JPWO2016203587A1 - Simulation signal generation apparatus, simulation signal generation method, and computer program - Google Patents

Simulation signal generation apparatus, simulation signal generation method, and computer program Download PDF

Info

Publication number
JPWO2016203587A1
JPWO2016203587A1 JP2016509207A JP2016509207A JPWO2016203587A1 JP WO2016203587 A1 JPWO2016203587 A1 JP WO2016203587A1 JP 2016509207 A JP2016509207 A JP 2016509207A JP 2016509207 A JP2016509207 A JP 2016509207A JP WO2016203587 A1 JPWO2016203587 A1 JP WO2016203587A1
Authority
JP
Japan
Prior art keywords
signal
charge
discharge
storage battery
simulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2016509207A
Other languages
Japanese (ja)
Other versions
JP6159474B2 (en
Inventor
佐久間 正剛
正剛 佐久間
山本 幸洋
幸洋 山本
小林 武則
武則 小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Publication of JPWO2016203587A1 publication Critical patent/JPWO2016203587A1/en
Application granted granted Critical
Publication of JP6159474B2 publication Critical patent/JP6159474B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/385Arrangements for measuring battery or accumulator variables
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/3644Constructional arrangements
    • G01R31/3648Constructional arrangements comprising digital calculation means, e.g. for performing an algorithm
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/385Arrangements for measuring battery or accumulator variables
    • G01R31/3865Arrangements for measuring battery or accumulator variables related to manufacture, e.g. testing after manufacture
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/20Information technology specific aspects, e.g. CAD, simulation, modelling, system security

Abstract

[課題]運用環境に適合した模擬信号を生成することを目的とする。[解決手段]本発明の一態様としての模擬信号生成装置は、蓄電池システムの充放電条件を取得する充放電条件取得部と、蓄電池システムの複数の充放電信号特徴量を取得する信号特徴量取得部と、複数の充放電信号特徴量に基づき、複数の充放電信号特徴量のそれぞれを有する複数の特徴信号を生成する特徴信号生成処理部と、複数の特徴信号を合成して、蓄電池システムに与える充放電の指令信号である模擬信号を生成する模擬信号生成部とを備える。[Problem] An object is to generate a simulation signal suitable for an operating environment. [Solution] A simulation signal generating apparatus as one aspect of the present invention includes a charge / discharge condition acquisition unit that acquires charge / discharge conditions of a storage battery system, and a signal feature quantity acquisition that acquires a plurality of charge / discharge signal feature quantities of the storage battery system. And a feature signal generation processing unit for generating a plurality of feature signals each having a plurality of charge / discharge signal feature amounts based on the plurality of charge / discharge signal feature amounts, and combining the plurality of feature signals into a storage battery system A simulation signal generation unit that generates a simulation signal that is a charge / discharge command signal to be applied.

Description

本発明の実施形態は、模擬信号生成装置、模擬信号生成方法、およびコンピュータプログラムに関する。   Embodiments described herein relate generally to a simulation signal generation device, a simulation signal generation method, and a computer program.

定置用大型蓄電池システム(ESS:EnergyStorageSystem)は、電力系統または工場やビル等のローカル系統における電力の安定化や、周波数変動の抑制など、電力品質を向上に用いられることができる。また、需要家のピーク使用時に電力を放電したり、余剰電力を充電したりする充放電機能を備えている。このような蓄電システムは、今後の市場の拡大が期待されている。   A stationary large storage battery system (ESS: Energy Storage System) can be used to improve power quality, such as stabilization of power in a power system or a local system such as a factory or a building, and suppression of frequency fluctuations. In addition, it has a charge / discharge function that discharges electric power or charges surplus electric power during peak use by consumers. Such a power storage system is expected to expand in the future market.

蓄電池システムは、運用開始前に、所定の性能を満たすかを試す性能試験が行われる。性能試験では、実運用環境を想定した充放電指令値が与えられる。一般的に、試験時に付与される充放電指令値は、既存のデータ、定電流、もしくは正弦波、矩形波、三角波などを組合せた模擬信号が用いられるが、できる限り実際の運用環境を反映した値が望ましい。電池の特性、寿命、安全性等が運用環境に大きく依存するため、実際の運用環境の反映が不十分だと、試験結果に基づくカスタマイズや安全策の効果が乏しくなる。また、正確な試験結果を得ることにより、電池の交換時期などを高精度に予測でき、予め対応計画を見積もることができる。   The storage battery system is subjected to a performance test to check whether a predetermined performance is satisfied before the operation is started. In the performance test, charge / discharge command values assuming an actual operating environment are given. Generally, the charge / discharge command value given during the test uses existing data, constant current, or a simulation signal that combines sine wave, rectangular wave, triangular wave, etc., but reflects the actual operating environment as much as possible. A value is desirable. Since the characteristics, life, safety, etc. of the battery greatly depend on the operating environment, if the actual operating environment is not sufficiently reflected, the effects of customization and safety measures based on the test results will be poor. Moreover, by obtaining an accurate test result, it is possible to predict the replacement time of the battery with high accuracy and to estimate the response plan in advance.

実際に運用中の充放電指令値は、蓄電池システムの様々な用途ごとの充放電指令の重ね合わせとなる。したがって、実際の充放電指令値は、蓄電池システムの接続先の系統の様々な環境要因に依存し、非常に複雑なものとなる。そのため、運用試験において、運用環境と酷似する充放電指令値を生成することは、困難であった。   The charge / discharge command value that is actually in operation is a superposition of charge / discharge commands for various uses of the storage battery system. Therefore, the actual charge / discharge command value depends on various environmental factors of the connection destination system of the storage battery system and becomes very complicated. Therefore, it has been difficult to generate a charge / discharge command value that is very similar to the operation environment in the operation test.

特許第3683753号公報Japanese Patent No. 36837553 特許第4697105号公報Japanese Patent No. 4697105 特許第5498414号公報Japanese Patent No. 5498414

International Electrotechincal Commission Market Strategy Board、 Electrical Energy Storage White Paper、December 2011、p.10-p.14、インターネット<URL:http://www.iec.ch/whitepaper/pdf/iecWP-energystorage-LR-en.pdf>International Electrotechincal Commission Market Strategy Board, Electrical Energy Storage White Paper, December 2011, p.10-p.14, Internet <URL: http://www.iec.ch/whitepaper/pdf/iecWP-energystorage-LR-en. pdf>

本発明の実施形態は、運用環境に適合した模擬信号を生成することを目的とする。   An embodiment of the present invention aims to generate a simulation signal suitable for an operating environment.

本発明の一態様としての模擬信号生成装置は、蓄電池システムの充放電条件を取得する充放電条件取得部と、蓄電池システムの複数の充放電信号特徴量を取得する信号特徴量取得部と、複数の充放電信号特徴量に基づき、複数の充放電信号特徴量のそれぞれを有する複数の特徴信号を生成する特徴信号生成処理部と、複数の特徴信号を合成して、蓄電池システムに与える充放電の指令信号である模擬信号を生成する模擬信号生成部とを備える。   A simulation signal generation device as one aspect of the present invention includes a charge / discharge condition acquisition unit that acquires charge / discharge conditions of a storage battery system, a signal feature amount acquisition unit that acquires a plurality of charge / discharge signal feature amounts of the storage battery system, and a plurality of Based on the charge / discharge signal feature amount, a feature signal generation processing unit that generates a plurality of feature signals having each of the plurality of charge / discharge signal feature amounts, and a charge / discharge of the charge / discharge that is provided to the storage battery system by combining the feature signals A simulation signal generation unit that generates a simulation signal that is a command signal.

第1の実施形態に係る模擬信号生成装置の概略構成の一例を示すブロック図。The block diagram which shows an example of schematic structure of the simulation signal generation apparatus which concerns on 1st Embodiment. 日負荷曲線の一例を示す図。The figure which shows an example of a daily load curve. 蓄電池システムの用途、および当該用途ごとの発令頻度と充放電の持続時間の分布を示す図。The figure which shows the use of a storage battery system, and the distribution of the issuing frequency and charge / discharge duration for every said use. FFTおよび逆FFTによる模擬信号生成のフローチャート。The flowchart of the simulation signal generation by FFT and inverse FFT. 基本信号を用いた模擬信号生成のフローチャート。The flowchart of the simulation signal production | generation using a basic signal. 重畳模擬信号生成のフローチャート。The flowchart of a superimposition simulation signal production | generation. 第2の実施形態に係る模擬信号生成装置の概略構成の一例を示すブロック図。The block diagram which shows an example of schematic structure of the simulation signal generation apparatus which concerns on 2nd Embodiment. フィードバック処理のフローチャート。The flowchart of a feedback process.

以下、図面を参照しながら、本発明の実施形態について説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings.

(第1の実施形態)
図1は、第1の実施形態に係る模擬信号生成装置の概略構成の一例を示すブロック図である。模擬信号生成装置100は、信号データ取得部101と、信号特徴量抽出部102と、信号特徴量取得部103と、N個(Nは1つ以上の整数)の特徴信号生成部104を含む特徴信号生成処理部111と、充放電条件取得部105と、模擬基本信号生成部106と、模擬信号合成部107と、模擬信号調整部108と、模擬信号出力部109とを備える。
(First embodiment)
FIG. 1 is a block diagram illustrating an example of a schematic configuration of a simulation signal generation device according to the first embodiment. The simulated signal generation apparatus 100 includes a signal data acquisition unit 101, a signal feature amount extraction unit 102, a signal feature amount acquisition unit 103, and N (N is an integer of 1 or more) feature signal generation units 104. A signal generation processing unit 111, a charge / discharge condition acquisition unit 105, a simulation basic signal generation unit 106, a simulation signal synthesis unit 107, a simulation signal adjustment unit 108, and a simulation signal output unit 109 are provided.

模擬信号生成装置100は、蓄電池システム201と、信号データ格納部301と、信号特徴量格納部302と、定格情報格納部303と接続される。   The simulated signal generation device 100 is connected to a storage battery system 201, a signal data storage unit 301, a signal feature amount storage unit 302, and a rating information storage unit 303.

模擬信号生成装置100は、蓄電池システム201に与える模擬信号を生成するものである。模擬信号は、電力と時間との関係で表される信号であり、蓄電池システム201に充放電を行わせるための指令信号(充放電指令値)として用いられる。ここでは、蓄電池システム201が実際の運用のために設置される前の蓄電池システム全体の運用試験にて、生成された模擬信号を充放電指令値として用いることを想定している。   The simulation signal generation device 100 generates a simulation signal to be given to the storage battery system 201. The simulated signal is a signal represented by the relationship between electric power and time, and is used as a command signal (charge / discharge command value) for causing the storage battery system 201 to perform charge / discharge. Here, it is assumed that the generated simulation signal is used as the charge / discharge command value in the operation test of the entire storage battery system before the storage battery system 201 is installed for actual operation.

生成される模擬信号は、蓄電池システム201の想定運用環境での充放電指令値と同じ特徴を持ちつつ、任意のデータ長で生成される。生成方法については、後述する。   The generated simulation signal has the same characteristics as the charge / discharge command value in the assumed operation environment of the storage battery system 201 and is generated with an arbitrary data length. The generation method will be described later.

蓄電池システム201は、模擬信号生成装置100により生成された模擬信号に基づき、接続されている電力系統に対し、充放電を行う。充放電により、蓄電池システム201内部におけるインバータと電池パックとの相互作用、インバータの動作に伴って発生するノイズ電流などについて、調べることができる。行った充放電に関するデータ(充放電計測データ)は、信号データ格納部301に送られる。充放電計測データには電圧、電流、蓄電池の温度などの情報が含まれる。充放電計測データを模擬信号生成装置100にフィードバックして、模擬信号の精度向上に用いることもできる。   The storage battery system 201 charges and discharges the connected power system based on the simulation signal generated by the simulation signal generation device 100. By charging and discharging, the interaction between the inverter and the battery pack in the storage battery system 201, the noise current generated by the operation of the inverter, and the like can be examined. Data on charge / discharge performed (charge / discharge measurement data) is sent to the signal data storage unit 301. The charge / discharge measurement data includes information such as voltage, current, and storage battery temperature. The charge / discharge measurement data can also be fed back to the simulation signal generator 100 and used to improve the accuracy of the simulation signal.

信号データ格納部301は、過去に生成された模擬信号や、運用中の他の蓄電池システムの充放電計測データなどの信号データを格納する。信号データは、時系列な信号に関するデータである。時間t(tは0以上の数)における信号データS(t)は、データ数n個(nは1以上の整数)の集合であり、次式のように表される。

Figure 2016203587
Tはサンプリング周期であり、s(nT)は、時刻nTにおける電力値を表す。The signal data storage unit 301 stores signal data such as simulation signals generated in the past and charge / discharge measurement data of other storage battery systems in operation. The signal data is data relating to a time-series signal. The signal data S (t) at time t (t is a number equal to or greater than 0) is a set of n data (n is an integer equal to or greater than 1), and is represented by the following equation.
Figure 2016203587
T is a sampling period, and s (nT) represents a power value at time nT.

信号特徴量格納部302は、模擬信号の生成に利用する、蓄電池システムへの充放電信号特徴量あるいは制御信号特徴量(以下、「信号特徴量」という。)を格納する。信号特徴量は、生成しようとする模擬信号に関する統計的な情報や、当該模擬信号を与える蓄電池システム201に関する利用情報が用いられる。   The signal feature quantity storage unit 302 stores a charge / discharge signal feature quantity or a control signal feature quantity (hereinafter referred to as “signal feature quantity”) for the storage battery system, which is used to generate a simulation signal. As the signal feature amount, statistical information related to the simulation signal to be generated or usage information related to the storage battery system 201 that provides the simulation signal is used.

統計的な情報としては、確率密度関数(PDF:Probability Density Function)や周波数スペクトル密度(PSD:Power Spectral Density)などに関する情報がある。例えば、確率密度関数における平均値、分散値、歪度、尖度、扁平度など、および周波数スペクトルにおける各周波数の振幅、位相などが特徴量として用いられる。   The statistical information includes information on a probability density function (PDF) and frequency spectral density (PSD). For example, the average value, variance value, skewness, kurtosis, flatness, etc. in the probability density function, and the amplitude and phase of each frequency in the frequency spectrum are used as feature quantities.

蓄電池システム201に関する利用情報としては、例えば、蓄電池システム201の用途、当該用途の割合などがある。用途としては、周波数調整、電圧調整、ピークシフト、予備力確保などがある。用途の割合は、全体に対する各用途の実行時間または実行回数またはこれらの両方の割合などがある。各用途が利用不可の場合は、当該割合は0としてもよい。また、蓄電池システム全体ではなく、蓄電池を構成する単位電池(セル)や電池モジュールなどの情報やこれらの接続構成などでもよい。   The usage information related to the storage battery system 201 includes, for example, the usage of the storage battery system 201 and the ratio of the usage. Applications include frequency adjustment, voltage adjustment, peak shift, and reserve capacity. The ratio of the use includes the execution time or the number of executions of each use or the ratio of both of them. When each use is unavailable, the ratio may be zero. Further, not the entire storage battery system, but information such as unit batteries (cells) and battery modules constituting the storage battery, connection configurations thereof, and the like may be used.

信号特徴量として、蓄電池システム201の利用情報を用いるのは、時系列信号である模擬信号の周期性と、蓄電池システム201の用途や規模などを対応付けることができると考えられるからである。一般に、時系列信号は、長期変動、周期的変動、不規則変動に分解して解析される。周期的変動の変動成分については、電力系統からみた負荷変動成分のうち、日間変動、月次変動、季節変動など、異なる期間の周期的な変動成分によって構成されることが知られている。   The reason why the usage information of the storage battery system 201 is used as the signal feature amount is that it is considered that the periodicity of the simulation signal, which is a time series signal, can be associated with the use and scale of the storage battery system 201. In general, a time series signal is analyzed by being decomposed into long-term fluctuations, periodic fluctuations, and irregular fluctuations. It is known that the fluctuation component of the periodic fluctuation is composed of periodic fluctuation components in different periods such as a daily fluctuation, a monthly fluctuation, and a seasonal fluctuation among the load fluctuation components viewed from the electric power system.

図2は、一日の中での電力消費量の変化を表した日負荷曲線の一例を示す。このように国や地域、系統の規模に応じて異なり、おのずと系統に接続された蓄電池システムが担う役割やシステムの規模、要件などにより、充放電指令の値や頻度などが異なる。   FIG. 2 shows an example of a daily load curve representing changes in power consumption during the day. As described above, the value differs depending on the country, region, and scale of the system, and the value and frequency of the charge / discharge command differ depending on the role of the storage battery system connected to the system, the scale of the system, and the requirements.

図3は、蓄電池システムの用途、および当該用途ごとの発令頻度と充放電の持続時間の分布である。図3では、蓄電池システムの役割が、予備力確保、タイムシフト、電圧の維持調整、周波数の維持調整の4つの種類に分類されている。当該用途の種類によって、使用頻度や使用時間が異なるため、充放電指令値も、行われる用途の割合によって、変動する。   FIG. 3 shows the usage of the storage battery system, and the distribution of the frequency of issuing and the duration of charge and discharge for each usage. In FIG. 3, the role of the storage battery system is classified into four types: reserve capacity securing, time shift, voltage maintenance adjustment, and frequency maintenance adjustment. Since the use frequency and the use time differ depending on the type of application, the charge / discharge command value also varies depending on the ratio of the application to be performed.

定格情報格納部303は、蓄電池システム201に関する定格情報を格納する。定格情報とは、蓄電池システム201のスペックなどの情報である。例えば、蓄電システム単体の性能によってのみ定められる充放電上下限値、蓄電容量、消費電力、充電時間、充電回数、使用温度などの環境、電池の種類などがある。また、蓄電池システム201内の蓄電池を構成する単位電池(セル)や電池モジュールなどの情報でもよい。また、これらの接続構成などでもよい。   The rating information storage unit 303 stores rating information regarding the storage battery system 201. The rating information is information such as specifications of the storage battery system 201. For example, there are charging / discharging upper and lower limit values determined only by the performance of the power storage system alone, power storage capacity, power consumption, charging time, number of times of charging, operating temperature, and the like, and the type of battery. Information such as a unit battery (cell) or a battery module constituting a storage battery in the storage battery system 201 may also be used. Further, these connection configurations may be used.

次に、模擬信号生成装置100の内部構成について説明する。   Next, the internal configuration of the simulation signal generation apparatus 100 will be described.

信号データ取得部101は、信号データ格納部301に格納された信号データ(時系列データ)から、1つ以上の信号データを取得する。取得された信号データは、信号特徴量抽出部102に送られ、信号特徴量の生成に用いられる。取得される信号データは、実際の運用時において蓄電池システム201に課せられる条件である運用条件を満たすとする。運用条件は、例えば、蓄電池システム201が運用される予定の場所、周辺環境、予定される充放電の頻度、蓄電池システム201の用途の種類や割合、設備の規模などが考慮され定まる。また、蓄電池システム201全体ではなく、蓄電池を構成する単位電池(セル)や電池モジュールなどの情報でもよい。また、これらの接続構成などでもよい。   The signal data acquisition unit 101 acquires one or more signal data from the signal data (time series data) stored in the signal data storage unit 301. The acquired signal data is sent to the signal feature quantity extraction unit 102 and is used to generate a signal feature quantity. It is assumed that the acquired signal data satisfies an operation condition that is a condition imposed on the storage battery system 201 during actual operation. The operating conditions are determined in consideration of, for example, the place where the storage battery system 201 is scheduled to operate, the surrounding environment, the planned charge / discharge frequency, the type and ratio of the usage of the storage battery system 201, the scale of equipment, and the like. Further, information on unit batteries (cells) and battery modules constituting the storage battery may be used instead of the entire storage battery system 201. Further, these connection configurations may be used.

信号特徴量抽出部102は、信号データ取得部101から信号データを取得し、信号データに対し、統計的処理など1つ以上の信号処理を行い、1つ以上の信号特徴量を生成する。信号特徴量抽出部102が実行する信号処理の種類は、f(S)からf(s)までのN個ある。全ての信号処理が行われた場合、1組の時系列信号S(t)から、N組の信号特徴量が求められる。信号処理は、例えば、平均または分散またはこれらの両方などがある。平均μ、分散Vは、1以上の整数であるpを用いて、次式で求められる。

Figure 2016203587
Figure 2016203587
信号特徴量抽出部102は、必要に応じ、信号の確率分布の偏り、正規分布からの逸脱の度合いなど、より高次のモーメントを算出して信号特徴量としてもよい。この信号特徴量により、生成する模擬信号の調整を行うことができる。The signal feature amount extraction unit 102 acquires signal data from the signal data acquisition unit 101, performs one or more signal processing such as statistical processing on the signal data, and generates one or more signal feature amounts. There are N types of signal processing executed by the signal feature quantity extraction unit 102 from f 1 (S) to f N (s). When all signal processing is performed, N sets of signal feature values are obtained from one set of time-series signals S (t). Signal processing includes, for example, average or variance or both. The average μ and the variance V are obtained by the following formula using p which is an integer of 1 or more.
Figure 2016203587
Figure 2016203587
The signal feature quantity extraction unit 102 may calculate higher-order moments such as bias of the probability distribution of the signal and the degree of deviation from the normal distribution as necessary to obtain the signal feature quantity. The simulation signal to be generated can be adjusted by the signal feature amount.

信号特徴量取得部103は、信号特徴量抽出部102から、1つ以上の信号特徴量を取得する。または、信号特徴量格納部302から、運用条件を満たす信号データの信号特徴量を取得してもよい。信号特徴量は個々の内容に応じ、個別に特徴信号生成部104に送られる。   The signal feature amount acquisition unit 103 acquires one or more signal feature amounts from the signal feature amount extraction unit 102. Alternatively, the signal feature amount of the signal data satisfying the operation condition may be acquired from the signal feature amount storage unit 302. The signal feature amount is individually sent to the feature signal generation unit 104 in accordance with each content.

なお、信号特徴量格納部302から信号特徴量を取得する機能と、個別に特徴信号生成部104に送る機能は、分けてもよい。   Note that the function of acquiring the signal feature amount from the signal feature amount storage unit 302 and the function of individually sending it to the feature signal generation unit 104 may be separated.

各特徴信号生成部104は、信号特徴量取得部103からそれぞれに送られた単一の信号特徴量に基づき、特徴信号を生成する。生成される特徴信号は、当該信号特徴量を有する。また、生成される特徴信号は、所定のデータ長とする。特徴信号生成部104は、所定のデータ長とするため、内挿、外挿などの処理を行ってもよい。特徴信号は、模擬信号合成部107に送られる。   Each feature signal generation unit 104 generates a feature signal based on a single signal feature amount sent from the signal feature amount acquisition unit 103. The generated feature signal has the signal feature amount. The generated feature signal has a predetermined data length. The feature signal generation unit 104 may perform processing such as interpolation and extrapolation in order to obtain a predetermined data length. The feature signal is sent to the simulation signal synthesis unit 107.

充放電条件取得部105は、定格情報格納部303から、蓄電池システム201の定格情報を取得する。充放電条件取得部105は、取得した定格情報により定まる充放電の制約を表す充放電条件を生成する。蓄電池システムの充放電条件は、インバータの性能で規定されるだけでなく、その蓄電池システムが設置され、接続される先の系統の容量や、その蓄電池システムとは別にある発電システムや電力消費をする機器によっても規定される。つまり、それらの機器や他のシステムが運用されるパターンと、発電と負荷の間のミスマッチなどの外的条件によっても、蓄電池システムへの充放電は規定される。ここでいう充放電条件とは、このような外的に規定される条件をも含めたものである。なお、これらの充放電条件を考慮したシミュレーションを通じて、蓄電池システムへの指令値というかたちで充放電が行われるパターンを得ることが可能である。そして、充放電条件は、模擬信号を生成する制約条件となる。この際、取得する定格情報に、模擬信号の生成に不要な情報が含まれる場合は、その情報を除去した上で充放電条件を生成してもよい。充放電条件を表すデータは、模擬基本信号生成部106と模擬信号調整部108に送られる。   The charge / discharge condition acquisition unit 105 acquires the rating information of the storage battery system 201 from the rating information storage unit 303. The charging / discharging condition acquisition unit 105 generates charging / discharging conditions that represent charging / discharging restrictions determined by the acquired rating information. The charging / discharging conditions of the storage battery system are not only defined by the performance of the inverter, but also the capacity of the system to which the storage battery system is installed and connected, and the power generation system and power consumption that are separate from the storage battery system It is also defined by the equipment. That is, charging / discharging to the storage battery system is also defined by the pattern in which these devices and other systems are operated and external conditions such as mismatch between power generation and load. The charge / discharge conditions here include such externally defined conditions. It is possible to obtain a pattern in which charging / discharging is performed in the form of a command value to the storage battery system through a simulation considering these charging / discharging conditions. And charging / discharging conditions become a constraint condition which produces | generates a simulation signal. At this time, if the rating information to be acquired includes information unnecessary for generating the simulation signal, the charging / discharging conditions may be generated after removing the information. Data representing the charge / discharge conditions is sent to the simulation basic signal generation unit 106 and the simulation signal adjustment unit 108.

模擬基本信号生成部106は、模擬信号の生成ための基本信号を生成する。基本信号は、模擬信号の基礎となる信号である。模擬基本信号生成部106は、取得した充放電条件を満たすように基本信号を生成する。この充放電条件に基づき生成される基本信号は、前述した複数の特徴信号の一つとしてみなすことができる。基本信号は、一様分布またはガウス分布で分布する信号としてもよい。また、例えば、充放電条件を満たす信号の一様分布の乱数を発生させた後、ボックス=ミューラー法などにより発生させた正規分布乱数を合成する方法などがある。生成された基本信号は、模擬信号合成部107に送られる。   The simulation basic signal generation unit 106 generates a basic signal for generating a simulation signal. The basic signal is a signal that is the basis of the simulation signal. The simulated basic signal generation unit 106 generates a basic signal so as to satisfy the acquired charge / discharge conditions. The basic signal generated based on this charge / discharge condition can be regarded as one of the plurality of characteristic signals described above. The basic signal may be a signal distributed in a uniform distribution or a Gaussian distribution. Further, for example, there is a method of generating a uniformly distributed random number of signals that satisfy charging / discharging conditions and then synthesizing a normal distributed random number generated by the Box-Muller method. The generated basic signal is sent to the simulation signal synthesis unit 107.

模擬信号合成部107は、1つ以上の特徴信号生成部104からの1つ以上の特徴信号と、基本信号に基づき、模擬信号を生成する。また基本信号は、模擬基本信号生成部106が生成した基本信号ではなく、信号データ格納部301に格納された信号データを用いてもよい。生成方法は、基本信号に対して、特徴信号を重畳させ、合成する方法などがある。基本信号を用いずに、複数の特徴信号を合成して模擬信号を生成する実施例も可能である。合成された模擬信号は模擬信号調整部108に送られる。   The simulation signal synthesis unit 107 generates a simulation signal based on one or more feature signals from the one or more feature signal generation units 104 and the basic signal. The basic signal may be signal data stored in the signal data storage unit 301 instead of the basic signal generated by the simulated basic signal generation unit 106. As a generation method, there is a method in which a feature signal is superimposed on a basic signal and synthesized. An embodiment in which a simulated signal is generated by combining a plurality of feature signals without using a basic signal is also possible. The synthesized simulation signal is sent to the simulation signal adjustment unit 108.

模擬信号調整部108は、合成された模擬信号に対し、充放電条件取得部105が生成した充放電条件が充足されているかを確認する。また、必要に応じて、模擬信号の調整を行う。例えば、模擬信号の値に所定の係数を乗じるなどの調整を行う。調整済みの模擬信号は、模擬信号出力部109に送られる。なお、模擬信号の形式は時間と電力値の関係を表し、これを蓄電池システムが時間に応じた充放電の指令値として解釈できるものとするが、必要に応じて、蓄電池システムが解釈可能な形式に変換してもよい。   The simulation signal adjustment unit 108 confirms whether the charge / discharge conditions generated by the charge / discharge condition acquisition unit 105 are satisfied for the synthesized simulation signal. Further, the simulation signal is adjusted as necessary. For example, adjustment such as multiplying a value of the simulation signal by a predetermined coefficient is performed. The adjusted simulation signal is sent to the simulation signal output unit 109. The format of the simulated signal represents the relationship between time and power value, which can be interpreted as a charge / discharge command value according to time by the storage battery system, but can be interpreted by the storage battery system as necessary. May be converted to

模擬信号出力部109は、模擬信号調整部108からの模擬信号を、蓄電池システム201に出力する。   The simulation signal output unit 109 outputs the simulation signal from the simulation signal adjustment unit 108 to the storage battery system 201.

以上が、第1の実施形態に係る模擬信号生成装置の概略構成である。   The above is the schematic configuration of the simulation signal generation device according to the first embodiment.

次に、実際に模擬信号生成装置100が模擬信号を生成する方法の一例を説明する。図4は、FFT(離散高速フーリエ変換)および逆FFTによる模擬信号生成のフローチャートである。   Next, an example of a method in which the simulation signal generation apparatus 100 actually generates a simulation signal will be described. FIG. 4 is a flowchart for generating a simulation signal by FFT (Discrete Fast Fourier Transform) and inverse FFT.

信号データ取得部101は、信号データ格納部301に格納された複数の信号データから、少なくとも1つの信号データ(基準信号と呼ぶ)を取得する(S101)。   The signal data acquisition unit 101 acquires at least one signal data (referred to as a reference signal) from the plurality of signal data stored in the signal data storage unit 301 (S101).

取得する基準信号は、ユーザが指定してもよいし、信号データ取得部101が選択してもよい。選択方法は、試験する蓄電システムの運用環境、使用目的、定格などが一致する蓄電システムのデータを選択すればよい。   The reference signal to be acquired may be designated by the user or may be selected by the signal data acquisition unit 101. As a selection method, it is only necessary to select data of a power storage system that matches the operating environment, purpose of use, rating, and the like of the power storage system to be tested.

信号特徴量抽出部102は、信号データ取得部101が取得した基準信号から、当該信号の特徴量(信号特徴量)を抽出する(S102)。   The signal feature amount extraction unit 102 extracts the feature amount (signal feature amount) of the signal from the reference signal acquired by the signal data acquisition unit 101 (S102).

抽出する特徴量は、予め定められているものとする。ここでは、信号特徴量抽出部102は、FFTまたは自己回帰モデル等により、周波数スペクトル、位相スペクトルを算出した上で、周波数スペクトル、位相スペクトルに関する信号特徴量を算出するものとする。   It is assumed that the feature amount to be extracted is determined in advance. Here, it is assumed that the signal feature amount extraction unit 102 calculates a signal feature amount related to the frequency spectrum and the phase spectrum after calculating the frequency spectrum and the phase spectrum by using FFT or an autoregressive model.

信号特徴量取得部103は、信号特徴量抽出部102から取得した複数の信号特徴量のそれぞれを、各特徴信号生成部104に振り分ける(S103)。   The signal feature amount acquisition unit 103 distributes each of the plurality of signal feature amounts acquired from the signal feature amount extraction unit 102 to each feature signal generation unit 104 (S103).

振り分け先は、入力する信号特徴量によって予め定められているものとする。   The distribution destination is assumed to be determined in advance by the input signal feature amount.

生成する模擬信号に、基準信号とは別の信号特徴量を持たせたい場合など、模擬信号に特定の信号特徴量を追加する場合は、信号特徴量取得部103は、信号特徴量格納部302から当該信号特徴量を取得してもよい。   When adding a specific signal feature quantity to the simulation signal, such as when it is desired to have a signal feature quantity different from the reference signal in the generated simulation signal, the signal feature quantity acquisition unit 103 includes the signal feature quantity storage unit 302. The signal feature amount may be acquired from

各特徴信号生成部104は、それぞれが取得した信号特徴量に基づき、特徴信号を算出する(S104)。信号特徴量がN個ある場合は、N個の特徴信号が生成される。   Each feature signal generation unit 104 calculates a feature signal based on the acquired signal feature amount (S104). When there are N signal feature amounts, N feature signals are generated.

本フローでは、各特徴信号生成部104は、与えられた周波数スペクトルまたは位相スペクトルに対し、予め定められたデータ長となるように内外挿の処理を行った上で、離散逆フーリエ変換を行う。これにより、N個の特徴信号(N個の時系列データ)が生成される。   In this flow, each feature signal generation unit 104 performs a discrete inverse Fourier transform on the given frequency spectrum or phase spectrum after performing an interpolation process so as to have a predetermined data length. As a result, N feature signals (N time-series data) are generated.

模擬信号合成部107は、各特徴信号生成部104が生成した複数の特徴信号を合成する(S107)。   The simulated signal synthesis unit 107 synthesizes a plurality of feature signals generated by the feature signal generation units 104 (S107).

本フローでは、模擬基本信号生成部106が生成する基本信号を用いず、特徴信号だけが合成される。この合成により、模擬信号が基準信号の特徴を有することとなる。   In this flow, only the characteristic signal is synthesized without using the basic signal generated by the simulated basic signal generation unit 106. By this synthesis, the simulation signal has the characteristics of the reference signal.

模擬信号調整部108は、生成された模擬信号を調整し(S108)、模擬信号出力部109は、模擬信号を出力する(S109)。出力された模擬信号は蓄電システムに送られる。以上で、模擬信号生成のフローは終了となる。   The simulation signal adjustment unit 108 adjusts the generated simulation signal (S108), and the simulation signal output unit 109 outputs the simulation signal (S109). The output simulation signal is sent to the power storage system. This is the end of the simulation signal generation flow.

次に、模擬基本信号生成部106により生成する基本信号を利用して、模擬信号を生成するフローを説明する。図5は、基本信号を用いた模擬信号生成のフローチャートである。本フローは、基本信号と同様の特徴を有する新たな模擬信号を生成するものである。先述のフローとは、基本信号を生成する処理が追加された点と、具体的な処理が異なる。   Next, a flow for generating a simulation signal using the basic signal generated by the simulation basic signal generation unit 106 will be described. FIG. 5 is a flowchart of generating a simulation signal using a basic signal. This flow is to generate a new simulation signal having the same characteristics as the basic signal. The specific processing is different from the above flow in that processing for generating a basic signal is added.

信号データ取得部101の処理は、先述のフローと同じである(S101)。   The processing of the signal data acquisition unit 101 is the same as the above-described flow (S101).

信号特徴量抽出部102は、基準信号の周波数スペクトル密度(PSD)、確率密度関数(PDF)を算出した上で、PSD、PDFに関する信号特徴量を算出するものとする。   The signal feature amount extraction unit 102 calculates the frequency feature density (PSD) and probability density function (PDF) of the reference signal, and then calculates the signal feature amount related to PSD and PDF.

信号特徴量取得部103の処理は、先述のフローと同じである(S103)。   The processing of the signal feature amount acquisition unit 103 is the same as the above-described flow (S103).

各特徴信号生成部104は、確率密度関数(PDF)に関する信号特徴量に基づき、特徴信号を算出する(S104)。具体的には、一様分布のグラフを生成した上で、乱数を発生させ、PDFに関する信号特徴量に合致する時系列グラフを生成する。   Each feature signal generation unit 104 calculates a feature signal based on the signal feature amount related to the probability density function (PDF) (S104). Specifically, after generating a uniformly distributed graph, a random number is generated to generate a time series graph that matches a signal feature amount related to PDF.

また、特徴信号生成部104の1つは、周波数スペクトル密度(PSD)に基づき、基準信号の周波数スペクトル形状を模擬する周波数フィルタを生成する。ステップS104で乱数を基に生成された時系列グラフは、周波数スペクトル上ではランダムであるため、FIRフィルタまたはIIRフィルタなどによるフィルタリングが必要なためである。   Also, one of the feature signal generation unit 104 generates a frequency filter that simulates the frequency spectrum shape of the reference signal based on the frequency spectral density (PSD). This is because the time series graph generated based on the random number in step S104 is random on the frequency spectrum, and thus needs to be filtered by an FIR filter or an IIR filter.

充放電条件取得部105は、定格情報格納部303から、定格情報を取得する(S201)。   The charge / discharge condition acquisition unit 105 acquires rating information from the rating information storage unit 303 (S201).

充放電条件取得部105には、例えば、試験する蓄電システムの番号等が予め与えられているものとし、当該番号等によって、取得する定格情報を定めてもよい。   For example, the charge / discharge condition acquisition unit 105 may be preliminarily given a number of a storage system to be tested, and the rating information to be acquired may be determined by the number or the like.

模擬基本信号生成部106は、取得した特徴量および定格情報格納部303から取得した定格情報に基づき、基本信号を生成する(S202)。   The simulated basic signal generation unit 106 generates a basic signal based on the acquired feature amount and the rating information acquired from the rating information storage unit 303 (S202).

生成する基本信号の種類は、予め定めておいてもよいし、基準信号の特徴量に基づき決定してもよい。   The type of basic signal to be generated may be determined in advance or may be determined based on the feature amount of the reference signal.

模擬信号合成部107は、各特徴信号生成部104が生成した複数の特徴信号と、模擬基本信号生成部106からの基本信号と、を合成する(S107)。   The simulated signal combining unit 107 combines the plurality of feature signals generated by the feature signal generating units 104 and the basic signal from the simulated basic signal generating unit 106 (S107).

以降の処理は、FFTおよび逆FFTによる模擬信号生成のフローチャート(図4参照)と同じである。以上で、基本信号を用いた模擬信号生成のフローは終了となる。   The subsequent processing is the same as the flowchart (see FIG. 4) of the simulation signal generation by FFT and inverse FFT. This is the end of the simulation signal generation flow using the basic signal.

次に、用途ごとの模擬信号が重畳された模擬信号を生成する方法を説明する。図6は、重畳模擬信号生成のフローチャートである。   Next, a method for generating a simulation signal on which a simulation signal for each application is superimposed will be described. FIG. 6 is a flowchart of superimposition simulation signal generation.

蓄電システムの用途が複数ある場合、模擬信号は、用途ごとに生成された複数の模擬信号を重畳して生成される。以降、用途ごとに生成された模擬信号を、用途ごとの模擬信号と称し、複数の用途ごとの模擬信号を重畳して生成された模擬信号を、重畳模擬信号と称する。   When there are a plurality of uses of the power storage system, the simulation signal is generated by superimposing a plurality of simulation signals generated for each use. Hereinafter, the simulation signal generated for each application is referred to as a simulation signal for each application, and the simulation signal generated by superimposing the simulation signals for a plurality of applications is referred to as a superimposed simulation signal.

蓄電池システムを、FR(周波数変動抑制)、電圧制御、ピークシフトの3種類の用途に用いる場合を想定する。信号データ取得部101は、上記3種類の用途ごとの基準信号を取得する(S301A、S301B、S301C)。   A case is assumed where the storage battery system is used for three types of applications: FR (frequency fluctuation suppression), voltage control, and peak shift. The signal data acquisition unit 101 acquires reference signals for each of the three types of applications (S301A, S301B, S301C).

信号データ取得部101、信号特徴量抽出部102、信号特徴量取得部103の処理は、模擬信号生成の処理と同じであるため省略する。   The processes of the signal data acquisition unit 101, the signal feature quantity extraction unit 102, and the signal feature quantity acquisition unit 103 are the same as the simulation signal generation process, and are therefore omitted.

各特徴信号生成部104は、逆フーリエ変換を行う前に、内挿処理(S302A、S302B、S302C)を行い、データ長を調整する。   Each feature signal generation unit 104 performs interpolation processing (S302A, S302B, S302C) and adjusts the data length before performing inverse Fourier transform.

充放電指令に対する蓄電システムの応答速度(時定数)は、蓄電システムの用途ごとに異なるため、用途ごとの模擬信号の時系列データの時間間隔も異なることが予想される。ゆえに、用途ごとの模擬信号をそのまま重畳すると、重畳模擬信号の時系列データの時間間隔が不揃いとなる。また、このような重畳模擬信号に対し内挿を行うと、信号特徴量が失われてしまう。したがって、信号特徴量を適切に反映させた重畳模擬信号を生成するためには、重畳する前に、用途ごとの模擬信号に内挿処理を行い、各模擬信号の時系列データの時間間隔を予め揃えておく必要がある。   Since the response speed (time constant) of the power storage system with respect to the charge / discharge command is different for each use of the power storage system, it is expected that the time interval of the time series data of the simulated signal for each use is also different. Therefore, if the simulation signal for each application is superimposed as it is, the time interval of the time-series data of the superimposed simulation signal becomes uneven. Further, if interpolation is performed on such a superimposed simulation signal, the signal feature amount is lost. Therefore, in order to generate a superimposed simulation signal that appropriately reflects signal feature amounts, interpolation processing is performed on the simulation signal for each application before superimposition, and the time interval of time series data of each simulation signal is set in advance. Must be aligned.

各特徴信号生成部104は、FR、電圧制御、ピークシフトの3種類の用途ごとの模擬信号それぞれに対し、内挿処理を行い、時系列データの数を3種類ともに同一にする。内挿は、他の用途ごとの模擬信号の時系列データが存在する時刻に、値が0であるデータを内挿する。但し、同時刻に自己の時系列データがある場合は内挿しない。このように、データを必要な数だけ追加した後で、信号特徴量を保持するために、FIRフィルタを適用する。   Each feature signal generation unit 104 performs interpolation processing on each of the three types of simulation signals for FR, voltage control, and peak shift, and makes the number of time series data the same for all three types. In the interpolation, data having a value of 0 is interpolated at the time when the time series data of the simulated signal for each of other uses exists. However, if there is own time-series data at the same time, no interpolation is performed. In this way, after adding the required number of data, the FIR filter is applied to retain the signal feature amount.

なお、内挿は、一次内挿(線形補間)、二次内挿(放物線補間)、0次内挿(最近傍補間)などの方法を用いてもよい。   For the interpolation, methods such as primary interpolation (linear interpolation), secondary interpolation (parabolic interpolation), and zero-order interpolation (nearest neighbor interpolation) may be used.

以降の特徴信号生成部104、模擬信号合成部107、模擬信号調整部108、模擬信号出力部109の処理は、模擬信号生成の処理と同じであるため省略する。以上で、重畳模擬信号生成のフローは終了となる。このようにして、用途別の模擬信号を重畳させて重畳模擬信号を生成することができる。   The subsequent processing of the feature signal generation unit 104, the simulation signal synthesis unit 107, the simulation signal adjustment unit 108, and the simulation signal output unit 109 is the same as the process of simulation signal generation, and is therefore omitted. This is the end of the superimposed simulation signal generation flow. In this way, a superimposed simulation signal can be generated by superimposing a simulation signal for each application.

以上のように、第1の実施形態によれば、実際の運用時同様に、周波数制御、電圧制御、ピークシフトなどの様々な用途により複雑化された充放電指令値と類似した模擬信号を生成し、蓄電池システムに印加することにより、運用時の状況を実現することができる。ゆえに、運用前の試験において、信頼性の高い試験結果を得る事ができる。   As described above, according to the first embodiment, a simulation signal similar to a charge / discharge command value complicated by various uses such as frequency control, voltage control, and peak shift is generated as in actual operation. And the situation at the time of an operation | movement is realizable by applying to a storage battery system. Therefore, a highly reliable test result can be obtained in the test before operation.

また、試験にて取得した充放電データを基準とし、今後の運用での充放電データと比較することにより、蓄電池システムを停止あるいは解列させることなく、蓄電池システムの状態変化や劣化の進行などを推定することが可能となる。
(第2の実施形態)
In addition, by comparing the charge / discharge data acquired in the test with the charge / discharge data in the future operation, the state of the storage battery system and the progress of deterioration can be monitored without stopping or disconnecting the storage battery system. It is possible to estimate.
(Second Embodiment)

図7は、第2の実施形態に係る模擬信号生成装置の概略構成を示すブロック図である。第2の実施形態は、第1の実施形態に対し、蓄電池応答取得部110、応答特性評価部111、模擬信号補正部112が追加されている。応答特性評価部111は特徴信号生成部113に含まれているが、特徴信号生成部113の外側に配置されてもよい。   FIG. 7 is a block diagram illustrating a schematic configuration of a simulation signal generation apparatus according to the second embodiment. In the second embodiment, a storage battery response acquisition unit 110, a response characteristic evaluation unit 111, and a simulated signal correction unit 112 are added to the first embodiment. The response characteristic evaluation unit 111 is included in the feature signal generation unit 113, but may be disposed outside the feature signal generation unit 113.

蓄電池応答取得部110は、蓄電池システム201からの応答を取得する。応答とは、蓄電池システム201が模擬信号に従い充放電を行った際に計測された充放電計測データである。つまり、模擬信号に対する結果が蓄電池システム201からフィードバックされる。蓄電池応答取得部110は、フィードバックされた充放電計測データから、模擬信号を評価するためのデータ(応答データ)を選択または算出する。応答データを選択または算出する方法は、予め定められているものとする。   The storage battery response acquisition unit 110 acquires a response from the storage battery system 201. The response is charge / discharge measurement data measured when the storage battery system 201 performs charge / discharge according to the simulation signal. That is, the result for the simulation signal is fed back from the storage battery system 201. The storage battery response acquisition unit 110 selects or calculates data (response data) for evaluating the simulation signal from the fed back charge / discharge measurement data. It is assumed that a method for selecting or calculating the response data is predetermined.

例えば、蓄電池応答取得部110が、蓄電池の応答として、蓄電池の充放電の際の電流値、電圧値、および温度のデータを取得したとする。蓄電池応答取得部110は、予め保持している表形式ファイルなどにより、取得した電流値、電圧値、および温度データに対応する応答データまたは応答データの算出式などを読み込んだ上で、応答データを算出する。なお、対応データは信号データ格納部などに格納され、蓄電池応答取得部110が必要に応じ取得してもよい。   For example, it is assumed that the storage battery response acquisition unit 110 acquires the current value, voltage value, and temperature data when charging and discharging the storage battery as the response of the storage battery. The storage battery response acquisition unit 110 reads the response data or the calculation formula of the response data corresponding to the acquired current value, voltage value, and temperature data by using a pre-stored table format file, etc. calculate. The correspondence data may be stored in a signal data storage unit or the like, and may be acquired by the storage battery response acquisition unit 110 as necessary.

なお、図7では、蓄電池応答取得部110は模擬信号生成装置100の内部に格納されているが、外部にあってもよい。   In FIG. 7, the storage battery response acquisition unit 110 is stored inside the simulation signal generation device 100, but may be external.

応答特性評価部111は、応答データの特性を評価し、補正の要否を判断する。判断は、応答データに含まれる電圧、電流、温度などの計測値に基づき、行われる。模擬信号は、周波数変動抑制など蓄電池システムが設置予定先の電力系統、配電系統などの条件に基づき決定されるが、蓄電池の定格容量や定格電流、運用温度など各種運用条件を加味していない場合もあり得るため、模擬信号の印加を継続的に行った場合、蓄電池システムがその運用条件を逸脱する場合もあり、補正が必要となる。例えば、応答データの特性または計測値またはこれらの両方などが、閾値または有効範囲などによる条件を満たすかを判断し、条件を満たさない場合には、模擬信号の出力値に補正が必要であるとの評価を行う。また、補正方法または補正モードの選択を行い、それらを評価結果に含めてもよい。   The response characteristic evaluation unit 111 evaluates the characteristics of the response data and determines whether correction is necessary. The determination is made based on measured values such as voltage, current, and temperature included in the response data. The simulated signal is determined based on the conditions of the power system and distribution system where the storage battery system is planned to be installed, such as frequency fluctuation suppression, but does not take into account various operating conditions such as the rated capacity, rated current, and operating temperature of the storage battery. Therefore, when the simulation signal is continuously applied, the storage battery system may deviate from the operation condition, and correction is necessary. For example, it is determined whether the response data characteristics and / or measurement values satisfy the conditions based on the threshold value or the effective range. If the conditions are not satisfied, the simulated signal output value needs to be corrected. Perform an evaluation. In addition, a correction method or a correction mode may be selected and included in the evaluation result.

模擬信号補正部112は、応答特性評価部111からの評価結果に基づき、模擬信号調整部108からの調整済みの模擬信号に対し、補正処理を行う。補正の方法は、補正の内容に応じて予め定められていてもよいし、応答特性評価部111から取得してもよい。補正する量は、模擬信号補正部112が算出してもよい。補正処理適用済みの模擬信号は、模擬信号出力部109に送られる。   The simulated signal correcting unit 112 performs a correction process on the adjusted simulated signal from the simulated signal adjusting unit 108 based on the evaluation result from the response characteristic evaluating unit 111. The correction method may be determined in advance according to the content of the correction, or may be acquired from the response characteristic evaluation unit 111. The simulated signal correction unit 112 may calculate the amount to be corrected. The simulation signal to which the correction process has been applied is sent to the simulation signal output unit 109.

例えば、蓄電システムの充放電の今までの積算値が、予め定められた範囲を逸脱または逸脱するおそれがある場合は、模擬信号に対して、予め定められた係数を掛けて変動幅を小さくするという補正を行ってもよい。または、模擬信号補正部112が当該範囲を逸脱しないような当該係数値を算出してもよい。その他にも、正または負の一定値をオフセットとして充放電値に加算する補正、時間の経過に対する単調増加あるいは単調減少のオフセットを加算する補正などが考えられる。また、例えば、充放電によって蓄電池システムの内部温度が上昇し、予め定められた限界温度を超えた場合、模擬信号補正部112は、試験を一次的に停止してもよい。   For example, when there is a possibility that the accumulated value of charge / discharge of the power storage system until now deviates or deviates from a predetermined range, the fluctuation range is reduced by multiplying the simulation signal by a predetermined coefficient. Correction may be performed. Alternatively, the coefficient value may be calculated so that the simulation signal correction unit 112 does not deviate from the range. In addition, a correction that adds a positive or negative constant value as an offset to the charge / discharge value, a correction that adds a monotonically increasing or monotonically decreasing offset over time, and the like can be considered. Further, for example, when the internal temperature of the storage battery system rises due to charging / discharging and exceeds a predetermined limit temperature, the simulated signal correction unit 112 may temporarily stop the test.

その他の箇所については、第1の実施形態と同じである。   Other portions are the same as those in the first embodiment.

図8は、第2の実施形態で追加された各部によるフィードバック処理のフローチャートである。本フローチャートは、蓄電システムからの応答を電池応答取得部が受け取った際に開始される。   FIG. 8 is a flowchart of feedback processing by each unit added in the second embodiment. This flowchart is started when the battery response acquisition unit receives a response from the power storage system.

蓄電池応答取得部110は、蓄電池システム201からフィードバックされた充放電計測データから、応答データを選択または算出する(S401)。   The storage battery response acquisition unit 110 selects or calculates response data from the charge / discharge measurement data fed back from the storage battery system 201 (S401).

応答データは、応答特性評価部111に送られる。   The response data is sent to the response characteristic evaluation unit 111.

応答特性評価部111は、蓄電池応答取得部110から取得した応答データの特性を評価し、補正の要否を判断する(S402、S403)。   The response characteristic evaluation unit 111 evaluates the characteristic of the response data acquired from the storage battery response acquisition unit 110 and determines whether correction is necessary (S402, S403).

判断基準は、予め定められているものとする。評価結果は、応答データとともに、模擬信号補正部112に送られる。   It is assumed that the determination criteria are determined in advance. The evaluation result is sent to the simulated signal correction unit 112 together with the response data.

模擬信号補正部112は、応答特性評価部111の評価結果に基づき、補正処理を行う(S404)。補正処理適用済みの模擬信号は、模擬信号出力部109に送られる。   The simulated signal correction unit 112 performs correction processing based on the evaluation result of the response characteristic evaluation unit 111 (S404). The simulation signal to which the correction process has been applied is sent to the simulation signal output unit 109.

以降の処理は、第1の実施形態でのフローチャートと同じである。以上で、フィードバック処理のフローは終了となる。   The subsequent processing is the same as the flowchart in the first embodiment. This completes the feedback processing flow.

以上のように、第2の実施形態によれば、生成した模擬信号による充放電の結果をフィードバックすることで、より信頼性の高い試験結果を得る事ができる。   As described above, according to the second embodiment, it is possible to obtain a more reliable test result by feeding back the result of charging / discharging by the generated simulation signal.

尚、各実施形態の模擬信号生成装置は、例えば、汎用のコンピュータ装置を基本ハードウェアとして用いることでも実現可能である。すなわち、上記のコンピュータ装置に搭載されたプロセッサにプログラムを実行させることにより実現出来る。このとき、模擬信号生成装置は、上記のプログラムをコンピュータ装置にあらかじめインストールすることで実現することや、各種の記憶媒体に記憶、あるいはネットワークを介して上記のプログラムを配布、このプログラムをコンピュータ装置に適宜インストールすることで実現が出来る。また、模擬信号生成装置内の各記憶部は、上記のコンピュータ装置に内蔵あるいは外付けされたメモリ、ハードディスクもしくはCD−R、CD−RW、DVD−RAM、DVD−Rなどの記憶媒体などを適宜利用して実現することができる。   In addition, the simulation signal generation apparatus of each embodiment is realizable also by using a general purpose computer apparatus as basic hardware, for example. That is, it can be realized by causing a processor mounted on the computer apparatus to execute a program. At this time, the simulation signal generating device can be realized by installing the above program in the computer device in advance, storing it in various storage media, or distributing the above program via a network, and distributing this program to the computer device. It can be realized by installing it appropriately. In addition, each storage unit in the simulation signal generation device appropriately includes a memory, a hard disk or a storage medium such as a CD-R, a CD-RW, a DVD-RAM, and a DVD-R, which is built in or externally attached to the computer device. It can be realized by using.

本発明は上記実施形態そのままに限定されず、実施段階では要旨を逸脱しない範囲で構成要素を変形し具体化出来る。上記実施形態に開示されている複数の構成要素の適宜な組み合わせで、種々の発明を形成できる。例えば、実施形態に示される全構成要素から幾つかの構成要素を削除出来、異なる実施形態に渡る要素を適宜組み合わせることも出来る。   The present invention is not limited to the above-described embodiments as they are, and the constituent elements can be modified and embodied without departing from the spirit in the implementation stage. Various inventions can be formed by appropriately combining a plurality of constituent elements disclosed in the embodiment. For example, some constituent elements can be deleted from all the constituent elements shown in the embodiments, and elements over different embodiments can be appropriately combined.

上記に、本発明の一実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施形態やその変形は、発明の範囲や要旨に含まれるとともに、特許請求の範囲に記載された発明とその均等の範囲に含まれる。   Although one embodiment of the present invention has been described above, these embodiment are presented as examples and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, replacements, and changes can be made without departing from the scope of the invention. These embodiments and modifications thereof are included in the scope and gist of the invention, and are included in the invention described in the claims and the equivalents thereof.

100 模擬信号生成装置
101 信号データ取得部
102 信号特徴量抽出部
103 信号特徴量取得部
104 特徴信号生成部
105 充放電条件取得部
106 模擬基本信号生成部
107 模擬信号合成部
108 模擬信号調整部
109 模擬信号出力部
110 蓄電池応答取得部
111 応答特性評価部
112 模擬信号補正部
201 蓄電池システム
301 信号データ格納部
302 信号特徴量格納部
303 定格情報格納部
DESCRIPTION OF SYMBOLS 100 Simulated signal production | generation apparatus 101 Signal data acquisition part 102 Signal feature-value extraction part 103 Signal feature-value acquisition part 104 Feature signal generation part 105 Charging / discharging condition acquisition part 106 Simulation basic signal generation part 107 Simulation signal synthesis part 108 Simulation signal adjustment part 109 Simulated signal output unit 110 Storage battery response acquisition unit 111 Response characteristic evaluation unit 112 Simulated signal correction unit 201 Storage battery system 301 Signal data storage unit 302 Signal feature amount storage unit 303 Rating information storage unit

本発明の一態様としての模擬信号生成装置は、電池システムへの複数の充放電信号特徴量を取得する信号特徴量取得部と、前記複数の充放電信号特徴量に基づき、前記複数の充放電信号特徴量のそれぞれを有する複数の特徴信号を生成する特徴信号生成処理部と、前記複数の特徴信号を合成して、前記蓄電池システムに与える充放電の指令信号である模擬信号を生成する模擬信号生成部とを備える。 Simulated signal generating apparatus according to one aspect of the present invention includes: a signal feature quantity acquisition unit that acquires a plurality of charge and discharge signal feature quantity to cell system, based on the plurality of charge and discharge signal feature value, said plurality of charge A feature signal generation processing unit that generates a plurality of feature signals each having a discharge signal feature amount and a simulation that combines the plurality of feature signals to generate a simulation signal that is a charge / discharge command signal given to the storage battery system A signal generation unit.

Claims (9)

蓄電池システムの充放電条件を取得する充放電条件取得部と、
前記蓄電池システムへの複数の充放電信号特徴量を取得する信号特徴量取得部と、
前記複数の充放電信号特徴量に基づき、前記複数の充放電信号特徴量のそれぞれを有する複数の特徴信号を生成する特徴信号生成処理部と、
前記複数の特徴信号を合成して、前記蓄電池システムに与える充放電の指令信号である模擬信号を生成する模擬信号生成部と
を備えた模擬信号生成装置。
A charge / discharge condition acquisition unit for acquiring charge / discharge conditions of the storage battery system;
A signal feature amount acquisition unit for acquiring a plurality of charge / discharge signal feature amounts to the storage battery system;
A feature signal generation processing unit that generates a plurality of feature signals each having the plurality of charge / discharge signal feature amounts based on the plurality of charge / discharge signal feature amounts;
A simulation signal generation device comprising: a simulation signal generation unit that combines the plurality of feature signals to generate a simulation signal that is a charge / discharge command signal to be supplied to the storage battery system.
少なくとも1つの他の蓄電池システムで計測された複数の充放電信号の中から、前記蓄電池システムの運用条件を満たす充放電信号を取得する信号データ取得部と、
前記信号データ取得部で取得された充放電信号から前記充放電信号特徴量を抽出する信号特徴量抽出部と
をさらに備えた請求項1に記載の模擬信号生成装置。
Among a plurality of charge / discharge signals measured by at least one other storage battery system, a signal data acquisition unit that acquires a charge / discharge signal that satisfies an operation condition of the storage battery system;
The simulated signal generation device according to claim 1, further comprising: a signal feature amount extraction unit that extracts the charge / discharge signal feature amount from the charge / discharge signal acquired by the signal data acquisition unit.
前記信号特徴量抽出部は、前記充放電信号特徴量として、前記充放電信号の周波数スペクトルおよび位相スペクトルに関する情報を抽出する
請求項2に記載の模擬信号生成装置。
The simulated signal generation device according to claim 2, wherein the signal feature amount extraction unit extracts information relating to a frequency spectrum and a phase spectrum of the charge / discharge signal as the charge / discharge signal feature amount.
前記複数の充放電信号特徴量は、確率密度関数に関する情報、周波数スペクトル密度に関する情報、前記蓄電池システムの用途に関する情報、平均および分散の少なくとも一方に関する情報のうち任意の複数を含む
請求項1ないし3のいずれか一項に記載の模擬信号生成装置。
The plurality of charge / discharge signal feature quantities include any plurality of information related to a probability density function, information related to a frequency spectral density, information related to an application of the storage battery system, and information related to at least one of average and variance. The simulation signal generation device according to any one of the above.
前記蓄電池システムの充放電条件に基づく信号の一様分布またはガウス分布を用いて乱数により前記信号を発生させ、発生させた信号を合成することで前記複数の特徴信号の一つである基本信号を生成する模擬基本信号生成部
をさらに備えた請求項1ないし4のいずれか一項に記載の模擬信号生成装置。
A basic signal that is one of the plurality of characteristic signals is generated by generating the signal by random numbers using a uniform distribution or a Gaussian distribution of the signal based on the charge / discharge conditions of the storage battery system, and combining the generated signals. The simulation signal generation device according to claim 1, further comprising a simulation basic signal generation unit to generate.
前記蓄電池システムが前記模擬信号に従い充放電を行った際に計測された充放電計測データを取得する蓄電池応答取得部と、
前記充放電計測データの特性を評価する応答特性評価部と、
前記応答特性評価部の評価結果に応じて、前記模擬信号を補正する模擬信号補正部と
をさらに備えた請求項1ないし5のいずれか一項に記載の模擬信号生成装置。
A storage battery response acquisition unit that acquires charge / discharge measurement data measured when the storage battery system performs charge / discharge according to the simulation signal;
A response characteristic evaluation unit for evaluating the characteristics of the charge / discharge measurement data;
The simulation signal generation device according to claim 1, further comprising: a simulation signal correction unit that corrects the simulation signal according to an evaluation result of the response characteristic evaluation unit.
前記応答特性評価部は、前記充放電計測データが前記蓄電池システムの運用時に課せられる条件である運用条件に合致するかを判断し、
前記模擬信号補正部は、前記充放電計測データが前記運用条件に合致しない場合に、前記模擬信号を補正する
請求項6に記載の模擬信号生成装置。
The response characteristic evaluation unit determines whether the charge / discharge measurement data matches an operation condition that is a condition imposed when the storage battery system is operated,
The simulation signal generation device according to claim 6, wherein the simulation signal correction unit corrects the simulation signal when the charge / discharge measurement data does not match the operation condition.
蓄電池システムの充放電条件を取得する充放電条件取得ステップと、
蓄電池システムへの複数の充放電信号特徴量を取得する信号特徴量取得ステップと、
前記複数の充放電信号特徴量に基づき、前記複数の充放電信号特徴量のそれぞれを有する複数の特徴信号を生成する特徴信号生成処理ステップと、
前記複数の特徴信号を合成して、前記蓄電池システムに与える充放電の指令信号である模擬信号を生成する模擬信号生成ステップと
を備えた模擬信号生成方法。
A charge / discharge condition acquisition step for acquiring a charge / discharge condition of the storage battery system;
A signal feature amount obtaining step for obtaining a plurality of charge / discharge signal feature amounts to the storage battery system;
A feature signal generation processing step for generating a plurality of feature signals each having the plurality of charge / discharge signal feature amounts based on the plurality of charge / discharge signal feature amounts;
A simulation signal generation method comprising: a simulation signal generation step of combining the plurality of feature signals to generate a simulation signal that is a charge / discharge command signal given to the storage battery system.
蓄電池システムの充放電条件を取得する充放電条件取得ステップと、
蓄電池システムへの複数の充放電信号特徴量を取得する信号特徴量取得ステップと、
前記複数の充放電信号特徴量に基づき、前記複数の充放電信号特徴量のそれぞれを有する複数の特徴信号を生成する特徴信号生成処理ステップと、
前記複数の特徴信号を合成して、前記蓄電池システムに与える充放電の指令信号である模擬信号を生成する模擬信号生成ステップと
をコンピュータに実行させるためのコンピュータプログラム。
A charge / discharge condition acquisition step for acquiring a charge / discharge condition of the storage battery system;
A signal feature amount obtaining step for obtaining a plurality of charge / discharge signal feature amounts to the storage battery system;
A feature signal generation processing step for generating a plurality of feature signals each having the plurality of charge / discharge signal feature amounts based on the plurality of charge / discharge signal feature amounts;
A computer program for causing a computer to execute a simulation signal generating step of combining the plurality of characteristic signals to generate a simulation signal that is a charge / discharge command signal given to the storage battery system.
JP2016509207A 2015-06-17 2015-06-17 Simulation signal generation apparatus, simulation signal generation method, and computer program Active JP6159474B2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2015/067510 WO2016203587A1 (en) 2015-06-17 2015-06-17 Simulated signal generation device, simulated signal generation method, and computer program

Publications (2)

Publication Number Publication Date
JPWO2016203587A1 true JPWO2016203587A1 (en) 2017-06-22
JP6159474B2 JP6159474B2 (en) 2017-07-05

Family

ID=57545776

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016509207A Active JP6159474B2 (en) 2015-06-17 2015-06-17 Simulation signal generation apparatus, simulation signal generation method, and computer program

Country Status (6)

Country Link
US (1) US10310018B2 (en)
EP (1) EP3312965A4 (en)
JP (1) JP6159474B2 (en)
KR (1) KR101877145B1 (en)
CN (1) CN107210608B (en)
WO (1) WO2016203587A1 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017022037A1 (en) 2015-07-31 2017-02-09 株式会社 東芝 Storage battery evaluating device, power storage system and storage battery evaluating method
KR102385437B1 (en) * 2017-08-17 2022-04-14 한국전력공사 Simulated signal generating Apparatus for partial discharge simulation
JP6759466B2 (en) * 2017-11-29 2020-09-23 株式会社東芝 Evaluation device, power storage system, evaluation method and computer program
TWI649573B (en) 2017-12-04 2019-02-01 財團法人工業技術研究院 Method and system for detecting short circuit impedance in battery
TWI657639B (en) * 2017-12-04 2019-04-21 Industrial Technology Research Institute Method and system for determining a discharging flow of a battery
JP7101265B2 (en) * 2019-01-15 2022-07-14 株式会社東芝 Abnormal factor diagnosis device and its method, and abnormal factor diagnosis system
CN110426644B (en) * 2019-07-29 2021-04-27 南京微盟电子有限公司 Method for testing lithium battery charging chip by simulating lithium battery
CN111190061B (en) * 2019-11-25 2022-07-15 平高集团有限公司 Energy storage system's test platform
ES2739535B9 (en) * 2019-12-18 2020-12-02 Garcia Luis Arturo Parres METHOD AND SYSTEM TO CALCULATE THE ENERGY AVAILABLE IN AN ELECTRIC BATTERY AT ANY TIME IN ITS LIFE. WITHOUT DOWNLOADING IT, AS WELL AS ITS AUTONOMY, CAPACITY. AND LIFE REMAINING
WO2023182537A1 (en) * 2022-03-21 2023-09-28 주식회사 피엠그로우 Method and device for evaluating battery lifespan

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007292654A (en) * 2006-04-26 2007-11-08 Toyota Motor Corp Durability tester for on-board battery
JP2013057603A (en) * 2011-09-08 2013-03-28 Toyota Motor Corp Lithium secondary battery and deterioration detection method
WO2013118265A1 (en) * 2012-02-09 2013-08-15 株式会社日立製作所 Power system stabilization control system and method

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4379410A (en) * 1981-01-22 1983-04-12 The United States Of America As Represented By The Secretary Of The Air Force Battery electrode fatigue simulator
WO1998022830A2 (en) * 1996-11-21 1998-05-28 Philips Electronics N.V. Battery management system and battery simulator
JP3666785B2 (en) 1998-03-25 2005-06-29 日本電信電話株式会社 Multiple battery automatic test method and apparatus
KR100395516B1 (en) * 1998-11-19 2003-12-18 금호석유화학 주식회사 Method and apparatus for digitizing characteristic factor of power storage device using nonlinear equivalent circuit model
JP3683753B2 (en) 1999-10-01 2005-08-17 日本電信電話株式会社 Secondary battery automatic test method
JP2006171184A (en) * 2004-12-14 2006-06-29 Toshiba Corp System and method for skill evaluation
JP4738243B2 (en) 2006-04-24 2011-08-03 株式会社東芝 Ultrasonic flaw detection system
JP4697105B2 (en) 2006-09-21 2011-06-08 横河電機株式会社 Battery characteristics simulator
JP2011007563A (en) * 2009-06-24 2011-01-13 Ihi Corp Moving body detection method and moving body detection device
JP2011038928A (en) 2009-08-12 2011-02-24 Yokogawa Electric Corp Battery characteristic simulator
US8892264B2 (en) * 2009-10-23 2014-11-18 Viridity Energy, Inc. Methods, apparatus and systems for managing energy assets
JP5691592B2 (en) * 2010-02-18 2015-04-01 日産自動車株式会社 Battery state estimation device
US9678164B2 (en) * 2010-03-23 2017-06-13 Furukawa Electric Co., Ltd. Battery internal state estimating apparatus and battery internal state estimating method
US9024589B2 (en) * 2011-01-06 2015-05-05 Panasonic Intellectual Property Management Co., Ltd. Charge/discharge control method for alkaline storage battery, and power supply system
JP5498414B2 (en) 2011-02-28 2014-05-21 株式会社東芝 Test apparatus and battery pack test method
JP5403437B2 (en) * 2011-07-29 2014-01-29 横河電機株式会社 Battery monitoring device
US8718850B2 (en) * 2011-11-30 2014-05-06 Nec Laboratories America, Inc. Systems and methods for using electric vehicles as mobile energy storage
US10756543B2 (en) * 2012-09-13 2020-08-25 Stem, Inc. Method and apparatus for stabalizing power on an electrical grid using networked distributed energy storage systems
JP6171827B2 (en) * 2013-10-17 2017-08-02 株式会社Ihi Simulation apparatus and simulation method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007292654A (en) * 2006-04-26 2007-11-08 Toyota Motor Corp Durability tester for on-board battery
JP2013057603A (en) * 2011-09-08 2013-03-28 Toyota Motor Corp Lithium secondary battery and deterioration detection method
WO2013118265A1 (en) * 2012-02-09 2013-08-15 株式会社日立製作所 Power system stabilization control system and method

Also Published As

Publication number Publication date
CN107210608B (en) 2020-03-31
CN107210608A (en) 2017-09-26
WO2016203587A1 (en) 2016-12-22
EP3312965A4 (en) 2018-12-05
EP3312965A1 (en) 2018-04-25
US20160370432A1 (en) 2016-12-22
KR101877145B1 (en) 2018-07-10
US10310018B2 (en) 2019-06-04
KR20170010741A (en) 2017-02-01
JP6159474B2 (en) 2017-07-05

Similar Documents

Publication Publication Date Title
JP6159474B2 (en) Simulation signal generation apparatus, simulation signal generation method, and computer program
EP2933896B1 (en) Charging and discharging control method, charging and discharging control system and charging and discharging control device
Crăciun et al. Frequency support functions in large PV power plants with active power reserves
US20200327206A1 (en) Systems and methods for distributed power system model calibration
CN101919134B (en) Event-based control system for wind turbine generators and control method thereof
Rezaei et al. Economic–environmental hierarchical frequency management of a droop-controlled islanded microgrid
US10333347B2 (en) Method and control device for controlling an electrical grid
Salee et al. Optimal siting and sizing of battery energy storage systems for grid-supporting in electrical distribution network
JP2012005346A (en) Method and system for controlling power generation unit
JP6515640B2 (en) Tidal current calculation apparatus, tidal current calculation method, and program
KR101759819B1 (en) Storage battery control device and storage battery control method
Jawad A systematic approach to estimate the frequency support from large-scale PV plants in a renewable integrated grid
JP6548570B2 (en) POWER SUPPLY SYSTEM, CONTROL DEVICE AND PROGRAM FOR POWER SUPPLY SYSTEM
US10283961B2 (en) Voltage and reactive power control system
JP6338009B1 (en) Power stabilization system and control device using power storage device
JP6338008B1 (en) Power stabilization system and control device
Parker et al. A probabilistic method for reserve sizing in power grids with high renewable penetration
Steinkohl et al. Frequency security constrained control of power electronic‐based generation systems
US20170324244A1 (en) Power demand estimation apparatus, power demand estimation method, and program
JP6212661B2 (en) Control device, control method, program, and hydrogen energy storage system
Sangwongwanich Grid-Friendly High-Reliability Photovoltaic Systems
Beura et al. Load frequency control of two area microgrid using reinforcement learning controller
Bhatti et al. Storage enabled flexibility of conventional generation assets (storflex)
Rosero et al. Characterization of the maximum loadability in power systems due to contingencies in the operative planning scenario
Pippi et al. Assessing the Provision of Ancillary Services by PV-BES Systems Considering BES Capacity Degradation

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170210

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170411

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170512

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170609

R151 Written notification of patent or utility model registration

Ref document number: 6159474

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151