KR0128962Y1 - Balustrade - Google Patents

Balustrade Download PDF

Info

Publication number
KR0128962Y1
KR0128962Y1 KR2019950012164U KR19950012164U KR0128962Y1 KR 0128962 Y1 KR0128962 Y1 KR 0128962Y1 KR 2019950012164 U KR2019950012164 U KR 2019950012164U KR 19950012164 U KR19950012164 U KR 19950012164U KR 0128962 Y1 KR0128962 Y1 KR 0128962Y1
Authority
KR
South Korea
Prior art keywords
bolt
nut
cross member
base cup
widths
Prior art date
Application number
KR2019950012164U
Other languages
Korean (ko)
Other versions
KR960037637U (en
Inventor
김기환
Original Assignee
김기환
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김기환 filed Critical 김기환
Priority to KR2019950012164U priority Critical patent/KR0128962Y1/en
Publication of KR960037637U publication Critical patent/KR960037637U/en
Application granted granted Critical
Publication of KR0128962Y1 publication Critical patent/KR0128962Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1817Connections therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1812Details of anchoring to the wall or floor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1842Balusters; Grille-type elements
    • E04F11/1846Balusters with means for fixing to the floor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1817Connections therefor
    • E04F2011/1819Connections therefor between balustrade posts and horizontal or sloping balustrade members

Abstract

[목적] 세로재 및 스페이서삽입용 레일홈을 가진 상,중 하단의 가로재로 상하 폭이 좁은 상부 공간과 넓은 하부 공간을 갖는 난간을, 상부 세로재의 하단을 레일끼움할 수 없는 중간 가로재에서도 상부 세로재를 안정감있고 또한 튼튼하게 조립할 수 있는 난간을 제공하기 위한 것이다.[Purpose] Rail top and bottom widths with vertical and spacer rail grooves for inserting railings with narrow upper and lower spaces and wide lower spaces. The purpose is to provide a railing that allows the top longitudinal material to be securely and securely assembled.

[구성] 세로재 및 스페이서삽입용 레일홈(12) 및 기둥이 될 자리마다 보울트공(13)을 가진 3개의 가로재(1a,b,c)를 상하폭이 좁은 상부 공간(a)과 넓은 하부 공간(b)을 가지게 나란히 배치하고, 상기 보울트공(13)에 위치하는 세로재(2,3)를 기준으로 등간격으로 조립한 다음 각 보울트공(13)에 장축보울트(6)을 끼워서 그 상단은 상단 가로재(1a)의 너트(8a)에 그리고 하단부는 하단 가로재(1c)내의 너트(8b)에 체결하는 한편 하단 가로재(1c) 밑으로 내려진 장축보울트(6)의 하단부에 베이스컵(7)을 끼우고 베이스컵(7)밑에 너트(8c)를 체결한 것을 특징으로 하는 난간.[Configuration] The upper and lower widths of the upper and lower widths (a) and the three horizontal members (1a, b, c) having the bolt hole 13 for each of the rail grooves 12 for the vertical member and the spacer insertion and the positions to be the pillars Placed side by side with a lower space (b), and assembled at equal intervals based on the longitudinal material (2, 3) located in the bolt hole 13, and then fitted with a long axis bolt (6) in each bolt ball (13) The upper end is fastened to the nut 8a of the upper cross member 1a and the lower end is fastened to the nut 8b in the lower cross member 1c while the lower end of the long shaft bolt 6 lowered below the lower cross member 1c. Handrail, characterized in that the base cup (7) is fitted and the nut (8c) is fastened under the base cup (7).

Description

난간Handrail

제1도는 본고안에 의한 난간의 일부를 발췌한 정면도.Figure 1 is a front view of a part of the handrail according to the present draft.

제2도는 일부를 생략한 제1도의 A-A선 단면도.2 is a cross-sectional view taken along the line A-A in FIG.

제3도는 제1도의 B-B선 단면도.3 is a cross-sectional view taken along the line B-B in FIG.

제4도는 제1도의 C-C선 절단면도.4 is a cross-sectional view taken along the line C-C of FIG.

* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

1a : 상단 가로재 1b : 중간 가로재1a: Upper cross member 1b: Middle cross member

1c : 하단 가로재 2 : 하부 세로재1c: lower cross member 2: lower longitudinal member

3 : 상부세로재 6 : 장축보울트3: upper vertical material 6: long shaft bolt

7 : 베이스컵 8a,b,c : 너트7: base cup 8a, b, c: nut

12 : 레일홈 13 : 보울트공12: rail groove 13: bolt ball

a : 상부 공간 b : 하부 공간a: upper space b: lower space

본고안은 건물의 난간 또는 울타리대용이 가능한 난간의 개량에 관한 것이며, 특히 세로재 및 스페이서삽입용 레일홈을 가진 상,중 하단의 가로재로 상하 폭이 좁은 상부 공간과 넓은 하부 공간을 갖는 난간을, 상부 세로재의 하단을 레일끼움할 수 없는 중간 가로재에서도 상부 세로재를 안정감있고 또한 튼튼하게 조립한 난간에 관한 것이다.This paper is concerned with the improvement of railings that can be used for building railings or fences. Especially, railings having upper and lower widths with upper and lower widths with vertical and spacer insert grooves. The present invention relates to a railing in which the upper longitudinal member is stably and firmly assembled even in an intermediate horizontal member which cannot rail-fit the lower end of the upper longitudinal member.

본고안은 특히 본인의 선출원고안 제94-23803호를 개량한 것이다. 이 선출원고안은 상기 가로재의 적용을 상단과 하단등 단 2단에 국한되었다. 각기 하나뿐인 상간과 하단의 가로재는 레일홈이 마주보게 배치해야만이 세로재의 상단과 하단을 레일끼움할 수 있고 그 반대되는 면에는 레일홈이 없어서 세로재를 레일끼움할 수 없기 때문이다. 그 결과, 조립후의 난간은 그 모양새가 너무 단조로왔다.This proposal is particularly an amendment to my Elected Application No. 94-23803. This draft application was limited to the application of the cross member to only two stages, including the top and bottom. The upper and lower rails each have only one rail groove facing each other so that the upper and lower rails can be rail-mounted. On the opposite side, there is no rail groove, so the rails cannot be rail-mounted. As a result, the railings after assembling have been so forged in shape.

그래서 본고안자는 겉보기에 무난하면서도 상기 선출원고안의 문제점을 극복할 수 있는 새로운 형태의 난간을 제공하는 것이다.Thus, the present author is to provide a new form of railing that is seemingly safe but can overcome the problems of the above-mentioned first draft.

상기 목적을 달성하기 위하여 본고안은 적어도 일면에 세로재의 단부를 레일끼움하는 동시에 세로간에 일정한 간격을 두기위하여 스페이서를 레일끼움하기 위한 레일홈을 갖고 또한 레일홈과는 별도로 길이방향을 따라 형성된 중공부에는 금속제 보강관을 삽입하여 휨응력을 보완한 가로재로 좁은 윗공간과 넓은 아랫공간을 형성하고, 이들 공간에 짧거나 긴 세로재를 소정의 간격을 두고 배치하되 기둥이 되는 부분의 세로재와 하단 및 중간 가로재에 장축보울트를 종방향으로 관통시키고 이 자욱보울트의 상단과 하단을 상단 가로재와 하단 가로재의 보강관내에 부착한 너트에 체결하는 것으로 조립상태가 안정된 난간을 제공하는 것이다.In order to achieve the above object, the present disclosure has a rail groove for rail-fitting the spacers to rail-fit the end portions of the longitudinal members on at least one surface and to have a constant distance between them, and a hollow portion formed along the longitudinal direction separately from the rail grooves. Insert the metal reinforcement pipe into the horizontal material to compensate for the bending stress to form a narrow upper space and a wide lower space, and arrange the short or long vertical material at predetermined intervals in these spaces, but the vertical material and the lower part of the column And a long shaft bolt penetrating the middle bar member in the longitudinal direction, and fastening the upper and lower ends of the jaw bolt to a nut attached to the reinforcing pipe of the top bar member and the bottom bar member to provide a stable railing.

이하, 본고안의 실시예에 대하여 설명한다.Hereinafter, the Example of this invention is described.

제1도에서 보듯이, 본고안은 상,중,하단에는 동일한 단면구조를 가진 가로재(1a,b,c)와, 짧고 긴 관으로 된 세로재(2,3)를 조립한 것으로서, 가로재(1a,b,c)는 제2,3도에 나타난 바와같이 길이방향으로 네모난 중공부(11)가 형성되고 일면에는 레일홈(12)이 형성된 합성수지 압출물이다. 상기 중공부(11)에는 보강관(4)을 삽입하여 휨응력이 약한 가로재(1a,b,c)들을 보완한다.As shown in FIG. 1, the present invention is a combination of horizontal members 1a, b and c having the same cross-sectional structure at the upper, middle and lower ends, and vertical members 2 and 3 of short and long tubes. Ash (1a, b, c) is a synthetic resin extrudate formed with a hollow hollow 11 in the longitudinal direction and a rail groove 12 on one side as shown in Figs. The hollow portion 11 is inserted into the reinforcing pipe 4 to compensate for the horizontal members (1a, b, c) of weak bending stress.

상기 보강관(4)은 금속관이며, 중공부(11)의 길이와 동등하고, 그 외형도 상기 중공부(11)의 단면형상과 같다.The reinforcement pipe 4 is a metal pipe, is equivalent to the length of the hollow part 11, and the external shape is also the same as the cross-sectional shape of the hollow part 11.

가로재(1a,b,c)의 일면에는 길이방향을 따라 레일홈(12)이 형성되어 있어서 각 층의 세로재(2,3)와 스페이서(5)를 레일끼움하게 된다.Rail grooves 12 are formed in one surface of the horizontal members 1a, b, and c along the longitudinal direction, so that the vertical members 2, 3 and the spacers 5 of each layer are rail-fitted.

상단 가로재(1a)와 중간 가로재(1b)와의 사이에 형성된 윗공간(a)은 상하폭이 좁으나 중간 가로재(1b)와 하단 가로재(1c)와의 사이에 형성된 아랫공간(b)은 윗공간(a)에 비해 훨씬 넓다. 따라서 윗공간(a)의 세로재(3)는 짧은 것을 사용하고 아랫공간(b)용 세로재(2)는 긴 것을 사용한다. 세로재(2,3)는 합성수지관이며, 각관 또는 둥근 관일 수 있으며, 상부 세로재(3)는 기둥이 될 곳에만 드문드문 배치한다.The upper space (a) formed between the upper cross member (1a) and the middle cross member (1b) has a narrow upper and lower width, but the lower space (b) formed between the middle cross member (1b) and the lower cross member (1c) Is much wider than the upper space (a). Therefore, the vertical material 3 of the upper space a uses a short one, and the vertical material 2 for the lower space b uses a long one. Longitudinal material (2,3) is a synthetic resin tube, may be a square tube or round tube, the upper longitudinal material (3) is sparsely disposed only where the column.

스페이서(5)는 각 공간부내에 조립되는 세로재(2)(3)끼리 일정한 간격을 유지시키는 것으로, 세로재(2) 또는(3)의 배치간격만하게 일정한 길이를 갖고, 또한 상기 레일홈(12)에 끼워져 빠지지 않게 걸리는 걸림요소를 갖고 있다. 예까지는 모두 상기 선행기술에 포함된 것과 동일하다.The spacers 5 maintain the constant spacing between the vertical members 2 and 3 assembled in the respective space parts, and have a constant length only in the arrangement interval of the vertical members 2 or 3, and the rail grooves ( 12) It has a catching element to be caught and prevent it from slipping out. All examples are identical to those included in the prior art.

본고안은 이러한 가로재(1a,b,c)와 세로재(2,3) 그리고 스페이서(5) 및 장축보울트(6)를 사용하여 제1도와 같은 모양의 난간을 조립한 것이다. 장축보울트(6)는 베이스컵(7)의 길이까지를 포함하는 난간의 전체 높이와 동등한 길이의 것을 상요한다.This proposal is to assemble a handrail having the shape as shown in FIG. 1 by using the horizontal members (1a, b, c) and the vertical members (2, 3) and the spacer (5) and the long axis bolt (6). The long shaft bolt 6 is of a length equal to the total height of the balustrade including up to the length of the base cup 7.

그리고 제3도에서 보듯이 장축보울트(6)가 꽂히는 부분의 상단 가로재(1a)는 밑면과 보강관(4)의 바닥면, 중간 가로재(1b) 및 하단 가로재(1c)는 상하로 완전히 관통하는 보울트공(13)을 뚫고, 이들 보울트공(13) 가운데 상단 가로재(1a)의 보강관(4) 바닥 및 하단 가로재(1c)의 보강관(4) 천정에는 너트(8a,b)를 용접해 붙인다.And as shown in FIG. 3, the upper cross member 1a of the portion where the long shaft bolt 6 is inserted is the bottom and the bottom surface of the reinforcing pipe 4, the middle cross member 1b and the lower cross member 1c up and down. Through the bolt hole 13 which penetrates completely, the bottom of the reinforcement pipe 4 of the upper cross member 1a among these bolt holes 13, and the ceiling of the reinforcement pipe 4 of the lower cross member 1c, the nut 8a, b) by welding.

또한 장축보울트(6)의 하단부는 베이스컵(7)을 끼우고 너트(8c)를 체결하고도 약간은 남을 정도로 노출시켜 앵커(9)에 용접해 붙일 수 있게 한다.In addition, the lower end of the long shaft bolt (6) by fitting the base cup (7) and tightening the nut (8c) to expose a little remaining to be able to weld to the anchor (9).

이러한 가로재(1a,b,c)와 세로재(2,3), 스페이서(5) 및 장축보울트(6)를 사용하여 조립한 난간은 제1도와 같다. 이때, 한가지 조건은 각 단의 가로재(1a,b,c)에서 보울트공(13)이 위치한 곳에는 반드시 세로재(2,3)가 위치해야 하고, 이를 기준으로 등간격으로 다른 세로재를 배치한다.The handrails assembled using the horizontal members 1a, b and c, the vertical members 2 and 3, the spacer 5 and the long shaft bolt 6 are shown in FIG. At this time, one condition is that the vertical material (2,3) must be located where the bolt hole 13 is located in the horizontal material (1a, b, c) of each stage, and based on this other vertical material at equal intervals To place.

난간의 조립순서는 다음과 같다. 먼저, 중간 가로재(1b)와 하단 가로재(1c)사이에 하부 세로재(2)와 스페이서(5)를 레일끼움하고, 보울트공(13)에 중간 가로재(1b)쪽에서 장축보울트(6)를 끼워내린 다음에 하단 가로재(1c)의 너트(8b)에 체결한다. 이때, 장축보울트(6)의 상단부는 중간 가로재(1b) 위로 또한 하단 가로재(1c) 밑으로 각각 넉넉하게 노출시킨다.The assembly procedure of the railing is as follows. First, the lower vertical member 2 and the spacer 5 are rail-fitted between the intermediate member 1b and the lower member 1c, and the long axis bolt 6 is disposed on the bolt hole 13 toward the intermediate member 1b. ), And then tighten the nut (8b) of the lower cross member (1c). At this time, the upper end of the long axis bolt (6) is exposed to each of the top of the middle bar (1b) and the bottom of the bottom bar (1c) generously.

중간 가로재(1b) 위로 솟구친 장축보울트(6)의 상단부에 상부 세로재(3)를 끼우고 이 세로재(3)위로 드러난 장축보울트(6)의 상단을 상단 가로재(1a)의 보울트공(13)에 끼워서 그 너트(8a)에 체결한다.Insert the upper longitudinal member 3 to the upper end of the long shaft bolt 6 soaring over the middle cross member 1b, and the upper end of the long shaft bolt 6 exposed above the longitudinal member 3 to the bolt hole of the upper cross member 1a. (13) and fasten to the nut (8a).

마지막으로 하단 가로재(1c) 밑으로 내려진 장축보울트(6)의 하단부에 베이스컵(7)을 끼우고 너트(8c)를 체결한다. 이리하여 난간이 완성되는 것이다.Finally, the base cup 7 is inserted into the lower end of the long shaft bolt 6 lowered below the lower horizontal member 1c, and the nut 8c is fastened. Thus the railing is completed.

이상 설명한 바와같은 본고안의 난간은 세로재 및 스페이서삽입용 레일홈을 가진 가로재를 좁은 상부 공간과 넓은 하부 공간을 가지게 나란히 배치하고 보울트공 마다 장축보울트를 꿰어 상단 가로재 및 하단 가로재내에 부착한 너트에 체결하는 것으로 난간의 조립상태를 안정시킨 것으로서, 상부 세로재의 하단을 레일끼움할 수 없는 중간 가로재에서도 상부 세로재를 안정감있고 또한 튼튼하게 조립할 수 있고, 따라서 상,하부 공간에 배치간격을 달리한 상부 세로재와 하부 세로재를 가진 난간으로 만들 수 있다.As described above, the railing of the present article is arranged side by side with a narrow upper space and a wide lower space with a longitudinal member and a rail groove for inserting spacers, and a long axis bolt is attached to each bolt hole to be attached to the upper member and the lower member. By tightening the nut, the assembly state of the railing is stabilized, and the upper longitudinal material can be assembled stably and firmly even in the middle horizontal material where the lower end of the upper longitudinal material cannot be fitted with rails. It can be made from railings with different upper and lower longitudinals.

Claims (1)

세로재 및 스페이서삽입용 레일홈(12) 및 기둥이 될 자리마다 보울트공(13)을 가진 3개의 가로재(1a,b,c)를 상하폭이 좁은 상부 공간(a)과 넓은 하부 공간(b)을 가지게 나란히 배치하고, 상기 보울트공(13)에 위치하는 세로재(2,3)를 기준으로 등간격으로 조립한 다음 각 보울트공(13)에 장축보울트(6)을 끼워서 그 상단은 상단 가로재(1a)의 너트(8a)에 그리고 하단부는 하단 가로재(1c)내의 너트(8b)에 체결하는 한편 하단 가로재(1c) 밑으로 내려진 장축보울트(6)의 하단부에 베이스컵(7)을 끼우고 베이스컵(7)밑에 너트(8c)를 체결한 것을 특징으로 하는 난간.The upper and lower widths of the upper and lower widths (a) and the wider lower spaces are divided into three horizontal members (1a, b, c) having a bolt hole (13) for each of the rail grooves (12) for inserting the longitudinal member and the spacer and the column. b) arranged side by side, and assembled at equal intervals on the basis of the longitudinal material (2, 3) located in the bolt ball 13, and then inserted the long axis bolt (6) in each of the bolt ball (13) The base cup (6) is fastened to the nut (8a) of the upper cross member (1a) and the lower end of the nut (8b) in the lower cross member (1c) while the base cup ( 7) a handrail characterized in that the nut (8c) is tightened under the base cup (7).
KR2019950012164U 1995-05-31 1995-05-31 Balustrade KR0128962Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019950012164U KR0128962Y1 (en) 1995-05-31 1995-05-31 Balustrade

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019950012164U KR0128962Y1 (en) 1995-05-31 1995-05-31 Balustrade

Publications (2)

Publication Number Publication Date
KR960037637U KR960037637U (en) 1996-12-18
KR0128962Y1 true KR0128962Y1 (en) 1998-12-15

Family

ID=19414642

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019950012164U KR0128962Y1 (en) 1995-05-31 1995-05-31 Balustrade

Country Status (1)

Country Link
KR (1) KR0128962Y1 (en)

Also Published As

Publication number Publication date
KR960037637U (en) 1996-12-18

Similar Documents

Publication Publication Date Title
KR0128962Y1 (en) Balustrade
DE3916590C2 (en)
JPH11280032A (en) Guardrail
KR101875476B1 (en) Wooden Bridge Structure for Biosphere Preservation and a Construction Method Thereof
DE2226323A1 (en) LONG ELEMENT, IN PARTICULAR FOR THE FRAME OF HOUSES, AS WELL AS CONNECTING ARRANGEMENTS FOR SUCH ELEMENTS
KR200350314Y1 (en) assembling body for fence
DE4439864C2 (en) Fastening arrangement for tabular components
EP1683927B1 (en) Balustrades for balconies, corridors, staircases and similar walking areas
KR200251518Y1 (en) Formwork Fixture_
EP0856617A2 (en) Balustrade
JPH044407B2 (en)
KR200322170Y1 (en) Balustrade
JP3561799B2 (en) Structure of handrail cross beam and construction method of handrail cross beam
KR200170751Y1 (en) Fabricating structure for handrail of veranda
JPS5915542Y2 (en) Lattice assembly structure for balconies, handrails, etc.
JP4336917B2 (en) Ladder mounting structure and ladder
KR0124503Y1 (en) Assembling clamper of a pipe structure
KR0123562Y1 (en) Fence frame assembly
JPS6236903Y2 (en)
EP0728875B1 (en) Balcony attachable to a building and connecting element therefor
DE19827670A1 (en) Supporting member made of natural stone, its application and process for its manufacture
CA2128487A1 (en) Banister and method of making the same
KR950001687Y1 (en) Structure for fixing a fence-post
KR20240019508A (en) A deck assembly structure
KR200176315Y1 (en) Inserting method of fence

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20090820

Year of fee payment: 12

EXPY Expiration of term