KR100201541B1 - Roof floor finishing method - Google Patents

Roof floor finishing method Download PDF

Info

Publication number
KR100201541B1
KR100201541B1 KR1019960033870A KR19960033870A KR100201541B1 KR 100201541 B1 KR100201541 B1 KR 100201541B1 KR 1019960033870 A KR1019960033870 A KR 1019960033870A KR 19960033870 A KR19960033870 A KR 19960033870A KR 100201541 B1 KR100201541 B1 KR 100201541B1
Authority
KR
South Korea
Prior art keywords
concrete
rooftop
installing
plate
edge
Prior art date
Application number
KR1019960033870A
Other languages
Korean (ko)
Other versions
KR19980014749A (en
Inventor
김충엽
윤우옥
Original Assignee
김헌출
삼성물산주식회사
김충엽
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김헌출, 삼성물산주식회사, 김충엽 filed Critical 김헌출
Priority to KR1019960033870A priority Critical patent/KR100201541B1/en
Publication of KR19980014749A publication Critical patent/KR19980014749A/en
Application granted granted Critical
Publication of KR100201541B1 publication Critical patent/KR100201541B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D11/00Roof covering, as far as not restricted to features covered by only one of groups E04D1/00 - E04D9/00; Roof covering in ways not provided for by groups E04D1/00 - E04D9/00, e.g. built-up roofs, elevated load-supporting roof coverings
    • E04D11/02Build-up roofs, i.e. consisting of two or more layers bonded together in situ, at least one of the layers being of watertight composition
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • E04D13/0404Drainage on the roof surface
    • E04D13/0445Drainage channels

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)
  • Floor Finish (AREA)

Abstract

본 발명은 옥상바닥용 P. C.판을 미리 공장에서 성형제작하여 건축물의 옥상바닥 마감층공사시에 일정한 형태로 신축줄눈설치용 가설판재와 동시에 조립설치한 후, 콘트리트를 현장타설하여 성형시키는 건축물 옥상바닥 마감층의 시공방법에 관한 것으로서, 콘크리트슬라브층(1) 상면에 설치된 방수층의 옥상바닥 4주변부에 조립설치되는 가장자리용 P. C.집수판(4)과, 상기 가장자리용 P. C.집수판(4)의 일측면에서 신축줄눈설치용 가설판재(7)를 동시에 지지되도록 고정 설치하고, 상기 가장자리용 P. C.집수판(7)이 설치된 옥상바닥의 내부에 내부용 P. C.판(6)을 일정위치마다 내부공간부(7)들이 형성되도록 격자형으로 조립설치하면서 내부용 P. C.판(6)의 양측면에서 신축줄눈설치용 가설판재(7)를 동시에 지지되도록 설치하고, 상기 내부공간(7)에 콘크리트를 현장타설하여 상기 P. C.집수판(4)(6)들의 상부면과 동일한 레벨이 되도록 누름콘크리트(8)을 성형시킨 후, 상기 신축줄눈설치용 가설판재(7)를 제거한 후 그 내부에 백업재를 설치하여 코킹재를 채워넣어 신축줄눈(9)을 형성함으로써 시공되는 건축물 옥상바닥 마감층의 시공방법이다.The present invention is manufactured by molding the rooftop PC board in advance in the factory, and then assembled and installed at the same time with the temporary joint material for expansion joint installation in a certain form during the roof floor finishing layer construction of the building, and then roofing the building to mold the concrete on-site A method of constructing a floor, comprising: an edge PC collecting plate (4) and an edge PC collecting plate (4) installed at the periphery of a rooftop floor of a waterproof layer provided on an upper surface of a concrete slab layer (1); The fixed joint member 7 for installing the expansion joints is fixedly installed at the same time, and the internal PC board 6 is installed at a predetermined position in the inner space of the rooftop on which the edge PC collecting plate 7 is installed. While installing and installing in a lattice shape to form a temporary joint member (7) for expansion joint installation on both sides of the inner PC board (6) at the same time, the concrete in the interior space (7) After in-site casting to form the pressed concrete 8 to be at the same level as the upper surface of the PC collecting plate (4) (6), and then remove the temporary joint installation plate material (7) after installing the backup material therein By filling the caulking material to form a new joint (9) is a construction method of the roof top floor of the building to be constructed.

Description

옥상바닥 마감층의 시공방법Construction method of rooftop finishing layer

제1도는 본 발명에 따른 옥상바닥 마감층이 설치된 상태의 도면으로서,1 is a view of the rooftop finishing layer is installed in accordance with the present invention,

(a)도는 전체적인 평면도.(a) is the overall top view.

(b)도는 (a)도의 A-A선 단면도.(b) is sectional drawing along the line A-A of (a).

제2도는 본 발명에서 사용되는 경량콘크리트와 단열판이 일체로 이루어진 P. C.판의 제1실시예의 도면으로서,FIG. 2 is a view of a first embodiment of the P. C. plate in which the lightweight concrete and heat insulating plate used in the present invention are integrally formed.

(a)도는 가장자리용 P. C.집수판의 사시도.(a) Perspective view of the edge P. C. collecting plate for turning.

(b)도는 (a)도의 횡단면도.(b) is a cross-sectional view of (a).

(c)도는 가장자리용 P. C.판의 사시도.(c) Perspective view of the edge P. C. plate for turning.

(d)도는 (c)도의 횡단면도.(d) is a cross sectional view of (c).

제3도는 본 발명에서 사용되는 경량콘크리트로서만 이루어진 P. C.판의 제2실시예의 도면으로서,3 is a view of a second embodiment of the P. C. plate made of only lightweight concrete used in the present invention,

(a)도는 가장자리용 P. C.집수판의 사시도.(a) Perspective view of the edge P. C. collecting plate for turning.

(b)도는 (a)도의 횡단면도.(b) is a cross-sectional view of (a).

(c)도는 가장자리용 P. C.판의 사시도.(c) Perspective view of the edge P. C. plate for turning.

(d)도는 (c)도의 횡단면도.(d) is a cross sectional view of (c).

제4도는 본 발명에서 사용되는 내부용 P. C.판의 도면으로서,4 is a view of the internal P. C. plate used in the present invention,

(a)도는 경량콘크리트와 단열판이 일체로 이루어진 P. C.판의 사시도.(a) is a perspective view of a P. C. plate in which the lightweight concrete and the insulation plate are integrated.

(b)도는 (a)도의 횡단면도.(b) is a cross-sectional view of (a).

(c)도는 경량콘크리트의 P. C.판의 사시도.(c) is a perspective view of a P. C. plate of lightweight concrete.

(d)도는 (c)도의 횡단면도.(d) is a cross sectional view of (c).

제5도는 본 발명의 옥상바닥 마감층의 시공단계별 도면으로써,5 is a drawing for each construction stage of the rooftop finishing layer of the present invention,

(a)도는 옥상바닥골조인 콘크리트슬라브층의 상부에 방수층이 설치된 최초상테의 단면도.(a) is a cross-sectional view of the first phase where the waterproofing layer is installed on the upper part of the concrete slab layer that is the rooftop frame.

(b)도는 옥상바닥 주변부에 가장자리용 P. C.집수판 및 신축줄눈설치용 가설판재가 설치된 상태의 단면도.(b) is a cross-sectional view of the edge P. C. collecting plate and temporary joint installation for expansion joints installed on the periphery of the rooftop.

(c)도는 옥상바닥 내부를 격자형으로 구획하는 내부용 P. C.판 및 신축줄눈설치용 가설판재가 설치된 상태의 단면도.(c) is a cross-sectional view of the interior P. C. plate and temporary joint plate material for installing the expansion joints that partition the inside of the rooftop into a lattice shape.

(d)도는 격자형으로 구획된 내부공간부에 콘크리트를 타설하여 누룸콘크리트층을 성형하는 상태의 단면도.(d) is a sectional view of a state in which a Nurum concrete layer is formed by pouring concrete into an inner space divided into a lattice shape.

(e)도는 신축줄눈설치용 가설판재를 제거한 후 신축줄눈을 설치한 상태의 단면도.(e) is a cross-sectional view of the state where the expansion joint is installed after removing the temporary plate for expansion joint installation.

(f)도는 가장자리용집수판 상부에 조적조를 설치한 상태의 단면도.(f) Cross-sectional view with masonry installed on the top of water collecting plate for edge.

(g)도는 가장자리용집수판 상부에 보조방수층을 설치한 상태의 단면도.(g) Cross-sectional view with an auxiliary waterproofing layer on top of the water collecting plate for edges.

* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

1 : 콘크리트슬라브층 2 : 난간벽체1: concrete slab layer 2: handrail wall

3 : 방수층 4 : 폴리에틸렌폼3: waterproof layer 4: polyethylene foam

5, 5' : 가장자리용 P. C. 집수판 5a, 5a' : 단턱부5, 5 ': edge P. C. collecting plate 5a, 5a': stepped portion

5b, 5b' : 요철홈 5c, 5c' : 바닥집수부5b, 5b ': Uneven groove 5c, 5c': Bottom collecting part

5d, 5d' : 단열판 6, 6' : 가장자리용 P. C.집수판5d, 5d ': Insulation plate 6, 6': Edge P. C. collecting plate

6a, 6b·6a', 6b' : 단턱부 6c, 6c' : 바닥집수부6a, 6b, 6a ', 6b': stepped portion 6c, 6c ': bottom catchment part

6d, 6d' : 단열판 7 : 내부용 P. C.판6d, 6d ': Insulation plate 7: Internal P. C. plate

8 : 신축줄눈설치용 가설판재 9 : 고정몰탈8: Temporary plate material for expansion joint installation 9: Fixed mortar

10 : 내부공간부 11 : 누룸콘크리트10: interior space 11: Nurum concrete

12 : 코킹재 13 : 백업재12: caulking material 13: backing material

14 : 공간부 15 : 조적조14: space part 15: masonry

16 : 몰탈 17 : 보조방수층16: mortar 17: auxiliary waterproof layer

18 : 루프드레인18: roof drain

[산업상 이용분야][Industrial use]

본 발명은 가장자리용 P. C.집수판과 내부용 P. C.판을 미리 공장에서 성형제작하여 건축물의 옥상바닥 마감층공사시에 격자형태로 옥상바닥에 배열하여 신축줄눈설치용 가설판재와 동시에 조립설치한 후, 격자형의 내부공간부에 콘크리트를 현장타설하여 성형시킨 후, 신축줄눈을 설치하는 옥상바닥 마감층의 시공방법에 관한 것이다.According to the present invention, the edge PC collecting plate and the internal PC plate are molded in advance in the factory and arranged at the rooftop floor in a lattice form during the construction of the rooftop finishing layer of the building, and then assembled and installed at the same time as the temporary joint plate for installing the expansion joint, and the lattice The present invention relates to a construction method of a rooftop finishing layer in which concrete joints are formed after in situ casting of concrete in the inner space of a mold.

[종래기술][Private Technology]

종래의 건축물 옥상바닥 마감층의 시공방법은 콘크리트슬라브층의 상부에 방수층을 설치한 후, 상기 방수층 상부로 일정간격으로 줄눈재를 몰탈로서 고정 지지시킨 후, 콘크리트를 현장타설하여 일정두께의 누룸콘크리트층을 경화시킨 후, 상기 누룸콘크리트층의 상면에 바탕몰탈층에 의한 마무리 작업, 즉 바닥구배작업 또는 배수로성형작업과, 또한 난간벽체 내부의 방수층 보호를 위한 조적조의 설치작업을 함으로써 옥상바닥의 마감층을 시공하는 구성으로 이루어져 있다.According to the conventional construction method of the rooftop finishing layer of a building, after installing a waterproof layer on the upper part of the concrete slab layer, the joint material is fixedly supported by mortar at a predetermined interval on the upper part of the waterproof layer, and the concrete is cast on-site to deposit a nurum concrete of a certain thickness. After hardening the layer, finishing of the roof floor by finishing the ground mortar layer on the upper surface of the nurum concrete layer, that is, bottom gradient work or drainage channel forming work, and installing masonry for protecting the waterproof layer inside the handrail wall. It consists of the construction of the floor.

또한, 일본공개실용신안 공보 실개평3-101721호에서 도시한 바와 같이, 옥상 바닥골조인 콘크리트슬라브층의 상부에 설치된 방수층의 상면에서 옥상바닥의 가장자리 4주변부에 P. C.집수판을 설치한 후, 상기 P. C.집수판의 내측에 일정간격으로 줄눈용판재를 몰탈로서 고정설치하여 경화시킨 후, 내부공간부에 콘크리트를 현장타설하여 누룸콘크리트층을 성형하고 상기 누룸콘크리트층의 상면에 바탈몰탈층을 형성함으로써 옥상바닥의 마감층을 시공하는 구성으로 이루어져 있다.Further, as shown in Japanese Utility Model Application Laid-Open No. Hei 3-101721, after installing a PC collecting plate on the periphery of the edge of the rooftop on the upper surface of the waterproofing layer provided on the upper part of the concrete slab layer that is the rooftop frame, By fixing the joint plate material as mortar on the inside of the PC collecting plate as a mortar and hardening it, then placing concrete on the inner space to form a nurum concrete layer and forming a metal mortar layer on the upper surface of the nurum concrete layer. It consists of constructing the finishing layer of the rooftop.

[종래기술의 문제점][Problems with Prior Art]

이와 같은 종래기술은 첫째, 옥상바닥의 가장자리 4주변부 바탕몰탈부분에 형성되는 옥상바닥 배수로를 특별한 기술을 가진 미장공이 직접 흙손을 가지고 몰탈로 현장에서 수작업을 통하여 옥상배수를 성형하여 이루어지는 것이기 때문에 신축줄눈 및 트렌치작업을 위한 인력소요로 인한 인건비증대와 작업능률이 저하되는 문제점이 있었으며, 둘째, 상기 옥상배수로가 경화된 후에 다음 공정인 줄눈용판재를 설치해야 하고, 또 줄눈용판재 양측면에 타설되는 고정몰탈도 완전히 경화된 후에 다음단계의 공정으로써 누룸콘크리트층 성형을 위한 콘트리트를 타설해야 하기 때문에 몰탈이 경화되는 시간만큼 공사기간이 지연되며, 또한 콘크리트타설시 고정몰탈에 의해 고정된 신축줄눈의 파손 및 변형이 발생되는 문제점이 있었으며, 셋째, 콘크리트의 열팽창에 의하여 바탕몰탈이 들뜨거나 깨지는 균열현상이 발생되는 문제점이 있으며, 기타 옥상배수로공사를 현장에서 몰탈에 의한 미장작업을 통하여 이루어지기 때문에 시멘트·모래·물 및 몰탈 등을 옥상에 비치하여 작업을 하기 때문에 옥상작업현장이 매우 어지럽고 청결하지 못한 문제점이 있었다.The prior art is a new joint joint because a plasterer having a special technique directly forms a roof drainage through the manual work of the mortar furnace with a trowel on the rooftop drainage channel formed at the base mortar part around the edge of the rooftop. And labor cost increase due to manpower demand for trench work and work efficiency is deteriorated. Second, after the rooftop drainage is cured, the joint plate material, which is the next process, must be installed, and the joint plate is fixed on both sides of the joint plate material. After the mortar is completely hardened, concrete for the Nurum concrete layer molding needs to be cast as the next step. Therefore, the construction period is delayed by the time when the mortar is cured. There was a problem that deformation occurs, and third, the concrete There is a problem that ground mortar rises or cracks due to thermal expansion, and other roof drainage works are carried out by plastering by mortar at the site, so cement, sand, water, and mortar are stored on the roof. Because the rooftop work site was very dizzy and unclean problem.

[본 발명이 해결하려고 하는 기술적 과제][Technical problem to be solved by the present invention]

따라서, 상기와 같은 종래기술상의 문제점을 해결하기 위하여 본 발명은 바닥 집수부가 형성된 가장자리용 P. C.집수판과 내부용 P. C.판을 공장제품으로 미리 성형시켜서 옥상바닥의 콘크리트슬라브층의 상부에 형성된 방수층의 상면에서 상기 P. C.판들을 옥상바닥의 가장자리부와 내부에 격자형으로 배열하고, 상기 P. C.판들의 측면에서 신축줄눈설치용 가설판재를 고정설치한 후, 격자형의 내부공간부에 콘크리트를 현장타설하여 경화시킨 다음, 신축줄눈설치용 가설판재를 제거하여 그 틈사이로 코킹재를 채워 신축줄눈을 형성하는 옥상바닥의 마감층 성형을 위한 시공방법을 통하여 해결하고자 한다.Therefore, in order to solve the problems of the prior art as described above, the present invention is formed by preforming the PC collecting plate and the inner PC plate for the bottom formed with the bottom water collecting part as a factory product, the upper surface of the waterproof layer formed on the top of the concrete slab layer of the rooftop floor. The PC boards are arranged in a lattice shape at the edge of the rooftop and inside, and fixed installation of the temporary joint mounting material for the expansion joints on the sides of the PC boards, and then cast concrete in the lattice-shaped inner space to harden Next, it is to solve the construction method for forming the finishing layer of the rooftop to form the expansion joint by removing the temporary joint member for installing the expansion joint and filling the caulking material between the gap.

[발명의 목적][Purpose of invention]

본 발명은 목적은 첫째, 옥상바닥공사시 바닥집수부가 형성된 가장자리용 P. C.집수판과 내부용 P. C.판을 기성제품화하여 현장에서 격자형으로 단순 조립함으로써 공사기간의 단축과 공사비용을 절감시켜 주며, 둘째, 별도의 트랜치작업이 필요없고, 또한 줄눈설치작업시 신축줄눈재 설치를 위한 가설판재를 P. C.판들과 동시에 고정설치함으로써 줄눈재설치를 위한 고정몰탈작업이 필요없음으로 인하여 P. C.판들의 설치완료와 동시에 콘크리트를 타설할 수 있어 이에 소요되는 인력절감 및 공사기간을 단축시켜 주며, 셋째, 누룸콘크리트층 성형을 위한 콘크리트타설후에 신축줄눈설치용 가설판재를 분리하고 난 후에 신축줄눈을 설치하기 때문에 타설되는 콘크리트에 의하여 신축줄눈재의 파손 및 변형이 일어날 수 없으며, 또한 격자형으로 일정한 간격으로 신축줄눈재를 설치하기 때문에 콘크리트의 열팽창에 의한 균일현상을 방지하게 되고, 넷째, P. C.판들의 사용으로 별도의 바탕몰탈작업이 필요없음으로 인하여 콘크리트의 열팽창에 의하여 바탕몰탈이 들뜨거나 깨지게 되는 현상이 없게 되며, 기타 옥상마감층공사시 옥상작업현장을 항시 깨끗하고 청결함을 유지할 수 있도록 하는 건축물 옥상바닥 마감층의 시공방법을 제공하는데 있다.The object of the present invention is to firstly make the ready-made edge PC collector plate and internal PC plate with the bottom catchment part during rooftop floor construction by simply assembling them into a lattice on the site, thereby reducing the construction period and reducing the construction cost. No need for separate trench work and concrete installation at the same time as installing the temporary joints for expansion joints at the same time as PC plates, so no need for fixing mortar for joints installation It can reduce the manpower and the construction period required for this process. Third, after installing the expansion joints for the expansion joints after the expansion of the concrete joints for forming the Nurum concrete layer, the expansion joints are installed. No breakage or deformation of expansion joints can occur, Since the expansion joints are installed at every interval to prevent uniform phenomenon due to the thermal expansion of concrete. Fourth, the ground mortar is lifted or broken due to the thermal expansion of concrete because there is no need for separate ground mortar work by using PC plates. There is no phenomena, and it is to provide a construction method of the roof top floor of the building to keep the rooftop work site clean and clean at all times during the rooftop finishing work.

[발명의 구성][Configuration of Invention]

이하, 본 발명의 기술적 구성을 상세히 설명하면 다음과 같다.Hereinafter, the technical configuration of the present invention in detail.

본 발명의 건축물 옥상바닥 마감층의 시공방법은 제1도의 (a)(b)도에서와 같이, 옥상표면에 떨어지는 빗물이 루프드레인 쪽으로 원활하게 배수될 수 있도록 방수층(3)이 상부에 설치된 콘크리트슬라브층(1)의 상부에서 난간벽체(2)와 이웃하는 옥상바닥의 가장자리부에는 가장자리용 P. C.집수판(5)(6)을 설치하고, 옥상바닥의 내부는 격자형의 내부공간부(110)가 형성되도록 구획하는 내부용 P. C.판(7)을 설치하고, 상기 P. C.판들의 측면부에 신축줄눈설치용 가설판재(8)를 고정설치한 후, 상기 내부공간부(10)에는 콘크리트를 현장타설하여 누룸콘크리트(11)를 성형시킨 후, 신축줄눈설치용 가설판재(8)를 제거하여 그 틈사이에 코킹재(12)로 신축줄눈을 형성함으로써 옥상바닥의 마감층 성형을 위한 시공방법을 그 특징으로 하는 것이다.In the construction method of the building's rooftop finishing layer of the present invention, as shown in (a) (b) of FIG. 1, concrete having a waterproof layer 3 installed thereon so that rainwater falling on the rooftop surface can be drained smoothly toward the roof drain. At the top of the slab layer 1, edge PC collecting plates 5 and 6 are provided at the edge of the rooftop adjacent to the handrail wall 2, and the inside of the rooftop is a lattice-shaped inner space 110. After installing the internal PC board (7) for partitioning to form, and fixedly installing the temporary joint member 8 for installing the expansion joints on the side portions of the PC plate, and then cast concrete in the interior space (10) After the Nurum concrete 11 is molded, the temporary joint installation member 8 for expansion joints is removed and the joint joint is formed with a caulking member 12 between the gaps. It is.

여기에서, 사용되어지는 옥상바닥 가장자리용 P. C.집수판(5), (6)은 난간벽체(2)와 이웃하는 옥상바닥의 가장자리 내주면에 설치되는 것으로써, 제2도에 도시되는 바와 같이, 소정의 폭과 두께를 가지되 그 상면 가운데 길이방향으로 빗물이 배수되도록 바닥집수부(5c)(6c)를 형성하고, 상기 바닥집수부의 상면 내측에는 단턱부(5a), (6a) (6b)가 돌출되어 길이방향으로 연장형성되며, 상기 바닥집수부의 상면 외측에는 요철홈(5b)들이 길이방향으로 형성되며, 단열판(5d), (6d)이 부착된 구조를 갖는다.Here, the rooftop floor PC collecting plates 5 and 6 to be used are provided on the inner circumferential surface of the edge of the rooftop floor adjacent to the handrail wall 2, as shown in FIG. Bottom catches 5c and 6c so as to drain rainwater in the longitudinal direction of the upper face of the upper face, and the step portions 5a, 6a and 6b inside the upper face of the bottom catchment. Is protruded to extend in the longitudinal direction, the grooves 5b are formed in the longitudinal direction on the outside of the top surface of the bottom catchment, and has a structure attached to the heat insulating plates (5d, 6d).

상기 가장자리용 P. C.집수판(5), (6)들의 하면에 일체로 부착된 단열판(5d), (6b)은 각기 폴리스티렌, 폴리스티로폴 등의 단열성 합성수지로 만들어진다.The insulating plates 5d and 6b integrally attached to the lower surfaces of the edge P. C. collecting plates 5 and 6 are each made of a heat insulating synthetic resin such as polystyrene and polystyrene.

여기에서, 요철홈(5b)들이 P. C.집수판(5) 상면 외측에 형성되는 이유는 접착력을 증대하기 위함인데, 제5도의 (f)도에서 도시되는 바와 같이, 요철홈(5b) 상부에 조적조(15)가 적층되는 경우에는 몰탈(16)과 긴밀하게 접착되도록 접착력을 증대시키기 위한 것이고, 제5도의 (h)도에서 도시되는 바와 같이, 요철홈(5b) 상부에 도포되는 보조방수층(15)과 긴밀하게 접착되도록 접착력을 증대시키기 위한 것이다.Here, the reason why the uneven grooves 5b are formed outside the upper surface of the PC collecting plate 5 is to increase the adhesive force, as shown in FIG. 5 (f), the masonry on the top of the uneven grooves 5b. When the (15) is laminated to increase the adhesive force to be in close contact with the mortar 16, as shown in Figure 5 (h), the auxiliary waterproof layer 15 is applied to the top of the uneven groove (5b) ) Is to increase the adhesive strength so as to be in close contact with the

한편, 또다른 가장자리용 P. C.집수판(5'), (6')이 제3도에 도시되어 있는데, 소정의 폭과 두께를 가지되 그 상면 중앙부분에 길이방향으로 빗물이 배수되는 바닥집수부(5c'), (6c')가 형성되며, 상기 바닥집수부의 양측으로부터 돌출되는 1쌍의 단턱부(5a')(5b'), (6a')(6b')들이 길이방향으로 형성된다.Meanwhile, another edge PC collecting plate 5 ', 6' is shown in FIG. 3, which has a predetermined width and thickness, but the bottom collecting portion in which rainwater is drained in the longitudinal direction to the central portion of the upper surface thereof. 5c 'and 6c' are formed, and a pair of stepped portions 5a ', 5b' and 6a 'and 6b' protruding from both sides of the bottom catchment portion are formed in the longitudinal direction. .

상기의 가장자리용 P. C.집수판(5'), (6')은 일반콘크리트로 만들어질 수 있으며, 또한 특수경량콘크리트로 제품의 향상을 도모하면서 운반 및 설치작업시 취급이 용이하게 되도록 만들어질 수도 있다.The above edge PC collecting plates 5 'and 6' may be made of ordinary concrete, and may be made of special lightweight concrete to facilitate handling during transportation and installation, while improving the product. .

한편, 내부용 P. C.판(7)은 경량콘크리트판(7a)과 단열판(7b)이 일체로 부착된 구조로써 공장제품으로 만들어질 수 있다.On the other hand, the internal P. C. plate 7 may be made of a factory product as a structure in which the lightweight concrete plate 7a and the heat insulating plate 7b are integrally attached.

또한, 단순히 평면상의 내부용 P. C.판(7')으로서 누룸콘크리트층의 두께와 동일한 두께로 일반콘크리트로 만들어질 수 있으며, 또한 특수경량콘크리트로 제픔의 향상을 도모하면서 운반 및 설치작업시 취급이 용이하게 되도록 만들어질 수도 있다.In addition, it can be made of ordinary concrete with the same thickness of the Nurum concrete layer as the internal PC board 7 'on a flat surface, and is easy to handle during transportation and installation work while improving the quality with a special lightweight concrete. It can be made to be.

상기 내부용 P. C.판(7), (7')은 옥상바닥내에 일정한 간격으로 격자형으로 조립설치되어 내부용 P. C.판(7), (7')들에 의해 내부공간부(10)들이 형성되며, 옥상가운데에 떨어진 빗물이 가장자리용 P. C.집수판(5)(6)의 바닥집수부로 흘려 보내도록 한다.The internal PC plates 7 and 7 'are assembled in a lattice shape at regular intervals in the rooftop to form internal space portions 10 by the internal PC plates 7 and 7'. Rain water falling in the middle of the roof flows to the bottom catchment part of the edge PC catcher (5) (6).

본 발명에서는 단열판이 부착된 가장자리용 P. C.집수판(5)(6) 및 내부용 P. C.판(7)들을 사용하여 옥상바닥층을 시공하는 것이 바람직하다. 이는 옥상 바닥의 단열을 겸하기 때문이며, 또한 운반이 용이하기 때문이다.In the present invention, it is preferable to construct a rooftop layer using the edge P. C. collecting plate 5 (6) and the interior P. C. plate 7 with the insulation plate attached thereto. This is because it also serves as heat insulation of the rooftop floor, and is also easy to transport.

이와 같은, 구조로 만들어지는 가장자리용 P. C.집수판(5)(6) 및 내부용 P. C.판(7)들은 공장제품으로 만들어져서 옥상마감층 공사현장의 옥상바닥의 주변부 및 내부에 격자형으로 조립설치되어 내부공간부(10)를 형성하며, 상기 내부공간부에 누룸콘크리트층(11)을 성형하기 위하여 콘크리트를 부어 넣어 현장타설하게 된다.As described above, the edge PC collecting plates 5 and 6 for internal structure and the internal PC plates 7 are made of factory products and are assembled in a lattice form on the periphery and inside of the rooftop of the rooftop construction site. The inner space portion 10 is formed, and concrete is poured into the inner space portion in order to mold the nurum concrete layer 11.

이하, 옥상바닥의 마감층에 대한 공정단계를 시공순서별로 구체적인 내용을 살펴보기로 한다.Hereinafter, the process steps for the finishing layer of the rooftop will be described in detail by construction order.

먼저, 제5도의 (a)도에서와 같이, 콘크리트슬라브층(1)의 상면에 방수층(3)이 설치된 상태에서, a) 제5도의 (b)도에서와 같이, 난간벽체(2)와 이웃하는 옥상바닥의 가장자리부에서 난간벽체(2)의 하부에 쿠숀재료인 폴리에틸렌폼(4)을 설치한 후, 가장자리용 P. C.집수판(5), (6)을 조립설치함과 동시에 상기 가장자리용 P. C.집수판(5), (6) 내측에 신축줄눈설치용 가설판재(8)를 몰탈(9)에 의하여 고정설치한 후에, b) 제5도의 (c)도에서와 같이, 상기 가장자리용 P. C.집수판(5)(6)이 설치된 옥상바닥의 내부에 내부용 P. C.판(7)을 일정위치마다 내부공간부(10)들이 형성되도록 격자형으로 조립설치하고, 내부용 P. C.판(7)의 양측면에 신축줄눈설치용 가설판재(8)를 몰탈(9)에 의하여 동시에 고정설치한 후, c) 제5도의 (d)도에서와 같이, 상기 내부공간부(10)들 내부에 상기 P. C.판(7)들의 상면과 동일한 레벨을 가지도록 콘크리트를 현장타설하여 누룸콘크리트층(11)을 성형시킨 후,d) 제5도의 (e)도에서와 같이, 상기 신축줄눈설치용 가설판재(8)들을 제거한 후, 그 틈사이 공간부(14)에 폴리에틸렌폼의 백업재(13)를 설치하여 아스팔트계 실리콘재의 코킹재(12)를 채워 넣어 이음부를 밀폐시키는 신축줄눈을 성형하는 단계로 구성된다.First, as shown in (a) of FIG. 5, with the waterproofing layer 3 installed on the upper surface of the concrete slab layer 1, a) as shown in (b) of FIG. 5, the handrail wall 2 and After installing polyethylene foam (4), which is a cushion material, in the lower part of the handrail wall (2) at the edge of the neighboring rooftop, assembling and installing edge PC collecting plates (5) and (6), After the temporary joint member 8 for expansion joint installation 8 is installed inside the PC collecting plates 5 and 6 by mortar 9, b) the edge PC collection as shown in FIG. 5C. The internal PC board 7 is assembled in a lattice shape so that the internal spaces 10 are formed at predetermined positions in the rooftop floor where the water plates 5 and 6 are installed, and both sides of the internal PC board 7 are installed. And fixedly installing the temporary joint member 8 for expansion joints by mortar 9 at the same time, and c) the PC inside the inner space portions 10, as shown in (d) of FIG. After the concrete is cast in situ to have the same level as the upper surface of the (7) to form the Nurum concrete layer (11), d) as shown in (e) of Figure 5, the expansion joints for installing the temporary joints (8) After removal, the space 14 between the gaps is provided with a backing material 13 of polyethylene foam to fill the caulking material 12 of the asphalt-based silicon material to form a stretch joint sealing the joint.

한편, 신축줄눈의 설치가 완료된 후, 마무리단계로서 가장자리의 4모서리에는 콘크리트를 현장타설하여 바닥집수부의 높이정도로 성형시키게 되고, 난간벽체(2) 내측에 부착된 방수층(3)을 보호하는 역할을 하는 조적조(15) 또는 보조방수층(17)간에 접착력을 증대시키 위하여 요철홈(5b)들이 형성되는 가장자리용 P. C.집수판(5)은 제5도의 (f)도 및 (g)도에서와 같이, 옥상바닥의 가장자리부, 즉 난간벽체(2)의 하부 내주면에 설치되어 상기 조적조(15) 또는 보조방수층(17)과의 접합부에서 긴밀하게 접착되도록 하는 것이다.On the other hand, after the installation of the expansion joint is completed, as the finishing step, the four corners of the edge is cast concrete in the form of about the height of the bottom catchment, and protects the waterproof layer (3) attached to the inside of the handrail wall (2). The edge PC collecting plate 5 in which the uneven grooves 5b are formed to increase the adhesion between the masonry 15 or the auxiliary waterproofing layer 17 is formed as shown in (f) and (g) of FIG. It is installed on the edge of the rooftop, ie, the lower inner circumferential surface of the handrail wall 2 so as to be intimately bonded at the junction with the masonry 15 or the auxiliary waterproof layer 17.

또한, P. C.판(5)(6), (7)들이 기성제품이기 때문에 조립설치를 완료하자마자 곧바로 신축줄눈설치용 가설판재(8)도 동시에 그 P. C.판(5)(6), (7)들 측면에 고정설치할 수 있을 뿐만 아니라, 상기 신축줄눈설치용 가설판재(8)의 고정설치 후에는 곧바로 격자형의 내부공간부(10)에 콘크리트를 타설할 수 있기 때문에 공사기간을 현저하게 단축시킬 수 있으며, P. C.판(5)(6), (7)들을 미리 공장에서 만들어서 작업현장에서 조립하는 것이므로 작업현장이 항시 깨끗하면서도 청결함을 유지할 수 있는 장점이 있다.In addition, since the PC boards 5, 6, and 7 are ready-made products, the temporary joint member 8 for expansion joint installation immediately at the same time as soon as the completion of the assembly installation is at the same time as the PC boards 5, 6, and 7 sides. Not only can be fixed to the installation, after the fixed installation of the expansion joint installation plate 8 for the expansion joint can be concretely shortened the construction period, because concrete can be poured directly into the lattice inner space 10, Since the PC boards (5), (6) and (7) are made at the factory in advance and assembled at the work site, there is an advantage that the work site is always clean and clean.

여기에서, 신축줄눈설치용 가설판재(8)의 일측면이 P. C.판(5)(6), (7)들의 측면부에서 지지되고, 타측면은 신축줄눈설치용 가설판재(8)가 쓰러지지 않는 정도로 가설판재의 타측면의 하부부분을 몰탈(9)을 단순히 고정시키는 것이며, 가설판재(8)가 고정된 후에 경화가 완전하지 않더라도 곧바로 격자형의 내부공간부(10)에 콘크리트를 타설할 수가 있다.Here, one side of the flexible joint installation temporary plate member 8 is supported by the side portions of the PC boards (5), (6), (7), the other side is a temporary plate member to the extent that the expansion joint member for expansion joint installation (8) does not fall. The lower portion of the other side of the mortar 9 is simply fixed, and after the temporary plate member 8 is fixed, it is possible to pour concrete directly into the lattice inner space part 10 even if the curing is not complete.

즉, 몰탈(9)이 완전히 경화되지 않더라도 신축줄눈설치용 가설판재(8)가 내부공간부(10)에 타설되는 콘크리트의 측압에 의하여 쓰러지지 않고 P. C.판(5)(6), (7)들에 지지되기 때문이다. 따라서, P. C.판(5)(6), (7)들 측면에 신축줄눈설치용 가설판재(8)를 고정설치한 후에 곧바로 격자형의 내부공간부(10)에 콘크리트를 타설할 수 있는 것이다.That is, even if the mortar 9 is not completely hardened, the temporary joint member 8 for installing the expansion joints does not fall down due to the side pressure of the concrete that is poured into the inner space 10, and the PC plates 5, 6, and 7 Because it is supported. Therefore, the concrete can be poured into the lattice-shaped inner space 10 immediately after fixing the temporary joint member 8 for installing the expansion joint on the sides of the P. C. plates (5) (6), (7).

이와 같이, 구성되는 본 발명은 옥상바닥의 가장자리 주변부에는 가장자리용 P. C.집수판(5)(6)이 설치되고, 옥상바닥의 내부에는 내부용 P. C.판(7)이 설치됨으로써 옥상바닥에 떨어지는 빗물이 내부용 P. C.판(7)의 바닥집수부를 통하여 가장자리용 P. C.집수판(5)(6)의 바닥집수부로 흘러 들어가서 옥상바닥의 모서리부분에 설치되어 있는 루프드레인(18)을 통하여 배수시키게 된다.Thus, in the present invention constituted, the edge PC collecting plate (5) (6) for the edge is installed on the periphery of the edge of the rooftop, and the interior PC plate (7) for the interior of the rooftop floor is provided with rain water falling on the rooftop It flows into the bottom collecting part of the edge PC collecting plate 5 and 6 through the bottom collecting part of the inner PC board 7 and is drained through the roof drain 18 installed at the corner of the rooftop. .

[발명의 효과][Effects of the Invention]

이와 같이 구성되는 종래기술의 작업현장에서 몰탈로 수작업을 통하여 트렌치작업과 줄눈설치작업을하여 작업성이 저하될 뿐만 아니라, 신축줄눈재 설치작업이 별도의 공정으로 수행되어져서 전반적인 공사기간이 길어졌으며, 작업현장이 어지럽고 청결하지 못하였던 것과는 달리, 본 발명은 첫째, 가장자리용 P. C.집수판(4) 및 내부용 P. C.판(6)들을 미리 공장에서 만들어서 옥상마감층작업현장에서 특별한 기능공이 아니고도 간편, 신속하게 조립설치되는 것이기 때문에 작업성이 증대되는 효과가 있으며, 둘째, P. C.판(4)(6)들이 기성제품이므로 조립 설치하자마자 곧바로 그 양측면에 신축줄눈설치용 가설판재(7)도 동시에 설치할 수 있을 뿐만 아니라, 신축줄눈설치용 가설판재(7)의 고정설치 후에는 곧바로 내부공간부(7)에 콘크리트를 현장타설할 수 있기 때문에 전반적인 공사기간이 현저하게 단축될 수 있는 효과가 있으며, 셋째, P. C.판(4)(6)들을 미리 공장에서 만들어서 작업현장에 조립하는 것이므로 작업현장이 항시 깨끗하면서도 청결함을 유지할 수 있는 효과가 있다.In the work site of the prior art configured as described above, not only the workability is degraded by the trench work and the joint installation work through the mortar by hand, but also the expansion work of the expansion joint is performed as a separate process, and the overall construction period is longer. Unlike the dizzy and unclean work site, the present invention firstly made the edge PC collecting plate (4) and the internal PC plate (6) in advance at the factory, not easy to be a special craftsman at the rooftop floor work site Since it is quickly assembled and installed, the workability is increased. Second, since the PC boards (4) and (6) are ready-made products, the temporary joint plates (7) for expansion joint installation on both sides can be installed at the same time. In addition, after the fixed installation of the temporary joint plate (7) for expansion joint installation, it is possible to cast concrete directly into the interior space (7) As a result, the overall construction period can be significantly shortened. Third, since the PC boards (4) and (6) are made in advance in the factory and assembled at the work site, the work site is always clean and clean. There is.

이상에서 살펴 본 바와 같이 본 발명의 건축물 옥상마감층의 시공방법은 P. C.판들을 공장에서 미리 기성제품화하여 옥상작업현장에서 간편 신속하게 조립설치하기 때문에 작업성이 증대되며, 또한 P. C.판과 신축줄눈설치용 가설판재(7)를 동시에 설치할 수 있을 뿐만 아니라, 신축줄눈설치용 가설판재(7) 설치후 곧바로 내부공간부에 콘크리트를 타설할 수 있기 때문에 전반적인 공사기간을 단축할 수 있으며, 현장타설이 아닌 공장제품을 현장에서 조립하는 것이기 때문에 작업현장이 항시 깨끗하면서도 청결함을 유지할 수 있는 매우 유용한 것이다.As described above, the construction method of the rooftop layer of the building of the present invention increases the workability because it is easily assembled and installed at the rooftop work site by making ready-made PC boards in a factory in advance, and also for installing a PC board and expansion joints. Not only can the temporary board member 7 be installed at the same time, but also concrete can be poured into the internal space immediately after installing the temporary joint member 7 for installation of expansion joints, so that the overall construction period can be shortened. It is very useful to keep the workplace clean and clean at all times because it is assembled on site.

Claims (1)

a) 콘크리트슬라브층(1) 상부에 방수층이 설치된 옥상바닥의 난간벽체 가장자리에 쿠숀재료를 설치한 후, 가장자리용 P. C.집수판(4)을 조립설치함과 동시에 상기 가장자리용 P. C.집수판(4) 내측에 신축줄눈설치용 가설판재(5)를 지지되도록 고정설치한 다음, b) 옥상바닥의 내부에 일정위치마다 내부공간부(7)들이 형성되도록 내부용 P. C.판(6)을 격자모양으로 조립설치함과 동시에 상기 내부용 P. C.집수판(6)의 양측면에 신축줄눈설치용 가설판재(5)를 지지되도록 고정설치한 다음, c) 상기 내부공간부(7)들 내부에 콘크리트를 현장타설하여 상기 P. C.집수판(4)(6)들의 상부면과 동일한 레벨의 누룸콘크리트층(8)을 성형시킨 후, d)상기 신축줄눈설치용 가설판재(5)를 제거한 후, 그 틈사이 내부에 백업재를 설치하여, 코킹재를 채워넣어 신축줄눈(9)을 형성함으로써 완료됨을 특징으로 하는 건축물 옥상바닥 마감층의 시공방법.a) After the cushion material is installed on the edge of the railing wall of the rooftop where the waterproof layer is installed on the concrete slab layer (1), the PC collecting plate for edge (4) is assembled and installed at the same time. After installing fixedly supporting the temporary joint plate member 5 for expansion joints inside, b) Assembling and installing the inner PC plate 6 in a grid shape so that the inner space portions 7 are formed at predetermined positions in the rooftop floor. At the same time, and fixedly installed so as to support the temporary joint mounting plate (5) for installing the expansion joints on both sides of the internal PC collecting plate (6), c) the site of the concrete in the interior space (7) by placing the PC After molding the Nurum concrete layer 8 having the same level as the upper surface of the collecting plates 4, 6, d) removing the temporary joint installation material 5 for expansion joint installation, and then installing a backup material therebetween. By filling the caulking material to form a stretch joint 9 Building roof construction method of the floor finishing layer as claimed complete.
KR1019960033870A 1996-08-16 1996-08-16 Roof floor finishing method KR100201541B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019960033870A KR100201541B1 (en) 1996-08-16 1996-08-16 Roof floor finishing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019960033870A KR100201541B1 (en) 1996-08-16 1996-08-16 Roof floor finishing method

Publications (2)

Publication Number Publication Date
KR19980014749A KR19980014749A (en) 1998-05-25
KR100201541B1 true KR100201541B1 (en) 1999-06-15

Family

ID=19469686

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019960033870A KR100201541B1 (en) 1996-08-16 1996-08-16 Roof floor finishing method

Country Status (1)

Country Link
KR (1) KR100201541B1 (en)

Also Published As

Publication number Publication date
KR19980014749A (en) 1998-05-25

Similar Documents

Publication Publication Date Title
FI91180B (en) Prefabricated building foundation element
KR100539333B1 (en) Drain board structure for under ground basement
WO2015116955A1 (en) Precast concrete wall and method
CN113585351A (en) Soil covering plane settlement post-cast strip prefabrication advanced reverse order closed construction method
KR101135473B1 (en) Roof structure system for improvement quality of roof waterproofing
TW202214938A (en) Floor rack including at least two horizontally spaced longitudinal bars and at least one transverse bar
KR100201541B1 (en) Roof floor finishing method
KR101111572B1 (en) Insulating and protecting panel for a waterproof layer on a concrete structure
KR200380424Y1 (en) Drain board structure for under ground basement
KR100542380B1 (en) Structure of Expansion Joint Filler for Concrete Slab, and Method for Carrying Out Thereof
CN211080807U (en) A waterproof system that is used for waterproof shop of roofing coiled material to paste modularization precast concrete circular arc chamfer
JPH01223245A (en) Concrete wall construction
AU2006262036B2 (en) Form for casting light weight composite concrete panels
KR102387380B1 (en) Floor system for bathroom
KR0179941B1 (en) Construction for roof floor
KR102270842B1 (en) the improved bottom panel unit and the bottom panel structure using the same and the construction method thereof
JPH0453404Y2 (en)
JP3615823B2 (en) Drainage construction method
JP3146245B2 (en) Stainless integrated precast plate and molding method
JPS6132055Y2 (en)
KR100297426B1 (en) Glass block panel and manufacturing method of glass block panel
JP5166225B2 (en) Driving form for fixing the floor of the floating formwork and construction method of the edge treatment structure of the waterproof layer using it
KR101083910B1 (en) Waterproofing sheet having an air vent, a device for constructing a waterproofing layer and method of construction using the same
KR0134428Y1 (en) Confining water p.c. plate with heat insulation of roof
JP4866271B2 (en) Drainage forming mold and joint material

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130314

Year of fee payment: 15

FPAY Annual fee payment

Payment date: 20140312

Year of fee payment: 16

LAPS Lapse due to unpaid annual fee