KR100450283B1 - A overhaul method of a water turbine generator - Google Patents

A overhaul method of a water turbine generator Download PDF

Info

Publication number
KR100450283B1
KR100450283B1 KR10-2002-0048537A KR20020048537A KR100450283B1 KR 100450283 B1 KR100450283 B1 KR 100450283B1 KR 20020048537 A KR20020048537 A KR 20020048537A KR 100450283 B1 KR100450283 B1 KR 100450283B1
Authority
KR
South Korea
Prior art keywords
guide
generator
rotor
cover
disassembly
Prior art date
Application number
KR10-2002-0048537A
Other languages
Korean (ko)
Other versions
KR20040016267A (en
Inventor
박영식
선점수
Original Assignee
수자원기술 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 수자원기술 주식회사 filed Critical 수자원기술 주식회사
Priority to KR10-2002-0048537A priority Critical patent/KR100450283B1/en
Publication of KR20040016267A publication Critical patent/KR20040016267A/en
Application granted granted Critical
Publication of KR100450283B1 publication Critical patent/KR100450283B1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03BMACHINES OR ENGINES FOR LIQUIDS
    • F03B3/00Machines or engines of reaction type; Parts or details peculiar thereto
    • F03B3/02Machines or engines of reaction type; Parts or details peculiar thereto with radial flow at high-pressure side and axial flow at low-pressure side of rotors, e.g. Francis turbines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

본 발명은 수력발전소(WATER POWER PLANT)에 설치되어 수력을 이용하여 전기를 생산하는 수차발전기를 일정기간 마다 보수를 실시할 때에 보다 능률적이고 체계적으로 시행하기 위한 프란시스(FRANCIS)수차발전기를 분해점검 보수하기 위한 방법에 관한 것으로써, 발전기와 수차를 순차적으로 분해하고 분해된 각 부품을 점검 및 보수를 실시한 후에 역순으로 조립시키되 고정체를 정위치에 정확하게 셋팅시키고 회전체를 안치조립시켜 주므로 분해 보수점검을 효율적이면서도 정확하게 수행할 수 있고, 분해 보수 점검시간을 단축시킬 수 있으며, 따라서 수차발전기의 성능을 지속적으로 유지시킬 수 있고 수명도 연장시킬 수 있게 된다.The present invention is installed in a water power plant (WATER POWER PLANT) to perform a more efficient and systematically when performing repairs for a certain period of time generators that generate electricity by using hydroelectric power (FRANCIS) generator breakdown inspection and repair The method is to disassemble the generator and aberrations sequentially, and after disassembling and inspecting each of the disassembled parts, assemble them in the reverse order, but set the fixed body in the correct position and assemble the rotating body. Can be carried out efficiently and accurately, and the time for overhaul and maintenance can be shortened, thereby maintaining the performance of the water turbine generator and extending its life.

Description

수차발전기의 보수방법{A OVERHAUL METHOD OF A WATER TURBINE GENERATOR}A OVERHAUL METHOD OF A WATER TURBINE GENERATOR}

본 발명은 수력발전소(WATER POWER PLANT)에 설치되어 수력을 이용하여 전기를 생산하는 수차발전기를 일정기간 마다 보수를 실시할 때에 보다 능률적이고 체계적으로 시행하기 위한 수차발전기의 보수방법에 관한 것으로, 특히 프란시스(FRANCIS)수차발전기를 분해점검 보수하기 위한 방법에 관한 것이다.The present invention relates to a method of repairing a water turbine generator for more efficiently and systematically when a water turbine generator installed in a water power plant (WATER POWER PLANT) to generate electricity by using hydraulic power for maintenance at regular intervals. A method for overhauling and repairing a FRANCIS aberration generator is provided.

이를 좀 더 상세히 설명하면, 프란시스수차발전기는 전기를 생산하는 발전기(GNERATER)와 물의 위치에너지를 기계적(회전)에너지로 바꿔주는 회전기계인 수차(HYDRAULIC TURBINE)가 동일 수직선상에 상하로 설치되어 수차의 동력을 받아 발전기가 전기를 생산하게 된다.To explain this in more detail, the Francis aberration generator has aberrations in which electric generators (GNERATER) and aberrations (HYDRAULIC TURBINE), a rotating machine that converts the potential energy of water into mechanical (rotary) energy, are installed on the same vertical line. Powered by the generator, the generator produces electricity.

상기와 같은 수차(프란시스수차)발전기는 발전설비와 그 부속설비 기기의 성능을 정상적으로 유지시키고 각종사고의 발생을 미연에 방지하여 더욱 안전하고 효율적으로 운용할 수 있도록 하기 위해 5 ~ 10년을 주기로 분해점검(OVERHAUL)을 실시해 주게 되며, 수차발전기의 분해점검보수는 대체적으로 발전기와 수차를 분해하고, 분해된 기기를 보수점검 및 보조기기 분해점검을 실시하며, 보수된 수차 및 발전기를 조립 등의 공정으로 시행하게 된다.The above-mentioned aberration (Francis aberration) generators are decomposed every 5 to 10 years in order to maintain the performance of the power generation equipment and its related equipment properly and to prevent the occurrence of various accidents in order to operate more safely and efficiently. The overhaul is carried out, and the overhaul of the aberration generator is generally performed by disassembling the generator and the aberration, performing a maintenance and disassembly inspection of the disassembled equipment, and assembling the repaired aberration and the generator. Will be implemented.

그러나, 종래에는 상기와 같이 수차발전기를 보수공사를 실시함에 있어 단순히 숙달된 기능에만 의존하여 실시하였으므로 보수에 따른 순서를 명확하게 설정하지 못한 상태에서 두서없이 분해하고 조립을 실시하여 보수기간을 추정할 수 없이 많은 시간과 인력이 소요되는 문제가 있었고, 보수에 따른 명확한 기준을 설정하지 못한 상태에서 실시하였으므로 조립을 실시할 때에 분해시킨 부품을 정위치에 정확하게 조립시킬 수 없었을 뿐만 아니라 일부의 부품은 정밀한 가공이 필요하여 작업에 많은 어려움이 발생하게 되며, 이로 인해 성능이 약화되거나 부품이 쉽게 파손되어 빈번하게 보수를 실시하여야 했으며, 따라서 시간과 비용을 낭비하게 되는 문제도 발생하였다.However, in the related art, in performing repair work on the aberration generator as described above, it was simply carried out only by a function of skill. Therefore, the repair period can be estimated by disassembling and assembling without setting the order according to the repair. There was a problem that required a lot of time and manpower, and it did not set clear standard according to the repair, so it was not possible to assemble the disassembled parts correctly in place when performing the assembly, and some parts were precise Due to the need for processing, many difficulties arise in the work, which results in a problem that the performance is weakened or the parts are easily broken and the maintenance is frequently performed, thus wasting time and money.

특히, 보수를 완료하더라도 정밀하게 작업하지 못하였고 부품을 정확하게 조립시키지 못하였으므로 메인샤프트 등이 수직선상으로 설치되지 못하여, 작동시에 축진동이 발생하였고 수차가진력에 의해 진동도 발생하였으며, 핫런(HOT RUN)에서 축진동이 발생하는 등 많은 문제가 있었다.In particular, even after the maintenance was completed, the work was not performed precisely and the parts were not assembled correctly, so the main shaft, etc., was not installed vertically, so axial vibration occurred during operation, and vibration caused by aberration vibration, and hot run There were many problems, such as axial vibration.

이와 같이 운전되는 수차발전기에서 진동이 발생하게 되면 부품들의 마모가 극심하게 되고, 이로 인해 수차발전기의 수명을 현저하게 단축시켜 조기에 교체시켜야 하는등 설비비를 낭비하게 되는 문제도 있었다.When vibration occurs in the driven generator, the wear of the parts is severe, and thus, there is a problem in that the waste of equipment costs, such as a significant shortening of the life of the generator, need to be replaced early.

본 발명은 상기와 같은 문제를 해소할 수 있도록 된 수차발전기의 보수방법을 제공하려는 것이다.The present invention is to provide a method of repairing a water turbine generator that can solve the above problems.

본 발명은 수차발전기를 일정기간 마다 보수를 실시할 때에 보다 능률적이고 체계적으로 시행하기 위한 수차발전기의 보수방법을 제공하되, 특히 프란시스(FRANCIS)수차발전기의 보수방법을 제공하려는데 그 목적이 있다.An object of the present invention is to provide a method of repairing a generator for more efficiently and systematically when performing repairs at regular intervals, and in particular, to provide a method of repairing a Francis generator.

본 발명의 다른 목적은 보수에 따른 분해 및 조립의 기준과 순서를 명확하게 설정할 수 있고, 수차발전기의 수명을 연장시킬 수 있으며, 보수에 따른 시간과 비용을 절감할 수 있도록 된 프란시스(FRANCIS)수차발전기의 보수방법을 제공하는데 있다.Another object of the present invention is to clearly set the standards and the order of disassembly and assembly according to the repair, to extend the life of the generator, and to reduce the time and cost of repair (FRANCIS) aberration The present invention provides a method for repairing a generator.

본 발명의 또 다른 목적은 분해시킨 부품을 정위치에 정확하게 조립시켜 일부의 부품이 조립되지 못하는 현상을 방지하여 성능이 약화되거나 부품이 쉽게 파손되는 현상을 방지할 수 있고, 보수에 따른시간과 비용의 낭비를 방지할 수 있도록 된 프란시스(FRANCIS)수차발전기의 보수방법을 제공하는데 있다.Another object of the present invention is to accurately assemble the disassembled parts in place to prevent the phenomenon that some parts can not be assembled to prevent the phenomenon of performance degradation or easily broken parts, time and cost of repair It is to provide a repair method of the FRANCIS water turbine generator, which can prevent the waste.

본 발명의 상기 및 기타 목적은,The above and other objects of the present invention,

수차발전기를 분해하고 점검한 후에 조립하는 것에 있어서, 프란시스수차발전기(1)를 보다 용이하고 능률적으로 분해시키기 위하여 각종 장비와 장치들을 점검 및 조작하고 분리시켜 주는 준비공정(200-1)과, 발전기부(2)를 분해하고 각종 부품들을 정비 및 보수하는 발전기분해공정(200-2)과, 수차부(3)를 순차적으로 분해하고 분해된 각종 부품을 정비하고 보수하는 수차분해공정(200-3)과, 발전기분해공정(200-2)과 수차분해공정(200-3)에 의해 분해된 발전기부(2)와 수차부(3)의 각 부품들과 보조기기들을 점검보수하도록 하는 분해기기점검공정(239)과, 분해 보수된 수차부(3)의 부품을 역순으로 순차 조립시키는 수차조립공정(200-4)과, 분해 보수된 발전부(2)의 각종부품을 역순으로 순차 조립시키는 발전기조립공정(200-5)과, 조립 완료된 수차발전기(1)를 최종적으로 점검하고 운전에 필요한 각종시험을 테스트하는 점검 및 시험공정(200-6)을 순차적으로 실시하도록 하는 것을 특징으로 하는 수차발전기의 보수방법에 의해 달성된다.In disassembling, inspecting and assembling the aberration generator, a preparation process (200-1) for inspecting, manipulating and separating various equipments and devices in order to disassemble the Francis aberration generator 1 more easily and efficiently, Generator disassembly process (200-2) for disassembling the base (2) and maintenance and repair of various components, and aberration disassembly process (200-3) for disassembling the aberration unit (3) sequentially and repairing and repairing the disassembled various components (200-3). And inspection of the disassembly device for inspecting and repairing the components and auxiliary devices of the generator part 2 and the aberration part 3 disassembled by the generator disassembling process 200-2 and the aberration disassembling process 200-3. Generator 239, an aberration assembly step 200-4 for assembling the parts of the dismantled and repaired aberration part 3 sequentially, and a generator for assembling the various parts of the disassembled and repaired power generation part 2 in order. The assembling process (200-5) and the assembled aberration generator (1) are finally And a check is accomplished by a repair process of the aberration generator characterized in that to carry out checks to test a variety of tests required for operation, and a test process (200-6) sequentially.

도 1은 본 발명에 의해 보수되는 프란시스수차발전기의 구조를 보인 단면도.1 is a cross-sectional view showing the structure of the Francis aberration generator repaired by the present invention.

도 2a 및 도 2b는 본 발명에 의해 보수되는 프란시스수차발전기의 발전기부 와 수차터빈부를 확대하여 보인 단면도.Figure 2a and Figure 2b is an enlarged cross-sectional view of the generator portion and the water turbine turbine portion of the Francis water turbine generator repaired by the present invention.

도 3a 내지 도 3h는 본 발명에 따른 수차발전기의 보수방법을 보인 공정도.3a to 3h is a process diagram showing a method of repairing a water turbine generator according to the present invention.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1. 프란시스수차발전기 2. 발전기부1. Francis Wheel Generator 2. Generator

3. 수차터빈부 200. 분해점검보수공정3. Turbine turbine part 200. Disassembly inspection repair process

200-1. 준비공정 200-2. 발전기분해공정200-1. Preparation process 200-2. Generator decomposition process

200-3. 수차분해공정 200-4. 수차조립공정200-3. Aberration Decomposition Process 200-4. Aberration Assembly Process

200-5. 발전기조립공정 200-6. 점검 및 시험공정200-5. Generator Assembly Process 200-6. Inspection and test process

본 발명의 상기 및 기타 목적과 특징은 첨부도면에 의거한 다음의 상세한 설명에 의해 더욱 명확하게 이해할 수 있을 것이다.The above and other objects and features of the present invention will be more clearly understood by the following detailed description based on the accompanying drawings.

첨부 도면 도 1 내지 도 3h는 본 발명에 따른 수차발전기의 보수방법의 구체적인 실현예를 보인 예시도로써, 도 1은 본 발명에 의해 분해점검 보수되는 프란시스수차발전기의 구조를 보인 단면도이고, 도 2a 및 도 2b는 도 1에 예시된 프란시스수차발전기의 발전기부와 수차터빈부를 확대하여 보인 단면도이며, 도 3a 내지 도 3h는 본 발명에 따른 수차발전기의 보수방법의 공정도이다.Figures 1 to 3h is an exemplary view showing a specific embodiment of the repair method of the aberration generator according to the present invention, Figure 1 is a cross-sectional view showing the structure of the Francis aberration generator to be inspected and repaired by the present invention, Figure 2a And FIG. 2B is an enlarged cross-sectional view of the generator unit and the water turbine turbine unit of the Francis water turbine generator illustrated in FIG. 1, and FIGS. 3A to 3H are process diagrams of a method of repairing a water turbine generator according to the present invention.

수차발전기의 분해점검 보수(OVERHAUL)는 정기적으로 시행하는 것으로써 이를 실시할 때에 각 기기마다 개별적으로 시기를 달리하여 시행하게 되면 여러번의 정전회수가 필요하여 설비가동율저하에 따른 발전손실을 초래하게 되고, 따라서 발전소 내부의 전체 설비를 일정기간동안에 계획적으로 시행하는 것이 매우 효과적이고 주요하며, 따라서 이와 같은 분해점검 보수(OVERHAUL)를 보다 짧은기간 내에 안전하고 효율적으로 끝내기 위해서는 수차발전기와 상기 수차발전기를 분해 조립하기 위한 천정기중기와 같은 각종장치(장비)들을충분히 검사하여야 하고 치밀한 계획을 수립하여 사전준비를 철저히 수행하여야 분해점검 복수공정을 차질 없이 실시할 수 있게 된다.The overhaul of the generator is carried out regularly, and if it is carried out at a different time for each device, several times of power failure will be required, resulting in power generation loss due to a decrease in facility operation rate. Therefore, it is very effective and important to plan and implement the entire equipment inside the power plant for a certain period of time, and thus, to complete such OVERHAUL safely and efficiently in a shorter time, the aberration generator and the aberration generator are dismantled. Various equipments (equipment) such as overhead cranes for assembly should be thoroughly inspected, and a detailed plan should be thoroughly prepared in advance so that multiple processes of disassembly and inspection can be carried out without any problems.

본 발명에 따른 수차발전기 분해점검 보수공정(200)은 수차발전기를 분해하고 점검·정비후에 조립하는 것에 있어서, 프란시스수차발전기(1)를 보다 용이하고 능율적으로 분해시키기 위하여 각종 장비와 장치들을 점검 및 조작하고 분리시켜 주는 준비공정(200-1)과, 발전기부(2)를 분해하고 각종 부품들을 정비 및 보수하여 주는 발전기분해공정(200-2)과, 수차부(3)를 순차적으로 분해하고 분해된 각종 부품을 정비하고 보수하여 주는 수차분해공정(200-3)과, 분해 보수된 수차부(3)의 부품을 역순으로 순차적 조립시켜 주는 수차조립공정(200-4)과, 분해 보수된 발전부(2)의 각종부품을 역순으로 순차조립하여 주는 발전기조립공정(200-5)과, 조립 완료된 수차발전기(1)를 최종적으로 점검하고 운전에 필요한 각종시험을 테스트하는 점검 및 시험공정(200-6)을 순차적으로 실시하게 된다.Aberration generator disassembly inspection and repair process 200 according to the present invention, in order to disassemble the aberration generator after assembly, inspection, maintenance, check the various equipment and devices in order to more easily and efficiently disassemble the Francis aberration generator (1) And the preparation process 200-1 for operating and separating the generator, the generator disassembling process 200-2 for disassembling the generator unit 2 and maintaining and repairing various components, and the aberration unit 3 in order. And aberration disassembly process (200-3) for repairing and repairing various disassembled parts, aberration assembly process (200-4) for assembling parts of disassembled and repaired aberration parts (3) in order, and disassembly repair Generator assembly step (200-5) for sequentially assembling the various parts of the generated power generation unit (2) in reverse order, and inspection and test process for finally inspecting the assembled water wheel generator (1) and testing various tests required for operation Sequential (200-6) Will be performed.

준비공정(200-1)은 도 3a에 예시된 바와 같이, 분해전 운전상태 점검공정(201), 내부탱크 게이트(INTANK GATE)폐쇄공정(202), 흡출관 게이트(DRAFT TUBE GATE)폐쇄공정(203), 각부 오일/냉각수/드레인밸브(OIL/COOL WATER/DRAIN VALVE)조작공정(204), 기내배선 분리작업공정(205)으로 이루어진다.As illustrated in FIG. 3A, the preparatory process 200-1 includes a pre-disassembly operation state checking process 201, an internal tank gate closing process 202, and a draft tube gate closing process ( 203), an oil / coolant / drain valve operation step 204, and an in-flight wiring separation operation step 205.

분해전 운전상태 점검공정(201)은 자동가동 및 정지(AUTO START & STOP)상태와 출력(OUT PUT)상태 등을 테스트(TEST)점검한다.The operation state checking process 201 before disassembly checks the AUTO START & STOP state and the OUT PUT state and the like (TEST).

분해전 운전상태 점검(201)을 완료한 후에는 본댐현장 조작반에서 배전반과 상호 무선으로 연락하면서 수동으로 조작하여 취수문비(INTAKE GATE)폐쇄공정(202)을 실시하되, 특히 이때에는 바이 패스 밸브(BY-PASS VALVE)의 동작상태 및 게이트 러버 씰(GATE RUBBER SRAL)상태를 명확하게 확인하여야 하고, 방수로의 게이트(GATE)는 평상시에 스톱퍼(STOPPER)에 걸려 있으므로 크레인(GANTRY CRANE)을 이용하여 게이트(GATE)를 이동시켜 와류형 케이싱(SPIRAL CASING)의 압력을 확인한 후에 폐쇄(CLOSER)시키며, 필요한 각종 기기는 TAG를 확인하면서 기기를 조작한다.After completion of the operation state inspection before disassembly (201), the main dam field operation panel communicates wirelessly with the switchboard and operates it manually to perform the INTAKE GATE closing process 202, but in this case, the bypass valve ( BY-PASS VALVE) and GATE RUBBER SRAL status must be clearly checked, and the gate of the waterproof path is normally caught by the stopper, so use the GANTRY CRANE to open the gate. Move (GATE) to check the pressure of SPIRAL CASING and then close (CLOSER) and operate various devices while checking TAG.

취수문비(INTAKE GATE)폐쇄공정(202)을 실시한 후에는 수차발전기의 수차설비 및 각부를 점검할 수 있도록 하기 위하여 수압관(PENSTOCK)과 와류형 케이싱(SPIRAL CASING) 및 흡출관(DRAFT TUBE)의 내부에 충진되어 있는 물을 배수피트(DRAINAGE PIT)로 집수하여 배수펌프를 가동시킬 수 있도록 흡출관 게이트(DRAFT TUBE GATE)폐쇄공정(203)을 실시한다.After performing the INTAKE GATE closing process 202, the PENSTOCK, SPIRAL CASING, and DRAFT TUBE of the DRAFT TUBE GATE closing process 203 is performed to collect the water filled in the drainage PIT to operate the drainage pump.

특히 수압관(PENSTOCK)의 내부에 있는 물을 배수시킬 때에는 취수구를 폐쇄시킨 후에 방수구와 연결된 수압관 배수밸브(PENSTOCK DRAIN VALVE)를 개방(OPEN)시켜 수압관(PENSTOCK)의 수위를 방수로 수위와 같게 하고, 배수펌프를 가동시켜 배수시키되 펌프를 운전시켜 배수시킬 때에 펌프 및 밸브의 이상 등으로 배수 PIT가 침수되지 않도록 배수상황을 감시하면서 완전히 배수시켜 준다.In particular, when draining the water inside the PENSTOCK, the water inlet is closed and the PENSTOCK DRAIN VALVE connected to the waterproof opening is opened to open the water level of the PENSTOCK equal to the level of the waterproof path. The drainage pump is operated and drained. When the pump is operated and drained, the drainage pump is completely drained while monitoring the drainage situation so that the drainage PIT is not flooded due to abnormalities of the pump and the valve.

또한 케이싱 및 흡출관 맨홀을 개방(CASING & DRAFT TUBE MANHOLE OPEN)시켜 주고, 완전 개방상태 및 폐쇄(FULL OPEN & CLOSE)상태에서 가이드밴의 간극(GUIDE VANE GAP)과 런너의 간극(RUNNER GAP)을 체크 한다.In addition, the casing and draft tube manholes are opened (CASING & DRAFT TUBE MANHOLE OPEN), and the guide vane gap and the runner gap are fully opened and closed. Check it.

흡출관 게이트(DRAFT TUBE GATE)폐쇄공정(203)을 실시한 후에 각부 오일/냉각수/드레인밸브(OIL/COOL WATER/DRAIN VALVE)조작공정(204)과 기내배선 분리작업공정(205)을 실시한다.After the draft tube gate closing step 203 is performed, each part oil / coolant / drain valve operation step 204 and in-flight wiring separation operation step 205 are performed.

기내배선 분리작업공정(205)을 실시할 때에 케이블(CABLE)이 손상되지 않도록 세심하게 주의하고 분리된 배선에 마킹(MARKING) 및 번호표를 부착하고 테이핑(TAPPING)처리하여 보관하며, 작업을 완료한 후에 결선시킬 때에 스퀀스 테스트(SEQUENCE TEST)를 실시하여 운전 중에 오동작을 예방할 수 있도록 한다. 특히, 분해를 실시하기 전에 마대 또는 바구니를 준비하여 분해된 볼트/너트 및 와샤가 섞이거나 분실되지 않도록 표시(MARKING)한 후에 보관하고, 분해를 실시하기 전에 파이프의 내부로 이물질이 유입되지 못하도록 청소한 후에 비닐 또는 넝마를 감싸서 테이핑(TAPPING)처리하여 보관한다.When carrying out the in-flight wiring disconnection process 205, pay careful attention not to damage the cable, attach markings and number tags to the separated wires, store them with taping, and complete the work. When wiring afterwards, perform a sequence test to prevent malfunction during operation. In particular, prepare a sack or basket before disassembly and store the disassembled bolts / nuts and washers after marking to avoid mixing or losing them, and clean them to prevent foreign substances from entering the pipe before disassembling. After wrapping, wrap the vinyl or rags and store it with taping.

상기와 같이 준비과정을 완료한 후에는 발전기부(2:GENERATOR)를 다음과 같은 순서에 입각하여 순차적으로 분해하도록 하는 발전기분해공정(200-2)을 실시하며, 발전기분해공정(200-2)은 P.M.G분해인출공정(206), 집진기 링 커버(COLLECTOR RING COVER)분해공정(207), 톱커버(TOP COVER)분해공정(208), 스터브샤프트(STUB SHAFT) 및 버스바(BUS BAR)연결볼트 분리시킨 후에 실시하는 스터브샤프트(STUB SHAFT)인출공정(209), 상측브라켓트(UPPER BRACKET)분해인출공정(211), 상측코일커버(UPPER COIL COVER)분해인출공정, 로터(ROTOR)분해인출공정(212), 하측오일가이드(LOWER OIL GUIDE)분해인출공정(213), 발전기가이드베어링(GEN, GUIDE BEARING)인출공정(214), 발전기샤프트(GEN, SHARFT)인출안치공정(215), 트라스트베어링(THRUST BEARING)인출안치공정(216), 하측브라켓트(LOWER BRACKET)분해인출안치공정(217), 하측에어디플렉터(LOWER AIR DEFLECTOR)분해인출공정(218)을 순차적으로 실시한다.After completing the preparation process as described above, the generator decomposition step (200-2) to sequentially disassemble the generator unit (2: GENERATOR) in the following order, and the generator decomposition step (200-2) Silver PMG decomposition extraction process (206), COLLECTOR RING COVER decomposition process (207), TOP COVER decomposition process (208), STUB SHAFT and BUS BAR connecting bolt STUB SHAFT take-out step 209, UP BRACKET decomposition take-out step 211, UPC coil cover take-out step, rotor decomposition take-out step 212) LOWER OIL GUIDE Explode Extraction Process (213), Generator Guide Bearing (GEN, GUIDE BEARING) Extraction Process (214), Generator Shaft (GEN, SHARFT) Extraction Settlement Process (215), Traverse Bearing ( Draw-Bearing Settlement Process (216), Lower Bracket Disassembly Draw-Out Settlement Process (217), Lower Air Deflector Emitter (LOWER AIR DEFLECTOR) subjected to decomposition withdrawal process 218 in sequential order.

P.M.G분해인출공정(206)은 시그널램프(10)가 구비되어 있는 커버(11)의 볼트(8개)를 분해하여 커버(11)를 철거하고, 시그널램프(10)의 인입선 및 P.M.G 인출선을 분리하며, 영구자석 교류발전기의 절연상태를 500V, 1000MEGGER 절연저항기로 측정한 후에 크레인(5톤)을 사용하여 로터(13)와 PMG스테이터(14)로 구성된 P.M.G(12:PERMANENT MAGNET GENERATOR:발전기 주파수 검출용 검출발전기)를 인출하여 안치시킨다.The PMG decomposition drawing process 206 disassembles the cover 11 by disassembling the eight bolts of the cover 11 provided with the signal lamp 10, and removes the lead wire and the PMG lead wire of the signal lamp 10. After measuring the insulation state of permanent magnet alternator with 500V, 1000MEGGER insulation resistor, PMG (12: PERMANENT MAGNET GENERATOR) consisting of rotor (13) and PMG stator (14) using a crane (5 tons) Detection generator) for detection and withdrawal.

집진기 링 커버(COLLECTOR RING COVER)분해공정(207)은 발전기카본브러시(GENERATOR CARBON BRUSH:36개)를 분해하여 소창직으로 포장하고 건조시켜서 안전한 장소에 보관하고, D.C 버스바(BUS BAR)와 집진기 링 조인트(COLLECTOR RING JOINT)의 볼트(8개)를 분해하며, 잭 업 리므트 스위치(JACK UP LIMIT SWITCH)의 지지대와 파이롯트 버스(PILOT BUS)용 전선(PB1,PB2)을 분리하고, 집진기 링 커버(COLLECTOR RING COVER)의 고정볼트(24개)를 분해하며, 특히 집진기 링 표면(COLLECTOR RING FACE)의 손상(DAMAGE)을 방지하기 위하여 가스켓 시트(GASKET SHEET)로 보호시킨 상태에서 크레인(5톤)을 사용하여 주위하면서 서서히 상승(UP) 인출시킨 후에 안치시킨다.COLLECTOR RING COVER Disassembly process (207) is to disassemble generator carbon brushes (36), pack them in small size, dry them, store them in a safe place, and store DC bus bar and dust collector Disassemble the eight bolts of the COLLECTOR RING JOINT, remove the support of the jack up limit switch and the cables for pilot bus (PB1, PB2), and the dust collector ring Disassemble the fixing bolts (24 pieces) of the cover (COLLECTOR RING COVER), and in particular, the crane (5 tons) protected with a gasket sheet (GASKET SHEET) to prevent damage to the collector ring face. ), Slowly raise (UP) while surrounding and settle.

톱커버(20:TOP COVER)를 분해하는 톱커버(TOP COVER)분해공정(208)은 톱커버죠인트(TOP COVER JOINT)부분에 표시(MARKING)를 한 후에 톱커버고정볼트(308개)와 톱커버 지지대 고정용 볼트(16)를 분해하고, 크레인을 사용하여 톱커버(8조각)를 인출하여 안치한 후에 톱커버 지지대(8개)를 철거한다.The top cover disassembly process (208) disassembles the top cover (20: TOP COVER) after marking the top cover joint (TOP COVER JOINT). The cover support fixing bolt 16 is disassembled, and the top cover (8 pieces) is taken out and placed using a crane, and then the top cover supports (8) are removed.

스터브샤프트(STUB SHAFT) 및 버스바(BUS BAR)연결볼트 분리공정 및 스터브샤프트(STUB SHAFT)인출공정(209)은 다음과 같이 실시한다.STUB SHAFT and BUS BAR connection bolt separation process and STUB SHAFT take-out process 209 are performed as follows.

P.M.G 볼 죠인트 커플링(BALL JOINT COUPLING)을 분해하고, 버스 바 죠인트(BUS BAR JOINT )부분의 절연테이프를 제거하고 고정볼트를 분리하며, 브러시 지지동판과 집진기 링(COLLECTOR RING)연결부의 볼트를 분리하고, 스터브 샤프트(STUB SHAFT)와 로터(24:ROTOR)를 연결하는 버스 바(BUS BAR)를 가스토치로 가열시켜 분리 하되 분리 전에 스터브 샤프트의 레벨(LEVEL)을 체크(CHECK)하며, 이어 버스바 지지대를 철거한다. 스터브 샤프트와 발전기 메인샤프트 커플링볼트(GEN' MAIN SHAFT COUPLING BOLT)를 분해하고, 크레인을 사용하여 스터브 샤프트를 서서히 인출하여 안치시키되 와이어 로프(WIRE ROPE)의 위치를 변경시킬 때에 집진기 링 표면(COLLECTOR RING FACE)이 손상(DAMAGE)되지 않도록 주의하면서 안치시킨다.Disassemble the PMG ball joint coupling, remove the insulation tape of the bus bar joint, remove the fixing bolt, and remove the bolts of the brush support copper plate and the collector ring connection. Then, remove the bus bar connecting the stub shaft and the rotor 24 with a gas torch and remove it, but check the level of the stub shaft before removing the bus bar. Remove the support. Disassemble the stub shaft and the generator main shaft coupling bolt, and slowly pull out the stub shaft using a crane to settle it, but change the position of the wire rope.COLLECTOR RING FACE), be careful not to damage.

상측브라켓트(22:UPPER BRACKET)를 분해 인출시키는 상측브라켓트(UPPER BRACKET)분해인출공정(211)은, 분해전에 레벨(LEVEL)을 측정하고, 상측 브라켓트(22)를 스테이터 프레임(STATOR FRAME)에 체결한 파운데이션 볼트(FOUNDATION BOLT)와 다우얼 핀(DOWEL PIN)을 분해 하며, 상측코일커버(UPPER COIL COVER)를 포함하는 상측브라켓트(22)를 인출하여 안치시킨 후에 발전기측에는 출입금지 안전로프 및 안전표시판을 설치하여 준다.The upper bracket disassembly and withdrawal step 211, which disassembles and pulls out the upper bracket 22, measures the level LEVEL before disassembly, and fastens the upper bracket 22 to the stator frame. After disassembling one foundation bolt and dowel pin, take out and place upper bracket 22 including upper coil cover. Install it.

발전기의 로터(24)를 분해 인출하는 로터(ROTOR)분해인출안치공정(212)은 다음과 같이 실시한다.The rotor disassembly takeout stabilization step 212 for disassembling and drawing out the rotor 24 of the generator is performed as follows.

로터(24)를 분해하기 전에 로터(24)와 스테이터(30:STATOR)사이의 에어갭(D1:AIR GAP) 및 로터(24)와 브레이크(BRAKE)사이의 갭을 측정하고, 로터고정볼트 스톱퍼의 용접부를 그라인딩하여 해체시킨 후에 고정볼트를 분리시키되 수압오일펌프(HYDRAULIC OIL PUMP)를 사용하여 압력을 체크하면서 분해한다.Before disassembling the rotor 24, measure the air gap (D1: AIR GAP) between the rotor 24 and the stator 30 (STATOR) and the gap between the rotor 24 and the brake (Brake) and stop the rotor fixing bolt stopper. After dismantling by grinding the weld, remove the fixing bolt, but disassemble it while checking the pressure by using a hydraulic oil pump (HYDRAULIC OIL PUMP).

로터(24)를 인출할 수 있는 디바이스(DEVICE)를 조립 설치하여 청소를 한 후에 베이스(BASE)면에 그리스를 도포하여 녹이 발생하는 것을 방지할 수 있도록 하고, 로터(24)를 안치시킬 때에 신속히 받쳐 줄 수 있도록 하기 위하여림지지대(RIM SUPPORT)와 잭(JACK)을 일정한 간격으로 배열 설치한다.After installing and cleaning the device (DEVICE) which can take out the rotor 24, apply grease to the surface of the base to prevent rust from occurring, and quickly settle the rotor 24. Arrange the RIM SUPPORT and JACK at regular intervals to support it.

로터(24)와 스테이터(30)와의 갭(D1)이 약 14mm 정도 이므로 로터(24)를 인출시킬 때에 로터폴(ROTOR POLE)과 스테이터코어(35:STATOR CORE) 및 코일(COIL)등이 손상(DAMAGE)되는 것을 방지할 수 있도록 하기 위하여 인원을 1~2m의 간격으로 배치하고 목판을 충분히 준비(16 ~ 20개)하여 로터(24)를 인출할 때에 목판을 상하좌우로 흔들면서 인출하여 로터(24)와 스테이터(30)가 접촉되지 않도록 보호하면서 인출하되, 로터(24)를 순차적으로 인출할 때마다(1 ~ 2회) 크레인을 정지시킨 상태에서 레벨(LEVEL)을 반복적으로 확인하고 조정하면서 인출을 실시하며, 로터(24)를 완전히 인출한 후에는 로터안치용베이스(BASE)의 위에 섬유시트(FIBER SHEET)를 전개시킨 상태에서 받침용 서포트(SUPPORT)를 설치한다.Since the gap D1 between the rotor 24 and the stator 30 is about 14 mm, the rotor pole, the stator core 35 and the coil may be damaged when the rotor 24 is taken out. In order to prevent (DAMAGE), the personnel should be placed at intervals of 1 ~ 2m, and the wooden boards should be sufficiently prepared (16 ~ 20), and the wooden boards may be pulled out by shaking the wooden boards up, down, left, and right when pulling out the rotor 24. Draw out while protecting the 24 and the stator 30 from contact, but each time the rotor 24 is taken out sequentially (1 to 2 times), the level (LEVEL) is repeatedly checked and adjusted while the crane is stopped. After drawing out the rotor 24 completely, the support SUPPORT is installed while the fiber sheet is developed on the rotor mounting base.

크레인의 후크를 해체하고, 분해후 조립 때까지의 보관을 위하여 접촉면(COUPLING면, ROTOR SPOKE면)의 돌출부에 발청을 방지하기 위하여 그리스를 도포하고, 로터림(ROTOR RIM)부에 이물질이 침투하거나 습기가 발생하는 것을 방지할 수 있도록 하기 위하여 소창직으로 커버링(COVERING)하며, 로터(24)를 인출한 후에는 하측브라켓트(45:LOWER BRACKET)를 점검할 수 있도록 점검용사다리를 설치하고, 스테이터(30)에는 이물질이 침투하거나 습기가 발생하는 것을 방지할 수 있도록 하기 위하여 소창직으로 커버링(COVERING)하여 준다.Disassemble the hook of the crane, apply grease to prevent rust on the projecting part of the contact surface (COUPLING surface, ROTOR SPOKE surface) for storage until disassembly and assembly, and foreign matter penetrates into the rotor RIM. To prevent moisture from occurring, cover it with a small window and install the inspection ladder so that the lower bracket (45: LOWER BRACKET) can be inspected after the rotor 24 is taken out. (30) is covered in small windows so as to prevent foreign matter from penetrating or generating moisture.

하측오일가이드(43:LOWER OIL GUIDE)를 분해 인출하는 하측오일가이드(LOWER OIL GUIDE)분해인출공정(213)은 다음과 같이 실시한다.The lower oil guide (LOWER OIL GUIDE) decomposition drawing-out process 213 which disassembles and draws out the lower oil guide 43 is performed as follows.

트러스트 베어링 탱크(44)의 내부에 충진되어 있는 오일(OIL)은 탱크드레인밸브의 후단에 구비된 보조탱크와 호스로 연결한 후에 펌프를 가동시켜 배출(DRAIN)시키고, 트러스트 베어링(49:THRUST BEARING)의 오일배관에 잔류하고 있는 오일은 파이프라인(PIPE LINE)에 설치되어 있는 드레인 밸브를 개방(OPEN)시키고 파이프 플랜지(PIPE FLANGE)를 분리하여 드레인시킨 후에 배관을 철거하며, 베어링오일탱크점검용 맨홀과 트러스트베어링 R.T.D 및 온도계를 철거하여 소창직으로 포장하여 보관하며, 발전기 실내 전선관 및 배선을 철거하고 전선관 지지대(SUPPORT)를 절단 제거하며, 배유한 오일은 오일여과기를 사용하여 여과시켜 준다.The oil filled in the thrust bearing tank 44 is connected to the auxiliary tank provided at the rear end of the tank drain valve and the hose, and then the pump is operated to drain and the thrust bearing (49: THRUST BEARING). Oil remaining in the oil piping of the pipe) is opened by opening the drain valve installed in the pipeline and removing and draining the pipe flange. Remove manholes and thrust bearing RTDs and thermometers, and pack and store them in small size. Remove generator conduits and wirings, cut and remove conduit support, and drained oil is filtered using an oil filter.

트러스트런너(40:THRUST RUNNER)는 분해하기 전에 레벨(LEVEL)을 체크하고 발전기샤프트(GEN' SHAFT)를 인출시킬 때에 함께 인출시킨 후에 이물질이 침투하지못하도록 소창직으로 감싸(COVERING)보관한다.TRUST RUNNER (40: THRUST RUNNER) checks the level (LEVEL) before disassembling and draws together when pulling out the generator shaft (GEN 'SHAFT) and then wraps it in a small window to prevent foreign matter from penetrating.

트러스트오일커버(41:THRUST OIL COVER)는 이를 분해하기 전에 래버린스 갭(LABYRINTH GAP)을 측정하고, 하측 가이드베어링 R.T.D와 온도계를 철거하여 소창직으로 포장하여 보관하며, 에어 공급 및 배출파이프를 철거하고 압류커버고정볼트를 풀어 제거한 후에 트러스트오일커버(41:THRUST OIL COVER)를 분해하여 안치시킨다.THRUST OIL COVER measures LABYRINTH GAP before disassembling it, removes the lower guide bearing RTD and thermometer and packs it in small size, and removes air supply and exhaust pipe. Loosen and remove the seizure cover fixing bolts, and then disassemble and install the thrust oil cover (41: THRUST OIL COVER).

발전기가이드베어링(GEN, GUIDE BEARING)인출공정(214)는 발전기가이드베어링(42)의 커버를 고정하는 고정볼트를 분해하여 철거하고, 발전기가이드베어링(42)을 분해하기전에 가이드베어링조절볼트(GUIDE BEARING ADJUSTING BOLT)와 베어링사이의 가이드베어링 갭(GUIDE BEARING GAP)을 갭 게이지(GAP GAUGE)로 측정하며,발전기가이드베어링(42)을 지지하는 조절볼트록킹너트(ADJUSTING BOLT LOCKING NUT)를 해체한 후에 16개의 각 발전기가이드베어링(42)의 상부에 별도의 아이볼트를 체결하여 인출한다.Generator guide bearing (GEN, GUIDE BEARING) take-out process (214) is dismantled and dismantled the fixing bolts for fixing the cover of the generator guide bearing 42, and before disassembling the generator guide bearing 42, the guide bearing adjustment bolt (GUIDE) Measure the guide bearing gap between bearing bearing and bearing with a gap gauge, and after dismantling the adjusting bolt locking nut supporting the generator guide bearing 42, A separate eyebolt is drawn out on the top of each of the sixteen generator guide bearings 42.

발전기가이드베어링(42)을 인출한 후에는 메인커플링볼트(51)를 제거하여야 하며 이를 제거하기 위한 공정은 다음과 같은 순서로 실시한다.After pulling out the generator guide bearing 42, the main coupling bolt 51 should be removed, and the process for removing the generator guide bearing 42 is performed in the following order.

터빈피트(TURBIN PIT)의 내부에 메인커플링볼트(51)를 용이하게 분해시키고 편리하게 작업을 실시할 수 있도록 비계를 적절한 높이에 안전하게 설치하고, 비계목과 파이프 비계를 적당한 높이로 세운 상태에서 윗부분에 합판을 얹고 이탈되지 않도록 고정시켜 준다.Inside the turbine pit, the scaffold is securely installed at the appropriate height so that the main coupling bolt 51 can be easily disassembled and the work can be carried out easily. Place the plywood on it and fix it so that it does not come off.

샤프트(SHAFT)측의 하측에어변류기(LOWER AIR DEFLECTOR)의 고정볼트를 분해하여 철거하고, 하측오일튜브(LOWER OIL WELL TUBE)고정볼트 홀(HOLE)에 아이볼트를 체결하여 2개의 체인블록(CHAIN BLOCK)을 좌우 양측에 설치하며, 커플링과 커버와의 사이에 목침(WOODEN BLOCK)을 받쳐주며, 기 설치한 체인블록(CHAIN BLOCK)을 이용하여 상부커버의 고정볼트를 분해한 후에 들어 올려주고, 커버의 내부에 체결된 볼트를 분리하여 분할 인출하며, 커플링고정볼트의 길이를 측정한 후에 하부커버 고정볼트를 분해하여 받침목의 위에 올려놓는다.Disassemble and disassemble the fixed bolt of the lower air deflector on the shaft side, and fasten the eye bolt to the lower oil tube fixing bolt hole. BLOCK) is installed on the left and right sides, supports the WOODEN BLOCK between the coupling and the cover, and lifts up after disassembling the fixing bolt of the upper cover by using the already installed chain block. , Remove the bolt fastened inside the cover and divide it out. After measuring the length of the coupling fixing bolt, disassemble the lower cover fixing bolt and put it on the top of the supporting neck.

샤프트(SHAFT)와 런너(RUNNER)를 이동 및 다운(MOVE-DOWN)시킬 때에 충격(DAMAGE)를 방지하기 위하여 런너와 보텀링(BOTTOM RING) 및 웨어링(WEARING)과의 사이에 별도로 제작된 받침용 테이퍼 카터(TAPER COTTER)를 다수 개소에 받쳐주며, 커플링볼트와샤(COUPLING BOLT WASHER)의 접힌 부분을 펴준다.For the bearings manufactured separately between the runner and the bottom ring and the wear ring to prevent the damaging when the shaft and the runner are moved and moved down. The taper carter supports a number of places, and the folded part of the coupling bolt washer is unfolded.

커플링볼트 및 너트를 분리시키기 위한 공구(TOOL)을 설치하고, 유압펌프를 사용하여 분해압력을 측정하면서 메인샤프트 및 여타장치에 의해 영향을 고려하여 대각선 방향순서로 12개의 커플링볼트/너트를 순차적으로 분해하고, 각 커플링볼트에 아이볼트를 체결한 후에 커플링볼트(12개)를 인출하며, 서로 대각을 이루고 있는 나머지 커플링볼트(4개)는 런너블래이드(RUNNER BLADE)의 충격(DAMAGE)방지용 볼트로서 런너(RUNNER)의 하중이 작용하게 되므로 커플링볼트에 걸리는 하중을 경감하고 메인샤프트의 흔들림이나 변형을 방지하기 위하여 4개의 인출용 예비볼트를 4각플레이트와 함께 4,5,12,13번 홀에 체결하여 준다.Install the tool to separate the coupling bolt and nut, and measure the disassembly pressure by using the hydraulic pump, and adjust the 12 coupling bolts / nuts in diagonal order in consideration of the influence by the main shaft and other devices. After disassembling sequentially, after tightening the eye bolts to each coupling bolt, the coupling bolts (12 pieces) are taken out, and the remaining coupling bolts (4 pieces) which are diagonal to each other are impacted by the runner blades ( DAMAGE) As a preventer bolt, the load of the RUNNER acts, so to reduce the load on the coupling bolt and to prevent the swing or deformation of the main shaft, four withdrawal bolts with a square plate 4, 5, Tighten to holes 12 and 13.

플레이트(PLATE)의 중앙에 잭램(JACK LAM)을 설치하고 압력(600kg/km)을 가하여 고정시키되, 작업이 완료될 때까지 잭펌프호스(JACK PUMP HOUSE)등을 움직이지 않도록 주의하고, 나머지 4개의 커플링볼트/너트를 분해하고 체인블럭을 사용하여 커플링볼트를 인출 제거하며, 커플링볼트와샤(8개)를 인출제거한다.Install the jack lam in the center of the plate and fix it by applying pressure (600kg / km), but be careful not to move the jack pump hose until the work is completed. Disassemble the two coupling bolts / nuts, take out the coupling bolts using a chain block, and remove the coupling bolts and screws (8).

터빈샤프트(TURBIN SHAFT)와 발전기 샤프트(50:GEN' SHAFT)의 연결부분인 메인샤프트(MAIN SHAFT)의 턱은 12mm정도이므로 체결되어 있는 잭펌프(JACK PUMP)의 오일을 천천히 배출(DRAIN)시켜 런너(RUN)와 터빈샤프트(TURBIN SHAFT)의 갭이 13 ~ 14mm되도록 하향이동(MOVING-DOWN)시켜 주고, 인출용 예비볼트(4개)와 플레이트(PLATE) 및 잭램(JACK LAM)을 철거하며, 커플링볼트를 분해 완료한 후에 볼트의 길이를 측정하며, 커플링볼트의 해체 및 발전기측 각부 기기의 분해 철거작업이 완료되어지면 터빈피트(TURBINE PIT)내에 설치하였던 비계를 철거한다.Since the jaw of the main shaft, which is the connection part between the turbine shaft and the generator shaft (50: GEN 'SHAFT), is about 12mm, slowly drain the oil from the jack pump that is connected. MOVING-DOWN so that the gap between RUN and TURBIN SHAFT is 13 ~ 14mm, remove 4 spare bolts for removing, plate and jack ram After disassembling the coupling bolts, measure the length of the bolts. After dismantling the coupling bolts and dismantling and dismantling of the equipment on the generator side, remove the scaffold installed in the turbine fittings.

발전기샤프트(50:GEN' SHAFT)을 인출 안치하는 발전기샤프트(50:GEN' SHAFT)인출안치공정(215)은 다음과 같이 실시한다.The generator shaft 50: GEN 'SHAFT drawout settling step 215 for drawing out the generator shaft 50: GEN'SHAFT is carried out as follows.

트러스트베어링(49)과 하측오일튜브베이스(LOWER OIL WELL TUBE BASE)의 고정볼트를 분해하고, 발전기 샤프트 플랜지(GEN' SHAFT PLANGE)의 상부에 받침목을 균등하게 4분배하여 넘어지지 않게 올려 놓으며, 트러스트베어링(49)의 R.T.D.와 온도계를 철거하여 소창직으로 포장하여 보관하며, 발전기 샤프트(GEN' SHAFT)의 상부에 리프팅 디바이스(LIFTING DEVICE)를 체결하고 와이어로프를 이용하여 크레인에 걸어준다.Disassemble the fixing bolts of the thrust bearing (49) and the lower oil tube base, and evenly distribute the support neck on the top of the generator shaft flange (GEN 'SHAFT PLANGE) to prevent it from falling, and The RTD and the thermometer of the bearing 49 are dismantled and packaged and stored in small windows, and the lifting device (LIFTING DEVICE) is fastened to the top of the generator shaft (GEN 'SHAFT) and hanged on the crane using a wire rope.

발전기샤프트(GEN' SHAFT)를 인출시킬 때에 하측오일튜브베이스(LOWER OIL WELL TUBE BASE)의 외경과 샤프트와의 외경의 갭이 20mm이고 트러스트베어링탱크의 내부에 설치된 각종 부품들과 함께 인출되어지므로 주의하고 수평을 유지시키면서 서서히 인출하고, 인출 후 지정된 장소에 운반하여 준비된 받침대의 상단에 트러스트베어링탱크의 내부에 구비된 각종부품들을 안치하되 발전기샤프트(GEN' SHAFT)를 안치시킨 후에 움직이지 않도록 플랜지홀에 4개의 볼트를 균등한 간격으로 유지시켜 체결하며, 발전기샤프트(GEN' SHAFT)를 완전하게 안치시킨 후에 오일(OIL)로 방청처리하고 광목으로 감싸 보호한다.When pulling out the generator shaft, the gap between the outer diameter of the lower oil tube base and the outer diameter of the shaft is 20 mm and is drawn out with the various components installed inside the thrust bearing tank. And take out gradually while keeping the level, and after the withdrawal, transport it to the designated place and place the various parts provided inside the thrust bearing tank on the top of the prepared pedestal, but place the generator shaft (GEN 'SHAFT) to prevent the flange hole from moving. 4 bolts are held at equal intervals, and the generator shaft is completely settled, and then rust-treated with oil and wrapped with wood.

트러스트베어링(40:THRUST BEARING)을 인출 안치하는 트스트베어링(THRUST BEARING)인출안치공정(216)은 베어링스톱퍼키볼트(BEARING STOPER KEY BOLT)를 분해하여 철거하고, 트러스트베어링패드(49-1)(12개)면이 손상되지 않도록 주의하면서 크레인으로 인출하여 안치시킨 후에 소창직으로 포장하여 보호한다.THRUST BEARING withdrawal settling process (216), which disassembles and removes a bearing bearing (40: THBEARING), dismantles and removes the bearing stopper key bolt, and the thrust bearing pad (49-1) Take care not to damage the (12) faces, take them out with a crane, set them up, and then wrap them in a small window to protect them.

하측브라켓트(45:LOWER BRACKET)을 인출하는 하측브라켓트(LOWER BRACKET)분해인출안치공정(217)은 다음과 같이 실시한다.The lower bracket decomposition drawing-out settling step 217, which draws out the lower bracket 45 (LOWER BRACKET), is carried out as follows.

분해 전에 레벨(LEVEL)을 체크한다. 오일 냉각기를 통하는 오일쿨러파이프(47) 및 기타 배선 등을 완전히 분리하고, 하측브라켓트(45)에 고정시킨 하측에어디플렉터(48)와 서포트볼트를 분해하며, 브라켓트프레임을 고정시키는 파운데이션볼트(FOUNDATION BOLT)와 다우얼핀(DOWEL PIN) 및 하측코일커버의 중간부분을 조인트하는 고정볼트를 분해한다.Check level (LEVEL) before disassembly. FOUNDATION BOLT to completely separate the oil cooler pipe 47 and other wiring through the oil cooler, disassemble the lower air deflector 48 and the support bolt fixed to the lower bracket 45, and fix the bracket frame. ) Remove the fixing bolt that joins the middle part of the dowel pin and the lower coil cover.

하측브라켓트(45)(하측코일커버포함)를 크레인으로 서서히 인출하되 발전기 의 스테이터(30: STATER)에 손상을 입히지 않도록 좌우의 갭을 적절하게 유지시키면서 인출하고, 하측브라켓트(45)의 하부에 발청방지용 그리스를 도포한 후에 받침목을 균등하게 배치한 상태에서 서서히 안치시키며, 하측브라켓트(45)하부의 라이너(LINER)의 치수를 확인하고 위치가 변경되지 않도록 표시(MARKING)한 후에 제청작업을 실시하여 보관한다.Pull out the lower bracket 45 (including the lower coil cover) slowly with a crane, but withdraw the gap while keeping the left and right gaps appropriately so as not to damage the stator 30 of the generator. After applying the grease for prevention, place the support neck in an evenly arranged condition, check the dimension of the liner of the lower bracket 45, mark it so that its position does not change, and then carry out the crushing work. keep it.

하측에어디플렉터(48:LOWER AIR DEFLECTOR)를 분해 인출하는 하측에어디플렉터(LOWER AIR DEFLECTOR)분해인출공정(218)은 하측에어디플렉터죠인트부분의 볼트(3개소) 및 고정볼트를 분해하고, 하측에어디플렉터(48)에 휨이 발생되지 않도록 크레인에 와이어를 걸어 수평을 유지시키면서 1편씩 차례로 인출한다.The lower air deflector disassembly and take-off process 218, which disassembles and draws out the lower air deflector 48, disassembles the bolts (3 places) and the fixing bolts of the lower air deflector joint, and removes the lower air deflector. In order to prevent bending in 48, wires are hooked to the crane and drawn out one by one while maintaining the level.

이와 같이 실시함으로써 발전기부(2)의 발전기분해공정(200-2)을 완료하게 된다.By doing in this way, the generator decomposition process 200-2 of the generator part 2 is completed.

수차터빈부(3)를 순차적으로 분해하고 분해된 각종 부품을 정비 보수하는 수차분해공정(200-3)은, 터빈피트워크웨이(TURBIN PIT WALK WAY) 및 그리스라인(GREASE LINE)분리공정(220), 시어핀(SHEAR PIN) 및 가이드밴레버핀(GUIDE VANE LEVER PIN)분해공정(221), 가이드밴캡,가이드밴암키(GUIDE VANE CAP, GUIDE VANE AMY KEY)분해공정(222), 가이드밴트러스트베어링(GUIDE VANE THRUST BRG')분해공정(223), 가이드베어링커버(GUIDE BEARING COVER)분해인출공정(224), 베어링커버서포트(BEARING COVER SUPPORT)분해인출공정(225), 터빈가이드베어링오일쿨러(TURBIN GUIDE BRG' OIL COOLER)분해인출공정(226), 패킹(PACKING)및 패킹박스(PACKING BOX)분해인출공정(227), 커플링볼트커버(COUPLING BOLT COVER)분해공정(228), 메인커플링볼트(MAIN COUPLING BOLT)분해공정(229), 가이드밴레버(GUIDE VANE LEVER)인출공정(230), 가이드밴스템하우징(GUIDE VANE STEM HOUSING)인출공정(231), 가이드링(GUIDE RING)인출공정(232), 헤드커버(HEAD COVER)분해인출공정(233), 가이드밴서보모터(GUIDE VANE SERVO MOTER)인출안치공정(234), 가이드밴(GUIDE VANE)인출안치공정(235), 보텀링(BOTTOM RING)인출안치공정(236), 런너 및 샤프트(RUNNER & SHAFT)분리안치공정(237), 터빈샤프트(TURBIN SHAFT)분리안치공정(238), 분해기기점검공정(239)의 순서로 실시하게 된다.The aberration disassembly process 200-3, which sequentially disassembles the aberration turbine unit 3 and repairs and disassembles the various parts, disassembles the turbine fit walkway and the grease line separation process 220. , SHEAR PIN and GUIDE VANE LEVER PIN disassembly process (221), GUIDE VANE CAP, GUIDE VANE AMY KEY disassembly process (222), guide van thrust bearing (GUIDE VANE THRUST BRG ') Disassembly process (223), Guide bearing cover (GUIDE BEARING COVER) Disassembly process (224), Bearing cover support (BEARING COVER SUPPORT) Disassembly process (225), Turbine guide bearing oil cooler (TURBIN) GUIDE BRG 'OIL COOLER) Disassembly and Extraction Process (226), Packing and Packing Box Disassembly and Extraction Process (227), Coupling Bolt Cover Disassembly Process (228), Main Coupling Bolt (MAIN COUPLING BOLT) Disassembly (229), Guide Van Lever (GUIDE VANE LEVER) Extraction (230), Guide Vanstem Housing (GUIDE VANE STEM H) OUSING) drawing process (231), guiding ring drawing process (232), head cover (HEAD COVER) disassembly drawing process (233), guide vane servo motor (GUIDE VANE SERVO MOTER) drawing out process (234), Guide vane withdrawal settling process (235), bottom ring withdrawal settling process (236), runner and shaft (RUNNER & SHAFT) separation settling process (237), turbine shaft (TURBIN SHAFT) separation settling process (238), the decomposition apparatus inspection step (239) is performed in this order.

수차분해공정(200-3)을 실시하기 위해 먼저 스피럴케이싱(100:SPIRAL CASING)의 맨홀(MANHOLE)과 드래프트 튜브(101:DRAFT TUBE)의 맨홀(MANHOLE)을 호픈시켜 주어야 한다.In order to perform the aberration decomposition process (200-3), the manhole of the spiral casing (100: SPIRAL CASING) and the manhole of the draft tube (101: DRAFT TUBE) must be honked.

기내배수를 완료한 후에 스파이럴케이싱맨홀(SPIRAL CASING MANHOLE)을 고정시키는 고정볼트(2개)를 스패너를 이용하여 분해하고 고정 플래이트(PLATE)를 철거하고, 스파이럴케이싱맨홀을 손으로 밀어 케이싱(CASING)의 내부쪽으로 오픈(OPEN)시켜 주며, 맨홀을 오픈시킨 후에 케이싱(CASING)의 내부에 안전하게 출입할 수 있도록 사다리를 설치한다.After completion of the cabin drainage, disassemble the two fixing bolts that hold the spiral casing manhole with a spanner, remove the fixing plate, and push the spiral casing manhole by hand to casing. Open to the inside of the door and install a ladder to safely enter and exit the casing after opening the manhole.

드래프트 튜브 맨홀(DRAFT TUBE MANHOLE)고정볼트를 임펙트렌치와 스패너를 사용하여 분해하고, 드래프트 튜브 맨홀을 오픈시킨 후에 각재, 비계목, 합판을 이용하여 발판을 설치하되 물기가 마르지 않고 매우 위험하므로 안전장구를 착용하여 미끄러지는 등의 안전에 유의하도록 하며, 드래프트 튜브의 내부에서 방수로 수문의 실링(SEALING)상태를 확인할 수 있도록 사다리를 맨홀의 입구에 설치하여 만약의 사태를 대비하며, 드래프트 튜브의 발판위에 투광등을 설치하고 다수인(3인)이상이 출입하는 것을 가능한 한 금지시킬 수 있도록 출입금지표시판을 설치하는 것이 바람직하다.DRAFT TUBE MANHOLE Fixing bolts are disassembled using impact wrench and spanner, and the draft tube manhole is opened and scaffolding is installed using lumber, scaffolding, and plywood. Pay attention to safety such as slipping by wearing it.In order to check the sealing state of the waterway by waterproofing the inside of the draft tube, a ladder is installed at the entrance of the manhole in case of emergency and flooded on the footboard of the draft tube. It is preferable to install a prohibition sign board so that a plurality of people (three or more) can be prevented from entering and leaving as much as possible.

또한 가이드밴(140:GUIDE VANE)의 갭(GAP)과 런너(RUNNER)의 갭(GAP)을 측정한다.In addition, the gap GAP of the guide van 140 (GUIDE VANE) and the runner GRUNN are measured.

가이드밴(140)이 완전히 닫혀 있는 상태에서 스파이럴케이싱맨홀(SPIRAL CASING MANHOLE)로 작업자가 들어가 가이드밴(140)과 상부의 헤드커버(HEAD COVER) 및 하부의 보텀링(144:BOTTOM RING)사이의 갭(GAP)을 측정하고, 보텀링(144:BOTTOM RING)사이의 갭(GAP)과 가이드밴(140)상호간의 갭(GAP)을 측정하며, 서보모터의 스트로크(SERVOR MOTOR STROKE)를 측정 기록하고, 런너(110)와 헤드커버(143)의 웨어링(WEARING), 보텀링(144:BOTTOM RING), 보텀링웨어링 링(BOTTOM RING WEARING RING)과의 간격을 측정한다.The operator enters the spiral casing manhole while the guide van 140 is completely closed, and between the guide van 140 and the head cover of the upper part and the bottom ring 144 of the lower part. Measuring the gap (GAP), measuring the gap (GAP) between the bottom ring (144: BOTTOM RING) and the gap between the guide van 140, and measure and record the servo motor stroke (SERVOR MOTOR STROKE) Then, the distance between the runner 110 and the head cover 143 of the wear ring (WEARING), the bottom ring 144 (BOTTOM RING), the bottom ring wear ring (BOTTOM RING WEARING RING) is measured.

가이드밴갭(GUIDE VANE)과 기이드밴(140)상호간의 간격을 측정하기 위하여 기이드밴(140)을 다음과 같은 방법으로 풀오픈(FULL OPEN)시킨다.In order to measure the distance between the guide van gap and the guide van 140, the guide van 140 is fully opened in the following manner.

먼저, 오일펌프메뉴얼(OIL PUMP MANUAL)을 오퍼레이팅(OPERATING)시키고, 터빈컨트롤스위치를 AUTO에서 MANUAL로 절환시키며, 컨버터상측스프링(CONVERTER UPPER SPRING)에 상측방향으로 힘이 인가되도록 종이(PAPER)를 스프링(SPRING)에 삽입시켜주며, 이어서 솔레노이드 밸브류를 수동으로 작동(20WC:CLOSE OPEN, 65S:SHUT RELEASE, 74LS:SHUT RELEASE)시켜 주고, 로드리미터노브(ROAD LIMITER KNOB)를 수동으로 조작하여 천천히 가이드밴(140)을 오픈시키면서 터빈피트(TURBINE PIT)에 감시자를 배치하여 풀오픈(FULL OPEN)시켜준다.First, operate the oil pump manual (OPERATING), switch the turbine control switch from AUTO to MANUAL, and spring the paper (PAPER) so that the upward force is applied to the converter upper spring. Insert it into (SPRING), then operate solenoid valves manually (20WC: CLOSE OPEN, 65S: SHUT RELEASE, 74LS: SHUT RELEASE), and manually operate the ROAD LIMITER KNOB to guide slowly. Opening the van 140, the monitor is placed on the turbine feet (TURBINE PIT) to open (FULL OPEN).

이어서, 가이드밴(140)을 풀오픈시킨 상태에서 가이드밴(140)사이의 간격을 측정하고, 측정을 완료한 후에는 작업원을 철수시킨 상태에서 로드리미터노브(ROAD LIMITER KNOB)를 사용하여 천천히 가이드밴(140)을 폐쇄시키며, OIL PRESSURE TANK의 메인밸브를 폐쇄(CLOSE)시킨 후에 M.C.C PANEL에서 OIL PRESSURE PUMP 전원을 MANUAL에서 OFF시킨다.Subsequently, the gap between the guide vans 140 is measured while the guide van 140 is fully open, and after completion of the measurement, slowly using the ROAD LIMITER KNOB while the worker is withdrawn. Close the guide van 140, close the main valve of the oil presser tank (CLOSE), and turn off the oil presser pump power from the manual in the MCC panel.

특히, 런너(110)와 보텀링웨어링(BOTTOM RING WEARING)사이의 갭은 드레프트 튜브(DRAFT TUBE)에 비계를 설치한 후에 측정하도록 하고, 가이드밴(140)을 풀오픈시킨 상태에서 가이드밴(140)사이의 간격을 측정할 때에는 작업자들이 가이드밴(140)의 사이에 들어가 작업을 실시하므로 디스트리뷰팅벨브(DISTRIBUTING VALVE)의 상부에 스톱퍼(STOPPER)를 삽입하여 디스트리뷰팅벨브(DISTRIBUTING VALVE)가 닫히는 신호를 받더라도 스톱퍼(STOPPER)에 의해 닫혀지지 않도록 한다.In particular, the gap between the runner 110 and the bottom ring wear ring (BOTTOM RING WEARING) is measured after installing the scaffold in the draft tube (DRAFT TUBE) to measure, the guide van (140) in the state that the guide van (full open) When measuring the distance between the 140 and the worker enters between the guide vans 140 to perform the work by inserting a stopper on top of the distribution valve (DISTRIBUTING VALVE) DISTRIBUTING VALVE Should not be closed by the stopper even if it receives a closing signal.

터빈피트워크웨이(106:TURBIN PIT WALK WAY) 및 그리스라인(GREASE LINE)분리공정(220)은 다음과 같이 실시한다.Turbine fit walkway 106 and grease line separation process 220 are carried out as follows.

터빈피트(101)의 내부에 설치된 핸드레일(HANDRAIL)과 레이더(RADDER) 및 월크웨이(106:WALKWAY)의 고정볼트를 분해 철거하고, 월크웨이서포트(106-1:WALKWAY SUPPORT)와 아웃사이드월크웨이(OUTSIDE WALKWAY)의 발판을 철거하며, 인사이드 월크웨이(INSIDE WALKWAY)의 고정볼트를 분해하여 철거한다.Disassemble and dismantle the fixed rails of HANDAIL, RADDER, and WALKWAY (106: WALKWAY SUPPORT) and OUTDOOR WALL installed inside the turbine pit 101. Remove the foot of OUTSIDE WALKWAY and dismantle the fixing bolt of INSIDE WALKWAY.

이어서 동파이프(COPPER PIPE), 플랙시블호스(FLEXIBLE HOSE), 카본스틸파이프(CARBON STEEL PIPE)의 그리스라인(GREASE LINE)을 철거하고, 디스트리뷰팅밸브(DISTRIBUTING VALVE)와 스위빌콘넥터(SWIVEL CONNECTER) 및 일반 콘넥터를 철거하며, 체크밸브와 런너에어공급파이프라인(RUNNER AERATION SUPPLY PIPE LINE) 및 스터핑박스(STUFFING BOX)의 냉각수파이프라인을 철거하며, 런너크라운(RUNNER CROWN) 및 실링워터(SEALING WATER)압력측정용 동파이프라인을 철거한다.Then, the grease line of copper pipe, flexible hose and carbon steel pipe was removed, and the distribution valve and swivel connector were removed. ) And general connectors are removed, and the check valve and runner air supply pipe line and the cooling water pipeline of the stuffing box are removed, and the runner crown and sealing water are removed. Remove the copper pipe for pressure measurement.

시어핀(SHEAR PIN) 및 가이드밴레버핀(GUIDE VANE LEVER PIN)분해공정(221)과 가이드밴캡,가이드밴암키(GUIDE VANE CAP, GUIDE VANE AMY KEY)분해공정(222)을 실시한다.The SHEAR PIN and GUIDE VANE LEVER PIN disassembly process 221 and the GUIDE VANE CAP and GUIDE VANE AMY KEY disassembly process 222 are performed.

가이드베어링(120)과 관련하는 가이드밴트러스트베어링(GUIDE VANE THRUST BRG')분해공정(223)과 가이드베어링커버(GUIDE BEARING COVER)분해인출공정(224)과 베어링커버서포트(BEARING COVER SUPPORT)분해인출공정(225) 및 터빈가이드베어링오일쿨러(TURBIN GUIDE BRG' OIL COOLER)분해인출공정(226)들은 다음과 같이 실시한다.GUIDE VANE THRUST BRG 'disassembly process (223), guide bearing cover (GUIDE BEARING COVER) disassembly process (224) and bearing cover support (BEARING COVER SUPPORT) The process 225 and the TURBIN GUIDE BRG 'OIL COOLER decomposition take-out process 226 are performed as follows.

통상의 오일여과기를 사용하여 터빈가이드베어링(120)의 탱크오일을 배유시키고, 오일레벨스위치와 사이트게이지(OIL LEVEL SWITCH & SIGHT GAUGE) 및 오일오염탐지기(OIL CONTAMINATION DETECTOR)와 진동검출기(VIBRATIPN DETECTOR)를 분해하여 철거하며, 가이드베어링커버(122)를 결합시키는 죠인트 및 고정볼트를 분해한다.A tank oil of the turbine guide bearing 120 is drained using a conventional oil filter, and an oil level switch, an oil level switch and sight gauge, an oil contamination detector, and a vibration detector are provided. Dismantle and dismantle, disassemble the joints and fixing bolts to couple the guide bearing cover 122.

가이드베어링갭(GUIDE BEARING GAP)을 측정한다. 이어서 터빈샤프트의 상단 플랜지에 와이어로프를 견고하게 매달아 체인블럭(CHAIN BLOCK)을 걸어주고, 체인블럭(CHAIN BLOCK)을 이용하여 가이드베어링커버(122)를 인출하되 가이드베어링(GUIDE BEARING)을 인출할 때에 지장을 주지 않도록 베어링커버서포트(121: BEARING COVER SUPPORT)측으로 이동시켜 안치하며, 터빈가이드베어링(TURBINE GUIDE BEARING)R.T.D와 온도계를 철거하여 소창직으로 포장보관하고 배선도 분리해 준다.Measure the guide bearing gap (GUIDE BEARING GAP). Then, hang the wire rope firmly on the top flange of the turbine shaft to hook the chain block, and withdraw the guide bearing cover 122 using the chain block, but withdraw the guide bearing. The bearing cover support (121: BEARING COVER SUPPORT) side is placed and placed so as not to cause any troubles. The turbine guide bearing (RTD) and the thermometer are removed, and the packaging is kept straight and separated from the wiring.

터빈가이드베어링(120)의 고정볼트를 분해하고, 체인블럭(CHAIN BLOCK)으로 서서히 상승(UP)시켜 베어링죠인트(BEARING JOINT)볼트를 분해하여 인출하되 분해전에는 터빈가이드베어링서포트레벨(TURBINE GUIDE BEARING SUPPORT LEVEL)을 측정한다.Disassemble the fixed bolt of the turbine guide bearing 120, and slowly raise it up with a chain block to disassemble and withdraw the bearing joint bolt, but before disassembling the turbine guide bearing support level (TURBINE GUIDE BEARING SUPPORT) LEVEL).

터빈가이드베어링탱크(TURBINE GUIDE BEARING TANK)에 잔류하는 오일(OIL)을 제거하고, 가이드베어링쿨링코일플랜지(GUIDE BEARING COOLING COIL FLANGE)의 고정볼트를 분해하여 쿨링코일(COOLING COIL: 2SET)을 인출하며,가이드베어링오일통(GUIDE BEARING OIL BASIN)의 고정볼트를 분리한 후에 오일통(OIL BASIN)을 분해 인출한다.Remove the oil remaining in the turbine guide bearing tank and remove the cooling coil by disassembling the fixing bolt of the guide bearing cooling coil flange (2 sets). Remove the fixing bolt of the guiding bearing oil basin and disassemble and take out the oil basin.

스터핑박스((STUFFING BOX)를 분해 인출하고자하는 패킹(PACKING)및 패킹박스(PACKING BOX)분해인출공정(227)은 다음과 같이 실시한다. 먼저 샤프트 슬리브(SHAFT SLEEVE)와 팩킹박스(PACKING BOX)사이의 갭(GAP)을 다수곳에서 체크하고, 패킹박스커버(PACKING BOX COVER) 및 코일스프링(COIL SPRING)과 패킹홀더(PACKING HOLDER)를 분해하여 인출하되 카본패킹(CARBON PACKING)을 손상시키지 않도록 주의하면서 인출하며, 상측의 팩킹박스(PACKING BOX)를 인출한다. 이어서 코일스프링(COIL SPRING)과 패킹홀더(PACKING HOLDER) 및 카본패킹(CARBON PACKING)을 분해하고, 하측의 팩킹박스(PACKING BOX)를 비롯하여 코일스프링(COIL SPRING)과 팩킹홀더(PACKING HOLDER) 및 카본패킹(CARBON PACKING)을 인출하며, 팩킹박스서포트(PACKING BOX SUPPORT)를 분해 인출한다.The packing and packing box disassembling and extraction process (227) for disassembling and pulling out the stuffing box is performed as follows: First, the shaft sleeve and the packing box are as follows. Check the gap between them in several places, take out the packing box cover, coil spring and packing holder, and take it out so as not to damage the carbon packing. Withdraw with care and take out the packing box on the upper side, disassemble the coil spring, packing holder and carbon packing, and lower packing box. In addition, coil springs, packing holders and packing cartons are taken out, and packing box supports are disassembled and taken out.

커플링볼트커버(COUPLING BOLT COVER)분해공정(228)과 메인커플링볼트(MAIN COUPLING BOLT)분해공정(229)을 실시한 후에 가이드링(130:GUIDE RING)과 주변 동작기구를 분해 인출하도록 하는 가이드링(GUIDE RING)인출공정(232)은 다음과 같이 실시한다.A guide that disassembles and removes the guide ring 130 and the guide mechanism after performing the coupling bolt cover disassembly process (228) and the main coupling bolt disassembly process (229). The ring takeout process 232 is performed as follows.

가이드링(130)과 가이드밴(140)의 개소에 설치된 그리스라인(GREASE LINE)을 모두 철거하고, 로드핀스톱퍼(ROAD PIN STOPPER)의 용접부위를절단하여 2개의 스톱퍼(STOPPER)를 철거하며, 서보모터(SERVO MOTOR)와 연결하는 컨넥팅로드(CONNECTING ROD)의 2개의 로드핀(ROD PIN)을 유압작키를 사용하여 분해인출한다.Remove all grease lines installed in the guide ring 130 and the guide van 140, and remove the two stoppers by cutting the welding part of the road pin stopper. The two rod pins of the connecting rod connecting to the servo motor are disassembled and drawn out using the hydraulic operation key.

가이드링(130)과 가이드밴(140)을 연결하는 가이드밴링크(GUIDE VANE LINK)의 시어핀(SHEAR PIN: 20개)과 편심링크핀(ECCENTRIC RINK PIN: 20개)을 분해 인출한 후에 가이드벤링크(GUIDE VANE LINK)를 인출하며, 가이드링홀더(GUIDE RING HOLDER:20개)를 분해한 후 홀더(HOLDER)를 철거하고, 터빈피트(101)내의 비계가 철거되면 가이드링(130)을 크레인으로 인출하며, 가이드링(130)과 헤드커버(143:HEAD COVER)의 마찰부위의 그리스(GREASE)를 깨끗하게 청소한다.After disassembling and taking out the shear pins (20 SHEAR PIN) and the eccentric link pins (ECCENTRIC RINK PIN: 20) of the guide vane link (GUIDE VANE LINK) connecting the guide ring 130 and the guide van 140, Take out the GUIDE VANE LINK, disassemble the guide ring holder (20 pieces), remove the holder (HOLDER), and remove the guide ring (130) when the scaffold in the turbine pit 101 is removed. Pull out with a crane, and clean the grease (GREASE) of the friction portion of the guide ring 130 and the head cover (143: HEAD COVER).

가이드밴(140:GUIDE VANE) 및 주변 동작기구를 인출하는 가이드밴레버(GUIDE VANE LEVER)인출공정(230)과 가이드밴스팀하우징(GUIDE VANE STEM HOUSING)인출공정(231) 및 가이드밴(GUIDE VANE)인출안치공정(235)은 다음과 같이 실시한다.Guide van lever (GUIDE VANE LEVER) withdrawal process (230) and guide vane steam housing (GUIDE VANE STEM HOUSING) withdrawal process (231) and guide van (GUIDE VANE) The drawout settling step 235 is performed as follows.

작업전에 오일 드레인밸브(OIL DRAIN VALVE)를 개방(OPEN)하여 오일을 완전히 배유시킨 후에 가이드밴서보모터(GUIDE VANE SERVOMOTOR)의 OPEN/CLOSE 파이프라인(PIPE LINE)을 분해하고, 가이드밴 서보모터 오일파이프라인 플랜지(GUIDE SERVOMOTOR OIL PIPE LINE FLANGE)의 고정볼트를 분해하고 배관을 철거하되, 가이드밴서보모터(GUIDE VANE SERVOMOTOR)의 고정볼트를 분해하기 전에 서보모터의 천정에 있는 고리에 체인블록(CHAIN BLOCK:2개)을 걸고 서보모터의 몸체에 후크를 걸어주며, 크레인에 와이어로프를 걸고 서보모터를 요지부동으로 묶어주며, 가이드밴서보모터(GUIDE VANE SERVOMOTOR)의 고정볼트를 분해하면서 서보모터의 무게중심을 잡아주기 위하여 체인블럭을 당겨주며, 가이드블럭을 서서히 내리면서 서보모터(SERVOMOTOR)가 수평으로 완전히 배출될 때까지 인출한 후에 크레인으로들어올려 준다.Open the oil drain valve (OPEN) before the operation to completely drain the oil, then disassemble the OPEN / CLOSE pipeline (PIPE LINE) of the guide vane servo motor, and guide van servomotor oil. Dismantle the fixing bolts of the pipeline flange (GUIDE SERVOMOTOR PIPE LINE FLANGE) and dismantle the pipe, but before disassembling the fixing bolts of the GUIDE VANE SERVOMOTOR, the chain block (CHAIN) 2) hooks, hooks on the body of the servomotor, wire ropes on the cranes, the servomotors are bundled with the main body, and the fixing bolts of the guide vane servo motors are disassembled. Pull out the chain block to grasp the center of gravity, and slowly lower the guide block and pull out the servo motor until it is completely discharged horizontally. It gives up.

헤드커버(143:HEAD COVER)를 분해인출하는 헤드커버(HEAD COVER)분해인출공정(233)은, 헤드커버맞춤핀(HEAD COVER DOWEL PIN)을 분해하고, 헤드커버고정볼트를 타격스패너를 이용하여 분해하며, 크레인에 4개의 와이어로프를 균등하게 걸어 수평을 유지시키면서 크레인을 상승시킨 후에 가이드밴(140)이 들리지 않도록 주의하면서 크레인을 작동시켜 헤드커버(143:HEAD COVER)를 서서히 인출하되, 헤드커버(143:HEAD COVER)를 인출할 때에 수차실벽과의 간격이 좁으므로 주의하고 벽에 설치되어 있는 부속설비와 접촉되거나 충돌하지 않도록 주의하며, 헤드커버(143:HEAD COVER)를 안치시킨 후에 가이드 밴 U-TYPE 패킹(PACKING)을 분해하여준다.In the head cover disassembly and withdrawal process 233 for disassembling and drawing the head cover 143, the head cover fixing pin is disassembled and the head cover fixing bolt is displaced using a blow wrench. After disassembling, while holding the four wire ropes evenly on the crane and leveling the crane, the crane is operated to take out the head cover (143: HEAD COVER) slowly while being careful not to lift the guide van 140. When taking out the cover (143: HEAD COVER), be careful that the gap between the aberration chamber wall is narrow and be careful not to contact or collide with the accessory equipment installed on the wall.After placing the head cover (143: HEAD COVER) Disassemble the guide van U-type packing.

보텀링(144:BOTTOM RING)인출안치공정(236)은, 분해전에 레벨(LEVEL)을 측정하고, 보텀링(144)의 고정볼트 및 못핀(DOWEL PIN)을 분해하며, 크레인에 인출용 디바이스(DEVICE)를 설치하여 보텀링(144:BOTTOM RING)을 인출하여 안치시킨 후에 인출용 디바이스(DEVICE)를 철거한다.The bottom ring 144 drawout step 236 measures the level LEVEL before disassembly, disassembles the fixing bolts and the dowel pins of the bottom ring 144, and pulls out the device for taking out the crane ( DEVICE), the bottom ring 144 (BOTTOM RING) is taken out and placed in place, and then the withdrawal device (DEVICE) is removed.

런너(110: RUNNER)와 터빈샤프트(160: TURBINE SHAFT)를 분해하여 인출하도록 하는 런너 및 샤프트(RUNNER & SHAFT)분리안치공정(237)과 터빈샤프트(TURBIN SHAFT)분리안치공정(238)은 다음과 같이 실시한다.The runner and shaft separation and settling process 237 and the turbine shaft separation and settling process 238, which disassemble and run the runner 110 and the turbine shaft 160, are as follows. Do as follows.

터빈피트(101)의 내의 비계를 철거하기 전에 터빈샤프트커플링(COUPLING)의 상단부에 리프팅 디바이스(LIFTING DEVICE)를 조립하고, 리프팅 디바이스(LIFTING DEVICE)에 크레인의 후크(HOOK)를 삽입한 후에 조인팅볼트(JOINTING BOLT)를 체결하며, 런너(110)를 인출하기 전에 보텀링베이스에 2m의 간격으로 인원을 배치하고 석면 가스켓트(GASKET)를 런너(110)와 보텀링웨어링 링(WEARING RING)의 사이에 끼운 후에 가스켓트를 상하좌우로 흔들어 런너(110)가 한쪽으로 치우치지 않도록 주의하면서 서서히 런너(110)와 터빈샤프트(160)를 인출하여 안치하며, 안치 후에는 런너(110)의 상단에 사다리를 설치하여 리프팅 디바이스(LIFTING DEVICE)에 체결된 크레인의 후크를 해체한다.Before lifting the scaffold in the turbine pit 101, assemble the lifting device at the upper end of the turbine shaft coupling, insert the hook of the crane into the lifting device, and then join it. The tightening bolt (JOINTING BOLT) is fastened, and before the runner 110 is drawn out, the personnel are placed in the bottoming base at intervals of 2 m, and the asbestos gasket is attached to the runner 110 and the bottom ring wear ring. After sandwiching between the gaskets up, down, left and right, carefully runner 110 and turbine shaft 160 withdrawal and pay attention not to bias the runner 110 to one side, and after settling the top of the runner 110 A ladder is installed on the crane to disengage the hook of the crane fastened to the lifting device.

이와 같이 실시하여 줌으로써, 수차터빈부(3)를 순차적으로 분해하고 분해된 각종 부품을 정비 보수하는 수차분해공정(200-3)을 완료하게 된다.By performing in this way, the aberration decomposition process 200-3 which disassembles the aberration turbine part 3 sequentially and maintains and repairs the various parts which were disassembled is completed.

발전기분해공정(200-2)과 수차분해공정(200-3)에 의해 분해된 발전기부(2)와 수차터빈부(3)의 각 부품들과 보조기기들은 분해기기점검공정(239)을 실시하여 보수를 실시한다.The components and auxiliary equipments of the generator unit 2 and the aberration turbine unit 3 decomposed by the generator decomposition process 200-2 and the aberration decomposition process 200-3 perform a decomposition apparatus inspection process 239. Repair is performed.

보조기기들의 점검·정비는 다음과 같이 실시한다.The inspection and maintenance of auxiliary equipment is carried out as follows.

먼저, 고정체의 센터링(CENTERING)작업을 실시한다. 센터링작업은 회전부와 고정부와 의 갭(GAP)을 정확하고 균일하게 하기 위해 실시하는 것으로써, 수차발전기의 센터에 피아노선과 같은 측정선을 내려 고정시키고 피아노선과 각 고정부품간의 칫수를 인사이드 마이크로메타(INSIDE MICROMETER)등으로 측정하며, 센터링측정에 필요한 공구(도구)로서는 피아노와이어(PIANO WIRE:0.3mm,20M), 센터링디바이스(CENTERING DEVICE:1SET),인사이드마이크로메타(INSIDE MICROMETER:1/100mm,2SET), 다이얼게이지(DIAL GAUGE:(MARGNET BASE포함, 1/100mm, 5개), 헤드폰(HEAD PHONE:1개), 건전지(4FM 6V, 1개), 추(WEIGHT:15Kg 1개), 정밀각형 수준기(1/100mm, 1개), 비닐코드선(25m), 유성매직(2개), 기름통(1개), 오일(OIL은 점도가 별로 크지 않는 것을 사용: 20L), 기타 약간의 공구 등을 필요로 한다.First, the centering of the stationary body is performed. Centering work is carried out to make the gap between the rotating part and the fixing part accurate and even.The measuring line, like the piano wire, is lowered and fixed to the center of the generator, and the dimension between the piano wire and each fixed part is inside the micrometer. Measured by (INSIDE MICROMETER), etc.The tools required for centering measurement include piano wire (PIANO WIRE: 0.3mm, 20M), centering device (CENTERING DEVICE: 1SET), inside micrometer (INSIDE MICROMETER: 1 / 100mm, 2 SET), DIAL GAUGE: (1 / 5mm, 1 / 100mm, including MARNETNET BASE), Headphones (HEAD PHONE: 1), Battery (4FM 6V, 1), Weight (WEIGHT: 15Kg 1), Precision Square level (1 / 100mm, 1 piece), vinyl cord wire (25m), oily magic (2 pieces), oil container (1 piece), oil (oil uses less viscous: 20L), A tool is required.

센터링(CENTERING)을 측정하기 위해 다음 사항을 확인 및 준비하여야 한다.The following items should be checked and prepared for measuring the centering.

피아노와이어(PIANO WIRE)는 이음매나 꼬임이 없어야 한다. 추(WEIGHT)는 오일(OIL)에 완전하게 잠겨야 하고, 피아노와이어(PIANO WIRE)가 유동하지 못하도록 추(WEIGHT)에 4개의 날개를 부착하여 저항을 높여 센터링디바이스(CENTERING DEVICE)에 연결하며, 오일에 이물질이 포함되거나 침투하지 못하도록 하되 추(WEIGHT)는 기름통의 바닥에 직접 닿지 않고 기름통의 바닥에서 1/3정도 뜨도록 설치한다.PIANO WIRE must be free of seams or kinks. WEIGHT must be completely immersed in oil, and 4 wings are attached to WEIGHT to prevent the PIANO WIRE from flowing, which increases resistance and connects to CENTERING DEVICE. Do not allow foreign substances to enter or penetrate the oil, but install the WEIGHT so that it floats about 1/3 of the bottom of the sump, rather than directly touching the bottom of the sump.

상측브라켓트(UPPER BRACKET)의 상부에 디바이스프레임(DEVICE FRAME)을 설치하고, 건전지의 "+"측은 센터링디바이스(CENTERING DEVICE)에 연결하고 "-"측은 어스(EARTH)를 위해 상측브라켓트(UPPER BRACKET)를 연결하며 헤드폰(HEAD PHONE)과도 연결시킨다. 중앙탐지기(CENTER DETECTOR)에 다이얼게이지(DIAL GAUGE)를 설치하고, 인사이드마이크로메타(INSIDE MICROMETER)로 상측브라켓트(UPPER BRACKET)의 4개의 대각점(POINT)을 측정하여 "O"점에 근접하도록 디바이스의 조정볼트로 조정하여 정치하며, 측정할 각 부품의 수평상태를 확인한다.Install DEVICE FRAME on top of UPPER BRACKET, connect "+" side of battery to CENTERING DEVICE and "-" side UPPER BRACKET for earth Connect the headphones with the headphone. Install a dial gauge in the center detector, and measure the four diagonal points of the upper bracket with the inside micrometer to approach the "o" point. Adjust it with the adjusting bolt of and fix it, and check the horizontal state of each part to be measured.

원주를 4등분(또는 필요시에 8등분)으로 분배하고, 동일지점에서 정확하게 되풀이 될 수 있도록 분할선상에 표시(MARKING)를 하며, 분할선의 방위는 바꾸지 않고 계속적으로 유지시켜주면서 모든 원주에 센터(CENTER)를 잡기 위하여 동일한순서로 표시(MARKING)를 하되, 일련의 측정점에 대한 측정을 실시할 때에는 반드시 동일한 사람이 시행하여 개인오차(4개의 측정점 중에서 3개는 사람A가 실시하고 다른 한 점은 사람B가 실시하여 생기는 오차)가 최소가 되어야 한다.Distribute the circumference into quarters (or eighths, if necessary), mark them on the dividing line so that they can be accurately repeated at the same point, and keep the orientation of the dividing lines unchanged and keep the centers on all the circumferences. Marking should be done in the same order in order to hold CENTER, but when measuring a series of measuring points, the same person must carry out a personal error (3 out of 4 measuring points are carried out by person A and the other point is Error caused by person B) should be minimized.

측정점과 피아노선과의 거리를 인사이드마이크로메타(INSIDE MICROMETER)로 측정하되, 이때에 마이크로메타(MICROMETER)가 피아노선에 접촉되는지의 여부를 확인하기 위하여 헤드폰(HEAD PHONE)을 사용한다.The distance between the measuring point and the piano wire is measured by the inside micrometer (INSIDE MICROMETER). At this time, a headphone is used to check whether the micrometer is in contact with the piano wire.

보텀링(BOTTOM RING)과 같이 타원형으로 변형되기 쉬운 부품은 타원으로 인한 오차를 최소화하기 위해서 원주를 8등분한 후에 측정하는 것이 바람직하고, 센터링을 실시하는 동안에 측정부품의 면이 매끈한지의 여부를 부단하게 확인하여야 하며, 1일에도 온도변화에 의해 다른 작업을 실시할 때에 피아노선이 진동하여 측정오차가 발생하게 되므로 가능한 한 온도변화가 적은 아침이나 오후 또는 야간에 실시하되 최종 측정은 다른 기계를 완전히 정지시킨 상태에서 실시하며, 노련한 숙련자가 수행하는 것이 바람직하다.Parts that are easily deformed into elliptical shapes, such as BOTTOM RING, should be measured after dividing the circumference into 8 parts in order to minimize errors due to ellipses, and whether the surface of the measuring part is smooth during centering. When performing other work due to temperature change on the day, the piano wire vibrates and measurement error occurs. Therefore, make the measurement in the morning, afternoon or night with the smallest temperature change as much as possible. It is preferably carried out in a stopped state and preferably carried out by an experienced person.

센터링(CENTERING)에 따른 판정 및 조정은 다음과 같이 실시한다.Judgment and adjustment by centering shall be carried out as follows.

인사이드마이크로메타(INSIDE MICROMETER)로 측정한 값을 섹션페이퍼(SECTION PAPER)에 플로트(PLOT)시키면 완만한 곡선이 그려지는데, 섹션페이퍼(SECTION PAPER)에 플로트(PLOT)시켜 줌으로써 측정의 오차와 INNER면의 끝손질 불량 등에 의한 측정치의 불규칙에서 발생하는 오차를 방지할 뿐만 아니라 센터(CENTER)가 어느 위치에서 가장 양호한지의 여부를 용이하게 알 수 있도록 하기 위한 것이며, 따라서 이동거리는 최대치와 최소치의 눈금자의 1/2만을 이동시키면되는 것이다.Plot the value measured by the inside micrometer to SECTION PAPER to draw a gentle curve. By plotting it to SECTION PAPER, the measurement error and INNER surface It is not only to prevent the error caused by the irregularity of the measured value due to the poor finish quality of, but also to easily know which position is the best at the center. Just move / 2.

타원인 경우에는 쌍봉성의 곡선이 얻어지지 않고 불규칙한 곡선이 되지만 역시 곡선의 최대치와 최소치의 눈금자의 1/2만을 이동시키면 쌍봉성 곡선에 가까워지게 되고, 이러한 조작을 2 ~ 3회 반복 실시하게 되면 대칭적인 상봉곡선을 얻어 중심을 산출할 수 있게 되며, 특히 각 부품을 이동시켜 조정을 실시할 필요가 있을 때에는 잭(JACK) 및 잭볼트(JACK BOLT)로 조정하지만 반대측을 풀어 필요로하는 측이 응동할 수 있도록 하지 않으면 고정물이 무거워 전체가 움직이지 않게 되고 잭(JACK)에 의해 억눌린 부분이 변형되는 경우가 발생하므로 유의하도록 한다.In the case of an ellipse, a bimodal curve is not obtained and becomes an irregular curve, but if only half of the ruler of the maximum and minimum values of the curve is moved, it becomes close to the bimodal curve. It is possible to calculate the center by obtaining the normal upper curve, especially when it is necessary to move and adjust each part with the jack and jack bolt. If you do not do this, the fixture is heavy, so that the whole does not move and the part pressed down by the jack (JACK) may occur, so be careful.

센터링(CENTERING)절차는 다음과 같이 실시한다.The centering procedure is carried out as follows.

헤드커버(HEAD COVER)와 상.하측브라켓트(UPPER. LOWER BRACKET)등을 가조립하여 부품을 안치하고, 센터링디바이스(CENTERING DEVICE)를 설치하며, 피아노선정위치(PIANO WIRE SUSPENSION)를 선정하되 터빈가이드베어링하우징(TURBINE GUIDE BEARING HOUSING)의 대칭점에서 측정된 값의 편차가 3/100mm보다 작도록 피아노선정위치(PIANO WIRE SUSPENSION)를 조정하고 이때에 보텀링과의 관계를 우선적으로 고려하여 허용치여부를 확인하도록 한다.Head cover (HEAD COVER) and upper and lower brackets (UPPER.LOWER BRACKET) are assembled and placed, the centering device (CENTERING DEVICE) is installed, the PIANO WIRE SUSPENSION is selected, but the turbine guide bearing Adjust the PIANO WIRE SUSPENSION so that the deviation of the measured value from the symmetry point of the TURBINE GUIDE BEARING HOUSING is less than 3/100 mm, and at this time, consider the relationship with the bottom ring to check whether the tolerance is allowed. do.

이어 각부의 레벨(LEVEL) 및 거리를 측정한다. 상측브라켓트레벨(UPPER BRACKET LEVEL) 및 거리를 측정하고, 발전기스테이터(GEN' STATOR)의 상.하거리를 측정하며, 하측브라켓트레벨(LOWER BRACKET LEVEL) 및 발전기가이드베어링서포트(GEN' GUIDE BEARING SUPPORT)의 거리와 터빈가이드베어링서포트레벨(TURBIN GUIDE BEARING SUPPORT LEVEL) 및 거리와 BOTTOM RINGWEARING RING의 거리를 측정한다.Then, the level (LEVEL) and the distance of each part are measured. Measure upper bracket level and distance, measure upper and lower distances of generator stator, lower bracket level, generator guide bearing support and GEN 'GUIDE BEARING SUPPORT Measure the distance between TURBIN GUIDE BEARING SUPPORT LEVEL and the distance between BOTTOM RING and WEARING RING.

각부를 조정한다. 각부조정 데이타(DATA)를 섹션페이퍼(SECTION PAPER)에 플로트(PLOT)하여 편심량 및 방향을 확인하고, 설치시 및 최종점검데이타(DATA)를 비교 검토하며, 편심량 및 이동량이 결정되면 고정볼트 및 테이퍼핀(TAPER PIN)을 뽑아내고 잭(JACK)으로 이동시켜 준다.Adjust the parts. Float each adjustment data (DATA) on section paper to check eccentricity and direction, compare installation and final inspection data (DATA), and fix bolts and tapers when eccentricity and movement amount are determined. Pull out the TAPER PIN and move it to the jack.

각 부재를 측정한다. 조정이 완료되면 각부 레빌(LEVEL) 및 거리를 정밀 측정하여 허용치 이내인지의 여부를 확인하고, DOWEL PIN가공 및 PIN HOLE REAMING을 실시하며, 조정범위가 너무 커서 REAMING작업이 곤란한 경우에는 볼트홀(BOLT HOLE) 및 핀홀(PIN HOLE)을 다른 위치에 뚫어주어야 하는데 이때에는 충분히 검토한 후에 실시하도록 한다.Each member is measured. When the adjustment is completed, precisely measure the level and distance of each part to check whether it is within the allowable value, dow pin processing and pin hole reaming, and if the reaming work is difficult because of too large adjustment range, bolt hole (bolt) HOLE) and PIN HOLE should be drilled in different locations. In this case, make sure that the test is carried out sufficiently.

가공된 DOWEL PIN을 끼워 넣고 고정볼트를 조여준 후에 최종적으로 점검을 실시하고, 조립의 역순으로 부품을 분해하여 인출하여 줌으로써 센터링(CENTERING)절차를 완료하게 된다.After inserting the processed DOWEL PIN and tightening the fixing bolts, the inspection is finally carried out, and the centering procedure is completed by disassembling and taking out the parts in the reverse order of assembly.

센터링(CENTERING)작업을 완료한 후에는 보텀링(144)의 웨어링 링(WEARING RING)의 보수점검을 실시하는데, 보텀링웨어링 링(BOTTOM RING WEARING RING)의 마모량을 체크하고, 터치(TOUCH)부위를 80등분하여 피아노선으로부터 마이크로메타로 실측하여 편향성을 체크하며, WEARING RING의 진원도 편차를 줄이기 위하여 회전체와 접촉한 부위를 그라인딩(GRINDING)하여 진원에 가깝도록 조치한다.After completing the centering operation, the maintenance of the wear ring of the bottom ring 144 is performed. The wear amount of the bottom ring ring is checked and the touch part is touched. After dividing into 80, measure the deflection by measuring the micrometer from the piano wire, and grind the part in contact with the rotating body to reduce the roundness variation of the bearing ring so that it is close to the source.

에어쿨러(AIR COOLER)와 그 주변장치의 점검보수는 다음과 같이 실시한다.Inspect and repair the air cooler and its peripheral equipment as follows.

에어쿨러드레인밸브(AIR COOL DRAIN VALVE)를 개방(OPEN)하여 완전히 배수시키고, COOLING WATER(냉각수)INLET 및 OUTLET FLANGE(65A)의 체결볼트를 분해하고 밀착되어 있는 플랜지(FLANGE)를 분리하며, 에어밴트(AIR VENT)용 파이프를 철거한다. 에어쿨러(AIR COOLER)냉각수 드레인플랜지(DRAIN FLANGE)를 분리하고, 에어쿨러(AIR COOLER)의 상단에 있는 리프팅러그(LIFTING LUG)에 와이어로프를 걸어 크레인으로 인출하여 옆으로 뉘어 안치하며, 워터박스커버(WATER BOX COVER)의 고정볼트를 분해하여 커버를 철거하고 하측워터박스의 고정볼트를 분해하여 철거하며, 상. 하측워터박스의 내부를 깨끗하게 청소한다.Open the air cooler drain valve (OPEN) to drain it completely, disassemble the fastening bolt of cooling water INLET and OUTLET FLANGE (65A), and remove the flange that is in close contact. Remove the pipe for the AIR VENT. Remove the air cooler drain flange, wire wire to the lifting lug on the top of the air cooler, pull it out with a crane, lay it on the side, and place it in the water box. Dismantle the cover by disassembling the fixing bolt of WATER BOX COVER and dismantle by removing the fixing bolt of the lower water box. Clean the inside of the lower water box.

쿨링튜브홀(COOLING TUBE HOLE)의 내부에 있는 뻘 등을 제거하여 깨끗하게 청소한 후에 각부의 상태를 육안으로 점검하고, 상측워터박스의 내부와 커버 및 하측워터박스를 에폭시 페인트를 칠하여 도장하며, 에어쿨러가스켓트(AIR COOLER GASKET)를 고무로 제작하여 하측워터박스의 가스켓트를 교체하고 워터박스를 조립하며, 워터박스커버의 가스켓트를 교체하고 커버를 조립한다.After removing the fan inside the cooling tube hole and cleaning it cleanly, check the condition of each part visually, and paint the inside of the upper water box, the cover and the lower water box with epoxy paint, and air AIR COOLER GASKET is made of rubber to replace the gasket of the lower water box, assemble the water box, replace the gasket of the water box cover, and assemble the cover.

에어쿨러(AIR COOLER)는 외부에어를 사용하여 먼지 등을 제거하고, 에어쿨러(AIR COOLER)수압시험장치를 조립하여 시험을 실시하며, 크레인을 사용하여 에어쿨러(AIR COOLER)를 조립하며, COOLING WATER(냉각수)INLET 및 OUTLET FLANGE의 가스켓트를 교체하고 플랜지를 체결하며, 에어밴트용 라이프를 조립하고, 에어쿨러(AIR COOLER)냉각수 드레인 플랜지의 가스켓트를 교체한 후에 플랜지를 체결한다.AIR COOLER removes dust, etc. using an external air, assembles an AIR COOLER hydraulic test device and performs tests, assembles an AIR COOLER using a crane, and COOLING Replace the gaskets of WATER INLET and OUTLET FLANGE and tighten the flanges, assemble the air vent life, and replace the gaskets of the AIR COOLER coolant drain flange before tightening the flanges.

발전기 브레이크(GENERATOR BRAKE)와 그 주변장치의 점검보수는 다음과 같이 실시한다.Inspect and repair the generator brake and its peripherals as follows.

브레이크 슈(BRAKE SHOE)고정스프링(4개)을 철거하여 슈(SHOE)를 분해하고, 에어(AIR)용 피스톤 커버(PISTON COVER)의 고정볼트를 분해하여 커버를 철거하며, 오일(OIL)용 피스톤을 오링(O RING)이 손상되지 않도록 하면서 분해 인출하며, 에어용 피스톤을 분해한다.Disassemble the shoe by removing the brake shoes fixing springs (4), disassemble the fixing bolt of the piston cover for the air, and remove the cover. Disassemble and withdraw the piston while avoiding damage to the O-ring, and disassemble the piston for air.

실린더(CYLINDER)의 내부에 있는 오일을 깨끗하게 청소하고, 분해한 부품들을 세척유로 깨끗이 청소하고 오링 및 볼트와 부품의 결함을 점검하며, 브레이크 슈(BRAKE SHOE)의 두께를 측정하여 15mm이상 마모되었으면 교체하고 슈(SHOE)의 표면이 긁힘이나 파손 등으로 손상되었을 때에는 마모정도에 상관없이 교체한다.Clean the oil inside the cylinder, clean the disassembled parts with cleaning oil, check the O-ring and bolts and parts, check the thickness of the brake shoe and replace it if worn over 15mm If the surface of the shoe is damaged due to scratches or damage, replace it regardless of the degree of wear.

에어용 피스톤과 오일용 피스톤을 조립하고, 에어용 피스톤커버를 조립하며, 브레이크 슈(BRAKE SHOE)를 조립하고 고정스프링을 체결하며, 수차발전기를 조립완료 후에 최종점검을 실시할 때에 브레이크(BRAKE)에 에어(AIR) 및 오일(OIL)을 공급하여 동작시험을 실시한다.Assemble the piston for air and the piston for oil, assemble the piston cover for air, assemble the brake shoe, fasten the fixed spring, and when the final inspection is completed after assembling the water turbine generator, Perform an operation test by supplying air and oil.

트러스트베어링(49)용 오일 쿨러(OIL COOLER)와 그 주변장치의 분해 점검은 다음과 같이 실시한다.Disassembly and inspection of the oil cooler for the thrust bearing (49) and its peripherals shall be carried out as follows.

워터박스(WATER BOX)를 분해하기 위해 강판틀 비계를 설치하고, 오일쿨러드레인밸브(OIL COOLER DRAIN VALVE:15A)를 개방(OPEN)하여 완전히 배수시키며, 워터박스의 고정볼트를 분해하고 커버를 철거하며, 오일쿨러(OIL COOLER)의 하단에 있는 워터박스클리닝커버(CLEANING COVER)고정용 볼트를 분해하고 커버를 철거한다.Install steel plate scaffolding to disassemble the water box, open the oil cooler drain valve (15A) to drain it completely, disassemble the fixing bolt of the water box and remove the cover Disassemble the bolt for fixing the CLEANING COVER at the bottom of the oil cooler and remove the cover.

쿨링튜브(COOLING TUBE) 및 셀(SHELL)의 상태를 점검하고, 쿨링튜브홀의 내부에 있는 뻘 등을 제거하여 깨끗하게 청소하며, 워터박스의 내부도 깨끗하게 청소하며, 워터박스의 커버를 조립하고 강판틀 비계를 철거하며, 워터박스클린닝커버( WATER BOX CLEANING COVER)를 조립하고 조립된 커버의 위에 조합페인트 도장을 실시한다.Check the condition of the cooling tube and shell, remove and clean the inside of the cooling tube hole to clean it, clean the inside of the water box, assemble the cover of the water box and Remove the scaffolding, assemble the WATER BOX CLEANING COVER and apply the combination paint on the assembled cover.

가바나(GOVERNOR)는 GOVERNOR CUBICLE 내의 오일필터(OIL FILTER)를 육각렌치로 분해하고, 오일필터를 세척제로 깨끗하게 청소하여 조립하며, 각 복원기구들의 동작상태를 점검한다.GOVERNOR disassembles the oil filter in the GOVERNOR CUBICLE with a hexagon wrench, cleans and assembles the oil filter with a cleaning agent, and checks the operation status of each restoration mechanism.

냉각수 여과기(STRAINER)의 분해 점검은, 메인여과기(MAIN STRAINER)를 분해 인출한 후에 와이어브러시와 물을 사용하여 깨끗하게 청소하고, 실링(SEALING)급수용 여과기(STRAINER:2대)를 분해한 후 와이어브러시와 물을 사용하여 깨끗하게 청소하며, 여과기(STRAINER)를 조립하기 전에 몸체 내부의 부식을 방지하기 위하여 에폭시 페인트로 도장한 후에 조립하며, 조립을 완료한 후에 여과기(STRAINER)의 외부를 조합페인트(청색)로 도장한다.For disassembly and inspection of the coolant filter, remove the main filter and remove the main filter, clean it with a wire brush and water, and remove the sealing water filter (STRAINER: 2 units). Clean with brush and water, and assemble after painting with epoxy paint to prevent corrosion of the body before assembling the STRAINER. After completing the assembly, the outside of the STRAINER is painted with a combination paint ( Blue).

압유탱크(OIL PRESSURE TANK)의 분해점검은, 압력탱크드레인밸브( PRESSURE TANK DRAIN VALVE)를 오픈(OPEN)시켜 SUMP TANK로 오일을 전량 배유시키고, 압력탱크의 맨홀(MANHOLE)을 상부고리에 체인블록을 걸어 놓은 상태에서 맨홀의 고정볼트를 분해하여 오픈(OPEN)시키며, 넝마 및 소창직을 사용하여 탱크의 내부를 깨끗하게 청소하고, 맨홀패킹(MANHOLE PACKING)을 교체한 후에 폐쇄(CLOSE)시킨다.Disassembly and inspection of the oil press tank opens the pressure tank drain valve and drains all the oil into the pump tank, and the manhole of the pressure tank is connected to the chain block. In the state of hanging, the fixing bolts of the manhole are disassembled and opened, and the inside of the tank is cleaned by using rags and small bowels, and the manhole packing is replaced and then closed.

섬프탱크(SUMP TANK)의 분해점검은, 오일여과기를 사용하여 "A"탱크에서 "B"탱크로 오일을 옮기면서 여과시키고, 섬프탱크커버의 고정볼트를 분해하여 커버를 철거하며, 리턴오일여과기(RETURN OIL STRAINER) 및 마그넷트필터(MAGNET FILTER)를 인출하여 오일 및 이물질을 휘발유나 세척제를 사용하여 깨끗이 세척하여 건조시키며, 탱크의 내부도 깨끗이 청소하되 'A"탱크의 내부청소를 완료한 후에 마그넷트필터와 리턴오일여과기를 조립하고 커버를 체결하며, 오일여과기를 사용하여 "B"탱크에서 "A"탱크로 오일을 여과시킨 후에 "B'탱크도 깨끗하게 청소하며, 탱크의 내부청소를 완료한 후에 다이얼타입(DIAL TYPE)의 오일레벨게이지(OIL LEVEL GAUGE)를 점검하고 조정한다.Disassembly and inspection of the sump tank is carried out by transferring the oil from the "A" tank to the "B" tank using an oil filter, dismantling the cover by disassembling the fixing bolt of the sump tank cover, and return oil filter ( Take out return oil and magnet filter and wash oil and foreign substances cleanly by using gasoline or cleaning agent and dry them, and clean inside of tank, but after cleaning the inside of tank 'A', Assemble the filter and return oil filter, fasten the cover, filter the oil from tank "B" to tank "A" using oil filter, clean the tank "B" and clean the tank. After that, check and adjust the oil level gauge of the dial type.

주 차단기의 분해 점검은 다음과 같이 실시한다.Disassembly and inspection of the main breaker shall be carried out as follows.

에어탱크드레인밸브(AIR TANK DRAIN VALVE)를 서서히 개방(OPEN)시켜 에어를 배출(DRAIN)시키고, SUPPRESSOR RESISTANCE를 분리하며, 너트를 분해하되 SILENCER-COOLER와 브레이크파트 커플링 너트를 분해시킬 때에 스프링의 압력이 작용하고 있으므로 SILENCER-COOLER를 한사람이 누르고 너트를 최종적으로 분해하며, SILENCER-COOLER와 스프링과 가이드를 분해 인출하고, SLIDING CONTACT를 인출하고 R,S,T상 분해순서를 동일하게 하여 분해한다.Open the air tank drain valve slowly to open the air, drain the air, separate the SUPISTOR RESISTANCE, and disassemble the nut. When disassembling the SILENCER-COOLER and the brake part coupling nut, Since pressure is working, one person presses the SILENCER-COOLER and finally disassembles the nut. .

이동접촉자(MOVING CONTACT), 고정접촉자(FIXED CONTACT), 슬라이딩접촉자(SLIDING CONTACT) 및 스프링 등 분해부품들의 손상여부를 점검하고 세척제를 사용하여 청소하며, DISCONNECTING PART의 SLIDING SURFACE에 결합한 상태에서 A,B,C 상순으로 이동접촉자(MOVING CONTACT)와 슬라이딩접촉자(SLIDING CONTACT)의 결합체를 안치하며, 가이드와 스프링을 안치하고 SILENCER-COOLER의 스톱퍼와 스프링의 위치를 맞춰 조립하며, 너트를 체결하고 SUPPRESSOR RESISTANCE를결합시키며, 에어드레인밸브를 폐쇄시키고 에어공급용 라인 밸브를 개방시키며, 조립 후에 실시되는 동작시험의 데이터(DATER)를 분해전의 데이터와 비교하여 검토한다.Check for damage of disassembled parts such as mobile contactor, fixed contactor, sliding contactor and spring, clean with cleaning agent, and A, B in combination with SLIDING SURFACE of DISCONNECTING PART In the order of C, the combination of MOVING CONTACT and SLIDING CONTACT is settled, and the guide and the spring are settled, the stopper and the spring of the SILENCER-COOLER are assembled with the stopper, the nut is tightened, and the SUPPRESSOR RESISTANCE is installed. The valves are closed, the air drain valve is closed, the air supply line valve is opened, and the date of operation test (DATER) performed after assembly is compared with the data before disassembly.

발전기부(2:GENERATOR)의 각 부품에 대한 점검보수는 다음과 같이 실시한다.The maintenance of each part of the generator (2: GENERATOR) is performed as follows.

P.M.G(12)는 충격과 외부 금속(METAL)과의 접촉에 의한 자력의 손실을 방지하기 위하여 석면시트(SHEET)로 포장(PACKING)하여 조립시까지 보관하고, 볼베어링(BALL BEARING)은 연속운전시의 수명이 대체적으로 3년이므로 이의 결함을 점검한다.PMG (12) is packed with asbestos sheet (SHEET) and stored until assembly to prevent the loss of magnetic force due to impact and contact with external metal (METAL), and the ball bearing (BALL BEARING) during continuous operation Since the service life of is generally 3 years, its defects are checked.

집진기(COLLECTOR)와 그의 링커버(RING COVER)는, 카본브러시(CARBON BRUSH:36개)를 소창직으로 깨끗하게 청소하고 버니어 캘리퍼스를 이용하여 마모량을 측정하여 측정값이 브러시홀더(BRUSH HOLDER)의 길이(25Cm)를 뺀 수치가 10mm이내이면 교체하고, 집진기링커버 내의 카본(CARBON)을 깨끗이 청소하며, 집진기링(COLLECTOR RING)의 표면에 스파이크흔적을 비롯하여 고스트마크(GHOST MARK)와 STOP WEAR 등에 손상이 없는지를 점검하여 링(RING)의 슬라이딩(SLIDING)표면에 가는 흠이나 가벼운 상처가 있는 경우에는 표면을 파인매시센드페이퍼(FINE-MESH(#150~200)SAND PAPER)로 자국을 없애며, 카본브러시는 습기에 약하므로 소창직으로 포장하여 실리카겔(SILICAGEL)을 함석에 넣어 건조한 곳에서 조립시까지 보관한다.COLLECTOR and its ring cover clean the carbon brushes (36 CARBON BRUSH) cleanly in small size and measure the amount of wear by using the vernier calipers, and the measured value is the length of the brush holder. Replace if the value minus 25cm is within 10mm, clean the carbon inside the dust collector ring cover, and damage the ghost mark and stop wear, including spike traces on the surface of the collector ring. If there are scratches or light scratches on the sliding surface of the ring, remove the marks with a fine mesh send paper (FINE-MESH (# 150 ~ 200) SAND PAPER). Brush is fragile, so pack it in small size and put silica gel (SILICAGEL) in tin and store it in dry place until assembly.

탑커버(20:TOP COVER)는 하부를 넝마 및 세척제로 깨끗하게 청소한다.Top cover (20: TOP COVER) to clean the lower part with a rag and cleaning agent.

여자(EXCITATION)전원공급용 버스바(BUS) 및 스터브샤프트(STUB SHAFT)는, 스터브샤프트(STUB SHAFT)의 먼지 및 이물질을 넝마와 세척제로 깨끗하게 청소한후에 비닐로 포장하여 보관하고, 버스바(BUS)고정볼트 및 와샤의 상태를 점검하여 불량품은 교체하며, 버스바(BUS)의 연결부는 가스토치로 가열한 후에 납을 제거하고 연마(연마지 및 줄을 이용)하여 표면처리하여 준다.Excitation bus and bus shafts should be cleaned with dust and debris from the stub shafts with rags and cleaning agents, and then wrapped in plastic and stored as bus bars. ) Check the condition of fixing bolt and washer and replace the defective product. After heating the bus part with bust, remove lead and polish it by polishing (using polishing paper and string).

상측브라켓트(22:UPPER BRACKET)는, 상측브라켓트(22)와 상측코일커버(UPPER COIL COVER)를 넝마와 세척제를 이용하여 깨끗하게 청소하고 조합페인트로 도장한다.The upper bracket 22 (UPPER BRACKET) cleans the upper bracket 22 and the upper coil cover (UPPER COIL COVER) with a rag and a cleaning agent and paints with a combination paint.

발전기로타(24:GENERATOR ROTOR)는, 로타(ROTOR)의 절연상태를 파악하기 위하여 500V 1000MEGGER로 절연저항을 측정하고, 폴피스(POLE PIECE)간의 분담전압을 측정하며, 로타의 표면을 소창직으로 청소한 후에 에어(AIR)를 사용하여 잔류하는 먼지 등을 제거하며, 절연체(꼭대기부분의 절연색과 코일브라켓트(COIL BRACKET)의 절연체)의 변형상태를 점검한다. 권선이 풀리지 않았는지 등의 상태를 점검하고 권선에서부터 집진기링까지의 도선과 케이블 인출선의 클랙(CRACK), 풀림, 과도한 오염 및 절연체의 구부러짐 등을 점검하고, 자극의 DAMPER BAR SHORT-CIRCUIT RING 및 코일브라켓트(COIL BRACKET)에 클랙(CRACK)이나 비정상 상태가 없는지의 여부를 점검하며, 림(RIM)과 스포크(SPOKE) 사이의 COTTER KEY의 변형이나 풀림 여부를 점검하며, 슬라이딩(SLIDING)의 표면에 탄 흔적이나 이상을 발견하기 위해 브라켓트링을 점검하고 마찰흔적이 심한 경우에는 연마작업을 실시하며, 밸런싱추(BALANCING WEIGHT)의 풀림이나 변형상태를 점검하고 볼트 너트의 이완여부를 점검하며, 철심이나 권선등은 수분이나 부식을 방지하기 위하여 도포된 바니시(VARNISH)가 오일이나 자연열화에 의해 손상되었는지를 세밀히 점검하여 표면을깨끗하게 한 후에 바니시(VARNISH)를 도포시켜 준다.The generator rotor (24) measures the insulation resistance with a 500V 1000 MEGGER to determine the insulation state of the rotor, measures the voltage sharing between pole pieces, and smoothes the surface of the rotor. After cleaning, use AIR to remove any residual dust and check the deformed state of the insulator (insulation color at the top and insulation of the coil bracket). Check the windings for looseness, check the cracks, loosening, excessive contamination and bending of insulators from the wires and cable leads from the windings to the dust collector ring, and the DAMPER BAR SHORT-CIRCUIT RING and coil Check if there is no crack or abnormal state in the coil bracket, check the deformation or loosening of the coating key between the rim and the spoke and check the sliding surface. Check the bracket ring to find burnt traces or abnormalities. In case of severe friction traces, perform grinding work. Check loosening or deformation of balancing weights. Check bolt nuts for looseness. In order to prevent moisture or corrosion, windings should be carefully checked to see if the varnish applied is damaged by oil or natural deterioration, and then clean the surface. Apply varnish to the skin.

발전기스테이터(GENERATOR STATOR)는, 스테이터의 상태를 점검하기 위하여 1000V 2000MEGGER로 로터의 분해전과 분해후의 절연저항을 측정하고, 스테이터의 권선과 철심 및 에어덕트(AIR DUCT)의 오염여부를 점검하며, 스테이터의 표면에 부착된 검정분말을 소창직으로 깨끗하게 청소한 후에 에어를 사용하여 잔류하는 먼지 등을 제거하며, 에어덕트에 부착된 검정분말 및 먼지를 진공청소기. 압축공기. 페인트붓 및 넝마 등으로 깨끗하게 청소한다. 쐐기(WEDGE)의 이완이나 균열여부를 주의 깊게 점검하고, 절연 바니시(VARNISH)탈락 및 처리가 미흡한 부분을 세밀히 점검하여 표면을 깨끗하게 닦아낸 후에 바니시를 칠하며, 점검보수를 완료한 후에 이물질이 침입하거나 습기가 발생하는 것을 방지하기 위하여 소창직으로 씌워(COVERING)주며, 스테이터의 점검보수는 하측브라켓트(LOWER BRACKET)를 가조립한 상태에서 실시한다.The generator stator measures the insulation resistance before and after disassembly of the rotor with a 1000V 2000MEGGER to check the status of the stator, and checks the stator winding, iron core and air duct for contamination. Clean the black powder adhering to the surface of the small window cleanly and then remove the remaining dust using air, and vacuum the black powder and dust adhering to the air duct. Compressed air. Clean with a paintbrush and rags. Carefully inspect the wedges for loosening or cracking, carefully inspect the areas where insulation varnishes are not dropped or treated, clean the surface, apply varnish, and clean the surface. In order to prevent the occurrence of moisture or moisture, it is covered with small window covering. The maintenance of the stator is performed with the lower bracket temporarily assembled.

트러스트베어링(29:THRUST BEARING)의 오일 및 배관은, 오일여과기를 사용하여 오일을 여과시키고, 오일파이프플랜지(OIL PIPE FLANGE)면을 깨끗하게 청소하고 이물질이 침투하는 것을 방지하기 위해 비닐로 포장하여 보관한다.The oil and piping of the thrust bearing (29: THRUST BEARING) are stored in vinyl to filter the oil using an oil filter, to clean the oil pipe flange surface and to prevent foreign matter from penetrating. do.

트러스트오일커버(41:THRUST OIL COVER)는 오일커버에 부착된 축적물을 넝마 및 세척수로 깨끗하게 청소하고 이물질이 침투하는 것을 방지하기 위하여 비닐로 포장하여 보관한다.The Thrust Oil Cover (41: THE OIL COVER) cleans the deposits attached to the oil cover with rags and washing water and keeps it wrapped in plastic to prevent foreign matter from penetrating.

하측가이드베어링(42:LOWER GUIDE BEARING)은 가이드베어링의 표면의 마찰상태를 점검하고, 베어링의 접촉면은 경유를 소창직에 묻혀서 깨끗하게 청소한 후에마찰부위를 스크랩핑(SCRAPING)하며, 이물질이 침투하는 것을 방지하기 위하여 소창직으로 포장(COVERING)하여 보관한다.The lower guide bearing (42: LOWER GUIDE BEARING) checks the friction of the surface of the guide bearing, and the contact surface of the bearing is cleaned by applying light oil to the small window and scraping the friction part. In order to prevent the damage, cover it with small window.

메인커플링볼트(51:MAIN COUPLING BOLT)는 볼트의 외경을 연마지로 연마하여 표면을 깨끗하게 청소하고 이물질이 침투하는 것을 방지하기 위해 비닐로 포장하여 보관하며, 커플링볼트의 와샤(WASHER)의 구부러진 부위를 평평하게 펴서 보관한다.Main Coupling Bolt (51: MAIN COUPLING BOLT) is polished with abrasive paper to clean the surface and packed with vinyl to prevent foreign matter from penetrating, and bent the washer of coupling bolt. Store the site flat.

하측브라켓트(45:LOWER BRACKET)는 하측브라켓트의 받침대(FOUNDATION BASE)의 녹을 연마지로 제거한 후에 청소하고 그리스를 도포하여 발청을 방지하며, 하측브라켓트(45) 및 하측코일커버를 넝마와 세척제로 깨끗하게 청소한 후에 조합페인트로 도장한다.The lower bracket (45: LOWER BRACKET) is cleaned after removing the rust of the lower bracket with abrasive paper and applying grease to prevent rusting.The lower bracket (45) and the lower coil cover are cleaned with rags and cleaning agents. After that, paint with a combination paint.

하측에어디플렉터(48:LOWER AIR DEFLECTOR)는 넝마에 세척수를 묻혀서 깨끗하게 청소하고 조합페인트로 도장한다.The lower air deflector (48: LOWER AIR DEFLECTOR) is cleaned by rinsing the rags with clean water and painting with a combination paint.

트러스트베어링(29:THRUST BEARING)은, 트러스트베어링패드(PAD)면의 6곳의 두께를 스크랩핑(SCRAPING)처리하기 전에 아웃사이드마이크로메타(OUT SIDE MICROMETER)로 측정하고, 베어링패드의 접촉면을 경유와 소창직으로 깨끗하게 청소한 후에 영유와 인주를 섞어 소창직뭉치에 묻혀 정반에 고르게 칠하며, 오일패드접촉면을 정반에 밀착시켜 3~4회 정도 문지르면 베어링패드의 돌츨부에 인주가 묻혀지고 인주가 묻은 부위를 깊이 0.02mm, 폭 20~30mm정도로 스크랩핑(SCRAPING)하며, 코일스프링(COIL SPRING)을 분해하여 경유 및 소창직으로 깨끗하게 청소하여 조립하고 이물질이 침투하는 것을 방지하기 위해 소창직으로 커버링(COVERING)한다.The thrust bearing (29: THRUST BEARING) measures the thickness of six surfaces of the thrust bearing pad (PAD) with an outside micrometer before scraping, and passes through the contact surface of the bearing pad. After cleaning clean with small intestine, mix infant oil and rice paddle and bury it in small intestine bundle and apply it evenly on the surface plate. Rub the oil pad contact surface against the surface plate and rub it 3 or 4 times so that the pad of the bearing pad is buried and Scrape the site to 0.02mm in depth and 20 ~ 30mm in width, disassemble the coil spring, clean and clean it with light oil and small size, and cover it with small size to prevent foreign substances from penetrating. (COVERING)

수차터빈부(3)의 점검보수는 다음과 같이 실시한다.Maintenance of the water turbine turbine unit 3 is carried out as follows.

스피럴케이싱(SPIRAL CASING) 및 드라프트튜브맨홀(DRAFT TUBE MANHOLE)은 스피럴케이싱맨홀의 녹을 제거하고 오링홈을 깨끗하게 청소하며, 드라프트튜브맨홀가스켓트(GASKET)를 철거하고 녹을 제거하여 별도로 제작된 드라프트튜브맨홀가스켓트로 교체한다.SPIRAL CASING and DRAFT TUBE MANHOLE remove rust of Spiral Casing Manhole, clean O-ring groove cleanly, remove Draft Tube Manhole Gasket and remove rust Replace the draft tube manhole gasket.

터빈피트(101:TURBINE PIT)의 월크웨이(106:WALK WAY)는 월크웨이(106:WALK WAY)의 하부를 넝마 및 세척제로 깨끗하게 청소한 후에 조합페인트를 도장한다.Wakeway 106 (WALK WAY) of the turbine pit 101 (TURBINE PIT) paints the combination paint after cleaning the lower part of the wakeway 106 (WALK WAY) with a rag and a cleaning agent.

그리스라인(GREASE LINE) 및 배관은 동파이프(COPPER PIPE) 및 플랙시블호스(FLEXIBLE HOSE)의 손상상태를 점검하여 필요자재를 준비하고, 냉각수 및 에어파이프의 플랜지면을 깨끗하게 청소한 후에 이물질이 침투하는 것을 방지할 수 있도록 비닐로 포장하여 보관한다.Grease line and piping should check the damage condition of copper pipe and flexible hose to prepare necessary materials, and clean the flange surface of cooling water and air pipe to clean foreign materials. Store it in plastic to prevent it.

스터핑박스(STUFFING BOX)는 분해 부품 등을 수세미와 물로 녹을 제거하여 깨끗이 청소하고, 카본패킹(CARBON PACKING)의 마모량을 측정하여 마모상태가 8mm이상이면 신품으로 교체하며, 분해부품들의 손상상태를 세밀하게 점검하며, 패킹박스조인트면 사이의 석면가스켓트를 별도로 제작하여 교체하며, 볼트 및 핀의 부식상태를 점검하고 패킹박스지지대(SUPPORT)의 녹을 제거하여 에폭시 페인트로 도장한다.STUFFING BOX cleans disassembled parts with loofah and water and cleans them.Measures the amount of wear of CARBON PACKING and replaces them with new ones if the wear condition is 8mm or more. Check and make asbestos gaskets between packing box joints and replace them separately. Check the corrosion status of bolts and pins. Remove rust from the packing box support and paint with epoxy paint.

터빈가이드베어링(120:TURBINE GUIDE BEARING)은 가이드베어링이 2쪽으로 분할된 상태에서 안치되어 있으므로 조인트볼트를 체결하여 원통형이 되도록 하고, 가이드베어링 표면의 마찰상태를 점검하여 접촉면을 경유와 소창직으로 깨끗하게 청소한 후에 마찰부위를 스크랩핑(SCRAPING)하며, 스크랩핑(SCRAPING)의 전.후에가이드베어링의 내경의 상.중.하 3개소를 측정하며, 보완이 완료되면 조인트볼트를 분해하여 2쪽으로 분할시킨 후에 이물질의 침투를 방지하기 위해 소창직으로 커버링(COVERING)하여 보관하며, OIL BASIN 밑부분의 녹을 제거하고 에폭시 페인트를 도장한다.Turbine guide bearing (120: TURBINE GUIDE BEARING) is settled in the state where the guide bearing is divided into two sides. Therefore, tighten the joint bolt to make it cylindrical, and check the friction state of the surface of the guide bearing to make the contact surface clean and light. After cleaning, scrape the friction part and measure the top, middle, and bottom of the inner diameter of the guide bearing before and after the scraping, and after completion, disassemble the joint bolt and divide it into 2 sides. To prevent the infiltration of foreign substances, cover and store them in a small window. Remove rust at the bottom of oil basin and paint epoxy paint.

가이드링(130:GUIDE RIING)과 동작기구는, 가이드링로드핀(GUIDE RING ROD PIN) 및 편심링크핀(ECCENTRIC RINK PIN)체결부위의 그리스(GREASE)를 제거하고 스톱퍼의 용접부위를 그라인딩(GRINDING)하며, 가이드밴링크의 핀 체결부위의 그리스를 제거하고 링크 몸체의 녹을 제거하여 청소하며, 가이드링홀더 및 홀더체결부위의 그리스를 제거한다.The guide ring 130 and the guide mechanism remove grease from the guiding ring rod pin and the ECCENTRIC RINK PIN fastening part, and grind the welding part of the stopper. Remove grease from pin fastening part of guide van link, remove rust of link body, and remove grease of guide ring holder and holder fastening part.

가이드밴(140:GUIDE VANE) 및 동작기구는, 가이드밴(140)의 손상여부를 점검하여 녹을 제거한 후에 에폭시 페인트를 도장하고, 가이드밴(140)의 상측스팀(UPPER STEM) 및 하측스팀(LOWER STEM)의 마모상태를 점검하며, 가이드밴의 내부 그리스홀(GREASE HOLE)에 에어를 주입시켜 내부의 오물을 제거함과 동시에 관통시험을 하며, 가이드밴스팀하우징의 상측브러시(UPPER BRUSH) 및 하측브러시(LOWER BRUSH)면의 내경을 측정하고 마찰에 의한 손상여부를 점검하며, 가이드밴키홈의 손상상태를 점검하고 마찰부위의 연마작업을 실시하며, 가이드밴키.암.트러스트베어링.스팀하우징 및 각종 볼트의 손상상태를 점검하고 깨끗하게 청소하며, U-TYPE 패킹(PACKING)의 손상상태 및 패킹그랜드(PACKING GRAND)의 부식상태를 점검한다.The guide van 140 and the operating mechanism check the damage of the guide van 140 to remove rust, and then paint epoxy paint, and the upper steam and the lower steam of the guide van 140 are lowered. STEM) checks the wear condition, injects air into the grease hole of the guide van, removes the internal dirt and conducts penetration test at the same time. UPBRUSH and lower brush of the guide vans housing Measure inner diameter of (LOWER BRUSH) surface, check for damage by friction, check damage state of guide vankey groove, grind friction part, guide vankey, arm, thrust bearing, steam housing and various bolts. Check the damaged state of the machine and clean it cleanly, and check the damaged state of the U-type packing and the corrosion state of the packing grand.

헤드커버(143:HEAD COVER)는, 헤드커버(143)의 그리스 및 이물질을 제거하고, 헤드커버의 바닥 및 밑부분을 와이어컵브러시(WIRE CUP BRUSH)로 녹을 제거한 후에 에폭시 페인트로 도장하며, 헤드커버패킹의 마모량을 측정하여 마모량이 허용범위(DESIN VALVE:0.7mm, TOLERANCE:0.3mm)이상이면 교체하며, 패킹(PACKING)의 손상상태를 점검하여 균열 및 파손부위가 있으면 연마하고 심한 개소는 교체하여 주며, 헤드커버(143)를 조립한 후에 도장작업을 실시할 때에 소정의 개소에 조합페인트를 도장한다.The head cover 143 removes grease and foreign substances from the head cover 143, removes rust from the bottom and bottom of the head cover with a wire cup brush, and then paints with epoxy paint. If the amount of wear is over the allowable range (DESIN VALVE: 0.7mm, TOLERANCE: 0.3mm), replace it if it is over the allowable range.Check the damaged state of the packing and polish it if there are cracks and damages. After assembling the head cover 143, the combination paint is applied to a predetermined place when performing the painting work.

보텀링(144:BOTTOM RING)은, 보텀링그리스 및 이물질을 제거하고, 보텀링의 옆과 밑부분을 와이어컵브러시(WIRE CUP BRUSH)로 녹을 제거한 후에 에폭시 페인트를 도장하며, 보텀링팩킹(PACKING)의 마모량을 측정하여 녹을 제거한 후에 에폭시 페인트로 도장하며, 헤드커버패킹의 마모량을 측정하여 마모량이 허용범위(DESIN VALVE:0.7mm, TOLERANCE:0.3mm)이상이면 교체하며, 패킹(PACKING)의 손상상태를 점검하여 균열 및 파손부위가 있으면 연마하고 심한 개소는 교체하며, 보텀링베이스 및 볼트와 핀홀(PIN HOLE)을 세척제로 깨끗하게 세척하고 TOOL AIR로 청소한 후에 베이스(BASE)에 녹 방지액을 도포하며, 보텀링부싱(BUSING)을 세척제로 깨끗하게 닦아내고 TOOL AIR로 청소한 후에 부싱의 손상여부를 점검하고 부싱의 내경을 인사이드마이크로메타(INSIDE MICROMETER)로 측정한다.Bottom ring (144: BOTTOM RING), remove the bottom ring grease and foreign matter, remove the rust on the side and bottom of the bottom ring with a wire cup brush (WIRE CUP BRUSH) and then paint the epoxy paint, packing After the rust is removed and rust is removed, it is painted with epoxy paint, and the amount of wear of the head cover packing is measured to replace it if it is over the allowable range (DESIN VALVE: 0.7mm, TOLERANCE: 0.3mm), and the packing is damaged. Check the condition and grind if there are cracks and damages, replace severe points, clean bottoming base, bolts and pinholes with cleaning agent, clean with TOOL AIR, and then remove rust prevention liquid to base. After coating, wipe down the bottom ring bushing with a cleaning agent and clean it with TOOL AIR, check the bushing for damage, and measure the inside diameter of the bushing with an inside micrometer.

런너(110:RUNNER) 및 터빈샤프트(160:TURBINE SHAFT)는, 런너(110)를 넝마와 헤라로 깨끗하게 청소하고, 런너블래이드캐비테이션(RUNNER BLADE CAVITATION)현상에 의한 피팅(PITTING)현상이 발생되었는지를 자세히 점검하며, 런너블래이드(RUNNER BLADE)가 부식 또는 클랙(CLACK)등이 발생되었는지의 여부를세밀히 점검하여 심할 경우에는 용접보수를 실시한 후에 에폭시 페인트로 도장을 하며, 런너(110)의 상부 및 커플링커버(COUPLING COVER)에 발생한 녹을 제거하고 에폭시 페인트로 도장한다.The runner 110 and the turbine shaft 160 clean the runner 110 with the rags and the hera, and check whether the fitting phenomenon caused by the runner blade cavitation phenomenon occurs. In detail, check whether the runner blade is corroded or cracked closely. If it is severe, paint with epoxy paint after repairing the welder. Remove rust on the COUPLING COVER and paint with epoxy paint.

스파이럴케이싱(100:SPIRAL CASING) 및 스테이밴(STAY VANE)은 부식 또는 마모된 부분이 없는지 점검하고, 냉각수트래시랙(COOLING WATER TRASH RACK)상태와 펜스톡(PENSTOCK)의 상부에 누수량을 점검하며, 녹발생부위의 녹을 제거하고 에폭시 페인트로 도장한다.Spiral casing (100: SPIRAL CASING) and STAY VANE checks whether there are any corrosion or wear parts, and checks the cooling water trap rack and leakage on the top of the penstock. Remove rust on the rust area and paint with epoxy paint.

디스차지링(DISCHARGE RING) 및 스테이링(STAY RING)은 각부의 녹을 제거하고 에폭시 페인트로 도장한다.DISCHARGE RING and STAY RING remove rust and paint with epoxy paint.

드래프트튜브라이너(DRAFT TUBE LINER)와 흡출관 및 게이트(GATE)는 방수로 수문의 실링(SEALING)상태와 내추럴에어홀(NATURAL AIR HOLE)을 점검하고, 부식 및 균열상태를 점검한다.DRAFT TUBE LINER, DRAFT TUBE AND GATE check the sealing condition of the waterway passage and NATURAL AIR HOLE, and check the corrosion and cracking condition.

이와 같이 각 장치에 대한 점검 및 보수를 실시한 후에 조립을 실시하되 조립은 분해의 역으로 수차부(3)부터 수차조립공정(200-4)을 실시한다.In this way, after the inspection and maintenance of each device is carried out assembling, the assembly is carried out the aberration assembly process (200-4) from the aberration unit (3) to the reverse of the disassembly.

런너 및 터빈샤프트(RUNNER & TURBINE SHAFT)의 조립은, 리프팅디바이스(LIFTING DEVICE)에 크레인의 후크(HOOK)를 삽입한 후에 조인트볼트(JOINT BOLT)를 체결하고, 런너(110)가 한쪽으로 편향되지 않도록 BOTTOM RING WEARING RING과 런너(110)와의 사이에 일정한 간격으로 인원을 충분히 배치한 후에 동판라이너(LINER)를 좌우로 흔들어 런너(110)가 한쪽으로 편심되지 않도록 주의하면서 서서히 다운시키고 BOTTOM RING WEARING RING의 사이에 테이프카터(TAPE COTTER)를 삽입하여 안치시키며, 리프팅디바이스(LIFTING DEVICE)의 고정볼트(4개)를 분해하여 디바이스를 후크에 걸어준 상태에서 철거한 후에 디바이스조인트볼트(DEVICE JOINT BOLT)를 해체한다.RUNNER & TURBINE SHAFT is assembled by inserting crane hook into lifting device, tightening joint bolt, and runner 110 not biased to one side. After placing enough personnel at regular intervals between the BOTTOM RING WEARING RING and the runner 110, shake the copper liner (LINER) to the left and right to lower it slowly while being careful not to eccentric the runner 110 to one side. Insert tape cutter in between and settle down, disassemble the fixing bolts (4 pieces) of lifting device and hang the device on the hook, and then remove the device joint bolt. To dismantle.

보텀링(144:BOTTOM RING)의 조립은, 보텀링베이스(BOTTOM RING BASE)의 상단 및 하단의 오링을 교체하고, 크레인에 인출용 디바이스(DEVICE)를 설치한 후에 보텀링(144)을 핀홀(PIN HOLE)에 맞춰 안치하고 디바이스를 철거하며, DOWEL PIN(4개)을 고정한 다음 보텀링레벨(LEVEL)을 측정하면서 고정볼트(20개)를 철거하고 보텀링(144)을 조립한 후에 레벨을 측정하며, 부싱(BUSHING)을 세척제로 깨끗하게 닦어내고 툴에어(TOOL AIR)로 청소한 다음 내부에 그리스를 도포시켜 준다.Assembling the bottom ring (144: BOTTOM RING) replaces the O-rings at the top and bottom of the bottom ring base (BOTTOM RING BASE), and installs the device for drawing (DEVICE) in the crane, and then pin the bottom ring 144 to the pinhole ( Settle according to the PIN HOLE), remove the device, fix the DOWEL PIN (4), remove the 20 fixing bolts while assembling the bottom ring (144) while measuring the bottom level (LEVEL) Measure, wipe the bushing clean with a cleaning agent, clean with TOOL AIR, and apply grease to the inside.

가이드밴(140:GUIDE VANE)의 조립은, 상측가이드밴스팀(UPPER GUIDE VANE STEM)에 인출용공구 및 아이볼트를 걸어 크레인에 와이어로프와 체인블럭을 설치하여 하측가이드밴스템부싱홀(LOWER GUIDE VANE STEM BUSING HOLE)에 근접하도록 체인블럭을 하향시키고, 가이드밴(140)을 2명이 좌우로 흔들어 부싱(BUSING)에 상처가 발생하지 않도록 가이드밴(140:20개)을 삽입하여 조립시키며, 가이드밴(140) 사이의 슈터(SHUTTER)면이 상호간에 부착되도록 밀착시킨 후에 인출용공구 및 아이볼트를 철거한다.Assemble the guide van 140 (GUIDE VANE) by mounting the wire rope and the chain block on the crane with the tool for pulling out and the eye bolt on the upper guide vane STEM (LOWER GUIDE). Lower the chain block so as to be close to the VANE STEM BUSING HOLE, and insert and assemble the guide vans (140: 20) so that two people shake the guide vans 140 from side to side to prevent damage to the bushings. SHUTTER surfaces between the vans 140 are closely attached to each other, and then the drawing tool and the eye bolt are removed.

헤드커버(143:HEAD COVER)의 조립은, 스테이링(STAY RING:헤드커버조립부위)에 있는 오링을 교체하고, 헤드커버베이스에 녹방지액을 도포한 후에 헤드커버의 바닥에 점검보수를 완료한 가이드밴스템하우징을 올려놓고 헤드커버(143)를 안착시키며, 크레인에 4개의 와이어로프를 균등하게 배분하여 매달아 수평을 확인하고 크레인을 상승(UP)시킨 후에 신호에 의해 헤드커버(143)를 서서히 이동시키며, 조립시킬 때에 수차실벽과의 간격이 좁으므로 주의하고 벽에 설치되어 있는 부속설비와 접촉되지 않도록 주의하며 헤드커버(143)를 상측가이드밴스템과 접촉되지 않도록 하고 수평상태를 유지시키면서 조금씩 하향(DOWN)시키고 핀홀(PIN HOLE)을 맞춰 안치하며, DOWEL PIN(4개)을 고정한 다음에 헤드커버레벨을 측정하면서 고정볼트를 체결하고 조립을 완료한 후에 레벨(LEVEL)을 측정한다.To assemble the head cover (143: HEAD COVER), replace the O-ring on the STAY RING, apply the anti-rust solution to the head cover base, and complete the maintenance on the bottom of the head cover. Place one guide vans housing, seat the head cover 143, evenly distribute the four wire ropes to the crane to check the horizontal and raise the crane (UP) and then the head cover 143 by the signal Move slowly, take care that the gap between the aberration chamber wall is narrow when assembling, be careful not to come in contact with the accessories installed on the wall, keep the head cover 143 from contact with the upper guide vans and maintain the horizontal state While down, the pinholes are settled down and the pinholes (4) are fixed.Then, the fixing bolts are tightened while measuring the head cover level. LEVEL).

가이드밴(140:GUIDE VANE)동작기구의 조립은, 가이드밴U-타입패킹(GUIDE VANE U-TYPE PACKING:20개)삽입공구를 사용하여 헤드커버(143)에서 상측가이드밴스템의 외경 패킹(PACKING)에 그리스를 도포하여 삽입시키며, 가이드밴스템하우징부싱(GUIDE VANE STEM HOUSING BUSING)에 그리스를 도포한 후에 스템하우징(20개)고정HEX'소켓헤드볼트(SOCKET HEAD BOLT)를 체결하며, 가이드밴암(20개)을 크레인에 체인블럭을 걸어 서서히 다운(DOWN)시켜 상측가이드밴스팀에 끼운 후에 수평을 맞춰 조립하며, 가이드밴트러스트베어링을 조립하고 고정볼트(6개)를 체결하며, 가이드밴암키(GUIDE VANE ARM KEY:40개)에 녹방지용 MOLYCOTE를 도포한 후에 조립하고 HEX' NUT를 조립하며, 가이드밴(140)의 상.하측 갭을 측정하여 가이드밴(140)을 패이싱플레이트(FACING PLATE)상.하부의 중간에 위치하도록 ADJUSTING LINER를 조정하고 상.하부의 간극이 정확할 때에 너트를 조여 준 후에 상.하측의 간극을 재점검한다.To assemble the guide van (140: guide vane) operating mechanism, use the guide vane u-type packing (20 pieces) inserting tool to seal the outer diameter of the upper guide vane on the head cover (143). Apply grease to PACKING, insert grease to GUIDE VANE STEM HOUSING BUSING, and then fasten stem housing (SOCKET HEAD BOLT) to fix stem housing (20 pieces). Hook up the van arms (20 pieces) to the crane and chain them down and slowly put them down on the upper guide vanes to assemble them horizontally. Assemble the guide vane thrust bearings and tighten the fixing bolts (6 pieces). Assemble after coating MOLYCOTE to prevent rust on 40 GUIDE VANE ARM KEY: Assemble and assemble HEX 'NUT, measure guide gap 140 upper and lower gap of guide van 140 Adjusting ADJUSTING LINER so that it is located in the middle of upper and lower part And phase. The material for the gap. After checking the lower semi-tightening the nut when the lower portion of the gap to be accurate.

가이드밴서보모터(150:GUIDE VANE SERVOMOTOR)의 조립은, 크레인에 와이어로프를 걸어 서보모터의 몸체에 움직이지 않도록 묶고 크레인을 상승시켜 조립위치로서서히 하향시키고, 서보모터의 천장에 있는 고리에 체인블럭(CHAIN BLOCK)을 걸고 서보모터의 몸체에 후크를 걸어주며, 체인블럭을 서서히 당겨 고정볼트홀에 맞추고 체인블럭으로 무게중심을 맞춘 상태에서 고정볼트(12개)를 체결하며, 서보모터오일파이프플랜지를 체결하여 개방/폐쇄(OPEN/CLOSE)유압배관작업을 실시하고 오일드레인파이프라인(OIL DRAIN PIPE LINE)의 플랜지를 체결하여 배관한다.Assemble the guide vane servo motor (150: GUIDE VANE SERVOMOTOR) by hooking the wire rope to the crane so that it does not move on the body of the servo motor, lifting the crane up and down to the assembly position, and chaining the hooks on the ceiling of the servo motor. Hook the block and hook the body of the servomotor, pull the chain block slowly to fit the fixed bolt hole, and fasten the fixed bolts (12 pcs) with the center of gravity with the chain block, and the servo motor oil pipe. Tighten the flange to open / close the hydraulic piping work, and tighten the flange of the oil drain pipe line.

가이드링(130:GUIDE RING) 및 그 동작기구의 조립은 다음과 같이 실시한다.The assembly of the guide ring 130 and its operating mechanism is carried out as follows.

가이드링(130)을 조립하기 전에 가이드밴링크의 ECCENTRIC RINK PIN을 삽입하여 링크(LINK)를 조립하고, 헤드커버부싱에 그리스를 도포한 후에 크레인으로 가이드링(130)을 조립하며, 가이드링홀더(GUIDE RING HOLDER:10개)를 조립하고 볼트(40개)를 체결한다. 컨넥팅로드(CONNECTING ROD)와 서보모터의 로드핀홀(ROD PIN HOLE)이 일치하도록 유압작키를 사용하여 맞추고 컨넥팅로드의 로드핀부싱에 그리스를 도포한 후에 로드핀(2개)을 조립하고, 로드핀스톱퍼를 끼워 놓고 컨넥팅로드와 용접하여 로드핀을 고정시키며, 가이드밴링크부싱에 그리스를 도포하고 가이드밴과 시어핀홀(SHEAR PIN HOLE)을 일치시킨 후에 시어핀(20개)를 삽입하여 너트를 체결하며, 가이드밴암록킹볼트(GUIDE VANE ARM LOCKING BOLT)를 조여 록킹시킨다. 가이드밴슈터(SHUTTER)면의 갭(GAP)조정은, 가이드밴 사이 폐접촉면 조정은 ECCENTRIC RINK PIN의 편심을 조정하고, 가이드밴의 몸체 중간에 와이어로프를 걸어 체인블록을 당겨 고정시킨 상태에서 가이드밴슈터면이 접촉되도록 밀착시키며, 가이드밴의 제1번 링크(NO1 LINK)를 표준길이가 되도록 조정하고 가이드밴의 폐위치에서 NO1과 NO2, NO2와 NO3,----- NO19와 NO20의 접촉면 사이의 갭(GAP)이 "0"상태가 되도록 조정하지 않은 가이드밴의 각각의 링크(LINK)를 조정하되 가이드밴 NO20과 NO1과의 사이의 갭은 ±g가 되지만 "0"가 되도록 할 수 있으며, 갭 ±g를 감소시키기 위해 가이드밴 NO20을 기준으로 기히 설명한 바와 같이 조정을 반복실시하면 가이드밴 NO20과 NO19의 갭은 거의 "0"상태로 감소시킬 수 있다.Before assembling the guide ring 130, insert the ECCENTRIC RINK PIN of the guide van link, assemble the link, apply grease to the head cover bushing, and then assemble the guide ring 130 with a crane, and guide ring holder. Assemble (GUIDE RING HOLDER: 10 pieces) and tighten the bolts (40 pieces). Use the hydraulic operation key to match the connecting rod with the rod pin hole of the servo motor, apply grease to the rod pin bushing of the connecting rod, and then assemble the rod pins (2). Insert the rod pin stopper and weld it with the connecting rod to fix the rod pin. Apply grease to the guide van link bushing, match the guide pin with the shear pin hole, and insert the shear pins (20 pieces). Tighten the nut and lock it by tightening the guide vane arm locking bolt. Adjust the gap of the guide van shooter, adjust the closed contact between the guide vans, adjust the eccentricity of ECCENTRIC RINK PIN, and guide the chain block while pulling the chain block by hanging the wire rope in the middle of the guide van body. Make sure the van shooter surface is in contact with each other, adjust the guide van's No.1 link to the standard length, and close the NO1 and NO2, NO2 and NO3, ----- NO19 and NO20 Adjust each link (LINK) of the guide van not adjusted so that the gap between the contact surfaces is "0" but the gap between the guide vans NO20 and NO1 is ± g but is "0". The gap between guide vans NO20 and NO19 can be reduced to near zero when repeated adjustments are made as described with reference to the guide vans NO20 to reduce the gap ± g.

슈터면의 갭의 조정을 완료한 후에 ECCENTRIC RINK PIN STOPPER를 세워 놓고 가이드링과 용접하여 링크핀(RINK PIN)을 고정시켜 준다.After adjusting the gap of the shooter surface, fix the ECCENTRIC RINK PIN STOPPER and fix the link pin by welding with the guide ring.

스터핑박스(STUFFING BOX)의 조립은 다음과 같이 실시한다.Assemble the stuffing box as follows.

4편으로 분리된 패킹박스서포트(PACKING BOX SUPPORT)를 연결부와 볼트홀이 일치하도록 헤드커버의 위에 설치하고, 연결부에 시트가스켓트(SHEET GASKET)를 기워 넣고 조립하며, 패킹박스서포트를 들어 올리고 헤드커버에 라운드 루버 패킹(ROUND RUBBER PACKING)을 교체한다.Install the packing box support divided into 4 pieces on the head cover so that the connection part and the bolt hole coincide, and put the seat gasket into the connection part and assemble it. Lift the packing box support and lift the head Replace ROUND RUBBER PACKING on cover.

패킹박스서포트를 헤드커버에 조립하되 실링워터 공급플랜지를 확인하고, 박스서포트에 레진패킹(RESIN PACKING)을 정열하여 축에 단단히 밀착시키되 패킹사이의 간극을 일정하게 유지시켜주며, 패킹홀더 사이의 간극을 일정하게 정렬시키고 코일스프링을 끼워 넣으며, 패킹박스서포트의 라운드 루버 패킹을 교체한다.Assemble the packing box support to the head cover, check the sealing water supply flange, align the resin packing to the box support, and tightly adhere to the shaft, but maintain the gap between packings, and the gap between packing holders. Align regularly, insert the coil spring, and replace the round louver packing of the packing box support.

패킹박스(BOTTOM)를 전술한바와 같이 조립하고, 4편의 패킹홀더세팅보드(PACKING HOLDER SETTING BOARD)를 이용하여 패킹홀더와 스프링을 정렬시키며, 세팅보드를 인출하고 패킹홀더텐션툴(PACKING HOLDER TENSION TOOL)을 이용하여 홀더를 인장시키며, 패킹홀더스페이서(SPACER)를 이용하여 패킹홀더를 인출시킨 상태에서 고정시키고 텐션툴을 제거한다.Assemble the packing box (BOTTOM) as described above, align the packing holder with the spring using the four packing holder setting boards, draw out the setting board and pack the packing holder tensioning tool. The holder is tensioned by using, and the packing holder is pulled out using the packing holder spacer (SPACER) and the tension tool is removed.

카본패킹(CARBON PACKING)을 정렬하여 축에 단단히 밀착시키고, 패킹박스(BOTTOM)의 라운드 러버 패킹을 교체하며, 패킹박스(UPPER)를 기히 설명한바와 같은 방법으로 조립하고, 위의 방법으로 패킹홀더, 코일스프링, 카본패킹을 조립하며, 패킹박스(UPPER)의 라운드 러버 패킹을 교체하며, 패킹박스커버와 실링(SEALING)급수용 파이프를 조립하며, 조립 후에 SHAFT SLEEVE와 패킹박스 사이의 갭(GAP)체크(CHECK)도 4개소를 실시한다.Align the carbon packing tightly to the shaft, replace the round rubber packing of BOTTOM, assemble the packing box in the same way as described above, packing holder, Assemble coil spring, carbon packing, replace round rubber packing of packing box, assemble packing box cover and sealing water supply pipe, gap between shaft slide and packing box after assembly Four checks are also performed.

터빈가이드베어링(120:TURBINE GUIDE BEARING)의 조립은 다음과 같이 실시한다. 오일통라운드루버패킹(OIL BASIN ROUND RUBBER PACKING)을 교체하고, 오일통(2개)을 조립하고 고정볼트(64개)를 체결하며, 오일통의 조립을 완료한 후에 이상유무를 확인하기 위해 오일탱크의 바닥에 경유 40ℓ를 충진시켜 약 12시간동안 LEAKAGE TEST를 실시하며, 시험을 완료한 후에 경유를 깨끗이 청소한다.The assembly of the turbine guide bearing (120: TURBINE GUIDE BEARING) is carried out as follows. Replace the oil barrel round rubber packing, assemble the oil cylinders (2), fasten the fixing bolts (64), and check the oil to check for abnormalities after completing the assembly of the oil cylinders. Fill the bottom of the tank with 40 liters of diesel oil and carry out LEAKAGE TEST for about 12 hours. Clean the diesel oil after the test is completed.

쿨링코일(2SET)을 조립하고 플랜지에 고정볼트(16개)를 체결하며, 터빈가이드베어링조인트볼트(10개)를 체결하여 가이드베어링을 조립하고 고정볼트(20개)를 체결하며, 조립 후에 가이드베어링갭을 측정하고 가이드베어링R.T.D와 온도계를 조립하며 배선도 결선한다.Assemble the cooling coil (2SET), fasten the fixing bolts (16 pieces) to the flanges, assemble the guide bearings by tightening the turbine guide bearing joint bolts (10 pieces), and fasten the fixing bolts (20 pieces), and guide them after assembly. Measure the bearing gap, assemble the guide bearing RTD and thermometer, and connect the wiring.

가이드 베어링 커버 베이스 라운드 러버 패킹(GUIDE BEARING COVER BASE ROUND RUBBER PACKING)을 교체하고, 가이드베어링커버(2편)를 오일레벨게이지홀을 맞춰 올려 놓고 조인트볼트(14개)와 고정볼트(80개)를 체결하며, 오일레벨스위치 및 사이트게이지(SIGHT GAUGE) 및 OIL CONTAMINATION DETECTOR를 조립하며, VIBRATION DETECTOR(2개)를 조립하고 터빈가이드베어링탱크에 기름을 충유한다.Replace the guide bearing cover base round rubber packing (Guide BEARING COVER BASE ROUND RUBBER PACKING), align the guide bearing cover (2 pieces) with the oil level gauge hole, and replace the joint bolts (14) and fixing bolts (80). Assemble the oil level switch, sight gauge and oil contactor detector, assemble the vibration detector (2 pieces) and fill the turbine guide bearing tank with oil.

그리스라인(GREASE LINE) 및 파이프라인(PIPE LINE)의 조립은, 런너크라운(RUNNER CROWN) 및 실링워터(SEALING WATER)의 압력측정용 동파이프 라인을 연결하고, 스터핑박스 냉각수 파이프라인과 RUNNER AERATION SUPPLY PIPE LINE을 연결하며, 체크밸브와 스위벨 컨넥터(SWEVEL CONNECTOR) 및 일반컨넥터와 DISTRIBUTING VALVE를 조립하며, 동파이프. 플랙시블호스. 카본스틸파이프의 그리스라인을 연결한다.The assembly of grease line and pipe line connects copper pipe line for pressure measurement of RUNNER CROWN and sealing water, and stuffing box cooling water pipeline and RUNNER AERATION SUPPLY It connects pipe line and assembles check valve and swivel connector, general connector and distributing valve, and copper pipe. Flexible hose. Connect grease line of carbon steel pipe.

터빈피트(101:TURBINE PIT)의 월크웨이(106:WALK WAY)의 조립은, 월크웨이(106:WALK WAY)의 서포트(106-1)를 조립하고 외측월크웨이(OUTSIDE WALK WAY)를 고정하며, INSIDE WALK WAY의 발판을 올려놓고 고정볼트를 체결하며, 터빈피트(101)내의 LADDER 및 발판(2개소)과 핸드레일(HAND RAIL)을 설치한다.The assembling of the turbine pit (101: TURBINE PIT) of the wakeway (106: WALK WAY), assembling the support (106-1) of the hawkway (106: WALK WAY) and fixing the outer side walkway (OUTSIDE WALK WAY) , Install the foot of INSIDE WALK WAY, fasten the fixing bolt, and install the ladder, the foot (two places) and the hand rail (HAND RAIL) in the turbine pit 101.

가이드밴(140:GUIDE VANE) 및 런너(110:RUNNER)의 갭(GAP)측정은 다음과 같이 실시한다.The gap measurement of the guide van 140 (GUIDE VANE) and the runner 110 (RUNNER) is performed as follows.

터빈 파트(TURBINE PART)의 분해점검 보수가 완료되면 최종적으로 분해전과 같은 방법으로 가이드밴(140) 및 런너(110)갭의 측정을 실시한다. 작업자가 스피럴 케이싱 맨홀로 들어가서 가이드밴(140)과 상부 헤드커버 및 하부 보텀링 사이의 갭을 측정하고, 가이드밴(140)의 상호간의 갭과 서보모터 스트로크를 측정 기록하며, 런너와 HEAD COVER WEARING, BOTTOM RING, BOTTOM RING WEARING RING과의 간격을 측정한다.When the overhaul and repair of the turbine part (TURBINE PART) is completed, the gap between the guide van 140 and the runner 110 is finally measured in the same manner as before disassembly. The operator enters the spiral casing manhole to measure the gap between the guide van 140 and the upper head cover and the lower bottom ring, measure and record the gap between the guide van 140 and the servomotor stroke, and runner and head cover. WEARING, BOTTOM RING, BOTTOM RING Measure the distance from the WEARING RING.

가이드밴갭과 가이드밴 상호간의 간격측정을 위해 다음과 같이 풀오픈(FULL OPEN)시켜 준다. 오일펌프의 매뉴얼을 조작하고, 터빈컨트롤스위치를절환(AUTO/MANUAL)시켜 주며, 컨버터상측스프링에 상측방향(OPEN방향)으로 힘이 인가되도록 종이스프링(PAPER SPRING)을 삽입시켜 주며, 솔레노이드 밸브류를 수동작으로 절환(20WC:CLOSE/OPEN, 65S:SHUT/RELASE, 74LS:SHUT/RELASE)시켜 주며, 로드 리미터 노브(LOAD LIMITER KNOB)를 수동으로 조작하여 서서히 가이드밴(140)을 오프닝(OPENING)시키면서 터빈피트에 감시자를 배치하여 풀오픈(FULL OPEN)시켜 준다.To open the gap between guide van gap and guide van, open it as follows. Operate the manual of the oil pump, switch the turbine control switch (AUTO / MANUAL), insert a paper spring so that the force is applied upward to the converter upper spring (OPEN direction), and solenoid valves. Switch to manual operation (20WC: CLOSE / OPEN, 65S: SHUT / RELASE, 74LS: SHUT / RELASE), and manually open the guide van 140 by operating the load limiter knob (OPENTER KNOB). The monitor is placed on the turbine feet to open full.

가이드밴(140)을 풀오픈시킨 상태에서 가이드밴(140)사이의 간격을 측정하고, 측정이 완료되면 인원을 철수시킨 상태에서 로드리미트노브를 사용하여 가이드밴(140)을 서서히 폐쇄시키고 이어 오일압력탱크의 메인밸브를 폐쇄시키며, M.C.C PANEL에서 오일 압력 펌프의 전원을 MANUAL에서 OFF시킨다.Measure the gap between the guide vans 140 in the state in which the guide vans 140 are fully open, and when the measurement is completed, the guide vans 140 are gradually closed by using a rod limit knob while the personnel are withdrawn. Close the main valve of the pressure tank, and turn off the power of the oil pressure pump from MANUAL in the MCC PANEL.

안전관리사항으로서는 런너와 BOTTOM RING WEARING RING사이의 갭 측정은 드래프트 튜브에 안전하게 비계를 설치한 후에 측정하고, 가이드밴 풀오픈 때의 가이드밴(140)의 간격측정은 작업자들이 가이드밴(140)의 사이에 들어가 작업을 실시하므로 만일의 경우 가이드밴(140)이 닫히면 위험하므로 DISTRIBUTING VALVE의 상부에 스톱퍼를 삽입하여 DISTRIBUTING VALVE가 폐쇄신호를 받더라도 스톱퍼에 의해 폐쇄되는 않도록 하여야 한다.As a safety management, the gap measurement between the runner and the BOTTOM RING WEARING RING is measured after the scaffold is safely installed in the draft tube, and the gap of the guide van 140 when the guide van is fully open is measured by the operator. Since the work is carried out between the guide van 140 is closed in case of danger, the stopper should be inserted in the upper part of the distributing valve so that the distributing valve is not closed by the stopper even if it receives a closing signal.

스파이럴케이싱(110:SPIRAL CASING) 및 드래프트 튜브 맨홀(101:DRAFT TUBE MANHOLE)의 결합은, 스파이럴케이싱(110:SPIRAL CASING)의 내부점검이 완료되면 케이싱내의 이물질을 청소하고 사다리를 철거하며, 스파이럴 케이싱 맨홀 라운드 루버 패킹을 교체하고 당겨 폐쇄(CLOSE)시키고, 케이싱 맨홀의 고정플래이트와 볼트를 체결하며, 드래프트 튜브의 내부점검이 완료되면 발판 및 사다리를 철거하고, 드래프트 튜브 맨홀을 폐쇄시키고 고정볼트를 체결하며, 케이싱 및 드래프트 튜브 맨홀을 폐쇄시킨 후에 바탕처리하고 조합페이트(회색)를 도장을 실시한다.Combination of Spiral Casing 110 and Draft Tube Manhole 101 cleans foreign substances in the casing and removes ladders when the internal inspection of Spiral Casing is completed. Replace and pull the manhole round louver packing to close it, tighten the fixing plate and bolt of the casing manhole, remove the scaffold and ladder when the internal inspection of the draft tube is completed, close the draft tube manhole and tighten the fixing bolt The casing and draft tube manholes are closed, followed by background treatment and coating with the combination paint (grey).

이와 같이 실시하여 줌으로써 수차터빈부(3)의 조립을 완료하고, 이어 발전부(2)의 부품들을 조립시켜 주는 발전기 조립공정(200-5)을 실시한다.By performing in this way, the assembly of the water turbine unit 3 is completed, and then, a generator assembly step 200-5 for assembling the components of the power generation unit 2 is performed.

먼저, 터빈피트(101)에 비계를 다음과 같이 설치한다. 터빈피트(101)의 내부에 커플링볼트 및 하측 에어 디플렉터(DEFLECTOR)와 오일파이프의 조립작업이 편리한 높이에 설치하고, 비계목과 파이프비계를 적당한 높이로 세우고 윗부분에 비계목과 파이프비계를 얹어 철선으로 묶어서 비계를 설치하며, 윗부분에 합판을 얹고 이탈되지 않도록 고정시켜주며, 커플링볼트 및 너트와 커버 및 오일파이프, 침목 및 공구 등을 운반하여 조립작업을 준비한다.First, the scaffold is installed in the turbine pit 101 as follows. Install the coupling bolt, lower air deflector and oil pipe inside the turbine pit 101 at a convenient height, and set up the scaffolding and pipe scaffold at a suitable height, and place the scaffolding and pipe scaffolding on the upper part. Install the scaffolding by tying it up, install the plywood on the upper part and fix it so that it does not come off, and prepare the assembly work by transporting coupling bolts and nuts, covers, oil pipes, sleepers and tools.

하측에어디플렉터(48:LOWER AIR DEFLECTOR)의 조립은, 하측에어디플렉터(48:LOWER AIR DEFLECTOR)의 일편을 와이어로프를 이용하여 크레인에 수평으로 매단 후에 크레인을 상승시켜 서서히 안치한 다음에 고정볼트를 체결하고, 2번째 및 3번째를 동일한 방법으로 안치하여 고정볼트 및 조인트볼트를 체결한다.To assemble the lower air deflector (48: LOWER AIR DEFLECTOR), one side of the lower air deflector (48: LOWER AIR DEFLECTOR) is horizontally hung on the crane using a wire rope, and then the crane is raised slowly to be settled. Then, fix the bolts and joint bolts by placing the second and third in the same way.

하측브라켓트(45:LOWER BRACKET)의 조립은 다음과 같이 실시한다.Assemble the lower bracket (45: LOWER BRACKET) as follows.

와이어로프를 균등 분배하여 크레인에 하측브라켓트(45:LOWER BRACKET)를 매달아 수평상태를 유지시키면서 크레인을 상승시킨 후에 하측브라켓트(45:LOWER BRACKET)를 서서히 하향시키고, 하측브라켓트(45:하측코일커버포함)를 핀홀에 맞춰안치하며, DOWEL PIN(6개)에 MOLYCOTE를 도포시키고 고정시킨 다음에 브라켓트의 수평상태를 확인하면서 고정볼트(12개)를 체결하며, 조립 후에 레벨(LEVEL)을 측정한다.Evenly distribute the wire rope and hang the lower bracket (45: LOWER BRACKET) on the crane to raise the crane while maintaining the horizontal state, then lower the lower bracket (45: LOWER BRACKET) gradually and lower the lower bracket (45: lower coil cover included) ) And set it to the pinhole, apply MOLYCOTE to DOWEL PIN (6 pieces), fix it, and then fasten the fixing bolts (12 pieces) while checking the level of the bracket, and measure the level after assembly.

하측코일커버의 중간 조인트부분에 고정볼트를 체결하고, 하측에어디플렉터와 서포트를 하측브라켓트에 볼트를 체결하여 고정시키며, 오일쿨러(OIL COOLER)를 통하여 오일 파이프라인 플랜지를 체결하여 배관하고, 하측브라켓트의 내부(트러스트 베어링 탱크)를 깨끗이 청소한다.Tighten the fixing bolt to the middle joint part of the lower coil cover, and fix the lower air deflector and the support to the lower bracket by tightening the bolt.Tighten the oil pipeline flange through the oil cooler and pipe the lower bracket. Clean the inside of the engine (thrust bearing tank).

트러스트베어링(49:THRUST BEARING)은 베어링패드(12개)를 크레인을 사용하여 조립하고, 코일 스프링의 위치와 수량을 확인하며, 베어링 패드 스톱퍼를 체결한다.THRUST BEARING (49: THRUST BEARING) assembles 12 bearing pads using a crane, checks the position and quantity of coil springs and tightens the bearing pad stopper.

트러스트런너(40:THRUST RUNNER)를 포함하는 발전기샤프트(50:GENERATOR SHAFT)의 조립은 다음과 같이 실시한다.The assembly of the generator shaft 50 including the trust runner 40 is performed as follows.

와이어로프를 이용하여 리프팅디바이스를 크레인에 수평으로 매달아 크레인을 상승(UP)시킨 후에 발전기샤프트(50:트러스트런너(40)포함)를 서서히 이동시키고, 발전기샤프트(50)를 안치시킬 때에 하측오일 웰 튜브(WELL TUBE)의 외경과 샤프트 외경과의 갭이 20mm이고 트러스트베어링탱크의 내부에 각종부품들이 함께 조립되어 있으므로 특히 주의하고 수평을 유지하면서 서서히 하향시켜 커플링볼트홀을 맞춰 안치시키며, 트러스트샤프트의 상부 내측(INNER)부분에 MOLYCOTE를 도포시킨다.After lifting the crane horizontally by lifting the lifting device to the crane using a wire rope, the generator shaft (50: including the thrust runner 40) is gradually moved, and the lower oil well is placed when the generator shaft 50 is settled. The gap between the outer diameter of the WELL TUBE and the outer diameter of the shaft is 20mm, and the various parts are assembled together in the inside of the thrust bearing tank. Apply MOLYCOTE to the inner part of upper part.

트러스트베어링(49)과 하측오일 웰 튜브 베이스(WELL TUBE BASE)의 고정볼트를 체결하고, 트러스트베어링패드를 깨끗하게 청소한 후에 오일(OIL)을 바른 후에 조립하며, 리프팅 디바이스를 철거한다.Tighten the fixing bolts of the thrust bearing 49 and the lower oil well tube base, clean the thrust bearing pad, apply oil after assembly, and remove the lifting device.

트러스트베어링R.T.D의 구부러진 곳을 바르게 편 다음 R.T.D HEAD를 베어링 위치에 정확하게 고정시켜 R.T.D PIPE가 꺾이지 않도록 주의하고, 하측브라켓트의 관통부분의 플랜지에는 본드를 사용하여 오일(OIL)이 누유되는 것을 방지시켜 주며, 트러스트베어링의 온도계와 각종 배선도 결선한다.Straighten the bent part of the thrust bearing RTD, and then fix the RTD HEAD correctly to the bearing position to prevent the RTD PIPE from being bent.Use the bond on the flange of the through bracket of the lower bracket to prevent oil leakage. Also connect thermometers of thrust bearings and various wiring.

메인커플링볼트(51:MAIN COUPLING BOLT)의 조립은 다음과 같이 실시한다.The main coupling bolts (51: MAIN COUPLING BOLT) are assembled as follows.

조립용 예비볼트 4개를 NO4,5,12,13에 4각 플레이트와 함께 체결하고, 플레이트의 중앙에 수동 잭 램(JACK LAM)을 설치하여 600Kg/㎢의 압력으로 잭을 업(up)하여 플랜지면을 밀착시키고, 하측오일웰튜브의 고정볼트홀에 아이볼트를 체결하여 한 쌍의 체인블록을 좌우에 설치하며, 메인커플링볼트와샤(8개)를 플랜지에 올려 놓고 체인블럭으로 커플링볼트를 들어 올려 삽입시키며, 커플링볼트와 너트 조립용 툴(TOOL)을 설치하고 유압펌프를 사용하여 조임압력(300Kg/㎢)을 측정하면서 메인샤프트 및 다른 기기에의 영향을 고려하여 대각선 방향의 순서로 커플링볼트의 너트(12개)를 체결한 후에 예비볼트 4개와 플레이트 및 잭 램을 철거한다.Four spare bolts for assembly are fastened together with a square plate on NO4, 5, 12, and 13, and a jack jack is installed at the center of the plate to raise the jack up to 600kg / ㎢. Close the flange surface, and fasten the eye bolt to the fixing bolt hole of the lower oil well tube to install a pair of chain blocks on the left and right, and put the main coupling bolt washers (8 pieces) on the flange and coupling with the chain block. Lift and insert the bolt, install the coupling bolt and nut assembling tool and measure the tightening pressure (300Kg / 하여) using the hydraulic pump while considering the influence on the main shaft and other equipment. After tightening the nuts (12 pieces) of the coupling bolts in sequence, remove the 4 spare bolts, the plate and the jack ram.

나머지 4개의 커플링볼트와 너트를 체결하고, 유압펌프 및 조립용 툴을 철거하며, 조립 후에 커플링볼트의 길이를 측정한다.Tighten the remaining four coupling bolts and nuts, remove the hydraulic pump and the assembly tool, and measure the length of the coupling bolts after assembly.

2쪽으로 분할되어 있는 커플링볼트 상부 커버의 조인트 볼트를 체결한 후에 체인블럭으로 들어 올려놓고 고정볼트를 체결하고, 2쪽으로 분할되어 있는 커플링볼트 하부 커버의 조인트 볼트를 체결한 후에 체인블럭으로 들어 올려놓고 고정볼트를 체결하며, 체인블럭을 철거하고 샤프트 측의 하측에어디플렉터(LOWER AIR DEFLECTOR)를 조립한 후에 터빈 피트의 비계를 철거한다.After tightening the joint bolt of the upper cover of the coupling bolt divided into two sides, lift it up with the chain block and fasten the fixing bolt, and then tighten the joint bolt of the lower cover of the coupling bolt divided into two sides and then lift the joint bolt into the chain block. After mounting, fasten the fixing bolts, remove the chain block, assemble the lower air deflector on the shaft side, and then remove the scaffold of the turbine pit.

하측오일가드(43:LOWER OIL GUARD)는 트러스트베어링탱크를 깨끗하게 청소하고 하측오일가드를 삽입한다.Lower oil guard (43: LOWER OIL GUARD) cleans the thrust bearing tank cleanly and inserts the lower oil guard.

하측가이드베어링(42:LOWER GUIDE BEARING)의 조립은 베어링의 상부에 아이볼트를 체결하여 베어링(16개)를 조립하고 갭이 24 ~ 27m/m가 되도록 ADJUSTING BOLT(16개)를 체결하며, 조립 후에 베어링과 ADJUSTING BOLT 사이의 갭을 갭 게이지로 측정하며, 가이드베어링커버(16개)를 체결한다.Assemble the lower guide bearing (42: LOWER GUIDE BEARING) to assemble the bearings (16 pieces) by fastening the eye bolts on the upper part of the bearings, and fasten the ADJUSTING BOLT (16 pieces) so that the gap is 24 ~ 27m / m. Afterwards, measure the gap between the bearing and the adjusting bolt with a gap gauge, and tighten the guide bearing cover (16 pieces).

트러스트오일커버(41:THRUST OIL COVER)는 트러스트오일커버의 에어파이프플랜지의 방향을 확인한 후에 오일커버를 조립하고, 에어공급 및 EXHAUST PIPE를 배관하며, 하측가이드베어링R.T.D와 온도계를 조립 후에 LABYRINTH GAP을 측정한다.Thrust oil cover (41: THRUST OIL COVER) assembles oil cover after checking the direction of air pipe flange of thrust oil cover, pipes air supply and exhaust pipe, and assembles LABYRINTH GAP after assembling lower guide bearing RTD and thermometer. Measure

트러스트런너(40:THRUST RUNNER)는 조립 후에 레벨(LEVEL)을 측정한다.The trust runner 40 measures the level LEVEL after assembly.

트러스트베어링탱크오일 및 발전기실 배관은, 베어링 오일 탱크 점검용 맨홀을 체결하고, 트러스트베어링탱크를 충유(발전기실 외벽에 설치되어 있는 밸브의 후단에 준비한 보조탱크 및 호스를 연결하고 펌프를 가동시켜 충유한 후에 누유되는지의 여부를 정밀하게 확인한다)하며, 발전기실 전선관의 서포트를 용접하고 전선간 및 배선을 연결한다.For thrust bearing tank oil and generator room piping, fasten the manhole for checking the bearing oil tank, and refill the thrust bearing tank (connect the auxiliary tank and hoses prepared at the rear of the valve installed on the outer wall of the generator room and operate the pump to fill the thrust bearing tank). Accurately check whether there is leakage after finite), weld the support of the generator room conduit and connect the wires and wiring.

발전기로타(24:GENERATOR ROTOR)의 조립은 다음과 같이 실시한다.The assembly of the generator rotor is performed as follows.

로타 리프팅 디바이스에 크레인 후크를 삽입한 후에 조인트볼트를 체결하고, 크레인에 로타(24)를 체결한 상태에서 크레인을 상승시켜 오버헤드크레인에 하중이걸리게 되면 레벨을 측정하여 정확하게 수평을 유지시키고 천천히 이동시킨 후에 하향시키며, 스테이터(30)에서 먼지 및 이물질의 유입을 방지하기 위해 설치해 놓은 소창직을 철거한다.After inserting the crane hook into the rota lifting device, fasten the joint bolts, raise the crane with the rota (24) fastened to the crane, and when the overhead crane is loaded, measure the level to accurately level and move slowly. After lowering, the small window is installed to prevent the inflow of dust and foreign matter in the stator (30).

로타폴과 스테이터(30)의 코어, 코일 등의 접촉을 피하기 위해 충분한 인원을 배치하여 목판을 로타(24)와 스테이터(30)와의 사이에 삽입하여 상하좌우로 흔들면서 로타(24)를 안치시킬 때에 폴과 코어와 코일을 보호하고, 로타스포크와 발전기 샤프트 플랜지의 간격을 10mm정도로 유지시켜 크레인을 일시 정지시킨 상태에서 볼트홀을 정확하게 일치시킨 후에 크레인을 완전히 하강시키며, 리프팅 디바이스를 철거한다.In order to avoid contact between the core of the rotapol and the stator 30, the coil, etc., a sufficient number of members is placed, and the wooden board is inserted between the rota 24 and the stator 30 to rock the rotor 24 up, down, left, and right. Protect the pole, core and coil at the same time, maintain the gap between the rota spoke and the generator shaft flange at about 10mm, match the bolt holes correctly with the crane paused, lower the crane completely and remove the lifting device.

로타(24)의 고정볼트를 대각방향의 순으로 유압펌프를 이용하여 조임압력(300Kg/㎢)을 측정하면서 체결하고, 로타(24)의 고정볼트에 스톱퍼를 용접하여 풀림을 방지하며, 조립 후에 로타(24)와 스테이터(30)의 에어갭 및 로타(24)와 브레이크와의 사이의 갭을 6 ~ 8포인트 측정한다.The fixing bolt of the rotor 24 is fastened by measuring the tightening pressure (300Kg / ㎢) using the hydraulic pump in the diagonal order, and the stopper is welded to the fixing bolt of the rotor 24 to prevent loosening. The air gap of the rotor 24 and the stator 30 and the gap between the rotor 24 and the brake are measured for 6 to 8 points.

상측브라켓트(22:UPPER BRACKET)의 조립은, 크레인에 와이어로프를 균등하게 분배하여 상측브라켓트(22)를 매달아 수평을 유지시키면서 크레인을 상승시킨 후에 상측브라켓트(22)를 서서히 하향시키고, 상측브라켓트(22:상측코일커버포함)를 핀홀에 맞춰 안치시키며, DOWEL PIN(8개)에 MOLYCOTE를 도포시키고 고정시킨 후에 브라켓트를 수평으로 유지시키면서 파운데이션볼트(FOUNDATION BOLT:16개)를 체결하며, 상측코일커버의 고정볼트를 체결하여 조립을 완료한 후에 레벨(LEVEL)을 측정한다.In the assembly of the upper bracket 22 (UPPER BRACKET), the wire rope is evenly distributed to the crane, the upper bracket 22 is suspended and the crane is raised while raising the crane, and then the upper bracket 22 is gradually lowered, and the upper bracket ( 22: Set the upper coil cover) to the pinhole, apply MOLYCOTE to the dowel pin (8 pieces), fix the foundation bolts (FOUNDATION BOLT: 16 pieces) while keeping the bracket horizontal, and secure the upper coil cover. Tighten the fixing bolts and measure the level after completing the assembly.

스터브샤프트(STUB SHAFT) 및 엑시테이션(EXCITATION)전원공급용 버스바(BUS BAR)의 조립은 다음과 같이 실시한다.The assembly of the STUB SHAFT and the EXCITATION power supply bus bar shall be carried out as follows.

샤프트플랜지에 아이볼트(2개)를 체결하고 크레인에 와이어로프를 걸어 스터브샤프트를 볼트에 맞춰 안치시킨 후에 스터브샤프트의 고정볼트를 체결하고, 조립 후에 레벨을 측정한다.Tighten the eye bolts (two) on the shaft flange, wire rope to the crane, set the stub shaft to the bolt, tighten the fixing bolt of the stub shaft, and measure the level after assembly.

P.M.G 볼 죠인트 커플링 고정볼트(8개)를 체결하여 조립하고, 버스바지지대 및 버스바 고정볼트를 체결하여 고정하며, 버스바에 솔더(SOLDER)처리할 곳은 볼트를 조금 느슨하게 조이고 솔더를 처리한 후에 완전히 체결시켜 주되 솔더가 완전히 굳은 후에 볼트를 재차 조여주며, BUS BAR MICA TAPE를 약 4겹으로 테이핑하고, 석면테이프로 약 8겹이 되도록 테이핑한 후에 바니시(VARNISH)를 도포 한다.Fasten and assemble PMG ball joint coupling fixing bolts (8 pcs), fasten bus bar support and bus bar fixing bolts. After complete tightening, after the solder is completely hardened, retighten the bolts. Tap BUS BAR MICA TAPE in about 4 layers, tape it to about 8 layers with asbestos tape, and apply varnish.

톱커버(20)의 조립은 크레인으로 이동시켜 차례로 조립하고 고정볼트를 체결하며, 톱커버(20)의 지지대를 조립한다.The assembly of the top cover 20 is assembled by moving to the crane in order to fasten the fixing bolts, and assemble the support of the top cover 20.

집진기링커버(COLLECTOR RING COVER)의 조립은 다음과 같이 실시한다.Assemble the collector ring cover as follows.

크레인을 사용하여 볼트홀에 맞춰 서서히 다운시키고, 집진기링표면의 손상(DAMAGE)을 방지하기 위해 가스킷트 시트(GASKET SHEET)로 보호한 후에 크레인을 서서히 다운시켜 안치하며, 집진기링커버의 고정볼트(4개)를 체결한다.Use crane to slowly down to the bolt hole, protect with dust gasket sheet to prevent damaging the surface of dust collector ring, and then slowly lower the crane to settle, and fix bolt of dust collector ring cover ( Tighten 4).

파이롯트 브러시(PILOT BRUSH)용 전선(PB1,PB2)을 연결하고, 잭업리미트스위치(JACK UP LIMIT SWITCH)지지대를 고정시키며, D.C버스바와 집진기링조인트볼트(8개)를 체결하며, 발전기의 카본브러시(CARBON BRUSH)를 조립한다.Connect the wires for pilot brush (PB1, PB2), fix the jack up limit switch (JACK UP LIMIT SWITCH) support, fasten DC bus bar and dust collector ring joint bolts (8 pcs), generator carbon brush Assemble the CARBON BRUSH.

P.M.G(12)의 조립은, 크레인을 사용하여 볼트홀에 맞춰 P.M.G(12)를 조립하여 P.M.G고정볼트를 체결하고, P.M.G 500/1000MEGGER로 절연저항을 측정하며, 시그널램프의 인입선 및 P.M.G 인출선을 결선하며, 시그널램프의 커버를 올려놓고 고정볼트(8개)를 체결한다.The PMG 12 is assembled by using a crane to assemble the PMG 12 in accordance with the bolt hole, tightening the PMG fixing bolt, measuring insulation resistance with the PMG 500/1000 MEGGER, and drawing the lead wire and the PMG lead wire of the signal lamp. After wiring, put on the cover of the signal lamp and fasten the fixing bolts (8 pcs.).

이와 같이 실시하여 줌으로써 발전기부(2)의 조립을 완료하게 되며, 수차발전기의 각 기기의 조립이 완료되면 공기구 및 자재를 철수하여 제자리에 정리 정돈하는 공사 뒷정리하며, 점검 및 시험공정(200-6)을 실시한다.In this way, the assembly of the generator unit 2 is completed by completing the construction. When the assembly of each apparatus of the aberration generator is completed, the construction and rearranging work to withdraw the air ducts and materials and arrange them in place, check and test process (200-6). ).

톱커버, 발전기실 및 터빈피트 등의 각 부분을 깨끗이 청소한 후에 조합페이트를 도장하고, 발전소내 지하 각층의 바닥을 청소하며, 분해 전에 조작한 기기들을 원상태로 복귀시켜 준다.After cleaning each part of the top cover, generator room, and turbine feet, paint the combination paint, clean the floor of each floor in the power plant, and return the equipment operated before disassembly.

충수작업은 다음과 같이 실시한다. 드래프트 터빈내 충수용 밸런스밸브(W67,68)를 개방하여 충수시키고, 드래프트 튜브내의 압력을 확인 한 후에 드래프트 튜브 게이트를 개방시키며, 인테이크 바이패스 밸브(INTAKE BY-PASS VALVE)를 개방하여 펜스톡(PENSTOCK)의 내부에 충수하면서 터빈피트에서 에어밴트용 밸브를 조작하여 에어를 배출시킨다.Addition work is carried out as follows. Open and fill the balance valves (W67, 68) for filling in the draft turbine, open the draft tube gate after checking the pressure in the draft tube, and open the intake bypass valve (INTAKE BY-PASS VALVE) While filling the inside of the PENSTOCK, operate the air vent valve from the turbine feet to discharge the air.

펜스톡(PENSTOCK)의 내부압력을 확인한 후에 인테이크게이트를 개방시켜 충수시키고 충수가 완료되면 냉각수 전동밸브를 수동으로 조작하여 냉각수의 흐름상태를 확인하고 다음 사항을 점검한다.After checking the internal pressure of PENSTOCK, open the intake gate to add water and when the water is completed, manually operate the coolant electric valve to check the flow of coolant and check the following.

스파이럴케이싱 및 드래프트 튜브 맨홀에서 누수가 없는지를 확인하고, 주축과 가이드밴스템(STEM)의 패킹박스에서 과다한 누수가 없는지 확인(점검)하며, 메인가이드베어링 오일저장소의 유면게이지가 정확하게 조정되었는지를 확인하고, 모든압력의 정밀도와 모든 온도계가 정확하게 지시하고 있는지 점검 확인하며, 보호장치가 정지(TRIP)위치에 있지 않은지를 확인하고 드래프트 튜브-공기흡입계통이 운전준비가 되어 있는지 여부를 확인하며, 그리스 공급계통의 올바른 동작상태를 위해 타이머가 조정되어 있는지를 재점검한다.Check for leaks in the spiral casing and draft tube manholes, check (check) for excess leakage in the packing box of the spindle and guide vanstem (STEM), and check that the oil gauge of the main guide bearing oil reservoir is correctly adjusted. Check that the accuracy of all pressures and all thermometers are correctly indicated, check that the protective device is not in the trip (TRIP) position, check whether the draft tube-air intake system is ready for operation, grease Recheck that the timer is adjusted for correct operation of the supply system.

이와 같이 뒷정리를 완료한 후에는 수차발전기를 정상적으로 작동시킬 수 있는 지의 여부를 발전기부(2)와 터빈부(3) 및 일반점검사항을 측정 및 시험한다.After the rearranging is completed, the generator section (2), turbine section (3) and general inspection items are measured and tested to see if the generator can operate normally.

발전기부(2)는, P.M.C절연저항측정, MEASUREMENT OF CARBON BRUSH ABRASION 용량, ROTOR POLE PIECE 전압 체크, 발전기 로터 및 스테이터 에어갭 체크, 로터 고정볼트 분해/조립시 나타난 압력측정, 로터 및 스테이터 절연저항 측정, 트러스트베어링 패드면 두께 측정, 발전기 가이드 베어링 갭 체크, 트러스트 오일커버 LABYRINTH 갭 체크, MEASUREMENT OF GAP FOR BRAKE SHOE AND RING, MEASUREMENT OF THICKNESS FOR BRAKE SHOE, MEASUREMENT RESISTANCE CHECK AND ANXILIARY를 체크한다.The generator unit 2 measures PMC insulation resistance, MEASUREMENT OF CARBON BRUSH ABRASION capacity, ROTOR POLE PIECE voltage check, generator rotor and stator air gap check, pressure measurement when disassembling / assembling the rotor fixing bolt, and rotor and stator insulation resistance measurement. Check the thickness of the thrust bearing pad, the generator guide bearing gap check, the trust oil cover LABYRINTH gap check, the MEASUREMENT OF GAP FOR BRAKE SHOE AND RING, MEASUREMENT OF THICKNESS FOR BRAKE SHOE, MEASUREMENT RESISTANCE CHECK AND ANXILIARY.

터빈부(3)는, 런너 각부의 갭 체크, 터빈 가이드밴 갭(상,하)체크, MEASUREMENT OF GUIDE VANE A-O 체크, 커플링볼트 분해/조립시 나타난 압력 및 볼트신장량 측정, 가이드 밴 스템 하우징 부싱면의 내경측정(상,하), 하측가이드 밴 스템 부싱면의 내경측정, 보텀링 및 헤드커버 패킹 마모량측정, 고정체 센터링, MEASUREMENT OF PACKING BOX 갭, MEASUREMENT OF THICKNESS FOR CARBON PACKING, MEASUREMENT OF TURBINE GUIDE BEARING 갭, 터빈 가이드 베어링의 내경을 측정한다.The turbine section 3 includes a gap check of each runner, a turbine guide van gap (upper and lower) check, a measurement of guide vane AO check, measurement of pressure and bolt extension during coupling bolt disassembly and assembly, and guide van stem housing bushing. Inner diameter measurement (upper and lower), lower guide ban stem inner diameter measurement, bottom ring and head cover packing wear measurement, fixed centering, MEASUREMENT OF PACKING BOX GAP, MEASUREMENT OF THICKNESS FOR CARBON PACKING, MEASUREMENT OF TURBINE GUIDE Measure the inner diameter of bearing gap and turbine guide bearing.

일반적인 점검사항으로는, SETTING VALUE ADJUSTMENT OF LEVEL SWITCH FOR BRG' OIL BOX, OPERATION TEST GENERATOR AIR BRAKE, SETTING VALUE ADJUST OF LIMIT SWITCH FOR GOVERNOR, ADJUSTMENT AND SETTING OF CONTROL VALVE, MEASUREMENT OF LEAKAGE FOR PRESSURE OIL SYSTEM, CALIBRATION FOR PRESSURE GAUGE, SETTING VALUE ADJUST OF PRESSURE SWITCH FOR AIR SYSTEM, MEASUREMENT OF LEAKAGE FOR AIR TANK & AIR LINE, SETTING VALUE ADJUST OF REDUCING VALVE FOR AIR SYSTEM, DISCHARGE TEST OF AIR COMPRESSOR, MOTOR VALUE OPERATION CHECK, DISCHARGE TEST DRAINAGE PUMP, SETTING VALUE ADJUSTMENT OF LEVEL SWITCH FOR DRAINAGE PIT, SETTING VALUE ADJUSTMENT OF PRESSURE RELAY FOR OIL SYSTEM, SETTING VALUE ADJUSTMENT OF LEVEL SWITCH FOR PRESSURE OIL SYSTEM, DISCHARGE TEST OF PRESSURE OIL PUMP를 실시한다.In general, SETTING VALUE ADJUSTMENT OF LEVEL SWITCH FOR BRG 'OIL BOX, OPERATION TEST GENERATOR AIR BRAKE, SETTING VALUE ADJUST OF LIMIT SWITCH FOR GOVERNOR, ADJUSTMENT AND SETTING OF CONTROL VALVE, MEASUREMENT OF LEAKAGE FOR PRESSURE OIL SYSTEM, CALIBRATION PRESSURE GAUGE, SETTING VALUE ADJUST OF PRESSURE SWITCH FOR AIR SYSTEM, MEASUREMENT OF LEAKAGE FOR AIR TANK & AIR LINE, SETTING VALUE ADJUST OF REDUCING VALVE FOR AIR SYSTEM, DISCHARGE TEST OF AIR COMPRESSOR, MOTOR VALUE OPERATION CHECK, DISCHARGE TEST DRAINAGE PUMP VALUE ADJUSTMENT OF LEVEL SWITCH FOR DRAINAGE PIT, SETTING VALUE ADJUSTMENT OF PRESSURE RELAY FOR OIL SYSTEM, SETTING VALUE ADJUSTMENT OF LEVEL SWITCH FOR PRESSURE OIL SYSTEM, DISCHARGE TEST OF PRESSURE OIL PUMP.

이와 같이 각종측정 및 시험을 실시함으로써, 수차발전기에 대한 점검 및 시험공정(200-6)을 완료한 후에 준공(295)을 하게 된다.By performing various measurements and tests in this way, completion of the inspection and test process (200-6) for the aberration generator is completed (295).

이상에서와 같이 본 발명에 따른 수차발전기의 보수방법은 발전기와 수차를 순차적으로 분해하고 분해된 각 부품을 점검·정비 및 보수를 실시한 후에 역순으로 조립시키되 고정체를 정위치에 정확하게 셋팅시키고 회전체를 안치조립시켜 주므로서 분해 보수점검을 효율적이면서도 정확하게 수행할 수 있고, 분해 보수 점검시간을 단축시킬 수 있으며, 따라서 수차발전기의 성능을 지속적으로 유지시킬 수 있고 수명도 연장시킬 수 있게 된다.As described above, in the repair method of the aberration generator according to the present invention, the generator and the aberration are sequentially disassembled and assembled in the reverse order after inspecting, maintaining and repairing the disassembled parts, but the fixed body is correctly set in the correct position and the rotating body. By assembling the assembly, it is possible to carry out disassembly and maintenance inspection efficiently and accurately, and to shorten the disassembly and maintenance inspection time. Therefore, it is possible to continuously maintain the performance of the aberration generator and extend its life.

Claims (4)

삭제delete 준비공정(200-1)과, 발전기분해공정(200-2)과, 수차분해공정(200-3)과, 분해기기점검공정(239)과, 수차조립공정(200-4)과, 발전기조립공정(200-5)과, 점검 및 시험공정(200-6)을 순차적으로 실시함에 있어서,Preparation process 200-1, generator decomposition process 200-2, aberration decomposition process 200-3, decomposition equipment inspection process 239, aberration assembly process 200-4, generator assembly In carrying out the process 200-5 and the inspection and test process 200-6 sequentially, 상기 준비공정(200-1)은 분해전 운전상태점검공정(201), 취수문비(INTAKE GATE)폐쇄공정(202), 흡출관게이트(DRAFT TUBE GATE)폐쇄공정(203), 각부 오일/냉각수/드레인밸브(OIL/COOL WATER/DRAIN VALVE)조작공정(204), 기내배선분리작업공정(205)의 순서로 실시하는 것과;The preparation step (200-1) is a pre-disassembly operation state check step (201), the INTAKE GATE closing step 202, the draft tube gate (DRAFT TUBE GATE) closing step 203, each part oil / coolant / Performing the drain valve (OIL / COOL WATER / DRAIN VALVE) operation step 204 and the in-flight wiring separation operation step 205; 상기 발전기분해공정(200-2)은 P.M.G분해인출공정(206), 집진기 링 커버(COLLECTOR RING COVER)분해공정(207), 톱커버(TOP COVER)분해공정(208), 스터브샤프트(STUB SHAFT) 및 버스바(BUS BAR)연결볼트 분리시킨 후에 실시하는 스터브샤프트(STUB SHAFT)인출공정(209), 상측브라켓트(UPPER BRACKET)분해인출공정(211), 상측코일커버(UPPER COIL COVER)분해인출공정, 로터(ROTOR)분해인출공정(212), 하측오일가이드(LOWER OIL GUIDE)분해인출공정(213), 발전기가이드베어링(GEN, GUIDE BEARING)인출공정(214), 발전기샤프트(GEN, SHARFT)인출안치공정(215), 트러스트베어링(THRUST BEARING)인출안치공정(216), 하측브라켓트(LOWER BRACKET)분해인출안치공정(217), 하측에어디플렉터(LOWER AIR DEFLECTOR)분해인출공정(218)을 순차적으로 실시하는 것과;The generator decomposition process 200-2 includes PMG decomposition withdrawal process 206, COLLECTOR RING COVER decomposition process 207, TOP COVER decomposition process 208, and STUB SHAFT. And STUB SHAFT take-out process (209), upper bracket decomposition take-out process (211), upper coil cover (UPPER COIL COVER) disassembly process ROTOR decomposition drawing out process 212, lower oil guide decomposition drawing out process 213, generator guide bearing drawing process 214, generator shaft drawing out GEN, SHAFT The settling process (215), the THRUST BEARING withdrawal settling process (216), the lower bracket (LOWER BRACKET) disassembly withdrawal settling process (217), and the lower air deflector disassembly withdrawal process (218) in sequence Carrying out; 수차분해공정(200-3)은 스파이럴케이싱(100:SPIRAL CASING)의 맨홀(MANHOLE)과 드래프트 튜브(101:DRAFT TUBE)의 맨홀(MANHOLE)을 호픈시키고 가이드밴(140:GUIDE VANE)의 갭(GAP)과 런너(RUNNER)의 갭(GAP)을 측정한 후에, 터빈피트워크웨이(TURBIN PIT WALK WAY) 및 그리스라인(GREASE LINE)분리공정(220), 시어핀(SHEAR PIN) 및 가이드밴레버핀(GUIDE VANE LEVER PIN)분해공정(221), 가이드밴캡,가이드밴암키(GUIDE VANE CAP, GUIDE VANE AMY KEY)분해공정(222), 가이드밴트러스트베어링(GUIDE VANE THRUST BRG')분해공정(223), 가이드베어링커버(GUIDE BEARING COVER)분해인출공정(224), 베어링커버서포트(BEARING COVER SUPPORT)분해인출공정(225), 터빈가이드베어링오일쿨러(TURBIN GUIDE BRG' OIL COOLER)분해인출공정(226), 패킹(PACKING)및 패킹박스(PACKING BOX)분해인출공정(227), 커플링볼트커버(COUPLING BOLT COVER)분해공정(228), 메인커플링볼트(MAIN COUPLING BOLT)분해공정(229), 가이드밴레버(GUIDE VANE LEVER)인출공정(230), 가이드밴스템하우징(GUIDE VANE STEM HOUSING)인출공정(231), 가이드링(GUIDE RING)인출공정(232), 헤드커버(HEAD COVER)분해인출공정(233), 가이드밴서보모터(GUIDE VANE SERVO MOTER)인출안치공정(234), 가이드밴(GUIDE VANE)인출안치공정(235), 보텀링(BOTTOM RING)인출안치공정(236), 런너 및 샤프트(RUNNER & SHAFT)분리안치공정(237), 터빈샤프트(TURBIN SHAFT)분리안치공정(238), 분해기기점검공정(239)을 순차적으로 실시하는 것이 포함되는 것을 특징으로 하는 수차발전기의 보수방법.The aberration decomposition process (200-3) hoists the manhole of the spiral casing (100: SPIRAL CASING) and the manhole of the draft tube (101: DRAFT TUBE), and the gap of the guide van 140 (GUIDE VANE) After measuring the gap between GAP) and RUNNER, Turbine Pit WALK WAY and Grease Line Separation Process 220, Shear Pin and Guide Van Lever Pin (GUIDE VANE LEVER PIN) Disassembly Process (221), Guide Van Cap, GUIDE VANE AMY KEY Disassembly Process (222), Guide Van Trust Bearing (GUIDE VANE THRUST BRG ') Disassembly Process (223) GUIDE BEARING COVER Disassembly Drawing Process (224), Bearing Cover Support (BEARING COVER SUPPORT) Disassembly Drawing Process (225), Turbine Guide Bearing Oil Cooler (TURBIN GUIDE BRG 'OIL COOLER) Disassembly Drawing Process (226) , Packing and packing box disassembly drawing process (227), coupling bolt cover (COUPLING BOLT COVER) disassembling process (228), main coupling bolt (MAIN CO) UPLING BOLT) Decomposition process (229), GUIDE VANE LEVER take-out process (230), GUIDE VANE STEM HOUSING take-out process (231), guide ring (GUIDE RING) take-out process (232) HEAD COVER Exploded Drawing Process (233), Guide Van Servo Motor (GUIDE VANE SERVO MOTER) Withdrawal Settlement Process (234), Guide Van (GUIDE VANE) Withdrawal Settlement Process (235), BOTTOM RING Sequentially carrying out the drawout settling step 236, the runner and shaft separation settling step 237, the turbine shaft separation settling step 238, and the decomposition equipment inspection step 239. Repair method of a water generator. 청구항 2에 있어서,The method according to claim 2, 발전기의 로터(24)를 분해 인출하는 로터(ROTOR)분해인출안치공정(212)은,The rotor disassembly take-out settling step 212 for disassembling and drawing out the rotor 24 of the generator, 로터(24)를 분해하기 전에 로터(24)와 스테이터(30:STATOR)사이의 에어갭(D1:AIR GAP) 및 로터(24)와 브레이크(BRAKE)사이의 갭을 측정하는 것과,Measuring the air gap D1: AIR GAP between the rotor 24 and the stator 30 and the gap between the rotor 24 and the brake before disassembling the rotor 24; 로터고정볼트 스톱퍼의 용접부를 해체시킨 후에 고정볼트를 분리시키되 수압오일펌프(HYDRAULIC OIL PUMP)를 사용하여 압력을 체크하면서 분해하는 것과,After dismantling the welding part of the rotor fixing bolt stopper, remove the fixing bolt and disassemble it while checking the pressure by using a hydraulic oil pump (HYDRAULIC OIL PUMP), 로터(24)를 인출할 수 있는 디바이스(DEVICE)를 조립 설치하고, 로터(24)를 안치시킬 때에 신속히 받쳐 줄 수 있도록 하기 위하여 림지지대(RIM SUPPORT)와 잭(JACK)을 일정한 간격으로 배열 설치한 것과,Rim support and jacks are arranged at regular intervals in order to assemble and install a device that can take out the rotor 24 and to quickly support it when the rotor 24 is settled. One thing, 로터(24)를 인출시킬 때에 로터폴(ROTOR POLE)과 스테이터코어(35:STATOR CORE) 및 코일(COIL)등이 손상(DAMAGE)되는 것을 방지하기 위해 인원을 1~2m의 간격으로 배치하고, 로터(24)를 인출할 때에 목판을 상하좌우로 흔들면서 인출하여 로터(24)와 스테이터(30)가 접촉되지 않도록 보호하면서 인출하되, 로터(24)를 순차적으로 인출할 때마다 크레인을 정지시킨 상태에서 레벨(LEVEL)을 반복적으로 확인하고 조정하면서 인출하는 것과,In order to prevent the rotor poles, stator cores (35: STATOR CORE), coils, etc. from being damaged when the rotor 24 is pulled out, the personnel are arranged at intervals of 1 to 2 m. When pulling out the rotor 24, the wooden board is pulled out while shaking up, down, left, and right, and the drawer is removed while protecting the rotor 24 and the stator 30 from contacting each other, but the crane is stopped every time the rotor 24 is sequentially taken out. Withdrawal while checking and adjusting level LEVEL repeatedly 인출된 로터 접촉면(COUPLING면, ROTOR SPOKE면)의 돌출부에 발청을 방지하기 위하여 그리스를 도포하고, 로터림(ROTOR RIM)부에 이물질이 침투하거나 습기가 발생하는 것을 방지할 수 있도록 소창직으로 커버링(COVERING)하는 것이 포함되는 것을 특징으로 하는 수차발전기의 보수방법.Apply grease to prevent rust on the protrusions of the drawn rotor contact surface (COUPLING surface, ROTOR SPOKE surface), and cover it with small window to prevent foreign matter from penetrating into the rotor rim or moisture. (COVERING) repair method of a water-powered generator characterized in that it comprises. 청구항 2에 있어서,The method according to claim 2, 수차조립공정(200-4)에서 고정체를 센터링(CENTERING)하는 방법은, 발전기 고정체 상단 양측을 가로질러 지지대를 설치하고, 중앙에 센터링 디바이스를 설치한 후, 피아노선을 측정기준선으로 하여 보텀링의 중심선상에 위치하도록 상기 피아노선의 하단에 추를 매달아 고정시키고, 피아노선과 각 고정부품간의 칫수를 인사이드 마이크로메타(INSIDE MICROMETER)로 측정하는 것이 포함되는 것을 특징으로 하는 수차발전기의 보수방법.The method of centering the fixture in the aberration assembly step 200-4 is to install a support across the upper sides of the generator fixture, install a centering device in the center, and then use the piano wire as the measurement reference line. Suspending the weight to the lower end of the piano wire so as to be located on the center line of the ring, and repairing the aberration generator, characterized in that measuring the dimension between the piano wire and each of the fixing parts (INSIDE MICROMETER).
KR10-2002-0048537A 2002-08-16 2002-08-16 A overhaul method of a water turbine generator KR100450283B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2002-0048537A KR100450283B1 (en) 2002-08-16 2002-08-16 A overhaul method of a water turbine generator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2002-0048537A KR100450283B1 (en) 2002-08-16 2002-08-16 A overhaul method of a water turbine generator

Publications (2)

Publication Number Publication Date
KR20040016267A KR20040016267A (en) 2004-02-21
KR100450283B1 true KR100450283B1 (en) 2004-09-30

Family

ID=37322312

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2002-0048537A KR100450283B1 (en) 2002-08-16 2002-08-16 A overhaul method of a water turbine generator

Country Status (1)

Country Link
KR (1) KR100450283B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102090819B1 (en) 2018-09-21 2020-03-18 주식회사 신한정공 A overhaul method of a water turbine generator

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE602006002883D1 (en) * 2006-07-14 2008-11-06 Openhydro Group Ltd Turbines with a chute for the passage of foreign bodies
KR100899981B1 (en) * 2008-06-27 2009-05-28 주식회사 와텍 Apparatus for aiding repair works preparation process of francis hydraulic turbine in hydroelectric power generation
KR100883932B1 (en) * 2008-09-17 2009-02-18 주식회사 와텍 Brake apparatus of water turbin generator having dust collector
RU2689236C2 (en) * 2017-10-10 2019-05-24 Общество с ограниченной ответственностью "Волга-Спецгидроэнергомонтаж" - "Камспецэнерго" (ООО "Волга-СГЭМ" - "Камспецэнерго") Method of recovery of hydraulic turbine serviceability after a long period of its operation

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09203370A (en) * 1996-01-26 1997-08-05 Hitachi Ltd Movable vane hydraulic turbine, and runner vane operating device for the same

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09203370A (en) * 1996-01-26 1997-08-05 Hitachi Ltd Movable vane hydraulic turbine, and runner vane operating device for the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102090819B1 (en) 2018-09-21 2020-03-18 주식회사 신한정공 A overhaul method of a water turbine generator

Also Published As

Publication number Publication date
KR20040016267A (en) 2004-02-21

Similar Documents

Publication Publication Date Title
CN111490649B (en) 660 MW-level double-water-internal-cooling generator installation method
CN107178675B (en) Method and device for realizing replacement of pipe section or valve without stopping water on water supply pipeline
CN102110520A (en) Construction process for installing and debugging large transformer
KR100899988B1 (en) Aiding apparatus for disassembling and assembling process of generator in repair works of propeller hydraulic turbine
CN110104569A (en) A kind of method and apparatus of municipal pipeline auxiliary installation
CN111219252B (en) Heavy gas turbine installation construction method
KR100450283B1 (en) A overhaul method of a water turbine generator
CN108362501A (en) A kind of rack installation method for aviation axial flow compressor performance test
KR100592560B1 (en) Complete equipment method of a propeller waterwheel electric generator
CN113084476A (en) Steam turbine unit installation process
CN116436219A (en) Method for installing generator of nuclear power unit
CN203023080U (en) Portable performance test device for submerged pump
CN114320501B (en) Disassembly and installation process for steam turbine of chemical power station
CN102231500A (en) Method for installing intensive plug-in type bus duct
KR100899983B1 (en) Aiding apparatus for disassembling and assembling process of generator in repair works of francis hydraulic turbine
CN111794549B (en) Construction method for lowering height and changing bottom of vertical storage tank
CN104134959B (en) The installation method of full mould casted middle voltage bus rod
CN116123103B (en) Large water taking pump and maintenance method thereof
KR100899984B1 (en) Aiding apparatus for disassembling and assembling process of francis hydraulic turbine
CN102518593A (en) Improved large-size centrifugal fan device and mounting and constructing method thereof
KR100899989B1 (en) Aiding apparatus for disassembling and assembling process of francis hydraulic turbine
CN106872120B (en) Hydrostatic test device and application method thereof
CN115303922B (en) Installation method of oversized mine hoist
CN104795227B (en) Transformer air-cooled remodeling method
CN216398653U (en) Auxiliary mounting tool for coupling bolt hydraulic stretcher of large-scale water turbine generator set

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120807

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20130916

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20140915

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20150901

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20160909

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20170912

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20190916

Year of fee payment: 16