KR100420493B1 - A steel conduit post for ground-making - Google Patents

A steel conduit post for ground-making Download PDF

Info

Publication number
KR100420493B1
KR100420493B1 KR10-2000-0040563A KR20000040563A KR100420493B1 KR 100420493 B1 KR100420493 B1 KR 100420493B1 KR 20000040563 A KR20000040563 A KR 20000040563A KR 100420493 B1 KR100420493 B1 KR 100420493B1
Authority
KR
South Korea
Prior art keywords
steel pipe
pipe pile
ground
circumferential surface
construction
Prior art date
Application number
KR10-2000-0040563A
Other languages
Korean (ko)
Other versions
KR20020006957A (en
Inventor
신홍식
Original Assignee
주식회사 협성기초
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 협성기초 filed Critical 주식회사 협성기초
Priority to KR10-2000-0040563A priority Critical patent/KR100420493B1/en
Publication of KR20020006957A publication Critical patent/KR20020006957A/en
Application granted granted Critical
Publication of KR100420493B1 publication Critical patent/KR100420493B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/226Protecting piles

Abstract

본 발명은 기초공사용 강관말뚝에 관한 것으로, 그 목적은 기초공사를 위하여 지중에 강관말뚝을 건입할 때 강관말뚝의 외주면과 천공갱의 내주면 사이에 틈이 발생되어 지하수가 강관말뚝의 하단부에 고이게 되고, 강관말뚝의 하단부에 고인 지하수로 인하여 지반이 연약해져 매입된 강관말뚝이 침하되는 것을 확실히 방지함으로써 공사기간을 단축시키고, 공사비용을 크게 절감할 수 있는 기초공사용 강관말뚝을 제공하는 것이며, 그 구성은 소정직경과 길이를 갖는 강관으로써 하단부 외주면에 조립되어 고정부착되는 강화링을 갖는 통상의 기초공사용 강관말뚝에 있어서, 상기 강관말뚝은 하단부 내주면에 강화링이 조립되어 고정부착되는 것을 특징으로 한다.The present invention relates to a steel pipe pile for basic construction, the purpose of which is to build a gap between the outer circumferential surface of the steel pipe pile and the inner circumferential surface of the drill pit when building the steel pipe pile in the ground for the foundation work, and the groundwater is accumulated in the lower end of the steel pipe pile In order to prevent the subsidence of the steel pipe piles that are buried due to groundwater accumulated in the lower part of the steel pipe piles, it is possible to shorten the construction period and provide the steel pipe piles for basic construction that can greatly reduce the construction cost. A steel pipe pile having a predetermined diameter and length, which has a reinforcing ring assembled and fixed to a lower end outer peripheral surface, wherein the steel pipe pile is characterized in that the reinforcing ring is assembled and fixed to the inner peripheral surface of the lower end.

Description

기초공사용 강관말뚝 {A steel conduit post for ground-making}Steel pipe pile for foundation work {A steel conduit post for ground-making}

본 발명은 기초공사용 강관말뚝에 관한 것으로서, 더욱 상세하게는 기초공사를 위하여 지중에 강관말뚝을 건입할 때 강관말뚝의 외주면과 천공갱의 내주면 사이에 틈이 발생되어 지하수가 강관말뚝의 하단부에 고이게 되고, 강관말뚝의 하단부에 고인 지하수로 인하여 지반이 연약해져 매입된 강관말뚝이 침하되는 것을 확실히 방지할 수 있는 구조를 갖도록 한 기초공사용 강관말뚝에 관한 것이다.The present invention relates to a steel pipe pile for basic construction, and more particularly, when a steel pipe pile is built into the ground for the foundation work, a gap is generated between the outer circumferential surface of the steel pipe pile and the inner circumferential surface of the drill pit, so that the groundwater is formed at the lower end of the steel pipe pile. And, it relates to a steel pipe pile for the basic public works to have a structure that can be prevented from sinking the steel pipe pile embedded by the ground due to groundwater accumulated in the lower end of the steel pipe pile.

일반적으로 구조물을 축조할 때 구조물의 부등침하와 허용치 이상의 침하를 방지하기 위한 기초공사는 필수적이다. 이러한 목적으로 시공되는 기초공사는 심도가 큰 기초와 심도가 낮은 기초로 분류된다. 이러한 기초공사는 강관말뚝을 지중에 관입시키는 강관말뚝의 관입시공법에 의해 시공되는데 이러한 관입시공법은 여러종류가 알려져 있으나 직항타공법이 널리 활용되고 있다.In general, when constructing a structure, it is essential to lay the foundation to prevent unequal settlement of the structure and settlement beyond the allowable value. Foundation works constructed for this purpose are classified into deep foundations and low depth foundations. The basic construction is constructed by the penetration method of the steel pipe piles that infiltrate the steel pipe piles into the ground. However, there are many known types of such penetration construction methods, but the non-stop drilling method is widely used.

본 명세서에서는 이러한 직항타공법에 의해 사용되는 강관말뚝에 대하여 기술된다는 것을 양지하기 바란다.It is to be noted that the present specification describes steel pipe piles used by such direct punching methods.

도 1은 종래의 기초공사용 강관말뚝의 구조를 도시한 단면도이며, 도 2는 종래의 기초공사용 강관말뚝을 사용하여 기초공사를 실시하였을 때를 예시하는 사용상태도이다.1 is a cross-sectional view showing the structure of a conventional steel pipe pile for basic construction, Figure 2 is a state diagram illustrating the use when performing the basic construction using a conventional steel pipe pile for basic construction.

도 1 및 도 2를 참조하면, 종래의 강관말뚝(a)은 소정직경과 길이를 갖는 강관으로서 하단부 외주면상에는 강관말뚝이 오거에 의해 지중에 관입될 때 강관말뚝의 하단부가 단단한 지반과 맞부딪쳐 강관말뚝의 하단부가 찌그러지는 것을 방지하기 위하여 강화링(b)이 조립되고 용접에 의해 고정부착되어 있다.1 and 2, the conventional steel pipe pile (a) is a steel pipe having a predetermined diameter and length, the lower end of the steel pipe pile hits the hard ground when the steel pipe pile is introduced into the ground by the auger on the lower peripheral surface Reinforcing ring (b) is assembled and fixed by welding in order to prevent the lower end of the warp.

그러나, 상기와 같이 구성을 갖는 종래의 강관말뚝(a)은 관입시공시 강관말뚝의 외주면에 고정부착된 상기 강화링(b)에 의해 강관말뚝(a)의 외주면과 천공갱(c)의 내주면 사이에 강화링(b)의 두께 만큼의 틈이 생기게 되어 강관말뚝(a)의 관입시공을 완료하였을 때 지중의 지하수가 상기 틈을 통하여 강관말뚝(a)의 하단부로 흘러내려 고이게되고, 이렇게 고인 지하수에 의해 강관말뚝(a)의 하단부와 맞닿은 단단한 지반이 지하수를 흡수하여 연약해지게 되어 관입시공이 완료된 강관말뚝(a)에 침하하게 됨으로 침하된 강관말뚝(a)을 재차 관입시공하여야 하기 때문에 공기가 길어지게 될 뿐만 아니라 이에 따른 공사비도 크게 증가하게 된다는 문제점이 잇었다.However, the conventional steel pipe pile (a) having the configuration as described above is the outer circumferential surface of the steel pipe pile (a) and the inner circumferential surface of the drill shaft (c) by the reinforcing ring (b) attached to the outer circumferential surface of the steel pipe pile at the time of penetration When the gap of the reinforcing ring (b) is formed between them, the groundwater in the ground flows down to the lower end of the steel pipe pile (a) through the gap when the construction of the steel pipe pile (a) is completed. Because the ground that is in contact with the lower part of the steel pipe pile (a) by the ground water absorbs the ground water and becomes weak, it sinks into the steel pipe pile (a) where the penetration construction is completed. Not only is the air longer, but there is a problem that the construction cost will increase accordingly.

본 발명은 상기와 같은 종래의 문제점을 고려하여 안출한 것으로서, 그 목적은 기초공사를 위하여 지중에 강관말뚝을 진입할 때 강관말뚝의 외주면과 천공갱의 내주면 사이에 틈이 발생되어 지하수가 강관말뚝의 하단부에 고이게 되고, 강관말뚝의 하단부에 고인 지하수로 인하여 지반이 연약해져 매입된 강관말뚝이 침하되는 것을 확실히 방지함으로써 공사기간을 단축함은 물론 공사비용을 크게 절감할 수 있는 기초공사용 강관말뚝을 제공하는 것이다.The present invention has been made in view of the conventional problems as described above, the purpose is that the gap between the outer peripheral surface of the steel pipe pile and the inner circumferential surface of the drill pit when entering the steel pipe pile in the ground for the foundation work, the groundwater steel pipe pile It is accumulated at the lower part of the pipe, and groundwater is accumulated at the lower part of the steel pipe pile so that the ground is weakened to prevent settlement of the steel pipe piles that are purchased, thereby shortening the construction period and providing steel pipe piles for basic construction that can greatly reduce the construction cost. It is.

상기와 같은 본 발명의 목적은 소정직경과 길이를 갖는 강관으로써 하단부 외주면에 조립되어 고정부착되는 강화링을 갖는 통상의 기초공사용 강관말뚝에 있어서, 상기 강관말뚝은 하단부 내주면에 강화링이 조립되어 고정부착되는 것을 특징으로 하는 기초공사용 강관말뚝에 의해 달성될 수 있는 것이다.An object of the present invention as described above is a steel pipe pile having a predetermined diameter and length in a conventional steel pipe pile having a reinforcing ring is assembled and fixed to the outer peripheral surface of the lower end, the steel pipe pile is fixed by the reinforcing ring is assembled to the inner peripheral surface of the lower end It can be achieved by a steel pipe pile for basic work characterized in that it is attached.

도 1은 종래의 기초공사용 강관말뚝의 구조를 도시한 단면도.1 is a cross-sectional view showing the structure of a conventional steel pipe pile for basic construction.

도 2는 종래의 기초공사용 강관말뚝을 사용하여 기초공사를 실시하였을 때를 예시하는 사용상태도.Figure 2 is a state diagram illustrating the use of the foundation work using a conventional steel pipe pile for basic construction.

도 3은 본 발명에 따른 기초공사용 강관말뚝의 구조를 도시한 단면도.Figure 3 is a cross-sectional view showing the structure of the steel pipe pile for basic construction according to the present invention.

도 4는 본 발명에 따른 기초공사용 강관말뚝을 사용하여 기초공사를 실시하였을 때를 예시하는 사용상태도.Figure 4 is a state diagram illustrating the time when the foundation work using the steel pipe pile for basic construction according to the present invention.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

10: 강관말뚝 11: 강화링10: Steel Pipe Pile 11: Reinforcing Ring

12: 땅 13: 천공갱12: Land 13: Drilled Gang

이하, 첨부한 도면을 참조하여 본 발명의 바람직한 실시예에 따른 기초공사용 강관말뚝에 대하여 설명하기로 한다.Hereinafter, with reference to the accompanying drawings will be described for the steel pipe pile for basic construction according to a preferred embodiment of the present invention.

도 3은 본 발명에 따른 기초공사용 강관말뚝의 구조를 도시한 단면도이며,도 4는 본 발명에 따른 기초공사용 강관말뚝을 사용하여 기초공사를 실시하였을 때를 예시하는 사용상태도이다.Figure 3 is a cross-sectional view showing the structure of the steel pipe pile for basic construction according to the present invention, Figure 4 is a state diagram illustrating when the foundation construction using the steel pipe pile for basic construction according to the present invention.

도 3 및 도 4를 참조하면, 본 발명에 따른 기초공사용 강관말뚝(10)은 강관말뚝(10)의 하단부가 단단한 지반과 맞부딪쳐 찌그러지는 것을 방지하기 위하여 하단부의 내주면에 소정직경과 두께를 갖는 강화링(11)이 조립되어 용접에 의해 고정부착된다.3 and 4, the steel pipe pile 10 for basic construction according to the present invention has a predetermined diameter and thickness on the inner circumferential surface of the lower end portion to prevent the lower end portion of the steel pipe pile 10 is crushed by a solid ground The reinforcing ring 11 is assembled and fixedly attached by welding.

첨부도면중 미설명 부호 12는 땅(지중)을 나타내고, 13은 천공갱을 나타낸다.In the accompanying drawings, reference numeral 12 denotes land (ground), and 13 denotes a perforated shaft.

상기와 같은 구성을 갖는 본 발명에 따른 기초공사용 강관말뚝(10)은 오거를 사용하여 요구되는 땅(12)에 관입시공을 실시하였을 때 상기 강화링(11)이 강관말뚝(10)의 하단부 내주면에 설치되어 있어 강관말뚝(10)의 관입으로 인해 형성되는 천공갱(13)의 내주면과 강관말뚝(10)의 외주면 사이에 틈이 발생되지 않음으로 지중(12)내의 지하수가 강관말뚝(10)의 하단부에 고이는 것을 확실히 방지함으로써 지하수에 의해 지반약화로 인한 강관말뚝(10)의 침하발생을 방지함으로써 공기를 단축시킬 수 있을 뿐만 아니라 공시비용을 크게 절감할 수 있는 것이다.Steel pipe pile 10 for basic construction according to the present invention having the configuration as described above when the reinforcement ring 11 is carried out in the required land (12) using the auger the inner peripheral surface of the lower end of the steel pipe pile (10) Since there is no gap between the inner circumferential surface of the drill hole (13) and the outer circumferential surface of the steel pipe pile (10) formed by the penetration of the steel pipe pile (10), the groundwater in the ground (12) steel pipe pile (10) It is possible to significantly reduce the cost of disclosure, as well as to reduce the air by preventing the settlement of the steel pipe piles 10 due to ground weakening by the ground water to prevent the accumulation at the lower end of the.

이상으로 설명한 본 발명에 의하면, 기초공사를 위하여 지중에 강관말뚝을 진입할 때 강관말뚝의 외주면과 천공갱의 내주면 사이에 틈이 발생되어 지하수가 강관말뚝의 하단부에 고이게 되고, 강관말뚝의 하단부에 고인 지하수로 인하여 지반이 연약해져 매입된 강관말뚝이 침하되는 것을 확실히 방지함으로써 공사기간을 단축시키고, 공사비용을 크게 절감할 수 있는 효과를 갖는다.According to the present invention described above, when entering the steel pipe pile in the ground for the foundation work, a gap is generated between the outer circumferential surface of the steel pipe pile and the inner circumferential surface of the drill pit so that the groundwater is accumulated at the lower end of the steel pipe pile, the lower portion of the steel pipe pile The ground is soft due to the decayed groundwater, which prevents the settlement of the piled steel pipe piles, thereby shortening the construction period and greatly reducing the construction cost.

Claims (1)

소정직경과 길이를 갖는 통상의 기초공사용 강관말뚝에 있어서, 상기 강관말뚝(10)의 하단부 내주면에 강화링(11)이 조립되어 고정부착되는 것을 특징으로 하는 기초공사용 강관말뚝.Steel pipe piles for general foundation for general use having a predetermined diameter and length, characterized in that the reinforcing ring (11) is assembled and fixed to the inner peripheral surface of the lower end of the steel pipe pile (10).
KR10-2000-0040563A 2000-07-14 2000-07-14 A steel conduit post for ground-making KR100420493B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2000-0040563A KR100420493B1 (en) 2000-07-14 2000-07-14 A steel conduit post for ground-making

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2000-0040563A KR100420493B1 (en) 2000-07-14 2000-07-14 A steel conduit post for ground-making

Publications (2)

Publication Number Publication Date
KR20020006957A KR20020006957A (en) 2002-01-26
KR100420493B1 true KR100420493B1 (en) 2004-03-02

Family

ID=19678109

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2000-0040563A KR100420493B1 (en) 2000-07-14 2000-07-14 A steel conduit post for ground-making

Country Status (1)

Country Link
KR (1) KR100420493B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102747729B (en) * 2012-07-13 2014-10-08 中铁二十四局集团上海铁建工程有限公司 Sleeve connection device for bored cast-in-place pile construction

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR940002432A (en) * 1992-07-21 1994-02-17 이명환 Tip-separable steel pipe pile and driving energy transmission member and steel pipe pile construction method using them
JP2000129673A (en) * 1998-10-20 2000-05-09 Asahi Chem Ind Co Ltd Pile with steel pipe and manufacture of pile with steel pipe

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR940002432A (en) * 1992-07-21 1994-02-17 이명환 Tip-separable steel pipe pile and driving energy transmission member and steel pipe pile construction method using them
JP2000129673A (en) * 1998-10-20 2000-05-09 Asahi Chem Ind Co Ltd Pile with steel pipe and manufacture of pile with steel pipe

Also Published As

Publication number Publication date
KR20020006957A (en) 2002-01-26

Similar Documents

Publication Publication Date Title
JP2008274553A (en) Slope stabilizing method
JP4693423B2 (en) Pile head reinforcement method
CN106703011A (en) Construction method of occlusive piles of water-containing pebble bed and saturated sandstone stratum
JP2010255237A (en) Method and structure for tunnel reinforcement
KR0136958B1 (en) Piles comprising both precast concrete portions and concrete portions cast in situ
KR100543727B1 (en) Ground boring method using double rock excavation
KR20200013275A (en) A device that can be separated after entering a PHC pile using a steel pipe
JP2007332559A (en) Removal method for existing underground pile
JP2007284866A (en) Steel pipe pile for rotation press fit and press fit construction method using steel pipe pile
KR100420493B1 (en) A steel conduit post for ground-making
JP6847899B2 (en) Ring-shaped tip hardware
JP4669494B2 (en) Steel pipe pile construction method
KR101491746B1 (en) pile foundation and the installation method
EP1041240A2 (en) Auger drill
JPH08184058A (en) Landslide protection construction
KR20100073373A (en) Steel pipe pile equipped with base enlargement device and the construction method
WO2011090055A1 (en) Steel pipe pile
RU2238366C1 (en) Method of injection pile building
JP2004278287A (en) Permeable steel pipe earth-retaining type retaining wall structure
KR100411662B1 (en) Construction Method of Prestressed spun High strength Concrete Pile
CN106223345A (en) A kind of length interleaved formula Soil-cement piling wall construction equipment and construction method
KR100932952B1 (en) Piles that have variable end
CN212927743U (en) Wear-resistant ring for rotary drilling rod
KR200318783Y1 (en) steel pile with drilling blade
JP2014109143A (en) Foot protection method for steel pile

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20070216

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee