A method for preventing water infiltration into structure Download PDF

Info

Publication number
KR100245328B1
KR100245328B1 KR1019970032803A KR19970032803A KR100245328B1 KR 100245328 B1 KR100245328 B1 KR 100245328B1 KR 1019970032803 A KR1019970032803 A KR 1019970032803A KR 19970032803 A KR19970032803 A KR 19970032803A KR 100245328 B1 KR100245328 B1 KR 100245328B1
Authority
KR
South Korea
Prior art keywords
waterproof sheet
waterproof
waterproofing
primer
sheet
Prior art date
Application number
KR1019970032803A
Other languages
Korean (ko)
Other versions
KR19990010144A (en
Inventor
김윤철
Original Assignee
김윤철
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김윤철 filed Critical 김윤철
Priority to KR1019970032803A priority Critical patent/KR100245328B1/en
Publication of KR19990010144A publication Critical patent/KR19990010144A/en
Application granted granted Critical
Publication of KR100245328B1 publication Critical patent/KR100245328B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0006Plastics
    • E02D2300/0014PU

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Architecture (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

본 발명은 지하철의 터널과 같은 지하구조물 및 건축물 등의 방수처리공사에 적합하도록 한 것으로 방수처리면을 깨끗하게 청소하는 단계와 상기 방수 처리면에 방수시트(1)를 일정간격이 유지되게 접착하는 단계와 상기 방수시트사이 및 방수시트의 양단이 중첩되게 프라이머(7)를 도포하여 건조하는 단계와 상기 프라이머가 코팅된 상면에 중첩되게 고분자물질(6)을 도포하여 방수막을 형성하는 단계로 이루어진다.The present invention is to be suitable for waterproofing construction of underground structures and buildings, such as tunnels of the subway to clean the waterproofing surface and the step of adhering the waterproof sheet 1 to the waterproofing surface to maintain a constant interval. And drying the primer 7 by applying the primer 7 so that both ends of the waterproof sheet and the waterproof sheet overlap each other, and forming a waterproof membrane by applying the polymer material 6 so as to overlap the primer coated top surface.

따라서 방수시트(1)에 의해 형성되는 방수막이 상호 격리되므로 누수에 따른 하자 보수작업이 편리해짐과 동시에 방수시공작업에 따른 공사기간이 단축된다.Therefore, since the waterproof membrane formed by the waterproof sheet 1 is mutually isolated, defect repair work is facilitated due to leakage and the construction period due to waterproof construction is shortened.

Description

구조물의 방수방법(Waterproofing for structure)Waterproofing for structure

본 발명은 구조물의 방수방법에 관한 것으로써, 더욱 구체적으로는 지하철의 터널과 같은 지하구조물 및 건축물 등의 방수처리공사에 적합한 방수공법에 관한 것이다.The present invention relates to a waterproofing method of a structure, and more particularly to a waterproofing method suitable for waterproofing construction of underground structures such as tunnels of subways and buildings.

일반적으로 지하구조물의 콘크리트는 유기물, 산, 알칼리, 무기염류 등의 불순물이 포함된 누수(漏水)에 의해 강도가 저하되고, 이들 불순물에 장기간 접촉할 경우에는 강도보강을 위해 매설된 철근까지도 부식되므로 구조물의 내구성이 더욱 저하된다.In general, concrete of underground structures is degraded by water leakage containing impurities such as organic matter, acid, alkali, and inorganic salts. The durability of the structure is further reduced.

특히, 철도 및 지하철의 터널인 경우에는 터널의 내부로 누수가 발생되면 레일이 부식되거나, 누수에 포함된 산성수로 인해 콘크리트의 열화가 촉진되어 전반적으로 사용성 저하를 초래하게 되므로 반드시 방수시공을 하여야 된다.In particular, in the case of tunnels of railways and subways, when the leakage occurs inside the tunnel, the rails are corroded, or the acidic water contained in the leakage promotes the deterioration of the concrete, which leads to deterioration of overall usability. do.

콘크리트 구조물은 고강도의 재료로서 기본적으로 어느 정도의 수밀성을 갖으나, 양생할 때 불규칙하게 미세 발생되는 균열 및 이음부분의 작업불량 등으로 터널내부로의 누수를 완전히 방지하기가 어려우므로 방수공법을 선정할 때 종합적인 사전 검토가 요구된다.The concrete structure is a high-strength material and basically has a certain degree of watertightness, but it is difficult to completely prevent leakage into the tunnel due to irregular micro cracks and poor work of the joints. Comprehensive prior review is required when doing so.

이에 따라 양호한 방수공법의 개발에 많은 인력 및 연구비를 투자하고 있는 실정이다.Accordingly, a lot of manpower and research expenses are invested in the development of a good waterproofing method.

제1도는 지하터널의 구조물을 나타낸 종단면도이고, 제2도는 종래에 방수시트를 이용하여 구조물의 방수작업을 실시한 상태도로써 터널의 방수시공방법을 일 예로 설명하면 다음과 같다.1 is a longitudinal sectional view showing a structure of an underground tunnel, and FIG. 2 is a state diagram in which a structure of waterproofing is performed using a waterproof sheet in the prior art.

먼저, 방수시트(1)를 접착 고정할 콘크리트면(2)을 깨끗하게 청소함과 동시에 물기를 제거한 다음 접착면에 접착제 역할을 하는 아스팔트 또는 프라이머(3)를 바른다.First, while cleaning the concrete surface (2) to be adhesively fixed to the waterproof sheet (1) and at the same time remove the water and then apply the asphalt or primer (3) to act as an adhesive on the adhesive surface.

그 후, 일정한 폭을 가진 방수시트(1)를 약 10mm 정도 상호 중첩되도록 연속적으로 접착한 다음 작업자가 방수시트(1)의 중첩면(1a)을 인두 또는 토치 등으로 기밀이 유지되도록 녹여 붙여 이들 사이의 틈새를 통해 누수가 발생되지 않도록 하였다.Thereafter, the waterproof sheet 1 having a constant width is continuously bonded to overlap each other by about 10 mm, and then the worker melts the overlapping surface 1a of the waterproof sheet 1 by a soldering iron or a torch to keep it airtight. The gap between them prevents leakage.

상기한 공법에 적용되는 방수시트(1)로는 유제 아스팔트 시트나, 고무화 아스팔트 시트가 널리 사용되고 있으며, 그밖에 벤토나이트 시트 등이 사용되고 있다.As the waterproof sheet 1 applied to the above-described method, an emulsion asphalt sheet and a rubberized asphalt sheet are widely used, and bentonite sheets and the like are also used.

그러나 이러한 시공방법은 다음과 같은 여러 가지 문제점이 발생되었다.However, this construction method has caused a number of problems.

첫째, 중첩되게 시공되는 방수시트(1)의 중첩면(1a)의 실링(sealing) 작업이 번거롭고, 완전히 접합시키기 어려워 중첩면 사이를 통해 누수가 발생되었다.First, sealing work of the overlapping surface 1a of the waterproof sheet 1 to be overlapped is cumbersome, and it is difficult to completely join, causing water leakage between the overlapping surfaces.

즉, 터널의 콘크리트면(2)과 굴착면(4) 사이의 공간이 시방서 상에는 80cm를 유지하도록 되어있으나, 굴착 작업할 때 암반이 출현하고 굴착작업의 편리성 등을 이유로 80cm 이하가 되게 시공하므로 방수시트(1)의 접착 작업을 할 때 충분한 작업공간을 확보할 수 없게 되고, 이에 따라 작업자가 이동하는데 장애를 받게 되므로 중첩면(1a)의 기밀유지가 곤란하게 된다.In other words, the space between the concrete surface 2 and the excavation surface 4 of the tunnel is to maintain 80cm on the specification, but when the excavation work, the rock appears and it is constructed to be 80cm or less for the convenience of excavation work. When the waterproofing sheet 1 is glued, it is difficult to secure a sufficient working space, and thus, the operator is obstructed to move, thereby making it difficult to maintain the airtightness of the overlapping surface 1a.

둘째, 방수시공이 완료된 상태에서 방수시트(1)가 접착된 방수처리면이 상호 내통하고 있으므로 중첩면에서 기밀이 유지되지 못하거나, 제2도에 나타낸 바와 같이 특정부위(제2도의 "G"부분)의 방수시트(1)가 찢어져 누수가 발생될 경우 누수된 물이 상호 내통하고 있는 방수처리면을 따라 이동하다가 균열이 발생된 지점 또는 이음부분의 틈새를 통해 누수가 발생되지만, 방수시트(1)를 통해 콘크리트 측으로 물이 유입된 부위와 누수가 발생되는 부위가 다르므로 하자보수를 하는데 정확한 작업지점을 찹을 수 없어 애로사항이 많다. 즉, 방수시트(1)의 1군데를 통해 콘크리트 쪽으로 물이 유입되더라도 유입된 물이 상호 내통하고 있는 방수처리면을 따라 이동하다가 여러 군데의 균열 부위 및 이음부분을 통해 누수되므로 하자 보수지점을 정확히 찾을 수 없게 되고, 이에 따라 많은 구간의 하자 보수작업을 실시할 수밖에 없다.Secondly, since the waterproofing surfaces to which the waterproof sheet 1 is bonded in the state where the waterproofing construction is completed, airtightness cannot be maintained at the overlapping surface, or as shown in FIG. 2, specific parts (" G " When the watertight sheet (1) of the part is torn and leaks, the water leaks through the cracks of the point or the joint where the leaked water moves along the watertight surface through which the leaked water flows. (1) There is a lot of trouble because the site where water is introduced into the concrete side and the site where the water leak occurs are different, so it is impossible to chop the correct working point for repairing the defect. That is, even if water flows into the concrete through one place of the waterproof sheet 1, the water flows along the waterproofing surface in which the water flows in and leaks through several cracks and joints. As a result, it is impossible to find a defect, and thus, repair work for many sections is forced.

셋째, 방수시트(1)의 꺾임 정도가 불량하여 구조물의 모서리부분 방수시공이 어려웠음은 물론 방수처리면에 제4도와 같은 돌출구조물(5)이 있을 경우에는 방수시트(1)를 절단한 다음 시공을 한 후 절단부를 실링해야 하므로 공사기간이 많이 소요되었다.Third, when the waterproof sheet 1 is poor in bending, it is difficult to waterproof the corners of the structure, and when the projecting structure 5 as shown in FIG. 4 is present on the waterproofing surface, the waterproof sheet 1 is cut. After the construction, the cutting part had to be sealed, which required a lot of construction time.

본 발명은 종래의 이와 같은 문제점을 해결하기 위해 개발한 것으로써, 방수처리면이 일정구간씩 각각 격리되도록 방수처리하여 하자가 발생할 때 신속한 하자 보수 작업이 이루어질 수 있도록 하는데 그 목적이 있다.The present invention has been developed in order to solve such a problem in the prior art, and the waterproofing surface is waterproof so that each is separated by a predetermined period, the purpose is to enable a quick repair work when a fault occurs.

상기 목적을 달성하기 위한 본 발명의 형태에 따르면, 방수처리면을 깨끗하게 청소하는 단계와, 상기 방수처리면에 방수시트를 일정간격을 띠고 접착하는 단계와, 상기 방수시트사이 및 방수시트의 양단이 중첩되게 프라이머를 도포하여 건조하는 단계와, 상기 프라이머가 코팅된 상면에 중첩되게 고분자물질을 도포하여 방수막을 형성하는 단계로 이루어진 구조물의 방수방법이 제공된다.According to an aspect of the present invention for achieving the above object, the step of cleaning the waterproofing surface clean, the step of adhering the waterproof sheet to the waterproofing surface at a predetermined interval, between the waterproof sheet and both ends of the waterproof sheet There is provided a method of waterproofing a structure consisting of applying a primer to overlap and drying, and forming a waterproof film by applying a polymer material overlapping the primer coated top surface.

제1도는 지하터널의 구조물을 나타낸 종단면도이다.1 is a longitudinal sectional view showing the structure of the underground tunnel.

제2도는 종래에 방수시트를 이용하여 구조물의 방수작업을 실시한 상태도.2 is a state in which the waterproofing operation of the structure using a waterproof sheet in the prior art.

제3도는 제2도의 A-A선 단면도이다.3 is a cross-sectional view taken along the line A-A of FIG.

제4도는 바닥면에 구조물이 있을 경우 방수처리과정을 나타낸 사시도이다.4 is a perspective view showing a waterproofing process when there is a structure on the bottom surface.

제5a도~제5c도는 본 발명의 방법을 설명하기 위한 공정도로써, 제5a도는 방수처리면에 일정간격으로 방수시트가 접착된 상태도이고, 제5b도는 방수시트의 양단이 중첩되게 프라이머가 도포된 상태도이다.Figures 5a to 5c is a process diagram for explaining the method of the present invention, Figure 5a is a state in which the waterproof sheet is bonded to the waterproof surface at a predetermined interval, Figure 5b is a primer is applied so that both ends of the waterproof sheet overlap State diagram.

제5c도는 프라이머의 상면에 고분자물질이 도포되어 방수막이 형성된 상태도이다.5c is a state diagram in which a polymer material is coated on an upper surface of a primer to form a waterproof film.

제6도는 제5c도의 B-B선 단면도이다.6 is a cross-sectional view taken along the line B-B in FIG. 5C.

* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

1 : 방수시트 2 : 콘크리트면1: waterproof sheet 2: concrete surface

6 : 고분자물질 7 : 프라이머6: polymer material 7: primer

이하, 본 발명을 일 실시예로 도시한 제5a도 내지 제6도를 참고로 하여 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to FIGS. 5A to 6.

제5a도~제5c도는 본 발명의 방법을 설명하기 위한 공정도이고 제6도는 제5c도의 B-B선 단면도이다.5A to 5C are process drawings for explaining the method of the present invention, and FIG. 6 is a cross-sectional view taken along line B-B in FIG. 5C.

제5a도는 방수처리면에 일정간격으로 방수시트가 접착된 상태도로써, 본 발명에 의해 방수시공을 실시하기 위해서는 먼저, 방수처리면인 콘크리트면(2)에 돌출된 부위 또는 용수개소가 없도록 평탄하게 정리하여야 된다.Figure 5a is a state in which the waterproof sheet is bonded to the waterproofing surface at a predetermined interval, in order to perform the waterproofing construction by the present invention, first, to be flat so that there are no protruding parts or water points on the concrete surface (2) of the waterproofing surface It should be arranged.

그 후, 레이턴스 등이 없도록 샌드 블라스팅, 에어 블라스팅, 브러시 등으로 청소하여 청결토록 유지한 다음 콘트리트면(2)의 함수량을 고주파 용량식 측정기를 이용하여 측정하고 함수량이 10% 이상인 경우 버너, 건조기 등으로 건조하여 함수량이 10% 이내가 되도록 한다.After that, clean it with sand blasting, air blasting, brush, etc. so that there is no latency, and keep it clean so that the moisture content of the concrete surface 2 is measured using a high frequency capacitive measuring instrument. Dry with water so that the water content is within 10%.

만약, 방수시공 정에 콘크리트 면의 균열을 발견하였다면 균열부위를 V-커트하여 모르타르로 충진한 다음 양생시키고, 누수가 있을 경우에는 급결 시멘트 등으로 지수 또는 도수시켜야 한다.If a crack in the concrete surface is found in the waterproofing process, the cracked part is V-cut and filled with mortar and cured. If there is a leak, it should be indexed or washed with quenched cement.

이와 같이 방수 시공할 콘크리트면(2)의 청소작업이 이루어지고 나면 제5a도와 같이 방수처리면에 일정 폭을 갖는 방수시트(1)를 약 5mm 정도의 간격이 유지되게 공지의 방법으로 접착한다.After the cleaning of the concrete surface 2 to be waterproofed as described above, the waterproof sheet 1 having a predetermined width is adhered to the waterproof surface as shown in FIG. 5a by a known method so as to maintain an interval of about 5 mm.

상기 방수시트(1)의 간격이 너무 좁으면 방수막을 충분히 격리시키지 못할 우려가 있게 되고, 이와는 반대로 방수시트의 간격이 너무 넓으면 방수막의 격리에는 유리하지만 다음 공정에서 사용되는 프라이머 및 고분자물질의 사용량이 많아져 시공비가 상승되므로 시공현장의 여건에 따라 적절한 간격의 설정이 요구된다.If the interval between the waterproof sheet 1 is too narrow, there is a risk that the waterproof membrane may not be sufficiently isolated, on the contrary, if the interval between the waterproof sheet is too wide, it is advantageous for the isolation of the waterproof membrane, but the amount of primers and polymers used in the following process is used. Since the construction cost increases due to the increase, it is required to set the appropriate interval according to the conditions of the construction site.

이때, 구조무의 끝단에 방수시트를 접착하는 경우, 예를 들어 벽면에 근접되게 위치하는 방수시트는 구조물의 끝단(벽면 또는 부착되는 부위가 벽면인 경우에는 바닥면)과 밀착되도록 접착하거나, 방수시트사이의 간격과 동일하게 유지하여 접착시킨다.At this time, when the waterproof sheet is bonded to the end of the structural nothing, for example, the waterproof sheet is located close to the wall surface to adhere to the end of the structure (wall or floor if the attached part is a wall surface), or waterproof The adhesive is maintained by keeping the same distance between the sheets.

이와 같이 상기 콘크리트면(2)에 방수시트(1)를 접착 고정하고 나면 그 사이면, 즉 외부로 노출된 콘크리트면 및 인접한 방수시트의 가장자리 또는 벽면, 바닥면에 근접되는 방수시트에 중첩되게 고분자물질(6)을 도포하여 방수막을 격리시킬 수 있지만, 방수효율을 극대화시키기 위해 고분자물질(6)이 먼저 프라이머(7)를 코팅하는 것이 더욱 바람직하다.In this way, after adhesively fixing the waterproof sheet 1 to the concrete surface 2, the polymer is overlapped with the surface between the surface, that is, the concrete surface exposed to the outside and the edge or wall surface of the adjacent waterproof sheet, the waterproof sheet close to the floor surface Although it is possible to isolate the waterproof membrane by applying the material (6), it is more preferable that the polymer material (6) first coat the primer (7) in order to maximize the waterproof efficiency.

상기 프라이머(7)의 도포작업은 다음과 같은 공정에 의해 이루어진다.Application of the primer 7 is performed by the following process.

시공할 콘크리트면(2)의 함수량이 10% 미만이면 소정의 비율로 개량 혼합한 프라이머(7)를 로울러(수성모) 또는 스프레이 도포기를 사용하여 외부로 노출된 콘크리트면(2) 및 인접한 방수시트(1)의 가장자리에 제5b와 같이 약 10mm 정도 중첩되게 도포한다.When the water content of the concrete surface 2 to be constructed is less than 10%, the concrete surface 2 and the adjacent waterproof sheet exposed to the outside by using a roller (aqueous wool) or a spray applicator are mixed with the primer 7 which has been improved and mixed at a predetermined ratio. It is applied to the edge of (1) overlapping about 10mm like 5b.

상기 프라이머(7)의 도포작업시 사용되는 로울로를 작업도중 방치하여 두면 그대로 굳어버려 재사용할 수 없으므로 각별한 주의가 필요하고, 햇볕에 노출되고 고온일 경우에는 도포작업시 도포면에 점점 달라붙으므로 로울러를 교환한 다음 도포 작업을 실시하여야 된다.If the rollers used during the application of the primer 7 are left unattended during the operation, they will harden as they are and cannot be reused. Therefore, special care is required.In case of exposure to the sun and high temperature, the rollers will gradually stick to the application surface during the application. After application, the application should be done.

초벌 방수막인 프라이머(7)는 혼합 후 약 30분 이내에 전부 사용할 수 있도록 그 양(약 10kg 정도)을 미리 설정하여 혼합하여야 된다.Primer 7, which is the primary waterproof membrane, should be mixed in advance by setting the amount (about 10 kg) in advance so that all of them can be used within about 30 minutes after mixing.

만약, 30분이 경과되면 혼합된 프라이머(7)의 점도가 증대되어 도포작업이 곤란해지게 되므로 주의하여야 된다.If 30 minutes have elapsed, the viscosity of the mixed primer 7 is increased so that the coating operation becomes difficult.

상기한 바와 같은 공정으로 외부로 노출된 콘크리트면(2) 및 인접한 방수시트(1)의 가장자리에 중첩되게 프라이머(7)의 코팅작업을 실시하고 일정시간이 경과되면 최종 방수면인 고분자물질(6)을 프라이머의 상면에 제5c도와 같이 중첩되게 코팅한다.The coating process of the primer (7) to overlap the edge of the concrete surface (2) and the adjacent waterproof sheet (1) exposed to the outside by the process as described above, and after a certain time the polymer material (6) ) Is coated on the upper surface of the primer so as to overlap with the 5c degree.

본 발명에 적용되는 고분자물질(6)은 사용장소 및 시공기간에 따라 적절히 선정하여 사용한다.Polymeric material (6) to be applied to the present invention is appropriately selected according to the use place and construction period.

상기 고분자물질(6)로는 폴리우레아(Polyurea), 폴리우레탄(Polyurethane) 또는 에폭시(Epoxy) 등을 사용할 수 있다.As the polymer material 6, polyurea, polyurethane, epoxy, or the like may be used.

상기 폴리우레아(Poloyurea)는 압축강도가 좋고, 신축성, 내산성, 내알칼리성, 내약품성, 자외선에 잘 견디는 특성이 있고, 환경오염이 없으며 온도의 영향을 전혀 받지 않으므로 겨울철에도 시공이 가능한 장점이 있다.The polyurea (Poloyurea) has a good compressive strength, elasticity, acid resistance, alkali resistance, chemical resistance, UV resistance characteristics, there is no environmental pollution and does not affect the temperature at all, there is an advantage that can be installed in winter.

또한, 시공 면에서는 벽면 및 천장에 도포작업을 할 때 흘러내리지 않으며 도포 후 빠른 시간(약 10~30초 정도)내에 경화되므로 약품 탱크 및 선박, 항공분야 등에 적합하지만, 소재의 가격이 비싸다는 단점이 있다.In addition, it is suitable for chemical tanks, ships, aviation, etc., because it does not flow down when applied to walls and ceilings and hardens within a fast time (approximately 10 to 30 seconds) after application, but the cost of materials is high. There is this.

한편, 폴리우레탄(Polyurethane) 또는 에폭시(Epoxy)는 벽면 및 전장의 도포 작업시 흘러내리고, 도포 후 경화되는 시간이 1일 정도로 폴리우레아에 비해 길므로 신속을 요하는 방수작업에는 적합치 않지만, 시공에 따른 소요 경비가 폴리우레아에 비해 현저히 줄어들므로 구조물 바닥면 등의 시공에 적합하다.On the other hand, polyurethane or epoxy flows down during wall and electric field coating, and the curing time after application is longer than that of polyurea for one day, so it is not suitable for rapid waterproofing. The cost required is significantly reduced compared to polyurea, so it is suitable for construction of the floor of a structure.

상기 고분자물질(6)은 소정시간(중복도장 가능시간)의 범위 내에서 도포작업을 실시하여야 된다.The polymer material 6 should be applied within a predetermined time (duplicate coating time).

즉, 1번의 도포작업을 실시한 후 소정의 시간이 경과되고 나면 상, 하, 좌, 우 방향으로 최소한 4회 이상 중복 시행하여 설정된 두께(약 1mm 정도)를 확보한다.That is, after a predetermined time has elapsed after performing one coating operation, at least four times are repeated in the up, down, left, and right directions to secure a set thickness (about 1 mm).

상기한 바와 같이 프라이머(7) 및 고분자물질(6)의 도포작업은 방수처리 대상물이 복잡한 구조물인 경우 평면부보다는 코너부를 먼저 도포하는 것이 보다 바람직함은 이해 가능한 것이다.As described above, it is understood that the application of the primer 7 and the polymer material 6 is more preferable to apply the corner portion first rather than the flat portion when the waterproofing object is a complicated structure.

이상에서와 같이 본 발명은 종래의 방수시공 방법에 비해 다음과 같은 장점을 갖는다.As described above, the present invention has the following advantages over the conventional waterproof construction method.

첫째, 방수시공에 따른 하자발생률을 현저하게 줄일 수 있고, 하자가 발생되더라도 누수되는 부위를 빠른 시간 내에 찾아내 보수할 수 있게 된다.First, the occurrence rate of defects due to waterproof construction can be significantly reduced, and even if a defect occurs, it is possible to find and repair the leaked portion in a short time.

즉, 본 발명은 제5c도에 나타낸 바와 같이 방수처리면이 프라이머(7) 및 고분자물질(7)의 코팅에 따라 각각 격리되어 특정부위("X"부위)에서 누수가 발생되더라도 인접된 방수시트(1)의 접착면("Y", "Z"부위) 측으로 흘러가지 목하므로 누수가 발생된 해당 방수시트의 접착면을 따라 하자보수작업만을 실시하면 되므로 하자발생에 따른 보수작업이 편리해지게 된다.That is, in the present invention, as shown in FIG. 5C, the waterproofing surface is isolated according to the coating of the primer 7 and the polymer material 7, respectively, so that even if a leak occurs at a specific site (" X "), the adjacent waterproof Since it flows toward the adhesive surface (" Y ", " Z ") side of the sheet 1, only the defect repair work needs to be performed along the adhesive surface of the corresponding waterproof sheet where the water leak is generated. It becomes convenient.

둘째, 방수 처리작업이 도포 및 스프레이작업이 의해 실시되므로 터널의 콘크리트면(2)과 굴착면(4) 사이의 공간이 시방서 상의 80cm 보다 좁더라도 도포작업이 용이하므로 도포작업의 불량에 다른 누수가 발생되지 않는다.Second, since the waterproofing work is applied and sprayed, even if the space between the concrete surface 2 and the excavation surface 4 of the tunnel is narrower than 80cm on the specification, the coating work is easy, so that other leaks may occur due to poor coating work. It does not occur.

셋째, 구조물의 코너부분 또는 방수처리면에 돌출구조물이 있더라도 스프레이작업으로 방수막의 형성이 가능하므로 방수시트를 접착하는 시공방법에 비해, 정확한 방수처리 및 시공에 따른 작업기간을 현저히 줄일 수 있게 된다.Third, even if there is a protruding structure in the corner portion or the waterproofing surface of the structure, it is possible to form a waterproof film by spraying operation, compared to the construction method for bonding the waterproof sheet, it is possible to significantly reduce the working period due to the accurate waterproofing and construction.

Claims (3)

방수처리면을 청소하는 단계; 상기 방수처리면에 방수시트를 일정간격을 띄우고 접착하는 단계; 그리고 상기 방수시트 사이 및 방수시트의 양단이 중첩되게 폴리우레아, 폴리우레탄, 에폭시로 된 무리에서 선택한 하나의 고분자물질을 도포하여 방수막을 형성하는 단계로 이루어진 구조물의 방수방법.Cleaning the waterproof surface; Bonding a waterproof sheet to the waterproofing surface at a predetermined interval; And coating one polymer material selected from the group consisting of polyurea, polyurethane, and epoxy such that both ends of the waterproof sheet and both ends of the waterproof sheet overlap to form a waterproof membrane. 제1항에서, 상기 방수시트사이 및 방수시트의 양단이 중첩되게 상기 고분자 물질을 도포하기 전에 방수시트 사이 및 방수시트의 양단이 중첩되게 프라이머를 먼저 도포하여 건조하는 단계를 더 포함하여 이루어진 구조물의 방수방법.The method of claim 1, further comprising applying a primer to dry the primer sheet so that both ends of the waterproof sheet and both ends of the waterproof sheet overlap before applying the polymer material such that both ends of the waterproof sheet and both ends of the waterproof sheet overlap. Waterproof way. 제1항에서, 상기 방수시트와 방수시트 사이는 5mm를 띠는 것을 특징으로 하는 구조물의 방수방법.The method of claim 1, wherein the waterproof sheet and the waterproof sheet has a thickness of 5mm.
KR1019970032803A 1997-07-15 1997-07-15 A method for preventing water infiltration into structure KR100245328B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019970032803A KR100245328B1 (en) 1997-07-15 1997-07-15 A method for preventing water infiltration into structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019970032803A KR100245328B1 (en) 1997-07-15 1997-07-15 A method for preventing water infiltration into structure

Publications (2)

Publication Number Publication Date
KR19990010144A KR19990010144A (en) 1999-02-05
KR100245328B1 true KR100245328B1 (en) 2000-02-15

Family

ID=19514505

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019970032803A KR100245328B1 (en) 1997-07-15 1997-07-15 A method for preventing water infiltration into structure

Country Status (1)

Country Link
KR (1) KR100245328B1 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100324364B1 (en) * 1999-12-28 2002-02-16 김윤철 Polyurea Waterproofing Sheet and Waterproofing method using the same
KR100758724B1 (en) * 2006-06-27 2007-09-14 주식회사 한강개발 Method of repairing manhole and material for repairing manhole
KR100844367B1 (en) * 2007-12-07 2008-07-07 주식회사 코와스 Construction method using a polyurea resin and the structure material using the same
KR100885944B1 (en) * 2008-01-22 2009-02-26 삼공건설화학 주식회사 Waterproof structure of concrete surfaces and construction method the same
KR101130828B1 (en) * 2009-10-08 2012-04-12 (주)아해 Fast-curing Polyurea Complex Sheets for Water-proofing and Water-proofing/Anti-root and Coating Method Using The Same

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61162661A (en) * 1985-01-05 1986-07-23 加賀防水工業株式会社 Water-proof structure of building and its construction

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61162661A (en) * 1985-01-05 1986-07-23 加賀防水工業株式会社 Water-proof structure of building and its construction

Also Published As

Publication number Publication date
KR19990010144A (en) 1999-02-05

Similar Documents

Publication Publication Date Title
CN109267709A (en) A kind of deformation joint anti-seepage drain structure and its restorative procedure
CN106988440B (en) Waterproof structure for main body and auxiliary interface of subway station and construction method of waterproof structure
CN107190783A (en) A kind of construction method of basement waterproofing structure and its outer wall of basement waterproof construction
KR100245328B1 (en) A method for preventing water infiltration into structure
DE3527764A1 (en) Device for cleaning textile slats for blinds or the like
CN107268809B (en) Waterproof structure and construction method thereof
KR100324364B1 (en) Polyurea Waterproofing Sheet and Waterproofing method using the same
CN207959289U (en) Structure is repaired in a kind of leak for basement post-pouring zone position
KR101902836B1 (en) Concrete repair and joint construction method using organic and inorganic hybrid water proofing material laminated self-adhesive seal reinforcing and waterproofing sheet
CN108131022A (en) A kind of plastering wall-surface patching technique
CN209369199U (en) A kind of deformation joint anti-seepage drain structure
CN101429784B (en) Construction method for bonding polymer water-proof coiled material
AU2015224401A1 (en) Textile reinforced membranes
KR102357268B1 (en) Water-proof Type Sealant
JP6095842B1 (en) Bridge floor slab water stop, floor slab waterproof structure
KR20010107074A (en) Waterproofing materials with combined membrane and sheet and waterproofing method thereby
KR20120077760A (en) The waterproofing method of buildings
JP2001200548A (en) Forward waterproof method for wall surface of underground structure
RU2242571C1 (en) Method and means for repairing and filling up interpanel joints
CN102505947A (en) Construction method for butt-jointing and sealing waterproof rolls
CN110924360A (en) Method for repairing settlement joint of concrete structure
JP2001193286A (en) Repair and reinforcing method for surface of structure
WO2023039745A1 (en) Drainage and anti-seepage device and method for assembled prefabricated sandwich thermal-insulation external wallboard
JP2642588B2 (en) Joint ditch and its construction method
CN117027523A (en) Seepage-proofing method for rural assembled sewage treatment facility

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121129

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20131129

Year of fee payment: 15

FPAY Annual fee payment

Payment date: 20141114

Year of fee payment: 16

FPAY Annual fee payment

Payment date: 20151116

Year of fee payment: 17

LAPS Lapse due to unpaid annual fee