KR100386333B1 - A connector of concrete bar - Google Patents

A connector of concrete bar Download PDF

Info

Publication number
KR100386333B1
KR100386333B1 KR10-2000-0074942A KR20000074942A KR100386333B1 KR 100386333 B1 KR100386333 B1 KR 100386333B1 KR 20000074942 A KR20000074942 A KR 20000074942A KR 100386333 B1 KR100386333 B1 KR 100386333B1
Authority
KR
South Korea
Prior art keywords
wedge member
reinforcing bar
sleeve
wedge
present
Prior art date
Application number
KR10-2000-0074942A
Other languages
Korean (ko)
Other versions
KR20020045672A (en
Inventor
노인환
Original Assignee
(주)진아건축도시종합건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)진아건축도시종합건축사사무소 filed Critical (주)진아건축도시종합건축사사무소
Priority to KR10-2000-0074942A priority Critical patent/KR100386333B1/en
Publication of KR20020045672A publication Critical patent/KR20020045672A/en
Application granted granted Critical
Publication of KR100386333B1 publication Critical patent/KR100386333B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/162Connectors or means for connecting parts for reinforcements
    • E04C5/163Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
    • E04C5/165Coaxial connection by means of sleeves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B7/00Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections
    • F16B7/04Clamping or clipping connections
    • F16B7/0406Clamping or clipping connections for rods or tubes being coaxial
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F15/00Connecting wire to wire or other metallic material or objects; Connecting parts by means of wire
    • B21F15/02Connecting wire to wire or other metallic material or objects; Connecting parts by means of wire wire with wire
    • B21F15/06Connecting wire to wire or other metallic material or objects; Connecting parts by means of wire wire with wire with additional connecting elements or material

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

본 발명은 철근 연결장치의 구조를 극히 단순화시켜 두 철근 사이의 연결부의 기계적 강도를 크게 향상시키면서도 철근의 연결작업을 매우 용이하게 하므로서 공기단축과 시공비용을 절감할 수 있게 한 철근 연결장치에 관한 것으로서,The present invention relates to a reinforcing bar connection device that greatly simplifies the structure of the reinforcing bar connection device and greatly reduces the air shortening and construction cost while greatly improving the mechanical strength of the connecting part between the two bars. ,

특히, 본 발명은 원통관 형상을 한 그 양단부를 수축하여 단부의 내경이 철근의 직경과 거의 일치하게 수축관부(112)를 형성하고, 그 수축관부(112) 사이의 확장관부(113)는 철근(200)(300)의 직경보다 좀 더 크게 형성한 슬리브(110)와; 상기 슬리브(110)의 수축관부(112)를 통해 확장관부(113)의 소정깊이까지 설치된 다음 그 일단이 철근(200)(300)의 한마디부, 또는 두마디부와 대응하여 삽입된 철근이 외부로 빠지지 않도록 고정하는 쐐기부재(120); 등으로 구성된 것을 특징으로 한 것이다.Particularly, in the present invention, both ends of the cylindrical tube are contracted to form the contraction tube portion 112 such that the inner diameter of the end portion substantially matches the diameter of the reinforcing bar, and the expansion tube portion 113 between the contraction tube portion 112 is reinforced with the rebar. A sleeve 110 formed larger than the diameter of the 200 and 300; The reinforcing bar is installed through the contraction pipe part 112 of the sleeve 110 to a predetermined depth of the expansion pipe part 113, and one end thereof is inserted in correspondence with one part or two parts of the reinforcing bars 200 and 300. Wedge member 120 for fixing so as not to fall out; It is characterized by consisting of.

또한, 본 발명은 상기 철근(200)(300)과 대응되는 쐐기부재(120')가 호형상으로 형성되며, 상기 쐐기부재(120')의 일변에 철근(200)(300)의 마디(210)(310)가 삽입될 수 있는 마디 삽입홈(121')이 형성된 것을 특징으로 한 것이며, 본 발명은 또 상기 슬리브(110)의 중간에 소정크기의 쐐기공(114)을 형성하여 상호 이격된 두 철근(200)(300)의 사이에 쐐기(130)를 압박한 것을 특징으로 한 것이다.In addition, in the present invention, the wedge member 120 'corresponding to the reinforcing bars 200 and 300 is formed in an arc shape, and the node 210 of the reinforcing bars 200 and 300 is formed at one side of the wedge member 120'. ) 310 is characterized in that the node insertion groove 121 'can be inserted, the present invention is also formed in the middle of the sleeve 110 by forming a wedge hole 114 of a predetermined size spaced apart from each other It is characterized in that the wedge 130 is pressed between the two rebars (200, 300).

Description

철근 연결장치{A connector of concrete bar}Rebar connector {A connector of concrete bar}

본 발명은 건설, 토목현장에서 시공물의 골격을 형성하는 철근의 철근 연결장치에 관한 것으로서, 더욱 자세하게는 두 철근 사이의 연결부의 기계적 강도를 향상시키고, 철근의 연결작업을 매우 용이하게 하여 공기단축과 시공비용을 절감할 수 있는 철근 연결장치에 관한 것이다.The present invention relates to a reinforcing bar reinforcing device of the reinforcing bars forming the skeleton of the construction in construction, civil engineering, and more specifically, to improve the mechanical strength of the connection between the two reinforcing bars, and to facilitate the connection work of the reinforcing bar to reduce the air shortage and The present invention relates to a rebar connecting device that can reduce construction costs.

예컨대, 건설 및 토목현장에서는 철근을 이용하여 기본 골격을 세운 후에 콘크리트를 타설 양생하는 과정으로 시공물을 건축하게 된다.For example, in the construction and civil works, the construction of the construction by the process of pouring concrete after building the basic skeleton by using reinforcing bars.

그리고, 상기 철근은 제조업체에서 소정의 길이로 절단되어 공급되기 때문에 시공물의 높이에 따라 철근을 절단하거나 상호 연결하여 요구하는 길이로 사용하게 된다.In addition, since the rebar is cut and supplied to a predetermined length by the manufacturer, the rebar is cut or interconnected according to the height of the construction to be used as the required length.

이때, 철근을 상호 연결하여 사용하는 방법이 여러 가지로 이용되고 있으나 그 대표적인 방법중에 하나는 연결하고자 하는 두 철근을 맞대어 놓고 그 연결부위를 융착하는 방법이 있으나, 이러한 융착방법은 1급 이상의 기능사 자격 보유자가 필요하고, 철근의 두 연결부위를 용접하는데 많은 시간이 소요될 뿐만 아니라, 용접된 철근의 부위가 열에 의해 취약해지거나 부식율이 크게 상승하는 등의 많은 요인을 안고 있었다.In this case, there are various methods of connecting the reinforcing bars, but one of the representative methods is to join two bars to be joined together and to fusion the connecting part. In addition to the need for a holder, it took much time to weld the two joints of the reinforcing bars, and also had many factors such as the welded reinforcing bars became vulnerable to heat and greatly increased the corrosion rate.

따라서, 근자에는 상기와 같은 요인들을 해소하기 위하여 철근 연결장치를 사용하는바, 이는 도 1과 같이 중앙부에 둘레턱(8)을 두고 그 양측 외경부에 나사부(10)(12)가 형성되며, 그 내경부는 중앙부분으로부터 양측단으로 확개되는 테이퍼면(14)(16)을 갖는 중간부재(2)와; 원통형부재로서 축방향으로 분할되어 2개 1조로 이루어져 상호 연결하고자 하는 철근(4)(6)의 선단부에 링상의 탄성부재 (42)(44)를 이용하여 가압 고정되어 그의 선단부가 중간부재(2)의 양측 테이퍼면( 14)(16)에 의해 가압되는 잭부재(18)(20)와; 상기 잭부재(18)(20)의 일측 외주면을 가압함과 동시에 그의 전단부분이 중간부재(2)의 양측 나사부(10)(12)에 체결되는 커플러부재(46)(48); 등으로 구성되어 있다.Therefore, the root bar uses a reinforcing bar connecting device to solve the above factors, which has a circumferential jaw (8) in the center portion as shown in FIG. The inner diameter portion includes an intermediate member (2) having tapered surfaces (14, 16) extending from the central portion to both side ends thereof; The cylindrical member is divided in the axial direction and is fixed by using a ring-shaped elastic member (42) (44) to the front end of the reinforcing bar (4) (6) to be interconnected in a set of two pieces so that the front end thereof is the intermediate member (2). Jack members (18, 20) pressed by both tapered surfaces (14) (16) of the < RTI ID = 0.0 > A coupler member (46) (48) for pressing the outer peripheral surface of the one side of the jack member (18) and at the same time the front end portion thereof is fastened to both side thread portions (10) (12) of the intermediate member (2); And the like.

그러나, 상기와 같이 구성된 종래의 철근 연결장치는 그 구조가 매우 복잡다단하여 철근의 연결작업이 매우 번거로울 뿐만 아니라, 작업시간의 지연으로 공기가 연장되어 시공비용이 상승하는 등의 많은 문제점을 내포하고 있다.However, the conventional reinforcing bar connecting device configured as described above is very complicated in structure, and the connection work of the reinforcing bar is very cumbersome, and the air cost is extended due to the delay of working time, and thus the construction cost increases. have.

따라서, 본 발명은 상기와 같은 문제점을 감안하여 발명한 것으로서, 철근 연결장치의 구조를 극히 단순화시켜 두 철근 사이의 연결부의 기계적 강도를 크게 향상시키면서도 철근의 연결작업을 매우 용이하게 하므로서 공기단축과 시공비용을 절감할 수 있게 한 철근 연결장치를 제공함에 그 목적이 있다.Accordingly, the present invention has been invented in view of the above problems, while greatly simplifying the structure of the reinforcing bar connecting device while greatly improving the mechanical strength of the connecting part between the two bars, and greatly simplifying the work of connecting the reinforcing bar and construction. The purpose is to provide a reinforcing bar linkage that can reduce costs.

도 1은 종래 기술에 따른 철근 연결장치의 일부 조립 단면도,1 is a partial assembly cross-sectional view of a rebar connecting device according to the prior art,

도 2는 본 발명에 따른 철근 연결장치의 분해사시도,Figure 2 is an exploded perspective view of the rebar connecting device according to the invention,

도 3은 본 발명에 따른 철근 연결장치의 단면도,3 is a cross-sectional view of the rebar connecting device according to the present invention,

도 4의 (a)와 (b)는 도 3의 사용상태를 보인 단면도,4A and 4B are cross-sectional views illustrating a state of use of FIG. 3;

도 5는 본 발명에 따른 철근 연결장치의 쐐기부재의 다른 실시예,5 is another embodiment of the wedge member of the rebar connecting device according to the present invention,

도 6은 본 발명에 따른 철근 연결장치의 사용상태를 보인 또 다른 실시예,Figure 6 is another embodiment showing the state of use of the rebar connecting device according to the invention,

도 7의 (a)와 (b)는 도 6의 쐐기부재가 설치된 철근연결장치의 단면도.Figure 7 (a) and (b) is a cross-sectional view of the reinforcing bar connecting device is installed wedge member of FIG.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

110:슬리브 111:안내홈110: sleeve 111: guide home

112:수축관부 113:확장관부112: shrink tube 113: expansion tube

114:쐐기공 120,120':쐐기부재114: wedge hole 120,120 ': wedge member

122:연결링 130:쐐기122: connection ring 130: wedge

140:경화제 200,300:철근140: hardener 200, 300: rebar

210,310:마디부210,310: Node

상기와 같은 목적을 달성하기 위한 본 발명은 원통관 형상을 한 그 양단부를 수축하여 단부의 내경이 철근의 직경과 거의 일치하게 수축관부를 형성하고, 그 수축관부 사이의 확장관부는 철근의 직경보다 좀 더 크게 형성한 슬리브와; 상기 수축관부를 통해 확장관부의 적소에 설치된 다음 그 일단이 철근의 한마디부 또는 두마디부와 대응하여 삽입된 철근이 외부로 빠지지 않도록 고정하는 쐐기부재; 등으로 구성된 것을 특징으로 한다.The present invention for achieving the above object is to shrink the both ends of the cylindrical tube shape to form a shrinkage tube portion with the inner diameter of the end almost equal to the diameter of the reinforcement, the expansion tube portion between the shrinkage tube portion than the diameter of the reinforcement A larger sleeve; A wedge member installed in place of the expansion tube portion through the contraction tube portion and fixed at one end thereof so as to prevent reinforcement of the reinforcement rod inserted corresponding to the one part or the two part of the reinforcing bar; And the like.

또한, 본 발명은 상기 양 수축관부에서 확장관부의 소정깊이까지 쐐기부재가 슬라이드 장착되도록 다수의 안내홈을 대향되게 형성한 것을 특징으로 한다.In addition, the present invention is characterized in that the plurality of guide grooves are formed to face the slide so that the wedge member is slide-mounted up to a predetermined depth in both of the contraction tube portion.

본 발명은 또, 상기 쐐기부재가 안내홈에 안정되게 고정 설치될 수 있게 자성체로 된 것을 특징으로 한다.The present invention is also characterized in that the wedge member is made of a magnetic body to be stably fixed to the guide groove.

또한, 본 발명은 다수의 쐐기부재가 연결링에 의해 상호 연결된 것을 특징으로 한다.In addition, the present invention is characterized in that a plurality of wedge members are interconnected by a connecting ring.

본 발명은 또, 상기 철근과 대응되는 쐐기부재가 호형상으로 형성되며, 상기 쐐기부재의 일변에 철근의 마디가 삽입될 수 있는 마디 삽입홈이 형성된 것을 특징으로 한다.In another aspect, the present invention is characterized in that the wedge member corresponding to the reinforcing bar is formed in an arc shape, and a node insertion groove is formed in which a bar of the bar can be inserted into one side of the wedge member.

또한, 본 발명은 상기 슬리브의 중간에 소정크기의 쐐기공을 형성하여 상호 이격된 두 철근의 사이에 쐐기를 압박한 것을 특징으로 한다.In addition, the present invention is characterized in that a wedge hole of a predetermined size is formed in the middle of the sleeve to press the wedge between two spaced apart rebars.

이하, 본 발명의 바람직한 실시예를 첨부된 도면에 의거하여 상세히 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 2는 본 발명에 따른 철근 연결장치의 분해사시도이고, 도 3은 본 발명에 따른 철근 연결장치의 단면도이다.2 is an exploded perspective view of a rebar connecting device according to the present invention, Figure 3 is a cross-sectional view of the rebar connecting device according to the present invention.

먼저, 원통형상을 한 소정길이의 슬리브(110)는 그 양단부에서 그 내부로 다수개의 안내홈(111)이 등간격으로 소정 깊이 형성된다.First, a sleeve 110 having a predetermined length having a cylindrical shape has a plurality of guide grooves 111 formed at predetermined intervals from both ends thereof at equal intervals.

그런 다음, 상기 슬리브(110)의 양단부를 수축하여 그 내경이 철근(200)(30 0)의 직경과 거의 일치하게 수축관부(112)를 형성하고, 양 수축관부(112)사이의 확장관부(113)는 철근의 직경보다 약 6㎜ 정도 크게 형성한다.Then, the both ends of the sleeve 110 is contracted to form a constriction tube portion 112 so that the inner diameter thereof substantially matches the diameter of the reinforcing bars 200 and 30 0, and an expansion conduit portion between the two constriction tube portions 112 ( 113) is about 6 mm larger than the diameter of the rebar.

한편, 상기 슬리브(110)의 안내홈(111)에 각각 설치되는 쐐기부재(120)는 삼각형상으로 형성되어 그 일단이 철근(200)(300)의 마디부(210)(310)와 각각 대응되므로서 슬리브(110)에 삽입된 철근(200)(300)이 외부로 인출되지 않도록 고정하게 된다.Meanwhile, the wedge members 120 respectively installed in the guide grooves 111 of the sleeve 110 are formed in a triangular shape so that one end thereof corresponds to the node portions 210 and 310 of the reinforcing bars 200 and 300, respectively. As a result, the rebars 200 and 300 inserted into the sleeve 110 are fixed so as not to be drawn out.

이때, 다수의 쐐기부재(120)가 안내홈(111)에 순차적으로 각각 삽입되어 도 4와 같이 철근(200)(300)의 두 마디부(210)(310)와 대응되므로서 쐐기부재(120)와 철근(200)(300)의 결합력을 크게 향상하는 한편, 상기 쐐기부재(120)가 안내홈 (111)에 안정되게 고정 설치될 수 있게 자성체로 됨이 바람직하다.At this time, the plurality of wedge members 120 are respectively inserted in the guide groove 111 in order to correspond to the two nodes 210, 310 of the reinforcement 200, 300, as shown in Figure 4 the wedge member 120 ) And the reinforcing force of the reinforcing bars 200 and 300 are greatly improved, and the wedge member 120 is preferably made of a magnetic material to be stably fixed to the guide groove 111.

또한, 도 5의 또 다른 실시예와 같이, 다수의 쐐기부재(120)에 소정의 거리를 두고 연결공을 각각 형성한 다음, 일측이 절단된 두개의 연결링(122)을 연결공에 끼워 사용하여도 무방하다. 즉, 두개의 연결링(122)에 다수의 쐐기부재(120)를 설치하는데, 상기 연결링(122)의 직경은 슬리브(110)의 확장관부(113)의 직경과 거의 일치되게 하여 확장관부(113) 내의 쐐기부재(120) 설치를 견고하게 한다. 이때, 상기 연결링(122)을 이 보다 직경이 작은 수축관부(112)를 통해 삽입하고자 할 시에는 일측이 절단된 연결링(122)을 오므린 상태에서 쐐기부재(120)를 확장관부(113)의 안내홈(111)에 각각 위치시키면 된다.In addition, as shown in another embodiment of Figure 5, each of the plurality of wedge member 120 to form a connection hole at a predetermined distance, and then use the two connection rings 122 cut one side to the connection hole You may. That is, a plurality of wedge members 120 are installed in the two connection rings 122, and the diameter of the connection ring 122 is substantially equal to the diameter of the expansion tube portion 113 of the sleeve 110 to expand the tube portion ( The installation of the wedge member 120 in 113 is secured. At this time, when the connection ring 122 is to be inserted through the shrinking tube part 112 having a smaller diameter than this, the wedge member 120 is expanded to the wedge member 120 in a state in which one side of the connection ring 122 is pinched. What is necessary is just to locate in the guide groove 111 of each.

도 6은 쐐기부재(120')의 또 다른 실시예로서, 상기 철근(200)(300)과 대응되는 쐐기부재(120')가 2개 또는 3개의 호형상으로 형성되며, 상기 쐐기부재(120')의 일변에 철근(200)(300)의 한,두마디가 삽입될 수 있는 마디 삽입홈(121')이 형성되고, 상기 슬리브(110)의 중간에 소정크기의 쐐기공(114)을 형성하여 도 7의 (a)와 같이 상호 이격된 두 철근(200)(300)의 사이에 쐐기(130)를 박아 넣거나 도 7의 (b)와 같이 경화제(140)를 충진하여 철근(200)(300)의 유동을 방지함이 바람직하다.FIG. 6 illustrates another example of the wedge member 120 ', wherein the wedge member 120' corresponding to the reinforcing bars 200 and 300 is formed in two or three arc shapes, and the wedge member 120 is formed. ') Is formed on the side of the reinforcing bar 200, 300, a node insertion groove 121' that can be inserted into a node, the wedge hole 114 of a predetermined size in the middle of the sleeve 110 Forming the wedge 130 between the two rebars 200, 300 spaced apart from each other as shown in Figure 7 (a) or filled with a hardener 140 as shown in Figure 7 (b) rebar 200 It is desirable to prevent the flow of 300.

상기와 같이 구성된 철근 연결장치의 작용을 설명하면 다음과 같다.Referring to the operation of the rebar connecting device configured as described above are as follows.

도 3 및 도 4와 같이, 슬리브(110)에 쐐기부재(120)를 설치하는데, 먼저 자석성질을 띤 다수의 쐐기부재(120)를 1조로 하여 먼저 양 수축관부(112)의 각 안내홈(111)을 따라 확장관부(113)까지 슬라이드시킨 다음, 또 다른 다수의 쐐기부재 (120)를 2조로 하여 먼저 삽입된 쐐기부재(120)와 맞닿게 슬라이드시킨다.3 and 4, the wedge member 120 is installed in the sleeve 110. First, a plurality of wedge members 120 having magnetic properties as a pair of first guide grooves of both of the shrinkage pipe parts 112 ( Then slide along the expanded tube portion 113 along the 111, and then slides in contact with the first inserted wedge member 120 in a pair of another wedge member (120).

이때, 다수의 쐐기부재(120)를 도 5와 같이 연결링(122)에 끼움 설치한 다음, 연결링(122)을 오므린 상태에서 쐐기부재(120)를 확장관부(113)의 안내홈(111)에 각각 위치시켜도 된다.At this time, the plurality of wedge member 120 is inserted into the connection ring 122 as shown in FIG. 5, and then the wedge member 120 is guide grooves of the expansion pipe part 113 in a state of pinching the connection ring 122. 111), respectively.

그런 다음, 슬리브(110)의 양 수축관부(112)로 각 선단부가 상호 맞닿도록 철근(200)(300)을 삽입하는데, 철근(200)(300)이 확장관부(113)를 통과할 때 안내홈(111)에 설치되어진 쐐기부재(120)와 접촉되나, 도 4의 (a)와 같이 철근(200)(300)의 단부, 또는 마디부(210)(310)가 쐐기부재(120)의 꼭지점과 접촉된 다음, 쐐기부재(120)의 변을 타고 슬라이드되며, 이때 쐐기부재(120)는 철근(200)(300)의 삽입력에 의해 안내홈(111)을 따라 밀려 들어가다가 안내홈(111)의 끝에 걸려 더 이상 들어가지 않고 철근(200)(300)만 삽입된다.Then, the reinforcing bars 200 and 300 are inserted into each of the shrinking pipe parts 112 of the sleeve 110 so that the tip ends abut each other, and guides when the rebars 200 and 300 pass through the expansion pipe part 113. In contact with the wedge member 120 is provided in the groove 111, the end of the reinforcing bars 200, 300, or nodes 210, 310 as shown in Figure 4 (a) of the wedge member 120 After being in contact with the vertex, the slide along the side of the wedge member 120, the wedge member 120 is pushed along the guide groove 111 by the insertion force of the reinforcement (200) (300) and then guide groove ( 111 is caught by the end of the reinforcing bar 200 and only 300 is inserted.

상기와 같이 슬리브(110)에 철근(200)(300)이 완전히 삽입된 상태에서 철근(200)(300)에 인장력이 가해지면 도 4의 (b)와 같이 철근(200)(300)의 두 마디부(210)(310)에 각 쐐기부재(120)의 꼭지점이 걸리면서 안내홈(111)을 따라 수축관부(112) 방향으로 내려 오다가 수축관부(112)의 내부턱에 쐐기부재(120)가 걸림과 동시에 이의 일측 꼭지점이 철근(200)(300)의 마디부(210)(310)와 강하게 가압되므로서 철근(200)(300)이 슬리브(110)의 바깥으로 이탈하는 것을 방지한다.When the tensile force is applied to the rebars 200 and 300 in a state where the rebars 200 and 300 are completely inserted into the sleeve 110 as described above, the two of the rebars 200 and 300 are as shown in FIG. While the vertices of each wedge member 120 are caught by the node portions 210 and 310, the wedge member 120 descends along the guide groove 111 in the direction of the contraction tube portion 112, and then the inner jaw of the contraction tube portion 112. Simultaneously with this, one side vertex thereof is strongly pressed with the node portions 210 and 310 of the reinforcement 200 and 300 to prevent the reinforcement 200 and 300 from escaping to the outside of the sleeve 110.

또한, 도 6과 같이 2개 또는 3개의 호형상으로 형성된 쐐기부재(120')를 두 수축관부(112)를 통해 도 7의 (a)와 같이 설치한 다음, 철근(200)(300)을 삽입하여 외측으로 당기게 되면, 쐐기부재(120')의 마디 삽입홈(121')에 철근(200)(300)의 마디부(210)(310)가 걸려 철근(200)(300)이 슬리브(110)의 바깥으로 이탈되는 것이 방지되며, 이때 상기 슬리브(110) 중간의 쐐기공(114)을 통해 두 철근(200)(300) 사이에 쐐기(130)를 박아 두 철근(200)(300)이 유동하는 것을 방지한다.In addition, the wedge member 120 'formed in two or three arc shapes as shown in FIG. 6 is installed as shown in FIG. 7A through the two contracting tube portions 112, and then the reinforcing bars 200 and 300 are installed. When inserted and pulled outward, the node portions 210 and 310 of the reinforcement 200 and 300 are caught in the node insertion groove 121 'of the wedge member 120' and the reinforcement 200 and 300 are sleeves ( It is prevented to escape to the outside of the 110, at this time through the wedge hole 114 in the middle of the sleeve 110, wedged wedge 130 between the two bars (200, 300) two bars (200, 300) Prevent it from flowing.

또한, 상기 쐐기(130) 대신에 도 7의 (b)와 같이 슬리브(110) 중간의 쐐기공 (114)을 통해 경화제(140)를 충진하여 철근(200)(300)의 유동을 방지하여도 된다.In addition, instead of the wedge 130, as shown in Figure 7 (b) to fill the hardener 140 through the wedge hole 114 in the middle of the sleeve 110 to prevent the flow of the reinforcement (200, 300) do.

따라서, 본 발명은 철근 연결장치의 구조를 극히 단순화시켜 두 철근 사이의 연결부의 기계적 강도를 향상시키면서도 철근의 연결작업을 매우 용이하게 하므로서 공기단축과 시공비용을 절감할 수 있게 한 매우 유용한 효과가 있다.Therefore, the present invention has a very useful effect of greatly simplifying the structure of the reinforcing bar connecting device while improving the mechanical strength of the connecting part between the two bars, thereby greatly reducing the air shortening and the construction cost. .

Claims (6)

삭제delete 원통관 형상을 한 그 양단부를 수축하여 단부의 내경이 철근의 직경과 거의 일치하게 수축관부(112)를 형성하고, 그 수축관부(112) 사이의 확장관부(113)는 철근(200)(300)의 직경보다 좀 더 크게 형성한 슬리브(110)와;The both ends of the cylindrical tube shape are contracted to form the contraction tube portion 112 so that the inner diameter of the end portion substantially matches the diameter of the reinforcing bar, and the expansion tube portion 113 between the contraction tube portions 112 is formed of the reinforcing rod 200 (300) A sleeve 110 formed larger than the diameter of; 상기 슬리브(110)의 수축관부(112)를 통해 확장관부(113)의 소정깊이까지 설치된 다음 그 일단이 철근(200)(300)의 한마디부, 또는 두마디부와 대응하여 삽입된 철근이 외부로 빠지지 않도록 고정하는 쐐기부재(120); 등으로 구성된 것을 특징으로 한 철근 연결장치에 있어서,The reinforcing bar is installed through the contraction pipe part 112 of the sleeve 110 to a predetermined depth of the expansion pipe part 113, and one end thereof is inserted in correspondence with one part or two parts of the reinforcing bars 200 and 300. Wedge member 120 for fixing so as not to fall out; In the rebar connecting device, characterized in that consisting of, 상기 양 수축관부(112)에서 확장관부(113)의 소정깊이까지 쐐기부재(120)가 슬라이드 장착되도록 다수의 안내홈(111)을 대향되게 형성한 것을 특징으로 한 철근 연결장치.Reinforcing bar connecting device, characterized in that the plurality of guide grooves (111) formed so as to slide so that the wedge member (120) to the predetermined depth of the expansion pipe section 113 in both of the contraction pipe section (112). 삭제delete 삭제delete 삭제delete 제 2 항에 있어서,The method of claim 2, 다수의 쐐기부재(120)가 하나, 또는 두개의 연결링(122)에 의해 상호 연결된 것을 특징으로 한 철근 연결장치.Rebar connecting device, characterized in that a plurality of wedge member 120 is interconnected by one or two connection ring (122).
KR10-2000-0074942A 2000-12-09 2000-12-09 A connector of concrete bar KR100386333B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2000-0074942A KR100386333B1 (en) 2000-12-09 2000-12-09 A connector of concrete bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2000-0074942A KR100386333B1 (en) 2000-12-09 2000-12-09 A connector of concrete bar

Publications (2)

Publication Number Publication Date
KR20020045672A KR20020045672A (en) 2002-06-20
KR100386333B1 true KR100386333B1 (en) 2003-06-09

Family

ID=27680733

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2000-0074942A KR100386333B1 (en) 2000-12-09 2000-12-09 A connector of concrete bar

Country Status (1)

Country Link
KR (1) KR100386333B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4180588A1 (en) * 2021-11-11 2023-05-17 Hilti Aktiengesellschaft Rebar coupler with bias pusher

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102172883B1 (en) * 2017-11-01 2020-11-02 주식회사 클라썸테크 The apparatus and production method to fix the reinforcement ULBON to tension plate of prestressed concrete structure
CN110258934A (en) * 2018-08-17 2019-09-20 李藏柱 A kind of sleeve connection structure and sleeve with swelling device
KR102172885B1 (en) * 2018-12-06 2020-11-02 주식회사 클라썸테크 Connecting apparatus for concrete pole

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5134212U (en) * 1974-09-05 1976-03-13
JPS5146417U (en) * 1974-10-05 1976-04-06
JPS5780528U (en) * 1980-11-05 1982-05-18
JPH0589642U (en) * 1991-06-14 1993-12-07 ミン フイ リン Rebar joining device
KR19980087741A (en) * 1998-09-12 1998-12-05 정문선 Rebar connector
KR20000047077A (en) * 1998-12-31 2000-07-25 백미정 Reinforcing joint device
KR20010029059A (en) * 1999-09-29 2001-04-06 하진규 Magnetic anchoring device and steel bars splicing device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5134212U (en) * 1974-09-05 1976-03-13
JPS5146417U (en) * 1974-10-05 1976-04-06
JPS5780528U (en) * 1980-11-05 1982-05-18
JPH0589642U (en) * 1991-06-14 1993-12-07 ミン フイ リン Rebar joining device
KR19980087741A (en) * 1998-09-12 1998-12-05 정문선 Rebar connector
KR20000047077A (en) * 1998-12-31 2000-07-25 백미정 Reinforcing joint device
KR20010029059A (en) * 1999-09-29 2001-04-06 하진규 Magnetic anchoring device and steel bars splicing device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4180588A1 (en) * 2021-11-11 2023-05-17 Hilti Aktiengesellschaft Rebar coupler with bias pusher

Also Published As

Publication number Publication date
KR20020045672A (en) 2002-06-20

Similar Documents

Publication Publication Date Title
KR101039120B1 (en) One-touch reinforcing bar coupler
KR100240099B1 (en) Coupler for iron bar
KR100386333B1 (en) A connector of concrete bar
KR102058544B1 (en) Sleeve for joining steel bars
KR101613429B1 (en) Joint apparatus for reinforcing bar
KR100708007B1 (en) Steel reinforcing coupler
CA2024276C (en) Pipe coupling
KR101498662B1 (en) Reinforced seams coupling
KR20210128953A (en) Steel Reinforcing Coupler
KR102344476B1 (en) Rebar coupler for beginning slip prevention
KR200211394Y1 (en) coupler for reinforcement steel bar
KR100272745B1 (en) A connector of concrete reinforcing bar
KR20190031075A (en) bar coupler for concrete construction
KR100445112B1 (en) Connection device of concrete fume pipe
KR100245890B1 (en) Splicer for erinforcement steel bars and splicing method using same
KR20190055280A (en) Steel reinforcing joint devices
KR200286102Y1 (en) steel reinforcement connector
KR100792556B1 (en) Reinforcing bar coupler
KR101267769B1 (en) Steel bar and coupling device the same
KR200491962Y1 (en) One-touch type steel reinforcing coupler
KR101859143B1 (en) Steel reinforcing joint devices
KR100377923B1 (en) apparatus for connecting inserting-type iron rod and method thereof
KR20130013196A (en) Splicing device for reinforcing bar
KR200223729Y1 (en) apparatus for connecting inserting-type iron rod
KR200268564Y1 (en) Connection device of concrete fume pipe

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
N231 Notification of change of applicant
FPAY Annual fee payment

Payment date: 20130730

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20140514

Year of fee payment: 12

LAPS Lapse due to unpaid annual fee