KR100453925B1 - A worker protecter for laying a steel pipe - Google Patents

A worker protecter for laying a steel pipe Download PDF

Info

Publication number
KR100453925B1
KR100453925B1 KR10-2002-0038927A KR20020038927A KR100453925B1 KR 100453925 B1 KR100453925 B1 KR 100453925B1 KR 20020038927 A KR20020038927 A KR 20020038927A KR 100453925 B1 KR100453925 B1 KR 100453925B1
Authority
KR
South Korea
Prior art keywords
worker
ladder
steel pipe
inclined surface
work
Prior art date
Application number
KR10-2002-0038927A
Other languages
Korean (ko)
Other versions
KR20020089207A (en
Inventor
노인호
Original Assignee
주식회사 한국건설관리공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 한국건설관리공사 filed Critical 주식회사 한국건설관리공사
Priority to KR10-2002-0038927A priority Critical patent/KR100453925B1/en
Publication of KR20020089207A publication Critical patent/KR20020089207A/en
Application granted granted Critical
Publication of KR100453925B1 publication Critical patent/KR100453925B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D39/00Closures arranged within necks or pouring openings or in discharge apertures, e.g. stoppers
    • B65D39/08Threaded or like closure members secured by rotation; Bushes therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D39/00Closures arranged within necks or pouring openings or in discharge apertures, e.g. stoppers
    • B65D39/0052Closures arranged within necks or pouring openings or in discharge apertures, e.g. stoppers made in more than one piece
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D53/00Sealing or packing elements; Sealings formed by liquid or plastics material
    • B65D53/02Collars or rings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Ladders (AREA)

Abstract

본 발명은 강관 매설 작업용 작업자 보호장치에 관한 것으로, 이 보호장치(1)는 그 하단일측에 터파기 경사면(2)과 일치되는 경사면(3)이 형성되어 직립설치되는 몸체(4)와, 이 몸체(4)의 전방쪽 좌우측단에 각각 탈착가능하게 설치되어 상기 몸체(4)의 변형을 막아줄 수 있도록 된 지지바아(5)와, 상기 몸체(4)의 후방쪽 내측에 다수 설치되어 작업자가 이를 잡고 올라가거나 내려갈 수 있도록 된 철제 계단(6)과, 상기 몸체(4)의 후방쪽 상단에 힌지(7)를 매개로 회동가능하게 설치된 사다리(8) 및, 상기 몸체(4)의 후방쪽 외측 중앙에 힌지(7)를 매개로 회동가능하게 설치됨과 더불어 그 선단에 형성된 고정브라켓트(9)가 상기 사다리(8)의 스텝(8a)에 끼워져 사다리(8)를 지지고정할 수 있도록 된 지지대(10)로 이루어진 구조로서, 작업자 보호장치에 의해 용접공을 보다 안정되게 보호함으로써 토사의 무너짐으로 인한 인명피해를 미연에 방지할 수 있고, 또한 용접공이 보다 효율적으로 작업할 수 있는 환경을 조성함으로써 작업효율을 높임과 더불어 강관 연결부의 작업품질을 향상시킬 수 있는 것이다.The present invention relates to a worker protection device for steel pipe embedding operation, the protection device 1 is a body (4) is installed upright and is provided with an inclined surface (3) corresponding to the trench inclined surface (2) on one side of the lower end, and The support bar 5 is detachably installed at the front left and right ends of the body 4 so as to prevent deformation of the body 4, and a plurality of workers are installed inside the rear side of the body 4 and the worker A steel staircase 6, which is capable of holding the teeth up or down, a ladder 8 rotatably installed via a hinge 7 on the rear upper end of the body 4, and the rear of the body 4; In the center of the outer side is rotatably installed via the hinge (7) and the fixing bracket (9) formed at the tip thereof is fitted to the step (8a) of the ladder (8) to support and fix the ladder (8) As a structure consisting of the support (10), the welder by the worker protection device With stable protection, it is possible to prevent human damage due to soil collapse, and to create an environment where welders can work more efficiently, thereby improving work efficiency and improving the work quality of steel pipe connections. .

Description

강관 매설 작업용 작업자 보호장치{A worker protecter for laying a steel pipe}A worker protecter for laying a steel pipe}

본 발명은 토목 건설현장에서 사용되는 보호장치에 관한 것으로, 특히 대형 상수도관을 설치하는 관로 공사시 강관을 연결하는 용접공을 안전하게 보호함과 더불어 그 작업효율을 높여줄 수 있도록 한 강관 매설 작업용 작업자 보호장치에 관한 것이다.The present invention relates to a protection device used in civil construction sites, in particular to protect the welder connecting the steel pipe during the pipeline construction to install a large water pipe, and to protect the worker for laying the steel pipe to increase the work efficiency. Relates to a device.

일반적으로 배수공사나 혹은 대형 상하수도의 관로 공사시 콘크리트 또는 강관 등으로 이루어진 대형관을 땅에 매설하게 되는 바, 상기 관을 매설하기 위해서는 관의 크기에 따라 중장비를 동원하여 터파기를 하게 되고, 또한 상기 터파기시 지반의 상태에 따라 각종 가설구조물이 설치되는 것이다.In general, a large pipe made of concrete or steel pipes is buried in the ground during drainage or large water and sewage pipe construction. In order to bury the pipe, heavy equipment is used according to the size of the pipe to destroy the pipe. Various temporary structures are installed according to the condition of the ground when digging.

즉, 도 1에 도시된 바와 같이 대형 상하수도의 관로 공사시에는 터파기를 한 후 다수의 대형 강관(101)을 배치한 후, 작업자가 직접 강관(101)이 놓여진 곳에 내려가 여러 가지 작업을 수행함으로써 공사가 진행되게 되고, 이 때 용접공에 의해 강관(101)과 강관(101)을 용접하여 이어줌으로써 관로가 만들어질 수 있게 되는 것이다.That is, as shown in Figure 1 when the pipeline construction of large water and sewage sewage and after placing a large number of large steel pipes 101, the worker goes directly to the place where the steel pipes 101 are placed to perform a variety of work This is to proceed, at this time by the welder by connecting the steel pipe 101 and the steel pipe 101 is to be able to be made a pipeline.

그런데, 상기 강관(101)을 매설하기 위해 실시되는 터파기의 경우 완만하게 자연경사를 갖도록 파야하지만 터파기 폭이 넓어지면 그 만큼 토공량이 많아지고 주변시설에도 영향을 미치기 때문에 거의 무너지지 않을 정도만 파게 되어, 이에 따라 용접공이 작업을 하는 도중에 종종 토사가 무너져 사상자가 발생하는 경우가 있고, 또한 상기와 같은 불안한 상황에서 작업자가 작업을 수행하다 보면 그 작업효율이 떨어질 수 밖에 없는 등의 제반 문제점이 있었다.By the way, in the case of the trench is carried out to bury the steel pipe 101 to dig gently to have a natural inclination, but if the width of the trench widens that much earthwork amount and affects the surrounding facilities will only be dug to almost collapse Therefore, there is a case that the earth and sand often collapses while the welder is working, and when the worker performs the work in an unstable situation as described above, there is a problem that the work efficiency is inevitably deteriorated.

이에 본 발명은 상기한 바의 문제점을 해소하기 위해 안출된 것으로, 대형 상수도관을 설치하는 관로 공사시 강관을 연결하는 용접공을 안전하게 보호함과 더불어 그 작업효율을 높여줄 수 있도록 한 강관 매설 작업용 작업자 보호장치를 제공함에 그 목적이 있는 것이다.Accordingly, the present invention has been made to solve the above problems, the worker for laying steel pipes to secure the welder connecting the steel pipes during the construction of the pipeline to install a large water pipe and to increase the work efficiency. The purpose is to provide a protective device.

상기한 바의 목적을 달성하기 위한 본 발명은, 작업자가 그 내측에서 작업할 수 있도록 반원통형으로 형성됨과 더불어 그 하단일측에 터파기 경사면과 일치되는 경사면이 형성되어 직립설치되는 몸체와, 이 몸체의 전방쪽 좌우측단에 각각 탈착가능하게 설치됨과 더불어 상하방향으로 일정간격을 두고 수평되게 다수 설치되어 상기 몸체의 변형을 막아줄 수 있도록 된 지지바아와, 상기 몸체의 후방쪽 내측에 상하방향으로 일정간격을 두고 다수 설치되어 작업자가 이를 잡고 올라가거나 내려갈 수 있도록 된 철제 계단과, 상기 몸체의 후방쪽 상단에 힌지를 매개로 회동가능하게 설치되어 작업자가 터파기 작업장을 벗어나거나 혹은 터파기 작업장으로 들어갈 수 있도록 된 사다리 및, 상기 몸체의 후방쪽 외측 중앙에 힌지를 매개로 회동가능하게 설치됨과 더불어 상기 사다리의 위치에 따라 그 길이가 조정되면서 그 선단에 형성된 고정브라켓트가 상기 사다리의 스텝에 끼워져 사다리를 지지고정할 수 있도록 된 지지대로 이루어진 구조이다.The present invention for achieving the above object, the body is formed in a semi-cylindrical shape so that the operator can work in the inside and the inclined surface is formed on the lower end side coinciding with the inclined surface is installed upright, this body The support bar is detachably installed at the front left and right sides of the support and is horizontally installed at a predetermined interval in the vertical direction to prevent deformation of the body, and is fixed in the vertical direction in the rear side of the body. Steel staircases are installed at intervals to allow the worker to grab and move up and down, and pivotally installed on the rear top of the body via a hinge to allow the worker to leave the trench workshop or to enter the trench workshop. A ladder and a hinged center of the rear outer side of the body In addition, while the length is adjusted according to the position of the ladder is a structure consisting of a support bracket that is formed in the front end of the fixing bracket is fitted to the step of the ladder to support the ladder.

그리고, 상기 몸체의 전방쪽 좌우측 단에 완충부재가 설치되어 접촉되는 강관을 보호함과 더불어 몸체의 경사면 내측에 계단형의 돌출단이 형성되어 작업자가쉬거나 몸체의 상부로 올라갈 수 있도록 된 것이다.In addition, the shock absorbing member is installed at the front left and right ends of the body to protect the steel pipe to be contacted, and a stepped protrusion is formed inside the inclined surface of the body to allow the worker to rest or climb to the top of the body.

따라서, 상기의 구조로 이루어진 작업자 보호장치에 의해 용접공을 보다 안정되게 보호함으로써 토사의 무너짐으로 인한 인명피해를 미연에 방지할 수 있고, 또한 용접공이 보다 효율적으로 작업할 수 있는 환경을 조성함으로써 작업효율을 높임과 더불어 강관 연결부의 작업품질을 향상시킬 수 있는 것이다.Therefore, by protecting the welder more stably by the worker protection device having the above structure, it is possible to prevent human injury due to the collapse of the soil in advance, and also to create an environment in which the welder can work more efficiently, thereby improving work efficiency. In addition to improving the work quality of the steel pipe connection can be improved.

도 1은 종래의 기술에 따라 강관이 매설되어 용접작업이 이루어지는 상태를 나타낸 상태도,1 is a state diagram showing a state in which a welding operation is made by embedding a steel pipe according to the prior art,

도 2는 본 발명에 따른 강관 매설 작업용 작업자 보호장치를 나타낸 사시도,Figure 2 is a perspective view showing a worker protection device for laying work steel pipe according to the present invention,

도 3은 본 발명에 따른 작업자 보호장치가 강관의 일측에 설치된 상태를 나타낸 상태도,Figure 3 is a state diagram showing a state in which the worker protection device according to the invention installed on one side of the steel pipe,

도 4는 도3의 평면도이다.4 is a plan view of FIG.

* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1 : 보호장치 2 : 터파기 경사면1: Protective device 2: Dig slope

3 : 경사면 4 : 몸체3: slope 4: body

5 : 지지바아 6 : 철제 계단5: support bar 6: iron stairs

7 : 힌지 8 : 사다리7: hinge 8: ladder

8a : 스텝 9 : 고정브라켓트8a: Step 9: Fixing Bracket

10 : 지지대 11 : 강관10: support 11: steel pipe

12 : 완충부재 13 : 돌출단12: cushioning member 13: protruding end

이하 본 발명을 첨부된 예시도면을 참조하여 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 2는 본 발명에 따른 강관 매설 작업용 작업자 보호장치를 도시한 사시도이고, 도 3은 본 발명에 따른 작업자 보호장치가 강관의 일측에 설치된 상태를 도시한 상태도이며, 도 4는 도3의 평면도이다.Figure 2 is a perspective view showing a worker protection device for laying steel pipe work according to the present invention, Figure 3 is a state diagram showing a state in which the worker protection device according to the present invention is installed on one side of the steel pipe, Figure 4 is a plan view of FIG. .

상기한 도면들에 의해 본 발명의 구조를 설명하면, 작업자가 그 내측에서 작업할 수 있는 반원통형의 보호장치(1)가 강관(11) 일측에 구비되되, 상기 보호장치(1)는 그 하단일측에 터파기 경사면(2)과 일치되는 경사면(3)이 형성되어 직립설치되는 몸체(4)와, 이 몸체(4)의 전방쪽 좌우측단에 각각 탈착가능하게 설치됨과 더불어 상하방향으로 일정간격을 두고 수평되게 다수 설치되어 상기 몸체(4)의 변형을 막아줄 수 있도록 된 지지바아(5)와, 상기 몸체(4)의 후방쪽 내측에 상하방향으로 일정간격을 두고 다수 설치되어 작업자가 이를 잡고 올라가거나 내려갈 수 있도록 된 철제 계단(6)과, 상기 몸체(4)의 후방쪽 상단에 힌지(7)를 매개로 회동가능하게 설치되어 작업자가 터파기 작업장을 벗어나거나 혹은 터파기 작업장으로 들어갈 수 있도록 된 사다리(8) 및, 상기 몸체(4)의 후방쪽 외측 중앙에힌지(7)를 매개로 회동가능하게 설치됨과 더불어 상기 사다리(8)의 위치에 따라 그 길이가 조정되면서 그 선단에 형성된 고정브라켓트(9)가 상기 사다리(8)의 스텝(8a)에 끼워져 사다리(8)를 지지고정할 수 있도록 된 지지대(10)로 이루어진 구조이다.Referring to the structure of the present invention by the above drawings, a semi-cylindrical protective device (1) that can be worked inside the operator is provided on one side of the steel pipe 11, the protective device (1) is the bottom The inclined surface (3) corresponding to the inclined inclined surface (2) is formed on one side and the body (4) to be installed upright, and is detachably installed at the front left and right ends of the body (4), and at regular intervals in the vertical direction A plurality of horizontally installed support bars (5) to prevent deformation of the body (4), and a plurality of installed at regular intervals in the vertical direction in the rear side of the body (4) by the operator The steel staircase 6, which can be grabbed up or down, and pivotally installed on the rear upper end of the body 4 by means of a hinge 7, allows an operator to leave the trenching workshop or to enter the trenching workshop. Ladder (8), The ladder is installed to be rotatable through the center of the rear outer side 7 of the body 4 and the length of the ladder 8 is adjusted according to the position of the ladder 8 while the fixing bracket 9 formed at the tip thereof is provided with the ladder. It is a structure which consists of the support stand 10 which was fitted in the step 8a of (8), and was able to support and fix the ladder 8.

여기서, 상기의 구조로 이루어진 보호장치(1)의 특징은 우선 상기 몸체(4)가 터파기 경사면(2)에 직립되게 설치되어 그 내측에서 작업자가 작업을 할 수 있도록 된 것과, 상기 몸체(4)에 부가적으로 설치되는 철제 계단(6) 및 사다리(8) 등에 의해 작업자가 쉽게 보호장치(1)로 들어가거나 나올수 있도록 된 것에 있는 것이다.Here, the characteristics of the protective device (1) having the above structure is that the body (4) is first installed so as to be upright on the trench inclined surface (2) that the operator can work inside, the body (4) By the steel staircase (6) and the ladder (8), which is additionally installed in the) is to be able to easily enter or exit the protective device (1).

그리고, 상기 보호장치(1)에는 또다른 부설수단이 구비되는 바, 상기 몸체(4)의 전방쪽 좌우측 단에 고무재질로 이루어진 완충부재(12)가 각각 설치되어 접촉되는 강관(11)의 표면을 보호할 수 있고, 또한 상기 몸체(4)의 경사면 내측에 계단형의 돌출단(13)이 형성되어 작업자가 쉬거나 작업도구를 올려 놓을 수 있도록 함과 더불어 상기 몸체(4)의 상부로 보다 편리하게 올라갈 수 있도록 된 것이다.In addition, the protection device 1 is provided with another laying means, the front surface of the steel pipe 11 which is installed in contact with the buffer member 12 made of a rubber material at the front left and right ends of the body 4, respectively. And a stepped protrusion 13 formed inside the inclined surface of the body 4 to allow an operator to rest or place a work tool, and also to the upper portion of the body 4. It is convenient to climb.

즉, 상기 보호장치(1)의 몸체(4)는 반원통형으로 이루어져 직립된 상태로 설치되는 바, 상기 몸체(4)의 전방이 강관(11)에 밀착된 상태로 설치되기 때문에 몸체(4) 좌우로 뻗어나온 좌우측단에 상기 완충부재(12)가 고정됨으로써 이 완충부재(12)가 상기 강관(11)의 표면에 접촉되고, 상기 몸체(4)의 전방에는 다수의 지지바아(5)가 수평방향으로 설치됨으로써 몸체(4)의 변형을 막아줌과 더불어 상기 지지바아(5)가 탈착가능함으로 작업자가 필요에 따라 이를 탈거한 상태에서 작업을 진행할 수 있는 것이다.That is, the body 4 of the protection device 1 is formed in a semi-cylindrical shape and is installed in an upright state, since the front of the body 4 is installed in close contact with the steel pipe 11 and the body 4. The buffer member 12 is fixed to the left and right end portions extending from side to side, and the buffer member 12 contacts the surface of the steel pipe 11, and a plurality of support bars 5 are provided in front of the body 4. By installing in the horizontal direction to prevent the deformation of the body (4) and the support bar (5) is removable so that the operator can proceed in the state of removing it as necessary.

그리고, 상기 몸체(4)의 바닥면 일측에는 모따기에 의한 경사면(3)이 형성되어 터파기 경사면(2)에 일치되는 바, 이를 통해 상기 몸체(4)가 보다 견고한 상태로 직립설치됨과 더불어 터파기의 폭을 줄여줄 수 있으며, 또한 상기 경사면(3)의 내측에는 계단형으로 이루어진 돌출단(13)이 다수 형성되어 작업자가 앉아서 쉬거나 혹은 장비를 올려 놓고 보관할 수 있고, 상기 돌출단(13)에 올라서서 상기 철제 계단(6)을 잡고 올라갈 수 있도록 된 것이다.In addition, an inclined surface 3 formed by a chamfer is formed at one side of the bottom surface of the body 4 to correspond to the inclined inclined surface 2, through which the body 4 is installed upright in a more solid state and It is possible to reduce the width of the digging, and also the inside of the inclined surface (3) is formed with a plurality of protrusions (13) made of a stepped shape so that the operator can sit or rest or place the equipment, the protrusions (13) Climb to) will be able to grab the iron stairs (6).

한편, 상기 보호장치(1)의 몸체(4)에는 사다리(8)와 이를 지지하는 지지대(10)가 회동가능하게 설치되는 바, 상기 사다리(8)의 경우 몸체(4)의 후방쪽 상단에 힌지(7)를 통해 회동가능하게 설치되고, 평상시에는 하부방향으로 위치되어 고정된 상태를 유지하다가 사용시에 상부로 들어 올려져 그 타측 선단이 터파기 경사면(2)의 상부에 걸쳐진 상태로 고정되는 것이다.Meanwhile, the ladder 4 and the support 10 supporting the same are rotatably installed in the body 4 of the protective device 1, and in the case of the ladder 8, the upper side of the rear side of the body 4 is provided. It is rotatably installed through the hinge (7), and is normally positioned in a lower direction to maintain a fixed state, and is lifted to the upper side in use so that the other end thereof is fixed to the upper portion of the trench slope (2). will be.

또한, 상기 사다리(8)를 지지하는 지지대(10)의 경우도 사다리(8)와 마찬가지로 회동가능하게 설치되되, 상기 지지대(10)의 선단에 형성된 고정브라켓트(9)의 양단이 상기 사다리(8)의 스텝(8a)에 끼워져 고정됨으로써 사다리(8)를 보다 견고한 상태로 지지할 수 있고, 상기 사다리(8)의 위치에 따라 지지대(10)의 길이가 늘어나거나 줄어들 수 있도록 된 것이다.In addition, in the case of the support (10) for supporting the ladder (8) is installed as rotatable similarly to the ladder (8), both ends of the fixing bracket (9) formed at the tip of the support (10) is the ladder (8) By being fitted into the step (8a) of the) it is possible to support the ladder 8 in a more solid state, the length of the support 10 can be increased or decreased depending on the position of the ladder (8).

따라서, 상기의 작업자 보호장치(1)에 의해 토사의 무너짐으로 인한 작업자의 매몰을 막아줄 수 있기 때문에 작업자가 심리적 안정을 가진 상태에서 보다 효율적으로 작업을 수행할 수 있는 것이다.Therefore, since the worker protection device 1 can prevent the worker from being buried by the collapse of the soil, the worker can perform the work more efficiently in a state of psychological stability.

이상에서 설명한 바와 같이 본 발명에 따른 강관 매설 작업용 작업자 보호장치에 의하면, 작업자 보호장치에 의해 용접공을 보다 안정되게 보호함으로써 토사의 무너짐으로 인한 인명피해를 미연에 방지할 수 있고, 또한 용접공이 보다 효율적으로 작업할 수 있는 환경을 조성함으로써 작업효율을 높임과 더불어 강관 연결부의 작업품질을 향상시킬 수 있는 효과가 있는 것이다.As described above, according to the worker protection device for embedding steel pipe according to the present invention, by protecting the welder more stably by the worker protection device, it is possible to prevent human injury due to soil collapse in advance and the welder is more efficient. By creating an environment in which work can be carried out, the work efficiency is increased and the work quality of the steel pipe connection can be improved.

Claims (2)

작업자가 그 내측에서 작업할 수 있도록 반원통형으로 형성됨과 더불어 그 하단일측에 터파기 경사면(2)과 일치되는 경사면(3)이 형성되어 직립설치되는 몸체(4)와,The body 4 is formed in a semi-cylindrical shape so that the worker can work in the inside, and the inclined surface 3 is formed on the lower end side to match the trench inclined surface 2 and is installed upright. 상기 몸체(4)의 전방쪽 좌우측단에 각각 탈착가능하게 설치됨과 더불어 상하방향으로 일정간격을 두고 수평되게 다수 설치되어 상기 몸체(4)의 변형을 막아줄 수 있도록 된 지지바아(5)와,Support bars (5) which are installed detachably at the front left and right sides of the body (4) and are horizontally installed at a predetermined interval in the vertical direction to prevent deformation of the body (4), 상기 몸체(4)의 후방쪽 내측에 상하방향으로 일정간격을 두고 다수 설치되어 작업자가 이를 잡고 올라가거나 내려갈 수 있도록 된 철제 계단(6)과,Iron staircase (6) and a plurality of installed at a predetermined interval in the vertical direction in the rear inner side of the body (4) to allow the worker to grab it up or down, 상기 몸체(4)의 후방쪽 상단에 힌지(7)를 매개로 회동가능하게 설치되어 작업자가 터파기 작업장을 벗어나거나 혹은 터파기 작업장으로 들어갈 수 있도록 된 사다리(8) 및,A ladder 8 installed on the rear upper end of the body 4 by a hinge 7 so as to allow the operator to leave the trench workshop or to enter the trench workshop; 상기 몸체(4)의 후방쪽 외측 중앙에 힌지(7)를 매개로 회동가능하게 설치됨과 더불어 상기 사다리(8)의 위치에 따라 그 길이가 조정되면서 그 선단에 형성된 고정브라켓트(9)가 상기 사다리(8)의 스텝(8a)에 끼워져 사다리(8)를 지지고정할 수 있도록 된 지지대(10)로 이루어진 강관 매설 작업용 작업자 보호장치.In addition to the hinge 7 is installed in the rear outer center of the body 4 via the hinge (7) and the length is adjusted in accordance with the position of the ladder (8) fixed bracket (9) formed at the front end of the ladder A worker protection device for steel pipe embedding work, comprising a support (10) fitted into a step (8a) of (8) to be capable of supporting and fixing a ladder (8). 제 1 항에 있어서, 상기 몸체(4)의 전방쪽 좌우측 단에 완충부재(12)가 설치되어 접촉되는 강관(11)을 보호함과 더불어 몸체(4)의 경사면 내측에 계단형의 돌출단(13)이 형성되어 작업자가 쉬거나 몸체(4)의 상부로 올라갈 수 있도록 된 것을 특징으로 하는 강관 매설 작업용 작업자 보호장치.The method of claim 1, wherein the buffer member 12 is installed at the front left and right ends of the body 4 to protect the steel pipe (11) in contact with the stepped protrusion end inside the inclined surface of the body (4) ( 13) is formed so that the worker can rest or climb to the upper portion of the body (4) worker protective device for laying work.
KR10-2002-0038927A 2002-07-05 2002-07-05 A worker protecter for laying a steel pipe KR100453925B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2002-0038927A KR100453925B1 (en) 2002-07-05 2002-07-05 A worker protecter for laying a steel pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2002-0038927A KR100453925B1 (en) 2002-07-05 2002-07-05 A worker protecter for laying a steel pipe

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR2020010014542U Division KR200244690Y1 (en) 2001-05-18 2001-05-18 A worker protecter for laying a steel pipe

Publications (2)

Publication Number Publication Date
KR20020089207A KR20020089207A (en) 2002-11-29
KR100453925B1 true KR100453925B1 (en) 2004-10-26

Family

ID=27727181

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2002-0038927A KR100453925B1 (en) 2002-07-05 2002-07-05 A worker protecter for laying a steel pipe

Country Status (1)

Country Link
KR (1) KR100453925B1 (en)

Also Published As

Publication number Publication date
KR20020089207A (en) 2002-11-29

Similar Documents

Publication Publication Date Title
KR100713787B1 (en) The underground structure assembly and the underground structure building method which it uses
KR200244690Y1 (en) A worker protecter for laying a steel pipe
KR100453925B1 (en) A worker protecter for laying a steel pipe
JP2019199705A (en) Box culvert insertion assisting device
KR100947049B1 (en) Pipe stand with fill-soil prevention walls
KR102186630B1 (en) Water and sewage construction method
US4329084A (en) Ditching over buried lines
JP4869821B2 (en) Pipe laying method
JP4959747B2 (en) Obstacle removal casing
JP2001207452A (en) Method for burying pipe
JPH0529248Y2 (en)
JP2000257069A (en) Earth retaining and earth retaining construction method
JP3450294B2 (en) Supporting structure of lining plate and lining method
JP3673921B2 (en) Preload panel retaining ring
JP3486824B2 (en) Sliding sheet pile and soil retaining method using it
JP2579584B2 (en) Earth retaining method and earth retaining box
CN216240718U (en) Supporting device is used in construction of antidetonation resistance to compression protection type communication pipeline
KR200312008Y1 (en) Asinking preventin equipment of a ladder type for a drainpipe use of recycling plastic
JPH07207664A (en) Earth retaining device of excavated trench and earth retaining method
JPS5847091Y2 (en) Earth retention shoring device for excavated trenches
KR200434428Y1 (en) Unificated support device in box shape
KR200405207Y1 (en) Mounting structure in temporary facility for road
JPH05156640A (en) Digging hole forming for constructing thin film wall
JP3019750U (en) Inclination correction device for buried pipe
JPS605089Y2 (en) Raising stand in earth retaining structure

Legal Events

Date Code Title Description
A108 Dual application of patent
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121009

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20131007

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20140917

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20150922

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20161004

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20181012

Year of fee payment: 15

FPAY Annual fee payment

Payment date: 20191010

Year of fee payment: 16