KR100352334B1 - Lattice type form for filling mortar and method for tile-construction work by use thereof - Google Patents

Lattice type form for filling mortar and method for tile-construction work by use thereof Download PDF

Info

Publication number
KR100352334B1
KR100352334B1 KR1020000013030A KR20000013030A KR100352334B1 KR 100352334 B1 KR100352334 B1 KR 100352334B1 KR 1020000013030 A KR1020000013030 A KR 1020000013030A KR 20000013030 A KR20000013030 A KR 20000013030A KR 100352334 B1 KR100352334 B1 KR 100352334B1
Authority
KR
South Korea
Prior art keywords
formwork
coupled
mortar
tile
vertical
Prior art date
Application number
KR1020000013030A
Other languages
Korean (ko)
Other versions
KR20000036459A (en
Inventor
변승용
Original Assignee
변승용
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from KR1019990009104A external-priority patent/KR19990046084A/en
Application filed by 변승용 filed Critical 변승용
Priority to KR1020000013030A priority Critical patent/KR100352334B1/en
Publication of KR20000036459A publication Critical patent/KR20000036459A/en
Application granted granted Critical
Publication of KR100352334B1 publication Critical patent/KR100352334B1/en

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/028Multi-compartmented pots
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/006Labels or label holders specially adapted for plant receptacles
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F15/00Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F15/00Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like
    • G09F15/0006Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like planar structures comprising one or more panels
    • G09F15/0018Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like planar structures comprising one or more panels panel clamping or fastening means

Abstract

본 발명은 타일 등의 건자재를 건축물 벽체와 바닥에 시공하기 위한 몰탈 충전식 격자형 거푸집 및 이를 사용한 타일 시공법에 관한 것이다. 본 발명은 복수개의 기둥재를 소정 간격으로 세우고 기둥재 상호간에 복수의 중간 수평재와 상, 하단 수평재를 타일 길이와 줄눈의 폭을 합한 간격으로 기둥재에 결합하고, 상기 중간 수평재와 상,하단 수평재 사이에 복수개의 수직재를 결합시킨 다음, 중간 수평재와 상,하단 수평재 및 수직재의 삽입홈에 각종 줄눈용 스페이서재와 실리콘 백업재를 삽입한 후 마구리재로 외곽을 마감하여 격자형 거푸집 본체를 구성하고, 상기 거푸집에 타일을 끼우고, 시공하고자 하는 건물 벽체의 상부에 레일을 고정시키고 하부에는 가이드앵글을 연결 철물로 부착고정하여, 건물벽체로부터 몰탈 피복 두께만큼 띄어 타일이 끼워진 복수개의 상기 거푸집을 동거푸집의 기둥재에 부착된 행거철물과 기둥재 걸이쇠를 이용,레일과 가이드앵글에 정착,고정시킨 후, 그 틈에 몰탈충전펌프로 몰탈을 채우고, 몰탈의 양생후에 행거철물과 기둥재 걸이쇠를 분리,해체하여, 격자형 거푸집을 건물벽체에 부착된 타일로부터 분리시키는 방식의 거푸집 및 타일 시공방법을 제공한다.The present invention relates to a mortar-filled lattice formwork for constructing building materials such as tiles on building walls and floors, and a tile construction method using the same. According to the present invention, a plurality of pillars are placed at predetermined intervals, and the plurality of intermediate horizontal members and the upper and lower horizontal members are coupled to the pillar materials at intervals of the sum of the tile length and the width of the joint between the pillar materials, and the intermediate horizontal members and the upper and lower horizontal members. After joining a plurality of vertical members therebetween, insert various spacer spacers and silicon backing materials into the insertion grooves of the middle horizontal member, the upper and lower horizontal member and the vertical member, and finish the outer edges with the copper material to form the grid formwork body. The tile is mounted on the formwork, the rail is fixed on the upper part of the building wall to be constructed, and the guide angle is fixed to the lower part by a connecting hardware, so that the plurality of the formwork is inserted into the mold by floating the mortar covering thickness from the building wall. Using the hanger hardware attached to the formwork column and the column latch, the rails and guide angles are fixed and fixed. To fill the mortar in the mortar charge pump, and after curing of the mortar hanger hardware and column re-separate the hook hinge, dissolution, there is provided a mold and a tile construction method of the method of separating a grid-like mold from the tiles attached to a building wall.

Description

몰탈 충전식 격자형 거푸집 및 이를 이용한 타일 시공방법 {Lattice type form for filling mortar and method for tile-construction work by use thereof}Mortar type filling for mortar and method for tile-construction work by use

본 발명은 타일 등의 건자재를 건축물의 벽체면과 바닥에 시공하기 위한 몰탈 충전식 격자형거푸집과 이를 이용한 타일붙임공법에 관한 것으로, 더욱 상세하게는 복수개의 기둥재(1), 복수개의 중간수평재(4), 상, 하단수평재(5), 수직재(6), 마구리재(7)를 볼트,너트(16, 16')로 조립하여 격자형거푸집 본체를 형성시키고, 이 본체에 각종 스페이서(18, 19, 20)와 실리콘 백업재(21)의 삽입하여 구성된 격자형 커푸집으로서, 복수개의 타일이 끼워진 복수개의 상기 격자형 거푸집과 행거철물(2) 등의 부속철물을 이용하여 건물벽체(9)에 지지, 결속시켜 타일을 부착하는 시공방법에 관한 것이다.The present invention relates to a mortar-filled lattice formwork and a tile pasting method using the same for constructing building materials such as tiles on the wall surface and floor of a building, and more specifically, a plurality of pillar materials (1) and a plurality of intermediate horizontal materials ( 4) The upper and lower horizontal member 5, the vertical member 6, and the copper member 7 are assembled with bolts and nuts 16 and 16 'to form a grid formwork body, and various spacers 18, 19, 20 and a lattice-shaped formwork formed by inserting the silicon backing material 21, the building wall 9 using a plurality of the above-mentioned lattice-shaped dies and hangers 2 and the like in which a plurality of tiles are inserted. The present invention relates to a construction method of attaching a tile by supporting and binding to a tile.

일반적으로 종래의 타일공사 분야의 내벽타일 부착공법을 대별하면, 쌓기붙임공법, 압착붙임공법, 개량압착붙임공법, 접착재붙임공법 등으로 분류된다.In general, when the inner wall tile attachment method of the conventional tile construction field is roughly classified, it is classified into a stacking method, a pressing method, an improved pressing method, an adhesive material attachment method and the like.

그러나 상기 붙임공법 오래전부터 사용중인 공법으로 타일뒷면에 몰탈을 밀실하게 뒷채움하면 완벽한 공법이지만, 타일 모서리부분이나 귀퉁이의 몰탈 뒷채움이 부실한 경우 동파에 의한 타일의 파손과 탈락 등 하자의 우려가 있으며, 상기 압착 및 개량 압착 공법은 쌓기 붙임 공법의 단점인 뒷채움의 부실을 보완하고자 개발된 공법으로 미리 미장바름을 우선 실시하여 몰탈양생후 압착용 몰탈을 얇게 바른 후 타일을 눌러붙이는 공법으로 개선된 공법이라 할수 있으나 눌러 붙임의 불충분이나 몰탈 도포후 30분이 경과될 경우 오히려 대량박리하자의 우려가 있으며,상기 접착재붙임공법은 가장 최근에 개발된 공법으로 초벌 몰탈바름과 정벌 몰탈 바름과정을 실시한 후 접착재를 이용하여 타일을 붙이는 방법으로 타일의 박리우려가 거의 없는 공법이나 공사비용과 시간이 많이 소용된다.However, this method is a method that has been in use for a long time since the filling method of the mortar on the back of the tile is a perfect method, but there is a risk of defects such as damage and dropping of the tile due to freezing in the case of poor filling of the mortar on the corners or corners of the tile. Crimping and improvement Crimping method is a method developed to compensate for the weakness of the backfill, which is a disadvantage of the stacking method, and is applied by applying plastering in advance to apply thinning mortar after mortar curing. However, there is a fear of mass peeling if 30 minutes have passed after the insufficiency of pressing or mortar coating, and the adhesive paste method is the most recently developed method. Method that hardly peels off tiles by attaching tiles Or construction cost and time are much avail.

상기와 같은 문제점을 해결하기 위하여 본 출원인은 1999년 3월 18일자의 대한민국 특허출원 제9104호(이하 선출원이라함)로서 출원한바 있으며, 본 발명은 상기 선출원의 구성을 일부 달리하여 발명한 것이다.In order to solve the above problems, the present applicant has filed as Korean Patent Application No. 9104 (hereinafter referred to as "first application") of March 18, 1999, and the present invention has been invented by differently configuring the above-mentioned application.

즉 선출원은 격자형 거푸집과 그 격자형 거푸집을 건물의 벽체에 고정하기 위한 고정수단이 일면에 있는 구성이나 본 발명은 상기 고정수단이 응용될수 있는 구성으로 이루어진다.That is, the prior application has a configuration in which the grid formwork and the fixing means for fixing the grid formwork to the wall of the building on one side, but the present invention consists of a configuration that can be applied to the fixing means.

본 발명은 상기와 같은 문제점을 해소하기 위하여 타일(110)등의 건자재를 이용 건축물의 벽체와 바닥에 타일붙임 시공할 때 복수개의 기둥재(100), 중간수평재(104), 상.하단수평재(105), 수직재(106), 마구리재(107, 108)를 볼트,너트(116, 116')로 조립한 후 각종 스페이서(118, 119, 120)와 실리콘백업재(145)를 수평재(104, 105)와 수직재(106)의 각각의 삽입홈(137)에 삽입.고정하여 격자형 거푸집 골격을 형성시키고, 삽입.고정된 스페이서의 걸칠턱(123)이 밖으로 노출되도록 복수개의 타일(110)을 끼워 완성된 격자형 거푸집 본체를, 행거철물(102), 기둥재걸이쇠(129) 및 연결철물등 부속철물을 이용하여 건물벽체(109)나 바닥 스라브(145)위에 고정한 후, 몰탈충전펌프(140)로 충전몰탈(125)을 거푸집과 건물모체 사이 공간에 채워 타일(110)을 부착하는 시공방법을 제공함으로서, 넓은 면적을 신속하게 시공할 수 있고, 시공후에도 평탄하고, 정확한 시공면이 제공되어 공사기간 단축 및 타일의 박리.탈락현상을 사전차단할 수 있는 몰탈충전식 격자형거푸집 및 타일붙임공법을 제공하는데 본 발명의 목적이 있는 것이다.The present invention is to solve the problems described above when using the building materials, such as tile 110, when the tile construction on the wall and floor of the building a plurality of pillars 100, the middle horizontal material 104, the upper and lower horizontal materials ( 105, the vertical member 106 and the copper member 107 and 108 are assembled with bolts and nuts 116 and 116 ', and then the various spacers 118, 119 and 120 and the silicon backup member 145 are horizontal members 104, The plurality of tiles 110 are inserted into and fixed to the respective insertion grooves 137 of the 105 and the vertical member 106 to form a lattice form skeleton, and the plurality of tiles 110 are exposed to expose the latching jaw 123 of the inserted and fixed spacers. After fixing the grid-shaped formwork main body on the building wall 109 or the floor slab 145 by using the attached hardware such as the hanger hardware 102, the column latch 129 and the connecting hardware, the mortar charging pump ( By filling the filling mortar 125 into the space between the formwork and the building matrix to provide a construction method to attach the tile (110), The present invention provides a mortar-filled lattice formwork and tile attaching method which can quickly construct an area and provide a flat and accurate construction surface even after construction, which can shorten the construction period and prevent the peeling and dropping of tiles in advance. There is a purpose.

본 출원인은 몰탈 충전식 격자형 거푸집을 제공하여 고도의 타일시공 외관과 부착강도 및 작업 효율성을 개선하고 타일시공비용을 절감시키고자 예의 연구한 결과 본 발명을 완성하게 되었다.Applicant has completed the present invention as a result of earnest research to provide a mortar-filled lattice formwork to improve the appearance and adhesion strength and work efficiency of the high tile construction and reduce the tile construction cost.

도 1은 일실시예의 격자형 거푸집의 조립상태를 나타내는 사시도.1 is a perspective view showing an assembled state of a lattice formwork of an embodiment;

도 2 내지 도 5는 일실시예의 기둥재, 원통재, 연결핀 및 연결핀용 클립의 미조립시의 사시도.2 to 5 is a perspective view of the assembly of the pillar member, the cylindrical member, the connecting pin and the clip for the connecting pin of one embodiment.

도 6 내지 도 7는 일실시예의 지지철물과 몰타르방지캡의 미조립시의 사시도.6 to 7 are perspective views of the assembly of the support hardware and the mortar prevention cap of one embodiment.

도 8은 일실시예의 중간수평부재의 사시도.8 is a perspective view of an intermediate horizontal member of one embodiment.

도 9는 일실시예의 상,하단부 수평부재의 사시도.Figure 9 is a perspective view of the upper, lower horizontal members of one embodiment.

도 10은 일실시예의 수직부재의 사시도.10 is a perspective view of a vertical member of one embodiment.

도 11은 일실시예의 상,하단부 마구리재의 사시도.Figure 11 is a perspective view of the upper and lower end of the copper material of one embodiment.

도 13 내지 도 15는 일실시예의 각종 스페이서 부재의 사시도.13-15 are perspective views of various spacer members in one embodiment.

도 16 내지 도 17는 일실시예의 발포 폴리에틸렌 백업부재의 사시도.16 to 17 are perspective views of the foamed polyethylene backup member of one embodiment.

도 18 내지 도 19는 일실시예의 연결걸이쇠틀과 연결걸이쇠 뭉치의 사시도.18 to 19 is a perspective view of the hook hook and hook hook of the embodiment;

도 20은 일실시예의 연결걸이쇠틀의 종,횡단면도.20 is a longitudinal cross-sectional view of the connecting hanger of one embodiment.

도 21는 일실시예의 몰타르 침투방지 튜브의 사시도.21 is a perspective view of a mortar penetration tube of one embodiment.

도 22는 일실시예의 격자형거푸집이 연결걸이쇠틀을 이용 건물 몸체에 접합한 상태의 종단면도.Figure 22 is a longitudinal cross-sectional view of a state bonded to the building body using a grid formwork connecting hanger frame of one embodiment.

도 23은 도 22의 일실시예의 A-A선을 자른 평면도.FIG. 23 is a plan view taken along the line A-A of the embodiment of FIG. 22; FIG.

도 24는 도 22의 일실시예의 B-B선을 자른 평면도.24 is a plan view cut along the line B-B of the embodiment of FIG.

도 25는 도 24의 일실시예의 줄눈만을 표시한 정면도.25 is a front view showing only the joint of the embodiment of FIG. 24;

도 26은 일실시예의 기둥재와 원통재의 조립단면도.Figure 26 is an assembled cross-sectional view of the pillar member and the cylindrical member of one embodiment.

도 27은 일실시예의 중간 수평부재와 수직재의 조립상태를 도시한 사시도.27 is a perspective view showing the assembled state of the intermediate horizontal member and the vertical member of one embodiment.

도 28은 일실시예 상,하단부 수평부재와 수평모서리재의 조립상태를 도시한 단면도.FIG. 28 is a cross-sectional view illustrating an assembly state of a lower horizontal member and a horizontal edge member according to one embodiment; FIG.

도 29는 일실시예의 수평부재와 수직모서리재의 접합상태를 도시한 단면도.29 is a cross-sectional view showing a bonding state of the horizontal member and the vertical edge member in one embodiment.

도 30a 내지 도 30d은 일실시예의 연결걸이쇠뭉치의 결속에서 해체에 이르는 단계를 도시한 횡단면도.30A to 30D are cross-sectional views showing the steps leading to dismantling of the bundle of hook hooks in one embodiment.

도 31는 일실시예의 연결걸이쇠틀과 기둥재의 접합상태를 도시한 사시도.Figure 31 is a perspective view showing a bonding state of the connecting hanger frame and the pillar material of one embodiment.

도 32은 다른 실시예의 격자형 거푸집의 조립상태를 나타내는 사시도.32 is a perspective view showing an assembled state of a lattice formwork of another embodiment.

도 33은 다른 실시예의 격자형 거푸집의 조립상태를 나타내는 부분사시도.33 is a partial perspective view showing an assembled state of a lattice formwork of another embodiment.

도 34 내지 도 37은 다른 실시예의 기둥재, 행거철물, 연결핀 및 클립 사시도.34 to 37 is a perspective view of a pillar, a hanger hardware, connecting pins and clips of another embodiment.

도 38 내지 도 39은 다른 실시예의 중간수평재 및 상, 하단수평재의 사시도.38 to 39 are perspective views of an intermediate horizontal member and the upper and lower horizontal members of another embodiment.

도 40 내지 도 41는 다른 실시예의 수직부재 및 마구리재의 사시도.40 to 41 is a perspective view of the vertical member and the copper material of another embodiment.

도 42 내지 도 44는 다른 실시예의 연결철물, 가이드 앵글 및 레일의 사시도.42 to 44 are perspective views of the connecting hardware, the guide angle and the rail of another embodiment.

도 45 내지 도 48은 다른 실시예의 각종 스페이서 및 실리콘백업재의 사시도.45-48 are perspective views of various spacers and silicon backup materials of another embodiment.

도 59 내지 도 52은 다른 실시예의 지지철물, 연결걸이쇠 뭉치, 연결걸이쇠틀 및 몰탈침투 방지용 튜브의 사시도.59 to 52 is a perspective view of the support hardware of another embodiment, a bundle of hook hook, hook hook and mortar penetration prevention tube.

도 53 및 도 54는 다른 실시예의 기둥재걸이쇠 및 조절나사의 사시도.53 and 54 are perspective views of the column latch and the adjustment screw of another embodiment.

도 55은 다른 실시예의 벽체 지지용 부라켓의 구성 및 결속 상태를 나타내는 사시도.The perspective view which shows the structure and binding state of the wall support part racket of another embodiment.

도 56는 다른 실시예의 격자형거푸집을 행거철물 및 가이드앵글 등과 결합, 건물벽체에 설치하는 과정을 나타내는 종단면도.56 is a longitudinal sectional view showing a process of installing a lattice formwork of another embodiment on a building wall in conjunction with a hanger hardware and a guide angle;

도 57는 다른 실시예의 격자형 거푸집이 행거철물을 이용, 레일과 접합 과정의 상세단면도.57 is a detailed cross-sectional view of the rail and the joining process using the lattice formwork hanger hardware of another embodiment.

도 58a 내지 도 58c는 다른 실시예의 격자형 거푸집의 기둥재 하단부를 건물 벽체에 지지 및 결속시키는 각종 방법의 상세단면도.58A to 58C are detailed cross-sectional views of various methods of supporting and binding the lower end of a pillar of a lattice formwork to a building wall in another embodiment.

도 59a 내지 도 59b는 다른 실시예의 바닥타일 시공시 격자형 거푸집을 건물 벽체에 지지 및 결속시키는 각종 방법의 상세단면도.59A-59B are detailed cross-sectional views of various methods of supporting and binding a lattice formwork to a building wall during construction of a floor tile in another embodiment;

도 60a 내지 도 60d는 다른 실시예의 격자형 거푸집을 상부레일 및 하부 가이드앵글과 접합, 해체 과정을 단계별로 나타내는 종단면도.60A to 60D are longitudinal cross-sectional views illustrating a process of joining and dismantling a lattice formwork of another embodiment with an upper rail and a lower guide angle.

도 61은 다른 실시예의 중간수평재와 수직재의 조립상태를 나타내는 사시도.61 is a perspective view showing the assembled state of the intermediate horizontal member and the vertical member of another embodiment.

도 62a 내지 도 62c는 다른 실시예의 연결걸이쇠 뭉치와 건물 벽체의 지지철물과의 결속 및 해체 과정을 단계별로 나타내는 단면도.62A to 62C are cross-sectional views illustrating a process of binding and dismantling a bundle of connecting hooks and supporting hardware of a building wall according to another embodiment.

도 63는 다른 실시예의 몰탈 충전펌프와 호스의 입면도.63 is an elevation view of a mortar charge pump and hose in another embodiment.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1, 100 : 기둥재 2 : 원통재1, 100: pillar material 2: cylindrical material

3, 103 : 지지철물 4, 104 : 중간수평재3, 103: supporting steel 4, 104: intermediate horizontal material

5, 105 : 상, 하단부 수평재 6, 106 : 수직재5, 105: upper and lower horizontal members 6, 106: vertical members

7, 107 : 상, 하단부 마구리재 8, 108 : 좌,우측단부 마구리재7, 107: upper and lower end of the copper material 8, 108: left and right end of the copper material

9, 109 : 건물 벽체 10, 110 : 타일9, 109: building walls 10, 110: tiles

11, 111 : 연결걸이쇠틀 12, 112 : 연결걸이쇠뭉치11, 111: hook hanger 12, 112: hook hanger bundle

13, 113 : 앵커 14, 114 : 연결핀13, 113: anchor 14, 114: connecting pin

15, 115 : 연결용 클립 16,16', 116,116' : 볼트,너트15, 115: Connecting clip 16,16 ', 116,116': Bolt, nut

7, 117 : 나사못 18, 118 : 십자형 스페이서7, 117: screw 18, 118: cross spacer

19, 119 : 일자형 스페이서 20, 120 : 수직형 스페이서19, 119: straight spacer 20, 120: vertical spacer

21 : 실리콘 패드21: silicone pad

22, 122 : 볼록 발포폴리에틸렌 백업재22, 122: convex expanded polyethylene backing

22' : 반달형 발포 폴리에틸렌 백업재 23 : 몰탈침투 방지캡22 ': Vandal foam polyethylene backing 23: Mortar penetration cap

24, 124 : 몰탈침투 방지튜브 25, 125 : 충전 몰탈24, 124: mortar penetration tube 25, 125: filling mortar

26, 126 : 연결걸이쇠 구멍 27, 127 : 앵커용 구멍26, 126: hook hole 27, 127: anchor hole

28 : 몰탈주입 구멍 29 : 실리콘패드 삽입구멍28: mortar injection hole 29: silicon pad insertion hole

30 : 나사못 연결구멍 31 : 좌,우 모서리재 홈30: screw connection hole 31: left and right corner groove

32 : 카본피라멘트 선 연결용 구멍 33 : 결합고리32: hole for carbon filament wire connection 33: binding ring

34 : 카본피라멘트 선 35 : 삽입용 홈34: carbon filament wire 35: insertion groove

36 : 상,하 이동용다이얼 37 : 상부걸이쇠36: Up and down movement dial 37: Upper hook

38 : 하부걸이쇠 39 : 전,후진용수직관통구멍38: lower hook 39: vertical through hole for forward and reverse

40 : 가이드 아크릴 41 : 상,하이동용나사봉40: acryl guide 41: screw rod for moving up and down

42 : 상하이동용너트 43 : 너트이동홈42: Shanghai copper nut 43: nut moving groove

44 : 아크릴접합용볼트 45 : 수직재접합홈44: acrylic bonding bolt 45: vertical rejoining groove

46, 139 : 모터 47, 140 : 몰탈 충전펌프46, 139: motor 47, 140: mortar charge pump

48, 141 : 몰탈 교반탱크 49, 146 : 몰탈 이송호스48, 141: mortar stirring tank 49, 146: mortar transfer hose

102 : 행거철물 123 : 걸칠턱102: hanger hardware 123: galling jaw

128 : 칼부럭 앵커 129 : 기둥재 걸이쇠128: knife anchor 129: pillar hook

130 : 가이드 앵글 131 : 조절나사130: guide angle 131: adjustment screw

132 : 조절나사 다이얼 133 : 벽체지지용 부라켓132: adjusting screw dial 133: bracket for wall support

134 : 삽입 수평재 135 : 크램프134: insertion horizontal member 135: clamp

136 : 걸이쇠 삽입홈 137 : 삽입홈136: latching groove 137: insertion groove

138 : 볼트 구멍 142 : 레일138: bolt hole 142: rail

143 : 연결철물 144 : 슬라브143: connecting hardware 144: slab

145 : 실리콘 백업재145: Silicone Backup Material

상기와 같은 목적을 달성하기 위한 일면의 본 발명은, 타일 시공용 격자형 거푸집에 있어서, 거푸집의 본체가 되는 구멍이 형성된 복수개의 기둥재(1)와, 상기 기둥재에 결합고정된 연결걸이쇠틀(11)과, 상기 기둥재의 구멍에 수직방향으로 결합되는 복수개의 원통재(2)로 구성된 거푸집 본체와, 상기 기둥재(1)에 소정의 간격에서 수직방향으로 결합되는 복수개의 도 2의 H빔 형태의 중간수평재(4)와 상기 상,하단 수평재(5)에 끼워지는 상,하단마구리재(7)와 중간 수평재(4)와 상,하단 수평재의 단부에 각각 삽입.결합되는 좌,우측마구리재(8)와, 상기 수평재들 사이에 수직방향으로 결합되는 복수개의 수직재(6)와, 상기 중간 수평재(4)와 상,하단 수평재(5) 및 수직재상에 부착고정되는 십자형,일자형 및 수직형 스페이서부재(18,19 및 20)와, 상기 중간 수평재에 결합되는 볼록 요철형 발포 폴리에틸렌 백업재(22)와 상기 수직재상에 결합 고정되는 반달형 발포 폴리에틸렌 백업재(23) 및 상기 수평재상에 실리콘 패드(21)로 구성되고, 상기 복수개의 기둥재(1)는 소정의 간격으로 복수개의 구멍이 형성되고 배열되있으며, 상기 복수개의 원통재는 복수개의 구멍이 형성된 기둥재(1)에 각각 끼워 지고 연결핀(14)과 연결용 클립(15)으로 결합되어 커푸집의 본체를 이루고, 상기 중간 복수개의 수평재는 본체의 기둥제(1)와 수직방향에서 타일의 넓이와 줄눈을 합한 간격으로 볼트(16)와 너트(16')로 결합되어 있으며, 상기 상,하 수평재는 타일의 넓이와 줄눈을 합한 간격에서 볼트(16)와 너트(16')로 결합되어 있으며, 상기 수직재(6)는 상기 수평재에 (45)접속홈이 형성되어 있어 상,하단 수평재 사이에 타일넓이와 줄눈 넓이를 합한 간격으로 접속홈(15)에 끼워지고 수직재 하부와 상부에 형성된 구멍에 연결핀용 클립(15)으로 결합되어 있으며, 상기 상,하단 마구리재(7)는 상기 상,하단 수평재에 나사못으로 결합되어 있으며, 좌,우측모서리재(8)는 중간 수평재(4)와 상,하단 수평재의 끝부분에는 각각 나사못 결합되며, 십자형 스페이서부재(18)는 중간 수평부재(4)와 수직재가 교차하는 지점의 삽입용홈(35)에 결합되며 상기 일자형 스페이서 부재는 중간 수평재(4)의 좌,우측 끝부분의 삽입용홈에(35)에 결합되며, 상기 수직형 스페이서부재는 상,하단수평재와(5)와 수직재(6)가 교차하는 지점의 수직재(6)의 내부와 외부에 걸처에 삽입결합되며, 상기 볼록 요철형 발포 폴리에틸렌 백업재(22)는 중간 수평재(4)의 삽입홈(35)내에 십자형 스페이서(18) 사이에서 또는 십자형 스페이서부재(18)와 일자형 스페이서부재(19) 사이에 삽입결합되고, 상기 반달형 발포 폴리에틸렌 백업재는 수직재(6)상에 부착 고정되며, 상기 기둥재(1)에 건물벽체의 지지철물(3)과 거푸집을 결합시키는 상,하부 연결걸이쇠(37,38)가 내장된 연결걸이쇠틀(11)이 완충용 아크릴판(51)로 끼워지고 볼트로 결합되어 이루어진 격자형 거푸집과, 상기 격자형 거푸집을 이용하여 타일시공시 건축물 건물 벽체(9)에 앵커삽입용 구멍을 천공하고 앵커(13)의 외피를 삽입하는 단계와, 몰타르 침투방지캠(23)이 내장된 지지철물(3)을 앵커(13)로 건축물의 벽체면에 부착고정시키는 단계와, 상기 거푸집의 중간 수평재(4)내부에 부착된 카본필라멘트 선 결합고리(33)로부터 출발 중간 수평재(4)의 삽입홈(35)내에 카본피라멘트 선 결합용 구멍(32)를 통과하여 타일(10) 뒷면을 감아돌아 다른 중간 수평재(4)의 결합고리(33)에 연결하여 타일이 떨어지지 않도록 하는 단계와, 상기 타일이 끼워진 격자형 거푸집을 건축물 벽면으로부터 몰타르 피복두께만큼 틈을 띄어 상기 지지철물(3)의 연결걸이쇠 출입구멍(26)과 수직재(6)의 연결걸이쇠 출입구멍이(26)이 일직선상에 일치하는 위치에서 기둥재(1)에 완충용 아크릴판(51)을 끼워 기둥연결볼트(52)를 이용하여 연결걸이쇠틀(11)을 결합시키는 단계, 상기 연결걸이쇠틀의 연결걸이쇠뭉치 하부걸이쇠(38)를 지지철물(3)의 출입구멍(26)내부에 완전히 진입시키고, 걸이쇠뭉치의 상,하이동용 다이얼(36)을 회전시켜 상기 연결걸이쇠뭉치를 전체적으로 하강시켜 하부걸이쇠(38)는 지지철물(3)의 출입구멍(26) 아래턱에 서로 물리도록 하고 상기 하부걸이쇠(38)의 하강으로 확보된 윗공간에 상기 연결걸이쇠뭉치의 상부걸이쇠(37)를 밀어넣어 결합시킴으로서 건물벽체의 보강용 지지철물과 격자형 거푸집을 결합고정시키는 단계와, 건물 벽체면과 타일 뒷면사이에 몰타르 이송용펌프(47)로 몰타르를 주입하는 단계 및 몰타르의 양생시간이 경과되면 상기 연결걸이쇠뭉치의 상,하부걸이쇠(37 및 38)를 상기 결합고정과는 역순으로 해체하여 거푸집을 건축물벽체로부터 분리시는 단계로 이루어지는 것을 특징으로 하여 건축물의 벽체면에 타일을 시공하는 방법을 제공한다.In one aspect of the present invention for achieving the above object, in the grid-shaped formwork for tile construction, a plurality of pillar material (1) having a hole to be the main body of the formwork, and the coupling hanger fixed to the pillar material (11), a die body composed of a plurality of cylindrical members (2) coupled in the vertical direction to the hole of the pillar member, and a plurality of H of Figure 2 coupled to the pillar member (1) in the vertical direction at a predetermined interval. Left and right sides inserted and coupled to the ends of upper and lower flat materials 7 and intermediate horizontal members 4 and upper and lower horizontal members fitted to the beam-shaped intermediate horizontal member 4 and the upper and lower horizontal members 5, respectively. The copper material (8), the plurality of vertical members (6) coupled in the vertical direction between the horizontal members, and the cross-shaped, straight and fixed to the intermediate horizontal member (4) and the upper and lower horizontal members (5) and the vertical member Vertical spacer members 18, 19 and 20, and the intermediate horizontal member The convex concave-convex foamed polyethylene backing material 22 and the semi-moon-shaped foamed polyethylene backing material 23 bonded and fixed on the vertical member and the silicone pad 21 on the horizontal member are formed. The plurality of holes are formed and arranged at predetermined intervals, the plurality of cylindrical members are fitted into each of the pillar member 1 is formed with a plurality of holes and coupled with the connecting pin 14 and the connecting clip 15 is large Forming the main body of the pouch, the middle plurality of horizontal members are coupled by a bolt 16 and a nut (16 ') at intervals of the sum of the width and the joint of the tile in the vertical direction and the pillar (1) of the main body, The lower horizontal member is coupled with the bolt 16 and the nut 16 'at the sum of the width and the joint of the tile, and the vertical member 6 has a connection groove (45) formed in the horizontal member between the upper and lower horizontal members. Combine tile width with joint width It is fitted in the connecting groove 15 at intervals and coupled to the hole formed in the lower portion and the upper portion of the connecting pin clip 15, and the upper and lower copper material (7) is coupled to the upper and lower horizontal members by screws. , The left and right edge member 8 is screwed to the ends of the intermediate horizontal member 4 and the upper and lower horizontal members, respectively, the cross-shaped spacer member 18 is inserted at the point where the intermediate horizontal member 4 and the vertical member intersect. It is coupled to the groove 35 and the straight spacer member is coupled to the insertion groove 35 of the left and right ends of the intermediate horizontal member (4), the vertical spacer member is the upper and lower horizontal members and (5) and the vertical member The convex concave-convex foamed polyethylene backing material 22 is inserted into and coupled to the interior and exterior of the vertical member 6 at the point where the intersecting points 6 intersect. 18) or between the cross spacer member 18 and Inserted and coupled between the magnetic spacer member 19, the half-moon foam polyethylene backing material is fixed on the vertical member (6), the coupling member and the formwork and the support hardware (3) of the building wall to the column member (1), The structure of the tile construction using the grid-shaped formwork formed by the connecting hook frame 11 with the lower linking hooks 37 and 38 fitted into the cushioning acrylic plate 51 and joined by bolts. Drilling a hole for inserting the anchor into the building wall (9) and inserting the outer shell of the anchor (13), and the supporting wall (3) in which the mortar intrusion prevention cam (23) is built is anchored to the wall surface of the building (13). Attaching and fixing to the carbon filament wire engaging hole 32 in the insertion groove 35 of the starting intermediate horizontal member 4 from the carbon filament wire engaging ring 33 attached to the inside of the intermediate horizontal member 4 of the formwork. Pass through the back of the tile (10) Connecting the coupling ring 33 of the plain material 4 to prevent the tile from falling off, and connecting the grid-shaped formwork in which the tile is inserted from the wall of the building by the thickness of the mortar to cover the hinge of the supporting hardware 3 The column connecting bolt 52 is used by inserting the cushioning acrylic plate 51 into the column member 1 at a position where the connecting latch access hole 26 of the hole 26 and the vertical member 6 coincide in a straight line. Step of engaging the connecting hook frame 11, the lower hook bracket (38) of the hook hanger hook of the hook is completely entered into the access hole 26 of the support hardware (3), the upper and lower hook bracket Rotate the movement dial 36 to lower the overall hook hanger so that the lower hook 38 snaps into the lower jaw of the access hole 26 of the support hardware 3 and then lowers the lower hook 38. Upper hook of the hook hanger in the secured upper space Coupling and fixing the reinforcing support hardware of the building wall and the grid formwork by pushing the fitting 37, and injecting the mortar with the mortar conveying pump 47 between the building wall surface and the tile back surface; When the curing time elapses, the upper and lower hooks (37 and 38) of the hook hanger in the reverse order of the coupling fixed to disassemble the formwork from the building wall, characterized in that the wall surface of the building Provides a way to construct tiles.

상기와 같은 목적을 달성하기 위한 또 다른 본 발명은, 건축물의 벽면 또는 바닥에 타일을 시공하기 위한 몰탈 충전식 거푸집에 있어서, 복수개의 기둥재(100);Another invention for achieving the above object, in the mortar-filled formwork for installing the tile on the wall or floor of the building, a plurality of pillar material (100);

상기 기둥재(100)에 소정의 간격을 두고 수직방향으로 결합되는 복수개의 중간수평재(104) 및 상,하단 수평재(105);A plurality of intermediate horizontal members 104 and upper and lower horizontal members 105 coupled to the pillar member 100 in a vertical direction at predetermined intervals;

상기 복수개의 수평재(104, 105)사이에 수직방향으로 결합되는 복수개의 수직재(106);A plurality of vertical members 106 coupled in a vertical direction between the plurality of horizontal members 104 and 105;

상기 상,하단 수평재(5)에 끼워 결합되는 상,하단마구리재(107); 상,하단 수평재(105) 및 중간 수평재(104)의 단부에 각각 결합되는 좌,우측 마구리재(108);Upper and lower end materials (107) inserted into and coupled to the upper and lower horizontal members (5); Left and right flanks 108 coupled to the ends of the upper and lower horizontal members 105 and the intermediate horizontal members 104, respectively;

상기 중간 수평재(104)와 수직재(106)가 수직으로 교차하는 곳의 중간 수평재(104)의 삽입홈(137) 내부에 삽입설치되는 십자형 스페이서(118);A cross spacer 118 inserted into the insertion groove 137 of the intermediate horizontal member 104 where the intermediate horizontal member 104 and the vertical member 106 intersect vertically;

중간 수평재(104)의 양단부 삽입홈(137) 내부에 삽입설치된 일자형 스페이서(119);A linear spacer 119 inserted into both end insertion grooves 137 of the intermediate horizontal member 104;

상,하단 수평재(105)와 수직재(106)가 수직으로 교차하는 곳의 상,하단 수평재(105)의 삽입홈(137) 내부에 삽입설치되는 수직형 스페이서(120);A vertical spacer 120 inserted into an insertion groove 137 of the upper and lower horizontal members 105 where the upper and lower horizontal members 105 and the vertical member 106 vertically intersect;

상기 중간 수평재(104)와 수직재(106)의 삽입홈(137) 내부에 삽입되는 실리콘백업재(145);A silicon backup material 145 inserted into the insertion groove 137 of the intermediate horizontal member 104 and the vertical member 106;

건물 벽체(109) 상부에 설치되어 거푸집의 기둥재(100) 상단부 행거철물(102)과 삽입,결속되는 레일재(142);A rail material 142 installed on the building wall 109 and inserted into and bound with the hanger hardware 102 at the upper end of the pillar material 100 of the formwork;

건물 벽체(109) 하단부에 설치되어 거푸집의 기둥재(100) 하단부 기둥재 걸이쇠(129)와 삽입,결속되는 가이드앵글(130);A guide angle 130 installed at the lower end of the building wall 109 to be inserted into and coupled with the pillar latch 129 at the lower end of the pillar 100;

상기 거푸집의 기둥재(100) 하단부 기둥재 걸이쇠(129)와 삽입,결속되어 건물 벽체에 밀착되는 조절나사(131)가 부착된 4각 후레임 형태의 가이드 앵글(130);Four angle frame-shaped guide angle 130 is attached to the formwork pillar 100, the lower end of the pillar hanger 129 is inserted, bound to the control screw 131 is in close contact with the building wall;

상기 거푸집을 건물 벽체(109)의 지지 철물(103)과 결합시키는 기둥재(100)에 부착된 연결 걸이쇠 틀(111);A connection latch frame 111 attached to the pillar material 100 for coupling the formwork with the supporting hardware 103 of the building wall 109;

상기 거푸집을 이용하여 바닥 타일시공을 위한 건물벽체(109)의 타일(110) 줄눈틈에 삽입수평재(134)를 삽입하여 거푸집 기둥재(100)에 연결되는 벽체지지용 브라켓(133); 및A wall support bracket 133 connected to the formwork pillar 100 by inserting the insertion horizontal member 134 into the tile 110 of the building wall 109 for the floor tile construction using the formwork; And

상기 바닥타일 시공시 거푸집 기둥재(100)와 결합하기 위하여 건물벽면(109)에 슬리브앵커(113)로 고정되는 연결 철물(143)로 구성됨으로서,As it is composed of a connecting hardware 143 is fixed to the sleeve anchor 113 to the building wall surface 109 in order to combine with the formwork pillar 100 when the floor tile construction,

상기 복수개의 중간 수평재(104)와 상,하단 수평재(105)를 시공하고자 하는 타일(110)의 길이와 줄눈 폭을 합한 간격마다 기둥재(100)와 수직으로 결합하며, 복수개의 수직재(106)는 중간 수평재(104) 상호간 및 중간 수평재(104)와 상,하단 수평재(105) 사이에 삽입 결합되고, 상기 중간 수평재(104)와 상,하단 수평재(105)상의 삽입홈(137)에 십자형 스페이서(118), 일자형 스페이서(119) 및 수직형 스페이서(120)를 삽입하고, 걸칠턱(123)이 밖으로 노출되도록 스페이서에 타일(110)을 삽입하여 타일의 위치를 고정하고, 줄눈의 폭을 일정하게 유지하며, 중간 수평재(104)상의 삽입홈(137)에 결합된 스페이서(118, 119) 사이에 실리콘백업재(145)를 삽입하고, 수직재의 경우는 삽입홈(137) 전체의 공간에 실리콘 백업재(145)를 삽입하여 몰탈 충전작업시에 충전몰탈(125) 누설을 방지하도록 하고, 상기 건물 벽체(109) 상부에 소정 간격마다 슬리브 앵커(113)로 고정된 연결 철물(143)에 결합된 레일(142)에 격자형 거푸집의 기둥재(100)와 연결핀, 클립(114, 115)으로 결합된 행거 철물(102)의 돌기부를 삽입, 고정하며, 건물벽체(109) 하단부에는 스리브 앵커(113)로 고정된 연결철물(143)과 결합된 가이드앵글(130)을 기둥재 걸이쇠(129)에 삽입.고정하도록 되어 있고, 건물 스라브 바닥에 조절나사(131)를 소정간격으로 부착한 4개의 가이드앵글(130)을 볼트,너트(116, 116')로 연결하여 4각후레임을 구성하며 상기 4각후레임을 조절나사(131)로 조절하여 나사봉 끝부분이 건물벽체(109)에 밀착 지탱하여, 고정된 4각 후레임의 가이드 앵글(130)과 격자형 거푸집의 기둥재 걸이쇠(129)를 결속하도록 되어 있고,The plurality of intermediate horizontal members 104 and the upper and lower horizontal members 105 are vertically coupled to the column member 100 at intervals of the sum of the lengths and joint widths of the tiles 110 to be constructed, and the plurality of vertical members 106. Is inserted into and coupled between the intermediate horizontal member 104 and the intermediate horizontal member 104 and the upper and lower horizontal member 105, the cross-shaped spacer in the insertion groove 137 on the intermediate horizontal member 104 and the upper and lower horizontal member 105 118, the straight spacer 119 and the vertical spacer 120 are inserted, and the tile 110 is inserted into the spacer to expose the latching jaw 123 to fix the position of the tile, and the width of the joint is fixed. And the silicon backup material 145 is inserted between the spacers 118 and 119 coupled to the insertion groove 137 on the intermediate horizontal member 104. In the case of the vertical member, the silicon backing member 145 is inserted into the space of the insertion groove 137. Inserting the backup material 145 to prevent leakage of the charging mortar 125 during the mortar filling operation In addition, the pillars 100 of the grid-shaped formwork and the connecting pins, clips 114 on the rails 142 coupled to the connecting hardware 143 fixed by the sleeve anchor 113 at predetermined intervals on the building wall 109. , 115, and inserts and fixes the protrusions of the hanger hardware 102 coupled to the bottom of the building wall 109, the guide angle 130 coupled with the connecting hardware 143 fixed by the sleeve anchor 113 pillar It is inserted and fixed in the latch 129, and the four guide angles 130 with the adjustment screw 131 attached to the floor of the building slab at predetermined intervals are connected to each other by bolts and nuts 116 and 116 '. By constructing a frame and adjusting the four-frame frame with the adjustment screw 131, the end of the screw rod is closely supported on the building wall 109, the fixed angle of the guide angle 130 and the pillar of the grid formwork Is to bind the hook (129),

상기 건물 벽체(109)에 칼부럭 앵커(129)로 고정된 지지철물(103)과 격자형 거푸집의 타일(110)사이에 몰탈 침투방지 튜브(124)를 끼워 넣고, 기둥재(100)에 볼트(116)로 결합된 연결 걸이쇠틀(111)내의 연결걸이쇠 뭉치(112)를 지지철물의 연결 걸이쇠 구멍(126)에 진입시킨 후 연결걸이쇠 뭉치를 밑으로 하강하여 지지철물과 연결 걸이쇠뭉치의 갈고리를 결속시키며, 격자형 거푸집을 분리할 때는 상기와 역순으로 실시하여 거푸집을 건물 벽체(109)에 고정된 지지철물로부터 분리,이탈시키도록 되어 있으며,The mortar penetration prevention tube 124 is inserted between the support hardware 103 fixed by the knife block anchor 129 and the grid 110 form the tile 110 to the building wall 109, and bolts to the pillar 100. After connecting the bundle hanger 112 in the coupling hanger frame 111 coupled to the 116 into the connection hanger hole 126 of the supporting hardware, the bundle hanger is lowered to the bottom to support iron and the bundle hook Bind the hooks, and when separating the grid formwork is carried out in the reverse order to separate the formwork from the supporting hardware fixed to the building wall 109,

상기 건물벽체(109)의 타일 줄눈틈에 끼워진 삽입수평재(134)에 클램프(135)로 연결된 벽체지지용 브라켓(133)을 거푸집의 기둥재(100)와 결속 고정시켜, 거푸집의 타일(110)과 바닥 스라브(144) 사이의 공간에 충전용 몰탈(125)을 채워,바닥타일을시공 하도록 되어 있으며,The wall support bracket 133 connected to the insert horizontal member 134 inserted into the tile joint of the building wall 109 by the clamp 135 is fixed to the pillar member 100 of the formwork, thereby forming the tile 110 of the formwork. Filling the mortar 125 for filling in the space between the floor slab 144, the floor tile is to be constructed,

상기 건물 벽체(109)의 하단부에 소정 간격으로 슬리브 앵커(113)로 고정된 연결철물(143)과 거푸집의 기둥재(100)를 결속고정시키고 거푸집의 타일(110)과 바닥 스라브(144) 사이의 공간에 충전 몰탈(125)을 채워,바닥타일을 시공 하도록 구성되는 몰탈충전식 격자형 거푸집 및 방법을 제공한다.Bonding fixture 143 and the pillar 100 of the formwork are fixed to the lower end of the building wall 109 by the sleeve anchor 113 at predetermined intervals, and between the formwork tile 110 and the floor slab 144. Filling the filling mortar 125 in the space of, provides a mortar-filled lattice formwork and method configured to construct a floor tile.

상기의 격자형 거푸집의 각종 수평재(104, 105)의 삽입홈(137)에 삽입된 각종 스페이서(118, 119, 120)에 걸칠턱(123)이 돌출되게 타일(110)이 끼워진 복수개의 거푸집 기둥재(100) 상단에 삽입,결합된 행거철물(102)의 높이에 맞게 연결철물(143)을 소정간격마다 슬리브 앵커(113)로 건물벽체(109)에 고정하며, 상기 연결철물(143)과 레일(142)을 건물벽체(109)면으로부터 충전몰탈(125)의 피복두께만큼 공간을두고 볼트,너트(116, 116')로 결속하며, 건물벽체(109) 하단부는 기둥재걸이쇠(129)에 가이드앵글(130)이 삽입 되도록 연결철물(143)과 가이드앵글(130)을 결속하며, 상기 타일이 끼워진 격자형거푸집을 하강시켜 행거철물(102)의 돌기부위를 레일(142)의 내부홈에, 하부 가이드앵글(130)의 수직부분은 기둥재걸이쇠(129) 내부공간에 삽입함으로 거푸집을 결합,고정하며, 상기 격자형거푸집에 끼워진 타일(110)뒷면과 건물벽체(109)면 사이공간에 몰탈충전펌프(140)로 충전몰탈(125)을 충전하며, 상기 충전몰탈(125)의 양생완료시 가이드앵글(130)은 연결철물(143)로부터, 상단 행거철물(102)은 레일(142)로 부터 각각 분리시킨후 상기 격자형거푸집을 건물벽체(109)에 부착된 타일(110)로 부터 탈형 분리시키는 과정으로 이루어지는 것을 특징으로 한 건물벽체(109)에 타일(110)을 부착 시공하는 방법을 제공한다.A plurality of formwork pillars in which the tile 110 is fitted such that the jaws 123 protrude from the spacers 118, 119, and 120 inserted into the insertion grooves 137 of the various horizontal members 104 and 105 of the lattice formwork. The connecting hardware 143 is fixed to the building wall 109 by the sleeve anchor 113 at predetermined intervals to fit the height of the hanger hardware 102 inserted and coupled to the upper part of the ash 100, and the connecting hardware 143 and The rail 142 is spaced from the surface of the building wall 109 by the thickness of the filling mortar 125 and bound to the bolts and nuts 116 and 116 ', and the lower end of the building wall 109 is the column latch 129. Binding the connecting hardware 143 and the guide angle 130 so that the guide angle 130 is inserted into the), and the projection of the hanger hardware 102 to the inside of the rail 142 by lowering the grid-shaped formwork is inserted into the tile In the groove, the vertical portion of the lower guide angle 130 is coupled to the formwork by inserting it into the inner space of the column latch 129, and the grid Filling the filling mortar 125 with a mortar charging pump 140 in the space between the tile 110, the back surface and the building wall 109 surface inserted into the formwork, the guide angle 130 when curing of the filling mortar 125 is completed From the connecting hardware 143, the upper hanger hardware 102 is separated from the rails 142, respectively, and the grid formwork is formed by the process of demolding separation from the tile 110 attached to the building wall 109 It provides a method for attaching the tile 110 to the building wall 109 characterized in that.

본 발명의 일면에 따른 발명은 이하 첨부된 도면에 의해 상세히 설명하면 다음과 같다.The invention according to one aspect of the present invention will be described in detail below with reference to the accompanying drawings.

도 1은 격자형 거푸집의 조립상태를 나타내는 사시도로서 기둥소재(1)에 소정의 간격으로 복수개의 구멍이 형성된 복수개의 기둥소재(1)를 소정간격으로 세우고 상호기둥재 간을 가로방향에서 소정간격으로 다수개의 원통재(2)를 상기 복수개의 기둥소재(1)에 형성된 구멍을 통과 연결시켜 구성되는 본체로서 거푸집 전체의 뒤틀림을 방지하고, 타일(10)의 넓이와 줄눈넓이를 합한 간격에서 가로방향으로 본체인 기둥재(1)에 볼트와 너트(16')로 결합되고 복수개의 실리콘패드 삽입용 구멍(29)이 형성된 복수개의 중간 수평재(4) 및 상,하단 수평재(5)와, 상기 복수개의중간 수평재(4)와 또는 상,하단 수평재(5)의 접속홈에 끼워져 결합된 수직재(6)와, 상,하단 수평재(5)에 상,하단 모서리재를, 중간 수평재(4)와 상,하단 수평재의 말단부에는 각각 나사못으로 접합되록 나사못 구멍(30)이 형성되고 상기 상,하단 수평재와 중간수평재들에 끼워지도록 홈(19)이 형성된 좌,우모서리재와, 중간 수평부재(4)와 수직재가 교차하는 지점의 삽입용홈(35)에 위치하는 십자형 스페이서 부재(18), 중간 수평재(4)의 좌,우측 말단부의 삽입용홈에(35)에 위치하는 일자형 스페이서(18) 및 상기 상,하단 수평제(5)와 수직재(6)가 교차하는 지점의 수직재(6)내부 및 외부에 걸처 삽입되는 수직형 스페이서부재로 구성된 거푸집 본체의 조립상태를 도시한다. 상기 각종 스페이서 부재로 구획된 직사각형 공간은 곧 타일이 위치할 자리임을 나타내며, 상기 중간 수평재(4)와 상,하단 수평재(5)에는 실리콘패드(21) 삽입용구멍(29)이 형성되어 있어 실리콘패드(21)를 삽입하여 타일의 표면이 수평재의 금속면에 직접접촉하는 것을 방지하고 타일의 위치를 고정하는 목적이 있다.1 is a perspective view showing a state of assembling the lattice formwork, a plurality of pillar materials (1) having a plurality of holes formed at predetermined intervals in the pillar material (1) at a predetermined interval and a predetermined interval between the cross pillar materials in the horizontal direction It is a main body configured by connecting a plurality of cylindrical materials (2) through the holes formed in the plurality of pillar materials (1) to prevent warping of the entire formwork, horizontally at the interval of the sum of the width and the joint width of the tile (10) A plurality of intermediate horizontal members 4 and upper and lower horizontal members 5 coupled to the pillar member 1 which is the main body in the direction and formed with a plurality of silicon pad insertion holes 29 and a plurality of silicon pad insertion holes 29; The upper and lower edge members are inserted into the vertical members 6 fitted into the connecting grooves of the plurality of intermediate horizontal members 4 or the upper and lower horizontal members 5, and the upper and lower edge members are attached to the upper and lower horizontal members 5, respectively. Screwed to the ends of the upper and lower horizontal members, respectively A lock screw hole 30 is formed, and the left and right edge materials having grooves 19 formed to fit the upper and lower horizontal members and the intermediate horizontal members, and the insertion grooves at the point where the intermediate horizontal member 4 and the vertical member intersect ( A cross spacer member 18 positioned at 35, a straight spacer 18 positioned at an insertion groove 35 at the left and right end portions of the intermediate horizontal member 4, and the upper and lower horizontal members 5 and the vertical member ( 6 shows an assembling state of the form body composed of a vertical spacer member inserted into and out of the vertical member 6 at the point where 6) intersects. The rectangular space partitioned by the various spacer members indicates that the tile is to be positioned, and the silicon pad 21 insertion holes 29 are formed in the middle horizontal member 4 and the upper and lower horizontal members 5, The purpose of the pad 21 is to prevent the surface of the tile from directly contacting the metal surface of the horizontal member and to fix the position of the tile.

도 2 내지 도 5에서 도 2는 상기 기둥재(1) 일부의 도시하고, 도 3은 관통재(2)의 일부와 구멍이 형성된 위치를 나타내며 도 4는 기둥재와 관통재를 고정결합 시키기 위한 연결핀이며 도 5는 상기 기둥재(1)와 관통재(2)를 연결핀(14)으로 고정결합 시키기 위한 클립(15)으로서 분리 및 해체가 가능한 기둥재, 관통재, 연결핀 및 클립의 부재를 도시하고 이를 이용하여 조립된 도 26의 단면도를 설명하면 도 2의 기둥재로부터 도 5의 크립의 순서로 기둥재(1)의 양측면의 관통구멍에 원통재(3)를 삽입시킨 후 기둥재와 원통재의 연결핀 구멍을 일치시킨후 기둥재의 뒷면으로부터 전면을 향하여 연결핀(14)을 삽입하고 연결핀의 끝부분에 위치한 연결핀의 구멍에 클립(15)을 삽입하여 조립된 상태 도시한다.2 to 5 in FIG. 2 shows a part of the pillar member 1, FIG. 3 shows a position where a part of the through member 2 and a hole are formed, and FIG. 4 is for fixing the pillar member and the penetrating member. 5 is a clip 15 for fixing and coupling the pillar member 1 and the penetrating member 2 with the connecting pin 14. Referring to the cross-sectional view of Fig. 26 shown and assembled using the member, the cylindrical member 3 is inserted into the through-holes on both sides of the column member 1 in the order of the creep of Fig. 5 from the pillar member of Fig. After connecting the connecting pin hole of the ash and the cylindrical material, the connecting pin 14 is inserted from the rear side of the pillar toward the front and the clip 15 is inserted into the hole of the connecting pin located at the end of the connecting pin. .

도 6 내지 도 7에서 도 6은 상기 거푸집을 건물벽체에 지지하기 위한 지지철물(3) 사시도이고 도 7은 상기 지지철물(3) 내부에 삽입되는 몰타르침투방지캡(23)의 사시도로서, 도 6은 건물벽체와 거푸집을 결합시킬 수 있도록 상기 지지철물(3)에 연결걸이쇠 출입구멍(26)이 형성되고 몰타르가 지지철물(3)내로 유동하여 충진되도록 구멍(28)이 형성되며, 지지철물 상부와 하부에 구멍(27)이 형성되어 있어, 건물의 벽체(9)에 전기드릴을 이용 앵커삽입용 구멍(27)을 형성시커, 앵커(13)의외피를 삽입시킨 후 몰타르를 침투방지캡(23)이 내장된 지지철물(3)을 앵커(13)로 건축물의 벽체에 고정되는 부재를 도시한 것이다.6 to 7 is a perspective view of the support hardware (3) for supporting the formwork on the building wall and Figure 7 is a perspective view of a mortar penetration cap 23 is inserted into the support hardware (3), Figure 6 is formed in the support hardware (3) to connect the building wall and the formwork, the connecting hook entrance hole 26 is formed and the hole 28 is formed so that the mortar flows into the support hardware (3), the support Holes 27 are formed in the upper and lower parts of the hardware to form holes 27 for inserting anchors using electric drills on the walls 9 of the building, thereby preventing the penetration of mortar after inserting the sheath of the anchor 13. It shows a member fixed to the wall of the building with the support hardware 3, the cap 23 is built in the anchor (13).

도 8은 중간 수평재(4)의 사시도로서, 기둥재(1)에 직각 방향인 가로방향으로 볼트(16)로 결합되는 부재로, 상기 중간 수평부재(4)는 중간부분에 각종 스페이서 부재와 폴리에틸렌 발포백업재(22)를 삽입할 수 있는 삽입홈(35)과, 수직부재(6)를 상,하 방향에서 끼워 결합되록한 상,하로 각각 한쌍의 접합홈(44)과, 타일의 완충 및 위치를 지지하기 위해 도 28 및 도 29에 도시된 바와 같이 실리콘 패드(21)가 삽입되는 실리콘패드용 구멍(29)과 및 도 24(B-B단면)에 도시된 바와 같이 타일을 커푸집으로 부터 이탈되지 않도록 카본피라멘트 선(34)이 삽입되는 카본피라멘트삽입용 구멍(32)이 사전에 가공처리되는 중간 수평재(4)를 도시한다.FIG. 8 is a perspective view of the intermediate horizontal member 4, which is a member coupled to the column member 1 by bolts 16 in a horizontal direction perpendicular to the pillar member 1, wherein the intermediate horizontal member 4 is formed of various spacer members and polyethylene in the middle portion. Inserting grooves 35 into which the foamed backup material 22 can be inserted, and a pair of joining grooves 44 to vertically and vertically fit the vertical members 6 in the up and down directions, respectively, and the cushioning of the tiles and To support the position, the tile is removed from the mold as shown in Figs. 28 and 29, and the silicon pad hole 29 into which the silicon pad 21 is inserted and as shown in Fig. 24 (cross section BB). The intermediate horizontal member 4 in which the carbon filament insertion hole 32 into which the carbon filament line 34 is inserted is processed beforehand is shown.

도 9는 상,하단수평재(5)의 사시도로서, 거푸집의 상단과 하단에 위치하는 수평부재로 기둥재(1)의 상,하단부에 직각방향인 가로방향에서 볼트(16)에 의해 결합 고정되는 부재로서, 상기 상,하단 수평재(5)에는 도 1에 도시된 바와 같이 상,하단모서리재(7)를 결합하기 위한 복수개의 나사못 결합용 구멍(30)과 상기 실리콘패드 삽입용 구멍(29)과 상기 상,하단 수평재의 위치에 따라 상부 또는 하부에 한쌍의 수직재접합홈(44)이 사전 가공처리되는 상,하단수평재(5)를 도시한다.9 is a perspective view of the upper and lower horizontal member (5), which is coupled to the horizontal member positioned at the top and bottom of the formwork by the bolt 16 in the horizontal direction perpendicular to the upper and lower ends of the pillar (1) As a member, the upper and lower horizontal members 5 and the plurality of screw coupling holes 30 and the silicon pad insertion holes 29 for coupling the upper and lower edge materials 7 as shown in FIG. And the upper and lower horizontal members 5 in which a pair of vertical rejoining grooves 44 are pre-processed in the upper or lower portion according to the positions of the upper and lower horizontal members.

도 10은 수직재(6)의 사시도로서, 중간수평재(4) 상호간과 중간 수평재(4)와 상단 또는 하단수평재(5)간을 연결하는 부재이며, 도 27도의 사시도에서 같이 수평재의 접합홈(44)에 구멍이 상,하 형성된 수직재(6)의 뒷날개부분을 삽입하여 상기구멍을 클립(15)으로 중간 수평재(4) 또는 상,하 수평재간에 수직으로 결합되는 수직재(6)이다. 상,하단 수평재와 결합되는 수직재의 끝부분에는 도 15의 형상의 수직형스페이서(20)가 삽입되며, 도 6의 지지철물(3)의 연결걸이쇠 출입구멍(26)과 일치되어야 하는 상기 수직재(6)의 연결걸이쇠 출입구멍(26)은 사전에 가공처리되며, 또한 상기 수직재에 접착재로 부착결합되는 도 17에 도시한 폴리에틸렌 발포백업재(22)는 상기 연결걸이쇠가 통과하도록 구멍이 형성되어 있다.FIG. 10 is a perspective view of the vertical member 6, which is a member connecting the intermediate horizontal member 4 with the intermediate horizontal member 4 and the upper or lower horizontal member 5, as shown in FIG. 27. FIG. ) Is a vertical member 6 which is vertically coupled between the intermediate horizontal member 4 or the upper and lower horizontal members by inserting the rear wing portion of the vertical member 6 having the upper and lower holes formed therein into the clip 15. The vertical spacer 20 of the shape of FIG. 15 is inserted into the end of the vertical member coupled to the upper and lower horizontal members, and the vertical member to be matched with the connection latch access hole 26 of the supporting hardware 3 of FIG. (6) The hook hook access hole 26 is processed in advance, and the polyethylene foam backing material 22 shown in FIG. 17 attached and bonded to the vertical member by an adhesive material has a hole through which the hook hook passes. Formed.

도 11 내지 도 12는 수직부재(6) 상,하부와 수평부재(5) 좌,우측 단부에 나사못으로 결합되는 모서리부재(8)의 사시도이며, 상기 모서리재는 타일이 거푸집으로부터 이탈을 방지하는 목적으로 설치되며, 격자형거푸집의 외곽을 구획하는 부재로서 상,하부 모서리재(7)는 상,하부 수평부재(50)에 나사못(17)으로 나사못 결합용 구멍(30)에 도 28의 단면도와 같이 결합되고, 좌,우측 모서리재(8)는 중간 수평재(4)와 상,하부 수평부재(5)의 단부에 나사못(17)으로 나사못 결합용 구멍(30)에 도 29의 단면도와 같이 결합되는 모서리부재를 도시하고 있다.11 to 12 are perspective views of the edge member 8 coupled to the left and right ends of the vertical member 6 upper and lower parts and the horizontal member 5 with screws, and the edge member is intended to prevent the tiles from being separated from the formwork. The upper and lower edge member 7 is installed as a member for partitioning the outer periphery of the lattice formwork, and the upper and lower horizontal members 50 have screws 17 in the upper and lower horizontal members 50, and Combined together, the left and right edge member 8 is coupled to the screw coupling hole 30 with the screw 17 at the ends of the intermediate horizontal member 4 and the upper and lower horizontal members 5 as shown in the cross-sectional view of FIG. The corner member is shown.

도 13 내지 도 15는 각종 스페이서를 보여주는 사시도로서, 상기 스페이서는 각기 형상은 상이하나 공히 사용목적은 타일(10)과 타일(10)사이의 줄눈간격의 유지를 목적으로 도 13은 십자형 스페이서(18)로서 사용위치는 중간수평재(4)와 수직재(6)가 교차하는 곳의 중간수평재(4)의 삽입용홈(35)에 삽입설치되고, 도 14는 일자형 스페이서부재(19)로서, 중간 수평부재(4)의 양단부의 삽입용홈(35)에 삽입설치되며 도 15는 수직형 스페이서부재(20)로서, 수직재(6)의 상,하단부의 수직재(6)내부와 외부에 걸처 끼워설치되는 각종 스페이서부재를 도시하고 있다.13 to 15 are perspective views showing various spacers, the spacers being different in shape, but the purpose of use is for the purpose of maintaining the joint spacing between the tiles 10 and 10, the cross-shaped spacer 18 The use position is inserted into the insertion groove 35 of the intermediate horizontal member 4 where the intermediate horizontal member 4 and the vertical member 6 intersect, and FIG. 14 is a straight spacer member 19, which is an intermediate horizontal member. Inserted into the insertion groove 35 of the both ends of (4) and Figure 15 is a vertical spacer member 20, a variety of spacers that are fitted across the inside and outside of the vertical member 6 of the upper and lower ends of the vertical member (6) The member is shown.

도 16 내지 도 17은 각종 포리에틸렌 발포백업재(22)의 형상을 보여주는 사시도로서, 상기 백업재의의 역할은 타일(10)과 타일사이의 틈새인 줄눈으로 주입몰타르(25)의 누출방지의 목적으로 설치되는데 도 16의 볼록 요철형상의 포리에틸렌 발포백업재(22)는 중간수평부재(4)의 사전형성된 삽입용홈(35)내에, 도 15의 스페이서부재(18 및 19) 사이에서 삽입설치되며, 도 17의 반달형 포리에틸렌 발포백업재(22')에는 연결걸이쇠 출입구멍이 형성되어 있으며수직부재(6)의 전면돌출부에 접착재로 접착되는 백업부재를 도시하고 있다.16 to 17 is a perspective view showing the shape of various polyethylene foam backup material 22, the role of the backup material is the purpose of preventing leakage of the injection mortar 25 to the joint that is the gap between the tile 10 and the tile. The convex concave-convex polyethylene foam backup material 22 of FIG. 16 is inserted into the preformed insertion groove 35 of the intermediate horizontal member 4 between the spacer members 18 and 19 of FIG. 15. 17 shows a backing member formed with a connecting clasp entrance hole in the half-moon polyethylene foam backup material 22 'and bonded to the front protrusion of the vertical member 6 with an adhesive.

도 18은 연결걸이쇠틀(11)의 사시도로서, 기둥재(1)에 기둥연볼트로 도 1에서 도시하는 바와 같이 거푸집의 기둥재(3) 외측 양쪽의 관통재(2) 설치부근에 복수개가 결합고정되며, 건물벽체면의 지지철물(3)에 격자형 거푸집을 결합고정하기 위한 연결걸이쇠틀(11)내의 연결걸이쇠뭉치(12)에는 상,하부연결걸이쇠(37,38)가 내장되어 있다.18 is a perspective view of the connecting hanger 11, a plurality of pillars in the vicinity of the through member (2) installed on both sides of the pillar member (3) outside of the formwork as shown in FIG. Coupling is fixed, the upper and lower coupling hooks (37, 38) are built into the coupling hook bundle (12) in the coupling hook frame (11) for coupling the grid formwork to the supporting hardware (3) of the building wall surface. have.

도 19는 상기 연결걸이쇠뭉치의 사시도로서, 거푸집을 건물 벽체의 지지철물(3)에 고정하기 위한 걸이쇠뭉치로서 상,하 이동용 다이얼(36), 상부걸이쇠(37), 하부걸이쇠(38), 전,후진용 구멍(39), 가이드용 아크릴(40), 상,하 이동용 나사봉(41) 상,하 이동용너트(42), 아크릴접합용 볼트(43)로 구성된 연결걸이쇠뭉치를 도시하고 있다.Fig. 19 is a perspective view of the bundle of hooks, which is a hook bracket for fixing the formwork to the supporting hardware 3 of the building wall, the upper and lower movable dials 36, the upper hook 37, and the lower hook 38. And a hook hanger consisting of a forward and backward hole 39, a guide acrylic 40, an up and down movement screw rod 41, an up and down movement nut 42, and an acrylic bonding bolt 43. have.

도 20은 연결걸이쇠틀의 종,횡 단면도로서 주요부문별 기능은 히부걸이쇠(38)를 전면으로 밀어내어 이동용너트(42)가 너트이동홈(43)의 우측단에 도달하면 상,하 이동용 다이얼(36)을 회전시켜 연결된 상,하 이동용나사봉(41)이 이동용 너트(42)를 내장한 도 19의 연결걸이쇠뭉치(12) 일체를 아래로 상부걸이쇠(37)의 높이 만큼 이동한다.20 is a longitudinal cross-sectional view of the connecting hook frame, the main section function is to push the locking hook (38) to the front to move up and down when the moving nut 42 reaches the right end of the nut moving groove (43) The upper and lower movable screw rods 41 connected by rotating the dial 36 move the integrated hook bracket 12 of FIG. 19 having the movable nut 42 therein by the height of the upper latch 37. .

도 21은 몰탈침투방지튜브의 사시도로서 싱부걸이쇠(37)와 하부걸이쇠(38)가 격자형거푸집을 건축물벽체(9)에 설치된 지지철물(3)과 접속할 때 설치되며 몰타르가 주입 또는 양생되는 동안 주입몰탈(25)로부터 격리차단하여 걸이쇠(37,38)를 지지철물(3)로 부터이탈을 쉽게하여 추후 거푸집탈형이 가능하도록 하는 목적의 부재를 도시한다.FIG. 21 is a perspective view of the mortar penetration prevention tube, and the hook-type latch 37 and the lower hook 38 are installed when the grid formwork is connected to the supporting hardware 3 installed on the building wall 9, and mortar is injected or cured. It is shown that the member is intended to be isolated from the injection mortar 25 so that the catches 37 and 38 can be easily detached from the supporting hardware 3 so as to be able to later die form.

도 22는 격자형거푸집을 연결걸이쇠틀(11)을 이용 건축물 벽체에 접합한 상태를 도시한 종단면도로서, 종단면도의 타일(10)을 기준으로 우측부분은 거푸집을 구성하는 부분으로 기둥재(1), 원통재(2), 중간수평재(4), 상,하단 수평재(5), 수직재(6), 상,하단모서리재(7), 좌,우측단 모서리재(8), 실리콘패드(21), 각종 스페이서(18, 19 및 20), 폴리에틸렌발포 백업재(22), 타일(10)과 상,하부 걸이쇠(37, 38)로 구성되고, 타일(10)을 포함하여 건축물 벽체(9)를 보강하는 부재로 지지철물(3), 상기 지지철물(3)을 건축물 벽체(9)에 결합시키는 앵커외피 및 앵커(13)와 몰타르 충진부(25), 상,하부 걸이쇠(37, 38)에 몰타르가 닿지않도록하는 몰타르 침투방지 캡(23), 몰타르침투방지 튜브(24) 등은 타일시공후 건축물벽체(9)로부터 거푸집을 해체할 경우 건축물벽체의 일부로 잔류되어 건축물벽체를 보강하게 된다. 몰타르 주입은 상기 타일의 뒷면과 건물벽체 사이의 몰타르 충진부에 상방향에서 도 (35)에 장치된 몰타르 주입호스로 펌핑하여 충진시킨다.22 is a longitudinal cross-sectional view showing a state in which the grid formwork is bonded to the building wall using the connecting hanger 11, the right side of the tile 10 in the longitudinal cross-sectional view as a part constituting the formwork pillar ( 1), cylindrical member (2), intermediate horizontal member (4), upper and lower horizontal member (5), vertical member (6), upper and lower edge member (7), left and right edge member (8), silicon pad ( 21, various spacers 18, 19, and 20, polyethylene foam backing material 22, tiles 10, and upper and lower latches 37, 38, and the building wall including tiles 10 9) as a member to reinforce the support hardware (3), the anchor shell and the anchor 13 and the mortar filling portion 25, the upper and lower latches (37) for coupling the support hardware (3) to the building wall (9) , The mortar penetration cap 23, the mortar penetration tube 24, etc., to prevent the mortar from contacting the mold 38, remain as part of the building wall when dismantling the formwork from the building wall 9 after tile construction. Thereby reinforcing the chukmul wall. The mortar injection is filled by filling the mortar filling section between the back of the tile and the building wall with the mortar injection hose installed in FIG. 35 in the upward direction.

도 23은 도 22의 A-A선을 자른 평면도로서 건축물벽체(9)에 결합된지지 철물(3)에 연결걸이쇠(38)의 접속상태, 지지철물(3)과 몰탈침투방지캡(23)의 접합모습, 몰탈침투방지튜브(24) 내부에 연결걸이쇠(38)가 관통된 모습, 중간수평재(4)와 타일(10)사이에 타일의 충격 완충작용과 위치고정 용도의 실리콘 패드(21)삽입되고, 중간수평재(4)와 수직재(6)의 접속과 클립연결상태, 기둥재(1)와 원통재(2)의 접속과 연결핀삽입과 클립결합모습을 나타낸다.FIG. 23 is a plan view taken along the line AA of FIG. 22, in which the connecting clasp 38 is connected to the supporting hardware 3 coupled to the building wall 9, and the supporting hardware 3 and the mortar penetration prevention cap 23 are shown in FIG. Bonding mode, the mortar penetrating prevention tube 24 inside the connecting clasp 38 is penetrated, between the intermediate horizontal material (4) and the tile 10, the impact pad and the silicone pad 21 for fixing the position of the tile The intermediate horizontal member 4 and the vertical member 6 are connected and clip-connected, the column member 1 and the cylindrical member 2 are connected, the connecting pin is inserted, and the clip coupling is shown.

도 24는 도 22의 B-B선을 자른 평면도로서 타일(10)사이의 줄눈에 위치하는 십자형스페이서(18)와 폴리에틸렌 발포백업재(22)의 배열상태와, 카본필라멘트 선이 타일(10)을 거푸집으로부터 이탈되지 않도록 하기위해 복수개의 연결고리가 설치된 중간수평재(4) 또는 상,하부 수평재(5)의 삽입홈(35) 내부에 부착된 복수개의 카본피라멘트 선이 상기 중간수평재(4)의 결합용고리(33)로 부터 출발 중간수평재(4)의 삽입홈(35)내 카본필라멘트 선(34) 결합용 구멍(32)을 통과하여 타일(10) 뒷면을 감아돌아 다른 중간수평재(4)의 결합 연결고리에(33)에 결합되는 과정을 나타낸다.FIG. 24 is a plan view of the BB line of FIG. 22, in which the arrangement of the cross spacer 18 and the polyethylene foam backup material 22 positioned at the joint between the tiles 10, and the carbon filament line form the tile 10 Intermediate horizontal member (4) or a plurality of carbon filament lines attached to the inside of the insertion groove 35 of the upper and lower horizontal member (5) in order to prevent separation from the coupling of the intermediate horizontal member (4) Starting from the ring ring 33, the carbon filament wire 34 in the insertion groove 35 of the intermediate horizontal member 4 passes through the coupling hole 32 and winds up the back surface of the tile 10 to form the other intermediate horizontal member 4. It shows the process of being coupled to the coupling link 33.

도 25는 중간수평재(4)의 발포 폴리에틸렌 백업재 삽입용홈(35)에 삽입된 십자형스페이서(18)와 발포 폴리에틸렌 백업재(22)의 배열상태와 카본피라멘트 선(34) 결합용 구멍(32)을 나타낸다.25 shows an arrangement of the cross spacer 18 and the foamed polyethylene backing material 22 inserted into the foamed polyethylene backing material insertion groove 35 of the intermediate horizontal member 4 and the holes 32 for joining the carbon filament wire 34. ).

도 26에 대해서는 이미 도 2 내지 도 5의 설명에서 언급하였다.26 is already mentioned in the description of FIGS. 2 to 5.

도 27에 대해서는 이미 도 10의 설명에서 언급하였다.27 is already mentioned in the description of FIG. 10.

도 28은 상,하단수평재(5)에 상,하단모서리재(7)를 나사못(17)으로 접합시킨 모습과 실리콘패드(21)를 상,하단 수평재(5)에 삽입하여 타일(10)을 완충 및 위치고정시키는 모습을 나타낸다.FIG. 28 is a view in which the upper and lower corner members 7 are joined to the upper and lower horizontal members 5 with the screws 17 and the silicon pads 21 are inserted into the upper and lower horizontal members 5 to insert the tiles 10. It shows the state of buffering and fixing.

도 29는 중간수평재(4)와 상,하단수평재(5)에 좌,우측모서리재(8)를 나사못(17)로 접합하는 모습과 실리콘패드(21)를 중간수평재(4)와 상,하단수평재(5)에 삽입하여 타일(10)의 완충작용 및 위치고정시키는 모습을 나타낸다.FIG. 29 is a view of joining the left and right corner members 8 to the middle horizontal member 4 and the upper and lower horizontal member 5 with the screw 17, and the silicon pads 21 with the upper and lower middle member. Inserted into the horizontal member (5) shows a cushioning action and position fixing of the tile (10).

도 30a 내지 도 30d은 거푸집의 연결걸이쇠틀(11)내 연걸걸이쇠뭉치의 상부걸이쇠(37)와 하부걸이쇠(38)를 건축물에 결합하고 지지철물(3)에 결합시키는 접속과 해체되는 과정을 (a),(b),(c),(d) 단계별로 나타낸 횡단면도이다.30a to 30d is a process of coupling and dismantling the upper hook 37 and the lower hook 38 of the hook hanger in the connecting hook mold 11 of the formwork to the building and coupled to the support hardware 3 (A), (b), (c), (d) is a cross-sectional view showing step by step.

도 30a의 단계는 준비단계로서 상시 연결걸이쇠 뭉치의 상부걸이쇠(37)와 하부걸이쇠(38) 모두는 연결걸이쇠틀 내부에서 움직임이 없음을 도시한다.The step of FIG. 30A is a preparatory step, in which both the upper clasp 37 and the lower clasp 38 of the bundle of the always-coupling hooks show no movement inside the coupling hook frame.

도 30b는 하부걸이쇠(38)를 지지철물의 출입구멍(26) 내부에 완전히 진입한 상태를 도시한다.FIG. 30B shows a state in which the lower clasp 38 is completely entered into the access hole 26 of the supporting hardware.

도 30c의 단계는 연걸걸이쇠뭉치 상,하이동용 다이얼(36)을 회전시켜 연결걸이쇠뭉치가 전채적으로 하강하여 하부걸이쇠(38)는 지지철물(3)의 출입용 구멍(26) 아래턱에 서로 물려있는 상태를 도시하고 있다.Step of Figure 30c is the hook hook up and down, the high-speed dial 36 is rotated by the hook hook bundle is lowered entirely, so the lower hook 38 is in the lower jaw of the access hole 26 of the support hardware (3) It shows the state of being inherited.

도 30d의 단계는 상기 하부걸이쇠(38)의 하강으로 확보된 윗공간부에 아직 연결걸이쇠틀 내부에 있는 상부걸이쇠(37)를 밀어넣어 연결작업을 완료한 상태를 도시하고 있다. 한편, 연결잡업을 해체할 경우에는 상기 순서를 역순으로 해체한다.The step of FIG. 30D shows a state in which the connecting operation is completed by pushing the upper latch 37 still in the connecting hanger into the upper space secured by the lowering of the lower latch 38. On the other hand, in the case of dismantling the connection job, the above procedure is reversed.

도 31은 연결걸이쇠틀과 기둥재의 접합상태를 도시한 사시도로서, 건축물 벽체(9)에 설치된 지지철물(3)의 연결걸이쇠 출입구멍(26)과 수직재(6)의 연결걸이쇠 출입구멍이(26)이 일직선상에 일치하는 위치의 기둥재(1)에 완충용 아크릴판(51)을 끼워 기둥연결볼트(52)를 이용하여 도 1에서 도시한 바와 같이 연결걸이쇠틀(11)을 결합시킨다.Fig. 31 is a perspective view showing the joining state of the connecting hanger frame and the pillar member, wherein the connecting latch access hole 26 of the supporting hardware 3 provided in the building wall 9 and the connecting latch access hole of the vertical member 6 are shown. As shown in FIG. 1, the connecting hook 11 is coupled using the column connecting bolt 52 by inserting the acryl plate 51 for cushioning into the column member 1 at the position corresponding to the straight line 26. Let's do it.

본 발명의 다른 일면에 따라 첨부된 도면에 의해 상세히 설명하면 다음과 같다.When described in detail by the accompanying drawings according to another aspect of the present invention.

도 32은 격자형 거푸집의 조립상태를 나타내는 사시도이며,32 is a perspective view showing the assembled state of the lattice formwork,

도 33은 격자형 거푸집의 조립상태를 나타내는 부분 상세 사시도로서,33 is a partial detailed perspective view showing the assembled state of the lattice formwork;

복수개의 기둥재(100)와 상기 기둥재 상단부에 연결핀(114)으로 결합된 행거철물(102)과 상기 기둥재(100)에 수직방향으로 복수개의 H빔형태의 중간 수평재(104)를 타일(110)의 넓이와 줄눈의 폭을 합한 간격으로 볼트,너트(116, 116')로 결합되고, 상,하단수평재(105)는 타일(110)의 넓이와 마구리재(107)두께를 합한 위치에 같은방법으로 결합되고, 상기 수직재(106)는 각각의 수평재(104, 105)사이에 끼워 고정하며, 상기 마구리재(107)는 각종 수평재(104, 105)의 양단부 및 날개부분에 나사못(117)으로 결합한다. 상기 복수개의 수평재 사이에 수직방향으로 결합되는 복수개의 수직재(106)와, 상기 중간수평재(104) 및 상,하단 수평재(105)의 삽입홈(137)에 끼워 고정하는 십자형, 일자형 및 수직형 스페이서(118,119,120)와 실리콘백업재(145)로 구성되고, 상기 격자형푸집의 각종 수평재(104,105)의 삽입홈(137)에 삽입된 각종 스페이서(118, 119, 120)에 걸칠턱(123)이 돌출되게 타일(110) 끼우기를 하여 기본적인 격자형 거푸집의 구성상태를 도시한다.Tile the plurality of pillars 100 and the hanger hardware 102 coupled to the upper end of the pillars with a connecting pin 114 and the intermediate horizontal member 104 having a plurality of H beams in a vertical direction to the pillars 100. The width of the joint 110 and the width of the joint are combined by bolts and nuts 116 and 116 ′, and the upper and lower horizontal members 105 are the sum of the width of the tile 110 and the thickness of the copper material 107. Combined in the same manner, the vertical member 106 is sandwiched between each of the horizontal member (104, 105) and fixed, and the copper material 107 is screwed to both ends and wings of the various horizontal member (104, 105) ) Cross-shaped, straight and vertical spacers fixed to the plurality of vertical members 106 coupled in the vertical direction between the plurality of horizontal members and the insertion grooves 137 of the intermediate horizontal member 104 and the upper and lower horizontal members 105. A jaw 123 protrudes from various spacers 118, 119, and 120, which are composed of 118, 119, 120 and a silicon backup material 145, and inserted into the insertion grooves 137 of the various horizontal members 104, 105 of the lattice-shaped die. Tile 110 is inserted to show the configuration of the basic grid formwork.

도 34는 기둥재(100)의 사시도로서 상기 기둥재는 격자형거푸집의 핵심 부재로서, 상기 거푸집의 모든하중과 외압에 내력을 갖는 부재이며, 복수개의 각종수평재(104, 105)와 볼트,너트(116, 116')로 고정결합되어 격자형거푸집의 골격을 이루며, 행거철물(102)과 기둥재걸이쇠(129)등과 접합결속하여 거푸집의 변형을 방지하여 충전 몰탈(125)의 원활한 양생이 가능하도록 한다.34 is a perspective view of the pillar 100, the pillar is a core member of the grid-shaped formwork, a member having a load capacity for all the load and external pressure of the formwork, a plurality of various horizontal members (104, 105) and bolts, nuts ( 116, 116 ') to form a skeleton of lattice formwork, and to bond with the hanger hardware 102 and the column hanger 129, etc. to prevent deformation of the formwork to facilitate the curing of the filling mortar (125) Do it.

도 35는 행거철물(102)의 사시도로서 상기 행거철물은 기둥재(100) 상단부내부에 행거철물의 하부구조를 삽입하여 연결핀,클립(114,115)으로 고정.결속하여, 거푸집을 레일(142)에 정착시켜주는 부재이다.35 is a perspective view of the hanger hardware 102, the hanger hardware is inserted into the lower structure of the hanger hardware inside the upper end of the pillar material 100, fixed with a connecting pin, clips (114, 115). It is a member to settle in.

도 36은 연결핀(114)의 사시도로서 상기 연결핀은 거푸집의 기둥재 상부를 행거 철물(102)에 고정결속 시켜주는 부재로서 클립(115)으로 이탈을 방지한다.36 is a perspective view of the connecting pin 114, the connecting pin is a member for fastening the top of the pillar of the formwork to the hanger hardware 102 to prevent the departure to the clip 115.

도 37은 클립(115)의 사시도로서 연결핀의 이탈방지를 목적으로 사용한다.37 is a perspective view of the clip 115 and used for the purpose of preventing separation of the connecting pin.

도 38은 중간수평재(104)의 사시도이며, 상기 중간수평재는 기둥재(100)와 함께 격자형 거푸집의 골격을 이루는 주요부재로서 기둥재와의 접합은 볼트,너트(116, 116')로 이루어지며, 타일(110)과 타일사이에 위치한다. 상기 중간수평재 중앙의 삽입홈(137)은 십자형 스페이서(118), 일자형 스페이서(119)와 실리콘 백업재(145)를 삽입하는 용도로 사용되며, 양쪽 단부에는 마구리재(108)를 나시못(117)으로 접합한다.38 is a perspective view of the intermediate horizontal member 104, the intermediate horizontal member is a main member constituting the skeleton of the lattice formwork with the pillar member 100, the joining with the pillar member is made of bolts, nuts (116, 116 ') It is located between the tile 110 and the tile. The insertion groove 137 at the center of the intermediate horizontal member is used for inserting the cross spacer 118, the straight spacer 119 and the silicon backup member 145, and the nail member 108 is not provided at both ends. )

도 39는 상,하단 수평재(105)의 사시도이며, 상기 상,하단 수평재는 격자형 거푸집의 상단 및 하단에 한정하여 사용되며, 이부재 또한 기둥재(100)와의 접합은 볼트,너트(116,116')로 이루어지며, 삽입홈(137)이 있으나, 수직형스페이서(120)한종류만 삽입하며, 마구리재 (107)를 횡방향으로 나사못(117)을 사용 접합한다.39 is a perspective view of the upper and lower horizontal members 105, the upper and lower horizontal members are used only in the upper and lower ends of the lattice formwork, this member is also joined to the column member 100 is bolts, nuts (116, 116 ') Consisting of, there is an insertion groove 137, but inserts only one type of vertical spacer 120, using the screw 117 in the transverse direction to join the screw 117.

도 40은 수직재(106)의 사시도이며, 이부재는 전면에 삽입홈(137)이 있으나 실리콘백업재(145) 한종류만 삽입하는데 사용되며, 상,하단 수평재(105)와 중간수평재(104)사이 또는 중간수평재 상호간에 끼워 설치한다.Figure 40 is a perspective view of the vertical member 106, this member has an insertion groove 137 on the front, but is used to insert only one type of silicon backup material 145, between the upper and lower horizontal member 105 and the intermediate horizontal member 104 Or install between intermediate horizontal members.

도 41는 마구리재(107,108)의 사시도로서 격자형거푸집의 테두리를 구성하는 부재이며, 외곽타일의 정열 및 타일보양에 효과적인 부재이며, 좌.우측 마구리재(108)는 중간수평재와 상,하단수평재의 양단부에 수평재와 직각방향으로 나사못으로 접합하며, 상.하단 마구리재(107)는 상,하단수평재의 넓은 날개에 평행으로 나사못으로 접합한다.Fig. 41 is a perspective view of the copper material 107, 108, which constitutes the rim of the lattice formwork, and is an effective member for the alignment of the outer tiles and the tile maintenance. The left and right copper material 108 is a middle horizontal material and an upper and lower horizontal material. Both ends of the horizontal member and a screw in a direction perpendicular to the screw, the upper and lower flap material 107 is screwed in parallel to the wide blade of the upper, lower horizontal material.

도 42은 연결철물(143)의 사시도이며, 기둥재 간격에 ??춰 건물벽체(109)에 슬리브 앵커(113)로 지지하며, 상부에 설치할 경우 레일(142)과 접합하여 행거철물(102) 삽입용도로 사용되며, 하단부에 설치할 경우 가이드앵글(130)과 접합하여 기둥재걸이쇠(129) 삽입용도로 사용된다. 그러나 바닥타일 시공시에는 격자형거푸집의 기둥재 끝부분에 직접 볼트,너트(116,116')로 접합 사용한다.FIG. 42 is a perspective view of the connecting hardware 143, and is supported by the sleeve anchor 113 on the building wall 109 at intervals between the pillars. It is used for insertion purposes, and when installed in the lower end is used for the purpose of inserting the pillar hook 129 by joining with the guide angle 130. However, when constructing floor tiles, bolts and nuts (116, 116 ') are directly bonded to the column ends of the grid formwork.

도 43은 가이드 앵글(130)의 사시도로서, 격자형 거푸집의 하단부 고정작업을위하여 기둥재걸이쇠(129) 접속용도로 사용되며, 연결철물(143)에 접합하여 사용할 경우와 연결철물과의 접합없이 가이드앵글로 4각틀을 조립하고 그 가이드앵글 밑바닥에 조절나사(131)를 부착하여 사용한다.43 is a perspective view of the guide angle 130, used for connecting the column latch 129 for fixing the lower end of the lattice formwork, when used in conjunction with the connecting hardware 143 and the connection with the connecting hardware Assemble the square frame with a guide angle without and use the adjusting screw 131 attached to the bottom of the guide angle.

도 44는 레일(142)의 사시도로서, 건물벽체(109) 상부에 설치된 연결철물(143)에 건물 벽체면으로부터 충전몰탈(125)의 두께 만큼 이격시켜 볼트,너트(116, 116')로 결속하며, 상기 레일의 "∪"자형 홈에 행거철물(102)의 돌기 부분을 삽입하여 격자형 거푸집과 건물벽체(109)를 연결시켜주는 부재임을 도시한다.FIG. 44 is a perspective view of the rail 142, and is connected to the connecting hardware 143 installed on the building wall 109 by bolts and nuts 116 and 116 'separated from the building wall surface by the thickness of the filling mortar 125. FIG. And, it is shown that the member connecting the lattice formwork and the building wall 109 by inserting the projection portion of the hanger hardware 102 in the "∪" shaped groove of the rail.

도 45 내지 도 48은 각종 스페이서(118, 119, 120) 및 실리콘 백업재(145)의 사시도로서, 상기 스페이서는 각기 형상은 상이하나 공히 사용목적은 타일(110)과 타일(110) 사이의 줄눈간격을 유지하며, 걸칠턱(123)은 끼워진 타일이 스페이서로부터 이탈을 방지한다. 도 45는 십자형 스페이서(118)로서 중간수평재(104)와 수직재(106)가 교차하는 곳의 중간수평재(104)의 삽입홈(137)에 삽입설치되고, 도 46는 일자형스페이서(119)로서 중간수평재(104)의 양단부의 삽입홈(137)에 삽입설치되고, 도 47는 수직형 스페이서(120)로서 상,하단수평재(105)와 수직재(106)가 교차하는 곳의 상,하단 수평재의 삽입홈(137)에 삽입설치되고, 도 48은 실리콘백업재(145)로서 중간수평재(104)의 삽입홈(137)의 십자형 스페이서 상호간 사이 공간과 일자형 스페이서에서 십자형 스페이서까지의 사이 공간 및 수직재(106)의 삽입홈(137)내에 삽입되어 타일과 타일 사이 줄눈공간을 밀실하게 채워 충전몰탈(125)의 누설을 차단하는 역할을 수행한다.45 to 48 are perspective views of various spacers 118, 119, and 120 and a silicon backing material 145. The spacers have different shapes but joint purposes between the tile 110 and the tile 110. Maintaining the gap, the latching jaw 123 prevents the tile from being separated from the spacer. 45 is a cross-shaped spacer 118 inserted into the insertion groove 137 of the intermediate horizontal member 104 where the intermediate horizontal member 104 and the vertical member 106 intersect, and FIG. 46 shows the intermediate spacer 119 as an intermediate spacer. Inserted into the insertion groove 137 of both ends of the horizontal member 104, Figure 47 is a vertical spacer 120 is inserted into the upper and lower horizontal member where the upper and lower horizontal member 105 and the vertical member 106 intersect. 48 is inserted into the groove 137, and Fig. 48 shows the silicon backing material 145 as a space between the cross spacers of the insertion grooves 137 of the intermediate horizontal material 104 and the space between the straight spacers and the cross spacers and the vertical material 106. Inserted into the insertion groove 137 of the) to fill the joint space between the tile tightly and serves to block the leakage of the filling mortar (125).

도 49은 지지철물(103)의 사시도로서 상기 지지철물(103)의 상부와 하부에 앵커용 구멍(127)이, 중앙부에는 연결걸이쇠 뭉치(112)의 갈고리부분이 진입,결속 되도록 연결걸이쇠 구멍(126)이 이중 형성된 것을 도시한것이다.49 is a perspective view of the support hardware 103, the anchor hole 127 in the upper and lower portions of the support hardware 103, the hook portion of the hook portion of the hook bracket 112 in the center portion, the connection hook It is shown that the hole 126 is double formed.

도 50은 연결걸이쇠 뭉치(112)의 사시도로서 연결걸이쇠틀(111)속에 삽입되어 지지철물(103)의 연결걸이쇠 구멍(126)에 진입 상기 연결걸이쇠 뭉치의 갈고리부분을 연결걸이쇠 구멍턱에 결속시키는 역할을 하며, 상기 연결걸이쇠뭉치 밑바닥의 걸이쇠 삽입홈(136)은 연결걸이쇠뭉치가 지지철물(103)과 결합 및 해제시 사용되는 걸이쇠의 삽입홈이다.50 is a perspective view of the bundle of hooks 112 is inserted into the hook bracket 111 to enter the hook hook hole 126 of the support hardware 103 hook hook portion of the hook hook bundle hook hole It acts to bind to the jaw, the hook hook insertion groove 136 of the bottom of the hook hook is a hook of the hook is used when the hook hook is engaged and released with the support hardware (103).

도 51는 연결걸이쇠 틀(111)의 사시도로서 상기 연결걸이쇠틀 내부에 연결걸이쇠뭉치(112)를 내장하고 내장된 뭉치가 틀내부에서 상,하.전,후 동작이 가능하며, 상기 연결걸이쇠틀 측면의 볼트구멍(138)을 이용 격자형거푸집의 기둥재(100)하단부에 상기 연결걸이쇠 틀을 볼트,너트(116, 116')로 결합할 수 있다.Figure 51 is a perspective view of the connecting hook frame 111, the built-in hook hook 112 is built into the hook hook frame, and the built-in bundle can be up, down, before, after operation inside the frame, the hook Using the bolt hole 138 on the side of the metal frame can be coupled to the connecting hook frame to the lower end of the pillar 100 of the grid formwork with bolts, nuts (116, 116 ').

도 52은 몰탈침투 방지용 튜브(124)의 사시도로서 중앙부의 연결걸이쇠 구멍(126을 통하여 연결걸이쇠 뭉치(112)의 진출입이 가눙하다, 설치위치는 지지철물(103)과 타일(110)사이에 위치하여 충전몰탈(125)이 지지철물(103)과 연결걸이쇠뭉치(112)에 접촉되는 것을 차단하는 목적으로 사용된다.52 is a perspective view of the mortar penetration prevention tube 124, the entrance and exit of the hook hanger 112 through the hook hook hole 126 in the center is thin, the installation position is between the support hardware 103 and the tile 110 Located in the filling mortar 125 is used for the purpose of blocking contact with the support hardware 103 and the hook hanger 112.

도 53내지 도 54는 기둥재걸이쇠(129) 및 조절나사(131)의 사시도로서 상기 기둥재걸이쇠는 격자형 거푸집의 기둥재(100)하단부에 볼트(116)로 연결되어 기둥재를 가이드앵글과 정착시켜주는 부재이다. 상기 조절나사는 가이드앵글(130)의 밑바닥에 볼트(116)로 결합되며, 조절나사를 전,후진하여 가이드앵글을 건물벽체(109)에 밀착 고정 또는 해제시킨다.53 to 54 is a perspective view of the pillar hanger 129 and the adjustment screw 131, the pillar hanger is connected to the lower end of the column member 100 of the grid formwork with a bolt 116 to guide the pillar It is a member to fix it. The adjustment screw is coupled to the bottom of the guide angle 130 by a bolt 116, the adjustment screw forwards and backwards to fix or release the guide angle in close contact with the building wall 109.

도 55은 벽체지지용 부라켓(133)의 구성 및 결속 상태를 나타내는 사시도로서 상기 벽체지지용 부라켓은 삽입 수평재(134)와 동 수평재를 부라켓과 연결시켜주는 크램프(135)로 구성되며, 건물벽체(109)면에 타일붙임을 우선시공한후 바닥타일붙임시 사용되는 거푸집의 결속방법으로 방수층의 훼손 우려가 없도록 한 것이다.55 is a perspective view showing the configuration and binding state of the wall support bracket 133. The wall support bracket is composed of a clamping member 135 connecting the horizontal member 134 and the horizontal member with the bracket. Prior to constructing the tile on the surface of the building wall 109, the form of the formwork used when pasting the floor tile is to prevent the damage of the waterproof layer.

도 56는 격자형 거푸집을 행거철물(102) 및 가이드 앵글(130) 등과 결합되어 건물벽체(109)에 설치한 모습의 종단면도이며, 상기 격자형 거푸집은 기둥재(100)에 직각방향으로 상단부와 하단부에는 각각 상,하단 수평재(105)가, 중앙부에는 복수개의 중간수평재(104)가, 각개 수평재 사이에는 수직재(106)가, 양단부 수평재에는 마구리재(107)가 접속,결합되어있으며, 상,하단부수평재의 삽입홈(137)에는 수직형 스페이서(120)가, 중간수평재의 삽입홈(137)에는 십자형 스페이서(118)가 삽입 되어있으며, 수직재의 삽입홈(137)에는 실리콘 백업재(145)가 삽입되고, 타일(110)은 중앙부에는 십자형 스페이서 사이에, 상,하단부 타일은 십자형 스페이서와 마구리재(107)사이에 걸칠턱(123)이 타일밖으로 돌출되도록 끼워져 있는 격자형거푸집 기둥상단에 연결핀, 클립(114, 115)으로 결합된 행거철물(102)의 돌기부분을 건물벽체(109)에 스리브앵커(113)로 지지된 연결철물(143)과 결속된 레일(142)의 홈내부에 끼워넣고, 상기 기둥재(100) 하단에 기둥재걸이쇠(129)는 볼트로 긴결하여 연결철물(143)과 함께 설치한 가이드앵글(130)에 접속하여 마무리한다.56 is a longitudinal cross-sectional view of the grid formwork coupled to the hanger hardware 102 and the guide angle 130 and the like installed on the building wall 109, the grid formwork is the upper end in the direction perpendicular to the pillar material 100 Upper and lower horizontal members 105 are connected to the lower and lower ends, respectively, and a plurality of intermediate horizontal members 104 are connected to the central part, vertical members 106 are connected between the horizontal members, and the copper material 107 is connected and coupled to the horizontal members. The vertical spacer 120 is inserted into the insertion groove 137 of the lower horizontal member, and the cross spacer 118 is inserted into the insertion groove 137 of the intermediate horizontal member, and the silicon backup member 145 is inserted into the insertion groove 137 of the vertical member. ) Is inserted, the tile 110 is in the center between the cross-shaped spacer, the upper and lower tiles are placed on the grid-shaped formwork pillar top sandwiched between the cross-shaped spacer and the copper material 107 so that the projection 123 is projected out of the tile. With connecting pins and clips (114, 115) The protrusion of the combined hanger hardware 102 is inserted into the groove of the rail 142, which is connected to the connecting hardware 143 supported by the sleeve anchor 113 on the building wall 109, the lower end of the pillar material 100 The pillar hanger 129 is connected to the guide angle 130 installed together with the connection hardware 143 by tightly bolted to finish.

도 57는 격자형 거푸집이 행거철물을 이용, 레일과 접합과정의 상세단면도로, 기둥재(100)상단부 내부에 행거철물(102)의 기둥부분을 끼운후 구멍에 연결핀(114)을 밀어넣어 클립(115)으로 결합하며, 상기 행거철물(102)의 돌기를 레일의 내부홈에 끼워 접합하며, 건물벽체로부터 충전 몰탈(125) 피복두꼐 만큼 공간을 띄어 레일(142)을 연결철물(143)에 볼트,너트(116, 116')로 결속하며, 중간수평재(104)와 상,하단 수평재(105)를 기둥재(100)에 볼트,너트(116, 116')로 결속하며, 마구리재(107)는 상단 수평재(105)에 나사못으로 결속하며. 수직재(106)는 중간 수평재(104)와 상단 수평재(105) 사이에 끼워 고정하며, 중간 수평재(104)의 삽입홈(137)에 십자형 스페이서(118), 상단수평재의 삽입홈(137)에는 수직형 스페이서(120)를 각각 삽입하며, 중간수평재(104)와 상단 수평재(105)사이에 끼워진 수직재(106)의 삽입홈(137)에 실리콘백업재(145)를 삽입하여, 십자형스페이서(118)와 수직형 스페이서(120) 사이에 걸칠턱(123)이 돌출되도록 타일(110)을 끼워넣는 과정을 도시한다.57 is a detailed cross-sectional view of the process of joining the rail using a grid formwork hanger hardware, and after inserting the pillar portion of the hanger hardware 102 inside the upper end of the pillar material 100, the connecting pin 114 is pushed into the hole. It is coupled to the clip 115, the projection of the hanger hardware 102 is fitted into the inner groove of the rail and bonded, spaced by the space of the filling mortar (125) covering from the building wall to the rail 142 connecting hardware 143 To the bolts and nuts 116 and 116 ', to bind the middle horizontal member 104 and the upper and lower horizontal members 105 to the column member 100 with the bolts and nuts 116 and 116', 107 is screwed to the top horizontal member 105. The vertical member 106 is sandwiched and fixed between the intermediate horizontal member 104 and the upper horizontal member 105, and the cross spacer 118 is inserted into the insertion groove 137 of the intermediate horizontal member 104, and is perpendicular to the insertion groove 137 of the upper horizontal member. The spacer 120 is inserted respectively, and the silicon backup material 145 is inserted into the insertion groove 137 of the vertical member 106 sandwiched between the intermediate horizontal member 104 and the upper horizontal member 105, and the cross spacer 118 is inserted. And inserting the tile 110 so that the projection 123 is protruded between the vertical spacer 120.

도 58a 내지 도 58c는 격자형 거푸집의 기둥재 하단부를 건물벽체에 지지결속시키는 각종 방법의 상세단면도로서, 도 58a는 슬리브앵커(113)로 건물벽체(109) 하단부에 결속된 연결철물(143)과 가이드앵글(130)을 볼트,너트(116, 116')로 체결하고, 가이드앵글턱에 기둥재걸이쇠(129)를 결속하는방법이며,. 도 58b는 밑바닥에 조절나사(131)를 소정간격으로 부착한 4개의 가이드앵글(130)을 볼트,너트(116, 116')로 연결하여 4각후레임을 구성하며 상기 4각후레임을 조절나사(131)를 회전시켜 나사봉 끝부분이 건물벽체(109)에 지탱하여 고정된 4각후레임의 가이드앵글(130)과 격자형 거푸집의 기둥재걸이쇠(129)를 결속하는 방법으로, 화장실등과 같이 바탕방수층의 보호를 위하여 슬리브앵커(113)의 사용을 제한하는 곳 에서는 효과적 방법이며, 도 58c는 격자형거푸집을 건물벽체(109)에 고정된 지지철물(103)에 연결걸이쇠틀(111)로 결속된 모습을 나타내는 단면도로서 상기 격자형거푸집의 기둥재(100)에 볼트,너트(116,116')로 연결걸이쇠틀(111)을 부착하고, 부착된 틀 내부에 연결걸이쇠 뭉치(112)를 삽입하며, 건물벽체(109)에 지지철물(103)을칼부럭 앵커(128)로 고정하며, 상기 지지철물의 연결걸이쇠 구멍(126)에 연결걸이쇠 뭉치(112)를 삽입하여 지지철물과 결합한다.58A to 58C are detailed cross-sectional views of various methods of supporting and fixing the lower end of the pillar-shaped column of the lattice formwork to the building wall, and FIG. 58A is a connecting anchor 143 bound to the lower end of the building wall 109 by the sleeve anchor 113. And guide angle 130 is fastened with bolts and nuts 116 and 116 ', and the column latch 129 is fastened to the guide angle jaw. 58B is a four-frame frame formed by connecting four guide angles 130 attached to the bottom of the adjusting screw 131 at predetermined intervals with bolts and nuts 116 and 116 ', and adjusting the four-frame frame. 131 by rotating the end of the screw rod is fixed to the guide angle 130 of the square frame supported by the building wall 109 and the column-shaped latch 129 of the lattice formwork, toilet and the like. As shown in FIG. 58C, the grid formwork is connected to the supporting hardware 103 fixed to the building wall 109 in order to restrict the use of the sleeve anchor 113 to protect the base waterproof layer. As a cross-sectional view showing the state of binding to the pillar 100 of the grid-shaped formwork with a bolt, nuts (116, 116 ') attached to the hook hanger 111, the bundle of hook hook 112 in the interior of the attached frame Inserting, fixing the support hardware 103 to the building wall 109 with a knife block anchor 128, Inserting the connecting hook iron bundle 112 in connection hook hinge hole 126 of the support hardware will be combined with the support hardware.

도 59a 내지 도 59b는 바닥타일 시공시 격자형거푸집을 건물벽체(109)에 지지 결속시키는 각종방법의 상세 단면도로서, 도 59a는 화장실바닥의 경우처럼 벽체타일이 시공된후 스라브(144)위에 타일을 붙일때 사용되는 방법으로 건물벽체(109)의 타일(110)과 타일사이의 줄눈틈에 삽입수평재(134)을 끼우고 상기 줄눈 삽입수평재 (134)에 크램프 (135)를 삽입하여 볼트로 벽체지지용 부라켓(133)과 연결하며, 타일(110)이 끼워진 격자형거푸집의 기둥재(100)양단부에 상기 벽체지지용 부라켓(133)을 볼트,너트(116, 116')로 결합하여 격자형 거푸집을 바닥에 설치한후 바닥 스라브(144)와 타일(110)사이 공간에 충전몰탈(125)을 채운다. 충전몰탈이 양생된후 벽체 지지용 부라켓의 볼트를 풀어 상기 부라켓을 거푸집의 기둥재로부터 분리한후 거푸집을 타일로부터 탈형시켜 마무리한다. 도 59b는 일반 건물벽면(109)에 접한 스라브(144)에 바닥타일시공시 격자형 거푸집을 건물벽체(109)에 지지결속시키는 방법의 상세 단면도로서,건물벽체(109)에 슬리브앵커(113)로 연결철물(143)을 결속하고 타일(110)이 끼워진 격자형거푸집의 기둥재(100) 양단부와 상기 연결철물(143)을 볼트, 너트(116, 116')로 결합하여 격자형 거푸집을 바닥에 설치한후 바닥 스라브(141)와 타일(110)사이 공간에 충전몰탈(125)을 채운다. 충전몰탈이 양생되면, 결합된 연결철물(143)의 볼트(116)를 풀어 격자형거푸집을 건물벽체(109)로부터 분리한후 거푸집을 타일로부터 탈형시켜 마무리한다.59A to 59B are detailed cross-sectional views of various methods of supporting and binding a lattice formwork to the building wall 109 during the construction of the floor tile. FIG. 59A is a tile on the slab 144 after the wall tile is constructed as in the case of the bathroom floor. Insert the leveling member 134 into the joint between the tile 110 and the tile of the building wall 109 and the clamp insert 135 into the joint inserting horizontal member 134 in a manner used when attaching the wall to the wall with bolts. It is connected to the support racquet 133, by coupling the wall support sub-rack 133 with bolts, nuts (116, 116 ') at both ends of the pillar material 100 of the grid-shaped mold in which the tile 110 is fitted. After the grid formwork is installed on the floor, the filling mortar 125 is filled in the space between the floor slab 144 and the tile 110. After the filling mortar is cured, the bolt of the wall support bracket is released and the bracket is separated from the pillar material, and the mold is demolded from the tile to finish. FIG. 59B is a detailed cross-sectional view of a method of fastening the lattice formwork to the building wall 109 when the floor tile is applied to the slab 144 in contact with the general building wall 109, and the sleeve anchor 113 to the building wall 109. Bind the connecting hardware 143 and the both ends of the pillar member 100 of the grid-shaped die in which the tile 110 is fitted and the connecting hardware 143 by bolts, nuts (116, 116 ') to form a grid formwork After installed in the filling floor mortar 125 in the space between the floor slab 141 and the tile (110). When the filling mortar is cured, the bolt 116 of the coupled connection hardware 143 is released to separate the lattice formwork from the building wall 109, and the form is demolded from the tile to finish.

도 60a 내지 도 60d는 격자형거푸집이 상부레일과 하부가이드앵글에 접합되는 과정과 해체되는과정을 단계별로 나타내는 단면도로서, 도 60a는 건물벽체(109)에 상부 레일(142)과 하부 가이드 앵글(130)이고 고정부착되고, 상기레일 및 가이드앵글위에 격자형 거푸집의 기둥재상단에 행거철물(102)이 삽입결합되고 하단부에는 기둥재걸이쇠(129)가 부착되고 타일(110)이 끼워진상태로 각각 홈에 하강접속하기 직전모습을 나타내며, 도 60b는 격자형거푸집을 하강시켜 상부의 행거철물(102)은 레일(142)의 홈에 접속되며 하부의 기둥재걸이쇠(129)는 가이드앵글(130)과 접속시켜 고정시킨 후 건물벽체(109)와 타일 사이공간에 몰탈 이송호스(146)를 통하여 충전몰탈(125)을 채우는모습을 나타내며, 도 60c는 충전몰탈이 양생된후 상부의 행거철물(102)은 격자형 거푸집의 기둥재(100)로 부터 연결철물(143)과 레일(142)은 건물벽체(109)로 부터 각각 분리시키고, 하단부의 가이드 앵글은 연결철물(143)로부터 분리시키는 모습을 나타내며, 도 60d는 건물벽체(109)와의 연결구조가 제거된 격자형거푸집을 타일(110)로부터 분리탈형시키는 모습을 나타낸다.60A to 60D are cross-sectional views illustrating a process of joining and dismantling the lattice formwork to the upper rail and the lower guide angle, and FIG. 60A illustrates an upper rail 142 and a lower guide angle (see FIG. 60A) on the building wall 109. 130) is fixedly attached, the hanger hardware 102 is inserted and coupled to the upper end of the column of the grid-shaped formwork on the rail and the guide angle, and the column latch 129 is attached to the lower end and the tile 110 is fitted Each of them shows just before the connection to the groove, Figure 60b is lowered lattice formwork, the upper hanger hardware 102 is connected to the groove of the rail 142 and the lower column latch 129 is a guide angle ( 130 and the fixed wall mortar 125 is filled through the mortar transfer hose 146 in the space between the building wall 109 and the tile after being fixed, and FIG. 60C shows the hanger hardware of the upper part after the mortar is cured. 102 silver lattice formwork pillars The connecting hardware 143 and the rail 142 are separated from the building wall 109 from the 100, and the guide angle of the lower part is shown to be separated from the connecting hardware 143, and FIG. 60D shows the building wall ( The grid formwork from which the connection structure with 109 has been removed is detached from the tile 110.

도 61은 중간수평재(104)와 수직재(106)의 조립상태를 나타내는 상세 사시도로서, 상기 중간수평재와 수직재가 만나는 부분은 서로 직각을 이루며, 삽입홈(137) 입구표면의 높이는 서로 일치하고 상기 중간수평재 상부날개를 수직재의 접합홈에 끼워 긴결하는 모습을 나타낸다.FIG. 61 is a detailed perspective view illustrating the assembled state of the intermediate horizontal member 104 and the vertical member 106, wherein the portions where the intermediate horizontal member and the vertical member meet each other form a right angle with each other, and the heights of the inlet surfaces of the insertion grooves 137 coincide with each other. The upper blade of the horizontal member is inserted into the joining groove of the vertical member to show the tightness.

도 62a 내지 도 62c는 연결걸이쇠 뭉치(112)와 건물벽체(109)의 지지철물(103)과의 결속 및 해제과정을 단계별로 나타내는 단면도로서, 도 62a는 건물벽체(109)에 칼부럭앵커(128)로 고정된 지지철물(103)과 기둥재(100)에 볼트(116)로 결합된 연결걸이쇠 틀(111)내의 연결걸이쇠 뭉치(112)와 타일(110)과상기 지지철물 사이의 몰탈 침투방지튜브(124)등이 준비단계의 모습을 나타내며, 도 62b는 연결걸이쇠 뭉치(112)의 이중갈고리를 지지철물의 연결걸이쇠구멍(126)에 진입된 모습을 나타내며, 도 62c는 상기 연결걸이쇠 뭉치를 밑으로 하강하여 지지철물과 연결걸이쇠뭉치가 결속된 모습을 나타낸다.62A to 62C are cross-sectional views illustrating a step of binding and releasing the connection bracket bundle 112 and the supporting hardware 103 of the building wall 109 step by step. FIG. 62A illustrates a knife block anchor on the building wall 109. Between the support hardware 103 fixed in the 128 and the connecting member bundle 112 and the tile 110 in the connecting hook frame 111 coupled to the bolt member 116 to the pillar material 100 between the support hardware The mortar penetration prevention tube 124 of the like shows the state of the preparation step, Figure 62b shows the double hook of the connection hook bundle 112 entered the connection hook hole 126 of the supporting hardware, Figure 62c Shows the state in which the support hanger and the bundle of the connecting hook is lowered by lowering the bundle of the hook.

도 63은 몰탈 충전펌프와 몰탈이송호스의 구성을 나타내는 입면도로서, 모터(139)가 몰탈 충전펌프(140)를 움직여 몰탈 교반탱크(141)내의 충전몰탈(125)을 몰탈 이송호스(146)를 통하여 충전을 한다.FIG. 63 is an elevation view showing the configuration of the mortar filling pump and the mortar transfer hose, in which the motor 139 moves the mortar charging pump 140 to move the mortar 125 in the mortar stirring tank 141 to the mortar transfer hose 146. Charge through

이상에서 설명한 바와 같이 본 발명은 건물벽체와 바닥에 타일시공시 상기 설명한바와 같은 격자형 거푸집과 시공방법을 이용함으로서, 몰탈 뒷채움의 부실을 보완하여 타일의 탈락과 동파에 의한 타일의 파손 등의 하자의 우려가 없고, 공사기간과 공사비용을 현저히 절감할 수 있으며, 줄눈용 스페이서 부재와 실리콘 백업재 사이에 타일을 끼워 시공하는 공법이므로 외관적으로 평탄한 타일면이 형성되므로 미려한 타일시공면을 제공할수 있는 장점이 있다.As described above, the present invention uses a lattice formwork and a construction method as described above when constructing tiles on building walls and floors to compensate for the insufficiency of mortar backfilling, such as the dropping of tiles and the damage of tiles due to freezing. There is no concern about the construction period, and the construction period and construction cost can be significantly reduced, and since the construction is made by inserting tiles between the joint spacer member and the silicon backing material, it is possible to provide a beautiful tile construction surface because an externally smooth tile surface is formed. There is an advantage.

Claims (10)

건축물의 벽면에 타일을 시공하기 위한 몰탈 충전식 거푸집에 있어서,In the mortar-filled formwork for constructing tiles on the wall surface of the building, 복수개의 기둥재(1);A plurality of pillar materials 1; 상기 기둥재에 수직방향으로 결합되는 복수개의 원통재(2)로 구성된 거푸집 본체;Formwork body consisting of a plurality of cylindrical members (2) coupled in the vertical direction to the pillar material; 상기 기둥재(1)에 소정의 간격에서 수직방향으로 결합되는 복수개의 중간 수평재(4)와 상,하단 수평재(5);A plurality of intermediate horizontal members 4 and upper and lower horizontal members 5 coupled to the pillar member 1 in a vertical direction at predetermined intervals; 상기 상,하단 수평재(5)에 끼워지는 상,하단모서리재(7)와 상기 중간 수평재(4)와 상,하단 수평재의 단부에 각각 결합되는 좌,우측모서리재(8);Left and right edge material (8) coupled to the upper and lower edge material (7) and the intermediate horizontal material (4) and the end of the upper and lower horizontal material respectively fitted to the upper and lower horizontal material (5); 상기 수평재들 사이에 수직방향으로 결합되는 복수개의 수직재(6);A plurality of vertical members 6 coupled in the vertical direction between the horizontal members; 상기 중간 수평재(4)와 상,하단 수평재(5) 및 수직재상에 부착고정되는 십자형, 일자형및 수직형 스페이서부재(18, 19 및 20);Cross-shaped, straight and vertical spacer members (18, 19 and 20) attached and fixed to the intermediate horizontal member (4) and the upper and lower horizontal members (5) and the vertical member; 상기 중간 수평재에 결합되는 백업재(22)와 상기 수직재상에 결합고정되는 백업재(22');A backup material 22 coupled to the intermediate horizontal member and a backup member 22 'fixedly coupled to the vertical member; 상기 수평재(4,5)상에 패드로 구성되어,Consisting of pads on the horizontal member (4, 5), 상기 복수개의 기둥재(1)는 소정의 간격으로 복수개의 구멍이 형성되어 배열되있으며, 상기 복수개의 원통재(2)는 복수개의 구멍이 형성된 기둥재(1)에 소정The plurality of pillar materials 1 are arranged with a plurality of holes formed at predetermined intervals, and the plurality of cylindrical materials 2 are predetermined in the pillar material 1 having a plurality of holes formed therein. 의 간격으로 각각 끼워지고 연결핀(14)과 연결핀용 클립(15)으로 결합되며, 상기 복수개의 중간 수평재(4)와 상,하단부 수평재(5)는 기둥제(1)와 수직방향에서 소정의 간격으로 볼트와 너트(16 및 16')로 결합되어 있으며, 상기 수직재(6)는 접속홈(45) 이형성된 상,하단 수평재 사이의 접속홈(45)에 수직으로 끼워지고 상기 수직재의 하부와 상부에 형성된 구멍통해 연결핀용 클립(15)으로 결합되어 있으며, 상기 상,하단 모서리재(7)는 상기 상,하단 수평재(5)에 나사못으로 결합되어 있으며, 좌,우측모서리재(8)는 중간 수평재(4)와 상,하단 수평재의 말단부에는 각각 나사못 결합되며, 십자형 스페이서부재(18)는 중간 수평부재(4)와 수직재가 교차하는 지점의 삽입용홈(35)에 결합되며 상기 일자형 스페이서부재(19)는 중간 수평재(4)의 좌,우측 끝부분의 삽입용홈에(35)에 결합되며, 상기 수직형 스페이서부재(20)는 상,하단수평재와(5)와 수직재(6)가 교차하는 지점의 수직재(6)의 내부와 외부에 걸처에 삽입결합되며, 상기백업제(22)는 중간 수평재(4)의 삽입홈(35)내에 십자형 스페이서(18) 사이에서 또는 십자형 스페이서부재(18)와 일자형 스페이서부재(19) 사이에 삽입결합되고, 상기 기둥재(1)에 건물벽체의 지지철물(3)과 거푸집을 결합시키는 연결걸이쇠틀(11)이 완충용 아크릴판(51)과 함께 기둥연결볼트(52)로 결합된 거푸집을 이용하여 건물의 벽체면에 타일을 시공하는 것을 특징으로 하는 몰타르 주입식 격자형 거푸집.Each of the plurality of intermediate horizontal members 4 and the upper and lower horizontal members 5 are fitted at intervals of the connecting pins 14 and the connecting pin clips 15, respectively. The vertical member 6 is vertically fitted into the connecting groove 45 between the upper and lower horizontal members having the connecting groove 45 formed therebetween, and the lower portion of the vertical member and The upper and lower edge member 7 is coupled to the connecting pin through the hole formed in the upper clip 15, the upper and lower horizontal members (5) are coupled with a screw, the left and right edge member (8) The intermediate horizontal member 4 and the ends of the upper and lower horizontal members are respectively screwed, the cross-shaped spacer member 18 is coupled to the insertion groove 35 at the point where the intermediate horizontal member 4 and the vertical member intersect and the straight spacer member 19 is an insertion groove 35 of the left and right ends of the intermediate horizontal member (4) Is coupled to, the vertical spacer member 20 is inserted and coupled across the inside and outside of the vertical member 6 at the point where the upper and lower horizontal members 5 and the vertical member 6 intersects, the backup agent ( 22 is inserted into the insertion groove 35 of the intermediate horizontal member 4 between the cross-shaped spacer 18 or between the cross-shaped spacer member 18 and the straight spacer member 19, and is mounted on the pillar member 1 The construction of the tile on the wall surface of the building using the formwork coupled to the column connecting bolts 52 together with the cushioning acrylic plate 51 is coupled to the support frame (3) and the formwork of the wall. Maltar-injected lattice formwork, characterized in that. 건축물의 벽면에 타일을 시공하기 위한 몰탈 충전식 거푸집에 있어서,In the mortar-filled formwork for constructing tiles on the wall surface of the building, 거푸집 본체가되는 복수개의 기둥재(1)와 상기 기둥재에 수직방향으로 결합되는 복수개의 원통재(2)로 구성된 거푸집 본체와, 상기 거푸집 본체의 기둥재(1)에 소정의 간격에서 수직방향으로 결합되는 중간수평재(4)와 상,하단 수평재(5)와, 상기 상,하단 수평재(5)에 끼워지는 상,하단모서리재(7)와 중간 수평재(4)와 상,하단 수평재(5)의 끝부분에 각각 결합되는 좌,우측모서리재(8)와, 상기 수평재들 사이에 수직방향으로 결합되는 복수개의 수직재(6)와, 상기 중간 수평재(4)와 상,하단 수평재(5) 및 수직재(6)상에 부착고정되는 십자형, 일자형 및 수직형 스페이서부재(18, 19 및 20)와, 상기 중간 수평재에 부착고정되는 백업재(22)와 상기 수직재상에 결합고정되는 백업재(22')와, 상기 수평재상에 패드(21)가 구성되는 몰타르 주입식 격자형 거푸집을 이용하여 타일벽을 시공하는 방법에 있어서,A formwork body composed of a plurality of pillar materials 1 serving as a formwork body and a plurality of cylindrical materials 2 coupled in a vertical direction to the pillar material, and a vertical direction at predetermined intervals with respect to the pillar materials 1 of the formwork body; Intermediate horizontal member (4) and the upper and lower horizontal member (5) coupled to the upper, lower edge member (7) and the middle horizontal member (4) and the upper and lower horizontal member (5) fitted to the upper and lower horizontal member (5) Left and right corner member (8) coupled to the ends of each), a plurality of vertical member (6) coupled in the vertical direction between the horizontal member, the middle horizontal member (4) and the upper and lower horizontal member (5) And cross, straight and vertical spacer members 18, 19 and 20 attached to and fixed on the vertical member 6, a backing member 22 attached to and fixed to the intermediate horizontal member and a backing member fixed to the vertical member. 22 ') and a mortar-injected lattice form in which pads 21 are formed on the horizontal member. A method for the construction of walls, 건축물 벽체(9)에 앵커삽입용 구멍을 천공하고 앵커(13)의 외피를 삽입한 후 몰타르 침투방지캠(23)이 내장된 지지철물(3)을 앵커(13)로 건축물의 벽체면에 부착고정시키는 단계와;After drilling the hole for inserting the anchor into the building wall (9) and inserting the outer shell of the anchor (13), attaching the supporting hardware (3) in which the mortar penetration prevention cam (23) is built is attached to the wall surface of the building with the anchor (13). Fixing; 상기 거푸집의 중간 수평재(4)와 수직부재사이의 공간에 타일을 끼우는 단계와;Fitting a tile into the space between the intermediate horizontal member (4) of the formwork and the vertical member; 상기 타일이 끼워진 격자형 거푸집을 건축물 벽면으로부터 몰타르 피복두께 만큼 틈을 띄고 몰타르 방지튜브와 연결걸이쇠틀(11)을 이용하여 건물벽의 지지철물(3)과 결합고정시키는 단계와;Fixing the tile-shaped grid formwork with a mortar covering thickness from the wall of the building and coupling and fixing it with the supporting hardware (3) of the building wall by using a mortar prevention tube and a connecting hanger (11); 상기 연결걸이쇠틀(11)의 연결걸이쇠뭉치(12) 하부걸이쇠(38)를 지지철물(3)의 출입구멍(26)내부에 완전히 진입시키고, 걸이쇠뭉치(12)의 상,하이동용 다이얼(36)을 회전시켜 상기 연결걸이쇠뭉치(12)를 전체적으로 하강시켜 하부걸이쇠(38)는지지 철물(3)의 출입구멍(26) 아래턱에 서로 물리도록 하고 상기 하부걸이쇠(38)의 하강으로 확보된 윗공간에 상기 연결걸이쇠뭉치(12)의 상부걸이쇠(37)를 밀어넣어 결합시킴으로서 건물벽체의 보강용 지지철물과 격자형 거푸집을 결합고정시키는 단계와;The hook hanger 12 of the hook hanger 11, the lower hook (38) is completely entered into the inside of the access hole 26 of the support hardware (3), the dial for the up and down movement of the hook hanger (12) ( Rotate 36 to lower the overall hook hook (12) as a whole to lower the lower hook (38) to bite each other in the lower jaw of the access hole (26) of the support hardware (3) to the lower of the lower hook (38) Coupling and fixing the grid-shaped formwork and the supporting hardware for reinforcing the building wall by pushing the upper latch 37 of the connecting hook bundle 12 into the secured upper space; 격자형 거푸집의 상부를 통하여 건물 벽체면(9)과 타일뒷면 사이에 몰타르 이송용펌프(47)로 몰타르를 주입하는 단계 및Injecting mortar into the mortar transfer pump 47 between the building wall surface 9 and the tile back surface through the upper part of the grid formwork; and 몰타르의 양생시간이 경과되면 상기 연결걸이쇠뭉치(12)의 상,하부걸이쇠(37,38)를 상기 결합고정과는 역순으로 해체하여 거푸집을 건축물벽체로부터 완전분리시는 단계로 이루어지는 것을 특징으로 하는 건축물의 벽체면에 타일을 시공하는 방법.When the curing time of the mortar is elapsed, the upper and lower hooks (37, 38) of the hook hanger 12 is disassembled in the reverse order to the coupling fixed to form the step of completely separating the formwork from the building wall How to build a tile on the wall surface of a building to say. 건축물의 벽면에 타일을 시공하기 위한 몰탈 충전식 거푸집에 있어서,In the mortar-filled formwork for constructing tiles on the wall surface of the building, 복수개의 기둥재(100)와;A plurality of pillar materials 100; 상기 복수개의 기둥재(100)의 하부에 볼트(116)에 의해 부착 고정된 기둥재 걸이쇠(129)와;A pillar clasp 129 attached and fixed to a lower portion of the plurality of pillars 100 by bolts 116; 상기 복수개의 기둥재(100)의 상부 삽입홈에 연결핀 과 클립으로 결합 또는 분리되는 돌기부가 형성된 행거철물(102)과;Hanger hardware (102) formed with protrusions coupled or separated by connecting pins and clips in the upper insertion groove of the plurality of pillar materials (100); 상기 기둥재(100)에 소정의 간격을 두고 수직방향으로 결합되는 복수개의 중간 수평재(104) 및 상,하단 수평재(105);A plurality of intermediate horizontal members 104 and upper and lower horizontal members 105 coupled to the pillar member 100 in a vertical direction at predetermined intervals; 상기 수평재들(104, 105) 사이에 수직 방향으로 결합되는 복수개의수직재(106);A plurality of vertical members 106 coupled in the vertical direction between the horizontal members 104 and 105; 상기 중간 수평재(104)와 수직재(106)가 수직으로 교차하는 곳의 중간 수평재(104) 삽입홈(137) 내부에 삽입설치되는 십자형 스페이서(118);A cross-shaped spacer 118 inserted into the intermediate horizontal member 104 and the insertion groove 137 where the intermediate horizontal member 104 and the vertical member 106 vertically intersect; 중간수평재(104)의 양단부 삽입홈(137) 내부에 삽입설치된 일자형 스페이서(119);A straight spacer 119 inserted into both end insertion grooves 137 of the intermediate horizontal member 104; 상,하단 수평재(105)와 수직재(106)가 수직으로 교차하는 곳의 상,하단 수평재(105)의 삽입홈(137) 내부에 삽입설치되는 수직형 스페이서(120);A vertical spacer 120 inserted into an insertion groove 137 of the upper and lower horizontal members 105 where the upper and lower horizontal members 105 and the vertical member 106 vertically intersect; 상기 중간 수평재(104)와 수직재(106)의 삽입홈(137) 내부에 삽입되는 실리콘 백업재(145);A silicon backup member 145 inserted into the insertion groove 137 of the intermediate horizontal member 104 and the vertical member 106; 상기 상,하단 수평재(105)에 끼워 결합되는 상,하단 마구리재(107) 및 중간 수평재(104)의 단부에 각각 결합되는 좌,우측 마구리재(107)로 구성되는 거푸집 골격과;Formwork frame consisting of the left and right side curling material (107) coupled to the upper and lower end of the horizontal member 105, the upper and lower corner member 107 and the intermediate horizontal member 104, respectively, coupled to the end; 상기 거푸집 골격의 스페이서 걸칠턱(123)이 밖으로 노출되도록 스페이서(118, 119, 120)에 타일을 끼워 완성된 거푸집 본체:Forming the body body by inserting a tile into the spacer 118, 119, 120 so that the spacer latching jaw 123 of the form skeleton is exposed to the outside: 건물 벽체(109) 상부에 앵커(113)로 고정된 연결철물을 거푸집의 기둥재(100) 상단부의 행거 철물(102)과 삽입되어 결속되는 레일과(142);A rail 142 inserted into and coupled with the hanger hardware 102 of the upper end of the pillar material 100 of the formwork, the connection hardware being fixed to the anchor 113 on the building wall 109; 상기 건물벽체(109)상단의 레일(142)과 수직되게 거푸집을 결합하도록 거푸집 하부구조를 건물벽체(109)하단부와 결합시키는 고정수단으로 구성되어,It is composed of a fixing means for coupling the formwork substructure with the lower end of the building wall 109 so as to couple the formwork perpendicular to the rail 142 on the upper end of the building wall, 상기 복수개의 중간 수평재(104)와 상,하단 수평재(105)를 시공하고자 하는 타일(110)의 길이와 줄눈 폭을 합한 간격마다 기둥재(100)와 수직으로 결합시키고,복수개의 수직재(106)는 중간 수평재(104) 상호간 및 중간 수평재(104)와 상,하단 수평재(105) 사이에 끼워 결합하고,The plurality of intermediate horizontal members 104 and the upper and lower horizontal members 105 are vertically coupled with the column member 100 at intervals of the sum of the lengths and joint widths of the tiles 110 to be constructed, and the plurality of vertical members 106. Is fitted between the intermediate horizontal member 104 and between the intermediate horizontal member 104 and the upper and lower horizontal member 105, 상기 중간 수평재(104)와 상,하단 수평재(105)상의 삽입홈(137)에 십자형 스페이서(118), 일자형 스페이서(119) 및 수직형 스페이서(120)를 삽입하고, 상기 스페이서의 걸치턱(123)이 밖으로 노출되도록 스페이서에 타일(110)을 끼워, 타일의 위치를 고정하고, 줄눈의 폭을 일정하게 유지하며,A cross spacer 118, a straight spacer 119, and a vertical spacer 120 are inserted into the intermediate horizontal member 104 and the insertion groove 137 on the upper and lower horizontal members 105, and the latching jaw 123 of the spacer is inserted. Insert the tile 110 into the spacer to expose the outside, to fix the position of the tile, to keep the width of the joint constant, 중간 수평재(104)상의 삽입홈(137)에 결합된 스페이서(118,119) 사이에 실리콘 백업재(145)를 삽입하고, 수직재(106)의 삽입홈 공간에 실리콘백업재(145)를 삽입하여 몰탈(125) 충전작업시 누설을 방지하도록 하며,The silicon backup material 145 is inserted between the spacers 118 and 119 coupled to the insertion groove 137 on the intermediate horizontal member 104, and the silicon backup material 145 is inserted into the insertion groove space of the vertical member 106 to provide mortar ( 125) To prevent leakage during charging operation, 상기 건물벽체(109) 상부는 소정 간격마다 슬리브 앵커(113)에 의해 고정된 연결철물(143)과, 상기 연결철물에 결합된 레일(102)에 격자형 거푸집의 기둥재와 연결핀, 클립으로 결합된 행거 철물의 돌기부를 삽입고정하며,The upper part of the building wall 109 is connected to the connection hardware 143 fixed by the sleeve anchor 113 at predetermined intervals, and the pillars and connecting pins, clips of the grid formwork to the rail 102 coupled to the connection hardware Insert and fix the protrusions of the combined hanger hardware, 상기 건물벽체(109)상단의 레일(142)에 삽입된 행거철물과 평행하여 거푸집을 설치할 수 있도록 거푸집 하부구조를 건물벽체(109)하단부와 결합시키는 고정수단을 포함하는 것을 특징으로 하는 몰탈충전식 격자형 거푸집.Mortar-filled grating, characterized in that it comprises a fixing means for coupling the formwork substructure with the lower end of the building wall 109 so as to install the formwork in parallel with the hanger hardware inserted into the upper rail 142 of the building wall 109 Mold dies. 제 3항에 있어서,The method of claim 3, wherein 상기 건물벽체(109)상단의 레일(142)에 삽입된 행거철물과 평행하여 거푸집을 설치할 수 있도록 거푸집 하부구조를 건물벽체(109)하단부와 결합시키는 고정수단이,Fixing means for coupling the formwork substructure with the lower end of the building wall 109 so that the formwork can be installed in parallel with the hanger hardware inserted into the rail 142 on the upper end of the building wall, 109, 상기 격자형거푸집의 기둥재걸이쇠(129)와 삽입.결합 용도로 건물벽체(109)에 앵커(113)로 부착된 연결철물(143)과 고정.결합되는 가이드앵글(130)로 구성되는 것을 특징으로 하는 몰탈 충전식 격자형 거푸집.It is composed of a guide angle 130 which is fixed and coupled with the connecting hardware 143 attached to the building wall 109 as an anchor 113 for insertion and coupling. Mortar-filled lattice formwork characterized by. 제 3항에 있어서,The method of claim 3, wherein 상기 건물벽체(109)상단의 레일(142)에 삽입된 행거철물과 평행하여 거푸집을 설치할 수 있도록 거푸집 하부구조를 건물벽체(109)하단부와 결합시키는 고정수단이,Fixing means for coupling the formwork substructure with the lower end of the building wall 109 so that the formwork can be installed in parallel with the hanger hardware inserted into the rail 142 on the upper end of the building wall, 109, 상기 격자형거푸집 기둥재(100)하단부의 기둥재걸이쇠(129)에 삽입.결합되고, 건물벽체의 하단 내벽에 밀착,고정되는 조절나사(131)가 부착된 4각 형태의 가이드앵글로 구성되는 것을 특징으로 하는 몰탈충전식 격자형 거푸집.Inserted and coupled to the column-shaped latch 129 at the lower end of the grid-shaped formwork pillar 100, consisting of a guide angle of the four-shape with a control screw 131 attached to the bottom inner wall of the building wall is fixed. Mortar-filled lattice formwork, characterized in that. 제 3항에 있어서,The method of claim 3, wherein 상기 건물벽체(109)상단의 레일(142)에 삽입된 행거철물과 평행하여 거푸집을 설치할 수 있도록 거푸집 하부구조를 건물벽체(109)하단부와 결합시키는 고정수단이,Fixing means for coupling the formwork substructure with the lower end of the building wall 109 so that the formwork can be installed in parallel with the hanger hardware inserted into the rail 142 on the upper end of the building wall, 109, 상기 격자형거푸집 기둥재(100)에 볼트(116)로 고정,결합되며,건물벽체(109) 하부에 부착된 지지철물(103)에 삽입,결합되는 연결걸이쇠틀(111)내부의 연결걸이쇠 뭉치(112)로 구성되는 것을 특징으로하는 몰탈 충전식 거푸집.The fastening and coupling bolts 116 to the lattice formwork pillar 100 is inserted into the support hardware 103 attached to the lower portion of the building wall 109, the coupling hooks inside the hook 111 Mortar-filled formwork, characterized in that consisting of a bundle (112). 건축물의 바닥에 타일을 시공하기 위한 몰탈 충전식 거푸집에 있어서,In the mortar-filled formwork for installing tiles on the floor of the building, 복수개의 기둥재(100)와;A plurality of pillar materials 100; 상기 복수개의 기둥재(100)의 하부에 볼트(116)에 의해 부착 고정된 기둥재 걸이쇠(129)와;A pillar clasp 129 attached and fixed to a lower portion of the plurality of pillars 100 by bolts 116; 상기 복수개의 기둥재(100)의 상부 삽입홈에 연결핀 과 클립으로 결합 또는 분리되는 돌기부가 형성된 행거철물(102)과;Hanger hardware (102) formed with protrusions coupled or separated by connecting pins and clips in the upper insertion groove of the plurality of pillar materials (100); 상기 기둥재(100)에 소정의 간격을 두고 수직방향으로 결합되는 복수개의 중간 수평재(104) 및 상,하단 수평재(105);A plurality of intermediate horizontal members 104 and upper and lower horizontal members 105 coupled to the pillar member 100 in a vertical direction at predetermined intervals; 상기 수평재들(104, 105) 사이에 수직 방향으로 결합되는 복수개의 수직재(106);A plurality of vertical members 106 coupled in the vertical direction between the horizontal members 104 and 105; 상기 중간 수평재(104)와 수직재(106)가 수직으로 교차하는 곳의 중간 수평재(104) 삽입홈(137) 내부에 삽입설치되는 십자형 스페이서(118);A cross-shaped spacer 118 inserted into the intermediate horizontal member 104 and the insertion groove 137 where the intermediate horizontal member 104 and the vertical member 106 vertically intersect; 중간수평재(104)의 양단부 삽입홈(137) 내부에 삽입설치된 일자형 스페이서(119);A straight spacer 119 inserted into both end insertion grooves 137 of the intermediate horizontal member 104; 상,하단 수평재(105)와 수직재(106)가 수직으로 교차하는 곳의 상,하단 수평재(105)의 삽입홈(137) 내부에 삽입설치되는 수직형 스페이서(120);A vertical spacer 120 inserted into an insertion groove 137 of the upper and lower horizontal members 105 where the upper and lower horizontal members 105 and the vertical member 106 vertically intersect; 상기 중간 수평재(104)와 수직재(106)의 삽입홈(137) 내부에 삽입되는 실리콘 백업재(145);A silicon backup member 145 inserted into the insertion groove 137 of the intermediate horizontal member 104 and the vertical member 106; 상기 상,하단 수평재(105)에 끼워 결합되는 상,하단 마구리재(107) 및 중간 수평재(104)의 단부에 각각 결합되는 좌,우측 마구리재(107)로 구성되는 거푸집 골격과;Formwork frame consisting of the left and right side curling material (107) coupled to the upper and lower end of the horizontal member 105, the upper and lower corner member 107 and the intermediate horizontal member 104, respectively, coupled to the end; 상기 거푸집 골격의 스페이서 걸칠턱(123)이 밖으로 노출되도록 스페이서(118, 119, 120)에 타일을 끼워 완성된 거푸집 본체:Forming the body body by inserting a tile into the spacer 118, 119, 120 so that the spacer latching jaw 123 of the form skeleton is exposed to the outside: 상기 타일(110)이 끼워진 격자형 거푸집 본체를 이용하여 바닥 스라브(144)위에 타일을 시공할 경우 거푸집의 기둥재(100)를 시공하고자 하는 바닥스라브(144)와 인접한 벽체(109)에 고정,결합시키는 고정수단으로 구성되는 것을 특징으로하는 몰탈 충전식 격자형 거푸집,When the tile 110 is installed on the floor slab 144 using the grid formwork body fitted with the tile 110 is fixed to the wall slab 109 adjacent to the floor slab 144 to be constructed, the pillar material 100 of the formwork, Mortar-filled lattice formwork, characterized in that consisting of the fixing means for coupling, 제 7항에 있어서,The method of claim 7, wherein 상기 타일(110)이 끼워진 격자형 거푸집 본체를 이용하여 바닥 스라브(144)위에 타일을 시공할 경우 거푸집의 기둥재(100)를 시공하고자 하는 바닥스라브(144)와 인접한 벽체(109)에 고정,결합시키는 고정수단이,When the tile 110 is installed on the floor slab 144 using the grid formwork body fitted with the tile 110 is fixed to the wall slab 109 adjacent to the floor slab 144 to be constructed, the pillar material 100 of the formwork, Fastening means for coupling, 상기 건물벽체(109) 하단부의 타일(110) 줄눈틈에 삽입 수평재(134)를 끼울수 있고 거푸집 기둥재(100)에 연결시키는 벽체지지용 브라켓(133)으로 구성되는 것을 특징으로 하는 몰탈 충전식 거푸집.Mortar-filled formwork, characterized in that consisting of the wall support bracket 133 that can be inserted into the horizontal member 134 in the joint of the tile 110 at the lower end of the building wall 109 and connected to the formwork pillar material 100. . 제 7항에 있어서,The method of claim 7, wherein 상기 타일(110)이 끼워진 격자형 거푸집 본체를 이용하여 바닥 스라브(144)위에 타일을 시공할 경우 거푸집의 기둥재(100)를 시공하고자 하는 바닥스라브(144)와 인접한 벽체(109)에 고정,결합시키는 고정수단이,When the tile 110 is installed on the floor slab 144 using the grid formwork body fitted with the tile 110 is fixed to the wall slab 109 adjacent to the floor slab 144 to be constructed, the pillar material 100 of the formwork, Fastening means for coupling, 상기 건물벽체(109) 하단부에 슬리브 앵커(113)에 의해 고정되고 상기 거푸집의 기둥재(100)에 연결 결합시키는 연결철물(143)로 구성되는 것을 특징으로 하는 몰탈 충전식 격자형 거푸집.Mortar-filled lattice-shaped formwork, characterized in that consisting of a connecting hardware 143 is fixed to the lower end of the building wall 109 by the sleeve anchor 113 and coupled to the pillar material 100 of the formwork. 제 3항 및 제 7항에 있어서,The method according to claim 3 and 7, 상기 격자형거푸집을 건축물모체에 고정한 다음 격자형거푸집 본체에 끼워진 타일(110) 뒷면과 건축물모체(109, 144) 사이공간에 충전몰탈(125)을 몰탈충전펌프 (140)로 충전시켜 타일붙임공사를 시공하는 몰탈충전식 격자형 거푸집공법.Fixing the lattice formwork to the building matrix, and then filling the mortar 125 with a mortar charging pump 140 in the space between the tile 110, the back of the tile 110 and the building matrix (109, 144) fitted to the lattice formwork the tile pasting construction Mortar-filled lattice formwork for construction.
KR1020000013030A 1999-03-18 2000-03-15 Lattice type form for filling mortar and method for tile-construction work by use thereof KR100352334B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020000013030A KR100352334B1 (en) 1999-03-18 2000-03-15 Lattice type form for filling mortar and method for tile-construction work by use thereof

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
KR1019990009104A KR19990046084A (en) 1999-03-18 1999-03-18 Lattice type die for injecting mortar and tile construction work method by use thereof
KR1019990009104 1999-03-18
KR1020000013030A KR100352334B1 (en) 1999-03-18 2000-03-15 Lattice type form for filling mortar and method for tile-construction work by use thereof

Publications (2)

Publication Number Publication Date
KR20000036459A KR20000036459A (en) 2000-07-05
KR100352334B1 true KR100352334B1 (en) 2002-09-11

Family

ID=26634836

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020000013030A KR100352334B1 (en) 1999-03-18 2000-03-15 Lattice type form for filling mortar and method for tile-construction work by use thereof

Country Status (1)

Country Link
KR (1) KR100352334B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101880669B1 (en) * 2017-08-10 2018-07-20 유정수 Tile construction apparatus and tile construction method using same

Also Published As

Publication number Publication date
KR20000036459A (en) 2000-07-05

Similar Documents

Publication Publication Date Title
US5656194A (en) Assembly jig for prefabricated concrete walls
US6151843A (en) Prefabricated wall panels connecting system
JP3083723B2 (en) Outdoor structures such as gateposts, gate sleeves, walls, etc. and their production methods
KR20000071725A (en) Structure of steel aggregate for concrete building and build method of concrete building
CN115370036A (en) Energy-saving prefabricated component for assembly type building wall
CN114856181A (en) Building pouring formwork support and construction method thereof
KR100352334B1 (en) Lattice type form for filling mortar and method for tile-construction work by use thereof
EP0169207A1 (en) One-piece building panel for walls
TW200535311A (en) Device for production of an upper anchorage for steps
EP0943742A1 (en) Structure panel and method of connecting same
KR101376356B1 (en) Structure of complex window frame for apartment veranda
KR19990046084A (en) Lattice type die for injecting mortar and tile construction work method by use thereof
JPH06207441A (en) Construction panel body and jointing method therefor
JP3707017B2 (en) Construction method of wall and its formwork
JP3255620B2 (en) Foundation formwork equipment for construction
CN218911858U (en) Prefabricated wall structure
JP2786412B2 (en) Exterior panel covering structure of concrete building and covering construction method
KR200147067Y1 (en) Inside and outside wall setting-up device
JPH0726402B2 (en) Reinforcement method such as cut slope
JPH089274Y2 (en) Tunnel lining structure with curved plate for tunnel lining
JP3194615B2 (en) How to repair a cave
KR20060122000A (en) Wall structure unified the finish material
KR20230131280A (en) panel attachment structure
JP2918898B2 (en) Construction side body used for formwork, etc.
JPH09111992A (en) Fitting structure of molded finishing material

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20090828

Year of fee payment: 8

LAPS Lapse due to unpaid annual fee