front member of the adjacent structure to the fastening hole with bolts and nuts At the same time assembling in a honeycomb shape, and filling the interior filling material consisting of natural stone, crushed stone, vegetation ton, earth and sand in the air gap of the structure to form a slope and a shelter retaining wall.

이하, 본 발명을 첨부한 예시도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, the present invention will be described in detail.

도 1은 본 발명에 따른 사면 및 호안옹벽용 구조물을 도시한 사시도이며, 도 2는 본 발명에 따른 사면 및 호안옹벽용 구조물을 도시한 정면도이며, 도 3은 본 발명에 따른 사면 및 호안옹벽용 구조물을 도시한 배면도이며, 도 4는 본 발명에 따른 사면 및 호안옹벽용 구조물을 도시한 평면도이며, 도 5는 본 발명에 따른 사면 및 호안옹벽용 구조물을 도시한 저면도이며, 도 6은 본 발명에 따른 사면 및 호안옹벽용 구조물을 도시한 측면도이며, 도 7a 내지 7d는 본 발명에 따른 사면 및 호안옹벽용 구조물의 설치 상태를 도시한 전개도이며, 도 8은 본 발명에 따른 사면 및 호안옹벽용 구조물의 설치 상태를 도시한 단면도이며, 도 9는 본 발명에 따른 사면 및 호안옹벽용 구조물에 철망이 설치된 상태를 도시한 예시도이며, 도 10은 본 발명에 따른 사면 및 호안옹벽용 구조물에 앵커철근이 설치된 상태를 도시한 예시도이다.1 is a perspective view showing the structure for the slope and rake wall according to the present invention, Figure 2 is a front view showing the structure for the slope and rake wall in accordance with the present invention, Figure 3 is for the slope and rake wall in accordance with the present invention Figure 4 is a rear view showing the structure, Figure 4 is a plan view showing the structure for the slope and rake wall according to the present invention, Figure 5 is a bottom view showing the structure for the slope and rake retaining wall according to the invention, Figure 6 Figure 4 is a side view showing the structure for the slope and rake retaining wall according to the present invention, Figure 7a to 7d is an exploded view showing the installation state of the structure for the slope and rake retaining wall according to the present invention, Figure 8 is a slope and revetment according to the present invention 9 is a cross-sectional view showing a state of installation of the retaining wall structure, Figure 9 is an exemplary view showing a state in which the wire mesh is installed on the slope and rake retaining wall structure according to the present invention, Figure 10 is a slope and rake in accordance with the present invention Example illustrating a state in which the anchor is installed in the reinforcement structures for the Fig.

이들 도면에 도시된 바와 같이, 본 발명에 따른 사면 및 호안옹벽용 구조물은 소정의 길이의 평활면을 갖는 직선부(12)와 상기 직선부(12)의 양단으로부터 하향 외측으로 소정의 각도를 갖도록 꺾여 형성된 경사부(14)로 이루어지는 전면부재(10)와; 상기 전면부재(10)의 직선부(12)의 가운데로부터 배면으로 일체로 소정의 단면으로 연장되는 지지부(22)와 상기 지지부(22)를 지탱하도록 끝단에 일체로 형성된 지지발(24)로 이루어지는 지지부재(20)로 구성된다.As shown in these figures, the structure for the slope and the rake wall according to the present invention has a predetermined angle downwardly outward from both ends of the straight portion 12 and the straight portion 12 having a smooth surface of a predetermined length. A front member 10 formed of a beveled portion 14 which is bent; It consists of a support portion 22 integrally extending from the center of the straight portion 12 of the front member 10 to the rear surface and a support foot 24 integrally formed at the end to support the support portion 22. It is composed of a support member (20).

여기서, 상기 전면부재(10)에는 직선부(12)와 경사부(14)에 걸쳐 소정의 망눈크기를 갖는 철망(60)이 볼트(62)를 매개로 하여 고정 설치되어, 내부채움재의 유실을 방지할 수 있는 구조이다.In this case, the front member 10 is fixed to the wire mesh 60 having a predetermined mesh size across the straight portion 12 and the inclined portion 14 through the bolt 62 is fixed, the loss of the inner filling material It is a structure that can be prevented.

또한, 상기 직선부(12)와 경사부(14)의 양단에는 전후가 관통되도록 4개의 체결공(30, 31)이 형성된 구조이다.In addition, four fastening holes 30 and 31 are formed at both ends of the straight portion 12 and the inclined portion 14 so that the front and rear portions thereof pass therethrough.

그리고, 상기 직선부(12)와 경사부(14)가 만나서 이루어지는 부재의 중심선 각도는 120°로 이루어진 구조이다.The center line angle of the member formed by the straight portion 12 and the inclined portion 14 is 120 °.

한편, 상기 지지발(24)은 지지부(22)의 단면보다 확대되는 상협하광의 단면형상으로 구성되며, 지지발(24)에는 지중에 구조물을 고착시키기 위해 앵커철근(70)이 연결 설치되며, 앵커철근(70)의 길이를 연장시킬 수 있는 철근연결장치(80)가 설치되어 앵커철근(70)의 길이가 연장될 수 있도록 한 구조이다.On the other hand, the support foot 24 is composed of a cross-sectional shape of the upper and lower light beams that are larger than the cross section of the support portion 22, the support foot 24 is connected to the anchor reinforcement 70 is installed to fix the structure in the ground, The rebar connecting device 80 that can extend the length of the anchor reinforcing bar 70 is installed so that the length of the anchor reinforcing bar 70 can be extended.

즉, 본 발명에 따른 사면 및 호안옹벽용 구조물은 하나의 전면부재(10)에 하나의 지지부재(20)가 일체로 형성된 단순한 구조이다.That is, the structure for the slope and the retaining wall according to the present invention is a simple structure in which one support member 20 is integrally formed on one front member 10.

여기서, 상기 전면부재(10)는 지지부재(20)의 최전면에 일체로 형성되어, 설치 시공후 내부채움재가 전면으로 빠져나오려고 하는 수평력에 저항하는 기능을 담당하는 구조이고, 또한 상기 전면부재(10)에 발생하는 수평응력을 지지부재(20)에 전달시키는 구조물(S)이다.Here, the front member 10 is integrally formed on the foremost surface of the support member 20, and is a structure that is responsible for resisting the horizontal force to the inner filling material to exit to the front after installation, the front member The structure (S) for transmitting the horizontal stress generated in the (10) to the support member (20).

한편, 내부채움재의 규격이 작은 경우에는 전면부재(10)의 전면에 볼트(62)를 매개로 하여 철망(60)을 고정 설치하여, 내부채움재의 유실을 방지할 수 있다.On the other hand, if the size of the inner filling material is small, the wire mesh 60 is fixed to the front surface of the front member 10 via the bolt 62, it is possible to prevent the loss of the inner filling material.

즉, 상기 전면부재(10)는 직선부(12)와 경사부(14)로 구성되며, 각각 일체로 형성되는 바, 이들의 중심선은 서로 120°의 각도로 형성된다.That is, the front member 10 is composed of a straight portion 12 and the inclined portion 14, each formed integrally, their centerline is formed at an angle of 120 ° to each other.

또한, 상기 직선부(12)와 경사부(14)의 끝단에는 인접하는 다른 구조물(S)과 연속적인 체결을 위해 체결공(30, 31)들이 형성되며, 체결공(30, 31) 중심간 거리(32)는 동일하여 조립 설치시 정육각형 형상의 벌집구조체가 형성된다.In addition, at the ends of the straight portion 12 and the inclined portion 14, fastening holes 30 and 31 are formed for continuous fastening with other adjacent structures S, and between the centers of the fastening holes 30 and 31. The distance 32 is the same, the honeycomb structure of the regular hexagonal shape is formed during assembly installation.

이 때 사용되는 전면부재(10)와 지지부재(20)는 내부채움재와의 접촉면에서 집중응력이 발생되므로 가급적 사각형 이상 원형 단면까지의 형상으로 형성하는 것이 구조적으로 바람직하다. At this time, the front member 10 and the support member 20 is structurally preferable to be formed in a shape up to a square or more circular cross section as possible because the concentrated stress is generated in the contact surface with the inner filling material.

한편, 상기 지지부재(20)는 상기 전면부재(10)를 통하여 전달되는 수평응력을 지지발(24)에 전달하는 지지부(22)와 지중앵커 역할을 수행하는 지지발(24)로 구성됨과 동시에 일체로 형성된다.On the other hand, the support member 20 is composed of a support portion 22 for transmitting the horizontal stress transmitted through the front member 10 to the support foot 24 and the support foot 24 serving as an underground anchor and at the same time It is formed integrally.

이하, 상기한 바와 같은 구성으로 이루어진 본 발명에 따른 사면 및 호안옹벽용 구조물을 이용한 사면 및 호안옹벽 시공에 대해 설명한다.Hereinafter, the construction of the slope and the rake wall using the slope and the rake wall structure according to the present invention having the configuration as described above.

본 발명에 따른 사면 및 호안옹벽용 구조물 시공방법은 사면 및 호안옹벽용 구조물(S)의 전면부재(10)를 표층으로 하며, 인접 구조물(S)의 전면부재(10)를 볼트와 너트로 체결공(30)에 연결하여 벌집형상으로 조립함과 동시에 구조물(S)의 공극부(40)에 자연석, 깬돌, 식생토낭, 토사 등으로 이루어지는 내부채움재를 충전하여 사면 및 호안옹벽을 형성하는 것이다.The construction method for the slope and rake retaining wall structure according to the present invention has the front member 10 of the slope and rake retaining wall structure (S) as the surface layer, and fastening the front member 10 of the adjacent structure (S) with bolts and nuts. It is connected to the ball 30 to assemble in a honeycomb shape and at the same time to fill the void portion 40 of the structure (S) of the inner filling material consisting of natural stone, crushed stone, vegetation ton, earth and sand to form the slope and the shelter wall.

즉, 본 발명에 따른 사면 및 호안옹벽용 구조물 시공방법은 도 8에 도시된 바와 같이 연약지반이 아닌 일반적인 기초지반에서는 기초콘크리트가 필요 없는 구조로서, 도 7a에 도시된 바와 같이, 수평방향 설치시에는 인접하는 구조물(S)들의 경사부 체결공(31)간 이격거리가 구조물(S)의 직선부 체결공(30)간 거리와 동일하도록 이격 설치한다.That is, the construction method for the slope and the retaining wall structure according to the present invention is a structure that does not require the foundation concrete in the general foundation rather than the soft ground, as shown in Figure 7, when installed in the horizontal direction The spaced apart distance between the inclined portion fastening hole 31 of the adjacent structure (S) is installed so as to be equal to the distance between the straight portion fastening hole 30 of the structure (S).

다단 조립시에는 직상단 구조물(S)의 경사부 체결공(31)들과 직하단에서 인접하는 구조물(S)의 직선부 체결공(30)들을 통해 볼트와 너트로 긴밀히 체결시킨 후, 그 구조물(S)의 공극부(40)에 내부채움재를 채우는 과정을 반복함으로써 연속되는 벌집형 구조물(S) 조립시공이 완료된다.In the multi-stage assembly, after the fastening hole 31 of the upper end structure (S) and the straight line fastening hole 30 of the adjacent structure (S) in the immediate lower end tightly tightened with bolts and nuts, and then the structure By repeating the process of filling the inner filling material in the void portion (S) of (S) is completed the continuous honeycomb structure (S) assembly construction.

이 과정에서 도 7a 내지 7d에 도시된 바와 같이, 벌집형상의 6각형 구조물(S)이 상하좌우로 연속적으로 조립되어 구조적으로 안정성이 확보됨과 동시에 내부채움재의 변위나 유실을 방지한다.In this process, as shown in Figure 7a to 7d, the honeycomb-shaped hexagonal structure (S) is continuously assembled up, down, left and right to ensure structural stability and to prevent displacement or loss of the inner filling material.

한편, 상기한 바와 같은 구조물(S) 시공시 일정수위 이하의 침수구간에는 내부채움재만 채우고, 일정수위 이상의 지상노출구간에는 내부채움재 대신에 초화류의 씨앗이 부착된 식생토낭을 쌓아 초화류의 생장을 촉진시키도록 변형시켜 시공할 수도 있음을 밝혀둔다. On the other hand, during the construction of the structure (S) as described above, only the inner filling material is filled in the submerged section below a certain level, and the vegetation ton is attached to the ground exposure section above a certain level instead of the inner filling material to promote the growth of herbaceous plants It should be noted that it can be modified to be constructed.

이상에서 설명한 바와 같이, 본 발명에 따른 사면 및 호안옹벽용 구조물 및 그의 시공방법은 다음과 같은 효과가 있다.As described above, the structure for the slope and rake retaining wall and its construction method according to the present invention has the following effects.

첫째, 본 발명은 자연석이나 깬돌 등을 내부채움재로 사용하여 커다란 공극을 갖는 벌집형 구조물을 형성함으로써, 집중호우시에도 내부채움재의 유실을 방지할 뿐만 아니라 내부채움재의 커다란 공극에서는 각종 초화류가 생장할 수 있음은 물론, 파충류, 곤충류, 어패류, 조류 등의 서식 산란처를 제공하여 자연 친화적인 하천환경을 제공할 수 있는 이점이 있다.First, the present invention forms a honeycomb structure having a large void using natural stone or crushed stone as the inner filling material, not only to prevent the loss of the inner filling material during heavy rain, but also to grow various herbaceous flowers in the large void of the inner filling material. Of course, there is an advantage that can provide a natural environment-friendly river environment by providing habitat spawn, such as reptiles, insects, fish, shellfish, birds.

둘째, 본 발명은 단순한 형태의 비교적 경량블록 구조물이므로 손쉽게 조립 체결할 수 있으므로 특별한 기능인력이나 장비 또는 기초콘크리트가 필요 없는 장점이 있다.Second, since the present invention is a relatively lightweight block structure of a simple form can be easily assembled and fastened, there is no need for a special functional manpower or equipment or foundation concrete.

셋째, 본 발명은 구조물의 형상이 대량운반이 용이한 구조이므로 공기단축이 가능하고, 일체의 콘크리트 공사가 불필요하므로, 동절기 공사, 산지하천 응급복구 공사 등에 유용하게 활용할 수 있는 경제적인 이점이 있다.Third, the present invention is the structure of the structure is easy to mass transport structure is easy to shorten the air, because no concrete construction is required, there is an economic advantage that can be usefully utilized in winter construction, mountain river emergency recovery construction.

도 1은 본 발명에 따른 사면 및 호안옹벽용 구조물을 도시한 사시도,1 is a perspective view showing the structure for the slope and rake retaining wall according to the present invention,

도 2는 본 발명에 따른 사면 및 호안옹벽용 구조물을 도시한 정면도,Figure 2 is a front view showing the structure for the slope and rake retaining wall according to the invention,

도 3은 본 발명에 따른 사면 및 호안옹벽용 구조물을 도시한 배면도,Figure 3 is a rear view showing the structure for the slope and rake retaining wall according to the invention,

도 4는 본 발명에 따른 사면 및 호안옹벽용 구조물을 도시한 평면도,Figure 4 is a plan view showing a structure for the slope and rake retaining wall according to the present invention,

도 5는 본 발명에 따른 사면 및 호안옹벽용 구조물을 도시한 저면도,Figure 5 is a bottom view showing the structure for the slope and rake retaining wall according to the invention,

도 6은 본 발명에 따른 사면 및 호안옹벽용 구조물을 도시한 측면도,Figure 6 is a side view showing the structure for the slope and rake retaining wall according to the present invention,

도 7a 내지 7d는 본 발명에 따른 사면 및 호안옹벽용 구조물의 설치 상태를 도시한 전개도,7a to 7d are exploded views showing the installation state of the structure for the slope and rake retaining wall according to the present invention,

도 8은 본 발명에 따른 사면 및 호안옹벽용 구조물의 설치 상태를 도시한 단면도,8 is a cross-sectional view showing an installation state of the slope and the retaining wall structure according to the invention,

도 9는 본 발명에 따른 사면 및 호안옹벽용 구조물에 철망이 설치된 상태를 도시한 예시도,9 is an exemplary view showing a state in which a wire mesh is installed on the structure for the slope and rake retaining wall according to the present invention,

도 10은 본 발명에 따른 사면 및 호안옹벽용 구조물에 앵커철근이 설치된 상태를 도시한 예시도.10 is an exemplary view showing a state in which anchor reinforcement is installed on the structure for the slope and rake retaining wall according to the present invention.

-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing

10 : 전면부재 12 : 직선부10: front member 12: straight part

14 : 경사부 20 : 지지부재14: inclined portion 20: support member

22 : 지지부 24 : 지지발22: support portion 24: support foot

30 : 직선부 체결공 31 : 경사부 체결공 30: straight part fastening hole 31: inclined part fastening hole

32 : 체결공 중심간 거리 40 : 공극부32: distance between the fastening hole center 40: air gap

60 : 철망 62 : 볼트60: wire mesh 62: bolt

70 : 앵커철근 80 : 철근연결장치70: anchor reinforcement 80: reinforcing bar connecting device

S : 구조물S: Structure

Claims (9)

소정의 길이의 평활면을 갖는 직선부(12)와 상기 직선부(12)의 양단으로부터 하향 외측으로 소정의 각도를 갖도록 꺾여 형성된 경사부(14)로 이루어지는 전면부재(10)와; A front member (10) comprising a straight portion (12) having a smooth surface of a predetermined length and an inclined portion (14) formed so as to have a predetermined angle downwardly outward from both ends of the straight portion (12); 상기 전면부재(10)의 직선부(12)의 가운데로부터 배면으로 일체로 소정의 단면으로 연장되는 지지부(22)와 상기 지지부(22)를 지탱하도록 끝단에 일체로 단면을 확대시켜 형성된 지지발(24)로 이루어지는 지지부재(20)로 구성됨을 특징으로 하는 사면 및 호안옹벽용 구조물.Support foot formed by extending the cross section integrally at the end to support the support portion 22 and the support portion 22 integrally extending from the center of the straight portion 12 of the front member 10 to the back surface ( Slope and retaining wall structure, characterized in that consisting of a support member 20 made of 24. 제 1항에 있어서,The method of claim 1, 상기 전면부재(10)에는 직선부(12)와 경사부(14)에 걸쳐 소정의 망눈크기를 갖는 철망(60)이 볼트(62)를 매개로 하여 고정 설치되어, 내부채움재의 유실이 방지됨을 특징으로 하는 사면 및 호안옹벽용 구조물.The front member 10 has a wire mesh 60 having a predetermined mesh size across the straight portion 12 and the inclined portion 14 is fixedly installed through the bolt 62 to prevent the loss of the inner filling material. Slope and rake retaining wall structure characterized in that. 제 1항에 있어서, The method of claim 1, 상기 직선부(12)와 경사부(14)의 단부에는 전후가 관통되도록 체결공(30, 31)들이 형성되며 체결공(30, 31) 중심간 거리(32)는 동일하게 형성됨을 특징으로 하는 사면 및 호안옹벽용 구조물. Fastening holes 30 and 31 are formed at the ends of the straight portion 12 and the inclined portion 14 so that the front and rear sides thereof are penetrated, and the distance 32 between the centers of the fastening holes 30 and 31 is the same. Structures for slopes and shelter walls. 제 1항 내지 제 3항중 어느 한 항에 있어서, The method according to any one of claims 1 to 3, 상기 직선부(12)와 경사부(14)가 만나서 이루어지는 부분의 부재 중심선 각도는 120°로 구성됨을 특징으로 하는 사면 및 호안옹벽용 구조물.Slope and rake wall structure, characterized in that the member centerline angle of the portion formed by the straight portion 12 and the inclined portion 14 is composed of 120 °. 제 1항에 있어서,The method of claim 1, 상기 지지발(24)은 상협하광의 단면형상으로 구성되어, 지중앵커 기능을 갖는 것을 특징으로 하는 사면 및 호안옹벽용 구조물.The support foot 24 is configured in the cross-sectional shape of the upper and lower light, the structure for slopes and rake wall, characterized in that it has an underground anchor function. 제 1항에 있어서,The method of claim 1, 상기 지지발(24)에는 지중에 구조물을 고착시키기 위해 앵커철근(70)이 연결 설치됨을 특징으로 하는 사면 및 호안옹벽용 구조물.Slope and rake wall structure, characterized in that the support foot 24 is connected to the anchor reinforcement 70 is installed to fix the structure in the ground. 제 6항에 있어서,The method of claim 6, 상기 앵커철근(70)에는 앵커철근(70)의 길이를 연장시키도록 철근연결장치(80)가 설치되며, 상기 철근연결장치(80)에 의하여 앵커철근(70)의 길이가 연장됨을 특징으로 하는 사면 및 호안옹벽용 구조물.The anchor reinforcing bar 70 is provided with a reinforcing bar connecting device 80 to extend the length of the anchor reinforcing bar 70, characterized in that the length of the anchor reinforcing bar 70 is extended by the reinforcing bar connecting device 80 Structures for slopes and shelter walls. 소정의 길이의 평활면을 갖는 직선부(12)와 상기 직선부(12)의 양단으로부터 하향 외측으로 소정의 각도를 갖도록 꺾여 형성된 경사부(14)로 이루어지는 전면부재(10)와; 상기 전면부재(10)의 직선부(12)의 가운데로부터 배면으로 일체로 소정의 단면으로 연장되는 지지부(22)와 상기 지지부(22)를 지탱하도록 끝단에 일체로 단면을 확대시켜 형성된 지지발(24)로 이루어지는 지지부재(20)로 구성되는 사면 및 호안옹벽용 구조물(S)로서, 상기 사면 및 호안옹벽용 구조물(S)의 전면부재(10)를 표층으로 하며, 인접하는 사면 및 호안옹벽용 구조물(S)의 전면부재(10)를 볼트와 너트로 체결공(30)에 연결하여 벌집형상으로 조립함과 동시에 상기 사면 및 호안옹벽용 구조물(S)의 공극부(40)에 자연석, 깬돌, 식생토낭, 토사 등으로 이루어지는 내부채움재를 충전하여 사면 및 호안옹벽용 구조물(S)을 형성함을 특징으로 하는 사면 및 호안옹벽용 구조물 시공방법.A front member (10) comprising a straight portion (12) having a smooth surface of a predetermined length and an inclined portion (14) formed so as to have a predetermined angle downwardly outward from both ends of the straight portion (12); Support foot formed by extending the cross section integrally at the end to support the support portion 22 and the support portion 22 integrally extending from the center of the straight portion 12 of the front member 10 to the back surface ( Slope and rake wall structure (S) composed of a support member 20 consisting of 24, the front surface of the slope and rake wall structure (S) as a surface layer, adjacent slope and rake wall By connecting the front member 10 of the structure (S) to the fastening hole 30 with bolts and nuts to assemble in a honeycomb shape and at the same time the natural stone, in the void portion 40 of the slope and the retaining wall structure (S) Method for constructing a slope and rake retaining wall structure, characterized in that to form the slope (S) and rake retaining wall structure (S) by filling the inner filling material consisting of crushed stone, vegetation ton, earth and sand. 삭제delete
KR1020040022769A 2004-04-02 2004-04-02 Structure for slope and shore protection, and it's construction method KR100475104B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040022769A KR100475104B1 (en) 2004-04-02 2004-04-02 Structure for slope and shore protection, and it's construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040022769A KR100475104B1 (en) 2004-04-02 2004-04-02 Structure for slope and shore protection, and it's construction method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0009170U Division KR200356106Y1 (en) 2004-04-02 2004-04-02 Structure for slope and shore protection

Publications (1)

Publication Number Publication Date
KR100475104B1 true KR100475104B1 (en) 2005-03-14

Family

ID=37228406

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040022769A KR100475104B1 (en) 2004-04-02 2004-04-02 Structure for slope and shore protection, and it's construction method

Country Status (1)

Country Link
KR (1) KR100475104B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018131828A1 (en) 2017-01-11 2018-07-19 주식회사 삼화플라스틱 Lipstick container
WO2019177340A1 (en) 2018-03-13 2019-09-19 주식회사 삼화플라스틱 Lipstick case

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018131828A1 (en) 2017-01-11 2018-07-19 주식회사 삼화플라스틱 Lipstick container
WO2019177340A1 (en) 2018-03-13 2019-09-19 주식회사 삼화플라스틱 Lipstick case

Similar Documents

Publication Publication Date Title
CA2975237C (en) A retaining wall method of precast block to prevent landslide
US5499891A (en) Earth-retaining module and system
KR100654936B1 (en) Method for constructing retaining wall
KR100475104B1 (en) Structure for slope and shore protection, and it's construction method
KR101281910B1 (en) Environmental constructing system of breast wall and the method thereof
KR200356106Y1 (en) Structure for slope and shore protection
KR101018903B1 (en) Stabilizing assembly for preventing soil-flow of slope and greening
KR100433496B1 (en) Revetment block for a slope of river dike
CN212477800U (en) Anchoring gabion retaining wall
JP3472708B2 (en) Slope and seawall retaining wall structures and their construction methods
KR200267606Y1 (en) Revetment block for a slope of river dike
KR101131814B1 (en) Rhombic dam using light weight steel and rock
KR101097055B1 (en) Debris barrier and plastering between rafters constructed by the cast iron panel and method of debris barrier
KR100840155B1 (en) Anchor system of concrete retaining wall and slops frame for reinforcement anchor
KR20100138705A (en) Base block for supporting revetment block
KR101684340B1 (en) Scour protection system for shore and its installation methods
KR200219575Y1 (en) The structure of a quilt-up a lattice block for construction
KR100458721B1 (en) Vegetation bank protection structures well-matched in nature environment and constructing method thereof
KR200429330Y1 (en) A wire mattress lay block
JP2002070024A (en) Earth retaining frame and earth retaining method of slope or the like
KR102152973B1 (en) Structure of Installation for Preventing Overflow
KR20030047369A (en) Bank protection vegetation zone at the low-water channel of river and construction method thereof
KR100968518B1 (en) Construction method of reinforced green retaining wall
KR200419606Y1 (en) Incisions and river frames
KR100669031B1 (en) The slope construction method of having used vegetation block structure and this

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130225

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20140224

Year of fee payment: 10

LAPS Lapse due to unpaid annual fee