KR100427956B1 - Band for constructing walls and wall construction method using the same - Google Patents

Band for constructing walls and wall construction method using the same Download PDF

Info

Publication number
KR100427956B1
KR100427956B1 KR10-2001-0036491A KR20010036491A KR100427956B1 KR 100427956 B1 KR100427956 B1 KR 100427956B1 KR 20010036491 A KR20010036491 A KR 20010036491A KR 100427956 B1 KR100427956 B1 KR 100427956B1
Authority
KR
South Korea
Prior art keywords
wall
band
concrete
fixing
wall construction
Prior art date
Application number
KR10-2001-0036491A
Other languages
Korean (ko)
Other versions
KR20030001676A (en
Inventor
김홍종
Original Assignee
김홍종
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김홍종 filed Critical 김홍종
Priority to KR10-2001-0036491A priority Critical patent/KR100427956B1/en
Publication of KR20030001676A publication Critical patent/KR20030001676A/en
Application granted granted Critical
Publication of KR100427956B1 publication Critical patent/KR100427956B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • E04B2/8611Walls made by casting, pouring, or tamping in situ made in permanent forms with spacers being embedded in at least one form leaf
    • E04B2/8617Walls made by casting, pouring, or tamping in situ made in permanent forms with spacers being embedded in at least one form leaf with spacers being embedded in both form leaves
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • E04B2/8652Walls made by casting, pouring, or tamping in situ made in permanent forms with ties located in the joints of the forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • E04B2002/8682Mixed technique using permanent and reusable forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

본 발명은 벽체 시공용 밴드 및 이를 이용한 벽체 건축방법에 관한 것으로, 본 발명의 벽체 시공용 밴드는 거푸집 패널 결속평판, 삼각지지대 연결용 구멍, 파이프 삽입 구멍, 거푸집용 패널 고정키, 수평철근 고정부, 못 고정구를 포함하여 구성되는 것으로, 본 발명에 의하면 콘크리이트 벽체의 시공이 간편하여 전체 공기를 단축할 수 있고, 단열재를 벽체에 매립하여 시공하므로 공정이 간단해지며, 벽체 시공시 사용한 재료들을 재활용할 수 있는 효과를 수득할 수 있다.The present invention relates to a wall construction band and a wall construction method using the same, the wall construction band of the present invention formwork panel binding plate, triangular support connection hole, pipe insertion hole, formwork panel fixing key, horizontal rebar fixing portion According to the present invention, the construction of the concrete wall is simple, and the overall air can be shortened, and the process is simplified because the insulation is embedded in the wall, thereby simplifying the process. A recyclable effect can be obtained.

Description

벽체 시공용 밴드 및 이를 이용한 벽체 건축방법{BAND FOR CONSTRUCTING WALLS AND WALL CONSTRUCTION METHOD USING THE SAME}BAND FOR CONSTRUCTING WALLS AND WALL CONSTRUCTION METHOD USING THE SAME}

본 발명은 벽체 시공용 밴드 및 이를 이용한 벽체 건축방법에 관한 것으로, 더욱 상세하게는 거푸집 제작에 이용될 수 있도록 특수하게 고안되어 콘크리이트 벽체의 시공을 간편하게 하여 전체 공기를 단축할 수 있고, 단열재를 벽체에 매립하여 시공하므로 공정이 간단해지며, 벽체 시공시 사용한 재료들을 재활용할 수 있도록 하는 벽체 시공용 밴드 및 이를 이용한 벽체 건축방법에 관한 것이다.The present invention relates to a wall construction band and a wall construction method using the same, and more specifically, it is specifically designed to be used in the formwork can simplify the construction of concrete walls to shorten the overall air, the insulation material The construction process is simplified by embedding in the wall, and relates to a wall construction band and a wall construction method using the same so that the materials used in the wall construction can be recycled.

일반적으로 주택 등의 건축물의 시공시 벽체는 거푸집내에 수평 철근과 수직 철근을 종횡으로 배근하고 그 안에 콘크리이트를 타설함으로써 구축된다. 이러한 콘크리이트 벽체의 시공시에는 다양한 종류의 기둥재 또는 거푸집 조립체 들이 사용되고 있다.In general, in the construction of buildings such as houses, walls are constructed by placing horizontal and vertical rebars vertically and horizontally in the formwork and placing concrete therein. In the construction of such concrete walls, various kinds of pillar or formwork assemblies are used.

종래의 벽체 건축 방법 가운데 하나로 국내특허공고 제 90-9897호는 가로 철선과 세로 철선 및 크로스 철선으로 이루어진 입방체의 거푸집을 용착하여서 된 입체식 구조의 조립식 건축모듈을 사용하는 방법을 제안하고 있다. 그러나, 이러한 입체식 구조의 거푸집을 사용하는 방법은 각 철선들의 교차점을 모두 용착해야 하기 때문에 결선 공정이 매우 복잡하고 입체식 거푸집 자체의 부피가 커서 시공 과정에서의 취급이 어려운 단점을 갖는다.As one of the conventional wall construction methods, Korean Patent Publication No. 90-9897 proposes a method of using a three-dimensional structured prefabricated building module by welding a cube formwork consisting of a horizontal wire, a vertical wire and a cross wire. However, the method of using the three-dimensional formwork has a disadvantage in that the wiring process is very complicated and the volume of the three-dimensional formwork itself is difficult to handle in the construction process because all intersections of the iron wires must be welded.

한편, 특허 제 257973호는 상술한 바와 같은 종래 기술의 문제점을 해결하기 위한 방법으로 세로 부재와 가로 부재 및 수직철근이 일체로 결합된 구조의 벽체 거푸집 조립체를 제조함에 있어서 입체식 거푸집이 아닌 단위 부재로 제조하여 그 부피와 중량이 감소되어 취급이 용이한 건축물 벽체 거푸집 조립체를 제안하고 있다. 그러나, 상기 특허의 조립체를 이용하여 건축물의 벽체를 시공하는 경우에는 수평 철근을 배근하는 것이 어렵고, 건축물의 코너 부분에서 철근을 구부릴 수 없어서 모서리 부분의 내구성이 취약해지며, 벽체 구성후 단열재 시공은 별도의 공정으로 수행해야 하기 때문에 공정이 복잡해지는 문제점을 갖는다.On the other hand, Patent No. 257973 is a unit member that is not a three-dimensional formwork in the manufacture of a wall formwork assembly of a structure in which the vertical member, the horizontal member and the vertical reinforcing bar as a method for solving the problems of the prior art as described above It has been proposed that the building wall formwork assembly is easy to handle because the volume and weight is reduced by manufacturing. However, when constructing the wall of the building using the assembly of the patent it is difficult to reinforce the horizontal reinforcement, can not bend the reinforcing bar in the corner portion of the building is weak durability of the corner portion, the construction of the insulation after construction of the wall Since the process must be performed in a separate process, the process becomes complicated.

본 발명은 상술한 종래 기술의 문제점을 극복하기 위하여 안출된 것으로, 본 발명의 하나의 목적은 단열재를 별도로 시공하지 않고 동시에 벽체에 매립해서 시공할 수 있는 벽체 시공용 밴드 및 이를 이용한 벽체 건축방법을 제공하는 것이다.The present invention has been made to overcome the problems of the prior art described above, one object of the present invention is to provide a wall construction band and a wall construction method using the same can be embedded in the wall at the same time without a separate construction of the insulating material To provide.

본 발명의 다른 목적은 철근 시공시 정위치에 배근이 용이하며 시공이 간편하여 공기를 단축할 수 있는 벽체 시공용 밴드 및 이를 이용한 벽체 건축방법을 제공하는 것이다.Another object of the present invention is to provide a wall construction band and a wall construction method using the same, which can shorten the air by easy reinforcement and easy construction at the time of rebar construction.

본 발명의 또 다른 목적은 벽체 시공시 사용한 건축자재들을 재활용할 수 있는 벽체 시공용 밴드 및 이를 이용한 벽체 건축방법을 제공하는 것이다.Still another object of the present invention is to provide a wall construction band and a wall construction method using the same, which can recycle building materials used in wall construction.

상술한 목적을 달성하기 위한 본 발명의 하나의 양상은One aspect of the present invention for achieving the above object is

중간 부분에 수평 철근을 고정하기 위한 홈이 상하로 대칭되게 구성되어 있는 거푸집 패널 결속평판;Formwork panel binding plate, the groove for fixing the horizontal reinforcing bar in the middle portion is configured symmetrically up and down;

상기 벽체 시공용 밴드의 좌우 날개 부분에 형성된 하나 이상의 파이프 삽입 구멍;One or more pipe insertion holes formed in left and right wing portions of the wall construction band;

시공용 밴드의 좌우 날개 부분에 상기 파이프 삽입 구멍 외측으로 좌우에 하나씩 형성되어 있는 삼각지지대 연결용 구멍;A triangular support connecting hole which is formed at the left and right wing portions of a construction band one by one to the outside of the pipe insertion hole;

상기 거푸집 패널 결속평판 중앙에 위치된, 상기 밴드를 콘크리이트에 고정하기 위한 한 못 고정구: 및A nail fixture for securing the band to concrete, located at the center of the formwork panel binding plate: and

상기 수평 철근 고정용 홈의 내측으로 양쪽에 각각 대칭되게 돌출 형성되어 있는 거푸집용 패널 고정키를 포함하여 구성되는 벽체 시공용 밴드이다.It is a band for wall construction including a formwork panel fixing key which is formed to protrude symmetrically on both sides of the horizontal reinforcing groove for each side.

상술한 목적을 달성하기 위한 본 발명의 제 2 양상은 거푸집내에 배근하고 그 안에 콘크리이트를 타설하여 콘크리이트 벽체를 시공함에 있어서,According to a second aspect of the present invention for achieving the above object, in the construction of concrete walls by placing in concrete and placing concrete therein,

상기 벽체 시공용 밴드를 못 고정구를 이용하여 콘크리이트벽에 고정시키는 제 1 단계;A first step of fixing the wall construction band to the concrete wall using a nail fixture;

상기 벽체 시공용 밴드 사이에 수직 철근을 일정한 간격으로 설치한 후 수평 철근 고정부에 수평 철근을 고정하고, 수평 철근을 수직 철근에 결속선으로 묶어 배근하는 제 2 단계;A second step of installing horizontal bars between the wall bands at regular intervals and then fixing the horizontal bars to the horizontal bar fixing unit and tying the horizontal bars to the vertical bars with a binding line;

파이프 삽입 구멍에 파이프를 삽입하는 제 3 단계;Inserting a pipe into the pipe insertion hole;

거푸집용 패널 고정키에 거푸집용 패널을 고정하는 제 4 단계; 및A fourth step of fixing the formwork panel to the formwork panel fixing key; And

상기 제 2 단계 내지 제 4 단계를 반복하여 다른 하나의 벽면을 설치하여 거푸집을 제작하는 단계를 포함하는 콘크리이트 벽체의 시공방법이다.It is a construction method of the concrete wall comprising the step of manufacturing the formwork by installing another wall surface by repeating the second to fourth steps.

도 1a은 본 발명에 의한 벽체용 밴드의 일 실시예의 평면도,1A is a plan view of one embodiment of a wall band according to the present invention,

도 1b는 본 발명에 의한 벽체용 밴드의 일 실시예의 측단면일부확대도,Figure 1b is an enlarged side cross-sectional view of one embodiment of a wall band according to the present invention,

도 1c는 본 발명에 의한 벽체용 밴드의 일 실시예의 사시도,Figure 1c is a perspective view of one embodiment of a wall band according to the present invention,

도 2a은 본 발명에 의한 곡면용 밴드의 일 실시예의 평면도,Figure 2a is a plan view of one embodiment of a curved band according to the present invention,

도 2b는 본 발명에 의한 곡면용 밴드의 일 실시예의 측단면일부확대도,Figure 2b is an enlarged side cross-sectional view of one embodiment of a curved band according to the present invention,

도 2c는 본 발명에 의한 곡면용 밴드의 일 실시예의 측단면일부확대도,Figure 2c is an enlarged side cross-sectional view of a portion of an embodiment of a curved band according to the present invention,

도 3a은 본 발명에 의한 기둥보용 밴드의 일 실시예의 평면도,Figure 3a is a plan view of one embodiment of a column beam band according to the present invention,

도 3b는 본 발명에 의한 기둥보용 밴드의 일 실시예의 측단면일부확대도,Figure 3b is an enlarged side cross-sectional view of a part of an embodiment of a column beam band according to the present invention,

도 4는 본 발명에 의한 콘크리이트 벽체 시공 방법중 본 발명의 벽체 시공용 밴드를 콘크리이트에 고정하고 일측 벽체 구성을 위한 거푸집용 패널과 철근들을 고정한 상태의 도면,4 is a view of a state in which the wall for fixing the wall construction band of the present invention in the concrete wall construction method according to the present invention fixed to the formwork panel and reinforcing bars for one-side wall configuration,

도 5는 일측 벽면을 위한 거푸집 형성후 다른 하나의 벽면을 위한 거푸집을 제작하는 단계의 도면,5 is a view of the step of manufacturing the formwork for the other one wall after the formwork for one side wall,

도 6은 양쪽 벽면을 위한 거푸집용 패널을 구성한 상태의 도면,Figure 6 is a view of the form panel for formwork for both walls;

도 7은 외벽 쪽으로 단열재를 삽입한 본 발명의 밴드를 이용하여 시공한 벽체의 단면도이다.7 is a cross-sectional view of the wall constructed using the band of the present invention with the heat insulating material inserted into the outer wall.

도면의 주요 부분에 대한 부호의 설명Explanation of symbols for the main parts of the drawings

10: 거푸집 패널 결속평판 1: 삼각지지대 연결용 구멍10: formwork panel binding plate 1: hole for tripod support

2: 파이프 삽입 구멍 3: 거푸집용 패널 고정키2: Pipe insertion hole 3: Formwork panel fixing key

4: 요철부 8: 못 고정구4: uneven portion 8: nail fixture

7: 단열재 100: 벽체 시공용 밴드7: insulation material 100: wall construction band

41, 41': 거푸집용 패널41, 41 ': formwork panel

42: 수평 철근 43: 수직 철근42: horizontal rebar 43: vertical rebar

60: 파이프 80: 콘크리이트60: pipe 80: concrete

이하에서 첨부 도면을 참조하여 본 발명의 구성 및 바람직한 구현예들을 더욱 상세하게 설명한다. 다만, 이러한 바람직한 구현예들은 단지 본 발명의 실시를 설명하기 위한 것으로 본 발명을 제한하는 것은 해석되어서는 안된다.Hereinafter, with reference to the accompanying drawings will be described in more detail the configuration and preferred embodiments of the present invention. However, these preferred embodiments are only intended to illustrate the practice of the invention and should not be construed as limiting the invention.

본 발명에 의한 벽체 시공용 밴드는 거푸집 패널 결속평판(10), 삼각지지대연결용 구멍(1), 파이프 삽입 구멍(2), 거푸집용 패널 고정키(3), 요철부(4), 못 고정구(8)를 포함하여 구성된다.Wall construction band according to the present invention is a die panel binding flat plate 10, triangular support connecting hole (1), pipe insertion hole (2), formwork panel fixing key (3), concave-convex portion (4), nail fixture It is comprised including (8).

본 발명의 벽체 시공용 밴드는 콘크리이트 벽체 시공시 거푸집용 패널들을 조립하고 벽체 두께에 상당하는 일정한 간격을 유지하여 그 안에 콘크리이트가 타설될 수 있도록 해 주는 것으로, 기둥보용, 곡면용, 및 벽체용 등의 용도에 따라 다양한 형태를 취할 수 있다. 이러한 본 발명의 벽체 시공용 밴드는 기본적으로 철판에 부식방지를 위한 코팅이 되어 있는 소재로 제조되며, 금속판으로부터 프레스 성형된다.Wall construction band of the present invention is to assemble the formwork panels during the construction of the concrete wall and to allow the concrete to be placed therein to maintain a constant gap corresponding to the wall thickness, for beams, curved surfaces, and walls Various forms can be taken according to uses, such as a dragon. The wall band for construction of the present invention is basically made of a material having a coating for preventing corrosion on the iron plate, press-molded from the metal plate.

도 1a는 본 발명의 벽체용 밴드의 일실시예의 평면도이고, 도 1b는 본 발명에 의한 벽체용 밴드의 일 실시예의 측단면일부확대도, 도 1c는 본 발명에 의한 벽체용 밴드의 일 실시예의 사시도이다. 본 발명의 상기 밴드의 거푸집 패널 결속평판(10) 상에는 상기 밴드를 콘크리이트에 고정하는 못 고정구(8), 수평 철근을 고정하기 위한 홈이 상하로 형성되어 있고, 파이프 삽입 구멍(2)이 상기 수평 철근 고정용 홈의 좌우에 한 개씩 형성되며, 상기 파이프 삽입 구멍(2)의 외측으로 좌우에 하나씩 삼각지지대 연결용 구멍(1)이 형성되어 있다. 삼각지지대는 코너 각을 유지하고 벽체를 지지하기 위해서 설치된다. 또한 상기 수평 철근 고정을 위한 홈은 예컨대, 각각 ∪(또는 └┘)형 및 ∩(┌┐)형으로 상하에 구성된다(홈의 형태는 반드시 이러한 형태로 제한되는 것은 아니고, 밴드의 용도에 따라 다양한 형태를 취할 수 있다). 이러한 홈의 폭은 벽체의 두께에 따라 달라질 수 있다. 이 경우에 상기 홈의 내부에는 거푸집용 패널(예컨대, 합판)을 고정하기 위한 키(3)들이 도 1b에 도시된 바와 같이 서로 대향하여 상하로 반대로 돌출 형성되고, 홈의 중간에는 본 발명의 벽체 시공용 밴드를 콘크리이트 바닥에 고정하기 위한 못 고정구(8)가 형성되어 있다. 한편, 홈이 수평 철근과 닿는 평평한 부분에는 수평 철근 고정시 미끄럼을 방지하기 위한 요철부(4)가 형성될 수 있다.Figure 1a is a plan view of one embodiment of a wall band of the present invention, Figure 1b is a side sectional enlarged view of a part of an embodiment of a wall band according to the present invention, Figure 1c is an embodiment of a wall band according to the present invention Perspective view. On the formwork panel binding plate 10 of the band of the present invention, a nail fixture 8 for fixing the band to concrete, grooves for fixing horizontal rebars are formed up and down, and the pipe insertion hole 2 is It is formed one by one on the left and right of the horizontal rebar fixing groove, the triangular support connecting hole (1) is formed on the left and right sides of the pipe insertion hole (2). Tripod supports are installed to maintain corner angles and to support walls. In addition, the groove for fixing the horizontal reinforcing bar is configured up and down, for example, ∪ (or └ ┘) type and ∩ (┌┐), respectively (the shape of the groove is not necessarily limited to this type, depending on the use of the band Can take various forms). The width of these grooves may vary depending on the thickness of the wall. In this case, the keys 3 for fixing the formwork panel (for example, plywood) are protruded upwards and downwards opposite to each other as shown in FIG. 1B in the groove, and in the middle of the groove, the wall of the present invention. Nail fasteners 8 for fixing the construction band to the concrete floor are formed. On the other hand, the flat portion where the groove is in contact with the horizontal rebar may be formed with an uneven portion 4 to prevent the slip when the horizontal rebar is fixed.

도 2a는 곡면용 밴드의 일실시예의 평면도이고, 도 2b 및 2c는 상기 도 2a의 곡면용 밴드 중의 거푸집용 패널 고정키의 일부 확대 단면도이다. 도 2b는 거푸집용 패널 고정키 3의 일부 확대 단면도이고, 도 2c는 거푸집용 패널 고정키 3'의 일부 확대 단면도이다. 본 발명의 상기 밴드의 거푸집 패널 결속평판(10)의 가운데 부분에는 수평 철근 고정부(4)를 구성하는 홈이 형성되어 있고, 파이프 삽입 구멍(2)이 상기 수평 철근 고정부의 좌측에 한 개 그리고 우측에 두 개 형성된다. 파이프 삽입 구멍(2)이 한 개인 쪽이 벽체 시공시 곡면의 안쪽으로 들어가고 파이프 삽입 구멍(2)이 두 개 있는 쪽이 곡면쪽으로 설치된다. 상기 파이프 삽입 구멍의 외측으로 좌우에 하나씩 삼각지지대 연결용 구멍(1)이 형성되어 있다. 또한 상기 수평 철근 고정용 홈의 내부에는 거푸집용 패널을 고정하기 위한 키(3 및 3')가 서로 대향하여 상하로 각각 돌출 형성되고, 홈의 하부 평평한 부분에는 수평 철근 고정시 미끄럼을 방지하기 위한 요철부(4)가 형성될 수 있다.2A is a plan view of one embodiment of a curved band, and FIGS. 2B and 2C are partially enlarged cross-sectional views of a formwork panel fixing key in the curved band of FIG. 2A. 2B is a partially enlarged cross-sectional view of the formwork panel fixing key 3, and FIG. 2C is a partially enlarged cross-sectional view of the formwork panel fixing key 3 '. The center part of the formwork panel binding plate 10 of the band of the present invention is formed with a groove constituting the horizontal rebar fixing portion 4, one pipe insertion hole (2) to the left of the horizontal rebar fixing portion And two on the right side. One pipe insertion hole 2 enters the inside of the curved surface when the wall is constructed, and two pipe insertion holes 2 are installed toward the curved surface. Holes 1 for connecting triangular supports are formed on the left and right sides of the pipe insertion hole. In addition, the key (3 and 3 ') for fixing the formwork panel is protruded up and down respectively facing each other inside the horizontal reinforcing fixing groove, the lower flat portion of the groove for preventing sliding when the horizontal reinforcing steel The uneven part 4 may be formed.

도 3a를 참조하여 기동보용 밴드를 살펴보면, 거푸집 패널 결속평판(10)의 가운데 수평 철근 고정용 홈이 형성되어 있고, 기둥용이기 때문에 파이프 삽입 구멍(2)이 상기 수평 철근 고정부의 좌우에 두 개씩 형성되며, 상기 파이프 삽입 구멍의 외측으로 좌우에 하나씩 삼각지지대 연결용 구멍(1)이 형성되어 있다. 상기수평 철근 고정용 홈의 내부에는 거푸집용 패널 고정키(3)가 서로 대향하여 상하로 각각 돌출 형성되고(도 3b 참조), U자형 홈이 철근과 닿는 평평한 부분에는 수평 철근 고정시 미끄럼을 방지하기 위한 요철부(4)가 형성될 수 있다.Referring to FIG. 3A, the maneuvering band is formed, and the center reinforcing bar fixing groove is formed in the center of the formwork panel binding plate 10, and the pipe insertion hole 2 is positioned at the left and right sides of the horizontal reinforcing bar fixing part because it is for a column. It is formed one by one, one side to the outside of the pipe insertion hole is formed for connecting the tripod support holes (1). Inside the horizontal rebar fixing groove, the formwork panel fixing keys 3 protrude upward and downward to face each other (refer to FIG. 3B), and the flat portion where the U-shaped groove contacts the rebar prevents sliding when the horizontal rebar is fixed. Concave-convex portion 4 may be formed.

본 발명의 다른 양상은 콘크리이트 벽체의 시공방법을 특징으로 한다. 도 4는 본 발명에 의한 콘크리이트 벽체 시공 방법중 본 발명의 벽체 시공용 밴드를 콘크리이트 바닥에 고정하고 일측 벽체 구성을 위한 거푸집용 패널과 수평철근 및 수평 철근을 고정한 상태의 도면이고, 도 5는 일측 벽면을 위한 거푸집 형성후 다른 하나의 벽면을 위한 거푸집을 제작하는 단계의 도면이며, 도 6은 양쪽 벽면을 위한 거푸집용 패널을 구성한 상태의 도면이다.Another aspect of the invention features a method of constructing a concrete wall. 4 is a view of a state in which the wall for fixing the wall construction band of the present invention in the concrete construction method according to the present invention to the concrete floor and fixed to the formwork panel and horizontal reinforcing bar and horizontal reinforcing bar for one side wall configuration, Figure 5 Is a view of the step of manufacturing the formwork for the other wall after forming the formwork for one wall surface, Figure 6 is a view of the form panel for the formwork for both wall surfaces.

본 발명에 의한 콘크리이트 벽체 시공은 기본적으로는 거푸집내에 수평 철근 및 수직 철근을 배근하고 그 안에 콘크리이트를 타설하여 콘크리이트 벽체를 시공하되, 상술한 본 발명의 벽체 시공용 밴드(100)를 사용하는 것을 특징으로 한다. 본 발명의 방법에 의해 벽체를 시공하는 경우에는, 도 4에 도시된 바와 같이, 먼저 상기 벽체 시공용 밴드(100)를 못 고정구(8)를 이용하여 콘크리이트 바닥에 고정시키고, 벽체 시공용 밴드(100) 사이에 수직 철근(43)을 일정한 간격으로 설치한다. 이어서, 수평 철근 고정부(4)에 수평 철근(42)을 고정하고, 수평 철근(42)을 수직 철근(43)에 결속선으로 묶어 연결한다. 이와 같이, 벽체 시공용 밴드(100)에 수평 철근(42)이 정위치에 배근됨과 동시에 수직 철근(43) 또한 정위치에 배근된다. 이어서 파이프를 파이프 삽입 구멍(2)에 끼우고, 거푸집용 패널 고정키(3)에 거푸집용 패널(41)을 고정하여 내벽면을 완성하고 이어서 수평 철근 및 거푸집용 패널 순으로 상술한 과정을 반복하여 외벽 면을 모두 설치하고, 파이프 삽입 구멍(2)에 각평 파이프 등의 파이프(60)를 삽입하여 거푸집을 완성한다(도 5 및 도 6 참조). 이와 같이 해서 수득된 거푸집에 콘크리이트 등을 타설하고 양생한 후 벽체 시공용 밴드(100)의 좌우를 절단하여 파이프를 분리해 내고, 외벽쪽 거푸집 패널을 제거한다. 이러한 과정에서 필요한 경우 코너각을 유지하고 벽을 지탱하기 위하여 벽체 시공용 밴드의 삼각지지대 고정 구멍을 이용하여 삼각지지대로 벽체를 지탱할 수 있다. 또한, 보온단열을 위해 거푸집의 외벽측 거푸집 패널의 내면에 폴리스티렌 폼 등의 단열재를 삽입함으로써 별도의 공정을 수행하지 않고도 보온단열재를 내부에 삽입할 수 있다.The concrete wall construction according to the present invention basically constructs a concrete wall by placing horizontal reinforcing bars and vertical reinforcing bars in the formwork and placing concrete therein, using the wall construction band 100 according to the present invention. Characterized in that. In the case of constructing the wall by the method of the present invention, as shown in FIG. 4, the wall construction band 100 is first fixed to the concrete floor using the nail fixture 8, and the wall construction band Vertical reinforcing bars 43 are installed at regular intervals between the 100. Next, the horizontal reinforcing bar 42 is fixed to the horizontal reinforcing bar fixing part 4, and the horizontal reinforcing bar 42 is tied to the vertical reinforcing bar 43 by a binding line. In this way, the horizontal reinforcing bar 42 is placed on the wall construction band 100 at the same time, and the vertical reinforcing bar 43 is also placed at the right position. Subsequently, the pipe is inserted into the pipe insertion hole (2), the formwork panel (41) is fixed to the formwork panel (41) to complete the inner wall surface, and then the above steps are repeated in the order of horizontal reinforcement and formwork panel. By installing all the outer wall surface, and inserting the pipe 60, such as square pipe in the pipe insertion hole (2) to complete the formwork (see Figs. 5 and 6). The concrete thus obtained is poured into concrete and cured, and then the left and right sides of the wall band 100 are cut to separate the pipes, and the external wall side form panels are removed. In this process, to maintain the corner angle and to support the wall, it is possible to support the wall by the triangular support using the triangular support fixing hole of the wall construction band. In addition, by inserting a heat insulating material such as polystyrene foam into the inner surface of the formwork panel on the outer wall side of the formwork for thermal insulation can be inserted into the thermal insulation material without performing a separate process.

본 발명의 벽체 시공용 밴드를 이용한 벽체 건축방법의 일실시예를 더욱 구체적으로 설명하면 다음과 같다.Hereinafter, an embodiment of the wall building method using the wall construction band of the present invention will be described in detail.

먼저 바닥 배근 후 벽체 시공 위치에 소킷철근을 접어 정확한 위치에 모두 다 설치하고 콘크리이트를 타설한다. 양생 후 벽체 시공 위치를 정확하게 표시하여 상술한 본 발명의 벽체 시공용 밴드를 벽체 선상에 콘크리이트 못으로 고정한다. 수직 철근을 밴드가 회전할 수 있을 정도의 간격으로 설치한다(외부 밴드-폼을 시공할 수 있게 지탱하여 준다.)First, after laying the floor, fold the sokit reinforcing bars on the wall, install everything in the correct location, and cast concrete. After curing, the wall construction position is accurately displayed to fix the wall construction band of the present invention described above on the wall line with concrete nails. Install the vertical rebars at intervals enough for the band to rotate (support the outer band form).

일정한 두께와 높이를 갖는 거푸집용 패널(예컨대, 두께 12㎜, 높이 30㎝)을 외부 하단에 세우고 높이에 맞추어 수평 철근을 수직 철근에 결속선으로 묶는다.Formwork panels having a constant thickness and height (e.g., thickness 12mm, height 30cm) are placed on the outer bottom and the horizontal bars are tied to the vertical bars in line with the height in accordance with the height.

각형 파이프에 밴드들(예컨대, 3M 벽을 시공할 경우 밴드 9개)을 끼워 바닥에 고정해 둔 벽체 시공용 밴드 구멍에 끼워 세우고 거푸집용 패널을 키홈에 끼운뒤 밴드 1개를 수평 철근에 고정하면 파이프가 수직으로 세워진다. 같은 방법으로 수평 철근, 파이프, 거푸집용 패널 순으로 연속하여 외벽 면을 모두 설치한다. 즉, 철근을 정위치에 배근하는 것이다.Insert the bands (e.g., 9 bands for 3M walls) into the square pipes, insert them into the wall banding holes fixed to the floor, insert the formwork panel into the keyway, and fix one band to the horizontal rebar. The pipe is erected vertically. In the same way, install the outer wall in succession in the order of horizontal rebar, pipe, formwork panel. In other words, the rebar is placed in place.

시공 상 필요한 나머지 철근을 모두 설치한 후 전기 파이프 및 내장물(예컨대, 전화선, 수도관 등)을 모두 설치한다. 이 때 외벽쪽에는 단열재로서 폴리스티렌 폼(expanded polystyrene foam) 등의 내후성 마감재를 바람직하게 두 겹으로 틈이 생기지 않도록 엇갈리게 배치하여 밴드에 끼워 넣는다.After installing all the remaining rebars for installation, install all electrical pipes and internals (eg, telephone lines, water pipes, etc.). At this time, weatherproof finishing materials such as expanded polystyrene foam (expanded polystyrene foam) as the heat insulating material is preferably arranged in a staggered manner so that there are no gaps in two layers.

거푸집용 패널을 하단으로부터 벽체 시공용 밴드에 끼워 넣으면 밴드 키에 고정되어 수직으로 하여 모두 설치한다. 파이프를 상단 밴드 구멍으로부터 하단으로 끼워 넣는다. 코너의 경우에는 앵글을 상단에 나사 못을 이용하여 설치하고, 삼각 지지대를 본 발명의 상기 벽체 시공용 밴드의 삼각지지대 구멍과 연결하여 벽체를 수직으로 하여 움직이지 않게 앙카 볼트로 고정한다.Insert the formwork panel into the wall construction band from the bottom, it is fixed to the band key and installed vertically. Insert the pipe from the top band hole to the bottom. In the case of a corner, the angle is installed using a screw nail on the top, and the triangular support is connected to the triangular support hole of the wall construction band of the present invention to fix the wall vertically with anchor bolts to prevent movement.

파이프와 받침용 파이프를 사용하여 거푸집 골격을 만든다. 거푸집용 패널을 깔고 코너 마나 앵글을 나사못으로 고정한다. 철근 및 필요한 각종 시설(예컨대, 환기구, 창호 등)을 한 뒤 콘크리이트를 타설한다.Formwork skeletons are constructed using pipes and supporting pipes. Lay out the formwork panel and fix the corner mana angle with screws. Reinforce concrete and other necessary facilities (e.g. vents, windows, etc.) before placing concrete.

양생 후 밴드의 좌우를 절단하여 파이프를 분리해 내고, 아울러 필요치 않은 외벽 쪽 거푸집용 패널은 나사못을 이용하여 분해한다. 이와 같이 분해된 파이프 및 거푸집용 패널은 재활용할 수 있다. 한편, 내벽 쪽 거푸집용 패널은 분해하지 않고 남아 있는 밴드를 이용하여 그 상태로 고정하고, 석고 보드 등의 마감재를 나사못으로 부착하면 마감이 된다.After curing, cut off the pipe by cutting the left and right side of the band, and disassemble the panel for formwork that is not necessary by using screws. The pipes and formwork panels thus disassembled can be recycled. Meanwhile, the formwork panel for the inner wall side is fixed in the state using the remaining band without disassembling, and the finishing material such as gypsum board is attached by screws.

도 7은 외벽 쪽으로 단열재를 삽입한 본 발명의 밴드를 이용하여 시공한 벽체의 단면도이다. 도 7을 참조하여, 본 발명에 의해 시공된 벽체의 단면을 살펴보면, 본 발명의 벽체 시공용 밴드(100)에 의해 두 장의 거푸집용 패널(41, 41')이 고정되고, 파이프 삽입 구멍에는 파이프(60) 등이 고정되며, 두 장의 거푸집용 패널(41, 41') 사이에 수평 철근(42) 및 수직 철근(43)들이 고정되고, 이렇게 해서 형성된 거푸집 골격에 콘크리이트(80)가 타설된다. 그리고, 폴리스티렌 폼과 같은 단열재(7)는 외벽 쪽으로 일측벽에 삽입될 수 있다.7 is a cross-sectional view of the wall constructed using the band of the present invention with the heat insulating material inserted into the outer wall. Referring to Figure 7, looking at the cross section of the wall constructed by the present invention, the two formwork panels (41, 41 ') are fixed by the wall construction band 100 of the present invention, the pipe is inserted into the pipe 60 and the like are fixed, the horizontal reinforcing bars 42 and the vertical reinforcing bars 43 are fixed between the two formwork panels 41 and 41 ', and the concrete 80 is poured into the form skeleton thus formed. . Then, the heat insulating material 7 such as polystyrene foam may be inserted into one side wall toward the outer wall.

본 발명에 의하면 철근 시공시 일정한 위치로 고정되는 밴드와 파이프를 통해 정위치에 수평철근과 수평철근을 배근할 수 있고, 시공이 간편하여 전체 공기를 단축시킬 수 있다. 또한, 벽체 시공시 사용한 대부분의 제품을 재활용할 수 있어 경제적이고, 단열재를 별도로 시공하지 않고 벽체 시공시 매립해서 동시에 시공할 수 있다.According to the present invention it is possible to reinforce the horizontal reinforcement and horizontal reinforcement in the right position through the band and the pipe is fixed to a certain position during the reinforcement construction, it is possible to simplify the construction to shorten the entire air. In addition, since most of the products used in the wall construction can be recycled, it is economical, and can be installed at the same time to be buried at the time of wall construction without a separate construction.

더 나아가 본 발명에 의하면 외장재를 자유롭게 선택할 수 있고, 밴드 삼각 지지대 앵글 이외의 제품은 시매품으로 사용하여 구입이 손쉽다. 또한 본 발명에 의하면 거푸집 패널 사이의 간격으로 물 및 기포가 원활하게 제거되므로, 콘크리이트 타설시 기포 및 물 빠짐이 원활하여 바이브레이터를 사용하거나 별도로 다져 주지 않아도 되므로 벽체 시공이 종래의 공법에 비해 훨씬 용이하게 된다.Furthermore, according to the present invention, the exterior material can be freely selected, and products other than the band triangular support angle are easily used as commercial products. In addition, according to the present invention, since water and bubbles are smoothly removed at intervals between the formwork panels, bubbles and water are smoothly removed when concrete is poured, so that the wall construction is much easier than the conventional method because it does not have to be used or compacted separately. Done.

Claims (6)

중간 부분에 수평철근 고정을 위한 홈이 상하로 대칭되게 구성되어 있는 거푸집 패널 결속평판;Formwork panel binding plate that the groove for fixing the horizontal reinforcing bar in the middle portion is configured symmetrically up and down; 상기 벽체 시공용 밴드의 좌우 날개 부분에 형성된 하나 이상의 파이프 삽입 구멍;One or more pipe insertion holes formed in left and right wing portions of the wall construction band; 시공용 밴드의 좌우 날개 부분에 상기 파이프 삽입 구멍 외측으로 좌우에 하나씩 형성되어 있는 삼각지지대 연결용 구멍;A triangular support connecting hole which is formed at the left and right wing portions of a construction band one by one to the outside of the pipe insertion hole; 상기 거푸집 패널 결속평판 중앙에 위치된, 상기 밴드를 콘크리이트에 고정하기 위한 한 못 고정구: 및A nail fixture for securing the band to concrete, located at the center of the formwork panel binding plate: and 상기 수평 철근 고정용 홈의 내측으로 양쪽에 각각 대칭되게 돌출 형성되어 있는 거푸집용 패널 고정키를 포함하여 구성되는 벽체 시공용 밴드.Wall construction band comprising a formwork panel fixing key protruding symmetrically on both sides of the horizontal reinforcing groove for each side. 제 1항에 있어서, 상기 수평 철근 고정용 홈의 내측면으로 수평 철근 고정시 미끄럼을 방지하기 위한 요철부가 형성되어 있는 것을 특징으로 하는 벽체 시공용 밴드.The wall band according to claim 1, wherein an uneven portion is formed on the inner surface of the horizontal reinforcing groove for preventing slipping when the horizontal reinforcing steel is fixed. 제 1항에 있어서, 상기 벽체 시공용 밴드가 기둥보용, 곡면용, 또는 벽체용인 것을 특징으로 하는 벽체 시공용 밴드.The wall construction band according to claim 1, wherein the wall construction band is for column beams, curved surfaces, or walls. 거푸집내에 배근하고 그 안에 콘크리이트를 타설하여 콘크리이트 벽체를 시공함에 있어서,In constructing concrete walls by laying in concrete and placing concrete therein, 상기 제 1항의 벽체 시공용 밴드를 못 고정구를 이용하여 콘크리이트벽에 고정시키는 제 1 단계;A first step of fixing the wall construction band of claim 1 to a concrete wall using a nail fixture; 상기 벽체 시공용 밴드 사이에 수직 철근을 일정한 간격으로 설치한 후 수평 철근 고정부에 수평 철근을 고정하고, 수평 철근을 수직 철근에 결속선으로 묶어 배근하는 제 2 단계;A second step of installing horizontal bars between the wall bands at regular intervals and then fixing the horizontal bars to the horizontal bar fixing unit and tying the horizontal bars to the vertical bars with a binding line; 파이프 삽입 구멍에 파이프를 삽입하는 제 3 단계;Inserting a pipe into the pipe insertion hole; 거푸집용 패널 고정키에 거푸집용 패널을 고정하는 제 4 단계; 및A fourth step of fixing the formwork panel to the formwork panel fixing key; And 상기 제 2 단계 내지 제 4 단계를 반복하여 다른 하나의 벽면을 설치하여 거푸집을 제작하는 단계를 포함하는 콘크리이트 벽체의 시공방법.Method of constructing a concrete wall comprising the step of repeating the second to fourth steps to form another form the wall surface. 제 4항에 있어서, 상기 방법이 삼각지지대 연결용 구멍을 삼각지지대와 연결하는 단계를 추가로 포함하는 것을 특징으로 하는 콘크리이트 벽체의 시공방법.5. The method of claim 4, wherein the method further comprises connecting the triangular support connection hole with the triangular support. 제 4항에 있어서, 상기 방법이 외벽측으로 스티로폼 2장을 엇갈리게 하여 밴드에 삽입하는 과정을 추가로 포함하는 것을 특징으로 하는 콘크리이트 벽체의 시공방법.5. The method of claim 4, wherein the method further comprises staggering two sheets of styrofoam to the outer wall and inserting the same into the band.
KR10-2001-0036491A 2001-06-26 2001-06-26 Band for constructing walls and wall construction method using the same KR100427956B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2001-0036491A KR100427956B1 (en) 2001-06-26 2001-06-26 Band for constructing walls and wall construction method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2001-0036491A KR100427956B1 (en) 2001-06-26 2001-06-26 Band for constructing walls and wall construction method using the same

Publications (2)

Publication Number Publication Date
KR20030001676A KR20030001676A (en) 2003-01-08
KR100427956B1 true KR100427956B1 (en) 2004-04-28

Family

ID=27711104

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2001-0036491A KR100427956B1 (en) 2001-06-26 2001-06-26 Band for constructing walls and wall construction method using the same

Country Status (1)

Country Link
KR (1) KR100427956B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
MX2007016566A (en) * 2007-12-19 2009-06-19 Fernando Javier Humphrey Hoyos Improvement to construction system with contact formworks.

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR880000876U (en) * 1986-06-21 1988-02-20 설승훈 Concrete formwork gap maintenance
KR910009233Y1 (en) * 1987-05-08 1991-11-28 에이이찌 수기우라 Liquid purifying apparatus
KR19980019399A (en) * 1998-03-16 1998-06-05 기승철 Architecture wall formwork assembly
JP2000154645A (en) * 1998-11-19 2000-06-06 Sekisui House Ltd Separator for formwork
JP2000154646A (en) * 1998-11-19 2000-06-06 Sekisui House Ltd Separator for formwork

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR880000876U (en) * 1986-06-21 1988-02-20 설승훈 Concrete formwork gap maintenance
KR910009233Y1 (en) * 1987-05-08 1991-11-28 에이이찌 수기우라 Liquid purifying apparatus
KR19980019399A (en) * 1998-03-16 1998-06-05 기승철 Architecture wall formwork assembly
JP2000154645A (en) * 1998-11-19 2000-06-06 Sekisui House Ltd Separator for formwork
JP2000154646A (en) * 1998-11-19 2000-06-06 Sekisui House Ltd Separator for formwork

Also Published As

Publication number Publication date
KR20030001676A (en) 2003-01-08

Similar Documents

Publication Publication Date Title
US6880304B1 (en) Structural thermal framing and panel system for assembling finished or unfinished walls with multiple panel combinations for poured and nonpoured walls
EP0208529B1 (en) Reinforced-concrete building structures
CA2515662C (en) Pre-cast concrete wall with truss ledge
CA2652839C (en) Insulation system for cement walls
US8776468B2 (en) Insulation roof or floor panels with deformation resistant elements for composite insulated concrete roof or floor system and such system
CA2444337A1 (en) Fire/party wall system
US6494004B1 (en) Self jigging concrete wall structure and method of construction
KR19980035620A (en) Prefabricated steel frame and construction method using the same
KR100521647B1 (en) Panel assembly for construction and wall structure thereof
WO2003027413A9 (en) Method and system for providing conduit and boxes in a closed wall system
KR100427956B1 (en) Band for constructing walls and wall construction method using the same
JP3983491B2 (en) Method for manufacturing insulated PC concrete board
JPH1181336A (en) Embedded concrete form
EP0558826A1 (en) Method for producing a floor part or ribbed floor, and sheet of a thermally insulating material for floor parts
JP2001065094A (en) Concrete form used for construction of concrete floor
US20060283119A1 (en) Building unit and method of constructing buildings therewith
US20070186497A1 (en) In-fill wall system
JP2002038642A (en) Concrete slab and construction method for it
JP3965644B2 (en) Construction concrete wall and manufacturing method thereof
KR200423643Y1 (en) Connection structure of i-slab using plate
KR20060094068A (en) The finishing-insulation-board using construction for slab of ceiling and the slab structure of ceiling usig it and the construction method thereof
KR100540643B1 (en) Wall of building
KR100504350B1 (en) A method manufacturing of building
JP2557785B2 (en) Architectural panel
KR100567381B1 (en) Reinforce construction of side wall for building

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20090327

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee