KR100360330B1 - Method for construction of charnel house - Google Patents

Method for construction of charnel house Download PDF

Info

Publication number
KR100360330B1
KR100360330B1 KR1020000034714A KR20000034714A KR100360330B1 KR 100360330 B1 KR100360330 B1 KR 100360330B1 KR 1020000034714 A KR1020000034714 A KR 1020000034714A KR 20000034714 A KR20000034714 A KR 20000034714A KR 100360330 B1 KR100360330 B1 KR 100360330B1
Authority
KR
South Korea
Prior art keywords
section
layer
ocher
ground
opening
Prior art date
Application number
KR1020000034714A
Other languages
Korean (ko)
Other versions
KR20020000963A (en
Inventor
오석수
Original Assignee
오석수
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 오석수 filed Critical 오석수
Priority to KR1020000034714A priority Critical patent/KR100360330B1/en
Publication of KR20020000963A publication Critical patent/KR20020000963A/en
Application granted granted Critical
Publication of KR100360330B1 publication Critical patent/KR100360330B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H13/00Monuments; Tombs; Burial vaults; Columbaria
    • E04H13/006Columbaria, mausoleum with frontal access to vaults

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

본 발명은 여러 대(代)의 조상과 가족의 화장한 유골(遺骨)을 동시에 봉안할 수 있는 봉분형으로 시공된 납골묘의 시공방법에 관한 것으로 더욱 상세하게는 한 기의 묘소에 유골을 안치한 다수의 납골함을 매장하여 영구보존이 가능하게 시공하고 최소단위 면적으로 선대의 조상과 여러가족들의 유골을 안치시킬 수 있어 묘지 개발로 인한 국토의 잠식을 최소화하고 황폐화되는 것을 방지하며 묘지구입 비용을 절감시키고 묘지의 유지관리와 성묘가 용이하게 하여 시간,경제적 손실을 절감할 수 있는 납골묘의 시공방법에 관한 것으로 다짐바닥의 상부에 모래층(11),자갈,숯 혼합층(21),석회층(30),방습지(31) 및 황토층(41)을 순차적으로 조성하고, 측벽은 석회층(30),황토몰탈층(12),아연철망(22)과 방습지(31)를 형성시킨 후 "C"형강기둥 (51)의 기둥사이 가로방향 일정간격으로 "C"형강(52)을 결합시키고 "C"형강(52)에 황토(41)를 채우며, "C"형강기둥(51)의 상부 천장도 "C"형강(52)으로 지지시키고 가로방향으로 "C"형강(52)을 설치하여 황토(41)로 채우고 각각의 바닥,벽면 및 천장은 석재패널(61)(61')을 돌기와 요홈을 형성하여 결합시켜서 납골함 안치실(1)을 형성하고 안치실(1)의 일측은 출입통로(2)를 형성하여 내측으로 출입사다리(3)가 장착되고 그 상부는 목재와 방습지 석재패널로 형성된 개폐구(4)를 설치하고 지상으로는 봉분(5)을 형성하여 잔디를 식재시키고 일측의 개폐구(4) 상부는 일반 흙으로 성토하여 지반과 일치시켜서 납골묘를 시공하는 것을 특징으로 하는 납골묘의시공방법.The present invention relates to a method of constructing a crypt of a crypt which is constructed in the form of a rod that can seal various generations of ancestors and family's cremated ashes at the same time. Can be buried and permanently preserved and the remains of the ancestors' ancestors and their families can be settled in a minimum unit area, minimizing the encroachment of the land caused by the development of the cemetery, preventing desolation and reducing the cost of purchasing the cemetery. The present invention relates to a method of constructing a gravel grave, which can be easily maintained and maintained in a cemetery, thereby saving time and economic loss. A sand layer (11), a gravel, a charcoal mixed layer (21), a lime layer (30), and a damp paper on the top of the compaction floor (31) and the ocher layer 41 are sequentially formed, and the sidewalls are formed of a lime layer 30, an ocher mortar layer 12, a zinc wire mesh 22 and a moisture resistant paper 31, and then a "C" -shaped steel column (51). Horizontal room between the pillars Coupling the "C" section 52 at regular intervals and fill the "C" section 52 with the ocher 41, the upper ceiling of the "C" section of the column 51 is also supported by the "C" section 52 Install the "C" section 52 in the transverse direction and fill it with ocher 41, and each floor, wall and ceiling are formed by combining stone panels 61, 61 'with protrusions and grooves to form the crypt chamber 1 One side of the settling chamber (1) forms an access passage (2), the access ladder (3) is installed inward, and the upper part is provided with an opening and closing opening (4) formed of wood and moisture-proof paper stone panel, and the ground powder (5) Forming the grass to plant) and one side of the opening and closing port (4) the upper part of the clay to build a crypt and gravel seedlings in accordance with the ground to match the ground.

Description

납골묘의 시공방법{Method for construction of charnel house}Method for construction of charnel house}

본 발명은 여러 대(代)의 조상과 가족의 화장한 유골(遺骨)을 동시에 봉안할 수 있는 봉분형으로 시공된 납골묘의 시공방법에 관한 것으로 더욱 상세하게는 한 기의 묘소에 유골을 안치한 다수의 납골함을 매장하여 영구보존이 가능하게 시공하고 최소단위 면적으로 선대의 조상과 여러가족들의 유골을 안치시킬 수 있어 묘지 개발로 인한 국토의 잠식을 최소화하고 황폐화되는 것을 방지하며 묘지구입 비용을 절감시키고 묘지의 유지관리와 성묘가 용이하게 하여 시간,경제적 손실을 절감할 수 있는 납골묘의 시공방법에 관한 것이다.The present invention relates to a method of constructing a crypt of a crypt which is constructed in the form of a rod that can seal various generations of ancestors and family's cremated ashes at the same time. Can be buried and permanently preserved and the remains of the ancestors' ancestors and their families can be settled in a minimum unit area, minimizing the encroachment of the land caused by the development of the cemetery, preventing desolation and reducing the cost of purchasing the cemetery. The present invention relates to a method of constructing a gravel grave, which can reduce time and economic loss by facilitating the maintenance and grave of a graveyard.

일반적으로 사람이 사망하게 되면 시신을 목재 또는 석재 등의 재질로 형성된 관에 입관하여 매장하는 방법과 시신을 화장하여 유골의 분말을 강,바다 및 산등에 뿌리는 방법의 장묘방식이 있었으며 근간에는 묘지구입 비용과 묘지개발로 인한 국토 잠식과 자연환경의 황폐화되는 문제로 인하여 납골묘에 대한 관심과 수요가 점차 확대되어 가는 실정이다.In general, when a person dies, there is a method of burial and burying the body in a coffin made of wood or stone, and cremating the body to spray powder of ashes on rivers, seas and mountains. Due to the cost of purchase and the deterioration of the natural environment due to the development of the cemetery, the interest and demand for the ossuary is gradually increasing.

상기한 납골묘는 매장과 화장의 장묘방식을 접목한 형태로서 화장한 유골을 납골함에 안치시켜 납골묘지 내에 영구적으로 봉안하는 방식의 장묘인 것이다.The crypt is a form of grafting the burial and cremation method of burial and cremation is placed in the crypt to permanently seal in the crypt.

종래에 이루어진 납골묘는 철근 콘크리트 건축구조물 내에 서랍식 함이나 수납장 형태로 설계되어 다수의 유골을 동시에 안치되는 방식과 관모양의 대리석 구조물 내의 항아리에 골회를 넣어 뚜껑으로 밀봉시키는 방식과 구조물의 외주연부에 서랍형태의 안치장을 설치하여 개폐하는 방식,잔디를 식재한 봉분내에 대리석으로 구조물을 조성한 방식으로 개인형 납골묘지 등이 있으나 이러한 종류의 납골묘는 심각한 누수와 결노(結露)현상으로 인한 골회의 부패와 악취가 발생하는 등의 문제점이 있었다.Conventional crypts are designed in the form of drawers or cabinets in reinforced concrete building structures, allowing multiple ashes to be placed at the same time, and sealing them with lids by putting bones in jars in tubular marble structures and drawers at the outer periphery of the structure. There is a private gravel cemetery, such as a method of opening and closing a form of a saddle and a marble structure in a grass planted with grass, but this type of ossuary is a decay of bone due to severe leakage and desolation. There was a problem such as the occurrence of odor.

따라서 본 발명은 상기와 같은 종래의 문제점을 해결하기 위한 목적으로 창출된 것으로 외형적으로는 잔디를 식재시킨 봉분의 형태로 일반적인 매장방식의 묘지의 형태를 갖추고 봉분의 내측(지하)으로는 납골함 안치장을 형성시켜 여러 대의 조상과 가족들의 골회를 동시에 영구적으로 보존 안치가 가능케하여 가족 또는 종중묘지로 사용할 수 있게하였으며 봉분형으로 시공하여 매장과 화장이 갖는 장묘형태의 장점을 동시에 충족시킬 수 있는 납골묘의 시공방법을 제공하기 위한 것이다.Therefore, the present invention was created for the purpose of solving the above-mentioned conventional problems, and in the form of a bonsai planted with grass in appearance, it has a form of a burial cemetery of a general burial method, and a crevice in the inner (basement) of the bonbon. Formation of the ancestral bones allows the ancestors of several ancestors and families to be permanently preserved at the same time, allowing them to be used as family or jong graveyards. The purpose is to provide a construction method.

상기한 납골묘의 시공방법을 제공하기 위하여 납골묘지를 시공할 지반을 굴삭하고 다짐바닥의 상부에 모래층을 형성하고 그 상부에 자갈(쇄석)과 숯을 혼합한 자갈,숯층을 형성하여그 상부에 석회층과 방습지를 깔고 황토층을 조성하고, 측벽은 석회층과 황토와 숯을 혼합한 황토몰탈층에 아연철망과 방습지를 형성시킨 후 "C"형강 기둥을 형성하여 "C"형강의 기둥사이 가로방향 일정간격으로 "C"형강을 결합시키고 "C"형강에 황토를 채우며, "C"형강기둥의 상부 천장도 "C"형강으로 지지시키고 가로방향으로 "C" 형강을 설치하여 황토로 채우고 각각의 바닥,벽면 및 천장은 석재패널(화강암,대리석 등)을 돌기와 요홈을 형성하여 결합시켜서 납골함 안치실을 형성하고 안치실의 일측은 출입통로를 형성하여 내측으로 출입사다리가 장착되고 그 상부는 목재와 방습지 석재패널로 형성된 개폐구를 설치하고 지상으로는 봉분을 형성하여 잔디를 식재시키고 일측의 개폐구 상부는 일반 흙으로 성토하여 지반과 일치시켜서 납골묘를 제공할 수 있는 것이다.In order to provide the method of constructing the crypt, the excavation of the ground for the construction of the crypt is formed, and a sand layer is formed on the top of the compaction bottom, and a gravel and char layer mixed with gravel (crushed stone) and charcoal is formed on the upper part to form a lime layer and Laminate the moisture-proof paper and make an ocher layer, and the side wall is formed with zinc wire mesh and moisture-proof paper on the ocher mortar layer mixed with lime layer, ocher and charcoal, and then form "C" section pillars at horizontal intervals between columns of "C" section section. Combine "C" section and fill ocher in "C" section, support upper ceiling of "C" section and support "C" section and install "C" section in transverse direction to fill with ocher. The ceiling is formed by combining stone panels (granite, marble, etc.) with protrusions and grooves to form a crypt, and one side of the chamber forms an access passage so that the access ladder is installed inside and the upper part is wood. Installed into the aperture formed in bangseupji stone panel and the ground is formed by the mounds and planted turf top access door on one side is that by matching the soil to fill the common earth to provide napgolmyo.

도 1 은 본 발명의 시공방법을 설명하기 위한 정면구조 단면도1 is a cross-sectional view of the front structure for explaining the construction method of the present invention

도 2 는 본 발명의 시공방법을 설명하기 위한 측면구조 단면도Figure 2 is a cross-sectional side view for explaining the construction method of the present invention

도 3 은 본 발명의 바닥과 측멱의 상세 시공 단면도Figure 3 is a detailed construction cross-sectional view of the floor and side of the present invention

도 4 는 본 발명의 천장 석재패널 결합구조도4 is a ceiling stone panel coupling structure diagram of the present invention

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

(1) 안치실 (2) 출입통로(1) Settling room (2) Access passage

(3) 출입사다리 (4) 개폐구(3) access ladder (4) opening

(5) 봉분 (11) 모래층(5) Bon powder (11) Sand layer

(12) 황토몰탈층 (21) 자갈,숯 혼합층(12) ocher mortar layer (21) gravel, charcoal mixture layer

(22) 아연철망 (30) 석회층(22) Zinc Wire Mesh (30) Lime Layer

(31) 방습지 (41) 황토층(31) Moisture-Proof Paper (41) Loess Layer

(51) "C"형강기둥 (52) "C"형강51 "C" section pillar 52 "C" section column

(61)(61') 석재패널61, 61 'stone panels

이하 발명의 요지를 첨부된 도면에 연계시켜 그 방법을 상세히 설명하면 다음과 같다.Hereinafter, the method will be described in detail with reference to the accompanying drawings.

도 1 은 본 발명의 시공방법을 설명하기 위한 정면구조 단면도이고,도 2 는 본 발명의 시공방법을 설명하기 위한 측면구조 단면도이며,도 3 은 본 발명의 바닥과 측멱의 상세 시공 단면도이고,도 4 는 본 발명의 천장 석재패널 결합구조도이다.1 is a cross-sectional view of the front structure for explaining the construction method of the present invention, Figure 2 is a cross-sectional side view for explaining the construction method of the present invention, Figure 3 is a detailed construction cross-sectional view of the floor and side of the present invention, 4 is a structural diagram of the ceiling stone panel bonding of the present invention.

다짐바닥의 상부에 모래층(11),자갈,숯 혼합층(21),석회층(30),방습지(31) 및 황토층(41)을 순차적으로 조성하고, 측벽은 석회층(30),황토몰탈층(12),아연철망(22)과 방습지(31)를 형성시킨 후 "C"형강기둥(51)의 기둥사이 가로방향 일정간격으로 "C"형강(52)을 결합시키고 "C"형강(52)에 황토(41)를 채우며, "C"형강기둥(51)의 상부 천장도 "C"형강(52)으로 지지시키고 가로방향으로"C"형강(52)을 설치하여 황토(41)로 채우고 각각의 바닥,벽면 및 천장은 석재패널(61)(61')을 돌기와 요홈을 형성하여 결합시켜서 납골함 안치실(1)을 형성하고 안치실(1)의 일측은 출입통로(2)를 형성하여 내측으로 출입사다리(3)가 장착되고 그 상부는 목재와 방습지 석재패널로 형성된 개폐구(4)를 설치하고 지상으로는 봉분(5)을 형성하여 잔디를 식재시키고 일측의 개폐구(4) 상부는 일반 흙으로 성토하여 지반과 일치시켜서 납골묘를 시공하는 것이다.Sand layer 11, gravel, charcoal mixed layer 21, lime layer 30, moisture-proof paper 31 and the ocher layer 41 are sequentially formed on the compaction bottom, and the sidewalls are lime layer 30 and ocher mortar layer 12. ), After forming the zinc wire mesh 22 and the damp-proof paper 31, the "C" section 52 is joined to the "C" section 52 at regular intervals in the horizontal direction between the columns of the "C" section of the column 51 Filling the ocher 41, the upper ceiling of the "C" section pillar 51 is also supported by the "C" section 52, and installed in the transverse direction "C" section 52 to fill with the loess 41 and each The floor, wall, and ceiling are formed by combining the stone panels 61, 61 'with protrusions and grooves to form a cramped enclosed chamber 1, and one side of the enclosed chamber 1 forms an access passage 2 to access the inside ladder. (3) is installed, the upper part of the opening and closing openings (4) formed of wood and moisture-proof paper stone panels are installed, and the ground (5) is formed on the ground to plant grass, and the opening and closing openings on one side (4) the upper part of the general soil It is to construct the ossuary grave in accordance with the ground by vomiting.

도면중 미설명부호 (6)은 석물,(7)은 배수구,(8)은 석재패널 고정핀,(9)는 측벽 석재패널 지지브라켓트이다.In the drawings, reference numeral 6 denotes a stone, 7 denotes a drain hole, 8 denotes a stone panel fixing pin, and 9 denotes a side wall stone panel support bracket.

이와같이된 본 발명은 납골묘를 시공하기 위하여 납골묘지를 시공할 지반을 굴삭시키고 굴삭된 바닥면을 다짐하고 상부에 모래층(11)을 형성하고 모래층(11)의상부에 자갈(쇄석)과 숯을 혼합한 자갈,숯 혼합층(21)을 형성하여 석회층(30)과 방습지(31)를 깔고 쌀뜬물로 반죽한 황토층(41)을 조성하여 바닥면을 형성하고, 측벽은 석회층(30)과 황토와 숯을 혼합한 황토몰탈층(12)에 아연철망(22)과 방습지(31)를 형성시킨 후 기초상에 "C"형강기둥(51)을 형성하고 "C"형강기둥(51)사이 가로방향 일정간격으로 "C"형강(52)을 결합시키고 다단으로 형성된 "C"형강(52)의 사이에 쌀뜬물로 반죽한 황토(41)를 채워서 벽면을 형성시키고,양측으로 형성된 "C"형강기둥(51)의 상부 천장도 "C"형강(52)으로 지지시키고 지지된 "C"형강(52)의 가로방향 일정간격으로 "C"형강(52)을 설치하여 그 사이에 쌀뜬물로 반죽한 황토(41)로 채워서 천장을 형성시키고 각각의 바닥,벽면 및 천장은 화강암,대리석등으로 된 석재패널(61)(61')을 상호 돌기와 요홈을 형성하여 결합시키며 이때 바닥에 설치되는 석재패널(61)과 측벽의 하단에 설치되는 석재패널(61)은 고정핀(8)으로 결합시키고 측벽의 상부에 결합되는 석재패널(61)(61')은 "C"형강(52)에서 연장된 지지브라켓트(9)에 의하여 하단을 지지결합시킬 수도 있다.The present invention as described above is to excavate the ground to construct the gravel graveyard to pave the gravel graveyard, to pave the excavated bottom surface and to form a sand layer 11 on the top and mixed gravel (crushed stone) and charcoal on the top of the sand layer 11 A gravel and charcoal mixture layer 21 is formed to lay a lime layer 30 and a damp paper 31, and a loess layer 41 kneaded with rice water is formed to form a bottom surface, and the side wall is a lime layer 30 and ocher and charcoal. After forming the zinc wire mesh 22 and the damp-proof paper 31 in the mixed ocher mortar layer 12, the "C" section of the steel column 51 is formed on the base and the horizontal constant interval between the "C" section of the steel column 51 Joining the "C" section 52 with the filling and filling the ocher 41 kneaded with rice water between the "C" section 52 formed in multiple stages to form a wall, "C" section pillars 51 formed on both sides (51) ) Also supports the upper ceiling of the "C" section 52 and install the "C" section (52) at a predetermined interval in the horizontal direction of the supported "C" section (52) Filled with ocher (41) kneaded with rice water in between forms a ceiling, and each floor, wall and ceiling are formed by combining the stone panels (61, 61 ') made of granite, marble, etc. to form mutual protrusions and grooves. The stone panel 61 installed at the bottom and the stone panel 61 installed at the bottom of the side wall are coupled with fixing pins 8, and the stone panels 61 and 61 'coupled at the top of the side wall are “C” shaped steel. The lower end may be supported by the support bracket 9 extending from 52.

상기와 같이 납골함 안치실(1)을 형성하고 안치실(1)의 일측은 출입통로(2)를 형성하여 내측으로 사람의 출입이 가능하게 출입사다리(3)가 장착되고 그 상부는 목재와 방습지 석재패널로 형성된 개폐구(4)를 설치하며 지상으로는 석물(6)상으로 봉분(5)을 형성하여 잔디를 식재시키고 일측의 개폐구(4) 상부는 일반 흙으로 성토하여 지반과 일치시켜서 납골묘를 시공하는 것이다.As described above, the crypt chamber 1 is formed, and one side of the chamber 1 forms an access passage 2 so that an access ladder 3 is installed to allow a person to enter and exit from the inside. Install the opening and closing hole (4) formed in the ground to form a grass (5) on the stone (6) to plant the grass, and the opening and closing port (4) of one side is filled with ordinary soil to match the ground to construct the gravel grave will be.

상기한 개폐구(4)는 사람의 출입이 빈번하지 않기 때문에 지상으로 돌츨 설치하지 않고 지하로 매설시켜 사용시에 만 성토된 흙을 제거하고 개폐구(4)를 개방시켜 출입사다리(3)를 이용하여 납골함을 안치시킬 수 있게 한 것이며 이로 인하여 안치실(1)이 외부와 완전 차단,밀폐된 상태에서 별도의 통풍장치가 없이도 황토,숯,자갈등의 천연 재질에 의해 시공된 물질이 자체적으로 누수 및 결로를 방지하여 안치실(1) 내부에 안치된 골회가 부패되어 악취가 발생되는 것을 방지할 수 있는 것이다.Since the opening and closing door 4 is not frequently visited by people, it is buried under the ground without being installed on the ground to remove soil that has only been filled in use, and the opening and closing door 4 is opened to use the access ladder 3 to open the door. In this state, the material constructed by natural materials such as ocher, charcoal, and gravel can leak and condensate without the need for a separate ventilation device. By preventing the decayed bones settled in the interior chamber (1) is to prevent the occurrence of odor.

본 발명은 상술한 특정의 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와같은 변경은 청구범위 기재의 범위 내에 있게 된다.The present invention is not limited to the above-described specific preferred embodiments, and various modifications can be made by any person having ordinary skill in the art without departing from the gist of the present invention claimed in the claims. Of course, such changes will fall within the scope of the claims.

그러므로 본 발명은 납골묘의 외부는 잔디를 식재한 봉분으로 형성되어 일반적인 분묘와 동일한 외형을 가지므로 일반인의 거부감을 해소시키고 안치실 내부에 시공된 모래,자갈,숯 및 황토에 의하여 별도의 통풍장치가 없이도 누수와 결로현상을 방지하여 골회의 부패로 인한 악취의 발생을 제거할 수 있어 영구적으로 보존이 가능하며 한 기의 납골묘로 여러 대의 조상과 가족을 모실 수 있어 가족 또는 종중묘지로 사용할 수 있을 뿐만 아니라 국토이용에 효과적이며 황폐화를 방지할 수 있고 또한 묘지구입 비용을 절감시키며 묘지의 유지관리와 성묘가 용이하게 하여 시간,경제적 손실을 절감할 수 있는 효과가 있는 것이다.Therefore, in the present invention, the exterior of the ossuary grave is formed with a rod planting grass so as to have the same appearance as a general grave, thereby relieving the general public's rejection and without the need for a separate ventilation device by sand, gravel, charcoal and loess installed inside the morgue. It prevents leakage and condensation and eliminates bad smell caused by bone decay.It can be preserved permanently.It can be used as a family or garden cemetery because it can serve several ancestors and families with one stealth grave. It is effective for the use of the land, prevents devastation, reduces the cost of purchasing the cemetery, facilitates the maintenance and graveyard of the cemetery, and saves time and economic losses.

Claims (1)

다짐바닥의 상부에 모래층(11),자갈,숯 혼합층(21),석회층(30),방습지(31) 및 황토층(41)을 순차적으로 조성하고, 측벽은 석회층(30),황토몰탈층(12),아연철망(22)과 방습지(31)를 형성시킨 후 "C"형강기둥(51)의 기둥사이 가로방향 일정간격으로 "C"형강(52)을 결합시키고 "C"형강(52)에 황토(41)를 채우며, "C"형강기둥(51)의 상부 천장도 "C"형강(52)으로 지지시키고 가로방향으로 "C"형강(52)을 설치하여 황토(41)로 채우고 각각의 바닥,벽면 및 천장은 석재패널(61)(61')을 돌기와 요홈을 형성하여 결합시켜서 납골함 안치실(1)을 형성하고 안치실(1)의 일측은 출입통로(2)를 형성하여 내측으로 출입사다리(3)가 장착되고 그 상부는 목재와 방습지 석재패널로 형성된 개폐구(4)를 설치하고 지상으로는 봉분(5)을 형성하여 잔디를 식재시키고 일측의 개폐구(4) 상부는 일반 흙으로 성토하여 지반과 일치시켜서 납골묘를 시공하는 것을 특징으로 하는 납골묘의 시공방법.Sand layer 11, gravel, charcoal mixed layer 21, lime layer 30, moisture-proof paper 31 and the ocher layer 41 are sequentially formed on the compaction bottom, and the sidewalls are lime layer 30 and ocher mortar layer 12. ), After forming the zinc wire mesh 22 and the damp-proof paper 31, the "C" section 52 is joined to the "C" section 52 at regular intervals in the horizontal direction between the columns of the "C" section of the column 51 Filling the ocher 41, the upper ceiling of the "C" section of the column 51 is also supported by the "C" section (52), install the "C" section (52) in the transverse direction to fill the ocher 41 and each The floor, wall, and ceiling are formed by combining the stone panels 61, 61 'with protrusions and grooves to form a cramped enclosed chamber 1, and one side of the enclosed chamber 1 forms an access passage 2 to access the inside ladder. (3) is installed and the upper part of the opening and closing openings (4) formed of wood and moisture-proof paper stone panels are installed, and the ground (5) is formed on the ground to plant grass and the opening of the opening (4) on one side is the general soil Saturday and construction method of napgolmyo characterized in that the construction napgolmyo by matching the ground.
KR1020000034714A 2000-06-23 2000-06-23 Method for construction of charnel house KR100360330B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020000034714A KR100360330B1 (en) 2000-06-23 2000-06-23 Method for construction of charnel house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020000034714A KR100360330B1 (en) 2000-06-23 2000-06-23 Method for construction of charnel house

Publications (2)

Publication Number Publication Date
KR20020000963A KR20020000963A (en) 2002-01-09
KR100360330B1 true KR100360330B1 (en) 2002-11-13

Family

ID=19673407

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020000034714A KR100360330B1 (en) 2000-06-23 2000-06-23 Method for construction of charnel house

Country Status (1)

Country Link
KR (1) KR100360330B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000063491A (en) * 2000-07-18 2000-11-06 윤재관 Constitution method of underground hangar of charnel house

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100425011B1 (en) * 2001-11-14 2004-04-03 강희명 Family laying grave

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000063491A (en) * 2000-07-18 2000-11-06 윤재관 Constitution method of underground hangar of charnel house

Also Published As

Publication number Publication date
KR20020000963A (en) 2002-01-09

Similar Documents

Publication Publication Date Title
KR100360330B1 (en) Method for construction of charnel house
CN107327205A (en) A kind of novel solid is buried
KR200384790Y1 (en) deposit device for person&#39;s remain
KR200163430Y1 (en) Charnel house of tradition round shape graveyard
Daviau et al. Excavation at Khirbat al-Mudayna and Survey in the Wādī ath-Thamad: Preliminary Report of the 2008, 2010 and 2011 seasons
KR100223665B1 (en) Charnel grave
KR200207087Y1 (en) Layout for storage room for remains case in charnel house
KR200392040Y1 (en) the burial type charnel tomb structure
KR100324996B1 (en) Charnel house and constructing method thereof
JP3055381U (en) Double-layered osseous chamber structure in a tomb
KR200350416Y1 (en) The environmental-friendly charnel house
KR100751419B1 (en) Enshrined tomb for person&#39;s ashes to rest
KR100306307B1 (en) A charnel house
JP3057172U (en) Ossuary room structure at family tomb
KR100425011B1 (en) Family laying grave
KR200243165Y1 (en) A charnel-grave
KR200216704Y1 (en) Prefabricated charnel house
KR200210575Y1 (en) Charnel tomb
KR200350382Y1 (en) The environmental-friendly charnel house
KR200179369Y1 (en) Building structure for charnel house
KR19990084161A (en) A family burial ground and construction method thereof
KR200383940Y1 (en) The environmental-friendly charnel house
KR200352981Y1 (en) A domestic grave for ashes
KR200392042Y1 (en) the charnel tomb structure by lenth direction underground installation type
KR200361497Y1 (en) the structure of pro-environ mental charnel house of the public cemetery utilizing the used briquet ashes

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20091028

Year of fee payment: 8

LAPS Lapse due to unpaid annual fee