KR100377633B1 - method and apparatus for removing a steel wire cable from an anchor for preventing side wall collapse - Google Patents

method and apparatus for removing a steel wire cable from an anchor for preventing side wall collapse Download PDF

Info

Publication number
KR100377633B1
KR100377633B1 KR10-2001-0008879A KR20010008879A KR100377633B1 KR 100377633 B1 KR100377633 B1 KR 100377633B1 KR 20010008879 A KR20010008879 A KR 20010008879A KR 100377633 B1 KR100377633 B1 KR 100377633B1
Authority
KR
South Korea
Prior art keywords
steel wire
head
wire cable
anchor
split wedge
Prior art date
Application number
KR10-2001-0008879A
Other languages
Korean (ko)
Other versions
KR20020068680A (en
Inventor
신종덕
Original Assignee
신종덕
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 신종덕 filed Critical 신종덕
Priority to KR10-2001-0008879A priority Critical patent/KR100377633B1/en
Publication of KR20020068680A publication Critical patent/KR20020068680A/en
Application granted granted Critical
Publication of KR100377633B1 publication Critical patent/KR100377633B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/08Members specially adapted to be used in prestressed constructions
    • E04C5/12Anchoring devices
    • E04C5/122Anchoring devices the tensile members are anchored by wedge-action
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • E04G21/121Construction of stressing jacks

Abstract

본 발명은 토목공사나 건축공사장에서 지하 터파기 또는 절토작업시에 절토된 흙이 무너지지 않도록 강선케이블로 앵커시킨 뒤, 토건공사의 완료시 그 강선케이블을 쉽게 제거할 수 있는 측벽붕괴방지 앵커 강선 제거방법과 그 앵커구조를 제공한다.The present invention is anchored with a steel wire cable so that the soil cut during underground excavation or cutting work in civil engineering or construction works, and then the side wall collapse prevention anchor wire removal method that can easily remove the steel wire cable when the construction work is completed And its anchor structure.

그 제거방법은, 토건공사시 측벽(4)에 그라우팅공(5)을 형성하고, 그 그라우팅공(5)에 헤드내하체(20)와 함께 피복 강선(10)을 삽입하여 콘크리트(6)로 그라우팅시킨 후, 양생된 때에 그 피복 강선(10)의 강선케이블(10')을 앵커용 헤드(11)에 대해 인장시켜 측벽(4)의 붕괴를 방지시키고, 토건공사완료시 그 헤드내하체(20)의 강선케이블(10')을 제거하는 방법에 있어서: 상기 강선케이블(10')의 인장력을 제거하기 위해 앵커용 헤드(11) 내측의 강선케이블(10')을 절단하고 강선케이블(10')을 그 꼬임방향으로 감속기계 등으로 비틀어 회전시킴으로써 그 강선케이블(10')이 더욱 꼬이면서 헤드내하체(20)의 헤드(21)의 후방으로 헤드(21)의 압착면(22a)으로부터 강제로 분할웨지(30)를 이탈시키는 것을 특징으로 하며, 이 경우, 분할웨지(30)의 파지공(31)에 45도 3각나사로 된 나사부(32)를 형성하여 강선케이블(10')을 비틀 때, 순간적인 나사운동을 시킴으로써 그 강선케이블(10')을 순간적으로 압착면(22a)으로부터 이탈시키고, 분할편(30a,30b,30c)이 서로 분리되어 나가게 하여 강선케이블(10')을 용이하게 인출,제거시키고, 또한, 강선케이블(10')에 고착된 분할웨지(30)는, 보호캡(25) 내측에 설치된 와이어 브러쉬와 같은 제거부재(26)에 충돌하여 분할편(30a,30b,30c)으로 분리되어 나가게 하는 것이 바람직하다.The removal method is to form a grouting hole (5) in the side wall (4) during construction, inserting the coated steel wire (10) together with the head load bearing body (20) into the grouting hole (5) to the concrete (6) After grouting, when cured, the steel wire cable 10 'of the coated steel wire 10 is tensioned with respect to the anchor head 11 to prevent the collapse of the side wall 4, and when the construction is completed, the head load body ( In the method of removing the wire cable (10 ') of 20): In order to remove the tensile force of the wire cable (10') to cut the wire cable (10 ') inside the anchor head (11) and the wire cable (10) ') Is twisted and rotated by a deceleration machine or the like in the twisting direction thereof so that the wire cable 10' is twisted further from the pressing surface 22a of the head 21 to the rear of the head 21 of the head undercarriage 20. It is characterized in that forcibly disengages the split wedge 30, in this case, a screw of 45 degrees triangular thread to the gripping hole 31 of the split wedge 30 When the threaded wire 32 is formed to twist the steel wire cable 10 ', the screw wire 10' is instantaneously detached from the crimping surface 22a by the momentary screw movement, and the divided pieces 30a, 30b, and 30c. ) And the wire wedge cable 10 'can be easily pulled out and removed, and the split wedge 30 fixed to the wire cable 10' is provided with a wire brush installed inside the protective cap 25. It is preferable to separate the divided pieces 30a, 30b, and 30c by colliding with the same removing member 26.

Description

측벽붕괴방지 앵커 강선 제거방법과 그 앵커구조{method and apparatus for removing a steel wire cable from an anchor for preventing side wall collapse}Method and apparatus for removing a steel wire cable from an anchor for preventing side wall collapse}

본 발명은, 측벽붕괴방지 앵커 강선 제거방법과 그 앵커구조에 관한 것으로, 더 상세하게는 토목공사나 건축공사장에서 지하 터파기 또는 절토작업시에 절토된 흙이 무너지지 않도록 강선케이블로 앵커시키고 그 강선케이블을 쉽게 제거하기 위한 측벽붕괴방지 앵커 강선 제거방법과 그 앵커구조에 관한 것이다.The present invention relates to a method for removing the side wall collapse anchor anchor wire and its anchor structure, and more particularly, anchored with a steel wire cable to prevent the soil cut during underground excavation or cutting work in civil engineering or construction work, and the wire cable The present invention relates to a method for removing the side wall collapse preventing anchor wire for easy removal thereof and its anchor structure.

종래의 토건공사에서 측벽붕괴방지를 위한 종래의 흙막이 공사공법이 도 1과 함께 개략적으로 설명하면, 먼저, 헤드내하체(20)에 피복 강선(10)의 강선케이블의 일단을 고정시키고, 그라우팅공(5)을 측벽(4)에 형성시킨 후, 헤드내하체(20)와 피복 강선(10)을 그 그라우팅공(5)에 삽입한다. 그 뒤, 피복 강선(10)의 다른 일단을 수직H비임(1)에 설치된 지압판(2)의 통과공(2a), 수평비임(3)의 통과공(3a), 앵커용 헤드(11)와 그 분할웨지, 인장실린더(12) 및 인장용 헤드(13)와 그 분할웨지를 통과시킨 상태에서 콘크리트(6)로 그라우팅시킨다. 그 그리우팅 콘크리트(6)가 양생된 때에 그 피복 강선(10)의 강선케이블을 앵커용 헤드(11)와 헤드내하체(20)에대해 인장실린더(12)로 인장시키고, 앵커용 헤드(11)에서 분할웨지를 이용하여 그 강선케이블을 고정시킴으로써 토건공사중에 측벽(4)의 붕괴를 방지시키게 된다.In the conventional civil engineering construction, a conventional earthquake construction method for preventing sidewall collapse is schematically described with reference to FIG. 1. First, one end of the steel wire cable of the coated steel wire 10 is fixed to the head load bearing body 20, and a grouting hole After 5 is formed on the side wall 4, the head inner body 20 and the coated steel wire 10 are inserted into the grouting hole 5. Thereafter, the other end of the coated steel wire 10 is connected to the through hole 2a of the pressure plate 2 provided in the vertical H beam 1, the through hole 3a of the horizontal beam 3, the anchor head 11, and the like. The split wedge, the tension cylinder 12 and the tensioning head 13, and the split wedge are passed through the concrete (6). When the grouting concrete 6 is cured, the steel wire cable of the coated steel wire 10 is tensioned by the tension cylinder 12 against the anchor head 11 and the head inner body 20, and the anchor head 11 By using the split wedge to secure the steel wire cable to prevent the collapse of the side wall (4) during construction work.

그 뒤, 토건공사완료시에 그 헤드내하체(20)의 강선케이블(10')을 헤드내하체(20) 및 그라우팅공(5)으로부터 제거하고, 다시 흙을 덮는다. 이때, 강선케이블(10')이 쉽게 인출하여 제거하기 위해 강선케이블(10')의 다른 단부를 U자 형태의 환형으로 헤드내하체(20)에 설치하여 전방에서 강선케이블(10')을 인출함으로써 제거되는 구조가 개발되어 있으나, U자 형상의 지지부재와 계속 마찰을 일으키면서 인출되게 되어 쨈이 발생하는 경우, 강선케이블(10')을 인출시킬 수 없게 되는 문제가 있다.Thereafter, the steel wire cable 10 'of the head undercarriage 20 is removed from the head undercarriage 20 and the grouting hole 5 when the construction work is completed, and the soil is covered again. At this time, in order to easily draw out and remove the wire cable (10 '), the other end of the wire cable (10') is installed in the head inner body 20 in a U-shaped annular to pull out the wire cable (10 ') from the front. Although the structure is removed by the development, but the friction occurs with the U-shaped support member is pulled out when there is a problem, there is a problem that can not pull out the wire cable (10 ').

따라서, 본 발명은, 상술한 문제점을 해결하기 위한 것으로, 토목공사나 건축공사장에서 지하 터파기 또는 절토작업시에 절토된 흙이 무너지지 않도록 강선케이블로 앵커시킨 뒤, 토건공사의 완료시 그 강선케이블을 쉽게 또한 완전하게 제거할 수 있는 측벽붕괴방지 앵커 강선 제거방법과 그 앵커구조를 제공하는 데에 그 목적이 있다.Accordingly, the present invention is to solve the above problems, anchored with a steel wire cable to prevent the soil cut during underground excavation or cutting work in civil engineering or construction work, and then the steel wire cable at the completion of construction work It is an object of the present invention to provide a method for removing the side wall collapse preventing anchor wire that can be easily and completely removed and its anchor structure.

도 1은 종래의 흙막이 공사공법을 개략적으로 설명하는 설명도,1 is an explanatory diagram schematically illustrating a conventional earthquake construction method;

도 2는 본 발명의 일실시예에 따른 측벽붕괴방지 앵커구조를 도시한 단면도,Figure 2 is a cross-sectional view showing a sidewall collapse preventing anchor structure according to an embodiment of the present invention,

도 3은 도 2에서 보호캡을 제거한 상태의 좌측면도,3 is a left side view of the protective cap removed from FIG.

도 4, 도 5 및 도 6은 분할웨지의 구조를 도시한 정면도, 단면도 및 좌측면도,4, 5 and 6 is a front view, a sectional view and a left side view showing the structure of the split wedge,

도 7 및 도 8은 본 발명에 따른 측벽붕괴방지 앵커 강선 제거방법에 의해 강선을 제거하는 과정을 설명하기 위한 도 1과 유사한 설명도.Figures 7 and 8 are explanatory views similar to Figure 1 for explaining the process of removing the steel wire by the method of removing the side wall collapse preventing anchor steel wire according to the present invention.

〈도면의 주요부분에 대한 부호설명〉<Code Description of Main Parts of Drawing>

1: 수직H비임 2: 지압판1: vertical beam 2: pressure plate

3: 수평비임 4: 측벽3: horizontal beam 4: side wall

5: 그라우팅공 6: 그리우팅 콘크리트5: grouting ball 6: grouting concrete

10: 피복 강선 10': 강선케이블10: sheath liner 10 ': liner cable

11: 앵커용 헤드 12: 인장실린더11: Anchor head 12: Tension cylinder

13: 인장용 헤드 20: 헤드내하체13: tension head 20: head bearing

21: 헤드 22: 관통공21: head 22: through hole

22a: 압착면 23: 그라우팅 홈22a: pressing surface 23: grouting groove

24: 밀폐부재 25: 보호캡24: sealing member 25: protective cap

26: 제거부재 30: 분할웨지26: removal member 30: split wedge

30a,30b,30c: 분할편 31: 파지공30a, 30b, 30c: Split piece 31: Holding hole

32: 나사부 35: 가조립링32: threaded portion 35: temporary assembly ring

상술한 목적을 달성하기 위해 본 발명의 일실시예에 따른 측벽붕괴방지 앵커 강선 제거방법은, 토건공사시 측벽에 그라우팅공을 형성하고, 그 그라우팅공에 헤드내하체와 함께 피복 강선을 삽입하여 콘크리트로 그라우팅시킨 후, 양생된 때에 그 피복 강선의 강선케이블을 앵커용 헤드에 대해 인장시켜 측벽의 붕괴를 방지시키고, 토건공사완료시 그 헤드내하체의 강선케이블을 제거하는 방법에 있어서: 상기 강선케이블의 인장력을 제거하기 위해 앵커용 헤드 내측의 강선케이블을 절단하고 강선케이블을 그 꼬임방향으로 감속기계 등으로 비틀어 회전시킴으로써 그 강선케이블이 더욱 꼬이면서 헤드내하체의 헤드의 후방으로 헤드의 압착면으로부터 강제로 분할웨지를 이탈시키는 것을 특징으로 한다.In order to achieve the above object, the method of removing the side wall collapse preventing anchor steel wire according to an embodiment of the present invention forms a grouting hole in the side wall during construction work, and inserts a coated steel wire together with the head bearing body to the grouting concrete to A method of tensioning a steel wire cable of a sheathed steel wire to an anchor head when cured to prevent it from collapsing the sidewalls, and removing the steel wire cable of the head inner body upon completion of construction work. In order to remove the tensile force, the steel wire cable inside the anchor head is cut, and the steel wire cable is twisted and rotated by a deceleration machine or the like in the twisting direction so that the steel wire cable is twisted more and more from the pressing surface of the head behind the head of the head inner body. It is characterized by forcibly leaving the split wedge.

이 경우, 분할웨지의 파지공에 45도 3각나사로 된 나사부를 형성하여 강선케이블을 비틀 때, 순간적인 나사운동을 시킴으로써 그 강선케이블을 순간적으로 압착면으로부터 이탈시키고, 분할편이 서로 분리되어 나가게 하여 강선케이블을 용이하게 인출,제거시키고, 또한, 강선케이블에 고착된 분할웨지는, 보호캡 내측에 설치된 와이어 브러쉬와 같은 제거부재에 충돌하여 분할편으로 분리되어 나가게 하는 것이 바람직하다.In this case, a screw part of 45 degree triangular thread is formed in the gripping hole of the split wedge, and when the twisted wire cable is twisted, the screw thread is momentarily removed from the crimping surface and the split pieces are separated from each other. It is preferable that the steel wire cable is easily drawn out and removed, and that the split wedge fixed to the steel wire cable collides with a removing member such as a wire brush provided inside the protective cap to be separated into the split pieces.

또한, 본 발명은, 앵커인 헤드내하체의 헤드에 설치되는 분할웨지에 피복 강선의 일단이 고정되고 토건공사시 측벽에 형성된 그라우팅공에 삽입되어 콘크리트로 그라우팅시킨 후, 양생된 때에 그 피복 강선의 강선케이블을 헤드내하체 및 앵커용 헤드사이에서 인장시켜 측벽의 붕괴를 방지시키고, 토건공사완료시 그 헤드내하체의 강선케이블을 용이하게 제거하기 위한 측벽붕괴방지 앵커구조에 있어서: 상기 헤드는 피복 강선이 기밀되게 통과하는 관통공을 구비하고, 분할웨지의 설치시 그 분할웨지를 압축시켜 강선케이블을 고정시키도록 분할웨지의 외면과 상호작용하는 압착면이 그 관통공의 후방에 형성되며, 밀폐부재를 개재하여 기밀되게 헤드의 후방을 커버하는 보호캡이 헤드의 후방에 고정되게 설치되고, 강선케이블을 그 꼬임방향으로 회전시킨 때에 분할웨지가 압착면으로부터 헤드의 후방으로 이탈된 후, 강선케이블로부터 분할웨지를 분리시킴과 동시에 각 분할편으로 분할웨지를 분리시키도록 와이어 브러쉬와 같은 제거부재가 상기 보호캡의 내부에 설치되며; 상기 분할웨지는 강선케이블의 인장력을 해제한 때에 강선케이블의 압축력 내지 반발력에 의해 헤드의 후방으로 이탈되어 서로 분리되도록 다수의 분할편으로 구성되고, 각 분할편은, 헤드에 설치된 후 제거되는 가조립링에 의해 조립된 때에 강선케이블을 통과시켜 파지시키도록 파지공을 구비하며, 그 강선케이블을 파지하여 헤드의 압착면에 설치한 때에 그 강선케이블을 고정시키도록 각 분할편의 외면이 원추 경사면으로 되는 것을 특징으로 하는 측벽붕괴방지 앵커구조를 제공한다.In addition, the present invention, the one end of the coated steel wire is fixed to the split wedge installed in the head of the head inner body as an anchor and inserted into the grouting hole formed in the side wall during construction work, grouted with concrete, and when the curing of the coated steel wire In the side wall collapse preventing anchor structure for tensioning the wire cable between the head inner body and the anchor head to prevent the collapse of the side wall, and to easily remove the steel wire cable of the head inner body when the construction work is completed. A steel wire is provided with a through hole through which the steel wire is hermetically sealed, and when the split wedge is installed, a crimping surface which interacts with the outer surface of the split wedge is formed at the rear of the through hole to compress the split wedge and fix the steel wire cable. A protective cap covering the rear of the head to be airtight through the member is installed to be fixed to the rear of the head, and the wire cable in the twisting direction When the transfer wedge is separated from the crimp face to the rear of the head, a removal member such as a wire brush is provided inside the protective cap to separate the split wedge from the wire cable and to separate the split wedge into each split piece. Installed; The split wedge is composed of a plurality of split pieces to be separated from each other by being separated from the rear of the head by the compressive force or repulsive force of the steel wire cable when releasing the tension of the wire cable, each split piece is a temporary assembly ring that is removed after being installed in the head It is provided with a gripping hole to hold and pass the steel wire cable when assembled by the wire, and when the steel wire cable is gripped and installed on the crimping surface of the head, the outer surface of each split piece becomes a conical slope to fix the steel wire cable. It provides a sidewall collapse preventing anchor structure characterized in.

또, 본 발명은, 앵커인 헤드내하체의 헤드에 설치되는 분할웨지에 피복 강선의 일단이 고정되고 토건공사시 측벽에 형성된 그라우팅공에 삽입되어 콘크리트로 그라우팅시킨 후, 양생된 때에 그 피복 강선의 강선케이블을 헤드내하체 및 앵커용 헤드사이에서 인장시켜 측벽의 붕괴를 방지시키고, 토건공사완료시 그 헤드내하체의 강선케이블을 용이하게 제거하기 위한 측벽붕괴방지 앵커구조에 있어서: 상기 헤드는 피복 강선이 기밀되게 통과하는 관통공을 지니며, 분할웨지의 설치시 그 분할웨지를 압축시켜 강선케이블을 고정시키도록 분할웨지의 외면과 상호작용하는 압착면이 그 관통공의 후방에 형성되고, 밀폐부재를 개재하여 기밀되게 헤드의 후방을 커버하는 보호캡이 헤드의 후방에 고정되게 설치되며; 상기 분할웨지는 강선케이블의 인장력을 해제한 때에 강선케이블의 압축력 내지 반발력에 의해 헤드의 후방으로 이탈되어 서로 분리되도록 다수의 분할편으로 구성되고, 각 분할편은, 헤드에 설치된 후 제거되는 가조립링에 의해 조립된 때에 강선케이블을 통과시켜 파지시키도록 파지공을 구비하며, 그 강선케이블을 파지하여 헤드의 압착면에 설치한 때에 그 강선케이블을 고정시키도록 각 분할편의 외면이 원추 경사면으로 되고, 강선케이블의 인장력 해제에도 불구하고 헤드의 압착면에 분할웨지가 고착된 경우, 강선케이블을 그 꼬임방향으로 회전시킨 때에 나사운동에 의해 분할웨지를 헤드의 압착면으로부터 후방으로 강제로 이탈시키도록 상기 파지공에 나사부가 형성되는 것을 특징으로 하는 측벽붕괴방지 앵커구조를 제공한다.In addition, the present invention, one end of the coated steel wire is fixed to the split wedge provided on the head of the head inner body, which is anchored and inserted into the grouting hole formed in the side wall during construction work, grouted with concrete, and when the curing of the coated steel wire In the side wall collapse preventing anchor structure for tensioning the wire cable between the head inner body and the anchor head to prevent the collapse of the side wall, and to easily remove the steel wire cable of the head inner body when the construction work is completed. The steel wire has a through hole through which the steel wedge is hermetically sealed, and when the split wedge is installed, a crimping surface which interacts with the outer surface of the split wedge is formed at the rear of the through hole to compress the split wedge and fix the steel wire cable. A protective cap which covers the rear of the head to be airtight through the member is fixedly installed at the rear of the head; The split wedge is composed of a plurality of split pieces to be separated from each other by being separated from the rear of the head by the compressive force or repulsive force of the steel wire cable when releasing the tension of the wire cable, each split piece is a temporary assembly ring that is removed after being installed in the head The gripping hole is provided so that the steel wire cable can be passed through and gripped when the steel wire cable is assembled. In the case where the split wedge is fixed to the crimping surface of the head despite the release of the tension of the steel wire cable, the split wedge is forcibly detached from the crimping surface of the head by screw movement when the cable is rotated in the twisting direction. It provides a side wall collapse preventing anchor structure characterized in that the threaded portion is formed in the gripping hole.

이하, 본 발명의 일실시예에 대하여 첨부도면을 참조하면서 상세히 설명한다.Hereinafter, an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

도 2에는 본 발명의 일실시예에 따른 측벽붕괴방지 앵커인 헤드내하체(20)의 구조가 단면도로서 도시되고, 도 3에는 보호캡을 제거한 상태의 좌측면도가 도시되며, 도 4, 도 5 및 도 6에는 분할웨지(30)의 구조가 정면도, 단면도 및 좌측면도로서 도시된다.Figure 2 is a cross-sectional view of the structure of the head inner body 20 is a side wall collapse preventing anchor according to an embodiment of the present invention, Figure 3 is a left side view of the protective cap removed state, Figure 4, Figure 5 6 shows the structure of the split wedge 30 as a front view, a sectional view and a left side view.

도 2 및 도 3에서 헤드내하체(20)는, 헤드(21)와 그 보호캡(25) 및 분할웨지(30)로 구성되며, 그 헤드(21)에는, 피복 강선(10)이 기밀되게 통과하는 관통공(22)이 형성된다. 그 관통공(22)의 후방에는, 분할웨지(30)의 설치시 그 분할웨지(30)를 압축시켜 강선케이블(10')을 고정시키도록 분할웨지(30)의 외면과 상호작용하는 압착면(22a)이 예를 들어 원추경사면 형상으로 형성되고, 경질크롬으로 도금되는 것이 고착을 방지하고 분할웨지(30)의 이탈을 용이하게 하는 점에서 바람직하다.In FIG. 2 and FIG. 3, the head load-bearing body 20 includes a head 21, a protective cap 25, and a split wedge 30. The head 21 has a hermetically sealed steel wire 10. A through hole 22 passing through is formed. At the rear of the through hole 22, a compression surface which interacts with the outer surface of the split wedge 30 to compress the split wedge 30 when the split wedge 30 is installed to fix the steel wire cable 10 '. It is preferable that 22a is formed, for example, in the shape of a conical inclined surface, and plated with hard chromium in terms of preventing sticking and facilitating the separation wedge 30.

또, 상기 헤드(21)에는 그 외주에 형성되는 그라우팅 홈(23)이 형성되는 바, 도 2에서와 같이 그리우팅 콘크리트(6)의 양생시 전방으로부터의 인장력에 강하게 대항하는 톱니형상과 같은 구조로 형성되는 것이 바람직하다.In addition, the head 21 is formed with a grouting groove 23 formed at its outer circumference, and as shown in FIG. 2, a tooth-like structure strongly opposed to a tensile force from the front during curing of the grouting concrete 6. It is preferable to form.

보호캡(25)은, O링과 같은 밀폐부재(24)를 개재하여 기밀되게 헤드(21)의 후방에 나사 등을 이용하여 고정되게 설치되며, 그 보호캡(25)의 내면에는, 도 2, 도 7 및 도 8에 도시된 바와 같이, 강선케이블(10')을 회전시켜 인출시키는 때에 분할웨지(30)가 압착면(22a)으로부터 헤드(21)의 후방으로 용이하게 이탈되게 하고, 강선케이블(10')에 고착될 수 있는 분할웨지(30)를 그 강선케이블(10')로부터 분리시킴과 동시에 각 분할편(30a,30b,30c)으로 분할웨지(30)를 분리시키도록 와이어 브러쉬와 같은 제거부재(26)가 설치되는 것이 바람직하다.The protective cap 25 is installed to be fixed to the rear of the head 21 by a screw or the like through an airtight member 24 such as an O-ring, and is mounted on the inner surface of the protective cap 25. 7 and 8, the split wedge 30 is easily detached from the crimping surface 22a to the rear of the head 21 when the steel wire cable 10 'is pulled out and the wire is pulled out. A wire brush to separate the split wedge 30 that can be secured to the cable 10 'from the steel wire cable 10' and to separate the split wedge 30 into each split piece 30a, 30b, 30c. It is preferable that such a removing member 26 is installed.

분할웨지(30)는, 도 4 내지 도 6에 그 조립상태로 도시된 바와 같이, 강선케이블(10')을 파지하여 헤드내하체(20)에 고정시키고, 강선케이블(10')의 인장력을 해제한 때에 강선케이블(10')의 압축력 내지 반발력에 의해 헤드(21)의 후방으로 이탈되어 서로 분리되도록 다수의 분할편(30a,30b,30c)으로 구성된다.Split wedge 30, as shown in the assembled state in Figures 4 to 6, to hold the wire cable 10 'fixed to the head load-bearing body 20, the tension of the wire cable 10' It is composed of a plurality of split pieces 30a, 30b, 30c so as to be separated from each other by being separated from the rear of the head 21 by the compressive force or the repulsive force of the steel wire cable 10 'when released.

각 분할편(30a,30b,30c)은, 헤드(21)에 설치된 후 제거되는 가조립링(35)에 의해 조립된 때에 강선케이블(10')을 통과시켜 파지시키도록 파지공(31)을 구비하며, 그 강선케이블(10')을 파지하여 헤드(21)의 압착면(22a)에 삽입된 때에 상기 압착면(22a)과 상호 캠작용을 하여 강한 인장력에 대항하여 그 강선케이블(10')을 고정시키도록 각 분할편(30a,30b,30c)의 외면이 원추 경사면으로 형성된다.Each of the divided pieces 30a, 30b, 30c is provided with a gripping hole 31 so as to pass through the steel wire cable 10 'to be gripped when assembled by the temporary assembly ring 35 that is installed in the head 21 and then removed. When the wire cable 10 'is gripped and inserted into the compression surface 22a of the head 21, the wire cable 10' is opposed to a strong tensile force by mutual cam-action with the compression surface 22a. The outer surface of each of the divided pieces 30a, 30b, and 30c is formed as a cone inclined surface to fix it.

또한, 강선케이블(10')의 인장력 해제에도 불구하고 헤드(21)의 압착면(22a)에 분할웨지(30)가 고착된 경우, 다수의 강선와이어로 꼬여진 강선케이블(10')을 그 꼬임방향으로 감속기계 등으로 강제로 회전시킨 때에 나사운동에 의해 분할웨지(30)를 헤드(21)의 압착면(22a)으로부터 후방으로 강제로 이탈시키도록 상기 파지공(31)에 나사부(32)가 형성된다. 분할웨지(30)가 강하게 고착된 경우, 강선케이블(10')을 회전시켜 압착면(22a)으로부터 분할웨지(30)를 이탈시키는 데에는 상기 나사부(32)를 45도의 3각나사로 한 때에 가장 효과적이었다. 또한, 압착면(22a)과 유사하게 분할웨지(30)의 외면인 원추경사면도 경질크롬으로 도금되는 것이 고착을 방지하고 이탈을 효과적으로 하기 위해 바람직하며, 피복 강선(10)의 내부의 강선케이블(10')의 외주 및/또는 분할웨지(30)와 압착면(22a)사이에 그리스 등을 도포하는 것이 인출시 그 인출을 용이하게 한다.In addition, when the split wedge 30 is fixed to the crimping surface 22a of the head 21 in spite of releasing the tensile force of the wire cable 10 ', the wire cable 10' twisted with a plurality of wire wires When forcibly rotated by a deceleration machine or the like in the twisting direction, the threaded portion 32 is formed in the gripping hole 31 so that the split wedge 30 is forcibly released from the pressing surface 22a of the head 21 by the screw movement. ) Is formed. When the split wedge 30 is firmly fixed, it is most effective when the threaded part 32 is a 45 degree triangular screw to rotate the steel wire cable 10 'to separate the split wedge 30 from the crimp surface 22a. It was. In addition, the conical inclined surface, which is the outer surface of the split wedge 30, similarly to the crimped surface 22a, is preferably plated with hard chromium in order to prevent sticking and to effectively remove the wires. The application of grease or the like between the outer circumference of 10 ') and / or the split wedge 30 and the pressing surface 22a facilitates the withdrawal at the time of withdrawal.

상술한 구조의 측벽붕괴방지를 위한 본 발명의 헤드내하체(20)의 작용 및 효과가, 본 발명에 따른 측벽붕괴방지 앵커 강선 제거방법에 의해 강선을 제거하는 과정을 설명하기 위한 도 1과 유사한 설명도인 7 및 도 8과 함께 다음에 설명된다.The action and effect of the head load bearing body 20 of the present invention for preventing sidewall collapse of the structure described above is similar to FIG. 1 for explaining a process of removing the steel wire by the method for removing the sidewall collapse preventing anchor wire according to the present invention. The following is explained in conjunction with the explanatory diagrams 7 and 8.

먼저, 토건공사시 그라우팅을 위해서 측벽(4)에 그라우팅공(5)을 형성하고, 그 그라우팅공(5)에 헤드내하체(20)와 함께 피복 강선(10)을 삽입한다. 이때, 그 헤드내하체(20)는 피복 강선(10)의 일단이 헤드(21)의 관통공(22)에 기밀되게 삽입되고, 그 단부의 강선케이블(10')이 가조립링(35)에 의한 조립상태의 분할웨지(30)의 파지공(31)에 삽입, 파지된 채, 헤드(21)의 압착면(22a)에 분할웨지(30)가 압입, 고정된 상태로 조립되며, 가조립링(35)은 절단 등에 의해 제거된 상태로 된다.First, a grouting hole 5 is formed in the side wall 4 for grouting in civil construction, and the coated steel wire 10 is inserted into the grouting hole 5 together with the head load-bearing body 20. At this time, the head load body 20 is one end of the coated steel wire 10 is inserted into the through-hole 22 of the head 21 to be hermetically inserted, the steel wire cable 10 'of the end of the head assembly ring 35 The split wedge 30 is press-fitted and fixed to the pressing surface 22a of the head 21 while being inserted and gripped by the gripping hole 31 of the split wedge 30 in the assembled state, and the pre-assembled ring 35 is removed by cutting or the like.

그 뒤, 도 1에서와 같이 그라우팅 호스(15)를 통해 콘크리트를 주입하고, 양생시킨 후, 종래와 같이 앵커용 헤드(11), 인장실린더(12), 인장용 헤드(13)를 통해 강선케이블(10')을 인장시킴으로써 도 7에서와 같이 측벽(4)의 붕괴를 방지하기 위한 앵커의 역할을 하게 된다.Then, after injecting and curing the concrete through the grouting hose 15, as shown in Figure 1, the steel wire cable through the anchor head 11, the tension cylinder 12, the tension head 13 as in the prior art By pulling the 10 ', it acts as an anchor to prevent the collapse of the side wall 4 as shown in FIG.

이와 같이 측벽(4)의 붕괴를 방지시킨 상태에서 토건공사를 완료하면, 다시 해체하고, 가급적 임시설치물들은 제거하고, 흙을 채워 원래의 상태로 하거나 또는 도로를 형성하는 등의 공사를 하기도 한다.As such, when the construction work is completed in the state of preventing the collapse of the side wall 4, it is dismantled again, and if necessary, temporary installations are removed, and the construction is performed such as filling the soil to the original state or forming a road.

해체시 일단 헤드내하체(20)의 헤드(21)와 피복 강선(10)의 피복물은 그리우팅 콘크리트(6)와 함께 매장되더라도 길이가 긴 강선케이블(10')은 가급적 100% 인출하여 재사용하고, 또한, 이와 같이 제거하는 것이 환경오염방지면에서도 바람직하다.At the time of dismantling, even if the coating of the head 21 and the coated steel wire 10 of the head undercarriage 20 is buried together with the grouting concrete 6, the long steel wire cable 10 'is drawn out and reused as much as possible. In addition, it is preferable to remove in this way also from the viewpoint of environmental pollution.

본 발명의 일실시예에 따른 방법은, 토건공사완료시 그 헤드내하체(20)의 강선케이블(10')을 제거하는 방법에 있어서: 상기 강선케이블(10')의 인장력을 제거하기 위해 앵커용 헤드(11) 내측의 강선케이블(10')을 절단하고 강선케이블(10')을 그 꼬임방향으로 감속기계 등으로 비틀어 회전시킴으로써 그 강선케이블(10')이 더욱 꼬이면서 그 비틂력에 의해 압착면(22a)사이의 고착력이 파열되어, 헤드(21)의 후방으로 압착면(22a)으로부터 강제로 분할웨지(30)가 이탈되는 것이다.The method according to an embodiment of the present invention, in the method of removing the wire cable (10 ') of the head undercarriage (20) when the construction work is completed: anchor to remove the tensile force of the wire cable (10') By cutting the steel wire cable 10 'inside the dragon head 11 and twisting the steel wire cable 10' in a twisting direction with a deceleration machine or the like, the steel wire cable 10 'is further twisted, The sticking force between the crimping surfaces 22a ruptures, and the split wedge 30 is forcibly separated from the crimping surfaces 22a to the rear of the head 21.

이와 같이 이탈시킴으로써 압착면(22a)으로부터 후방으로 순간적으로 파열되듯이 돌출하여 나가 각 분할편(30a,30b,30c)으로 분리되기 때문에 분할웨지(30)에 의한 장애없이 강선케이블(10')을 거의 100% 크레인 등으로 인출하여 제거할 수 있게 된다.In this way, the wire cable 10 'is removed without obstacles caused by the split wedge 30 because it is separated into the divided pieces 30a, 30b, and 30c by protruding out of the crimping surface 22a and bursting backwards. Almost 100% of the crane can be taken out and removed.

이 경우, 분할웨지(30)의 파지공(31)에 45도 3각나사로 된 나사부(32)를 형성하여 강선케이블(10')을 비틂으로써 순간적인 나사운동에 의해 그 강선케이블(10')을 순간적으로 압착면(22a)으로부터 더욱 강하게 파열되듯이 이탈시키고, 분할편(30a,30b,30c)이 서로 분리되어 나가게 하여 강선케이블(10')을 용이하게 인출,제거시킬 수 있게 된다.In this case, a threaded portion 32 made of a 45 degree triangular screw is formed in the gripping hole 31 of the split wedge 30 and the steel wire cable 10 'is formed by momentary screw movement by twisting the steel wire cable 10'. Is separated from the pressing surface 22a as if bursting more strongly, and the split pieces 30a, 30b, and 30c are separated from each other so that the wire cable 10 'can be easily drawn out and removed.

종래, 강선케이블(10')의 인장력을 제거하기 위해 앵커용 헤드(11) 내측의 강선케이블(10')을 절단하게 되는 바, 이때 인장력이 제거되면서 압축력 내지 반발력이 헤드내하체(20)에 대해 강선케이블(10')에 작용하게 됨으로써 헤드내하체(20)의 헤드(21)의 통상 원추면인 압착면(22a)으로부터 어느 정도 분할웨지(30)를 이탈시킬 수 있었지만, 강하게 고착된 경우, 완전하게는 이탈시키지 못하고, 강선케이블(10')의 인출시 다시 압착면(22a)에 박히게 되어 강선케이블(10')의 인출을 불가능하게 하였지만, 본 발명에 따라서는 아무리 강하게 박힌 분할웨지(30)라도 완전히 이탈시키고 제거하는 것이 가능하게 되었다.Conventionally, the steel wire cable 10 'inside the anchor head 11 is cut in order to remove the tensile force of the steel wire cable 10', wherein the compressive force or the repulsive force is removed from the head underbody 20 while the tensile force is removed. By acting on the steel wire cable 10 ', the split wedge 30 could be detached to some extent from the pressing surface 22a, which is a normal conical surface of the head 21 of the head lower body 20. Although not completely detached, the wire wedge cable 10 'is pulled back to the crimping surface 22a when the wire wire 10' is pulled out, but the wire wedge cable 10 'cannot be pulled out. It is possible to remove and remove completely.

따라서, 본 발명의 방법은, 이러한 종래의 문제점을 완전히 해결한 것이다.Therefore, the method of the present invention completely solves these conventional problems.

또한, 상술한 바와 같이 이탈된 분할웨지(30)가 강선케이블(10')에 고착된 경우에도 강선케이블(10')을 인출할 수 없게 된다. 이를 방지하기 위해 강선케이블(10')을 계속하여 회전시키면, 보호캡(25) 내부로 설치된 와어어 브러쉬와 같은 제거부재(26)에 충돌하면서 강선케이블(10')로부터 떨어져 나감과 동시에 분할웨지(30)가 각 분할편(30a,30b,30c)으로 분리되게 된다. 이와 같이분할웨지(30)가 분할편(30a,30b,30c)으로 분리되어 강선케이블(10')로부터 떨어져 나간 상태에서는 강선케이블(10')을 전방으로 인출하는 것이 100% 용이하게 이루어질 수 있게 된다.In addition, even when the separated wedge 30 is detached from the wire cable 10 'as described above, the wire cable 10' cannot be drawn out. In order to prevent this, when the steel wire cable 10 'is continuously rotated, the wedge is separated from the steel wire cable 10' while colliding with a removing member 26 such as a wire brush installed inside the protective cap 25, and at the same time, a split wedge. 30 is separated into each divided piece 30a, 30b, 30c. In this way, when the split wedge 30 is separated into the split pieces 30a, 30b, and 30c and is separated from the wire cable 10 ', the wire wedge cable 10' can be pulled forward 100% easily. do.

앞에서 설명한 바와 같이 본 발명의 실시예에 따른 측벽붕괴방지 앵커 강선 제거방법과 그 앵커구조의 구성과 작용에 의하면, 간단한 구조와 방법에 의해 토목공사나 건축공사장에서 지하 터파기 또는 절토작업 등에 사용된 측벽붕괴방지용 강선케이블(10')을 공사완료시헤드내하체(20)로부터 강선케이블을 용이하게 완전히 제거할 수 있어 자원재활용 및 환경보호에 만전을 기할 수 있는 등의 효과가 있다.As described above, according to the method of removing the side wall collapse preventing anchor wire according to the embodiment of the present invention and the structure and function of the anchor structure, the side wall used for underground excavation or cutting work in civil engineering or building construction by a simple structure and method The steel wire cable 10 'for preventing collapse can be easily removed completely from the head load-bearing body 20 when the construction is completed, thereby making it possible to ensure complete resource recycling and environmental protection.

Claims (5)

토건공사시 측벽(4)에 그라우팅공(5)을 형성하고, 그 그라우팅공(5)에 헤드내하체(20)와 함께 피복 강선(10)을 삽입하여 콘크리트(6)로 그라우팅시킨 후, 양생된 때에 그 피복 강선(10)의 강선케이블(10')을 앵커용 헤드(11)에 대해 인장시켜 측벽(4)의 붕괴를 방지시키고, 토건공사완료시 그 헤드내하체(20)의 강선케이블(10')을 제거하는 방법에 있어서:The grouting hole (5) is formed in the side wall (4) during civil construction, and the grouting hole (5) is inserted into the grouting hole (5) with the coated steel wire (10) and grouted with concrete (6). When the steel wire cable 10 'of the sheathed steel wire 10 is tensioned with respect to the anchor head 11, the side wall 4 is prevented from collapsing. In the method of removing (10 '): 상기 강선케이블(10')의 인장력을 제거하기 위해 앵커용 헤드(11) 내측의 강선케이블(10')을 절단하고 강선케이블(10')을 그 꼬임방향으로 비틀어 회전시킴으로써 그 강선케이블(10')이 더욱 꼬이면서 헤드내하체(20)의 헤드(21)의 후방으로 헤드(21)의 압착면(22a)으로부터 강제로 분할웨지(30)를 이탈시키는 것을 특징으로 하는 측벽붕괴방지 앵커 강선 제거방법.In order to remove the tensile force of the steel wire cable 10 'by cutting the steel wire cable 10' inside the anchor head 11 and twisting the wire cable 10 'in the twisting direction to rotate the steel wire cable 10'. Side wall collapse prevention anchor wire removal, characterized in that the split wedge 30 is forcibly separated from the pressing surface (22a) of the head 21 to the rear of the head 21 of the head inner body (20) more twisted) Way. 제 1 항에 있어서, 피복 강선(10)을 헤드내하체(20)와 함께 그라우팅공(5)에 삽입하는 때에 상기 분할웨지(30)의 파지공(31)에 45도 3각나사로 된 나사부(32)를 형성하여 강선케이블(10')을 고정시키고, 분할웨지(30)의 나사부(32) 를 개재하여 순간적인 나사운동을 시킴으로써 그 강선케이블(10')을 순간적으로 압착면(22a)으로부터 이탈시키고, 분할편(30a,30b,30c)이 서로 분리되어 나가게 하여 강선케이블(10')을 용이하게 인출,제거시키며;The screw portion of claim 1, wherein when the coated steel wire 10 is inserted into the grouting hole 5 together with the head inner body 20, the screw portion having a 45 degree triangular screw into the gripping hole 31 of the split wedge 30 32 is formed to fix the steel wire cable 10 ', and instantaneous screw movement is performed through the threaded portion 32 of the split wedge 30 so that the steel wire cable 10' is instantaneously removed from the crimping surface 22a. To separate and separate the split pieces 30a, 30b, and 30c from each other so that the wire cable 10 'can be easily pulled out and removed; 또한, 부식 등에 의해 강선케이블(10')에 고착된 분할웨지(30)의 경우, 보호캡(25) 내측에 설치된 와이어 브러쉬와 같은 제거부재(26)에 의해 계속 강선케이블(10')의 회전시 그 제거부재(26)에 걸려 강선케이블(10')로부터 분할편(30a,30b,30c)이 분리되어 나가게 하여 강선케이블(10')을 더욱 용이하게 인출,제거시키는 것을 특징으로 하는 측벽붕괴방지 앵커 강선 제거방법.In addition, in the case of the split wedge 30 fixed to the steel wire cable 10 'due to corrosion or the like, the steel wire cable 10' is continuously rotated by a removing member 26 such as a wire brush installed inside the protective cap 25. Side wall collapse, characterized in that the divided pieces (30a, 30b, 30c) are separated from the steel wire cable (10 ') by being caught by the removal member (26) to draw out and remove the steel wire cable (10') more easily. How to remove anchor liners. 앵커인 헤드내하체(20)의 헤드(21)에 설치되는 분할웨지(30)에 피복 강선(10)의 일단이 고정되고 토건공사시 측벽(4)에 형성된 그라우팅공(5))에 삽입되어 콘크리트(6)로 그라우팅시킨 후, 양생된 때에 그 피복 강선(10)의 강선케이블(10')을 헤드내하체(20) 및 앵커용 헤드(11)사이에서 인장시켜 측벽(4)의 붕괴를 방지시키고, 토건공사완료시 그 헤드내하체(20)의 강선케이블(10')을 용이하게 제거하기 위한 측벽붕괴방지 앵커구조에 있어서:One end of the coated steel wire 10 is fixed to the split wedge 30 installed on the head 21 of the head inner body 20, which is an anchor, and inserted into the grouting hole 5 formed on the side wall 4 during construction work. After grouting with concrete 6, when cured, the steel wire cable 10 'of the coated steel wire 10 is tensioned between the head inner body 20 and the anchor head 11 so as to collapse the side wall 4. In the sidewall collapse preventing anchor structure for preventing and easily removing the steel wire cable 10 'of the head undercarriage 20 when the construction work is completed: 상기 헤드(21)는 피복 강선(10)이 기밀되게 통과하는 관통공(22)을 구비하고, 분할웨지(30)의 설치시 그 분할웨지(30)를 압축시켜 강선케이블(10')을 고정시키도록 분할웨지(30)의 외면과 상호작용하는 압착면(22a)이 그 관통공(22)의 후방에 형성되며, 밀폐부재(24)를 개재하여 기밀되게 헤드(21)의 후방을 커버하는 보호캡(25)이 헤드(21)의 후방에 고정되게 설치되고, 강선케이블(10')을 그 꼬임방향으로 회전시킨 때에 분할웨지(30)가 압착면(22a)으로부터 헤드(21)의 후방으로 이탈된 후, 강선케이블(10')로부터 분할웨지(30)를 분리시킴과 동시에 각 분할편(30a,30b,30c)으로 분할웨지(30)를 분리시키도록 와이어 브러쉬와 같은 제거부재(26)가 상기 보호캡(25)의 내부에 설치되며;The head 21 has a through hole 22 through which the sheathed steel wire 10 is hermetically passed, and when the split wedge 30 is installed, the split wedge 30 is compressed to fix the steel wire cable 10 '. A pressing surface 22a which interacts with the outer surface of the split wedge 30 is formed at the rear of the through hole 22 so as to cover the rear of the head 21 to be hermetically sealed through the sealing member 24. The protective cap 25 is fixed to the rear of the head 21, and when the steel wire cable 10 'is rotated in the twisting direction, the split wedge 30 is rearward of the head 21 from the pressing surface 22a. After the separation, the separating wedge 30 such as a wire brush to separate the split wedge 30 from the steel wire cable 10 'and at the same time separate the split wedge 30 into each split piece 30a, 30b, 30c. ) Is installed inside the protective cap 25; 상기 분할웨지(30)는 강선케이블(10')의 인장력을 해제한 때에 강선케이블(10')의 압축력 내지 반발력에 의해 헤드(21)의 후방으로 이탈되어 서로 분리되도록 다수의 분할편(30a,30b,30c)으로 구성되고, 각 분할편(30a,30b,30c)은, 헤드(21)에 설치된 후 제거되는 가조립링(35)에 의해 조립된 때에 강선케이블(10')을 통과시켜 파지시키도록 파지공(31)을 구비하며, 그 강선케이블(10')을 파지하여 헤드(21)의 압착면(22a)에 설치한 때에 그 강선케이블(10')을 고정시키도록 각 분할편(30a,30b,30c)의 외면이 원추 경사면으로 되는 것을 특징으로 하는 측벽붕괴방지 앵커구조.The split wedges 30 are separated from each other by being separated from the rear of the head 21 by the compressive or repulsive force of the steel wire cable 10 'when the tensioning force of the steel wire cable 10' is separated from each other. 30b, 30c, and each of the divided pieces 30a, 30b, 30c passes through the steel wire cable 10 'and is gripped when assembled by the temporary assembling ring 35 which is installed on the head 21 and then removed. And a gripping hole 31 so as to grip the wire cable 10 'and to install the wire cable 10' on the crimping surface 22a of the head 21 to fix the wire cable 10 '. Side wall collapse preventing anchor structure, characterized in that the outer surface of the, 30b, 30c is a cone slope. 앵커인 헤드내하체(20)의 헤드(21)에 설치되는 분할웨지(30)에 피복 강선(10)의 일단이 고정되고 토건공사시 측벽(4)에 형성된 그라우팅공(5))에 삽입되어 콘크리트(6)로 그라우팅시킨 후, 양생된 때에 그 피복 강선(10)의 강선케이블(10')을 헤드내하체(20) 및 앵커용 헤드(11)사이에서 인장시켜 측벽(4)의 붕괴를 방지시키고, 토건공사완료시 그 헤드내하체(20)의 강선케이블(10')을 용이하게 제거하기 위한 측벽붕괴방지 앵커구조에 있어서:One end of the coated steel wire 10 is fixed to the split wedge 30 installed on the head 21 of the head inner body 20, which is an anchor, and inserted into the grouting hole 5 formed on the side wall 4 during construction work. After grouting with concrete 6, when cured, the steel wire cable 10 'of the coated steel wire 10 is tensioned between the head inner body 20 and the anchor head 11 so as to collapse the side wall 4. In the sidewall collapse preventing anchor structure for preventing and easily removing the steel wire cable 10 'of the head undercarriage 20 when the construction work is completed: 상기 헤드(21)는 피복 강선(10)이 기밀되게 통과하는 관통공(22)을 지니며, 분할웨지(30)의 설치시 그 분할웨지(30)를 압축시켜 강선케이블(10')을 고정시키도록 분할웨지(30)의 외면과 상호작용하는 압착면(22a)이 그 관통공(22)의 후방에 형성되고, 밀폐부재(24)를 개재하여 기밀되게 헤드(21)의 후방을 커버하는 보호캡(25)이 헤드(21)의 후방에 고정되게 설치되며;The head 21 has a through hole 22 through which the sheathed steel wire 10 is hermetically passed, and when the split wedge 30 is installed, the split wedge 30 is compressed to fix the steel wire cable 10 '. The pressing surface 22a which interacts with the outer surface of the split wedge 30 is formed at the rear of the through hole 22 so as to cover the rear of the head 21 to be hermetically through the sealing member 24. The protective cap 25 is fixedly installed at the rear of the head 21; 상기 분할웨지(30)는 강선케이블(10')의 인장력을 해제한 때에 강선케이블(10')의 압축력 내지 반발력에 의해 헤드(21)의 후방으로 이탈되어 서로 분리되도록 다수의 분할편(30a,30b,30c)으로 구성되고, 각 분할편(30a,30b,30c)은, 헤드(21)에 설치된 후 제거되는 가조립링(35)에 의해 조립된 때에 강선케이블(10')을 통과시켜 파지시키도록 파지공(31)을 구비하며, 그 강선케이블(10')을 파지하여 헤드(21)의 압착면(22a)에 설치한 때에 그 강선케이블(10')을 고정시키도록 각 분할편(30a,30b,30c)의 외면이 원추 경사면으로 되고, 강선케이블(10')의 인장력 해제에도 불구하고 헤드(21)의 압착면(22a)에 분할웨지(30)가 고착된 경우, 강선케이블(10')을 그 꼬임방향으로 회전시킨 때에 나사운동에 의해 분할웨지(30)를 헤드(21)의 압착면(22a)으로부터 후방으로 강제로 이탈시키도록 상기 파지공(31)에 나사부(32)가 형성되는 것을 특징으로 하는 측벽붕괴방지 앵커구조.The split wedges 30 are separated from each other by being separated from the rear of the head 21 by the compressive or repulsive force of the steel wire cable 10 'when the tensioning force of the steel wire cable 10' is separated from each other. 30b, 30c, and each of the divided pieces 30a, 30b, 30c passes through the steel wire cable 10 'and is gripped when assembled by the temporary assembling ring 35 which is installed on the head 21 and then removed. And a gripping hole 31 so as to grip the wire cable 10 'and to install the wire cable 10' on the crimping surface 22a of the head 21 to fix the wire cable 10 '. When the outer surface of the 30b and 30c becomes the conical inclined surface and the split wedge 30 is fixed to the crimping surface 22a of the head 21 in spite of the release of the tension force of the steel wire cable 10 ', the steel wire cable 10 ') Is rotated in its twisting direction to force the split wedge 30 to be forcibly separated from the pressing surface 22a of the head 21 by the screw movement. Jigong 31 threaded side wall collapse preventing the anchor structure characterized in that (32) is formed on. 제4항에 있어서, 상기 나사부(32)는 45도 3각나사이며, 상기 헤드(21)의 압착면(22a)과 분할웨지(30)의 외면인 원추경사면이 경질크롬으로 도금되고, 상기 헤드(21)에는 그 외주에 형성되는 그라우팅 홈(23)은 그라우팅시 전방으로부터의 인장력에 강하게 대항하는 구조의 톱니형상인 것을 특징으로 하는 측벽붕괴방지 앵커구조.The screw portion 32 is a 45 degree triangular screw, the conical inclined surface of the pressing surface 22a of the head 21 and the outer surface of the split wedge 30 is plated with hard chrome, the head (21), the grouting groove (23) formed on the outer circumference of the sidewall collapse preventing anchor structure, characterized in that the sawtooth of the structure strongly opposed to the tensile force from the front when grouting.
KR10-2001-0008879A 2001-02-22 2001-02-22 method and apparatus for removing a steel wire cable from an anchor for preventing side wall collapse KR100377633B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2001-0008879A KR100377633B1 (en) 2001-02-22 2001-02-22 method and apparatus for removing a steel wire cable from an anchor for preventing side wall collapse

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2001-0008879A KR100377633B1 (en) 2001-02-22 2001-02-22 method and apparatus for removing a steel wire cable from an anchor for preventing side wall collapse

Publications (2)

Publication Number Publication Date
KR20020068680A KR20020068680A (en) 2002-08-28
KR100377633B1 true KR100377633B1 (en) 2003-03-29

Family

ID=27695151

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2001-0008879A KR100377633B1 (en) 2001-02-22 2001-02-22 method and apparatus for removing a steel wire cable from an anchor for preventing side wall collapse

Country Status (1)

Country Link
KR (1) KR100377633B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100818504B1 (en) 2006-12-27 2008-03-31 (주) 공인건설 Tension soil nail and construction method of precast concrete panel using the same
CN102477739A (en) * 2010-11-23 2012-05-30 王立明 Embedded recyclable soil nail
KR101198871B1 (en) * 2009-12-16 2012-11-07 주식회사 삼우기초기술 Transverse supporting apparatus for standing underground retaining walls being given the earth pressure of backfill
CN108487242A (en) * 2018-03-26 2018-09-04 中冶沈勘工程技术有限公司 A kind of Recyclable anchor rope and application method

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108808594A (en) * 2018-06-14 2018-11-13 国网浙江省电力有限公司宁波供电公司 The cable penetration sleeve structure and its construction method of slip casting sealing
KR101943955B1 (en) * 2018-07-04 2019-01-31 세기하이테크건설 주식회사 Tendon construction method using rigid sheathed strand
CN111794520B (en) * 2020-06-17 2022-05-31 安徽金星预应力工程技术有限公司 Steel strand prestress tensioning device and method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH055938U (en) * 1991-07-09 1993-01-29 住友電気工業株式会社 Wedge stopper for pretensioning grip
KR19980072170A (en) * 1998-07-28 1998-10-26 이창훈 Temporary ground anchor body and tension material dismantling method
KR100237346B1 (en) * 1994-03-04 2000-01-15 이창훈 Earth anchor and construction method in situ.
KR20000039990A (en) * 1998-12-16 2000-07-05 김국일 Internal settling agent for removing stretching material for ground anchor
KR20000047445A (en) * 1998-12-16 2000-07-25 김정열 Fixing unit for removing tension bar for a ground anchor
KR20010016726A (en) * 1999-08-03 2001-03-05 이창훈 Removable ground anchorage and method disassembling tensile memberes
KR20010016264A (en) * 2000-11-28 2001-03-05 김지호 Removable anchor systems
KR20020014647A (en) * 2000-08-17 2002-02-25 이기웅 apparatus and method for removal anchor using double anchor head

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH055938U (en) * 1991-07-09 1993-01-29 住友電気工業株式会社 Wedge stopper for pretensioning grip
KR100237346B1 (en) * 1994-03-04 2000-01-15 이창훈 Earth anchor and construction method in situ.
KR19980072170A (en) * 1998-07-28 1998-10-26 이창훈 Temporary ground anchor body and tension material dismantling method
KR20000039990A (en) * 1998-12-16 2000-07-05 김국일 Internal settling agent for removing stretching material for ground anchor
KR20000047445A (en) * 1998-12-16 2000-07-25 김정열 Fixing unit for removing tension bar for a ground anchor
KR20010016726A (en) * 1999-08-03 2001-03-05 이창훈 Removable ground anchorage and method disassembling tensile memberes
KR20020014647A (en) * 2000-08-17 2002-02-25 이기웅 apparatus and method for removal anchor using double anchor head
KR20010016264A (en) * 2000-11-28 2001-03-05 김지호 Removable anchor systems

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100818504B1 (en) 2006-12-27 2008-03-31 (주) 공인건설 Tension soil nail and construction method of precast concrete panel using the same
KR101198871B1 (en) * 2009-12-16 2012-11-07 주식회사 삼우기초기술 Transverse supporting apparatus for standing underground retaining walls being given the earth pressure of backfill
CN102477739A (en) * 2010-11-23 2012-05-30 王立明 Embedded recyclable soil nail
CN102477739B (en) * 2010-11-23 2015-02-11 王立明 Embedded recyclable soil nail
CN108487242A (en) * 2018-03-26 2018-09-04 中冶沈勘工程技术有限公司 A kind of Recyclable anchor rope and application method

Also Published As

Publication number Publication date
KR20020068680A (en) 2002-08-28

Similar Documents

Publication Publication Date Title
AU770277B2 (en) Post-tension anchor seal cap
KR100377633B1 (en) method and apparatus for removing a steel wire cable from an anchor for preventing side wall collapse
CN109162743B (en) Friction-shearing combined quasi-constant-resistance large-deformation anchor cable
KR100741405B1 (en) A tie cable
KR101074293B1 (en) Compressed sealing apparatus for unbonded tendon, and anchorage, anchorage construction method, anchor, anchor construction method using the same
KR100284670B1 (en) Temporary ground anchor body and tension material dismantling method
KR100699334B1 (en) A Tie Cable Binding Device
CN111648361A (en) Recoverable device for prestressed anchor cable and construction method thereof
WO2014098310A1 (en) Removable ground anchor body using spring
US8292545B2 (en) Small diameter splitter and method
CN103410252B (en) Construction and installation riveting plate and construction and installation structure
KR20000007547U (en) Compression Removal Anchors
KR20040042975A (en) Removable Ground Anchor
KR101241403B1 (en) Removal anchor
CN210066742U (en) Sleeve bead type detachable anchorage device
CN213538957U (en) Single-recoverable anchor rod
JP3350681B2 (en) Tunnel lining segment and assembly method thereof
CN104929668B (en) Anchor cable dismounting joint and anchor cable method for dismounting
KR20090033290A (en) Internal fixture of tension wire removal type ground anchorage
KR200188101Y1 (en) Ground anchorage
KR100479569B1 (en) Tension member removable anchoring apparatus using of fixable-ring and controllable-board
KR100394542B1 (en) Ground anchorage
KR200313709Y1 (en) Ground Anchor
JP3330107B2 (en) Structure of anchoring part of PC steel and method of injecting buffer material in anchoring part of PC steel
CN111827308A (en) Recoverable anchor cable structure and use method thereof

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20090306

Year of fee payment: 7

LAPS Lapse due to unpaid annual fee