KR100374061B1 - Soil improvement technique for foundation applied to reinforced earth theory using h-pile and belt-types armature material - Google Patents

Soil improvement technique for foundation applied to reinforced earth theory using h-pile and belt-types armature material Download PDF

Info

Publication number
KR100374061B1
KR100374061B1 KR10-1999-0048685A KR19990048685A KR100374061B1 KR 100374061 B1 KR100374061 B1 KR 100374061B1 KR 19990048685 A KR19990048685 A KR 19990048685A KR 100374061 B1 KR100374061 B1 KR 100374061B1
Authority
KR
South Korea
Prior art keywords
earth
pile
reinforcement
road
tie strap
Prior art date
Application number
KR10-1999-0048685A
Other languages
Korean (ko)
Other versions
KR20000006804A (en
Inventor
정재영
Original Assignee
한국기술개발 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국기술개발 주식회사 filed Critical 한국기술개발 주식회사
Priority to KR10-1999-0048685A priority Critical patent/KR100374061B1/en
Publication of KR20000006804A publication Critical patent/KR20000006804A/en
Application granted granted Critical
Publication of KR100374061B1 publication Critical patent/KR100374061B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0241Retaining or protecting walls comprising retention means in the backfill the retention means being reinforced earth elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Road Paving Structures (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

본 발명은 에이취 파일을 이용하는 가설 보강토 공법에 관한 것으로서, 더욱 상세하게는 에이취 파일의 가설 공사중 공학적인 조립식 보강토 공법을 적용하여 안전하게 시공하고, 보강재를 제외한 자재를 100% 재사용할 수 있는 방법을 제공함과 아울러 보강토 공법으로 토류판에 토압을 감소시키고 보강재를 제외한 모든 자재를 100% 재사용하는 효과를 가지는 에이취 파일과 띠형 보강재의 가설 보강토 공법에 관한 것이다.The present invention relates to a temporary reinforcement earth process using a pile, more specifically, to provide a method that can be safely installed by applying the engineering prefabricated reinforcement earth method during the construction of a pile, and 100% reusable material except the reinforcement and In addition, it is related to the temporary reinforcement earthwork method of H. pile and strip type reinforcement that has the effect of reducing the earth pressure on the earth plate by reinforcement earth method and reusing all materials except the reinforcement material.

본 발명은, 도로 중앙에 에이취 파일을 박고, 어스 앵커 작업을 굴착 작업과 병행하면서 에이취 파일 사이에 토류판과 타이 스트랩을 부착한 L 형강을 삽입하고, 도로를 굴착한 후 타이 스트랩에 보강재를 연결하고 토류판에 흙포대 쌓기와 어스 앵커의 에이취 빔의 제거를 반복하면서 성토를 완료하고, 반대편 도로는 어스 앵커의 케이블을 끊으면서 굴착하고, 토류판 제거 및 타이 스트랩과 보강재의 볼트를 분리시켜 엘(L) 형강을 제거하고 성토한 후 에이취 파일을 뽑아내는 에이취 파일을 이용하는 가설 보강토 공법을 제공한다.According to the present invention, the H pile is placed in the center of the road, the earth anchor work is carried out in parallel with the excavation work, and the L-shaped steel attached with the earth plate and the tie strap is inserted between the H piles, and the reinforcing material is connected to the tie strap after the excavation of the road. Complete the fill by repeating the earthen bags on the earth plate and removing the anchor beams of the earth anchors, and excavating the other side roads by disconnecting the cables of the earth anchors, and removing the earth plate and separating the tie straps and bolts of the reinforcements. It provides a temporary reinforcement soil method using H pile to remove H-beams and extract H- piles.

Description

에이취 파일과 띠형 보강재의 가설 보강토 공법{SOIL IMPROVEMENT TECHNIQUE FOR FOUNDATION APPLIED TO REINFORCED EARTH THEORY USING H-PILE AND BELT-TYPES ARMATURE MATERIAL}SOIL IMPROVEMENT TECHNIQUE FOR FOUNDATION APPLIED TO REINFORCED EARTH THEORY USING H-PILE AND BELT-TYPES ARMATURE MATERIAL}

본 발명은 도로 또는 교량을 확장할 경우의 가설 공사에 있어 에이취 파일을 이용하는 가설 보강토 공법에 관한 것으로서, 더욱 상세하게는 에이취 파일의 가설 공사중 공학적인 조립식 보강토 공법을 적용하여 안전하게 시공하고, 보강재를 제외한 자재를 100% 재사용할 수 있는 방법을 제공함과 아울러 보강토 공법으로 토류판에 토압을 감소시키고 보강재를 제외한 모든 자재를 100% 재사용하는 효과를 가지는 에이취 파일과 띠형 보강재의 가설 보강토 공법에 관한 것이다.The present invention relates to a temporary reinforcement soil method using a pile in the construction of roads or bridges when expanding, more specifically, by safely applying engineering prefabricated reinforced soil method during construction of a pile pile, excluding reinforcement The present invention relates to a temporary reinforcement earthwork method of H. pile and band-shaped reinforcement that provides a method of 100% reuse of materials and reduces the earth pressure on earth plate by reinforcement earth method and reuses all materials except reinforcement material 100%.

종래의 가시설 공사는 기존 도로의 측면에 에이취 파일(H-pile)을 박고 한쪽 도로를 굴착하면서 어스 앵커(Earth-anchor)에 대한 작업을 실시한 후 작업이 완료되면 토류판을 제거하기 위하여 반대편 쪽으로 다시 굴착하면서 어스 앵커 작업을 실시한다.이 방법은 이중의 어스 앵커 작업을 요구하며 공기가 크게 연장된다. 케이블(cable)을 삽입하는 타이 케이블(Tie-cable) 공법 및 와이어 로프 + 턴 버클(Wire rope + turn buckle) 공법도 사용하지만 공법이 난이하며, 도로 구조에 따라서 공법 적용에 제한이 따르므로 적용이 불가능할 때가 있고, 또한 도로의 양측면을 에이취 파일로 고정하기 때문에 어스 앵커 작업과 함께 두 배의 에이취 파일이 필요하게 된다.이와 같은 굴착 방법은 어스 앵커의 수직 수평간격이 약 2m 이상으로 크기때문에 일반 콘크리트 옹벽과 같은 높은 토압을 받으며, 시공 후 일부 토류판이 휘어지던가 파손되는 불안정한 경우를 종종 볼수 있고, 토류판 제거시 과도한 토압에 의하여 자칫 붕괴의 위험이 따르기 때문에 에이취 파일과 어스 앵커를 지지한 에이취 빔(H-beam)과 토류판과 에이취 파일을 구조물 속에 묻어버리는 경우가 있어 공법상 부적절하다.Conventional temporary construction works with earth-anchor by attaching H-pile to the side of the existing road, excavating one road, and then excavating again to the other side to remove the earth plate when the work is completed. Earth anchor work is performed, which requires double earth anchor work and greatly extends air. Tie-cable and wire rope + turn buckle methods that insert cables are also used, but the method is difficult and the application of the method is difficult because the road construction is restricted. There are times when it is not possible, and since both sides of the road are fixed with a pile of anchors, double anchor piles are required along with the earth anchoring operation. This excavation method is a general concrete because the vertical horizontal distance of the earth anchor is larger than about 2 m. Hike beams supporting H pile and earth anchor are often seen as unstable under high earth pressure such as retaining walls, and some earth plates are bent or broken after construction, and there is a risk of collapse due to excessive earth pressure when removing the earth plate. -beam), earth plate and H. pile may be buried in the structure, which is inappropriate for construction.

본 발명은 에이취 파일의 가설 공사중 도로 구조상 가설 공법이 난이한 곳에 공학적인 조립식 보강토 공법을 적용하여 안전하게 시공하고, 조립된 모든 부재중 보강재를 제외한 자재를 100% 재사용할 수 있는 방법을 제공하는데 목적이 있다.따라서, 본 발명의 목적은 도로 확장 공사에 필연적으로 수반되는 가설 공사를 전면의 토압이 극히 미미하여 거의 적용하지 않는 공학적인 조립식 보강토 공법을 적용하여 안전하며, 에이취 파일의 소요량이 종래에 비하여 월등히 적고 보강재를 제외한 각종 자재를 작업과정에서 제거하여 재사용할 수 있는 경제적이며 조직적인 가설 보강토 공사를 제공하는데 있다.The purpose of the present invention is to provide a method that can be safely installed by applying the engineering prefabricated reinforcement soil method where the construction method of the construction of H. pile pile is difficult, and 100% reusable material except all assembled reinforcement materials. Therefore, the object of the present invention is safe by applying the engineering prefabricated reinforcement soil method, which hardly applies to the temporary construction work that is inevitably accompanied by road extension construction, the front earth pressure is very small, and the required amount of H. pile is much smaller than before. It is to provide economic and organizational temporary reinforcement soil construction that can be reused by removing various materials except work reinforcement.

도 1,2는 타이 스트랩과 엘(L) 형강을 조립한 전개도.1,2 is an exploded view of the tie strap and the L (L) section steel assembled.

도 3은 에이취 파일과 엘 형강과 보강재를 조립한 전개도.3 is a developed view of the H pile and the el section steel and reinforcing materials assembled.

도 4는 에이취 파일과 보강재 및 어스 앵커 측면도.4 is a side view of the pile and the reinforcement and earth anchor.

<도면의 주요부분에 대한 부호의 설명><Description of the code | symbol about the principal part of drawing>

1 : 철재 띠형 보강재 2 : 엘(L) 형강1: Steel strip type reinforcement 2: L (L) section steel

3 : 타이 스트랩(tie-strap) 4 : 에이취 파일(H-pile)7 : 토류판 10: 엘형 타이스트랩(L-tie strap)3: tie-strap 4: H-pile 7: earth plate 10: L-tie strap

볼트로 조립된 구조물은 볼트 결합의 역순으로 해체할 수 있으며, 이를 첨부된 도면에 의하여 그 구성을 설명하면 다음과 같다.Structure assembled with bolts can be dismantled in the reverse order of bolt coupling, the configuration of which will be described by the accompanying drawings as follows.

<실시예><Example>

도 1에서, 길이방향의 양단에 볼트 구멍(2b)과 중앙부에 볼트 구멍(도시없음)이 형성된 엘(L) 형강(2)과, 수직하게 엘 형강(2)의 하부에 부착되고 길이방향의 양단에 볼트 구멍(3a)이 형성된 타이 스트랩(tie strap)(3)이 볼트(2a)에 의해 일체형으로 조립된 엘형 타이스트랩(L-tie strap)(10)을 도시하고 있다.In Fig. 1, the L-shaped steel 2 formed with the bolt hole 2b at both ends in the longitudinal direction and the bolt hole (not shown) at the center thereof, and is vertically attached to the lower portion of the L-shaped steel 2 and is in the longitudinal direction. An L-tie strap 10 is shown in which a tie strap 3 having bolt holes 3a formed at both ends is integrally assembled by a bolt 2a.

도 2에서, 길이방향의 양단에 볼트 구멍(2b)과 중앙부에 볼트 구멍(도시없음)이 형성된 상하 2개의 엘 형강(2)이 말착되는 한편, 길이방향의 양단에 볼트 구멍(3a)이 형성된 타이 스트랩(3)을 2개의 엘 형강(2)의 사이에 삽입하여 볼트(2a)에 의해 일체형으로 조립된 엘형 타이스트랩(10)을 도시하고 있다.In Fig. 2, bolt holes 2b are formed at both ends in the longitudinal direction, and two upper and lower el-shaped steels 2 having bolt holes (not shown) are formed at the center, while bolt holes 3a are formed at both ends in the longitudinal direction. The L-shaped tie strap 10 is shown integrally assembled by the bolt 2a by inserting the tie strap 3 between two L-shaped steels 2.

도 3에서, 도로의 측면에 에이취 파일(H-pile)(4)을 같은 라인으로 여러 줄 박은 후 우측 도로를 톱 다운(top-down) 방식으로 소요의 깊이로 굴착하면서 에이취 파일(4)의 사이에 토류판(7)과 엘형 타이스트랩(10)을 삽입한다.수직하게 설치된 에이취 파일(4)에 브라켓트를 붙여 어스 앵커(Earth-anchor)용 에이취 빔(H-beam)(5)을 수평하게 상,하로 거치하고 에이취 빔(5) 사이로 좌측 도로의 지층 단면(11)에 어스 앵커(도시없음)를 설치한다.In Fig. 3, the H-pile 4 is lined with the same line on the side of the road, and then the right side of the H-pile 4 is excavated to the required depth in a top-down manner. Insert the earth plate (7) and the el-type tie strap (10) in between. Attach the bracket to the vertically installed H pile (4) to horizontally mount the H-beam (5) for the earth anchor (Earth-anchor) Mounted up and down, and the earth anchor (not shown) is installed in the stratum section 11 of the left road between the H-beam (5).

토류판(7)과 엘형 타이스트랩(10) 및 어스 앵커(도시없음)의 굴착 및 설치의 반복 작업으로 우측 도로를 완전히 굴착한 후, 엘형 타이스트랩(10)의 볼트 구멍(3a)과 철재 띠형 보강재(1)의 볼트 구멍을 맞추어서 볼트(1a)로 연결하여 철재 띠형 보강재를 부설하고, 토류판(7)에 흙포대(13)를 쌓은 다음 지층 단면(12)에 흙을 부설하고 다짐하는 과정을 반복한 후 에이취 빔 높이에 도달하면 어스 앵커(도시없음)의 머리부(head)(6)와 지지대(11)를 분리하고 용접한 브라켓트를 해체하여 에이취 빔(5)을 제거한다.After excavation and installation of the earth plate 7, the el-type tie strap 10 and the earth anchor (not shown), the right road is completely excavated, and the bolt hole 3a and the steel strip-shaped reinforcement of the el-type tie strap 10 are completed. Align the bolt holes in (1) and connect them with bolts (1a) to install the steel strip-shaped reinforcement, pile up the earthen bags (13) on the earth plate (7), and then repeat the process of laying and compacting the soil on the ground section (12). After the height of the Hak beam is reached, the head 6 of the earth anchor (not shown) and the support 11 are separated, and the welded bracket is dismantled to remove the Hak beam 5.

도 4에서, 우측도로 성토작업이 완성되면 좌측도로 지층단면(12)에 삽입한 어스 앵커(9)의 케이블(8)을 절단하면서 완전히 굴착한 다음 에이취 파일(4)의 하단에 설치된 토류판(7)을 2~3장 높이인 30~45cm 제거한다.엘형 타이스트랩(10)의 볼트(2a)를 해체하여 철재 띠형 보강재(1)를 분리시키고 엘 형강(2)을 제거한 다음 지층 단면(12)에 흙을 부설하여 성토 작업을 한다.이러한 작업을 반복하여 성토를 완료한 후 완전히 분리된 에이취 파일(4)을 기중기로 인발하고, 인발된 에이취 파일의 공간을 모래로 충진한다.In FIG. 4, when the land filling work on the right road is completed, the earth plate (7) installed at the lower end of the pile (4) is completely excavated while cutting the cable (8) of the earth anchor (9) inserted into the stratum cross section (12) on the left road. 2 ~ 3cm height of 30 ~ 45cm is removed.The bolt (2a) of the el-type tie strap (10) is disassembled to separate the steel strip-shaped reinforcement (1), the el-shaped steel (2) is removed, and the strata section (12) is removed. The soil is laid in the soil and the work is carried out. After completing the work by repeating these works, the completely separated H pile (4) is drawn with a crane, and the space of the drawn H pile is filled with sand.

본 공사에 비하여 가설 공사는 제한된 공간에서 작업하므로 매우 복잡하고 안전상 위험이 수반되므로 큰 비용이 소요된다.제한된 공간에서 가설 공법이 적용이 불가능한 곳이나 과도한 자재가 투입될 경우에 본 발명의 공법을 적용하면 보강재를 제외한 투입자재(H-pile, H-beam, L형강 및 토류판)을 100% 재사용하는 경제성과 공학적인 보강토 공법의 안정성을 부여하는 효과가 있다.Compared to this construction, temporary construction works in a limited space, which is very complicated and entails a high safety risk. Therefore, the construction method of the present invention is applied in a place where a temporary construction method is not applicable or an excessive amount of material is applied. If there is less than reinforcement material, it is economical to reuse 100% of input materials (H-pile, H-beam, L-shaped steel and earth plate) and it is effective to give stability of engineering reinforcement method.

Claims (5)

볼트의 복적단을 고려하여 양단에 볼트 구멍(2b)과 중앙부에 볼트 구멍(도시없음)이 형성된 상하 2개의 L 형강(2)이 밀착된 사이에 양쪽에 볼트 구멍(3a)이 형성된 타이 스트랩(3)을 삽입하여 볼트(2a)로 조립한 엘형 타이스트랩(10)과;In consideration of the bolted end of the bolt, a tie strap having bolt holes 3a formed on both sides between the bolt holes 2b at both ends and the upper and lower L-shaped steels 2 having bolt holes (not shown) formed at the center thereof. 3) an el-shaped tie strap 10 inserted and assembled with bolts 2a; 도로의 측면에 에이취 파일(H-pile)(4)을 박은 후 우측도로를 톱 다운(top-down) 방식으로 소요의 깊이로 굴착하고, 에이취 파일(4)의 사이에 토류판(7)과 엘형 타이스트랩(10)을 삽입하는 것과;After H-pile 4 is put on the side of the road, the right road is excavated to the required depth in a top-down manner, and the earth plate 7 and the elbow are formed between the H-pile 4. Inserting the tie straps 10; 에이취 파일(4)에 브라켓트(bracket)를 붙여 어스 앵커(Earth-anchor)용 에이취 빔(H-beam)(5)을 상,하로 수평하게 거치하고, 에이취 빔(5) 사이로 좌측도로의 지층단면(11)에 어스 앵커(도시없음)를 설치하며,A bracket is attached to the H pile 4 to horizontally mount the H-beam 5 for earth-anchor up and down, and the stratum cross section on the left road between the H beam 5. (11) installs an earth anchor (not shown), 엘형 타이스트랩을 직접 에이취 파일에 볼트로 결합할 경우, 에이취 파일(4)에 천공하여 생긴 볼트 구멍(도시없음)과 엘형 타이스트랩(10)의 볼트 구멍(2b)을 볼트(도시없음)로 연결하는 것과;When bolting the L-type tie strap directly to the H. pile, the bolt hole (not shown) formed by drilling the H-file (4) and the bolt hole (2b) of the L-type tie strap 10 are bolted (not shown). Doing; 에이취 파일(4)에 에이취 빔(5)을 상,하로 거치하여 좌측도로의 지층 단면(12)에 도 4의 어스 앵커(9) 작업을 하고, 토류판(7)과 엘형 타이스트랩(10') 및 어스 앵커(9)의 굴착 및 설치의 반복작업으로 우측도로를 굴착한 후, 엘형 타이 스트랩(10)의 볼트 구멍(3a)과 철재 띠형 보강재(1)의 볼트 구멍을 맞추어서 볼트(1a)로 연결하여 철재 띠형 보강재를 부설하고, 토류판(7)에 흙포대(13)를 쌓는 것과;Mounting the H. beam 4 up and down on the H. pile 4 to perform the earth anchor 9 of FIG. 4 on the stratum section 12 of the left road, and the earth plate 7 and the el-type tie strap 10 '. And excavation and installation of the earth anchor 9 by excavation of the right side road, and then the bolt hole 3a of the el-type tie strap 10 and the bolt hole of the steel strip-shaped reinforcement 1 are aligned with the bolt 1a. Laying the steel strip-shaped reinforcement by connecting, and stacking the earthen bags 13 on the earth plate (7); 지층 단면(11)에 흙을 부설하고 다짐하는 과정을 반복한 후 어스 앵커(9)의 머리부(head)(60)와 지지대(11)를 분리하고 브라켓트를 해체하여 에이취 빔(5)을 제거하는 작업을 포함하는 것을 특징으로 하는 에이취 파일과 띠형 보강재의 가설 보강토 공법.After repeating the process of laying and compacting soil on the stratum section 11, the head 60 and the support 11 of the earth anchor 9 are separated and the bracket is dismantled to remove the H. beam 5. Temporary reinforcement earth method of H pile and strip-shaped reinforcement, characterized in that it comprises a work to. 삭제delete 삭제delete 삭제delete 삭제delete
KR10-1999-0048685A 1999-11-04 1999-11-04 Soil improvement technique for foundation applied to reinforced earth theory using h-pile and belt-types armature material KR100374061B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-1999-0048685A KR100374061B1 (en) 1999-11-04 1999-11-04 Soil improvement technique for foundation applied to reinforced earth theory using h-pile and belt-types armature material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-1999-0048685A KR100374061B1 (en) 1999-11-04 1999-11-04 Soil improvement technique for foundation applied to reinforced earth theory using h-pile and belt-types armature material

Publications (2)

Publication Number Publication Date
KR20000006804A KR20000006804A (en) 2000-02-07
KR100374061B1 true KR100374061B1 (en) 2003-03-04

Family

ID=19618591

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-1999-0048685A KR100374061B1 (en) 1999-11-04 1999-11-04 Soil improvement technique for foundation applied to reinforced earth theory using h-pile and belt-types armature material

Country Status (1)

Country Link
KR (1) KR100374061B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102562702B1 (en) 2022-09-19 2023-08-04 주식회사 동아특수건설 Reinforcement device of pile anchor using earth anchor

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101005874B1 (en) * 2008-08-27 2011-01-06 한길토건(주) Construction method of falling rock depense wall which is available for steel beam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102562702B1 (en) 2022-09-19 2023-08-04 주식회사 동아특수건설 Reinforcement device of pile anchor using earth anchor

Also Published As

Publication number Publication date
KR20000006804A (en) 2000-02-07

Similar Documents

Publication Publication Date Title
KR100866162B1 (en) Chair-type self-supported earth retaining wall constructing method
KR101302743B1 (en) Phc pile and its using the same soil cement wall construction methode
CN103958780B (en) The method for forming cementing retaining wall
US4405260A (en) Method of constructing underpass across railway and highway without affecting normal traffic thereof
CN107090851B (en) The inverted side-wall construction method of downtown area open cut groove
KR101283672B1 (en) Non open cut method using the lifting device
KR20070075506A (en) Construction method of underground structure using concrete filled pipe roof and concrete wall
KR100712593B1 (en) Construction method of pipe roof structures
US7025537B2 (en) Subterranean structures and methods for constructing subterranean structures
JP3036295B2 (en) Construction method of retaining wall
KR100805189B1 (en) Construction method of underground structure characterized by going side by side wall construction and excavation
KR100562158B1 (en) Steel pipe roof construction method for building underground structure, roof structure therefor, and structure of steel pipe therefor
KR100569703B1 (en) Structure of steel pipe applied to steel pipe roof construction method for building underground structure, and steel pipe roof structure therefor using the same, and steel roof construction method thereof
KR100442712B1 (en) Construction establishment method and the structure for underground tunnel formation
KR101061516B1 (en) Temporary wall structure using arched steel pile
KR100784201B1 (en) Method for construction of tunnel
KR101041264B1 (en) Displacement control tunnelling reinforcing structure using pressurizing support
KR100374061B1 (en) Soil improvement technique for foundation applied to reinforced earth theory using h-pile and belt-types armature material
KR200354467Y1 (en) Steel pipe roof structure for building underground structure
KR100813910B1 (en) Pipe roof structure
JPS584094A (en) Method of constructing low road cross
CN113898349A (en) Shield tunnel expanding and excavating pipe gallery construction method
KR101041262B1 (en) Displacement control tunnelling method using pressurizing support
GB2101177A (en) Method of constructing underpass across railway and highway without affecting normal traffic thereof
KR20220003846A (en) Excavation method of controlling displacement using air-packer

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20080129

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee