KR100307288B1 - Apparatus for safe receipt of deck plate for bridge and method for the same - Google Patents

Apparatus for safe receipt of deck plate for bridge and method for the same Download PDF

Info

Publication number
KR100307288B1
KR100307288B1 KR1019970051228A KR19970051228A KR100307288B1 KR 100307288 B1 KR100307288 B1 KR 100307288B1 KR 1019970051228 A KR1019970051228 A KR 1019970051228A KR 19970051228 A KR19970051228 A KR 19970051228A KR 100307288 B1 KR100307288 B1 KR 100307288B1
Authority
KR
South Korea
Prior art keywords
frame
plate
support frame
support
bridge
Prior art date
Application number
KR1019970051228A
Other languages
Korean (ko)
Inventor
주일
Original Assignee
주일
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주일 filed Critical 주일
Priority to KR1019970051228A priority Critical patent/KR100307288B1/en
Application granted granted Critical
Publication of KR100307288B1 publication Critical patent/KR100307288B1/en

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE: An apparatus for safely receiving a deck plate of a bridge is provided to deliver, move and lift the deck plate and to easily joint several plates by only linking both ends thereof, to lead reduction of working term and workers, and to allow a safe working environment. CONSTITUTION: The apparatus comprises a plurality of base frames(11) on a barge ship(10); a first support frame(20) on the frames(11); a second support frame(30) corresponding to the first frame(20); a pivoting upper frame(40) on the first frame(20); an elevation device(50) on the upper frame(40) to get a deck plate(S) up/down; pivoting devices(60,70) to pivot the upper and the second frames(40,30) at a desired angle; a supporting device(80) to support the pivoting of the second frame(30); and a control part(90) to electrically connect with and to control the supporting device(80), the elevation device(50) and the pivoting devices(60,70).

Description

교량용 상판 안착장치 및 그 방법Bridge plate seating device and method

본 발명은 교량용 상판 안착장치 및 그 방법에 관한 것으로서, 좀더 상세하게는 교량(bridge)을 건설하는데 있어 조립식으로 설치되는 교량의 상판을 이송하고, 리프팅시켜 안착시킬 수 있는 장치를 적용하여 교각사이에 상판의 한 구간을 직접 안착시켜 공사기간을 단축시킬 수 있도록 한 교량용 상판 안착장치 및 그 방법에 관한 것이다.The present invention relates to a bridge top seating device and a method thereof, and more particularly, to a bridge between the bridges by applying a device that can transfer, lift and seat the top plate of a bridge that is prefabricated in construction. The present invention relates to a bridge top seating device and a method for shortening a construction period by directly seating a section of a roof top.

일반적으로 교량을 건설하는데 있어 교량의 상판공사가 이루어지기 전까지는 다리의 교각공사가 기초적으로 완공되어 있어야 하며, 이러한 교각공사는 지반에 대한 구축을 견고하게 하기 위해 정밀한 설계에 따라 장기간의 공사로 교각을 세울수 있다.In general, in the construction of bridges, the bridge piers must be completed until the bridge deck is completed. Such bridge piers are long-term bridges based on precise design to strengthen the construction of the ground. Can stand.

상기 교각의 상측에 설치되는 상판의 공사는 상판골조의 구조물(truss)이거나, 빔을 조합한 상판이 안착되며, 이러한 상판은 안착상태에 따라 일부 조합된 상판간의 연결과정이 작업이 이루어지며, 상판의 상면으로는 도로포장 및 케이블배선, 가로등, 핸드레일, 보도 등의 마무리 작업이 이루어진다.The construction of the top plate installed on the upper side of the pier is a structure of the top frame (truss), or the top plate is combined with the beam is seated, this top plate is a connection process between the combined top plate is made according to the seating state, the top plate The upper surface of the road is paved with roads, cable wiring, street lights, handrails and sidewalks.

통상적인 교량의 상판 공사는 지상에서 일정길이로 조합한 후 동력 준설선 또는 동력 바지선을 이용하여 교각의 공사지점까지 실어 운반하고, 별도의 대형 크레인이 설치된 바지선을 동원하여 상판의 일부분을 교각상에 위치시켜 준다.In general, the top plate construction of the bridge is assembled to a certain length from the ground, and then carried to the construction site of the pier by using a power dredger or a power barge, and a part of the top plate is placed on the pier using a barge provided with a large crane. Let it be.

바지선에 설치되는 크레인은 2개의 기둥을 가진 교형영상의 것으로 교상의 하역장치에 주로 이용되는 교형크레인(gantry crane)이 사용된다.The crane installed on the barge is a bridge image of two columns, and a gantry crane, which is mainly used for the pier unloading device, is used.

상기 상판을 교각의 상측으로 이동하는데 있어 상판의 조합구조물은 와이어 또는 체인으로 슬링(sling)하여 교각상으로 들어 올려지며, 일정위치에 이동된 상판을 고공에서 연계적으로 조립하기 위해서는 교각의 상측 소정위치에 상판을 일시적으로 지지하기 위한 구조물이 설치된다. 이때 다수의 작업인원은 각 지점에 배치되어져 상판이 양호한 위치에서 연결될 수 있도록 위치 및 상판을 들어 올리는 크레인의 위치상태를 보정하면서 연결작업을 진행한다.In moving the upper plate to the upper side of the pier, the combination structure of the upper plate is sled with a wire or a chain to be lifted into the pier, and in order to assemble the upper plate moved at a predetermined position in high altitude, the upper predetermined portion of the pier In place a structure is installed for temporarily supporting the top plate. At this time, a number of working people are disposed at each point to proceed with the connection work while correcting the position and position of the crane lifting the top plate so that the top plate can be connected in a good position.

상기와 같이 순차적으로 상판의 조합물을 이동시켜 조립작업하는데 있어, 다수의 중장비(크레인 및 상판의 지지구조물)가 필수적으로 따라야 하는 비경제적인 단점이 있다.In assembling work by moving the combination of the top plate sequentially as described above, there is an uneconomical disadvantage that a number of heavy equipment (crane and top support structure) must follow.

또한, 상판의 위치결정 및 연결작업에 있어서 다수의 인원이 고공에서 연결작업을 하여야 하는 난이한 작업과, 안전설계에 따라 작업되어야 하는 이유로 고공에서의 작업소요시간이 장시간이 소요되는 단점이 있었다.In addition, in the positioning and connection work of the top plate has a disadvantage that a large number of people need to work at high altitude, and the work required at high altitude takes a long time due to the safety design.

또한, 상기 상판공사가 이루어진 상태에서는 상판 구조물의 연결부위를 각각 재확인검사를 하여야 하는 검사기간이 길어져 더욱이 공사기간이 지연되는 문제점이 있었다.In addition, in the state in which the top plate construction is made, there is a problem in that the construction period is further delayed due to a long inspection period in which the connection parts of the top structure have to be re-checked.

본 발명은 상기와 같은 제반 문제점을 감안하여 안출한 것으로, 교량을 건설하는데 있어 조립식으로 설치되는 교량의 상판을 이송, 리프팅시켜 안착시킬 수 있는 안착장치를 적용하여 교각사이에 상판의 한 구간을 지상에서 조립하여 직접 안착시켜 공사기간을 단축시키고, 상판으로부터 고정작업하는 작업인원을 줄이며, 안전한 공사를 수행할 수 있도록 하는데 그 목적이 있다.The present invention has been made in view of the above-mentioned problems, in the construction of the bridge by applying a seating device that can be transported, lifted and seated the top plate of the prefabricated bridge to ground one section of the top plate between the piers Its purpose is to shorten the construction period by assembling and to directly seat and to reduce the number of workers fixed from the top plate and to perform safe construction.

상기 목적을 달성하기 위한 본 발명에 의하면, 바지선상에 복수로 설치된 소정의 넓이의 베이스프레임상에 소정의 높이를 갖고 수직으로 설치되는 제 1지지프레임; 제 1지지프레임에 소정간격으로 대응되면서 일측이 회동가능하게 수직으로 설치되는 제 2지지프레임과; 상기 제 1지지프레임의 상측에 일측이 회동가능하게 설치된 상부프레임과; 상부프레임에 설치되어 다리의 상판을 안착시켜 상승 또는 하강 시키기 위한 승강수단과; 상부프레임 및 제 2지지프레임을 소정각도로 회동시키기 위한 회동부재와; 상기 제 2지지프레임의 회동을 서서히 지지시키기 위한 지지수단으로 설치된 교량용 상판 안착장치가 제공된다.According to the present invention for achieving the above object, the first support frame is installed vertically with a predetermined height on the base frame of a predetermined width provided on a barge; A second support frame having one side rotatably vertically corresponding to the first support frame at predetermined intervals; An upper frame rotatably installed on one side of the first support frame; An elevating means installed on the upper frame to raise or lower the upper plate of the leg; A rotation member for rotating the upper frame and the second support frame at a predetermined angle; There is provided a bridge top seating device installed as a support means for gradually supporting the rotation of the second support frame.

또한, 본 발명은 바지선상에 다리의 상판을 승강수단의 받침판에 안착시킨 후 콘트롤부의 제어에 의해 상판을 승강시키는 단계와; 상승된 상판을 소정간격으로 설치되어 있는 교각의 상측에 안착되도록 승강수단의 받참판을 소정높이 상승 또는 하강시켜 상판을 교각에 안착시키는 단계와; 안착된 상판으로부터 승강수단의 받침판을 하강시키고, 받침판의 하강과 동시에 승강수단이 설치된 상부프레임을 상측으로 회동시키는 단계와; 상부프레임의 회동과 동시에 상부프레임을 받쳐 지지하는 지지프레임을 일측으로 회동시켜 교각에 안착된 상판으로부터 이탈시키는 단계로 이루어진 것을 특징으로 하는 교량용 상판의 안착방법이 제공된다.In addition, the present invention comprises the steps of elevating the top plate under the control of the control unit after seating the top plate of the leg on the barge on the support plate of the lifting means; Placing the upper plate on the pier by raising or lowering the receiving plate of the elevating means by a predetermined height so that the raised upper plate is seated on the upper side of the piers provided at predetermined intervals; Lowering the supporting plate of the elevating means from the seated upper plate and rotating the upper frame provided with the elevating means at the same time as the lowering of the supporting plate; At the same time as the rotation of the upper frame is provided with a method for seating the bridge top plate comprising a step of moving away from the top plate seated on the pier by rotating the support frame supporting the upper frame to one side.

도 1은 본 발명인 상판 안착장치의 전체적인 구성을 도시한 사시도,1 is a perspective view showing the overall configuration of the present inventors seating device,

도 2는 본 발명에 따른 상판 안착장치의 상부프레임 및 지지프레임의 회동되는 상태를 도시한 사시도,Figure 2 is a perspective view showing a rotating state of the upper frame and the support frame of the seat mounting apparatus according to the present invention,

도 3은 본 발명에 따른 상판을 교각에 안착된 상태를 도시한 정면도,Figure 3 is a front view showing a state seated on the piers top plate according to the invention,

도 4는 본 발명에 따른 안착장치가 교각에 안착된 상판으로부터 벗어나는 상태를 도시한 측면도.Figure 4 is a side view showing a state in which the seating device according to the present invention deviated from the top plate seated on the piers.

*도면의 주요부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

1: 교각 S: 상판1: pier S: tops

10: 바지선 11: 베이스프레임10: barge 11: baseframe

20: 제 1지지프레임 30: 제 2지지프레임20: first support frame 30: second support frame

40: 상부프레임 50: 승강수단40: upper frame 50: lifting means

60,70: 회동부재 80: 지지수단60, 70: rotating member 80: support means

90: 콘트롤부90: control unit

이하, 본 발명을 일 실시예로 도시한 첨부된 도 1 내지 도 4를 참조하여 더욱 상세히 설명하면 다음과 같다.Hereinafter, with reference to the accompanying Figures 1 to 4 showing an embodiment of the present invention in more detail as follows.

첨부된 도 1은 본 발명인 상판 안착장치의 전체적인 구성을 도시한 사시도이고, 도 2는 본 발명에 따른 상판 안착장치의 상부프레임 및 지지프레임의 회동되는 상태를 도시한 사시도이며, 도 3은 발명에 따른 상판을 교각에 안착된 상태를 도시한 정면도, 도 4는 발명에 따른 안착장치가 교각에 안착된 상판으로부터 벗어나는 상태를 도시한 측면도이다.1 is a perspective view showing the overall configuration of the upper seat mounting apparatus of the present invention, Figure 2 is a perspective view showing a rotating state of the upper frame and the support frame of the upper seat mounting apparatus according to the present invention, Figure 3 4 is a side view illustrating a state in which the seating apparatus according to the present invention is separated from the top plate seated on the piers.

바지선(10)상에 복수로 설치된 소정의 넓이의 베이스프레임(11)상에 소정의 높이를 갖고 수직으로 설치되는 제 1지지프레임(20)과; 제 1지지프레임(20)에 소정 간격으로 대응되면서 일측이 회동가능하게 수직으로 설치되는 제 2지지프레임(30)과; 상기 제 1지지프레임(20)의 상측에 일측이 회동가능하게 설치된 상부프레임(40)과; 상부프레임(40)에 설치되어 다리의 상판(S)을 안착시켜 상승 또는 하강 시키기 위한 승강수단(50)과; 상부프레임(40) 및 제 2지지프레임(30)을 소정각도로 회동시키기 위한 희동부재(60)(70)와; 상기 제 2지지프레임(30)의 회동을 서서히 지지시키기 위한 지지수단(80)과; 상기 지지수단(80), 승강수단(50) 및 회동부재(60)(70)에 전기적으로 연결되어 제어하기 위한 콘트롤부(90)으로 설치되어 구성된다.A first support frame 20 installed vertically with a predetermined height on the base frame 11 of a predetermined width provided on the barge 10; A second support frame 30 corresponding to the first support frame 20 at a predetermined interval and vertically installed at one side to be rotatable; An upper frame 40 rotatably installed on one side of the first support frame 20; An elevating means (50) installed on the upper frame (40) for mounting or lowering the upper plate (S) of the leg; A sliding member (60) (70) for rotating the upper frame (40) and the second support frame (30) at a predetermined angle; Support means (80) for gradually supporting the rotation of the second support frame (30); The support means 80, the elevating means 50 and the rotating member 60, 70 is electrically connected to the control unit 90 is configured to be installed.

그리고, 상기 제 2지지프레임(30)은 베이스프레임(11)에 대해 일단이 회동되도록 하측에 회동편(21)을 갖고, 이 회동편(21)은 베이스프레임(11)에 설치된 브라켓트(12)에 회동가능하게 연결되어 있다.In addition, the second support frame 30 has a pivoting piece 21 at a lower side thereof so that one end thereof is pivoted with respect to the base frame 11, and the pivoting piece 21 has a bracket 12 installed in the base frame 11. It is connected rotatably to.

상기 회동부재(60)는 일측이 회동가능한 브라켓트(61)에 연결 설치된 유압실린더이며, 이 브라켓트(61)은 제 1지지프레임(20)의 상측에 대향되게 설치되고, 유압실린더의 작동로드의 일단은 상기 상부프레임(40)의 소정 위치에 연결 설치되며, 상기와 같은 또 다른 회동부재(70)는 제 2지지프레임(30)의 하부 일측에 고정되고, 일단은 베이스프레임(11)상의 소정위치에 회동가능한 브라켓트(71)에 연결되어 설치된다.The rotating member 60 is a hydraulic cylinder connected to one side of the rotatable bracket 61, the bracket 61 is installed to face the upper side of the first support frame 20, one end of the operating rod of the hydraulic cylinder Is connected to a predetermined position of the upper frame 40, another pivot member 70 as described above is fixed to the lower side of the second support frame 30, one end of the predetermined position on the base frame 11 It is connected to the rotatable bracket 71 is installed.

상기 승강수단(50)은 상부프레임(40)의 상측 일면에 소정간격으로 권선기(51)가 설치되고, 권선기(51)에 설치된 와이어(52)의 일단에는 상판(S)의 양측부분을 받치기 위한 받침판(53)이 설치된다.The lifting means 50 is a winding machine 51 is installed at a predetermined interval on the upper surface of the upper frame 40, one end of the wire 52 installed on the winding machine 51 supports both sides of the upper plate (S) Support plate 53 is installed.

그리고, 상기 지지수단(80)은 회동되는 제 2지지프레임(30)의 일측에 고정 설치되는 와이어(81)와, 와이어(81)를 직각으로 안내하기 위해 제 1지지프레임(20)의 길이방향 상하측에 회전가능하게 설치되는 아이들풀리(82)와, 아이들풀리(82)로부터 안내되는 와이어를 풀고, 감는 권선풀리(83)와, 권선풀리(83)에 연결 설치되어 동력을 전달하기 위한 동력기(84)로 구성된다.In addition, the support means 80 is a wire 81 fixed to one side of the second support frame 30 to be rotated, the longitudinal direction of the first support frame 20 to guide the wire 81 at a right angle. An idle pulley 82 rotatably installed on the upper and lower sides, a wire pulley 83 which unwinds and winds the wire guided from the idle pulley 82, and a motor provided to be connected to the winding pulley 83 to transmit power. It consists of 84.

한편, 본 발명에 따른 상판(S)을 안착시키기 위한 방법으로는 바지선(10)상에 다리의 상판(S)을 승강수단(50)의 받침판(53)에 안착시킨 후 콘트롤부(90)의 제어에 의해 상판(S)을 승강시키는 단계와; 상승된 상판(S)을 소정간격으로 설치되어 있는 교각(1)의 상측에 안착되도록 승강수단(50)의 받침판(53)을 소정높이 상승 또는 하강시켜 상판(S)을 교각(1)에 안착시키는 단계와; 안착된 상판(S)으로부터 승간수단(50)의 받침판(53)을 하강시키고, 받침판(53)의 하강과 동시에 승강수단(50)이 설치된 상부프레임(40)을 상측으로 회동시키는 단계와; 상부프레임(40)의 회동과 동시에 상부프레임(40)을 받쳐 지지하는 지지프레임을 일측으로 회동시켜 교각(1)에 안착된 상판(S)으로부터 이탈시키는 단계로 이루어진 것이다.On the other hand, as a method for seating the top plate (S) according to the present invention by seating the top plate (S) of the leg on the support plate 53 of the elevating means 50 on the barge 10 of the control unit 90 Elevating the upper plate S by the control; The upper plate S is seated on the pier 1 by raising or lowering the support plate 53 of the elevating means 50 so that the raised upper plate S is seated on the upper side of the pier 1 provided at predetermined intervals. Making a step; Lowering the support plate 53 of the lifting means 50 from the seated upper plate S, and simultaneously rotating the upper frame 40 provided with the lifting means 50 at the same time as the lowering of the support plate 53; At the same time as the upper frame 40 is rotated, the support frame supporting the upper frame 40 is rotated to one side to be separated from the upper plate S seated on the pier (1).

상기와 같이 구성된 본 발명인 교량용 상판 안착장치 및 그 방법에 대한 작용효과를 설명하면 다음과 같다.Referring to the operation effect on the bridge seat mounting apparatus and method of the present invention configured as described above are as follows.

먼저, 교각(1)사이에 안착되는 한 구간의 상판(S)조립은 지상에서 이루어지며, 이때 상판(S)은 다수의 조합구조물로서 상호 연결 조립되어 트러스를 이룬다.First, assembling the upper plate (S) of one section to be seated between the pier (1) is made on the ground, wherein the upper plate (S) is assembled with a plurality of combination structures interconnected to form a truss.

이러한 상태에서 한 구조물을 이루는 상판(S)은 기중장치(또는 레일)에 의해 수중에 떠있는 바지선(10)으로 운반하되, 바지선(10)상에 복수로 설치된 베이스프레임(11)상의 제 1지지프레임(20) 및 제 2지지프레임(30)사이로 운반시켜 승강수단(50)의 받침판(53)에 상판(S)의 양측부분을 안착시켜 준다.In this state, the upper plate (S) constituting a structure is transported to the barge 10 floating in the water by the lifting device (or rail), the first support on the base frame 11 installed on the barge 10 a plurality It is transported between the frame 20 and the second support frame 30 to seat both sides of the upper plate (S) on the support plate 53 of the lifting means (50).

상기 승강수단(50)은 트러스를 이루는 상판(S)의 길이에 따른 중량을 100∼10,000톤(ton)까지 범주내에서 안착시킬 수 있다.The elevating means 50 may be seated in the range up to 100 to 10,000 tons (ton) the weight along the length of the top plate (S) forming a truss.

상기와 같은 상태에서 바지선(10)은 상판(S)이 위치되어야 할 교각(1)까지 상판(S)을 실어 운송하게 되는 데 일정위치상, 즉 받침판(53)에 안착된 상판(S)이 교각(1)사이에 정확히 안착되는 위치에 설 때 안착장치의 콘트롤부(90)의 제어에 의해 승강수단(50)의 권선기(51)는 와이어(52)를 들어 올려 받침판(53)을 상승시켜 준다.In the state as described above, the barge 10 is to be transported to the top plate (S) to the pier (1) where the top plate (S) should be located in a certain position, that is, the top plate (S) seated on the support plate 53 When it is positioned at the position correctly seated between the piers 1, the winding unit 51 of the lifting means 50 lifts the wire 52 and raises the support plate 53 by the control of the control unit 90 of the seating device. give.

여기서, 상판(S)의 높이는 교각(1)의 상면에 대해 소정높이 더 상승된 상태로 콘트롤부(90)의 제어에 의해 승강수단(50)의 권선기(51)의 작동을 정지시켜 준다. 이때 상측에 위치된 상판(S)은 바지선(10)의 이동으로 교각(1)사이까지 진입하며 상판(S)의 양단이 교각(1)과 교각(1)사이의 상측에 정확히 위치되는 상태에서 상기 권선기(51)를 작동시켜 상판(S)을 교각(1)의 상측에 안착시켜 준다.Here, the height of the upper plate (S) stops the operation of the winding machine 51 of the elevating means 50 by the control of the control unit 90 in a state in which the predetermined height is further raised with respect to the upper surface of the pier 1. At this time, the upper plate (S) located on the upper side enters between the piers (1) by the movement of the barge 10 and in the state where both ends of the upper plate (S) is exactly located on the upper side between the piers (1) and the piers (1) The winding machine 51 is operated to seat the upper plate S on the upper side of the piers 1.

상판(S)이 완전히 안착된 상태에서 상판(S)의 양측에서는 교각(1)의 상부에 소수의 작업인원이 배치되어 상판의 양단부를 고정시켜 준다.In the state where the top plate (S) is completely seated, on both sides of the top plate (S) a small number of workers are arranged on the top of the pier (1) to fix both ends of the top plate.

상기와 같이 상판(S)의 양단부측 고정작업이 완료된 상태에서는 안착장치의 제 1지지프레임(20) 및 제 2지지프레임(30) 사이와 상부프레임(40)의 저면측으로는 상판(S)이 갇혀진 상태가 되는데, 이때 콘트롤부(90)를 제어하여 상기 상부프레임(40)에 설치된 권선기(51)를 작동시켜 받침판(53)을 하강시키고, 상부프레임(40) 및 제 2지지프레임(30)을 회동시켜 준다.As described above, in the state in which the fixing operation of both ends of the upper plate S is completed, the upper plate S is disposed between the first support frame 20 and the second support frame 30 of the seating device and the bottom of the upper frame 40. In a trapped state, the control unit 90 is controlled to operate the winding machine 51 installed in the upper frame 40 to lower the support plate 53, and the upper frame 40 and the second support frame 30. Rotate).

상기와 같은 상태를 좀더 자세히 설명하면, 상부프레임(40)의 회동동작은 제 1지지프레임(20)의 상부 일측에 대향설치된 회동부재(60)인 유압실린더의 작동에 따라 상부프레임(40)을 상측으로 회동시켜 상측을 개방시켜 준다.Referring to the above state in more detail, the rotation of the upper frame 40 is the upper frame 40 in accordance with the operation of the hydraulic cylinder of the rotating member 60 is installed on the upper one side of the first support frame 20, the upper side Rotate to open the upper side.

한편, 상기와 같은 상부프레임(40)이 회동되는 동작에 따라 제 2지지프레임(30)의 하측에 설치된 회동부재(70)인 유압실린더의 작동에 따라 제 2지지프레임(30)을 외측으로 회동시켜 일측을 개방시켜 준다.On the other hand, according to the operation of the upper frame 40 as described above to rotate the second support frame 30 to the outside in accordance with the operation of the hydraulic cylinder which is the rotating member 70 installed on the lower side of the second support frame 30. To open one side.

상기 각 회동부재(60)(70)의 유압실린더는 일측이 회동가능한 브라켓트(61)(71)에 힌지결합되어 있어, 유압실린더가 소정각도로 기울어 지면서 제 2지지프레임(30) 및 상부프레임(40)을 밀어내면서 회동된다.The hydraulic cylinders of the pivot members 60 and 70 are hinged to the brackets 61 and 71 which are rotatable on one side thereof, so that the hydraulic cylinder is inclined at a predetermined angle so that the second support frame 30 and the upper frame ( It is rotated by pushing out 40).

여기서, 제 2지지프레임(30)의 하측에 설치된 회동편(21)은 베이스프레임(11)상에 설치된 브라켓트(12)의 회동점을 중심으로 회동되는데 과중량체인 제 2지지프레임(30)의 회동을 지지수단(80)이 회동되는 속도를 느리게 하여 제 2지지프레임(30)의 갑작스런 회동에 따른 파손됨을 방지할 수 있게 된다.Here, the rotating piece 21 provided on the lower side of the second support frame 30 is rotated around the pivot point of the bracket 12 installed on the base frame 11 of the second support frame 30 which is an overweight body. The rotation of the support means 80 may be slowed down to prevent damage caused by sudden rotation of the second support frame 30.

상기 지지수단980)의 작동상태는 지지수단(80)의 동력원을 이루는 동력기(84)의 구동으로 권선풀리(83)를 구동시켜 권선풀리(83)에 감긴 와이어(81)를 풀어주고, 이와 연계동작으로 와이어(81)는 상기 제 1지지프레임(20)의 상하측변에 설치된 아이들풀리(82)에 안내됨과 동시에 와이어(81)의 일단이 고정된 상기 제 2지지프레임(30)의 상부를 지지하면서 서서히 회동시켜 준다.The operating state of the support means 980 drives the winding pulley 83 by the driving of the power generator 84 constituting the power source of the support means 80 to release the wire 81 wound on the winding pulley 83, and linked thereto In operation, the wire 81 is guided to the idle pulley 82 provided on the upper and lower sides of the first support frame 20 and at the same time supports an upper portion of the second support frame 30 to which one end of the wire 81 is fixed. Rotate slowly.

상기와 같이 제 2지지프레임(30) 및 상부프레임(40)이 회동될 수 있는 범위까지 상측 및 일측이 개방된 상태에서 바지선(10)의 동력으로 교각(1)에 안착된 상판(S)으로부터 안착장치를 이격시킬 수 있게 된다.From the upper plate (S) seated on the pier (1) by the power of the barge 10 in the state that the upper and one side is open to the extent that the second support frame 30 and the upper frame 40 can be rotated as described above The seating device can be spaced apart.

한편, 상판(S)으로 부터 이격된 상태에서는 역순으로 제 2지지프레임(30)에 연결된 와이어(81)를 권선풀리(83)에 역으로 권선시킴과 동시에 회동부재(70)를 역으로 동작시켜 제 2지지프레임(30) 및 상부프레임(40)을 초기상태로 복귀시켜 준다.Meanwhile, in a state spaced apart from the upper plate S, the wire 81 connected to the second support frame 30 is reversely wound to the winding pulley 83 in the reverse order, and the rotating member 70 is operated in reverse. The second support frame 30 and the upper frame 40 are returned to the initial state.

이와같은 상태로 바지선(10)은 공사지점인 교각(1)으로부터 이동하여 육지에 대기상태중인 상판(S)을 안착시켜 상술한 바와 같이 다음 상판(S)을 연속적으로 운송하여 교각(1)에 설치하는 과정으로 진행된다.In such a state, the barge 10 moves from the pier 1, which is the construction site, and seats the top plate S on the land, and continuously transports the next top plate S to the pier 1 as described above. The installation process proceeds.

따라서, 기존의 상판(S)을 낱개로 고공에서 조합하는 작업성에 비해 상판(S)의 양단을 고정하는 작업만으로서 공사기간을 현저히 단축시킬 수 있고, 지상에서 한 구조물을 갖는 상판(S)으로 안착, 조립시켜 각 연결부위의 검사시간을 절감할 수 있게 된다.Therefore, the construction period can be significantly shortened by only fixing the both ends of the upper plate S compared to the workability of combining the existing upper plate S individually at high altitude, and having the structure on the ground as the upper plate S. By mounting and assembling, it is possible to reduce the inspection time of each connection part.

이상에서와 같이 본 발명은 교량을 건설하는데 있어 조립식으로 설치되는 교량의 상판을 한구조물로 조립한 상태에서 이송, 리프팅시켜 안착시킬 수 있는 안착장치를 사용하므로써, 상판의 양단부만의 연결로서 연결작업이 수월하여 공사기간을 줄일 수 있고, 상판의 연결부분으로부터 고정작업하는 작업인원을 줄일 수 있으며, 안전한 공사를 수행할 수 있는 효과가 있다.As described above, the present invention uses a seating device that can be transported, lifted and seated in a state in which the upper plate of the bridge that is prefabricated as a structure is assembled in the construction of the bridge, thereby connecting the connection work by connecting only both ends of the upper plate. This can reduce the construction period, reduce the number of workers fixed from the connecting portion of the top plate, there is an effect that can perform a safe construction.

Claims (6)

바지선(10)상에 복수로 설치된 소정의 넓이의 베이스프레임(11)상에 소정의 높이를 갖고 수직으로 설치되는 제 1지지프레임(20)과; 제 1지지프레임(20)에 소정간격으로 대응하면서 일측이 회동가능하게 수직으로 설치되는 제 2지지프레임(30)과; 상기 제 1지지프레임(20)의 상측에 일측이 회동가능하게 설치된 상부프레임(40)과; 상부프레임(40)에 설치되어 다리의 상판(S)을 안착시켜 상승 또는 하강 시키기 위한 승강수단(50)과; 상부프레임(40) 및 제 2지지프레임(30)을 소정각도로 회동시키기 위한 회동부재(60)(70)와; 상기 제 2지지프레임(30)의 회동을 서서히 지지시키기 위한 지지수단(80)과; 상기 지지수단(80), 승강수단(50) 및 회동부재(60)(70)에 전기적으로 연결되어 제어하기 위한 콘트롤부(90)으로 설치되어 구성된 것을 특징으로 하는 교량용 상판 안착장치.A first support frame 20 installed vertically with a predetermined height on the base frame 11 of a predetermined width provided on the barge 10; A second support frame 30 vertically installed to be rotatable vertically while corresponding to the first support frame 20 at a predetermined interval; An upper frame 40 rotatably installed on one side of the first support frame 20; An elevating means (50) installed on the upper frame (40) for mounting or lowering the upper plate (S) of the leg; Rotating members 60 and 70 for rotating the upper frame 40 and the second support frame 30 at a predetermined angle; Support means (80) for gradually supporting the rotation of the second support frame (30); The upper plate seating device for a bridge, characterized in that configured as a control unit 90 for being electrically connected to the support means (80), elevating means (50) and the rotating member (60) (70). 제 1항에 있어서, 상기 제 2지지프레임(30)은 베이스프레임(11)에 대해 일단이 회동되도록 하측에 회동편(21)을 갖고, 이 회동편(21)은 베이스프레임(11)에 설치된 브라켓트에 회동가능하게 연결된 것을 특징으로 하는 교량용 상판 안착장치.According to claim 1, wherein the second support frame 30 has a rotating piece 21 on the lower side so that one end is rotated with respect to the base frame 11, this rotating piece 21 is installed in the base frame 11 A top plate seating device for a bridge, characterized in that connected to the bracket rotatably. 제 1항에 있어서, 상기 회동부재(60)(70)는 일측이 회동가능한 브라켓트(61)(71)에 연결 설치된 유압실린더인 것을 특징으로 하는 교량용 상판 안착장치.The seat mounting apparatus for a bridge according to claim 1, wherein the pivot member (60) (70) is a hydraulic cylinder installed at one side of the pivotable bracket (61) (71). 제 1항에 있어서, 상기 승강수단(50)은 상부프레임(40)의 상측에 소정간격을 갖고 설치되는 권선기(51)와, 권선기(51)에 설치된 와이어(52)의 일단에 연결 설치된어 상판(S)의 양단부를 받치기 위한 받침판(53)으로 설치되어 구성된 것을 특징으로 하는 교량용 상판 안착장치.The upper plate of claim 1, wherein the elevating means (50) is connected to one end of a winding machine (51) installed at a predetermined interval on an upper side of the upper frame (40) and a wire (52) provided on the winding machine (51). The upper plate seating device for a bridge, characterized in that configured to be installed as a support plate (53) for supporting both ends of (S). 제 1항에 있어서, 지지수단(80)은 회동되는 제 2지지프레임(30)의 일측에 고정 설치되는 와이어(81)와, 와이어(81)를 직각으로 안내하기 위해 제 1지지프레임(20)의 길이방향 상하측에 회전가능하게 설치되는 아이들풀리(82)와, 아이들풀리(82)로부터 안내되는 와이어를 풀고, 감기 위한 권선풀리(83)와, 권선풀리(83)에 연결 설치되어 동력을 전달하기 위한 동력기(84)로 구성된 것을 특징으로 하는 교량용 상판 안착장치.According to claim 1, The support means 80 is a wire 81 fixed to one side of the second support frame 30 is rotated, the first support frame 20 to guide the wire 81 at a right angle The idle pulley 82 rotatably installed on the upper and lower sides in the longitudinal direction, and the wire pulled from the idle pulley 82, the winding pulley 83 for winding, and the winding pulley 83 is installed to connect the power Top plate seating device for a bridge, characterized in that consisting of a motor (84) for transmitting. 바지선(10)상에 다리의 상판(S)을 승강수단(50)의 받침판(53)에 안착시킨 후 콘트롤부(90)의 제어에 의해 상판(S)을 승강시키는 단계와; 상승된 상판(S)을 소정 간격으로 설치되어 있는 교각(1)의 상측에 안착되도록 승강수단(50)의 받침판(53)을 소정높이 상승 또는 하강시켜 상판(S)을 교각(1)에 안착시키는 단계와; 안착된 상판(S)으로부터 승강수단(50)의 받침판(53)을 하강시키고, 받침판(53)의 하강과 동시에 승강수단(50)이 설치된 상부프레임(40)을 상측으로 회동시키는 단계와; 상부프레임(40)의 회동과 동시에 상부프레임(40)을 받쳐 지지하는 지지프레임을 일측으로 회동시켜 교각(1)에 안착된 상판(S)으로부터 이탈시키는 단계로 이루어진 것을 특징으로 하는 교량용 상판의 안착방법.Placing the upper plate S of the leg on the barge 10 on the support plate 53 of the elevating means 50, and then elevating the upper plate S under the control of the control unit 90; The upper plate S is seated on the pier 1 by raising or lowering the support plate 53 of the elevating means 50 so as to be seated on the upper side of the pier 1 provided at the predetermined intervals. Making a step; Lowering the supporting plate 53 of the elevating means 50 from the seated upper plate S, and simultaneously rotating the upper frame 40 provided with the elevating means 50 at the same time as the lowering of the supporting plate 53; At the same time as the rotation of the upper frame 40, the support frame for supporting the upper frame 40 is rotated to one side to the step of separating from the upper plate (S) seated on the bridge (1) How to settle.
KR1019970051228A 1997-10-06 1997-10-06 Apparatus for safe receipt of deck plate for bridge and method for the same KR100307288B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019970051228A KR100307288B1 (en) 1997-10-06 1997-10-06 Apparatus for safe receipt of deck plate for bridge and method for the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019970051228A KR100307288B1 (en) 1997-10-06 1997-10-06 Apparatus for safe receipt of deck plate for bridge and method for the same

Publications (1)

Publication Number Publication Date
KR100307288B1 true KR100307288B1 (en) 2001-11-30

Family

ID=37530411

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019970051228A KR100307288B1 (en) 1997-10-06 1997-10-06 Apparatus for safe receipt of deck plate for bridge and method for the same

Country Status (1)

Country Link
KR (1) KR100307288B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040040695A (en) * 2002-11-07 2004-05-13 주식회사 하이테크한상 Temporary apparatus for dismantalement of slab
KR101147620B1 (en) 2009-12-30 2012-05-23 세방 주식회사 Installing method for upper plate of bridge using climbing jack system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040040695A (en) * 2002-11-07 2004-05-13 주식회사 하이테크한상 Temporary apparatus for dismantalement of slab
KR101147620B1 (en) 2009-12-30 2012-05-23 세방 주식회사 Installing method for upper plate of bridge using climbing jack system

Similar Documents

Publication Publication Date Title
CN110952550B (en) Suspended self-supporting pile driving method and pile driver
GB2250731A (en) Apparatus and method of constructing a building
CN113846563B (en) Construction method for side span and auxiliary span steel truss girder erection of large-span cable-stayed bridge
WO1996007795A1 (en) Bridge construction machinery and method for constructing bridges
KR102013575B1 (en) Hydraulic Gantry Crane
CN113026563B (en) Suspension bridge high-low displacement girder trestle girder hoisting facility and construction method thereof
EP0392310B1 (en) A machine for pile-driving, a method for transport and erection of a machine for piledriving, and a method for establishement of foundations beside rails
KR100307288B1 (en) Apparatus for safe receipt of deck plate for bridge and method for the same
JPH03110208A (en) Mobile scaffold device for bridge and assembling method for same
KR100627102B1 (en) Upper bridge structure construcion method with precast segment deck or box using a lifting traveller
CN215925692U (en) Overlength multispan assembly type integrated multifunctional bridge girder erection machine
CN113235460B (en) Prefabricated segment swinging method for bridge cantilever assembly
KR200363059Y1 (en) Upper bridge structure construcion system with precast segment deck or box using a lifting traveller
US6598549B1 (en) Boat lift
CN109537433B (en) All-directional automatic pushing platform for pontoon bridge
CN113135508A (en) Single-side light hoisting equipment suitable for rear cantilever arm of composite-section beam bridge and construction method
EP0164936A2 (en) Bridge construction
JPH092780A (en) Jib-type traveling crane provided with jack up device
JP4310583B2 (en) Steel tower lifting device
KR100530351B1 (en) Telescopical Trolley Car for Inspection
CN215558550U (en) Single-side light hoisting equipment suitable for rear cantilever arm of composite-section segmental beam bridge
CN114016422B (en) Steel girder erection method
CN116119540B (en) Water hoisting machine system and transfer method thereof
EP0053861B1 (en) Artificial island
JPS5847803A (en) Bridge crane

Legal Events

Date Code Title Description
A201 Request for examination
G15R Request for early opening
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E601 Decision to refuse application
J201 Request for trial against refusal decision
J301 Trial decision

Free format text: TRIAL DECISION FOR APPEAL AGAINST DECISION TO DECLINE REFUSAL REQUESTED 20000626

Effective date: 20011126

S901 Examination by remand of revocation
GRNO Decision to grant (after opposition)
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee