KR100328358B1 - Device and method for constructing slant protection layer of landfill - Google Patents

Device and method for constructing slant protection layer of landfill Download PDF

Info

Publication number
KR100328358B1
KR100328358B1 KR1019990033709A KR19990033709A KR100328358B1 KR 100328358 B1 KR100328358 B1 KR 100328358B1 KR 1019990033709 A KR1019990033709 A KR 1019990033709A KR 19990033709 A KR19990033709 A KR 19990033709A KR 100328358 B1 KR100328358 B1 KR 100328358B1
Authority
KR
South Korea
Prior art keywords
molding
waste
landfill
space
cover plate
Prior art date
Application number
KR1019990033709A
Other languages
Korean (ko)
Other versions
KR20010017951A (en
Inventor
전한용
김영식
강호정
Original Assignee
전한용
김영식
강호정
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 전한용, 김영식, 강호정 filed Critical 전한용
Priority to KR1019990033709A priority Critical patent/KR100328358B1/en
Priority to KR2019990016939U priority patent/KR200168451Y1/en
Publication of KR20010017951A publication Critical patent/KR20010017951A/en
Application granted granted Critical
Publication of KR100328358B1 publication Critical patent/KR100328358B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/002Ground foundation measures for protecting the soil or subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/006Sealing of existing landfills, e.g. using mining techniques
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE
    • B09B1/00Dumping solid waste
    • B09B1/008Subterranean disposal, e.g. in boreholes or subsurface fractures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Abstract

본 발명은 폐기물매립장의 경사면보호층 성형재 및 그 설치방법에 관한 것으로 보다 상세하게는 재활용 용도가 제한적임에 따른 처리가 어려운 폐합성수지 및 합성수지재 등을 이용하여 제작한 바닥판, 덮개판, I형상의 연결재 및 간격유지봉으로 이루어진 성형재를 폐기물 매립지 경사면에 설치하도록 하여 자원의 재활용을 도모하고, 모래 등의 충진재가 적정하게 소요됨으로서 재료비의 감소와 더불어 폐기물 매립량이 상대적으로 증가되고 다양한 충진재 재료를 자유롭게 사용할 수 있도록 한 특징이 있다.The present invention relates to a molding material for the inclined surface protection layer of a waste landfill and a method of installing the same. More specifically, a bottom plate, a cover plate, and I made using waste synthetic resins and synthetic resins, which are difficult to process due to the limited use of recycling. Forming materials consisting of connecting members and gap retaining rods are installed on slopes of waste landfills to promote the recycling of resources, and fillers such as sand are appropriately consumed to reduce material costs and increase the amount of waste landfills. There is a feature that can be used freely.

Description

폐기물매립장의 경사면보호층 성형재 및 그 설치방법{DEVICE AND METHOD FOR CONSTRUCTING SLANT PROTECTION LAYER OF LANDFILL}Slope protection layer molding material of waste landfill and its installation method {DEVICE AND METHOD FOR CONSTRUCTING SLANT PROTECTION LAYER OF LANDFILL}

본 발명은 폐기물매립장의 경사면보호층 성형재 및 그 설치방법에 관한 것으로 보다 상세하게는 재활용 용도가 제한적임에 따른 처리가 어려운 폐합성수지 및 합성수지재 등을 이용하여 제작한 바닥판, 덮개판, I형상의 연결재 및 간격유지봉으로 이루어진 성형재를 폐기물 매립지 경사면에 설치하도록 하여 자원의 재활용을 도모하고, 모래등의 충진재가 적정하게 소요 됨으로서 재료비의 감소와 더불어 폐기물 매립량이 상대적으로 증가되고 다양한 충진재 재료를 자유롭게 사용할 수 있도록 한 폐기물매립장의 경사면보호층 성형재 및 그 설치방법에 관한 것이다.The present invention relates to a molding material for the inclined surface protection layer of a waste landfill and a method of installing the same. More specifically, a bottom plate, a cover plate, and I made using waste synthetic resins and synthetic resins, which are difficult to process due to the limited use of recycling. Forming material consisting of shape connecting material and gap retaining rod is installed on the slope of waste landfill to promote recycling of resources, and filling materials such as sand are appropriately consumed, which reduces the material cost and increases the amount of waste landfill. And a method for installing the inclined surface protection layer molding material in which the landfill can be freely used.

오늘날 환경에 대한 사회적 기술적 인식의 발달로 폐기물 매립장의 건설 및 관리기술은 점차적으로 강화되고 있다.Today, with the development of social and technological awareness of the environment, the construction and management of waste landfills is increasingly strengthened.

폐기물매립장 차수시설과 침출수 집배수시설은 시설 중에 가장 중요한 시설로서 이러한 시설에 대한 각종 기준은 엄격하게 적용되고 있는 실정이다.Waste landfill and leachate collection and drainage facilities are the most important of the facilities, and various standards for these facilities are strictly applied.

그 기준은 경사면에 점토광물류 차수층 또는 점토합성층(벤트나이트매트)을 설치하고, 그 상부에 2mm 두께의 HDPE 시이트를 건설하고 인공합성배수층과 두께 30cm 이상의 모래등으로 보호층을 포설하도록 명시되어 있다.The standard specifies that a clay mineral order layer or clay composite layer (ventite mat) be installed on the inclined surface, a 2 mm thick HDPE sheet on top, and a protective layer made of artificial synthetic drainage layer and sand with a thickness of 30 cm or more. .

여기에서 HDPE 시이트 상부에 건설되는 인공합성배수층과 모래등의 보호토사의 기능은 다음과 같다.Here, the functions of the protective soil such as artificial synthetic drainage layer and sand, which are built on the HDPE sheet, are as follows.

인공합성배수층은 경사를 이루고 있는 경사면에 자갈, 모래 등으로 이루어진침출수 집배수층의 설치가 불가능 함에 따라 계획된 것으로 침출수를 집배수하는 기능으로 활용하고 있으며 본 시설은 매립장 건설시에 설치된다.The artificial synthetic drainage layer is planned because the leachate drainage layer consisting of gravel, sand, etc. cannot be installed on the inclined slope, and it is used as a function of collecting and draining the leachate. This facility is installed when the landfill is constructed.

또한, 모래등의 재료를 이용한 보호증은 매립장을 건설한 이후에 쓰레기 매립작업 운영시에 건설하고 있으며, 차수막 상부에 포설하여 침출수를 집배수 하고 매립장등에 의한 차수막의 손상을 매립장등에 의한 차수막의 손상을 방지하고 가스배재기능을 가지고 있다.In addition, protection certificates using materials such as sand are constructed at the time of landfill operation after constructing the landfill site, and are installed on top of the water curtain to collect and drain the leachate, and damage of the water curtain by landfills, etc. Prevents and has a gas exhaust function.

이러한 시설은 폐기물매립장에서는 필수시설이지만 경사면 경사가 완만한 지역에서는 시공성이 다소 있으나 대부분의 매립장에서는 시설의 설치가 어려우며 시설 설치를 시행하였더라도 유지 관리가 매우 어려웠다.Although these facilities are essential in landfills, construction is somewhat possible in areas with gentle slopes, but most of them are difficult to install and even very difficult to maintain.

모래등의 재료가 이용되는 보호층은 경사가 급하고 미끄러운 HDPE 시이트 상부에 설치가 거의 불가능하며, 보조시설 없이 포설할 경우에는 아주 많은 량의 재료가 소모되며, 공사가 어렵고 따라서 대부분의 매립장에서는 이를 무시하거나 규정과 비교 불충분하게 건설되고 있다.A protective layer using materials such as sand is almost impossible to install on top of a steep and slippery HDPE sheet, and when installed without auxiliary facilities, a large amount of material is consumed, which is difficult to construct, and thus, most landfill sites do not use it. It is either neglected or inadequately constructed.

일부 매립장에서 적용되고 있는 공법으로는 페타이어를 연결하여 시공하는 공법이 있으나 이 경우 차수층과 페타이어의 사이에 차수막 보호용 토목섬유가 추가적으로 필요하고, 모래 등을 포설할 경우 침식에 의해 모래등의 충진재료가 하부로 유실되며 폐타이어 연결 줄을 상부에 고정하여야 하는 바, 이러한 고정부가 과도하게 커지며 쓰레기를 매립하기 전에도 취약하며 쓰레기를 매립한 후에는 더욱취약하게 된다.In some landfills, there is a construction method that connects pet tires. However, in this case, additional geotechnical fibers are required between the barrier layer and the pet tire, and in case of laying sand, the sand is filled by erosion. The material is lost to the bottom, and the waste tire connecting string must be fixed at the top. The fastening part is excessively large, and is vulnerable even before the landfill is disposed and becomes more vulnerable after landfill.

구체적으로 종래에는 첨부도면 도 1에 도시된 바와 같이 폐기물 관리법의 매립장 경사면(300) 보호용 모래 부설 기준인 30cm 이상을 부설할 경우 모래(100)를 상광하협 형상을 갖는 깔대기 모양으로 부설하여 쓰레기(200)를 적층시켜 매립하여야만 관련 법규를 충족시킬 수 있어 모래의 양 증가 및 쓰레기 매립량의 감소는 엄청난 경제적 손실을 가져온다.Specifically, as shown in FIG. 1, when sand 30 or more, which is a criterion for laying sand for protection of the landfill slope 300 of the waste management method, is laid, the sand 100 is laid in a funnel shape having a shape of a subsoil. ) Only by laminating landfills in order to meet the relevant legislation, so increasing the amount of sand and reducing the amount of landfills leads to enormous economic losses.

기존의 매립장 경사각이 완만할수록 모래를 채워야하는 부피가 커지게 되며 사실은 이 중간에 쓰레기가 매립되어야 함으로 경제적으로도 큰 손실이 발생된다. 왜냐하면 쓰레기를 투입해야 하는데 하지 못하며 이곳을 모래로 채워야 하므로 모래 구입비용까지 포함하면 엄청난 경제작적 손실이 발생되기 때문이다.The slower the slope of the existing landfill is, the larger the volume of sand must be filled. In fact, the waste must be buried in the middle, resulting in economic losses. Because garbage can not be put in, but this place must be filled with sand, including the cost of purchasing sand will cause huge economic losses.

또한, 폐타이어와 하부 차수막 층간의 밀착이 어려워 이러한 부분으로 모래등 충진재가 유실되는 현상이 발생하게 되며, 시공시에도 폐타이어의 연결의 어려움과 더블어 충진에 어려움이 있다.In addition, the close contact between the waste tire and the lower order layer layer is difficult to lose the filling material such as sand occurs in this portion, there is a difficulty in the connection of the waste tire and the double air filling during construction.

또한, 경제적인 측면에서도 차수막을 고정하는 앵커링 시설과 인공합성배수층, 모래 등 재료의 과도한 낭비요소와 더블어 과도하게 소요되는 재료 양 만큼 폐기물 매립용량이 감소되는 문제점이 있다.In addition, in terms of economics, there is a problem in that the amount of waste landfill is reduced by an excessive amount of waste material and an excessive amount of material such as an anchoring facility for fixing the membrane and artificial synthetic drainage layer and sand.

또한, 각종 용도로 사용되는 합성수지재의 사용은 증가되는 반면에 폐합성수지재를 재사용하는 방법은 상대적으로 빈약하여 폐합성수지재의 처리가 어려운 상황이다.In addition, while the use of synthetic resin materials used for various purposes is increased, the method of reusing waste synthetic resin materials is relatively poor, which makes it difficult to process the waste synthetic resin materials.

상기한 종래 문제점을 감안하여 안출한 본 고안의 목적은 폐기물매립장 경사면에 균일한 두께로 성형재를 용이하게 포설함과 불충분한 보호로 말미암은 차수막의 손상, 쓰레기층의 매립으로 인한 꿰뚫림 및 찢어짐방지, 차수막 상부에 모래층을 포설 할 경우 침식 등으로 부터 적정 단면을 유지하며, 차수막이 햇빛에 장기간 노출에 따른 자외선에 의한 열화 및 차수막과 하부 차수재료의 밀착되지 않음으로 인한 마찰력 부족과 높은 온도 열팽창에 의한 차수막의 손상방지, 폐기물 매립시 차수막 또는 기타재료의 과도한 고정시설(앵커링)을 배재하도록 하는 폐기물매립장의 경사면 보호층 성형재 및 그 설치방법에 의하여 달성된다.The object of the present invention devised in view of the above-mentioned conventional problems is to easily install a molding material with a uniform thickness on the slope of a waste landfill and to prevent damage and damage due to the insulator membrane caused by insufficient protection, and to prevent piercing and tearing due to the filling of the waste layer. In case of installing sand layer on the top of the liner, it maintains the proper cross section from erosion and so on. It is achieved by the inclined surface protection layer molding material of the landfill and the method of installing the same, which prevents the damage of the water curtain by the damage, the excessive anchoring of the film or other materials when landfill.

이러한 본 발명의 목적은 평면을 갖는 바닥판과 덮개판 사이에 공간을 형성하도록 소정간격 이격시키고, 바닥판과 덮개판 사이에는 이들의 간격을 조절하는 간격유지봉으로 이루어진 성형틀의 공간에 충진재를 충입시켜 이루어진 것을 특징으로 하는 폐기물매립장의 경사면 보호층 성형재에 의하여 달성된다.An object of the present invention is to fill a space in the mold of the molding frame consisting of a space between the bottom plate and the cover plate spaced apart to form a space, and the space between the bottom plate and the cover plate to adjust the spacing. It is achieved by the inclined surface protective layer molding material of the landfill.

또한, 평면을 갖는 바닥판과 덮개판 사이에 공간을 형성하도록 소정간격 이격시키고, 바닥판과 덮개판 사이에는 이들의 간격을 조절하는 간격유지봉으로 이루어진 성형재틀의 공간에 충진재를 충입시켜 이루어진 폐기물매립장의 경사면 보호층 성형재의 어느 한쪽판이 경사면에 밀착시킨 후 성형재를 적층시켜 시공하도록 하는 폐기물매립장의 경사면 보호층 성형재의 설치방법에 의하여 달성된다.In addition, the waste is made by filling the filling material into the space of the molding frame consisting of a space between the bottom plate and the cover plate a predetermined interval to form a space between the bottom plate and the cover plate to adjust the spacing between the bottom plate and the cover plate. It is achieved by a method of installing the inclined surface protection layer molding material of a waste landfill site in which one plate of the inclined surface protection layer molding material of a landfill is in close contact with the inclined surface and then laminated and constructed.

도 1은 종래 폐기물매립장에 경사면보호층 성형재가 설치된 상태를 보여주는 예시도.1 is an exemplary view showing a state in which a slope protection layer molding material is installed in a conventional landfill.

도 2는 본 발명의 기술이 적용되어 폐기물매립장에 경사면보호층 성형재가 설치된 상태를 보여주는 예시도.Figure 2 is an exemplary view showing a state in which the slope protection layer molding material is installed in the landfill by applying the technology of the present invention.

도 3a은 본 발명의 경사면보호층 성형재의 구조를 보여주는 사시도이며 도 3b는 도 3a의 측단면도이다.Figure 3a is a perspective view showing the structure of the inclined surface protection layer molding of the present invention, Figure 3b is a side cross-sectional view of Figure 3a.

도 4a는 성형틀의 다른 실시예를 보여주는 평면도이고, 도 4b는 성형재를 경사면에 시공시의 일예를 보여주는 사시도이다.Figure 4a is a plan view showing another embodiment of the molding die, Figure 4b is a perspective view showing an example of the molding material when the construction on the inclined surface.

※도면의 주요부분에 대한 부호의 설명※※ Explanation of symbols about main part of drawing ※

1 : 성형재 1a : 성형틀1: Molding material 1a: Mold

2 : 바닥판 3 : 덮개판2: bottom plate 3: cover plate

4 : 공간 5 : 간격유지봉4: space 5: spacing rod

6 : 충진재 7 : 배출공6: filling material 7: discharge hole

이하 본 발명의 바람직한 실시예를 첨부된 도면에 의거하여 상세히 설명하면 다음과 같다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

첨부도면 도 3a는 본 발명의 경사면 보호층 성형틀의 구조를 보여주는 사시도이며 도 3b는 성형틀에 충진재를 충입시킨 성형재의 구조를 보여주는 단면도로써본 발명의 폐기물매립장의 경사면 보호층 성형재(1)는 침출수 및 가스등을 배출할 수 있도록 배출공(7)이 구비되며 평면으로 형성된 바닥판(2)과 덮개판(3) 사이에 공간(4)을 형성하도록 소정간격 이격시키고, 바닥판(2)과 덮개판(3) 사이에는 간격유지봉(5)이 설치된 성형틀(1a)의 공간(4)에 충진재를 충입시킨 구조이다.Figure 3a is a perspective view showing the structure of the inclined surface protection layer molding frame of the present invention and Figure 3b is a cross-sectional view showing the structure of the molding material filled with a filling material in the molding frame inclined surface protection layer molding material (1) Is provided with a discharge hole (7) for discharging the leachate and gas, and spaced apart a predetermined interval to form a space (4) between the bottom plate 2 and the cover plate 3 formed in a flat, the bottom plate (2) And a filler are filled in the space 4 of the molding die 1a in which the gap retaining rod 5 is provided between the cover plate 3 and the cover plate 3.

상기 간격유지봉(5)은 바닥판(2)과 덮개판(3)이 유동되지 않도록 고정하도록 봉형, 각형 등의 형상으로 단일품의 간격유지봉을 다수로 설치할 수도 있지만 매립장의 경사각에 따라 바닥판(2)과 덮개판(3) 사이의 공간(4)을 조절할 수 있도록 안테나와 같은 구조이거나 스프링과 볼 및 고정홈에 의한 통상의 구조를 사용할 수도 있다.The gap retaining rod 5 may be provided with a plurality of gap retaining rods in the form of rods, squares, etc. to fix the bottom plate 2 and the cover plate 3 so as not to flow. It is also possible to use a structure such as an antenna or a conventional structure by a spring, a ball and a fixing groove so that the space 4 between the 2 and the cover plate 3 can be adjusted.

한편, 상기 공간(4)에 충진되는 충진재로는 모래, 자갈, 쇄석이 사용하며 첨부도면 도 4a에 도시된 바와 같이 성형재의 적층시 이의 결합이 용이하도록 요홈(8)과 요철부(9)를 적어도 하나 이상으로 각각 형성시킨 것을 사용할 수도 있으며 첨부도면 도 4b와 같이 성형틀(1a)을 적층/평면시공시 인접하는 성형틀(1a) 사이에 I빔형상의 연결재(10)를 삽입하여 적층/평면시공을 행할 수 있다.On the other hand, as the filler filled in the space 4 is used sand, gravel, crushed stone and as shown in Figure 4a attached to the groove 8 and the concave-convex portion 9 to facilitate the coupling of the molding material as shown in Figure 4a. Each formed of at least one or more may be used. As shown in FIG. 4B, when the molding die 1a is laminated / planared, the I beam-shaped connecting member 10 is inserted between the adjacent molding dies 1a. Planar construction can be performed.

도면상 미설명부호 S는 매립장의 경사면이다.In the drawings, reference numeral S denotes an inclined surface of a landfill.

상기와 같은 구조로 이루어진 경사면보호용 성형재(1)를 첨부도면 도 2에 도시된 바와 같이 소정의 경사각을 갖는 매립지의 경사면(S)에 합성수지 또는 폐합성수지재의 성형틀(1a)을 이루는 바닥판(2)과 덮개판(3) 중 어느 한쪽판을 경사면(S)에 밀착시키고 공간(4)에 충진재(6)를 충입시킨후 공간(4)에 충진재(6)가 충입되지 않이한 성형틀(1a)을 적층시킨 후 다시 공간(4)에 충진재(6)를 충입하는 방법을 여러번 반복하여 구유하는 소정의 높이가 되도록 한다.As shown in FIG. 2, the inclined surface protection molding member 1 having the above structure includes a bottom plate constituting a molding frame 1a of synthetic resin or waste synthetic resin material on the inclined surface S of a landfill having a predetermined inclination angle ( 2) and the cover plate (3) is in close contact with the inclined surface (S), the filling material 6 is filled in the space (4) and then the molding frame without filling the filler (6) in the space (4) After laminating (1a), the method of filling the filler 6 into the space 4 again is repeated several times so as to have a predetermined height.

한편, 첨부도면 도 3에 도시된 바와 같이 성형재(1)를 적층/평면시공시 사각형으로 되어 있는 성형틀(1a)의 유동을 방지함과 이의 설치가 용이하도록 바닥판(2)과 덮개판(3)에는 요홈(8)이 형성된 성형틀을 설치하고, 이에 인접하는 성형틀에는 요철부(9)가 형성된 것을 요홈(8)에 끼워 설치한다.Meanwhile, as shown in FIG. 3, the bottom plate 2 and the cover plate prevent the flow of the forming mold 1a, which is a quadrangle when the molding material 1 is laminated / planned, and is easy to install. (3) is provided with a molding frame in which the grooves 8 are formed, and the molding frame adjacent to this is fitted with the grooves 8 in which the uneven portions 9 are formed.

한편, 첨부도면 도 4b에 도시된 바와 같이 적층/평면시공시 연결되는 성형재(1)와 성형재(1) 사이에는 I빔형상을 갖는 연결재(10)를 삽입하여 적층시 및 평면으로 연결하여 시공할 때 하중에 따른 파손을 방지하면서 곡선을 갖는 경사면(S)에 설치시 인접하는 성형재(1)와 성형재(1) 사이에 설치되는 성형재(1)의 바닥판(2)과 덮개판(3)이 I빔형상을 갖는 연결재(10)의 내측으로 입설시키되 연결재(10)의 중앙판으로부터 연결재(10) 내에서 벗어나지 않는 한도 내에서 벌어지게 설치하여 곡선과 같은 곡선이 되도록하여 성형재를 설치하며 상기 배출공(7)으로는 침출수 및 가스가 배수된다.Meanwhile, as shown in FIG. 4B, a connecting member 10 having an I beam shape is inserted between the molding member 1 and the molding member 1 which are connected at the time of lamination / planar construction and connected in a lamination and planar manner. The bottom plate 2 and the cover of the molding member 1 installed between the adjacent molding member 1 and the molding member 1 when installed on the inclined surface S having a curve while preventing damage due to the load during construction The plate 3 is placed inside the connecting member 10 having an I beam shape, but is installed to be widened within the connecting member 10 so as not to deviate from the center plate of the connecting member 10 so as to be curved like a curve. Ash and leachate and gas are drained to the discharge hole (7).

이와 같은 구조로 이루어져 사용되는 본 발명의 폐기물매립장의 경사면 보호층 성형재 및 그 설치방법은 재활용 용도가 제한적이어서 처리가 어려운 폐비닐, 폐-PE, 폐-PET, 폐합성수지재 및 합성수지를 이용한 바닥판, 덮개판, I형상의 연결재, 간격유지봉으로 이루어진 성형재를 폐기물 매립지 경사면에 설치하여 자원의 재활용을 도모하고, 모래등의 충진재가 적정하게 소요 됨으로서 재료비의 감소와 더불어 모래등의 충진재가 적정하게 소요 됨으로서 재료비의 감소와 폐기물 매립량이 상대적으로 증가 되고 다양한 충진재료를 자유롭게 사용 할 수 있다.The sloped protective layer molding material and installation method of the waste landfill site of the present invention, which is composed of such a structure, has a limited use for recycling, and thus is difficult to process, such as waste vinyl, waste-PE, waste-PET, waste synthetic resin, and synthetic resin. Forming material consisting of plate, cover plate, I-shaped connecting material and gap retaining rod is installed on the slope of waste landfill to promote the recycling of resources, and appropriate filling material such as sand is required to reduce material cost and filling material such as sand. By appropriately reducing the material cost and increasing the amount of landfills, various filling materials can be freely used.

한편, 상부/하부가 구조체로 되어 있음으로 침식등에 문제가 없어 영구적으로 일정한 간격과 균질한 층을 이룰수 있고, 차수시설 상부의 보호층/배수층의 재질을 다양하게 성정할 수 있으며, 별도의 시설없이 다양하게 시설의 설치가 가능, 성형물간에 장애물이 없음으로 인해 침출수의 집수 유공관, 침출수 배수 무공관, 매립가스 배제 유공관등을 자유롭게 설치 할 수 있으므로 시설의 적용 및 유연성이 크다.On the other hand, since the upper and lower parts are structured, there is no problem of erosion, so that they can form a uniform interval and a homogeneous layer permanently. Various facilities can be installed. Since there are no obstacles between moldings, the leachate collection pipe, leachate drainage pipe, landfill gas exclusion pipe, etc. can be installed freely, so the application and flexibility of the facility is great.

또한 균질한 층을 확보 할 수 있음으로 인해 보호층의 기능 뿐만아니라, 침출수의 집수기능, 매립가스를 배제할 수 있는 가스배제층의 기능을 가짐, 차수막이 장기간 노출됨에 따른 자외선에 의한 차수막의 열화 방지한다.In addition, it is possible to secure a homogeneous layer, which not only functions as a protective layer, but also has a function of collecting leachate and a gas drainage layer that can exclude landfill gas. prevent.

상하부 구조체 및 충진재가 태양광선을 차단함으로서 태양열이 직접적으로 차수막에 전달되지 않게하고, 차수막과 하부재료의 밀착도를 높임으로서 마찰력을 증가시켜 열팽창에 따른 하부로의 늘어지는 현상을 방지한다.The upper and lower structures and the filler block solar light so that solar heat is not directly transmitted to the insulation film, and the adhesion between the insulation film and the underlying material is increased, thereby increasing the frictional force, thereby preventing the drooping to the bottom due to thermal expansion.

동절기에 점토차수층이 동결 융해작용으로 투수계수가 급격하게 증가하고, 차수층 자체가 박리되는 현상이 있는 바, 본 발명의 성형틀과 적절한 충진재를 선정하게 되면 동결현상을 최소화 할 수 있다.In winter, when the clay order layer is freeze-thawed, the coefficient of permeability increases sharply, and the order layer itself is peeled off. When the mold and the appropriate filler are selected, the freezing phenomenon can be minimized.

차수막위에 모래등의 보호층과 폐기물을 매립할 경우 경경사면의 과소한 마찰력으로 인해 과도한 차수막 고정시설이 필요하나, 본 시설은 폐기물과 차수시설을 완전히 격리시킴으로서 차수막 고정시설을 최소화 할 수 있다.In case of embedding the protective layer such as sand and the waste on the water curtain, excessive water curtain fixing facilities are needed due to the excessive frictional force on the slope, but this facility can minimize the water curtain fixing facilities by completely separating the waste and water facilities.

차수시설 상부에 두 개의 두꺼운 구조체와 구조체 사이에 모래등의 재료를 충진함으로서, 차수막을 설치 후 폐기물을 매립 할 때까지의 유지관리시 이물질 쥐 등에 의한 손상을 방지하고, 폐기물을 매립할때 많이 발생하는 중장비등에 의한 차수막의 손상을 방지 할 수 있음. 따라서 본 발명을 이용 할 경우 별도의 보호시설이 필요하지 않는 등의 효과가 있다.By filling material such as sand between the two thick structures and the structure at the upper part of the facility, it prevents damage caused by foreign substances and rats during the maintenance until the landfill is filled up, and occurs a lot when the waste is buried. It can prevent damage to the curtains caused by heavy equipment. Therefore, when using the present invention there is an effect such as not needing a separate protective facility.

Claims (6)

배출공을 형성한 바닥판과 덮개판 사이에 공간을 형성하도록 소정간격 이격시키고, 바닥판과 덮개판 사이에는 간격유지봉이 설치된 성형틀의 공간에 충진재를 충입시킬 수 있도록 한 것을 특징으로 하는 폐기물매립장의 경사면보호층 성형재.A waste landfill site characterized in that the space between the bottom plate and the cover plate to form a discharge hole to form a space, and filling the space between the bottom plate and the cover plate to fill the space of the molding frame in which the gap retaining rod is installed. Slope protection layer of molding material. 제 1 항에 있어서, 상기 바닥판과 덮개판이 간격유지봉에 의하여 간격이 조절되는 것을 포함하여 이루어진 것을 특징으로 하는 폐기물매립장의 경사면 보호층 성형재.According to claim 1, wherein the bottom plate and the cover plate inclined surface protective layer molding material, characterized in that the gap is controlled by the gap holding rod. 제 1 항에 있어서, 성형틀을 이루는 바닥판과 덮개판에 요홈을 형성하거나 요홈부를 형성하여 이루어진 것을 특징으로 하는 폐기물매립장의 경사면 보호층 성형재.The inclined surface protection layer molding material according to claim 1, wherein the bottom plate and the cover plate forming the mold are formed with grooves or grooves. 평면을 갖는 바닥판과 덮개판 사이에 공간을 형성하도록 소정간격 이격시키고, 바닥판과 덮개판 사이에는 이들의 간격을 조절하는 간격유지봉으로 이루어진 성형재틀의 공간에 충진재를 충입시킬 수 있도록 한 폐기물매립장의 경사면 보호층 성형재의 어느 한쪽판이 매립장의 경사면에 밀착시킨 후 성형재를 적층 또는 평면으로 연결시켜 시공하도록 하는 것을 특징으로 하는 폐기물매립장의 경사면 보호층 성형재의 설치방법.A waste spaced apart from each other to form a space between the bottom plate and the cover plate having a flat surface, and filling the space into the space of the molding frame consisting of a gap retaining rod that controls the gap between the bottom plate and the cover plate. A method of installing a slope protection layer molding material of a waste landfill site, wherein one plate of the inclined surface protection layer molding material of a landfill is closely adhered to the inclination surface of the landfill and the molding materials are laminated or connected in a plan. 제 4 항에 있어서, 상기 성형재를 적층/평면 연결시켜 시공한 후 매립하는 쓰레기를 일시에 매립할 수 있도록 한 것을 특징으로 하는 폐기물매립장의 경사면 보호층 성형재의 설치방법.5. The method for installing a sloped protective layer molded material according to claim 4, wherein the waste material to be landfilled after the construction by laminating / planarly connecting the molding materials can be buried at a time. 제 4 항에 있어서, 상기 성형재가 적층 또는 평면으로 시공시 서로 인접하는 성형틀과 성형틀 사이에 연결재를 설치하여 시공하는 것을 특징으로 하는 폐기물매립장의 경사면 보호층 성형재의 설치방법.The method according to claim 4, wherein the molding member is constructed by connecting a connecting member between the molding mold and the molding mold which are adjacent to each other when the molding member is laminated or planed.
KR1019990033709A 1999-08-16 1999-08-16 Device and method for constructing slant protection layer of landfill KR100328358B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1019990033709A KR100328358B1 (en) 1999-08-16 1999-08-16 Device and method for constructing slant protection layer of landfill
KR2019990016939U KR200168451Y1 (en) 1999-08-16 1999-08-17 Device for constructing slant protection layer of landfill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019990033709A KR100328358B1 (en) 1999-08-16 1999-08-16 Device and method for constructing slant protection layer of landfill

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2019990016939U Division KR200168451Y1 (en) 1999-08-16 1999-08-17 Device for constructing slant protection layer of landfill

Publications (2)

Publication Number Publication Date
KR20010017951A KR20010017951A (en) 2001-03-05
KR100328358B1 true KR100328358B1 (en) 2002-03-20

Family

ID=19607363

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019990033709A KR100328358B1 (en) 1999-08-16 1999-08-16 Device and method for constructing slant protection layer of landfill

Country Status (1)

Country Link
KR (1) KR100328358B1 (en)

Also Published As

Publication number Publication date
KR20010017951A (en) 2001-03-05

Similar Documents

Publication Publication Date Title
US4704048A (en) Subterranean drainage
US5803662A (en) Drainage channel and associated method
US5845456A (en) Basement waterproofing
KR100959407B1 (en) Concrete structure repair work method
CN101307622B (en) Water proof method for underground structure top board expansion joint also serving as urban roads base and the structure
US5447389A (en) Insulation system for soil
KR102299784B1 (en) Precast concrete panel having heating module and black ice preventive road packing method using this same
KR100939237B1 (en) Pavement material for road surface, and method for paving the road surface with use thereof
CN111254779B (en) Embedding method for improving cracking of pavement around luminous floor tiles
CN107747261A (en) A kind of new Soft Clay seasonal frozen soil region highway subgrade structure and construction method
CN201217851Y (en) Underground structure roof plate expansion joint water-proof structure used as urban highway base
KR100328358B1 (en) Device and method for constructing slant protection layer of landfill
KR200168451Y1 (en) Device for constructing slant protection layer of landfill
CN104763043A (en) HDPE linear finished product drainage ditch
CN205741809U (en) The permeable road structure of a kind of footpath and water-permeable brick
JP2012255250A (en) Rainwater disposal facility
CN207958902U (en) A kind of pitch pervious concrete pavement
US20070271860A1 (en) Waste tires foundation bags
CN210657926U (en) Composite grid anti-cracking belt suitable for treating early cracks of semi-rigid base layer
KR101560189B1 (en) Flexible jointing structure of concrete road installation using key shape and constructing method thereof
KR101395281B1 (en) Insulating drainage board
CA2153941C (en) Convection cooling of embankments
EP0980451A1 (en) Concrete surface
CN218373112U (en) Laying structure
CN219992918U (en) Annular gutter drainage structure of aerial football court

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20080228

Year of fee payment: 7

LAPS Lapse due to unpaid annual fee