KR100401700B1 - Guide rail post setting device - Google Patents
Guide rail post setting device Download PDFInfo
- Publication number
- KR100401700B1 KR100401700B1 KR10-2001-0009717A KR20010009717A KR100401700B1 KR 100401700 B1 KR100401700 B1 KR 100401700B1 KR 20010009717 A KR20010009717 A KR 20010009717A KR 100401700 B1 KR100401700 B1 KR 100401700B1
- Authority
- KR
- South Korea
- Prior art keywords
- reference plate
- guide rail
- strut
- setting device
- depth
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F15/00—Safety arrangements for slowing, redirecting or stopping errant vehicles, e.g. guard posts or bollards; Arrangements for reducing damage to roadside structures due to vehicular impact
- E01F15/02—Continuous barriers extending along roads or between traffic lanes
- E01F15/04—Continuous barriers extending along roads or between traffic lanes essentially made of longitudinal beams or rigid strips supported above ground at spaced points
- E01F15/0461—Supports, e.g. posts
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- A Measuring Device Byusing Mechanical Method (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
본 발명은 가이드레일을 설치할 때 사용하는 지주의 기준면에 대한 매설위치와 매설 깊이를 설정하는 지주 셋팅장치에 관한 것으로, 평면을 유지하는 기준판과, 기준판상에 형성되는 확인창과, 기준판 상에 전후 좌우로 위치변환이 가능하도록 설치되는 수직 기둥과, 상기 수직기둥상에는 상하로 위치변동이 가능하도록 결합되는 지시침 및 휴대를 위한 손잡이로 이루어져 지시침의 끝이 상기한 확인창으로부터 수직으로 연장된 선상에 위치하도록 한 상태에서 지시침의 끝부분이 기준판에 대한 이격거리와 이격높이를 지시하도록 구성됨으로서 확인창을 기준으로 한 가이드레일 지주의 박음위치와 박음깊이를 측정하고 설정할 수 있도록 하는 것을 특징으로 하는 가이드레일 설치를 위한 지주 셋팅장치이다.The present invention relates to a support setting device for setting the embedding position and the embedding depth with respect to the reference plane of the support used when installing the guide rail, the reference plate to maintain the plane, the confirmation window formed on the reference plate, on the reference plate The vertical pillar is installed to be able to change the position of the front and rear, and on the vertical pillar is composed of an indicator hand and a handle for carrying the position change up and down and the tip of the indicator hand extends vertically from the confirmation window The tip of the indicator hand is configured to indicate the separation distance and the separation height with respect to the reference plate in the state of being placed on the ship, so that it is possible to measure and set the position and depth of the guide rail strut based on the confirmation window. It is a prop setting device for installing the guide rail.
본 발명은 철근과 줄 및 위치표시를 위한 핀을 사용하지 않더라도 신속하고 정확하게 지주의 박음위치와 깊이를 설정할 수 있으며, 지주를 잡아주는 사람이 휴대하고 이동하면서 사용이 가능하여 종래에 비하여 현저한 인력절감 효과를 갖게 된다.The present invention can set the position and depth of the struts quickly and accurately without using the pins for reinforcing bars and strings and position indications, and it is possible to use while holding and moving the strut holders, which is a significant reduction in manpower compared to the prior art. Will have an effect.
Description
본 발명은 가이드레일을 설치할 때 사용하는 지주의 기준면에 대한 매설위치와 매설 깊이를 설정하는 지주 셋팅장치에 관한 것으로, 보다 상세히는 도로의 경계부에 설치되는 다이크를 기준면으로 하여 평면을 유지하는 기준판 상에 전후 상하 운동을 하는 기둥을 형성하고 상기 기둥상에 수평계를 구비한 지침을 설치하여 다이크를 기준으로 하는 지주의 박음위치와 깊이를 쉽게 설정할 수 있도록 하는 지주 셋팅장치에 관한 것이다.The present invention relates to a strut setting device for setting the embedding position and the depth of embedding with respect to the reference plane of the support used when installing the guide rail, more specifically a reference plate for maintaining a plane with reference to the dyke installed on the boundary of the road The present invention relates to a pillar setting device for forming pillars for vertically moving up and down and installing a guide having a level gauge on the pillars so as to easily set the position and depth of the pillar based on the dike.
신설도로나 기존의 도로상에 차량이 도로를 벗어나 추락하는 것을 방지할 목적으로 도로 경계면 외측으로 가이드레일이 설치된다.Guide rails are installed outside the road boundary to prevent the vehicle from falling off the road on a new road or an existing road.
가이드레일은 도로의 경계부에 설치되는 다이크 외측으로 대략 17cm 정도 떨어진 위치에 일정간격으로 지주를 박고 여기에 벤딩가공한 판 레일을 연속적으로 부착하는 구조로 설치되는 것으로 지주의 매설위치와 깊이가 기준면에 대하여 일정하게 유지되어야 정확한 시공이 가능하게 된다.The guide rail is installed by striking the strut at a certain interval about 17cm away from the outside of the dyke, which is installed at the boundary of the road, and continuously attaching the bending rail plate to it. It must be kept constant for accurate construction.
즉, 각각의 지주 상단부에는 판레일 조립을 위한 나사공을 갖고 상기 나사공에 규격이 일정한 판레일을 부착하는 방법으로 설치되고, 먼저 지주를 박은 후 최종단계에서 판레일이 조립되는 방법으로 시공되기 때문에 지주사이의 간격이 정확하게 유지되어야 하고, 기준면에 대하여 나사공의 위치가 정확하게 유지되어야만 판레일의 조립이 가능해 지는 특징이 있다.That is, the upper end of each strut has a screw hole for assembling the plate rail and is installed by attaching a plate rail having a predetermined standard to the screw hole, and the construction is performed by putting the strut first and then assembling the plate rail in the final step. Therefore, the spacing between the struts must be maintained accurately, and the plate rail can be assembled only when the position of the screw hole is correctly maintained with respect to the reference plane.
지주의 박음위치와 간격을 정확하게 유지하기 위한 종래의 방식은 도6에 도시된 바와 같이 다이크와 일정한 간격을 유지하도록 다이크(100) 외측으로 4-5m간격으로 철근(101)을 박은 후 지주(102)의 나사공(103)위치 높이로 철근상에 줄(104)을 걸어 선형을 잡고, 각 지주의 박음위치를 표시하기 위해 줄에 핀(105)을 꽂아 그 가르키는 방향을 지주의 박음깊이로 표시하는 방법이 사용되고 있다.The conventional method for precisely maintaining the position and spacing of the struts is to support the struts 102 after driving the reinforcement 101 at intervals of 4-5 m to the outside of the dike 100 to maintain a constant distance from the dyke as shown in FIG. Hook the rope 104 on the rebar to the height of the screw hole 103 position), hold the linear, insert the pin 105 into the rope to indicate the position of each strut, and the direction of the pointing to the depth of the strut The display method is used.
그러나 상기한 방법은 지주를 박기 위해 필요한 인력(1인의 포스트를 잡아주는 사람과 1인의 항타기를 조작하는 사람)외에 철근 및 줄을 설치하는 사람등 많은 수의 인원이 필요하고, 지주의 선형과 박음위치를 설정하기 위해 많은 량의 철근을 박아야 하고 지주를 박은 후에는 이를 다시 철거하여야 하는 등 작업이 복잡하고 많은 인력이 소요되는 문제점이 있었다.However, the above method requires a large number of personnel, such as a man who installs reinforcing bars and strings, besides the manpower required to fix the prop (one post holder and one manipulator), In order to set the position, a large amount of rebar was put in, and after putting the prop, the work was complicated and required a lot of manpower.
또한, 바람이나 줄의 쳐짐등의 요인에 의해 지주의 박음위치 및 깊이에 오류가 많아 판레일의 부착시 깊이 및 위치를 다시 수정하여 주어야 하고, 많은 인력이 투입됨에도 불구하고, 철근과 줄을 설치하고 핀을 박아 주어야 하는 등 사전작업에 소요되는 시간이 길어져 효율적인 작업이 이루어 지지 못하는 문제점이 있었다.In addition, due to factors such as wind and string sagging, there are a lot of errors in the position and depth of the anchorage, so when the rail is attached, the depth and position must be corrected again. There was a problem in that the time required for the pre-working is long, such as the need to pin a pin and efficient work is not achieved.
본 발명은 철근과 줄 및 위치표시를 위한 핀을 사용하지 않더라도 신속하고 정확하게 지주의 박음위치와 깊이를 설정할 수 있는 장치를 제시함으로서 인력을 절감하고, 공기를 단축시키고자 할 목적을 갖는다.The present invention aims to reduce manpower and shorten air by presenting a device capable of setting the position and depth of fastening of a strut quickly and accurately without using pins for reinforcing bars and strings and positioning.
도1은 본 발명의 구성도1 is a block diagram of the present invention
도2는 본 발명에 의한 지시침과 지주의 박음 위치 및 박음깊이와의 관계도Figure 2 is a relationship between the needle position and the depth of the needle of the indicator needle and the support according to the present invention
도3은 지주의 박음위치를 표시하기 위한 평면 상태도3 is a plan view showing the position of the post of the strut
도4는 가이드레일 지주의 셋팅에 사용되는 본 발명의 사용 상태도Figure 4 is a use state of the present invention used for the setting of the guide rail struts
도5는 중앙분리대 지주의 매설깊이를 측정할때의 본 발명의 사용 상태도Figure 5 is a use state of the present invention when measuring the depth of embedment of the median strut
도6은 종래 방법에 의한 지주의 박음위치 설정 상태도6 is a state diagram of setting the posture of the strut by the conventional method;
*주요부호의 설명* Description of the major symbols
10.기준판 11.턱 20.손잡이 30.확인창10.Standard plate 11.Chuck 20.Handle 30.Confirmation window
40.수직기둥 41.수평축 42.홀더 43.볼트40.Vertical column 41.Horizontal axis 42.Holder 43.Bolt
50.지시침 51.침부분 52.몸통 53.너클나사50.Instructions 51.Needle 52.Body 53.Knuckle Screw
60.수평계 70.박음위치선 80.나사 각(却)60.Horizontal 70.Parking position line 80.Screw angle
이를 위하여 본 발명은 평면을 유지하는 기준판상에 휴대를 위한 손잡이를 형성하고, 기준판의 후반부에 확인창을 형성하며, 기준판의 전반부에는 기준판에 대하여 전후로 회전하는 중심축을 형성하고, 상기 중심축의 외측 단부에 수직 기둥을 결합하며, 상기 수직기둥상에는 상하로 위치변동이 가능하도록 수평계를 포함하는 지시침을 결합하여 지시침의 끝이 상기한 확인창으로부터 수직으로 연장된 선상에 위치하도록 한 구조의 가이드레일 설치를 위한 지주 셋팅장치를 새로이 제시한다.To this end, the present invention forms a handle for carrying on a reference plate to maintain a plane, forming a confirmation window in the second half of the reference plate, the first half of the reference plate to form a central axis to rotate back and forth with respect to the reference plate, the center The vertical column is coupled to the outer end of the shaft, and the vertical pillar is coupled to the indicator needle including a horizontal so that the position can be changed up and down so that the end of the indicator needle is located on a line extending vertically from the confirmation window New prop setting device for guide rail installation
상기 구성은 기 시공된 상태에 있는 다이크를 기준면으로 하여 백묵등을 사용하여 지주의 박음간격을 표시하고, 지시침의 끝부분이 확인창으로부터 수직으로 연장된 선상에 위치하고 확인창과 지시침의 끝부분까지 거리 및 확인창으로 부터 지시침의 끝부분까지 높이가 각기 다이크로부터 지주의 이격거리 및 지주의 나사공높이가 되도록 조절한 상한 상태에서 다이크에 표시된 각각의 지주 박음간격표시선상에 확인창이 위치하도록 기준판을 다이크 위에 놓으면 지시침의 끝부분이 정확한 지주의 박음위치 및 지주의 박음 깊이가 된다.The above configuration is to indicate the interval between the struts using a chalk lamp as a reference surface for the dyke in the pre-installed state, the end of the indicator hand is located on a line extending vertically from the confirmation window, the end of the confirmation window and the indicator needle To ensure that the confirmation window is positioned on each strut interval marked on the dyke with the upper limit adjusted so that the distance from the distance and the confirmation window to the tip of the indicator hand is the distance between the shore and the screw hole height of the shore respectively. When the reference plate is placed on the dyke, the tip of the indicator hand is the correct position of the strut and the depth of the strut.
따라서 본 발명은 지주의 박음위치 및 깊이를 설정하기 위해 철근을 박고 줄은 건 후 핀으로 표시하는 방법에 비해 매우 간편하며, 항타기에 의한 지주의 박음시 지주를 잡아주는 사람이 들고 이동하면서 지주의 위치 및 박음 깊이를 설정할 수 있어 적은 인력으로 지주의 매설작업이 가능하게 되는 특징을 갖는다.Therefore, the present invention is very simple compared to the method of marking the pin after pinching and reducing the reinforcing rod to set the position and depth of the strut, the person holding the strut during the striking of the strut by the propulsion while holding the movement of the strut Since the position and the depth of seizure can be set, it is possible to bury the shore with less manpower.
이하 첨부된 도면에 의한 실시례에 의하여 본 발명을 더욱 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in more detail with reference to the accompanying drawings.
도1은 본 발명의 구성을 도시하기 위한 것으로 본 발명은 평평한 판형태의 기준판(10)과, 기준판상에 형성된 손잡이(20)와, 기준판을 천공하여 손잡이 외측에 형성한 확인창(30)과, 기준판 전반부에 형성한 수평축(41)에 의해 축회전되고 상기 수평축의 확인창 쪽 단부에 수직으로 결합되는 수직기둥(40)과, 상기 기둥상에 상하 운동할 수 있게 결합되는 지시침(50)으로 이루어지고, 상기 지시침에는 수평계(60)가 부착되는 구조를 갖는다.1 is a view showing the configuration of the present invention, the present invention is a flat plate-shaped reference plate 10, the handle 20 formed on the reference plate, and the confirmation window 30 formed on the outside of the handle by punching the reference plate ), A vertical column 40 axially rotated by a horizontal shaft 41 formed in the first half of the reference plate, and vertically coupled to an end portion of the confirmation window of the horizontal axis, and an indicator needle coupled to move vertically on the column. 50, the indicator hand has a structure that is attached to the horizontal gauge (60).
기준판(10)은 대략 장방형 판으로 일측부가 ¬ 형태로 절곡된 턱(11)이 형성되어 다이크(100)의 측면에 절곡된 턱부분이 밀착되어 걸리도록 함으로서 다이크 위에 올려놓을 때 다이크와 기준판의 방향이 일치할 수 있게 된다.The reference plate 10 is a substantially rectangular plate, and a jaw 11 bent at one side thereof is formed in a shape of a dimple so that the bent jaw portion closes and hangs on the side of the dike 100 so as to be placed on the dike and the reference plate. The directions of can match.
확인창(30)은 다이크상에 표시된 지주박음위치선(70)을 확인하기 위한 것으로 원형 이나 방형으로 기준판을 관통시킨 구멍이며, 다이크의 측면과 일치하도록 절곡된 경계부에 형성함으로서 지시침위치의 사전 결정시 상기한 확인창을 기준점으로 삼기 편리하다.The confirmation window 30 is for confirming the post-positioning position line 70 displayed on the dyke, and is a hole penetrating the reference plate in a circular or rectangular shape, and is formed at the boundary portion bent to coincide with the side of the dyke. It is convenient to use the confirmation window as a reference point when making a predetermined decision.
기준판 전반부에 형성한 수평축(41)과 그 단부에 결합되는 수직기둥(40)은 상기 지시침에 전후 상하운동을 부여함으로서 지시침 끝부분의 공간상 위치를 쉽게 조절할 수 있도록 하기 위한 것으로 수평축은 기준판에 대하여 회전할 수 있도록 우레탄을 가공한 홀더(42)에 끼우고 볼트(43)에 의해 고정되도록 결합되며, 수직기둥은 상기한 수평축 단부에 결합된 홀더(41a)에 축고정 됨으로서 수평축에 대한 수직기둥의 좌우 회전각을 조절할 수 있도록 구성된다.The horizontal axis 41 formed in the first half of the reference plate and the vertical column 40 coupled to the end portion of the horizontal axis 41 are designed to easily adjust the spatial position of the tip of the indicator hand by giving the front and rear vertical movement to the indicator hand. The urethane is inserted into the holder 42 processed by the urethane to be rotated with respect to the reference plate, and is coupled to be fixed by the bolt 43. The vertical column is axially fixed to the holder 41a coupled to the horizontal axis end, It is configured to adjust the left and right rotation angle of the vertical column.
지시침(50)은 지주의 박음위치와 박음깊이를 가르키기 위한 것으로 침부분(51)과 일체로 결합된 몸통부분(52)은 너클나사(53)에 의해 수직기둥에 고정됨으로서 나사를 풀어준 상태에 수직기둥을 타고 상하로 이동되어 지시침의 높이를 조절할 수 있고, 그 상태에서 몸통부분이 회전하며 몸통부분에 부착된 수평계(60)에 의해 수직기둥이 경사진 상태에서도 지시침의 수평을 유지할 수 있도록 구성된다.The indicator needle (50) is for indicating the position and the depth of the anchoring of the strut. The body portion (52) integrally coupled with the needle portion (51) is fixed to the vertical column by a knuckle screw (53) to loosen the screw. The vertical pole in the state is moved up and down to adjust the height of the indicator hand, in that state the body portion is rotated and the horizontal level of the indicator needle even in a state in which the vertical column is inclined by the horizontal 60 attached to the body portion It is configured to maintain.
상기한 실시례에 있어서, 기둥상에 2개의 지시침을 결합할 수 있으며, 이와 같이 구성함으로서 상부의 지시침은 지주를 박을 때 박음 깊이의 기준이 되는 지주(102)의 나사공(103) 위치를 가르키고, 하부의 지시침은 지주의 박음위치를 표시하는 작용을 하며, 상하 2개의 지시침은 지주를 박을 때 지주의 수직상태를 파악하는 기준이 됨으로서 지주를 정확하게 수직으로 박을 수 있도록 도와 주는 작용을 하게 된다.In the above embodiment, it is possible to combine the two indicator needles on the column, by configuring in this way, the upper indicator needle 103 is a screw hole 103 of the pillar 102, which is a reference of the depth of penetration when the pillar is driven. Pointing position, the lower indicator needle acts to indicate the position of the strut, and the two upper and lower indicator needles serve as a criterion to grasp the vertical state of the strut when the strut is driven so that the strut can be accurately vertically driven. To help.
상기와 같이 상하부에 지시침을 설치한 경우에 하부의 지시침 침 끝부분은 반원형으로 구성할 수 있고, 이경우 반원형 내측으로 지주가 위치하도록 한 상태에서 지주를 박을 수 있어 보다 정확한 지주의 박음 위치를 설정할 수 있게 된다.When the indicator needle is installed in the upper and lower parts as described above, the tip of the lower indicator needle can be configured as a semi-circle, and in this case, the prop can be driven in a state in which the support is positioned inside the semi-circle, so that the position of the support is more accurate. Can be set.
본 발명은 도로의 중앙에 설치되는 중앙분리대 공사시에도 활 용할 수 있음은 물론이다.The present invention can of course be utilized even during construction of the central separator installed in the center of the road.
즉, 도로의 중앙분리대 공사는 도로외측에 설치되는 가이드레일과 달리 도로상에 설치됨으로 지주매설공정은 도로면을 천공하여 지주공을 형성한 후 여기에 지주를 삽입 매설하는 방법으로 이루어지게 되는바, 지주공에 지주를 삽입한 상태에서 노면으로 부터 지주상에 형성된 나사공 높이를 일정하게 유지시켜야 하는 작업을 수반하기 때문에 지주의 기준면에 대한 매설깊이 설정시 본 발명에 의한 셋팅장치가 유용하게 사용될 수 있다.In other words, unlike the guide rail that is installed on the outside of the road, the central divider construction of the road is installed on the road, so the landslide laying process is performed by inserting the landslides after forming the holding holes by drilling the road surface. , The setting device according to the present invention is useful when setting the depth of embedding of the reference plane of the support because it involves the task of maintaining the height of the screw hole formed on the support from the road surface while the support is inserted in the support hole. Can be.
이 경우 기준판 일측에 형성한 절곡된 턱(11) 부분이 방해 요소로 작용되기 때문에 본 발명은 중앙분리대 공사시에도 쉽게 적용할 수 있도록 상기 기준판상에나사 각(却)을 형성한 구성을 아울러 제시한다.In this case, because the bent jaw (11) formed on one side of the reference plate acts as a disturbing element, the present invention provides a configuration in which a screw angle is formed on the reference plate so that it can be easily applied even when constructing the central separator. present.
즉, 기준판 상의 3점에 삼각을 이루는 나사공을 내고 여기에 핸들을 구비한 나사 각을 결합하여 가이드레일 공사시에는 나사각을 기준판의 바닥면으로 돌출되지 않게 한 상태에서 사용하고, 중앙분리대 지주의 매설깊이를 설정할 때는 상기 나사각을 턱보다 돌출되게 하여 노면에 접하도록 한 상태에서 사용할 수 있도록 구성한다.In other words, make a triangular screw hole at the three points on the reference plate, and combine the screw angle with the handle therein so that the screw angle is not protruded to the bottom surface of the reference plate when constructing the guide rail. When setting the depth of embedding of the separator struts, the screw angle is configured to be protruded from the jaw so as to be used in contact with the road surface.
상기 나사각은 전방에 2개를 형성하고 후방에 하나를 형성함으로서 전방의 2개의 나사각을 고정한 상태에서 후방의 나사각의 돌출길이를 미세하게 조정함으로서 노면의 경사가 다른 지역에서도 후방의 다리와 수평계를 활용하여 정확한 평면을 유지시킨 상태에서 측정할 수 있게 된다.The two screw angles are formed at the front and one at the rear, so that the protruding length of the rear screw angle is finely adjusted while the two screw angles at the front are fixed. By using a level gauge, it is possible to measure while maintaining an accurate plane.
이상의 구성에 의한 본 발명의 사용과정을 설명하면 다음과 같다.Referring to the use process of the present invention by the above configuration is as follows.
도2 및 도3은 가이드레일용 지주의 셋팅을 설명하기 위한 것으로 상부 지시침과 하부지시침을 정해진 규격에 맞게 조정한 상태에서 움직이지 않게 고정하고, 손잡이를 사용하여 들고 다니면서 기설치된 다이크상에 지주의 박음위치를 표시한 표시선(70)이 확인창으로 보이도록 기준판을 다이크 위에 올려놓는다.Figures 2 and 3 are for explaining the setting of the guide rail struts and fixed without moving in the state in which the upper indicator and lower indicators are adjusted in accordance with a predetermined standard, holding the handle using a holding on the pre-installed dyke The reference plate is placed on the dyke so that the indication line 70 indicating the position of the insertion is seen as a confirmation window.
이때 지시침의 상부 침 끝부분은 다이크를 기준면으로 하였을 때 지주의 나사공이 위치하는 높이(h)가 되고, 하부지지침의 끝부분은 지주를 대고 박는 위치(다이크로부터 이격거리,l)가 된다.At this time, the upper needle end of the indicator needle is the height (h) where the screw hole of the support is located when the reference surface of the dyke, and the end of the lower support needle is the position (distance from the dyke, l) against the support post.
이와 같이 지주의 위치를 설정한 상태에서 도4에 표시된 바와 같이 한사람의 작업자는 셋팅위치가 변경되지 않도록 지주를 잡아주고 다른 한사람의 작업자는 항타기(106)를 조작하여 지주를 박는다.As shown in FIG. 4 in the state of setting the posts as described above, one worker holds the posts so that the setting position is not changed, and the other operator drives the props 106 to drive the posts.
지주를 잡아주는 작업자는 상하부 지시침을 참고로 하여 지주가 정확하게 박아지도록 지주를 잡아주고, 지주의 나사공이 상부지시침과 일치하면 신호를 주어 항타를 종료시키는 방법으로 이동하면서 지주의 매설작업을 수행한다.The worker holding the prop is to hold the prop so that the prop is precisely driven by referring to the upper and lower indicator needles. do.
도5는 중앙분리대 설치작업에 사용하는 상태를 도시한 것으로 이경우에는 나사각(80)을 돌출시켜 노면(107)에 접지되도록 한 상태에서 노면을 기준으로 하여 상부 지시침 끝이 지주(102)의 규정된 지주의 매설깊이가 되도록 미리조정한다.5 is a view showing the state used in the installation of the center separator in this case, the tip of the upper indicator needle is based on the road surface in the state of projecting the screw angle 80 to be grounded on the road surface 107. Adjust in advance to bury the prescribed landfill depth.
그 상태에서 지주를 견인기에 매달거나 작업자가 들어 미리 천공한 지주공(107)에 삽입하고, 지주를 잡아주는 작업자는 지시침의 끝부분과 지주의 나사공이 일치하도록 매설깊이를 조정한 후 일치된 상태에서 그라우팅 작업을 행함으로서 지주의 매설작업이 완료된다.In that state, the strut is suspended in the retractor or the worker lifts and inserts it into the pre-punched strut hole 107, and the operator holding the strut adjusts the embedding depth so that the end of the indicator needle and the screw hole of the strut coincide. The landfill work of the prop is completed by performing grouting work in the state.
지주가 고정된 후에는 지주의 양측으로 판레일(109)을 부착하는 방법으로 중앙분리대의 설치작업이 이루어 지게 된다.After the support is fixed, the installation work of the median separator is made by attaching the plate rails 109 to both sides of the support.
이상의 구성에 의한 본 발명은 철근과 줄 및 위치표시를 위한 핀을 사용하지 않더라도 신속하고 정확하게 지주의 박음위치와 깊이를 설정할 수 있으며, 지주를 잡아주는 사람이 휴대하고 이동하면서 사용이 가능하여 종래에 비하여 현저한 인력절감 효과를 갖게 된다.The present invention according to the above configuration can be set quickly and accurately the anchoring position and depth of the props without using the reinforcing rods and strings and pins for position display, the person holding the props can be used while carrying and moving Compared with the manpower saving effect.
또한, 지주의 박음 또는 매설작업이 정확하게 이루어 짐으로 후행하는 판레일의 부착작업이 원활하게 이루어져 적은 인력으로도 가이드레일 설치나 중앙분리대 설치작업을 행할 수 있고 공기를 단축시킬 수 있는 효과를 갖게 된다.In addition, since the anchoring or buried work of the prop is precisely performed, the trailing plate rail is smoothly attached so that the guide rail or the center separator can be installed with a small manpower and the air can be shortened. .
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2001-0009717A KR100401700B1 (en) | 2001-02-26 | 2001-02-26 | Guide rail post setting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2001-0009717A KR100401700B1 (en) | 2001-02-26 | 2001-02-26 | Guide rail post setting device |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20010067634A KR20010067634A (en) | 2001-07-13 |
KR100401700B1 true KR100401700B1 (en) | 2003-10-17 |
Family
ID=19706258
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-2001-0009717A KR100401700B1 (en) | 2001-02-26 | 2001-02-26 | Guide rail post setting device |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100401700B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101712655B1 (en) | 2016-08-30 | 2017-03-07 | 뉴그린창신 주식회사 | a piling zig for fence pole and a construction method using thereof |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100526779B1 (en) * | 2003-08-22 | 2005-11-08 | 영일산업개발(주) | An Apparatus for carrying out of pillar fabric and carrying out method using of it |
KR101714373B1 (en) * | 2015-11-25 | 2017-03-13 | 한국도로공사 | Construction method of manhole for expressway communication pipe |
-
2001
- 2001-02-26 KR KR10-2001-0009717A patent/KR100401700B1/en not_active IP Right Cessation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101712655B1 (en) | 2016-08-30 | 2017-03-07 | 뉴그린창신 주식회사 | a piling zig for fence pole and a construction method using thereof |
Also Published As
Publication number | Publication date |
---|---|
KR20010067634A (en) | 2001-07-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109577517A (en) | Assembly of shear wall structure and construction method | |
JP2008069577A (en) | Pile cage building method and pile cage building apparatus | |
JP5585059B2 (en) | Measuring method of steel pipe installation error | |
KR20060019602A (en) | Method of precisely positioning anchor bolt in foundation by swing-type anchor bolt | |
CN109281688B (en) | Tunnel advanced pipe shed accurate positioning system and construction method | |
CN212865883U (en) | Deformation monitoring device of accurate foundation ditch | |
KR100401700B1 (en) | Guide rail post setting device | |
CN112554222A (en) | Pile foundation reinforcement cage elevation and centering positioning device and method | |
CN111851517A (en) | Accurate installation method of steel lattice column applied to foundation pit supporting engineering | |
JP2022061704A (en) | Inclination measuring device and displacement measuring method for steel material, and displacement measuring method for mountain retention wall | |
CN209099382U (en) | A kind of pier foundation embedding anchor bolts auxiliary device and pier foundation | |
CN108179749B (en) | Lattice column positioner and positioning method thereof | |
CN209293049U (en) | A kind of fashioned iron goes along with sb. to guard him pile driving construction locator | |
CN212358328U (en) | Foundation pit support anchor rod | |
KR200384542Y1 (en) | An indicator for a boring location | |
CN210317209U (en) | Tunnel pipe shed rig drilling rod position correcting unit | |
CN111549790A (en) | Foundation pit support anchor rod and construction method thereof | |
CN214939552U (en) | Engineering survey mark warning device | |
CN105002936B (en) | For the optional centering CPIII measuring methods in railway bed location | |
CN221030157U (en) | Pile foundation limiting device | |
CN210862634U (en) | Positioning auxiliary device for indium steel ruler | |
CN217980333U (en) | Measure portable compulsory homing target dish | |
JP3004228U (en) | Holder for concrete formwork | |
CN216766019U (en) | Triaxial cement mixing pile non-normal position test deviational survey oral area fixed knot constructs | |
KR20170078311A (en) | Freestanding temporary retaining of deep excavations and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
N231 | Notification of change of applicant | ||
N231 | Notification of change of applicant | ||
GRNT | Written decision to grant | ||
LAPS | Lapse due to unpaid annual fee | ||
R401 | Registration of restoration | ||
FPAY | Annual fee payment |
Payment date: 20120928 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20130930 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20140925 Year of fee payment: 12 |
|
FPAY | Annual fee payment |
Payment date: 20150825 Year of fee payment: 13 |
|
FPAY | Annual fee payment |
Payment date: 20170928 Year of fee payment: 15 |
|
FPAY | Annual fee payment |
Payment date: 20180905 Year of fee payment: 16 |
|
FPAY | Annual fee payment |
Payment date: 20190731 Year of fee payment: 17 |