KR100406813B1 - Method and apparatus for mounting lock bolt and lock anchor - Google Patents
Method and apparatus for mounting lock bolt and lock anchor Download PDFInfo
- Publication number
- KR100406813B1 KR100406813B1 KR10-2001-0017464A KR20010017464A KR100406813B1 KR 100406813 B1 KR100406813 B1 KR 100406813B1 KR 20010017464 A KR20010017464 A KR 20010017464A KR 100406813 B1 KR100406813 B1 KR 100406813B1
- Authority
- KR
- South Korea
- Prior art keywords
- packer
- lock
- hole
- rock
- bolt
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/80—Ground anchors
- E02D5/805—Ground anchors with deformable anchoring members
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/003—Injection of material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/30—Miscellaneous comprising anchoring details
Abstract
본 발명은 락볼트와 락앵커 설치장치 및 설치방법에 관한 것으로서, 암벽, 암반 및 토사 등에 대한 락볼트의 설치시 고압의 그라우팅에 의한 락볼트의 마찰력 증가로 그 강성이 증대되도록 한 락볼트와 락앵커 설치장치 및 설치방법을 제공하는데 그 목적이 있다. 이러한 목적달성을 위한 본 발명의 락볼트 및 락앵커 설치장치는, 경사지면(10)의 삽입공(11)에 일정깊이 위치에 설치되며, 중앙에 락볼트(22) 및 락앵커(32)의 삽설을 위한 통공(16)과, 이 통공(16)의 양측으로 각각 관통공(18,20)들이 형성된 팩커(14)와, 이 팩커(14)의 하부측으로 몰탈을 주입시키기 위한 주입호스(24) 및 팩커(14)의 하부측 공기를 외부로 배출시키기 위한 배기호스(26)를 포함하여 이루어지며, 이와 같은 구성을 갖는 락볼트 및 락앵커 설치장치(12)를 이용한 락볼트 및 락앵커의 설치방법은, 상기 팩커(14)의 통공(16)을 통해 락볼트(22) 및 락앵커를 일정깊이로 삽입시킨 후, 이 팩커(14)의 상부측에 무압상태로 팽창제를 사용하여 몰탈을 주입함으로써, 1차 그라우팅을 실시하는 단계; 상기 1차 그라우팅후 양생이 되었으면 제 1관통공(18)에 삽설된 주입호스(24)를 통하여 몰탈을 주입하여 상기 팩커(14)의 하부측에 고압의 2차 그라우팅을 실시함으로써, 고밀도로 충진되도록하여 락볼트(22)가 보다 견고하게 고정설치되도록 하는 단계;로 이루어진 것을 특징으로 한다.The present invention relates to a rock bolt and a rock anchor installation device and a method for installing the rock bolt and the rock bolt to increase its rigidity by increasing the frictional force of the rock bolt by high pressure grouting when the rock bolt is installed on rock walls, rocks and earth and sand Its purpose is to provide an anchor installation device and installation method. Rock bolt and lock anchor installation device of the present invention for achieving this purpose, is installed in a predetermined depth position in the insertion hole 11 of the inclined surface 10, the center of the lock bolt 22 and the lock anchor 32 A through hole 16 for inserting, a packer 14 having through holes 18 and 20 formed on both sides of the through hole 16, and an injection hose 24 for injecting mortar into the lower side of the packer 14; ) And an exhaust hose 26 for discharging the lower side air of the packer 14 to the outside, and the lock bolt and the lock anchor using the lock bolt and the lock anchor installation device 12 having such a configuration. In the installation method, the lock bolt 22 and the lock anchor are inserted to a predetermined depth through the through hole 16 of the packer 14, and then mortar is removed from the upper side of the packer 14 by using an expanding agent without pressure. By injection, performing primary grouting; After curing the first grouting, the mortar is injected through the injection hose 24 inserted into the first through hole 18 to perform high pressure secondary grouting on the lower side of the packer 14, thereby filling with high density. To ensure that the lock bolt 22 is installed more firmly; characterized in that consisting of.
Description
본 발명은 락볼트와 락앵커 설치장치 및 설치방법에 관한 것으로서, 보다 상세하게는 도로와 인접한 경사지면 또는 터널 시공시 그 측부가 각종 충격 및 풍우작용 등에 의하여 붕괴되는 것을 방지하도록 상기한 경사지면을 이루는 암벽, 암반및 토사 등에 설치되는 락볼트 및 락앵커를 고압의 그라우팅에 의해 설치하여 마찰력 증가로 그 강성이 증대되도록 한 락볼트와 락앵커 설치장치 및 설치방법에 관한 것이다.The present invention relates to a rock bolt and a lock anchor installation device and a method of installation, and more particularly to the inclined surface adjacent to the road or tunnel construction when the side is prevented from collapsing due to various impacts and windy action, etc. The present invention relates to a rock bolt and a lock anchor installation device and a method for installing the rock bolt and the rock anchor installed in a rock wall, rock, and earth and sand by high pressure grouting to increase its rigidity by increasing frictional force.
일반적으로, 산악지형 등에 개설된 도로변에는 암벽, 암반, 토사 등을 포함한 경사지면이 많고, 이들 도로는 경사지면으로부터 발생되는 사면 붕괴에 대하여 노출된다.In general, there are many sloped roads including rock walls, rocks, earth and sand, and the like, which are open to mountainous terrain, and these roads are exposed to slope collapse from sloped roads.
이러한 사면 붕괴는 지진 또는 도로를 통행하는 차량 등에 의한 각종 충격 및 해빙기를 비롯한 풍우작용과 중력 작용 등으로 그 지지기반이 약해짐에 따라 붕괴되는 현상이다.This slope collapse is a phenomenon that collapses as the support base weakens due to wind and gravitational action, including various impacts and thawing by the earthquake or vehicles traveling on the road.
따라서, 이러한 사면 붕괴의 위험을 최소화하기 위해 사면을 일정각도로 경사지게 형성하고, 아울러 이 사면으로부터 도로로 낙석 및 토사가 흘러내리는 것을 방지하기 위해 다양한 형태의 사면안정공사가 실시되고 있는 실정이다.Therefore, in order to minimize the risk of the collapse of the slope to form a slope at an angle, and also to prevent the falling of the rock and soil from the slope from the slope of the various types of slope stabilization work is being carried out.
이러한 사면 붕괴 현상을 방지하기 위한 사면안정공사는, 암반 등의 사면에서 붕괴 위험이 있는 부위 즉, 경사지면 상에 일정간격으로 3∼5m 정도의 깊이 또는 그 이상의 깊이로 삽입공을 다수 형성하고, 이 삽입공에 일정길이를 갖는 락볼트를 삽입하여 몰탈 등을 충진시켜 고정하는 것이다.Slope stabilization work to prevent such slope collapse phenomenon, the formation of a large number of insertion holes at a depth of about 3 to 5m or more at a predetermined interval on the site of the risk of collapse on the slope, such as rock, such as slopes, A lock bolt having a certain length is inserted into the insertion hole to fill and fix mortar or the like.
이와 같이 고정된 락볼트의 단부는 경사지면의 표면으로부터 돌출된 형상을 이루게 되고, 이 돌출된 락볼트의 단부에는 일정한 두께와 강성을 갖는 방사형의 지지판이 관통되어 위치되며, 이후 락볼트와 짝을 이루는 너트가 체결됨에 따라 상기한 지지판은 경사지면의 표면에 대향하여 밀착됨과 동시에 락볼트와 너트의 체결력에 대응하여 경사지면의 표면을 지지하게 된다.The end of the fixed lock bolt is formed to protrude from the surface of the inclined surface, the end of the protruding rock bolt is positioned through the radial support plate having a constant thickness and rigidity, and then mated with the rock bolt As the nut is fastened, the support plate is brought into close contact with the surface of the inclined surface and simultaneously supports the surface of the inclined surface in response to the fastening force between the lock bolt and the nut.
그러나, 경사지대 상의 특정부위 붕괴가 심화되면, 붕괴에 의한 하중이 그 부위의 락볼트 보강부위에 집중되고, 이와 같이 붕괴 하중이 집중되는 락볼트 보강부위는 하중에 의해 변형 또는 파손되어 이후의 붕괴에 대하여 지지력을 상실하여 암반 붕괴로 이루어지는 등 안전사고의 위험이 잔존하게 되는 문제가 있었다.However, when the collapse of a specific part on the inclined zone is intensified, the load due to the collapse is concentrated on the rock bolt reinforcement part of the site, and the rock bolt reinforcement part in which the collapse load is concentrated is deformed or broken by the load and subsequently collapsed. There was a problem that the risk of safety accidents remained, such as loss of support for the rock collapse.
이에, 각 락볼트의 단부를 와이어 또는 철근 등으로 연결하여 상호 보완토록 한 것이 제공되어 있으며, 각 와이어와 철근 사이에 망을 씌워 낙석 및 토사의 흘러내림을 방지토록 한 것 또한 제공되고 있는 실정이다.Therefore, the ends of each rock bolt are connected to each other by a wire or reinforcing bars, and the ones are provided to cover each other and to prevent falling rocks and sediment by covering the mesh between each wire and the reinforcing bars. .
그러나, 이와 같이 경사지면에 단순히 삽입공을 뚫고 락볼트를 일정깊이로 삽입한 후, 몰탈을 충진시키는 과정에서 별도의 몰탈유출억제 수단이 마련되어 있지 않음에 따라 상기 삽입공으로부터 몰탈이 역류되어 외부로 유출되는 바, 그 밀도의 저하로 인하여 락볼트와 사면의 일체화 성능이 저하되어 견고한 고정상태를 유지할 수 없을 뿐만 아니라 몰탈의 낭비가 초래되는 문제점이 있었다.However, after simply inserting the hole into the inclined surface and inserting the rock bolt to a certain depth, in the process of filling the mortar, there is no separate mortar outflow restraint means so that the mortar flows backward from the insertion hole to the outside. As it flows out, the density of the rock bolt and the slope decreases due to the decrease in the density thereof, so that it is not possible to maintain a firm fixed state and waste of mortar is caused.
이에, 본 발명의 출원인은 상기한 문제점에 착안하여 락볼트부재와 사면사이에 설치되어 락볼트삽입공을 밀폐한 상태에서 별도의 주입공을 통해 몰탈을 주입충진시킬 수 있도록 함으로써, 몰탈의 외부유출을 막아 충진되는 몰탈의 밀도를 높일수 있을 뿐만 아니라 락볼트의 중심을 잡아 항상 그 중심이 유지되게 한 상태에서 몰탈주입이 이루어지도록 하는것에 의해 사면에 일체로 박혀 설치되는 락볼트부재의 결합력을 한층 높일 수 있도록 한 락볼트용 몰탈유출방지구(특허출원 1999년 제 56578호)를 출원한 바 있다.Accordingly, the applicant of the present invention is installed between the lock bolt member and the slope in view of the above problems to allow the injection of the mortar through a separate injection hole in the sealed state of the lock bolt insertion hole, the external leakage of mortar It not only increases the density of mortar which is filled by preventing the mortar, but also increases the bonding force of the rock bolt member that is integrally embedded in the slope by holding the center of the rock bolt so that the mortar injection is performed while maintaining the center of the lock bolt. It has applied for mortar spill prevention device (patent application No. 56578, 1999) for the lock bolt.
상기한 락볼트용 몰탈유출방지구는 중앙에 락볼트가 끼워져 관통되는 지지부를 형성한 방지구본체의 일측에는 몰탈주입공을 형성하고, 상기 지지부 대향측에는 밀봉부를 형성하고 상기 밀봉부 외면에는 밀봉링을 끼워 설치하여서 되는 것을 특징으로 한다.The mortar outflow prevention tool for the lock bolt is formed in the center of the prevention tool body formed with a support portion through which the lock bolt is inserted in the center to form a mortar injection hole, forming a sealing portion on the opposite side of the support portion and a sealing ring on the outer surface of the sealing portion It is characterized in that the installation.
또한, 상기 방지구본체의 지지부에는 패킹을 설치하여서 된 것을 특징으로 함으로써, 경사지면에 대한 사면안정공사시 상기 경사지면에 형성한 삽입공 내부로 충진하는 몰탈의 외부유출을 방지할 수 있게 될 뿐만 아니라, 삽입공 내부로 설치되는 락볼트의 중심유지도 가능하게 하여 락볼트와 경사지면간의 결속력을 높일 수 있게 되어 사면안정공사의 작업효율을 높일 수 있도록 한 것이다.]In addition, the support portion of the preventive body is characterized in that the packing is provided, it is possible to prevent the external leakage of the mortar filling the inside of the insertion hole formed on the inclined surface during slope stability work on the inclined surface In addition, it is possible to maintain the center of the lock bolt installed into the insertion hole to increase the binding force between the rock bolt and the inclined surface to increase the work efficiency of slope stabilization work.]
한편, 본원발명 출원인은 상기한 락볼트를 대신하여 암반을 관통하는 자유장 부위와 소정 깊이의 지반에 이르는 정착장 부위로 구분되는 삽입공을 형성하고, 이 삽입공에 복수개의 PC강선이 주입관을 중심으로 밴드에 의해 고정되며, 자유장 부위에 위치되는 상기 각 PC강선은 합성수지 재질의 관에 의해 커버되고, 자유장과 정착장의 경계 부위에서 실링고정되며, 정착장 부위에 위치되는 상기 각 PC강선은 상기 밴드 사이에 위치되어 상기 주입관이 관통하는 상기 받침대의 측부홈에 지지되는 굴곡된 형상을 이루며, 상기 각 PC강선의 단부는 상기 주입관 단부에 대향하는 용기 형상으로 형성된 정착콘의 개방된 주연 부위에 체결구로 고정되어 형성된 와이어 조립체가 상기 삽입공에 삽입되어 몰탈에 의해 고정되는 구성으로 이루어진 암반 붕괴 방지용 락앵커장치 및 그 설치방법(특허출원 1998-0023590호)을 제안하여 출원한 바 있다.Meanwhile, the applicant of the present invention forms an insertion hole divided into a free field portion penetrating a rock and a fixing field portion reaching a ground of a predetermined depth in place of the rock bolt, and a plurality of PC steel wires are inserted into the insertion hole. Each PC steel wire is fixed by a band, and located at the free field part is covered by a tube of synthetic resin material, the sealing is fixed at the boundary of the free field and the anchorage, each PC located at the anchorage site The steel wire is bent between the bands to form a curved shape supported by the side groove of the pedestal through which the injection pipe passes, and the end of each PC steel wire is opened in the fixing cone formed in a container shape opposite to the injection pipe end. For rock collapse prevention consisting of a configuration in which the wire assembly formed by being fastened to the peripheral portion is fixed to the insertion hole is fixed by mortar The lock anchor device and its installation method (patent application 1998-0023590) has been proposed and filed.
본 발명은 암벽, 암반 및 토사 등에 대한 락볼트 및 락앵커의 설치시 고압의 그라우팅에 의한 락볼트 및 락앵커의 마찰력 증가로 그 강성이 증대되도록 한 락볼트와 락앵커 설치장치 및 설치방법을 제공하는데 그 목적이 있다.The present invention provides a lock bolt and a rock anchor installation device and a method for installing the rock bolt and rock anchor by increasing the frictional force of the rock bolt and the rock anchor by the high pressure grouting when the rock bolt and rock anchor to the rock wall, rock and earth and sand, etc. Its purpose is to.
도 1은 본 발명에 따른 락볼트 설치장치 및 설치방법을 나타낸 도면.1 is a view showing a lock bolt installation apparatus and an installation method according to the present invention.
도 2는 본 발명에 따른 락앵커 설치장치 및 설치방법을 나타낸 도면.Figure 2 is a view showing a lock anchor installation device and installation method according to the present invention.
<도면의 주요부분에 대한 부호의 설명><Description of Symbols for Main Parts of Drawings>
10 : 경사지면 11 : 삽입공10: sloped surface 11: insertion hole
12 : 락볼트 설치장치 14 : 팩커12: lock bolt installation device 14: packer
16 : 통공 18 : 제 1관통공16: through-hole 18: first through-hole
20 : 제 2관통공 22 : 락볼트20: second through hole 22: rock bolt
24 : 주입호스 26 : 배기호스24: injection hose 26: exhaust hose
32 : 락앵커32: lock anchor
이러한 목적달성을 위한 본 발명의 락볼트 및 락앵커 설치장치는, 경사지면에 형성된 다수개의 삽입공의 일정깊이 위치에 고정설치되어서 상기 삽입공의 내주면과 밀착지지되는 것으로, 중앙측에 락볼트 및 락앵커가 삽설되기 위한 통공이 형성되어 있고 이 통공의 양측으로 각각 제 1관통공과 제 2관통공이 형성된 팩커와; 상기 팩커의 제 1관통공에 삽설되어서 팩커의 하부측에 몰탈을 주입하는 통로로 사용되는 주입호스와; 상기 팩커의 제 2관통공에 삽설되어서 팩커의 하부측에 몰탈 주입에 따라 그 내부의 공기를 외부로 배출시키는 통로로 사용되는 배기호스;를 포함하여 이루어진 것을 특징으로 한다.The lock bolt and the lock anchor installation device of the present invention for achieving this purpose is to be fixedly installed at a predetermined depth position of the plurality of insertion holes formed on the inclined surface to be in close contact with the inner circumferential surface of the insertion hole, and to the center of the lock bolt A packer having a through hole for inserting the lock anchor and having a first through hole and a second through hole formed at both sides of the through hole; An injection hose inserted into the first through hole of the packer and used as a passage for injecting mortar into the lower side of the packer; And an exhaust hose inserted into the second through hole of the packer and used as a passage for discharging the air therein to the outside according to the mortar injection to the lower side of the packer.
또한, 상기와 같은 목적달성을 위한 본 발명의 락볼트 및 락앵커 설치방법은, 경사지면에 형성된 삽입공의 일정깊이 위치에 팩커를 설치하고, 상기 팩커의 통공을 통해 락볼트 및 락앵커를 일정깊이로 삽입시킨 후, 이 팩커의 상부측에 무압상태로 팽창제를 사용하여 몰탈을 주입함으로써, 1차 그라우팅을 실시하는 단계; 상기 1차 그라우팅후 양생이 되었으면 제 1관통공에 삽설된 주입호스를 통하여 몰탈을 주입하여 상기 팩커의 하부측에 고압의 2차 그라우팅을 실시함으로써, 고밀도로 충진되도록하여 락볼트 및 락앵커가 보다 견고하게 고정설치되도록 하는 단계;로 이루어진 것을 특징으로 한다.In addition, the lock bolt and the lock anchor installation method of the present invention for achieving the above object, the packer is installed at a predetermined depth position of the insertion hole formed on the inclined surface, the lock bolt and the lock anchor through the through hole of the packer constant Carrying out primary grouting by injecting mortar with a swelling agent in a pressureless state on the top side of the packer after insertion into depth; If curing after the first grouting is injected mortar through the injection hose inserted in the first through-hole to perform a high-pressure secondary grouting on the lower side of the packer, so that the lock bolt and the lock anchor is more densely packed To be firmly fixed to install; characterized in that consisting of.
이하, 본 발명의 바람직한 일 실시예를 첨부된 예시도면에 의거하여 상세히 설명한다.Hereinafter, a preferred embodiment of the present invention will be described in detail with reference to the accompanying drawings.
도 1 및 도 2는 본 발명에 따른 락볼트와 락앵커의 설치장치 및 설치방법을 나타낸 도면으로서, 먼저 도 1에 도시된 바와 같이, 특히 토사 및 모래로 이루어진 도로변 경사지면(10)에 일정너비 및 일정깊이로 삽입공(11)을 형성하고, 이 삽입공(11)의 일정깊이 위치에 팩커(14)를 삽입설치하여서 2차로 나누어 그라우팅을 시행하는 것이다.1 and 2 is a view showing the installation device and the installation method of the lock bolt and the rock anchor according to the present invention, as shown in Figure 1, in particular, a certain width on the road side slope surface 10 made of soil and sand And the insertion hole 11 is formed to a certain depth, and the packer 14 is inserted into a predetermined depth position of the insertion hole 11 to be divided into two times to grout.
즉, 토사 및 모래 등으로 이루어진 경사지면(10)에 형성된 삽입공(11)의 일정깊이에 설치되는 팩커(14)는 원판형으로 이루어져 있고, 그 중앙부위에 락볼트(22)가 삽설되기 위한 통공(16)이 형성되어 있으며, 이 통공(16)의 양측으로 각각 소정크기의 관통공(18,20)들이 형성되어 있다.That is, the packer 14 installed at a predetermined depth of the insertion hole 11 formed on the inclined surface 10 made of soil, sand, etc. is formed in a disc shape, and the lock bolt 22 is inserted into the center portion thereof. Through holes 16 are formed, and through holes 18 and 20 of predetermined size are formed on both sides of the through holes 16, respectively.
상기 관통공(18,20)들은 팩커(14)의 하부로 몰탈을 주입하기 위한 주입호스(24)가 관통설치되는 제 1관통공(18)과, 상기 팩커(14)의 하부측으로 몰탈의 주입에 따라 그 내부의 공기를 배출하기 위한 배기호스(26)가 관통설치되는 제 2관통공(20)으로 이루어져 있다.The through holes 18 and 20 are first through holes 18 through which an injection hose 24 for injecting mortar into the packer 14 is installed, and mortar is injected into the lower side of the packer 14. According to the exhaust hose 26 for discharging the air therein is composed of a second through-hole 20 is installed through.
따라서, 토사 및 모래 등으로 이루어진 경사지면(10)에 형성된 삽입공(11)의 일정깊이 위치에 팩커(14)를 설치하여, 이 팩커(14)의 외주면이 삽입공(11)의 내주면과 밀착고정되도록 한 후, 이 팩커(14)의 통공(16)으로 락볼트(22)를 일정깊이로 삽입시키고, 양측의 관통공(18,20)들에 각각 몰탈 주입호스(24)와공기배기호스(26)를 관통설치한다.Therefore, the packer 14 is installed at a predetermined depth position of the insertion hole 11 formed in the inclined surface 10 made of sand, sand, and the like, and the outer circumferential surface of the packer 14 is in close contact with the inner circumferential surface of the insertion hole 11. After it is fixed, the lock bolt 22 is inserted into the through hole 16 of the packer 14 to a predetermined depth, and the mortar injection hose 24 and the air exhaust hose are respectively inserted into the through holes 18 and 20 on both sides. (26) is installed through.
이때, 상기 주입호스(24)는 그 단부가 삽입공(11)의 하부측에 위치되게 깊숙히 삽설시키고, 반대로 배기호스(26)는 그 단부가 팩커(14)의 하면측에 위치되게 상대적으로 덜 깊숙히 삽설시킨다.At this time, the injection hose 24 is inserted deeply so that the end is located on the lower side of the insertion hole 11, on the contrary, the exhaust hose 26 is relatively less so that the end is located on the lower surface side of the packer (14) Insert deeply.
그리고, 상기 팩커(14)의 상부측으로 몰탈을 주입하되, 팽창제를 사용하여 수축이 없도록 하며, 무압상태로 그라우팅을 실시한다.Then, the mortar is injected into the upper side of the packer 14, so that there is no shrinkage using an expanding agent, and grouting is performed in a pressureless state.
이와 같이, 1차 그라우팅이 마무리되어 양생이 되었는지 확인 후, 양생이 되었으면, 바로 2차 그라우팅을 실시한다.As such, after confirming that the primary grouting is completed and curing, the secondary grouting is immediately performed after curing.
즉, 주입호스(24)로 몰탈을 주입하여 상기 몰탈이 팩커(14)의 하부측으로 유입되도록 한다.That is, the mortar is injected into the injection hose 24 so that the mortar flows into the lower side of the packer 14.
따라서, 몰탈의 주입에 따라 팩커(14)의 하부측에 존재하던 공기는 배기호스(26)를 통해 외부로 유출되며 이때, 상기 배기호스(26)로 몰탈이 유출되기 시작하면 이 배기호스(26)의 선단측 입구를 막고, 2차 그라우팅의 압을 설계시의 압력으로 도달할 때까지 몰탈의 주입을 계속한다.Therefore, the air existing in the lower side of the packer 14 is discharged to the outside through the exhaust hose 26 as the mortar is injected, and at this time, when the mortar begins to flow out into the exhaust hose 26, the exhaust hose 26 Block the inlet on the tip side and continue injecting mortar until the pressure of the secondary grouting reaches the design pressure.
상기와 같은 그라우팅이 실시되는 경사지면(10)은 토사나 모래와 같이 마찰계수가 적은 바, 고압의 2차 그라우팅에 따라 삽입공(11)의 면적이 하단부터 팽창하여 결국 삽입공의 확장 피트의 사용과 같은 효과를 거둘수 있으며, 또한 고압의 그라우팅에 의해 락볼트(22)의 마찰력이 증대된다.The inclined surface 10, which is grouted as described above, has a small coefficient of friction, such as soil and sand, so that the area of the insertion hole 11 expands from the bottom in accordance with the high pressure secondary grouting, and thus the expansion pit of the insertion hole The same effect as the use can be obtained, and the friction force of the rock bolt 22 is increased by the high pressure grouting.
즉, 도면에 압력이 발생되는 부위를 화살표 방향으로 표시한 바와 같이, 1차 그라우팅이 실시되는 자유장 부위에는 지면지압상태로 되고, 2차 그라우팅이 실시되는 정착장 부위에는 마찰지압상태가 되어서 삽입공이 확장되면서 마찰력에 의해 락볼트(22)가 보다 견고히 장착된다.That is, as shown in the direction of the arrow in the area where the pressure is generated in the drawing, the ground field pressure is applied to the free field portion subjected to the first grouting, and the frictional pressure state is inserted into the anchorage portion subjected to the second grouting. As the ball expands, the lock bolt 22 is more firmly mounted by the friction force.
한편, 상기 경사지면(10)의 삽입공(11) 선단측에 1차 그라우팅을 실시한 후, 이 그라우팅의 표면은 외부에 대하여 노출시켜도 무방하며, 필요에 따라 별도의 팩커로서 덮을 수도 있다.On the other hand, after the first grouting is applied to the tip end side of the insertion hole 11 of the inclined surface 10, the surface of the grouting may be exposed to the outside, and may be covered as a separate packer if necessary.
또한, 이러한 락볼트 설치장치(12) 및 설치방법은 경사지면(10)의 삽입공(11) 깊이를 임의로 천공가능 하며, 상기한 바와 같이, 토사 및 모래로 이루어진 경사지면에 대한 적용이 바람직하나, 풍암이나 연암 등의 암벽, 암반으로 이루어진 경사지면에도 적용이 가능함은 물론이다.In addition, such a lock bolt installation device 12 and the installation method can be drilled arbitrarily the depth of the insertion hole 11 of the inclined surface 10, as described above, it is preferable to apply to the inclined surface made of sand and sand Of course, it is also possible to apply to the inclined surface consisting of rock walls, rock, such as wind and soft rock.
한편, 도 2에 도시된 바와 같이, 상기한 락볼트(22)를 대신하여 락앵커(32)를 설치할 경우에도 상기와 같은 구성으로 설치가능하며, 그 설치방법은 동일하다.On the other hand, as shown in Figure 2, in the case of installing the lock anchor 32 in place of the above-described lock bolt 22 can be installed in the same configuration as above, the installation method is the same.
이상에서 설명한 바와 같이, 본 발명의 락볼트와 락앵커 설치장치 및 그 설치방법에 의하면, 토사나 모래 등으로 이루어진 경사지면에 삽입공을 뚫고 이 삽입공의 일정깊이에 팩커를 설치하여서, 이 팩커를 기준으로 상부측에 무압상태로 1차 그라우팅을 실시하고, 상기 팩커의 하부측에 고압으로 2차 그라우팅을 실시함으로써, 공극률이 커서 마찰계수가 적은 경사지면의 삽입공에 몰탈이 고압으로 충진되어 밀도가 높아지는 바, 확장 피트의 사용과 같은 효과를 얻을 수 있으며, 이에 따라 락볼트 및 락앵커가 보다 견고한 상태로 고정설치되는 효과가 있다.As described above, according to the rock bolt and the lock anchor installation apparatus of the present invention, and the installation method thereof, the packer is installed by drilling an insertion hole in an inclined surface made of soil, sand, etc., and installing the packer at a predetermined depth of the insertion hole. By performing the first grouting without pressure on the upper side and the second grouting with the high pressure on the lower side of the packer, the mortar is filled with high pressure in the insertion hole of the inclined surface having a large void ratio and a small coefficient of friction. As the density is increased, it is possible to obtain the same effect as the use of the extension pit, whereby the lock bolt and the lock anchor are more firmly fixed and installed.
본 발명은 기재된 구체적인 예에 대해서만 상세히 설명되었지만 본 발명의기술사상 범위 내에서 다양한 변형 및 수정이 가능함은 당업자에게 있어서 명백한 것이며, 이러한 변형 및 수정이 첨부된 특허청구범위에 속함은 당연한 것이다.Although the invention has been described in detail only with respect to the specific examples described, it will be apparent to those skilled in the art that various modifications and variations are possible within the spirit of the invention, and such modifications and variations belong to the appended claims.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2001-0017464A KR100406813B1 (en) | 2001-04-02 | 2001-04-02 | Method and apparatus for mounting lock bolt and lock anchor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2001-0017464A KR100406813B1 (en) | 2001-04-02 | 2001-04-02 | Method and apparatus for mounting lock bolt and lock anchor |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20020077721A KR20020077721A (en) | 2002-10-14 |
KR100406813B1 true KR100406813B1 (en) | 2003-11-21 |
Family
ID=27699646
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-2001-0017464A KR100406813B1 (en) | 2001-04-02 | 2001-04-02 | Method and apparatus for mounting lock bolt and lock anchor |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100406813B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100955666B1 (en) | 2008-03-18 | 2010-05-06 | 장인희 | rock-bolt assembly for reinforcing rock bed of tunnel |
CN104846823A (en) * | 2015-05-18 | 2015-08-19 | 葛洲坝集团第一工程有限公司 | Full-bonding cement mortar anchor rod and grouting method |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100402890B1 (en) * | 2001-04-02 | 2003-10-22 | 심석래 | Method and apparatus for mounting rock bolt |
KR100493927B1 (en) * | 2001-07-10 | 2005-06-10 | 주식회사 도담이앤씨 | Movable foaming-urethane packer and pressure soil-nailing construction method using the packer |
KR100419031B1 (en) * | 2001-08-24 | 2004-02-19 | 대림산업 주식회사 | Method for non-shrink grouting and members for the method |
KR100773920B1 (en) * | 2007-05-03 | 2007-11-07 | 주식회사 도담이앤씨 | Pre-tention soil nailing system and method for reinforcing inclined earth using the same |
KR100925677B1 (en) * | 2009-06-30 | 2009-11-10 | 그린이엔지 주식회사 | Complex stability method for slope surface |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5294604A (en) * | 1976-02-02 | 1977-08-09 | Nippon Kiso Kougiyou Kk | Anchoring method |
JPS6043516A (en) * | 1983-08-18 | 1985-03-08 | Tokai Rubber Ind Ltd | Solidifying rockbed |
JPS60185051A (en) * | 1984-02-29 | 1985-09-20 | Matsushita Electric Ind Co Ltd | Instantaneous water heater |
JPH074198A (en) * | 1993-06-12 | 1995-01-10 | Oyo Corp | Packer and anchor driving method using the packer |
JPH07127058A (en) * | 1993-11-05 | 1995-05-16 | Sumitomo Electric Ind Ltd | Construction method for upward anchor and its anchor |
JPH07317059A (en) * | 1994-05-26 | 1995-12-05 | Japan Found Eng Co Ltd | Casing packer |
JPH07331999A (en) * | 1994-06-07 | 1995-12-19 | Taisei Corp | Master packer for lock bolt fixation and executing method of lock bolt |
JPH08226119A (en) * | 1995-02-20 | 1996-09-03 | K F C:Kk | Packer and natural ground consolidation method using the packer |
JPH09143965A (en) * | 1995-11-18 | 1997-06-03 | S Ii:Kk | Door element fixing anchor for upward facing hole |
KR200183308Y1 (en) * | 1999-12-31 | 2000-05-15 | 주식회사동아지질 | Anchoring implement for cut off plate of ground anchor |
KR20010007908A (en) * | 2000-10-20 | 2001-02-05 | 최용기 | Multistage grouting equipment by Fiberglass Reinforced Plastics inject pipe and its construcion work method |
KR20010010803A (en) * | 1999-07-23 | 2001-02-15 | 최홍기 | An apparatus and method for multi-step grouting using FRP tube |
KR20010111405A (en) * | 2000-06-08 | 2001-12-19 | 김광수 | Removable soil nailing method and its nail assembly |
KR20020009300A (en) * | 2000-07-25 | 2002-02-01 | 이기웅 | apparatus and method for earth anchor using expansible packer |
KR20020077719A (en) * | 2001-04-02 | 2002-10-14 | 심석래 | Method and apparatus for mounting rock bolt |
-
2001
- 2001-04-02 KR KR10-2001-0017464A patent/KR100406813B1/en active IP Right Grant
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5294604A (en) * | 1976-02-02 | 1977-08-09 | Nippon Kiso Kougiyou Kk | Anchoring method |
JPS6043516A (en) * | 1983-08-18 | 1985-03-08 | Tokai Rubber Ind Ltd | Solidifying rockbed |
JPS60185051A (en) * | 1984-02-29 | 1985-09-20 | Matsushita Electric Ind Co Ltd | Instantaneous water heater |
JPH074198A (en) * | 1993-06-12 | 1995-01-10 | Oyo Corp | Packer and anchor driving method using the packer |
JPH07127058A (en) * | 1993-11-05 | 1995-05-16 | Sumitomo Electric Ind Ltd | Construction method for upward anchor and its anchor |
JPH07317059A (en) * | 1994-05-26 | 1995-12-05 | Japan Found Eng Co Ltd | Casing packer |
JPH07331999A (en) * | 1994-06-07 | 1995-12-19 | Taisei Corp | Master packer for lock bolt fixation and executing method of lock bolt |
JPH08226119A (en) * | 1995-02-20 | 1996-09-03 | K F C:Kk | Packer and natural ground consolidation method using the packer |
JPH09143965A (en) * | 1995-11-18 | 1997-06-03 | S Ii:Kk | Door element fixing anchor for upward facing hole |
KR20010010803A (en) * | 1999-07-23 | 2001-02-15 | 최홍기 | An apparatus and method for multi-step grouting using FRP tube |
KR200183308Y1 (en) * | 1999-12-31 | 2000-05-15 | 주식회사동아지질 | Anchoring implement for cut off plate of ground anchor |
KR20010111405A (en) * | 2000-06-08 | 2001-12-19 | 김광수 | Removable soil nailing method and its nail assembly |
KR20020009300A (en) * | 2000-07-25 | 2002-02-01 | 이기웅 | apparatus and method for earth anchor using expansible packer |
KR20010007908A (en) * | 2000-10-20 | 2001-02-05 | 최용기 | Multistage grouting equipment by Fiberglass Reinforced Plastics inject pipe and its construcion work method |
KR20020077719A (en) * | 2001-04-02 | 2002-10-14 | 심석래 | Method and apparatus for mounting rock bolt |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100955666B1 (en) | 2008-03-18 | 2010-05-06 | 장인희 | rock-bolt assembly for reinforcing rock bed of tunnel |
CN104846823A (en) * | 2015-05-18 | 2015-08-19 | 葛洲坝集团第一工程有限公司 | Full-bonding cement mortar anchor rod and grouting method |
Also Published As
Publication number | Publication date |
---|---|
KR20020077721A (en) | 2002-10-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR200290351Y1 (en) | A packer apparatus for pressure type soil nailing | |
KR100869815B1 (en) | Apparatus to upgrade end bearing capacity of pile and pile construction method | |
JP2004027813A5 (en) | ||
KR100406813B1 (en) | Method and apparatus for mounting lock bolt and lock anchor | |
US20070172315A1 (en) | Method and Apparatus for Creating Soil or Rock Subsurface Support | |
KR100966148B1 (en) | Ground adhering soil nailing structure and ground reinforcement method using the same | |
KR100766450B1 (en) | The anchor construction method in soft ground of gaving used the foundation fixing anchor and this shich consisted of fixing supporter | |
KR100760293B1 (en) | Tunnel construction method for shallow overburden tunnel | |
KR100437910B1 (en) | grouting apparatus for earth anchor using compound packer and earth anchor construction method using the same | |
KR20200022181A (en) | Internal packer coupling structure of steel pipe multi-stage grouting device | |
KR102155058B1 (en) | Steel pipe multi-stage grouting device | |
KR100867385B1 (en) | Extension type ground anchor structure that construction a method | |
KR100940276B1 (en) | Anchoring method using pressing and reaming | |
KR100402890B1 (en) | Method and apparatus for mounting rock bolt | |
KR100466491B1 (en) | Rock bolt linking reinforcement equipment | |
KR101913493B1 (en) | Cast in place pile used self-retaining construction method | |
CN109083669A (en) | Roadway floor prestressed grouting birdcage anchor cable construction method | |
JP3584323B2 (en) | Slope stabilization method | |
JP4705468B2 (en) | Drainage pipe with deterrent function | |
KR100742775B1 (en) | The anchor having conical jacket and the construction method using the same | |
KR20020085119A (en) | Pipe-tube type anchor and nailling process using the anchor | |
KR200431272Y1 (en) | The foundation fixing anchor and this which consisted of fixing supporter | |
KR100608502B1 (en) | Method for constructing anchors to the slope of a road using steel pipe and pack | |
KR101063277B1 (en) | The slope means of reinforcement work for which pressurization grouting packer for soil nail and this were used | |
KR20020012451A (en) | apparatus and method for removal anchor using double uneven pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20121113 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20131112 Year of fee payment: 13 |
|
FPAY | Annual fee payment |
Payment date: 20161111 Year of fee payment: 16 |
|
FPAY | Annual fee payment |
Payment date: 20191106 Year of fee payment: 17 |