JPWO2013121700A1 - Consumer power distribution system and consumer power distribution method - Google Patents

Consumer power distribution system and consumer power distribution method Download PDF

Info

Publication number
JPWO2013121700A1
JPWO2013121700A1 JP2014500069A JP2014500069A JPWO2013121700A1 JP WO2013121700 A1 JPWO2013121700 A1 JP WO2013121700A1 JP 2014500069 A JP2014500069 A JP 2014500069A JP 2014500069 A JP2014500069 A JP 2014500069A JP WO2013121700 A1 JPWO2013121700 A1 JP WO2013121700A1
Authority
JP
Japan
Prior art keywords
power
air conditioning
lighting
facility
illumination
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2014500069A
Other languages
Japanese (ja)
Other versions
JP5800979B2 (en
Inventor
雅仁 松下
雅仁 松下
洋介 金子
洋介 金子
晃久 安田
晃久 安田
川岸 元彦
元彦 川岸
隆也 山本
隆也 山本
博 米谷
博 米谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2014500069A priority Critical patent/JP5800979B2/en
Publication of JPWO2013121700A1 publication Critical patent/JPWO2013121700A1/en
Application granted granted Critical
Publication of JP5800979B2 publication Critical patent/JP5800979B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/004Generation forecast, e.g. methods or systems for forecasting future energy generation
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00004Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the power network being locally controlled
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/10The network having a local or delimited stationary reach
    • H02J2310/12The local stationary network supplying a household or a building
    • H02J2310/14The load or loads being home appliances
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Air Conditioning Control Device (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

従来のデマンドレスポンスに対応した需要家内の電力使用量の抑制策は、空調設備だけの場合であり、照明等を加えた複数種の負荷設備に対応していないという課題があった。また、利用可能な電力を複数種の設備に電力分配を行う方法が提案されているが、環境変化により負荷設備ごとの電力需要が変化した場合に対応できないという課題があった。本発明は、空調や照明など、複数種の負荷設備を有する需要家内において、複数の負荷設備に対応して通知された各負荷設備の必要電力とデマンドレスポンス等により制限される消費可能上限電力値とに基づいて、消費可能上限電力値を超えないように各負荷設備に分配電力を割り振り、割り振られた分配電力内で各負荷設備を運用するようにしたので、ピーク電力を抑制できるという効果を奏する。The conventional measures for suppressing the amount of electric power consumed in the consumer corresponding to the demand response are only for the air-conditioning equipment, and there is a problem that it is not compatible with a plurality of types of load equipment including lighting. In addition, a method for distributing available power to a plurality of types of equipment has been proposed, but there is a problem that it cannot cope with a change in power demand for each load equipment due to environmental changes. The present invention provides a consumable upper limit power value limited by required power and demand response of each load facility notified in correspondence to the plurality of load facilities in a customer having a plurality of types of load facilities such as air conditioning and lighting. Based on the above, the distributed power is allocated to each load facility so that the upper limit of consumable power is not exceeded, and each load facility is operated within the allocated distributed power, so the peak power can be suppressed. Play.

Description

この発明は、デマンドレスポンスに対応した需要家内電力分配システムおよび需要家内電力分配方法に関する。   The present invention relates to a consumer power distribution system and a consumer power distribution method that support demand response.

電力会社等の電力を供給する側から、単位時間当たりに使用可能な電力量の上限値を提示されるデマンドレスポンスに対応した需要家内での電力使用量の抑制策として、空調の熱負荷変動を予測し、エネルギー消費量が最低となるように空調設備を制御することでピーク電力を抑制する方法がある(例えば、特許文献1)。   As a measure to reduce the amount of power used in the consumer in response to demand response, the upper limit of the amount of power that can be used per unit time is presented by the power supplier, etc. There is a method of suppressing peak power by predicting and controlling air conditioning equipment so that energy consumption is minimized (for example, Patent Document 1).

また、利用可能な電力を複数の負荷設備間で分配する際、負荷設備が提供している快適性や利便性の他に、電気料金を尺度に加えた統一尺度をテーブル化し、これに基づいて電力分配を行う方法が提案されている(例えば、特許文献2)。   In addition to the comfort and convenience provided by load facilities when distributing available power among multiple load facilities, a unified measure that includes electricity charges is also tabulated and based on this table. A method of performing power distribution has been proposed (for example, Patent Document 2).

特開2011−36084号公報JP 2011-36084 A 特開2010−166636号公報JP 2010-166636 A

しかし、特許文献1に示されている従来手法では、需要家内で制御可能な負荷設備が空調設備だけの場合は適切に電力消費を抑制可能であるが、照明等を加えた複数種の負荷設備が存在する場合、各設備種別間での電力分配を決められないという課題があった。   However, in the conventional method shown in Patent Document 1, when the load equipment that can be controlled in the customer is only the air conditioning equipment, it is possible to appropriately suppress power consumption. When there is a problem, there has been a problem that it is not possible to determine the power distribution among the respective equipment types.

また、特許文献2に示されている従来手法では、複数種の設備に負荷電力を分配する際、統一尺度を用いてコストを最小化するように分配を実施しているが、分配後の電力需要を予測していないため、環境変化により負荷設備ごとの電力需要が変化した場合に対応できないという課題があった。   Moreover, in the conventional method shown in Patent Document 2, when distributing load power to a plurality of types of facilities, distribution is performed so as to minimize costs using a unified scale. Since the demand was not predicted, there was a problem that it was not possible to cope with a change in power demand for each load facility due to environmental changes.

この発明は、上記のような問題点を解決するためになされたもので、空調や照明など、複数種の負荷設備を有する需要家内において、複数の負荷設備に対応して通知された各負荷設備の必要電力とデマンドレスポンス等により制限される消費可能上限電力値とに基づいて、消費可能上限電力値を超えないように各負荷設備に分配電力を割り振り、割り振られた分配電力内で各負荷設備を運用することを目的とする。   The present invention has been made to solve the above-described problems, and each load facility notified in correspondence to a plurality of load facilities in a consumer having a plurality of types of load facilities such as air conditioning and lighting. Based on the required power and the consumable upper limit power value limited by demand response, etc., the distributed power is allocated to each load facility so that the consumable upper limit power value is not exceeded, and each load facility is within the allocated distributed power The purpose is to operate.

この発明に係る需要家内電力分配システムは、電力を供給する側、もしくは需要家内の電力の使用量をコントロールするエネルギー管理システムから指示される、今後の所定時間の間に需要家内で消費してもよい消費可能電力の上限値を受け取るとともに、この消費可能電力の上限値と需要家内の複数の負荷設備に対応して通知された各負荷設備の必要電力とに基づいて、それぞれの負荷設備に対して分配する分配電力を指示する電力分配部と、前記負荷設備それぞれに対応して設けられ、当該負荷設備が前記今後の所定時間の間に必要とする前記必要電力を、目標指標値を満たす運用パターンごとに予測して、最小の必要電力を前記電力分配部に通知し、前記電力分配部から指示された分配電力となる運用パターンを運用制御パターンとして指示する電力予測部と、前記負荷設備それぞれに対応して設けられ、当該負荷設備に対応する前記電力予測部から指示された運用制御パターンに基づいて当該負荷設備を制御する設備制御部とを備えた。   The consumer power distribution system according to the present invention is directed from the energy supply system or the energy management system that controls the amount of power used in the consumer, even if consumed in the consumer for a predetermined time in the future. A good upper limit value of consumable power is received, and for each load facility based on the upper limit value of this consumable power and the required power of each load facility notified in response to multiple load facilities in the consumer. The power distribution unit for instructing the distributed power to be distributed and the load facilities are provided corresponding to each of the load facilities, and the required power required by the load facilities during the predetermined time in the future satisfies the target index value. Predicting for each pattern, notifying the power distribution unit of the minimum required power, and setting the operation pattern to be the distributed power instructed from the power distribution unit as the operation control pattern A power prediction unit for instructing, and a facility control unit that is provided corresponding to each of the load facilities and controls the load facility based on an operation control pattern instructed by the power prediction unit corresponding to the load facility. It was.

この発明に係る需要家内電力分配システムによれば、空調や照明など、複数種の負荷設備を有する需要家内において、複数の負荷設備に対応して通知された各負荷設備の必要電力とデマンドレスポンス等により制限される消費可能上限電力値とに基づいて、消費可能上限電力値を超えないように各負荷設備に分配電力を割り振り、割り振られた分配電力内で各負荷設備を運用するようにしたので、ピーク電力を抑制できるという効果を奏する。   According to the power distribution system in a consumer according to the present invention, in a consumer having a plurality of types of load facilities such as air conditioning and lighting, required power and demand response of each load facility notified corresponding to the plurality of load facilities, etc. The distribution power is allocated to each load facility based on the consumable upper limit power value that is limited by the limit, and the load facility is operated within the allocated distribution power. The peak power can be suppressed.

この発明の実施の形態1に係る需要家内電力分配システムの構成の一例を示すシステム構成図である。It is a system configuration figure showing an example of the composition of the consumer power distribution system concerning Embodiment 1 of this invention. この発明の実施の形態2に係る需要家内電力分配システムの構成の一例を示すシステム構成図である。It is a system configuration | structure figure which shows an example of a structure of the customer power distribution system which concerns on Embodiment 2 of this invention. この発明の実施の形態2に係る需要家内電力分配システムの動作の一例を示すフローチャートである。It is a flowchart which shows an example of operation | movement of the customer power distribution system which concerns on Embodiment 2 of this invention. この発明の実施の形態3に係る需要家内電力分配システムの構成の一例を示すシステム構成図である。It is a system configuration | structure figure which shows an example of a structure of the electric power distribution system in a consumer concerning Embodiment 3 of this invention. この発明の実施の形態3に係る需要家内電力分配システムの動作の一例を示すフローチャートである。It is a flowchart which shows an example of operation | movement of the customer power distribution system which concerns on Embodiment 3 of this invention.

この発明に係る需要家内電力分配システムは、オフィスビルや店舗、あるいは工場のような需要家の施設内にある空調や照明などの複数の負荷設備の消費電力を、消費可能上限電力値を超えないように制御するシステムとして実現される。ここで、消費可能上限電力値とは、電力を供給する側、もしくは需要家内の電力の使用量をコントロールするエネルギー管理システム(例えば、ビルエネルギー管理システム、BEMS:Building and Energy Management System)から指示される、今後の所定時間の間に需要家内で消費してもよい消費可能電力の上限値である。以下、この発明の需要家内電力分配システムにおける実施の形態を説明する。   The power distribution system within a consumer according to the present invention does not exceed the upper limit power consumption value of the power consumption of a plurality of load facilities such as air conditioning and lighting in a customer facility such as an office building, a store, or a factory. It is realized as a control system. Here, the consumable upper limit power value is instructed by an energy management system (for example, building energy management system, BEMS: Building and Energy Management System) that controls the amount of power used by the power supply side or the consumer. This is the upper limit value of consumable power that may be consumed in the consumer during a predetermined time in the future. Hereinafter, an embodiment in an in-customer power distribution system of the present invention will be described.

実施の形態1.
この発明の実施の形態1に係る需要家内電力分配システムは、需要家の施設内に三つの負荷設備(負荷設備a、b、cとする)を持つものとして、そのシステム例について説明する。
Embodiment 1 FIG.
The customer power distribution system according to Embodiment 1 of the present invention will be described as an example of a system having three load facilities (load facilities a, b, and c) in the customer's facility.

図1は、この発明の実施の形態1に係る需要家内電力分配システムの構成の一例を示すシステム構成図である。図において、需要家内電力分配システムは、電力分配部1、3対の電力予測部12a〜cおよび設備制御部13a〜cを備える。電力分配部1は、電力を供給する側、もしくは需要家内の電力の使用量をコントロールするエネルギー管理システムから指示される、今後の所定時間の間に需要家内で消費してもよい消費可能電力の上限値を受け取るとともに、この消費可能電力の上限値と需要家内の複数の負荷設備a〜cに対応して通知された各負荷設備の必要電力a〜cとに基づいて、それぞれの負荷設備a〜cに対して分配する分配電力a〜cを指示する。電力予測部12a〜cは、負荷設備a〜cそれぞれに対応して設けられ、当該負荷設備が今後の所定時間の間に必要とする必要電力を、当該負荷設備の目標指標値を満たす運用パターンの候補ごとに予測して、最小の必要電力a〜cを電力分配部1に通知し、電力分配部1から指示された分配電力a〜cで運用される運用パターンa〜cを運用制御パターンa〜cとして指示する。設備制御部13a〜cは、負荷設備a〜cそれぞれに対応して設けられ、当該負荷設備a〜cに対応して電力予測部12a〜cから指示された運用制御パターンa〜cに基づいて当該負荷設備a〜cを制御する。   1 is a system configuration diagram showing an example of a configuration of an in-customer power distribution system according to Embodiment 1 of the present invention. In the figure, the in-customer power distribution system includes a power distribution unit 1, three pairs of power prediction units 12a to 12c, and facility control units 13a to 13c. The power distribution unit 1 is configured by the power supply side or the energy management system that controls the usage amount of power in the consumer, and the consumable power that may be consumed in the consumer during a predetermined time in the future. Each of the load facilities a is received based on the upper limit value of the consumable power and the required power ac of each load facility notified in correspondence to the plurality of load facilities ac in the consumer. The distribution powers a to c to be distributed to -c are indicated. The power prediction units 12a to 12c are provided corresponding to the load facilities a to c, respectively, and an operation pattern that satisfies the target index value of the load facility with the required power required by the load facility for a predetermined time in the future. The minimum required powers a to c are notified to the power distribution unit 1, and the operation patterns a to c operated with the distribution power a to c instructed from the power distribution unit 1 are used as the operation control patterns. Indicate as ac. The facility control units 13a to 13c are provided corresponding to the load facilities a to c, respectively, and based on the operation control patterns a to c instructed from the power prediction units 12a to 12c corresponding to the load facilities a to c. The load facilities a to c are controlled.

ここで、負荷設備a〜cそれぞれに対応して設けられた電力予測部12a〜cは、目標指標値を満たす運用パターンa〜cの候補ごとに必要電力a〜cを予測するが、指標値は、例えば負荷設備が空調設備であれば室温、照明設備であれば照度が相当し、その目標指標値は、目標とする室温である目標室温、目標とする照度である目標照度である。目標指標値を満たす運用パターンとは、例えば目標室温を満たすことのできる空調運転パターン、目標照度を満たすことのできる照明調光点灯パターンが相当する。運用制御パターンは、目標指標値を満たすことのできる運用パターンの中から選択された運用パターンであり、当該負荷設備を制御するように運用される、例えば空調運転制御パターン、照明調光点灯制御パターンが相当する。   Here, the power prediction units 12a to 12c provided corresponding to the load facilities a to c predict the necessary powers a to c for each of the operation patterns a to c that satisfy the target index value. For example, if the load facility is an air conditioner, the room temperature is equivalent, and if it is a lighting facility, the illuminance is equivalent. The target index value is a target room temperature that is a target room temperature and a target illuminance that is a target illuminance. The operation pattern that satisfies the target index value corresponds to, for example, an air conditioning operation pattern that can satisfy the target room temperature and an illumination dimming / lighting pattern that can satisfy the target illuminance. The operation control pattern is an operation pattern selected from the operation patterns that can satisfy the target index value, and is operated to control the load facility, for example, an air conditioning operation control pattern, an illumination dimming / lighting control pattern Corresponds.

なお、電力分配部1は、消費可能電力の上限値が電力予測部12a〜cから通知された必要電力の合計に対して不足しないときには、通知された必要電力をそのまま分配電力として指示してもよいし、また余裕があるときには、分配電力の合計が消費可能電力の上限値を超えない範囲で、少なくとも一つの負荷設備に対して通知された必要電力より大きい分配電力を指示してもよい。一方、不足するときには、各負荷設備の分配電力の合計が消費可能電力の上限値を超えないように、少なくとも一つの負荷設備に対して通知された必要電力より小さい分配電力を指示するようにする。   When the upper limit value of the consumable power is not insufficient with respect to the total required power notified from the power prediction units 12a to 12c, the power distribution unit 1 may instruct the notified required power as the distributed power as it is. In addition, when there is a margin, distributed power larger than the required power notified to at least one load facility may be instructed within a range where the total distributed power does not exceed the upper limit value of consumable power. On the other hand, when there is a shortage, the distribution power smaller than the required power notified to at least one load facility is instructed so that the total distribution power of each load facility does not exceed the upper limit value of consumable power. .

また、電力予測部12は、電力分配部1から指示された分配電力以内で運用される運用パターンを運用制御パターンとして指示するが、電力分配部1から指示された分配電力が当初通知した必要電力と等しいときには、通知した必要電力に対応する運用パターンを運用制御パターンとして指示する。一方、電力分配部1から指示された分配電力が当初通知した必要電力より大きいとき、または小さいときには、分配電力以内で運用される運用パターンの候補の中で目標指標値からの乖離が最も少ない運用パターンを選択して運用制御パターンとして設備制御部13に指示するものとする。なお、電力予測部12は、電力分配部1に必要電力を通知する際に、運用パターンの各候補に対して予測した必要電力を記憶しておける場合には、必要電力から変更された分配電力に対応する運用パターンの候補算出に利用してもよい。また、負荷設備の目標指標値ごとの運用パターンと必要電力との対応、分配電力ごとの運用パターンと指標値との対応をテーブル化して算出負荷を軽減してもよい。   In addition, the power prediction unit 12 instructs an operation pattern that is operated within the distribution power instructed from the power distribution unit 1 as an operation control pattern, but the required power that the distribution power instructed from the power distribution unit 1 has initially notified Is equal to, the operation pattern corresponding to the notified required power is instructed as the operation control pattern. On the other hand, when the distribution power instructed from the power distribution unit 1 is larger or smaller than the initially notified required power, the operation with the smallest deviation from the target index value among the operation pattern candidates operated within the distribution power A pattern is selected and instructed to the equipment control unit 13 as an operation control pattern. When the power prediction unit 12 can store the required power predicted for each candidate of the operation pattern when notifying the power distribution unit 1 of the required power, the distributed power changed from the required power is stored. May be used for calculating candidate operation patterns corresponding to. Further, the calculation load may be reduced by tabulating the correspondence between the operation pattern for each target index value of the load facility and the required power and the correspondence between the operation pattern for each distributed power and the index value.

この電力予測部12が分配電力以内で運用される運用パターンの候補の中から運用制御パターンとして選択する、目標指標値と乖離が最も少ない運用パターンとは、例えば負荷設備が空調設備であれば、暖房運転のときは目標室温またはその最も近い室温まで上げられる空調運転パターン、また冷房運転のときは目標室温またはその最も近い室温まで下げられる空調運転パターン、また、負荷設備が照明設備であれば目標照度またはその最も近い照度まで上げられる照明調光点灯パターンである。   For example, if the load facility is an air-conditioning facility, the power predicting unit 12 selects an operation control pattern from among operation pattern candidates that are operated within the distributed power as the operation control pattern. An air-conditioning operation pattern that can be raised to the target room temperature or the nearest room temperature during heating operation, an air-conditioning operation pattern that can be lowered to the target room temperature or the nearest room temperature during cooling operation, and a target if the load equipment is lighting equipment It is an illumination dimming lighting pattern that can be increased to illuminance or the closest illuminance.

ここで、今後の所定時間の間(所定の時間帯)に需要家内で消費してもよい消費可能電力の上限値(消費可能電力上限値)は、次のような単位や形式で、電力を供給する側、もしくは需要家内の電力の使用量をコントロールするエネルギー管理システムから指示されてもよい。例えば、12時から12時30分に使用可能電力上限値が○○kWと指示されるとき、その対象時間帯を開始時間と終了時間による指定(例えば、「12時」から「12時30分」)、あるいは開始時間と対象時間長による指定(例えば、「12時」から「30分間」)と指示する場合、対象となる時間長が一定長でも可変長でも構わない。また、予め時間長が決まっているならば、開始時間のみによる指定(例えば、12時[から30分間(省略)])などで指示してもよい。対象時間帯と指示する時間の両方が予め決まっていれば、使用可能電力上限値のみによる指示でも構わない。なお、ここに示した指示の単位や形式は一例であって、他の指示の単位や形式によっても構わない。   Here, the upper limit value of consumable power that can be consumed in the consumer during a predetermined time in the future (predetermined time zone) (consumable power upper limit value) is the following unit or format. You may instruct | indicate from the energy management system which controls the usage-amount of the electric power in the supply side or a consumer. For example, when the usable power upper limit value is instructed from 12:00 to 12:30 as OO kW, the target time zone is designated by the start time and end time (for example, from “12:00” to “12:30” ”), Or when specifying by the start time and the target time length (for example,“ 30 minutes ”from“ 12:00 ”), the target time length may be a fixed length or a variable length. Further, if the time length is determined in advance, it may be instructed by specifying only the start time (for example, 12:00 [from 30 minutes (omitted)]). If both the target time zone and the time to be instructed are determined in advance, an instruction using only the usable power upper limit value may be used. The instruction unit and format shown here are merely examples, and other instruction units and formats may be used.

このように、この発明の実施の形態1に係る需要家内電力分配システムは、需要家の施設内に三つの負荷設備a〜cを持つシステム構成例について説明したが、2つ以上の負荷設備から通知される必要電力に対して、合計が消費可能上限電力値を超えないように分配電力を割り振るシステムとして実現されるものである。   As described above, the in-customer power distribution system according to Embodiment 1 of the present invention has been described with respect to the system configuration example having the three load facilities a to c in the facility of the consumer, but from two or more load facilities. This is realized as a system that allocates the distributed power so that the total does not exceed the consumable upper limit power value for the notified required power.

この発明の実施の形態1に係る需要家内電力分配システムによれば、複数種の負荷設備を有する需要家内において、各負荷設備対応に通知された必要電力とデマンドレスポンス等により制限される消費可能上限電力値とに基づいて、消費可能上限電力値を超えないように各負荷設備に分配電力を割り振り、割り振られた分配電力内で各負荷設備を運用するようにしたので、需要家内のピーク電力を抑制できるようになる。   According to the power distribution system within a consumer according to Embodiment 1 of the present invention, within a consumer having a plurality of types of load facilities, a consumable upper limit limited by the required power, demand response, etc. notified to each load facility Based on the power value, the distributed power is allocated to each load facility so that the maximum consumable power value is not exceeded, and each load facility is operated within the allocated distributed power. It becomes possible to suppress.

このような需要家内電力分配システムの電力分配部1、電力予測部12、設備制御部13におけるより詳細な動作は、需要家の施設内にある代表的な負荷設備である空調と照明の二つを具体例として実施の形態2、3で説明する。   More detailed operations in the power distribution unit 1, power prediction unit 12, and facility control unit 13 of such a customer power distribution system include two types of air conditioning and lighting, which are typical load facilities in the customer's facility. Are described in Embodiments 2 and 3 as specific examples.

実施の形態2.
この発明の実施の形態2に係る需要家内電力分配システムは、需要家の施設内にある代表的な負荷設備である空調と照明の二つを制御するものとして、そのシステム例について説明する。
Embodiment 2. FIG.
The customer power distribution system according to Embodiment 2 of the present invention will be described as an example of a system that controls two types of air conditioning and lighting, which are typical load facilities in a customer's facility.

図2は、この発明の実施の形態2に係る需要家内電力分配システムの構成の一例を示すシステム構成図である。図において、電力分配部1は、電力会社等、電力を供給する側、もしくは需要家内の電力の使用量をコントロールするエネルギー管理システムから指示される、今後の所定時間の間に需要家内で消費してもよい消費可能電力の上限値を受け取るとともに、この消費可能電力の上限値と空調電力予測部2および照明電力予測部4から空調設備と照明設備に対応して通知された空調必要電力および照明必要電力とに基づいて、空調設備と照明設備に対して分配する空調分配電力と照明分配電力を指示する。空調電力予測部2は、今後の所定時間の間に空調設備が必要とする空調必要電力を、目標室温を満たす空調運転パターンの候補ごとに予測して、最小の空調必要電力を電力分配部1に通知し、電力分配部1から指示された空調分配電力で運用される空調運転パターンを空調運転制御パターンとして指示する。空調設備制御部3は、空調電力予測部2から指示された空調運転制御パターンに基づいて空調設備を制御する。照明電力予測部4は、今後の所定時間の間に照明設備が必要とする照明必要電力を、目標照度を満たす照明調光点灯パターンの候補ごとに予測して、最小の照明必要電力を電力分配部1に通知し、電力分配部1から指示された照明分配電力で運用される照明調光点灯パターンを照明調光点灯制御パターンとして指示する。照明設備制御部5は、照明電力予測部4から指示された照明調光点灯制御パターンに基づいて照明設備を制御する。   FIG. 2 is a system configuration diagram showing an example of the configuration of the consumer power distribution system according to Embodiment 2 of the present invention. In the figure, the power distribution unit 1 is consumed in the consumer for a predetermined time in the future, which is instructed by the power management company or the energy management system that controls the amount of power used in the consumer. The upper limit value of the consumable power that may be received is received, and the upper limit value of the consumable power and the air conditioning power requirement and the lighting notified from the air conditioning power prediction unit 2 and the lighting power prediction unit 4 corresponding to the air conditioning facility and the lighting facility Based on the required power, an air conditioning distribution power and an illumination distribution power to be distributed to the air conditioning facility and the lighting facility are instructed. The air-conditioning power prediction unit 2 predicts the air-conditioning power required by the air-conditioning equipment for a predetermined time in the future for each candidate air-conditioning operation pattern that satisfies the target room temperature, and the power distribution unit 1 The air conditioning operation pattern operated with the air conditioning distributed power instructed from the power distribution unit 1 is instructed as the air conditioning operation control pattern. The air conditioning equipment control unit 3 controls the air conditioning equipment based on the air conditioning operation control pattern instructed from the air conditioning power prediction unit 2. The illumination power prediction unit 4 predicts the required illumination power required by the illumination facility for a predetermined time in the future for each candidate of the lighting dimming lighting pattern that satisfies the target illuminance, and distributes the minimum required illumination power to the power distribution The unit 1 is notified, and an illumination dimming / lighting pattern operated with the illumination distribution power instructed from the power distribution unit 1 is instructed as an illumination dimming / lighting control pattern. The lighting equipment control unit 5 controls the lighting equipment based on the lighting dimming / lighting control pattern instructed by the lighting power prediction unit 4.

図3は、この発明の実施の形態2に係る需要家内電力分配システムの動作の一例を示すフローチャートである。この図に沿って、この発明の実施の形態2に係る需要家内電力分配システムの動作について説明する。   FIG. 3 is a flowchart showing an example of the operation of the consumer power distribution system according to Embodiment 2 of the present invention. The operation of the consumer power distribution system according to Embodiment 2 of the present invention will be described with reference to FIG.

ステップST101.
空調電力予測部2は、今後の所定時間の間の空調運転パターンの候補に応じた空調設備が必要とする空調必要電力を算出する。一般に、ある設定された目標室温を実現する空調の制御方法は、一意には決まらず、さまざまな空調運転パターンが存在するため、空調運転パターンの候補ごとに空調必要電力を予測するものとする。次に、空調電力予測部2は、目標室温を実現する空調運転パターンの候補のうち、最小必要電力で実現する空調運転パターンを選択し、選択した空調運転パターンの電力を空調必要電力として電力分配部1に通知する。
Step ST101.
The air-conditioning power prediction unit 2 calculates the required air-conditioning power required by the air-conditioning equipment corresponding to the candidate air-conditioning operation pattern for a predetermined time in the future. Generally, the air conditioning control method for realizing a certain set target room temperature is not uniquely determined, and various air conditioning operation patterns exist. Therefore, the required air conditioning power is predicted for each air conditioning operation pattern candidate. Next, the air-conditioning power prediction unit 2 selects an air-conditioning operation pattern to be realized with the minimum required power from among air-conditioning operation pattern candidates that realize the target room temperature, and distributes the power of the selected air-conditioning operation pattern as the air-conditioning required power. Notify part 1.

ステップST102.
また、照明電力予測部4は、今後の所定時間の間の照明調光点灯パターンの候補に応じた照明設備が必要とする照明必要電力を算出する。一般に、ある設定された目標照度を実現する照明の制御方法は一意には決まらず、さまざまな照明調光点灯パターンが存在するため、照明調光点灯パターンの候補ごとに照明必要電力を予測するものとする。次に、照明電力予測部4は、目標照度を実現する照明調光点灯パターンの候補のうち、最小必要電力で実現する照明調光点灯パターンを選択し、選択した照明調光点灯パターンの電力を照明必要電力として電力分配部1に通知する。
Step ST102.
In addition, the illumination power prediction unit 4 calculates the required illumination power required by the illumination facility according to the illumination dimming / lighting pattern candidate for a predetermined time in the future. In general, the lighting control method that achieves a certain set target illuminance is not uniquely determined, and there are various lighting dimming lighting patterns. Therefore, the required lighting power is predicted for each lighting dimming lighting pattern candidate. And Next, the illumination power prediction unit 4 selects an illumination dimming / lighting pattern to be realized with the minimum required power from among the illumination dimming / lighting pattern candidates that realize the target illuminance, and sets the power of the selected illumination dimming / lighting pattern. The power distribution unit 1 is notified of the necessary illumination power.

ステップST103.
電力分配部1は、空調電力予測部2から受け取った空調必要電力と照明電力予測部4から受け取った照明必要電力との合計値(必要電力の合計値)が、消費可能電力上限値を超えていないかを確認する。
Step ST103.
In the power distribution unit 1, the total value (total value of necessary power) of the required air conditioning power received from the air conditioning power prediction unit 2 and the required illumination power received from the illumination power prediction unit 4 exceeds the consumable power upper limit value. Check if there is any.

ステップST104.
電力分配部1は、必要電力の合計値が消費可能電力上限値と同じ、もしくはそれ以下であった場合は、空調と照明の必要電力と同じ値を分配電力として空調電力予測部2と照明電力予測部4に対して指示する。
Step ST104.
When the total value of the required power is equal to or less than the consumable power upper limit value, the power distribution unit 1 uses the same value as the required power for air conditioning and lighting as the distributed power, and the air conditioning power prediction unit 2 and the lighting power The prediction unit 4 is instructed.

ステップST105.
空調電力予測部2は、電力分配部1から空調必要電力と同値の空調分配電力の指示を受け取ると、先に選択した空調運転パターンを空調運転制御パターンとして空調設備制御部3に指示する。空調設備制御部3は、この空調電力予測部2から指示された空調運転制御パターンに基づいて空調設備を制御する。
Step ST105.
When the air-conditioning power prediction unit 2 receives an instruction for the air-conditioning distribution power having the same value as the air-conditioning required power from the power distribution unit 1, the air-conditioning power prediction unit 2 instructs the air-conditioning equipment control unit 3 using the previously selected air-conditioning operation pattern as the air-conditioning operation control pattern. The air conditioning equipment control unit 3 controls the air conditioning equipment based on the air conditioning operation control pattern instructed from the air conditioning power prediction unit 2.

ステップST106.
同様に、照明電力予測部4は、電力分配部1から照明必要電力と同値の照明分配電力の指示を受け取ると、先に選択した照明調光点灯パターンを照明調光点灯制御パターンとして照明設備制御部5に指示する。照明設備制御部5は、この照明電力予測部4から指示された照明調光点灯制御パターンに基づいて照明設備を制御する。
Step ST106.
Similarly, when the illumination power prediction unit 4 receives an instruction of illumination distribution power having the same value as the required illumination power from the power distribution unit 1, the illumination power control is performed using the previously selected illumination dimming lighting pattern as the lighting dimming lighting control pattern. Instruct part 5. The lighting equipment control unit 5 controls the lighting equipment based on the lighting dimming / lighting control pattern instructed by the lighting power prediction unit 4.

なお、ステップST104において、電力分配部1は、必要電力の合計値が消費可能電力上限値以下であった場合は、消費可能電力上限値を超えない範囲で、余裕分の電力をどちらかの設備、あるいは双方の設備に分配する、必要電力以上の分配電力を指示してもよい。なお、双方の設備に分配する際には、余裕分の電力を均等に分配してもよいし、重みを付けて分配してもよい。また、特定の設備に対して優先して分配するようにしてもよい。   In step ST104, when the total value of the required power is equal to or lower than the upper limit of consumable power, the power distribution unit 1 supplies either of the extra power within a range not exceeding the upper limit of consumable power. Alternatively, it is possible to instruct distributed power more than necessary power distributed to both facilities. In addition, when distributing to both facilities, a sufficient amount of electric power may be distributed equally or may be distributed with a weight. Moreover, you may make it distribute with priority with respect to a specific installation.

すなわち、ステップST104において、電力分配部1が余裕分の電力を分配して分配電力を指示する(ステップST104’とする。)場合、ステップST105において、空調電力予測部2は、電力分配部1から空調必要電力以上の空調分配電力の指示を受け取ると、空調分配電力を空調必要電力とする空調運転パターンを算出し、算出した空調運転パターンを空調運転制御パターンとして空調設備制御部3に指示し、空調設備を制御させる。(ステップST105’とする。)。同様に、ステップST106において、照明電力予測部4は、電力分配部1から照明必要電力以上の照明分配電力の指示を受け取ると、照明分配電力を照明必要電力とする照明調光点灯パターンを算出し、算出した照明調光点灯パターンを照明調光点灯制御パターンとして照明設備制御部5に指示し、照明設備を制御させる。(ステップST106’とする。)。   That is, in step ST104, when the power distribution unit 1 distributes the surplus power and instructs the distribution power (referred to as step ST104 ′), the air conditioning power prediction unit 2 starts from the power distribution unit 1 in step ST105. When receiving an instruction of air conditioning distribution power that is equal to or greater than the air conditioning required power, an air conditioning operation pattern using the air conditioning distribution power as the air conditioning required power is calculated, and the calculated air conditioning operation pattern is instructed to the air conditioning facility control unit 3 as an air conditioning operation control pattern. Control air conditioning equipment. (Referred to as step ST105 '). Similarly, in step ST106, when the illumination power prediction unit 4 receives an instruction from the power distribution unit 1 for illumination distribution power that is equal to or greater than the required illumination power, the illumination power prediction unit 4 calculates an illumination dimming lighting pattern that uses the illumination distribution power as the illumination required power. The calculated lighting dimming pattern is instructed to the lighting equipment control unit 5 as the lighting dimming lighting control pattern, and the lighting equipment is controlled. (Referred to as step ST106 ').

また、需要家施設に蓄電池のような蓄電設備が存在した場合は、余裕分の電力を全量あるいは一定量、空調設備と照明設備に分配するよりも優先して蓄電設備に蓄電するようにしてもよい。あるいは、空調設備と照明設備に分配した後、残余分の電力を蓄電設備に蓄電してもよい。畜電池が満充電したとき、または蓄電電力を供給しているときには、この限りではない。   In addition, if there is power storage equipment such as a storage battery in the customer facility, the total amount or a certain amount of power can be stored in the power storage equipment in preference to being distributed to the air conditioning equipment and lighting equipment. Good. Alternatively, the remaining power may be stored in the power storage facility after being distributed to the air conditioning facility and the lighting facility. This is not the case when the battery is fully charged or when the stored power is being supplied.

ステップST107.
一方、電力分配部1は、必要電力の合計値が消費可能電力上限値を超えた場合は、消費可能電力の上限値以下となるように空調と照明に分配する分配電力を決定し、空調電力予測部2および照明電力予測部4に対して指示する。
Step ST107.
On the other hand, when the total required power exceeds the upper limit value of consumable power, the power distribution unit 1 determines the distributed power to be distributed to the air conditioner and the lighting so as to be equal to or lower than the upper limit value of the consumable power. The prediction unit 2 and the illumination power prediction unit 4 are instructed.

ステップST108.
空調電力予測部2は、電力分配部1から空調必要電力未満の空調分配電力を指示されると、目標とする室温を変更するなどして、分配電力以下で空調設備を制御する空調運転パターンの候補を算出し、算出した空調運転パターンを空調運転制御パターンとして空調設備制御部3に指示する。空調設備制御部3は、空調電力予測部2から指示された空調運転制御パターンに基づいて空調設備を制御する。なお、電力分配部1から指示された空調分配電力が空調必要電力を確保できているときは、ステップST105と同様の処理を行う。
Step ST108.
When the air conditioning power prediction unit 2 is instructed by the power distribution unit 1 to supply the air conditioning power less than the required air conditioning power, the air conditioning power prediction unit 2 changes the target room temperature, and controls the air conditioning operation pattern to control the air conditioning equipment below the power distribution. Candidates are calculated, and the calculated air conditioning operation pattern is instructed to the air conditioning equipment control unit 3 as an air conditioning operation control pattern. The air conditioning equipment control unit 3 controls the air conditioning equipment based on the air conditioning operation control pattern instructed from the air conditioning power prediction unit 2. In addition, when the air conditioning distribution power instructed from the power distribution unit 1 can secure the necessary air conditioning power, the same processing as in step ST105 is performed.

ステップST109.
また、照明電力予測部4は、電力分配部1から照明必要電力未満の照明分配電力を指示されると、目標とする照度を変更するなどして、分配電力以下で照明設備を制御する照明調光点灯パターンの候補を算出し、算出した照明調光点灯パターンを照明調光点灯制御パターンとして照明設備制御部5に指示する。照明設備制御部5は、照明電力予測部4から指示された照明調光点灯制御パターンに基づいて照明設備を制御する。なお、電力分配部1から指示された照明分配電力が照明必要電力を確保できているときは、ステップST106と同様の処理を行う。
Step ST109.
In addition, when the illumination power prediction unit 4 is instructed by the power distribution unit 1 to provide illumination distribution power less than the required illumination power, the illumination power prediction unit 4 changes the target illuminance, for example, to control the lighting equipment below the distribution power. The light lighting pattern candidates are calculated, and the calculated lighting dimming lighting pattern is instructed to the lighting equipment control unit 5 as the lighting dimming lighting control pattern. The lighting equipment control unit 5 controls the lighting equipment based on the lighting dimming / lighting control pattern instructed by the lighting power prediction unit 4. In addition, when the illumination distribution power instruct | indicated from the power distribution part 1 has ensured illumination required power, the process similar to step ST106 is performed.

なお、需要家内電力分配方法の一例として図3に示されるフローチャートでは、空調設備側の空調電力予測部2、空調設備制御部3の動作を照明設備側の照明電力予測部4、照明設備制御部5の動作より先行する手順として説明しているが、例えば、照明設備側の照明電力予測部4、照明設備制御部5の動作を空調設備側の空調電力予測部2、空調設備制御部3の動作より先行する手順としてもよい。また、例えば、ステップST101とステップST102、ステップST105とステップST106、ステップST108とステップST109は、並行して動作する手順としても構わない。   In the flowchart shown in FIG. 3 as an example of the power distribution method within the consumer, the operation of the air conditioning power prediction unit 2 on the air conditioning facility side and the operation of the air conditioning facility control unit 3 are the lighting power prediction unit 4 on the lighting facility side, and the lighting facility control unit. However, for example, the operations of the lighting power prediction unit 4 and the lighting equipment control unit 5 on the lighting equipment side are the same as those of the air conditioning power prediction unit 2 and the air conditioning equipment control unit 3 on the air conditioning equipment side. The procedure may precede the operation. Further, for example, step ST101 and step ST102, step ST105 and step ST106, step ST108 and step ST109 may be procedures that operate in parallel.

次に、電力分配部1において、電力分配部1から必要電力の合計値が消費可能電力上限値を上回っている場合に、空調と照明に分配する電力値を決定する方法について、需要家施設がオフィスビルである場合を例に、さらに詳しく説明する。   Next, in the power distribution unit 1, when the total value of necessary power from the power distribution unit 1 exceeds the consumable power upper limit value, the customer facility determines how to determine the power value to be distributed to air conditioning and lighting. This will be described in more detail by taking an example of an office building.

今、対象となるオフィスビルにおいては、執務環境の快適性の観点から目標とする室内環境が、冷房使用時室温26℃、照度700ルクスとされていたとする。   Now, in the target office building, it is assumed that the target indoor environment from the viewpoint of the comfort of the office environment is a room temperature of 26 ° C. and an illuminance of 700 lux when using the cooling.

このとき、この室温と照度を実現するために必要な最小電力が、空調、照明のそれぞれの必要電力となる。しかし、必要電力の合計値が、上限の消費可能電力値を上回っているため、それぞれ、もしくはどちらか一方の必要電力は供給できないことになる。   At this time, the minimum electric power required to realize the room temperature and the illuminance is the electric power required for air conditioning and illumination. However, since the total value of the required power exceeds the upper limit consumable power value, either or one of the required powers cannot be supplied.

ここで、オフィスビルのような施設の場合、人が業務を行う居室内の室温や精密な作業を行う執務環境としての照度が法律等で規定されている。例えば、人が業務を行う居室内は、「建築物における衛生的環境の確保に関する法律」(通称:ビル管法)により、17℃以上28℃以下でなくてはならないと定められている。また、精密な作業を行う執務環境は、「労働安全衛生法」(通称:安衛法)に関する「事務所衛生基準規則」では、300ルクス以上の照度を確保する必要があると定められている。   Here, in the case of a facility such as an office building, laws and the like stipulate the room temperature in a room where people work and the illuminance as a work environment where precise work is performed. For example, a living room where a person works is required to be 17 ° C. or higher and 28 ° C. or lower according to the “Law for Ensuring Sanitary Environment in Buildings” (common name: Building Pipe Law). In addition, the office environment where precise work is performed is stipulated in the “Office Sanitation Standard Rules” regarding the “Occupational Safety and Health Act” (commonly referred to as the “Safety and Health Act”) that it is necessary to ensure an illuminance of 300 lux or more.

そのため、冷房使用期間におけるオフィスビルの場合、室温は28℃以下を維持する必要がある。一方、照明は最低でも300ルクスの明るさを確保するよう照明設備を制御する必要がある。以下、このような空調、照明、それぞれに法定基準を守るために必要な電力を法定基準電力(以下、空調法定基準電力、照明法定基準電力)と呼ぶ。   Therefore, in the case of an office building during the cooling use period, the room temperature needs to be maintained at 28 ° C. or lower. On the other hand, it is necessary to control the lighting equipment so that the brightness is at least 300 lux. Hereinafter, such electric power required for complying with legal standards for air conditioning and lighting is referred to as legal standard power (hereinafter referred to as air conditioning legal standard power and illumination legal standard power).

電力分配部1は、まず、消費可能上限電力値のうち、空調、照明の法定基準電力をそれぞれに割り当てる。   First, the power distribution unit 1 allocates the legal reference power for air conditioning and lighting among the consumable upper limit power values.

次に、電力分配部1は、余裕分の電力である分配可能電力を、例えば、
分配可能電力=消費可能電力上限値−(空調法定基準電力+照明法定基準電力)
という計算式で求め、空調、照明それぞれに振り分ける。
Next, the power distribution unit 1 distributes distributable power, which is a surplus power, for example,
Distributable power = Consumable power upper limit-(Air conditioning legal standard power + Lighting legal standard power)
It is calculated by the following formula and distributed to each air conditioning and lighting.

ここで、空調、照明それぞれに振り分けた分配可能電力を空調分配可能電力、照明分配可能電力とすれば、割り当てられる空調分配電力、照明分配電力は、
空調分配電力=空調法定基準電力+空調分配可能電力
照明分配電力=照明法定基準電力+照明分配可能電力
という計算式で求められる。
Here, if the distributable power distributed to each of the air conditioning and lighting is defined as air conditioning distributable power and lighting distributable power, the allocated air conditioning distributed power and lighting distributed power are:
Air conditioning distribution power = Air conditioning legal reference power + Air conditioning distributable power Lighting distribution power = Lighting legal reference power + Lighting distributable power.

なお、需要家施設に蓄電設備が存在し、蓄電設備に蓄電された電力(蓄電電力)がある場合には、分配可能電力を、例えば、
分配可能電力=(消費可能電力上限値+蓄電電力)
−(空調法定基準電力+照明法定基準電力)
という計算式で求め、空調、照明それぞれに振り分ければよい。
In addition, when there is power storage equipment in the customer facility and there is power stored in the power storage equipment (power storage power), the distributable power is, for example,
Distributable power = (Consumable power upper limit value + Stored power)
-(Statutory standard power for air conditioning + legal standard power for lighting)
It can be calculated by the following formula and distributed to air conditioning and lighting.

この分配可能電力の内訳決定には、さまざまな方法がある。例えば、昼間は空調の必要電力確保を優先し、分配可能電力から空調必要電力を満たすために必要な電力を分配する。このあと、まだ分配可能電力に残余がある場合は、これを照明に分配する方法をとることができる。一方、これとは逆に、夜間は照明の必要電力確保を優先し、分配可能電力から照明必要電力を満たすために必要な電力を照明に分配し、分配可能電力の残余分を空調に分配する方法をとることができる。なお、夜間でも寒暖が顕著である場合には、分配可能電力の残余分を昼間と同様に空調の必要電力に優先して分配するようにしてもよい。   There are various methods for determining the breakdown of the distributable power. For example, priority is given to securing necessary power for air conditioning during the daytime, and power necessary to satisfy the necessary power for air conditioning is distributed from the distributable power. After this, if there is still residual power that can be distributed, a method of distributing this to lighting can be taken. On the other hand, on the other hand, priority is given to securing the necessary power for lighting at night, and the power necessary for satisfying the required lighting power is distributed to the lighting from the distributable power, and the remainder of the distributable power is distributed to the air conditioning. Can take the way. When the temperature is remarkable even at night, the remainder of the distributable power may be distributed with priority over the necessary power for air conditioning in the same way as in the daytime.

また、室温と照度を快適性の視点から指標化し、快適性の低下が最小限になるよう室温と照度の目標値設定を変更する方法をとることもできる。このとき、快適性の指標化は、例えば、室温が1℃変動することによる快適性の喪失感と、照度が100ルクス低下することによる快適性の喪失感の比率を、オフィスビルに於ける執務者へのアンケート等で数値化して用いる。このアンケートは、例えば端末からの評価投票によって集計するようにしてもよい。もちろん、他の方法で指標化しても良いことは言うまでもない。また、快適性の視点として、室温と照度だけでなく、湿度も加えて指標化してもよい。   Alternatively, the room temperature and the illuminance can be indexed from the viewpoint of comfort, and the target value setting of the room temperature and the illuminance can be changed so that the decrease in comfort is minimized. At this time, the indexing of comfort is, for example, the ratio of the feeling of loss of comfort due to a change in room temperature of 1 ° C to the feeling of loss of comfort due to a decrease in illuminance by 100 lux. It is digitized and used in questionnaires to the people. This questionnaire may be totaled by, for example, evaluation voting from a terminal. Of course, it goes without saying that other methods may be used for indexing. Further, as a viewpoint of comfort, not only room temperature and illuminance but also humidity may be added as an index.

このように、この発明の実施の形態2に係る需要家内電力分配システムによれば、空調や照明など、複数種の負荷設備を有する需要家内において、各負荷設備対応に通知された必要電力とデマンドレスポンス等により制限される消費可能上限電力値とに基づいて、消費可能上限電力値を超えないように各負荷設備に分配電力を割り振り、割り振られた分配電力内で各負荷設備を運用するようにしたので、需要家内のピーク電力を抑制できるという効果を奏する。   As described above, according to the in-customer power distribution system according to Embodiment 2 of the present invention, the required power and the demand notified to each load facility in a consumer having a plurality of types of load facilities such as air conditioning and lighting. Based on the consumable upper limit power value limited by response etc., allocate the distributed power to each load facility so that the consumable upper limit power value is not exceeded, and operate each load facility within the allocated distributed power As a result, the peak power in the consumer can be suppressed.

また、この発明の実施の形態2に係る需要家内電力分配システムによれば、空調、照明などの各負荷設備が割り振られた分配電力以内で運用できる複数のパターンの候補の中から最適な制御パターンを選択するようにしたので、需要家内の快適性低下を計画的に抑制し、また快適性の低下を最小限に抑えることができるという効果を奏する。   Further, according to the in-customer power distribution system according to Embodiment 2 of the present invention, the optimum control pattern from among a plurality of pattern candidates that can be operated within the distributed power to which each load facility such as air conditioning and lighting is allocated. Therefore, it is possible to systematically suppress a decrease in comfort in the consumer and to minimize a decrease in comfort.

実施の形態3.
この発明の実施の形態3に係る需要家内電力分配システムは、この発明の実施の形態2に係る需要家内電力分配システムと同様に、需要家の施設内にある代表的な負荷設備である空調と照明の二つを制御するものとして、そのシステム例について説明する。
Embodiment 3 FIG.
The consumer power distribution system according to Embodiment 3 of the present invention is similar to the consumer power distribution system according to Embodiment 2 of the present invention, and is an air conditioner that is a typical load facility in a customer facility. An example of the system will be described as controlling two of the illuminations.

図4は、この発明の実施の形態3に係る需要家内電力分配システムの構成の一例を示すシステム構成図である。図において、電力分配部1、空調電力予測部2、空調設備制御部3、照明電力予測部4、照明設備制御部5は、図2に示したこの発明の実施の形態2に係る需要家内電力分配システムにおける同一符号のものと同様であるが、空調電力予測部2、空調設備制御部3、照明電力予測部4は、一部異なる動作を行う。また、図2に示したこの発明の実施の形態2に係る需要家内電力分配システムに対して、空調設備稼働履歴記録部6、熱負荷予測部7、照度予測部8が追加された構成になっている。   FIG. 4 is a system configuration diagram showing an example of the configuration of the consumer power distribution system according to Embodiment 3 of the present invention. In the figure, the power distribution unit 1, the air conditioning power prediction unit 2, the air conditioning equipment control unit 3, the lighting power prediction unit 4, and the lighting equipment control unit 5 are the in-customer power according to the second embodiment of the present invention shown in FIG. Although it is the same as that of the same code | symbol in a distribution system, the air-conditioning power estimation part 2, the air-conditioning equipment control part 3, and the illumination power prediction part 4 perform a partially different operation | movement. Moreover, it becomes the structure by which the air-conditioning-equipment operation log | history recording part 6, the thermal load prediction part 7, and the illumination intensity prediction part 8 were added with respect to the power distribution system in the consumer which concerns on Embodiment 2 of this invention shown in FIG. ing.

空調電力予測部2は、今後の所定時間の間に空調設備が必要とする空調必要電力を、目標室温を満たす空調運転パターンの候補ごとに熱負荷予測部7(後述)によって生成された室温変化予測情報に基づいて予測して、予測した室温との乖離が最小の空調必要電力を電力分配部1に通知し、電力分配部1から指示された空調分配電力で運用される空調運転パターンを空調運転制御パターンとして指示する。空調設備制御部3は、空調電力予測部2から指示された空調運転制御パターンに基づいて空調設備を制御し、制御した空調設備稼働情報を生成する。照明電力予測部4は、今後の所定時間の間に照明設備が必要とする照明必要電力を、目標照度を満たす照明調光点灯パターンの候補ごとに照度予測部8(後述)によって生成された照度予測情報に基づいて予測して、予測した照度との乖離が最小の照明必要電力を電力分配部1に通知し、電力分配部1から指示された照明分配電力で運用される照明調光点灯パターンを照明調光点灯制御パターンとして指示する。空調設備稼働履歴記録部6は、記憶手段として、空調設備制御部3が生成した空調設備稼働情報を空調設備稼働履歴として記録する。熱負荷予測部7は、空調設備稼働履歴記録部6が記録した空調設備稼働履歴から建物の蓄熱特性を算出し、算出した建物の蓄熱特性と空調電力予測部2から得た目標室温を満たす空調運転パターンと外気温の変化予測情報とに基づいて、今後の室温変化を予測した室温変化予測情報を生成する。照度予測部8は、照明電力予測部4から得た目標照度を満たす照明調光点灯パターンに基づいて、室内の照度を予測した照度予測情報を生成する。   The air-conditioning power prediction unit 2 generates a change in room temperature generated by the thermal load prediction unit 7 (described later) for each air-conditioning operation pattern candidate that satisfies the target room temperature with respect to the air-conditioning power required by the air-conditioning equipment for a predetermined time in the future. Predicting based on the prediction information, the power distribution unit 1 is notified of the air conditioning required power with the smallest deviation from the predicted room temperature, and the air conditioning operation pattern operated with the air conditioning distribution power instructed from the power distribution unit 1 is air-conditioned. Specify as the operation control pattern. The air-conditioning equipment control unit 3 controls the air-conditioning equipment based on the air-conditioning operation control pattern instructed from the air-conditioning power prediction unit 2, and generates controlled air-conditioning equipment operation information. The illumination power predicting unit 4 generates the illumination required power required by the lighting equipment for a predetermined time in the future by the illuminance prediction unit 8 (described later) for each illumination dimming lighting pattern candidate that satisfies the target illuminance. Lighting dimming lighting pattern that is predicted based on the prediction information, notifies the power distribution unit 1 of the required illumination power with the smallest deviation from the predicted illuminance, and is operated with the illumination distribution power instructed from the power distribution unit 1 Is designated as an illumination dimming control pattern. The air conditioner operation history recording unit 6 records the air conditioner operation information generated by the air conditioner control unit 3 as the air conditioner operation history as a storage unit. The thermal load prediction unit 7 calculates the heat storage characteristics of the building from the air conditioning facility operation history recorded by the air conditioning facility operation history recording unit 6, and satisfies the target room temperature obtained from the calculated heat storage characteristics of the building and the air conditioning power prediction unit 2. Based on the operation pattern and the change prediction information of the outside air temperature, room temperature change prediction information that predicts a future change in the room temperature is generated. The illuminance prediction unit 8 generates illuminance prediction information that predicts the illuminance in the room based on the illumination dimming lighting pattern that satisfies the target illuminance obtained from the illumination power prediction unit 4.

なお、具体的な熱負荷予測の方法については、例えば特開2011−214794号公報に開示される方法などがある。   As a specific method for predicting the heat load, for example, there is a method disclosed in Japanese Patent Application Laid-Open No. 2011-214794.

図5は、この発明の実施の形態3に係る需要家内電力分配システムの動作の一例を示すフローチャートである。この図に沿って、この発明の実施の形態3に係る需要家内電力分配システムの動作について説明する。   FIG. 5 is a flowchart showing an example of the operation of the customer power distribution system according to Embodiment 3 of the present invention. The operation of the in-customer power distribution system according to Embodiment 3 of the present invention will be described along this diagram.

ステップST201.
空調電力予測部2は、今後の所定時間の間の空調運転パターンに応じた空調設備が必要とする空調必要電力を算出する。次に、空調電力予測部2は、目標室温を満たす各空調運転パターンに応じて、気象予測情報に含まれる外気温変化予測情報と空調設備稼働履歴記録部6に記録された空調設備稼働履歴とに基づいて室温がどのように変化するかを熱負荷予測部7に予測させ、その予測結果として得た室温変化予測情報を参照して、目標室温を実現する空調運転パターンの候補のうち、目標室温からの乖離が最も小さく、かつ最小必要電力で実現する空調運転パターンを選択し、選択した空調運転パターンの電力を空調必要電力として電力分配部1に通知する。
Step ST201.
The air conditioning power prediction unit 2 calculates the required air conditioning power required by the air conditioning equipment according to the air conditioning operation pattern for a predetermined time in the future. Next, the air conditioning power prediction unit 2 determines the outside air temperature change prediction information included in the weather prediction information and the air conditioning facility operation history recorded in the air conditioning facility operation history recording unit 6 according to each air conditioning operation pattern that satisfies the target room temperature. The thermal load prediction unit 7 predicts how the room temperature changes based on the air temperature, and refers to the room temperature change prediction information obtained as a result of the prediction, and among the air conditioning operation pattern candidates that realize the target room temperature, the target An air conditioning operation pattern that has the smallest deviation from room temperature and is realized with the minimum required power is selected, and the power distribution unit 1 is notified of the power of the selected air conditioning operation pattern as the air conditioning required power.

ステップST202.
また、照明電力予測部4は、今後の所定時間の間の照明調光点灯パターンに応じた照明設備が必要とする照明必要電力を算出する。次に、照明電力予測部4は、目標照度を満たす各照明調光点灯パターンに応じて、室内の照度がどのようになるかを照度予測部8に予測させ、その予測結果として得た照度予測情報を参照して、目標照度を実現する照明調光点灯パターンの候補のうち、目標照度からの乖離が最も小さく、かつ最小電力で実現する照明調光点灯パターンを選択し、選択した照明調光点灯パターンの電力を照明必要電力として電力分配部1に通知する。
Step ST202.
In addition, the illumination power prediction unit 4 calculates the required illumination power required by the illumination equipment according to the illumination dimming / lighting pattern for a predetermined time in the future. Next, the illumination power prediction unit 4 causes the illuminance prediction unit 8 to predict the illuminance in the room according to each illumination dimming / lighting pattern satisfying the target illuminance, and the illuminance prediction obtained as the prediction result. Referring to the information, select the lighting dimming lighting pattern that has the smallest deviation from the target illuminance and achieves the minimum power among the lighting dimming lighting pattern candidates that achieve the target illuminance, and select the selected lighting dimming The power distribution unit 1 is notified of the power of the lighting pattern as the required illumination power.

ステップST103、ステップST104、ステップST107.
空調電力予測部2、照明電力予測部4から空調設備、照明設備に対応した必要電力を通知された電力分配部1は、図3に示される実施の形態2に係るフローチャートと同様の手順(ステップST104、ステップST107)で、それぞれの設備に対する分配電力を決定する。ここで、ステップST107は、必要電力の合計値が消費可能電力上限値を上回っている場合であって、電力分配部1は、空調電力予測部2、照明電力予測部4に対して、空調設備、照明設備の少なくとも一方に必要電力未満の分配電力を指示する。
Step ST103, step ST104, step ST107.
The power distribution unit 1 notified of the necessary power corresponding to the air conditioning equipment and the lighting equipment from the air conditioning power prediction unit 2 and the lighting power prediction unit 4 is the same procedure (steps) as the flowchart according to the second embodiment shown in FIG. In ST104 and step ST107), the distribution power for each facility is determined. Here, step ST107 is a case where the total value of the required power exceeds the consumable power upper limit value, and the power distribution unit 1 provides air conditioning equipment to the air conditioning power prediction unit 2 and the illumination power prediction unit 4. Instructing at least one of the lighting facilities to distribute power less than the required power.

ステップST105、ステップST106.
また、ステップST104に続くステップST105、ステップST106は、図3に示される実施の形態2に係るフローチャートと同様の手順で処理するため、説明を省略する。
Step ST105, step ST106.
Further, step ST105 and step ST106 following step ST104 are processed in the same procedure as the flowchart according to the second embodiment shown in FIG.

ステップST203.
電力分配部1から空調電力予測部2に対して、空調必要電力未満の空調分配電力が指示された場合、空調電力予測部2は、空調分配電力以下で空調を制御する新たな空調運転パターンに応じて、気象予測情報に含まれる外気温変化予測情報と空調設備稼働履歴とに基づいて室温がどのように変化するかを熱負荷予測部7に予測させ、その予測結果として得た室温変化予測情報を参照して、新たな空調運転パターンの候補のうち、目標室温からの乖離が最も少ない空調運転パターンを選択し、選択した空調運転パターンを空調運転制御パターンとして空調設備制御部3に指示する。空調設備制御部3は、空調電力予測部2から指示された空調運転制御パターンに基づいて空調設備を制御すると共に、空調設備の稼働状況およびこれに付随する室温情報などを含む空調設備稼働情報を空調設備稼働履歴記録部6に通知して空調設備稼働履歴として記録させる。なお、電力分配部1から指示された空調分配電力が空調必要電力を確保できているときは、ステップST105と同様の処理を行う。
Step ST203.
When the power distribution unit 1 instructs the air conditioning power prediction unit 2 that the air conditioning distribution power is less than the required air conditioning power, the air conditioning power prediction unit 2 sets the air conditioning operation pattern to a new air conditioning operation pattern for controlling the air conditioning below the air conditioning distribution power. In response, the thermal load prediction unit 7 predicts how the room temperature will change based on the outside air temperature change prediction information and the air conditioning equipment operation history included in the weather prediction information, and the room temperature change prediction obtained as the prediction result With reference to the information, the air conditioning operation pattern with the smallest deviation from the target room temperature is selected from the candidates for the new air conditioning operation pattern, and the selected air conditioning operation pattern is instructed to the air conditioning equipment control unit 3 as the air conditioning operation control pattern. . The air-conditioning equipment control unit 3 controls the air-conditioning equipment based on the air-conditioning operation control pattern instructed by the air-conditioning power prediction unit 2, and also provides air-conditioning equipment operation information including the operating status of the air-conditioning equipment and the room temperature information associated therewith. The air conditioner operation history recording unit 6 is notified and recorded as the air conditioner operation history. In addition, when the air conditioning distribution power instructed from the power distribution unit 1 can secure the necessary air conditioning power, the same processing as in step ST105 is performed.

ステップST204.
また、電力分配部1から照明電力予測部4に対して、照明必要電力未満の照明分配電力が指示された場合、照明電力予測部4は、照明分配電力以下で照明を制御する新たな照明調光点灯パターンに応じて、室内の照度がどのようになるかを照度予測部8に予測させ、その予測結果として得た照度予測情報を参照して、新たな照明調光点灯パターンの候補のうち、目標照度からの乖離が最も少ない照明調光点灯パターンを選択し、選択した照明調光点灯パターンを照明調光点灯制御パターンとして照明設備制御部5に指示する。照明設備制御部5は、照明電力予測部4から指示された照明調光点灯制御パターンに基づいて照明設備を制御する。なお、電力分配部1から指示された照明分配電力が照明必要電力を確保できているときは、ステップST106と同様の処理を行う。
Step ST204.
In addition, when the power distribution unit 1 instructs the illumination power prediction unit 4 to provide illumination distribution power that is less than the required illumination power, the illumination power prediction unit 4 performs a new illumination adjustment for controlling the illumination below the illumination distribution power. According to the light lighting pattern, the illuminance prediction unit 8 predicts what the illuminance in the room will be, and referring to the illuminance prediction information obtained as the prediction result, among the new illumination dimming lighting pattern candidates Then, the lighting dimming / lighting pattern with the least deviation from the target illuminance is selected, and the selected lighting dimming / lighting pattern is instructed to the lighting equipment control unit 5 as the lighting dimming / lighting control pattern. The lighting equipment control unit 5 controls the lighting equipment based on the lighting dimming / lighting control pattern instructed by the lighting power prediction unit 4. In addition, when the illumination distribution power instruct | indicated from the power distribution part 1 has ensured illumination required power, the process similar to step ST106 is performed.

なお、需要家内電力分配方法の一例として図5に示されるフローチャートでは、空調設備側の空調電力予測部2、空調設備制御部3の動作を照明設備側の照明電力予測部4、照明設備制御部5の動作より先行する手順として説明しているが、例えば、照明設備側の照明電力予測部4、照明設備制御部5の動作を空調設備側の空調電力予測部2、空調設備制御部3の動作より先行する手順としてもよい。また、例えば、ステップST201とステップST202、ステップST105とステップST106、ステップST203とステップST204は、並行して動作する手順としても構わない。   In the flow chart shown in FIG. 5 as an example of the power distribution method within the consumer, the operations of the air conditioning power prediction unit 2 and the air conditioning facility control unit 3 on the air conditioning facility side are changed to the lighting power prediction unit 4 and the lighting facility control unit on the lighting facility side. However, for example, the operations of the lighting power prediction unit 4 and the lighting equipment control unit 5 on the lighting equipment side are the same as those of the air conditioning power prediction unit 2 and the air conditioning equipment control unit 3 on the air conditioning equipment side. The procedure may precede the operation. Further, for example, step ST201 and step ST202, step ST105 and step ST106, and step ST203 and step ST204 may be procedures that operate in parallel.

また、照度予測部8により、照度を予測する際、人の入退室に応じて照明の点灯箇所を増減するような省エネルギー制御を含めた照度変化を予測しても良い。また、近年の照明機器は、照度センサと連動することで、昼間は屋外から差し込む太陽光を利用した省エネルギー制御が可能なものもあるため、このような昼光利用省エネルギー制御を含めた照度変化を予測してもよい。   In addition, when the illuminance prediction unit 8 predicts the illuminance, a change in illuminance including energy saving control that increases or decreases the number of lighting positions according to the person's entrance and exit may be predicted. In addition, some lighting devices in recent years are capable of energy-saving control using sunlight that is inserted from the outdoors during the daytime in conjunction with an illuminance sensor. It may be predicted.

このように、この発明の実施の形態3に係る需要家内電力分配システムによれば、この発明の実施の形態2に係る需要家内電力分配システムと同様に、空調や照明など、複数種の負荷設備を有する需要家内において、各負荷設備対応に通知された必要電力とデマンドレスポンス等により制限される消費可能上限電力値とに基づいて、消費可能上限電力値を超えないように各負荷設備に分配電力を割り振り、割り振られた分配電力内で各負荷設備を運用するようにしたので、需要家内のピーク電力を抑制できるという効果を奏する。   Thus, according to the in-customer power distribution system according to Embodiment 3 of the present invention, a plurality of types of load facilities such as air conditioning and lighting, as in the in-consumer power distribution system according to Embodiment 2 of the present invention. Power distribution to each load facility so as not to exceed the consumable upper limit power value based on the required power notified to each load facility and the consumable upper limit power value limited by demand response, etc. Since each load facility is operated within the allocated distributed power, the peak power in the consumer can be suppressed.

また、この発明の実施の形態3に係る需要家内電力分配システムによれば、空調、照明などの各負荷設備が割り振られた分配電力以内で運用できる複数のパターンの候補の中から、例えば目標室温、目標照度などの負荷設備に対する目標指標値からの乖離が少ない最適な制御パターンを選択するようにしたので、需要家内の快適性低下を計画的に抑制し、また快適性の低下を最小限に抑えることができるという効果を奏する。   In addition, according to the power distribution system within a consumer according to Embodiment 3 of the present invention, for example, a target room temperature is selected from among a plurality of pattern candidates that can be operated within the distributed power to which each load facility such as air conditioning and lighting is allocated. Since the optimal control pattern with little deviation from the target index value for load equipment such as target illuminance is selected, it is possible to systematically suppress the decrease in comfort within the customer and minimize the decrease in comfort. There is an effect that it can be suppressed.

また、この発明の実施の形態3に係る需要家内電力分配システムによれば、気象予測情報に含まれる外気温変化予測情報と空調設備稼働履歴とに基づいて予測した室温変化予測情報を利用して、空調設備が割り振られた分配電力以内で運用できる複数のパターンの候補の中から目標室温からの乖離がより少ない最適な空調運転制御パターンを選択するようにしたので、需要家内の快適性低下を計画的に抑制し、また快適性の低下を最小限に抑えることができるという効果を奏する。   In addition, according to the power distribution system within a consumer according to Embodiment 3 of the present invention, the room temperature change prediction information predicted based on the outside air temperature change prediction information and the air conditioning equipment operation history included in the weather prediction information is used. Since the optimal air-conditioning operation control pattern with less deviation from the target room temperature is selected from the multiple pattern candidates that can be operated within the distributed power allocated to the air-conditioning equipment, the comfort in the consumer is reduced. There is an effect that it can be systematically suppressed and a decrease in comfort can be minimized.

以上のように、この発明の実施の形態に係る需要家内電力分配システムでは、空調設備と照明設備の組合せを具体例として説明したが、この負荷設備の組合せに限らず、需要家内で他の制御可能な負荷設備を含めた任意の組合せで構成してもよい。   As described above, in the consumer power distribution system according to the embodiment of the present invention, the combination of the air-conditioning equipment and the lighting equipment has been described as a specific example. You may comprise in arbitrary combinations including possible load equipment.

この発明に係る需要家内電力分配システムによれば、複数種の負荷設備を有する需要家内において、各負荷設備対応に通知された必要電力とデマンドレスポンス等により制限される消費可能上限電力値とに基づいて、消費可能上限電力値を超えないように各負荷設備に分配電力を割り振り、割り振られた分配電力内で各負荷設備を運用するようにしたので、需要家内のピーク電力を抑制できるという効果を奏する。   According to the power distribution system within a consumer according to the present invention, based on the required power notified to each load facility and the consumable upper limit power value limited by demand response or the like in a consumer having multiple types of load facilities. Therefore, the distributed power is allocated to each load facility so that the upper limit power consumption value is not exceeded, and each load facility is operated within the allocated distributed power, so that the peak power in the customer can be suppressed. Play.

以上のように、本発明にかかる需要家内電力分配システムおよび需要家内電力分配方法は、電力が不足し、電力供給側からデマンドレスポンスによるピークカットが行われた場合に有用であり、空調、照明それぞれの消費電力予測モデルに基づき、例えばビル全体で快適性に配慮しつつピークカット制御を行うことができる。   As described above, the in-customer power distribution system and the in-consumer power distribution method according to the present invention are useful when power is insufficient and peak cut by demand response is performed from the power supply side. Based on this power consumption prediction model, for example, peak cut control can be performed while considering comfort in the entire building.

1 電力分配部、2 空調電力予測部、3 空調設備制御部、4 照明電力予測部、5 照明設備制御部、6 空調設備稼働履歴記録部、7 熱負荷予測部、8 照度予測部、12 電力予測部、13 設備制御部。 DESCRIPTION OF SYMBOLS 1 Power distribution part, 2 Air conditioning power prediction part, 3 Air conditioning equipment control part, 4 Lighting power prediction part, 5 Lighting equipment control part, 6 Air conditioning equipment operation history recording part, 7 Thermal load prediction part, 8 Illuminance prediction part, 12 Electric power Prediction unit, 13 equipment control unit.

Claims (9)

電力を供給する側、もしくは需要家内の電力の使用量をコントロールするエネルギー管理システムから指示される、今後の所定時間の間に需要家内で消費してもよい消費可能電力の上限値を受け取るとともに、この消費可能電力の上限値と需要家内の複数の負荷設備に対応して通知された各負荷設備の必要電力とに基づいて、それぞれの負荷設備に対して分配する分配電力を指示する電力分配部と、
前記負荷設備それぞれに対応して設けられ、当該負荷設備が前記今後の所定時間の間に必要とする前記必要電力を、当該負荷設備の目標指標値を満たす運用パターンの候補ごとに予測して、最小の必要電力を前記電力分配部に通知し、前記電力分配部から指示された分配電力で運用される運用パターンを運用制御パターンとして指示する電力予測部と、
前記負荷設備それぞれに対応して設けられ、当該負荷設備に対応して前記電力予測部から指示された運用制御パターンに基づいて当該負荷設備を制御する設備制御部と
を備えた需要家内電力分配システム。
Receive an upper limit value of consumable power that can be consumed in the consumer for a predetermined time in the future, as instructed by the power supplier or the energy management system that controls the usage of the electricity in the consumer, Based on the upper limit value of consumable power and the required power of each load facility notified in correspondence with a plurality of load facilities in the consumer, a power distribution unit that instructs the distributed power to be distributed to each load facility When,
Provided corresponding to each of the load facilities, predicting the required power required for the future predetermined time for each of the operation pattern candidates that satisfy the target index value of the load facilities, A power predicting unit for notifying the minimum required power to the power distributing unit and instructing an operation pattern operated with the distributed power instructed from the power distributing unit as an operation control pattern;
An in-customer power distribution system provided with a facility control unit provided for each of the load facilities and controlling the load facility based on an operation control pattern instructed by the power prediction unit corresponding to the load facility .
前記電力分配部は、前記消費可能電力の上限値が前記複数の負荷設備に対応して通知された必要電力の合計に対して不足しないとき、前記複数の負荷設備それぞれに対して当該負荷設備が通知してきた必要電力を分配電力として指示し、
前記電力予測部は、前記電力分配部から指示された分配電力が前記電力分配部に通知した必要電力に等しいとき、通知した必要電力に対応する運用パターンを運用制御パターンとして指示することを特徴とする請求項1記載の需要家内電力分配システム。
The power distribution unit, when the upper limit value of the consumable power is not insufficient with respect to the total required power notified corresponding to the plurality of load facilities, the load facilities are provided for each of the plurality of load facilities. Instruct the required power that has been notified as distributed power,
The power prediction unit, when the distribution power instructed from the power distribution unit is equal to the required power notified to the power distribution unit, to instruct the operation pattern corresponding to the notified required power as an operation control pattern, The in-customer power distribution system according to claim 1.
前記電力分配部は、前記消費可能電力の上限値が前記複数の負荷設備に対応して通知された必要電力の合計に対して余裕があるとき、分配電力の合計が消費可能電力の上限値を超えない範囲で、前記複数の負荷設備の少なくとも一つの負荷設備に対して通知された必要電力より大きい分配電力を指示し、
前記電力予測部は、前記電力分配部から指示された分配電力が前記電力分配部に通知した必要電力より大きいとき、指示された分配電力以内で運用される運用パターンの候補の中から前記目標指標値と乖離の少ない運用パターンを運用制御パターンとして指示することを特徴とする請求項1記載の需要家内電力分配システム。
When the upper limit value of the consumable power has a margin with respect to the total required power notified corresponding to the plurality of load facilities, the total power distribution unit sets the upper limit value of the consumable power. Instructing a distribution power greater than the required power notified to at least one load facility of the plurality of load facilities within a range not exceeding
The power prediction unit, when the distributed power instructed from the power distribution unit is larger than the required power notified to the power distribution unit, the target index from among the operation pattern candidates operated within the instructed distribution power The in-customer power distribution system according to claim 1, wherein an operation pattern with little difference from the value is indicated as an operation control pattern.
前記電力分配部は、前記消費可能電力の上限値が前記複数の負荷設備に対応して通知された必要電力の合計に対して不足するとき、分配電力の合計が消費可能電力の上限値を超えないように、前記複数の負荷設備の少なくとも一つの負荷設備に対して通知された必要電力より小さい分配電力を指示し、
前記電力予測部は、前記電力分配部から指示された分配電力が前記電力分配部に通知した必要電力より小さいとき、指示された分配電力以内で運用される運用パターンの候補の中から前記目標指標値と乖離の少ない運用パターンを運用制御パターンとして指示することを特徴とする請求項1記載の需要家内電力分配システム。
The power distribution unit, when the upper limit value of the consumable power is insufficient with respect to the total required power notified corresponding to the plurality of load facilities, the total distributed power exceeds the upper limit value of the consumable power Indicating a distribution power smaller than the required power notified to at least one load facility of the plurality of load facilities,
The power prediction unit, when the distribution power instructed from the power distribution unit is smaller than the required power notified to the power distribution unit, the target index from among operation pattern candidates operated within the instructed distribution power The in-customer power distribution system according to claim 1, wherein an operation pattern with little difference from the value is indicated as an operation control pattern.
電力を供給する側、もしくは需要家内の電力の使用量をコントロールするエネルギー管理システムから指示される、今後の所定時間の間に需要家内で消費してもよい消費可能電力の上限値を受け取るとともに、この消費可能電力の上限値と空調設備および照明設備に対応して通知された空調必要電力および照明必要電力とに基づいて、前記空調設備と前記照明設備に対して分配する空調分配電力と照明分配電力を指示する電力分配部と、
前記今後の所定時間の間に前記空調設備が必要とする前記空調必要電力を、目標室温を満たす空調運転パターンの候補ごとに予測して、最小の空調必要電力を前記電力分配部に通知し、前記電力分配部から指示された空調分配電力で運用される空調運転パターンを空調運転制御パターンとして指示する空調電力予測部と、
前記空調電力予測部から指示された空調運転制御パターンに基づいて前記空調設備を制御する空調設備制御部と、
前記今後の所定時間の間に前記照明設備が必要とする前記照明必要電力を、目標照度を満たす照明調光点灯パターンの候補ごとに予測して、最小の照明必要電力を前記電力分配部に通知し、前記電力分配部から指示された照明分配電力で運用される照明調光点灯パターンを照明調光点灯制御パターンとして指示する照明電力予測部と、
前記照明電力予測部から指示された照明調光点灯制御パターンに基づいて前記照明設備を制御する照明設備制御部と
を備えた需要家内電力分配システム。
Receive an upper limit value of consumable power that can be consumed in the consumer for a predetermined time in the future, as instructed by the power supplier or the energy management system that controls the usage of the electricity in the consumer, Air conditioning distribution power and illumination distribution to be distributed to the air conditioning facility and the lighting facility based on the upper limit value of the consumable power, the air conditioning required power and the lighting required power notified corresponding to the air conditioning facility and the lighting facility. A power distribution unit for instructing power;
Predicting the required air conditioning power required by the air conditioning facility during the future predetermined time for each candidate of an air conditioning operation pattern that satisfies a target room temperature, and notifying the power distribution unit of the minimum required air conditioning power, An air conditioning power prediction unit for instructing an air conditioning operation pattern operated with the air conditioning distribution power instructed from the power distribution unit as an air conditioning operation control pattern;
An air conditioning equipment control section for controlling the air conditioning equipment based on an air conditioning operation control pattern instructed by the air conditioning power prediction section;
Predicting the required lighting power required by the lighting equipment during the predetermined time in the future for each lighting dimming lighting pattern candidate that satisfies the target illuminance, and notifies the power distribution unit of the minimum required lighting power And an illumination power prediction unit for instructing an illumination dimming lighting pattern operated with the illumination distribution power instructed from the power distribution unit as an illumination dimming lighting control pattern,
An in-customer power distribution system comprising: an illumination facility control unit that controls the illumination facility based on an illumination dimming / lighting control pattern instructed by the illumination power prediction unit.
電力を供給する側、もしくは需要家内の電力の使用量をコントロールするエネルギー管理システムから指示される、今後の所定時間の間に需要家内で消費してもよい消費可能電力の上限値を受け取るとともに、この消費可能電力の上限値と空調設備および照明設備に対応して通知された空調必要電力および照明必要電力とに基づいて、前記空調設備と前記照明設備に対して分配する空調分配電力と照明分配電力を指示する電力分配部と、
前記今後の所定時間の間に前記空調設備が必要とする前記空調必要電力を、目標室温を満たす空調運転パターンの候補ごとに生成された室温変化予測情報に基づいて予測して、目標室温との乖離が最も少なく、かつ最小の空調必要電力を前記電力分配部に通知し、前記電力分配部から指示された空調分配電力で運用される空調運転パターンを空調運転制御パターンとして指示する空調電力予測部と、
前記空調電力予測部から指示された空調運転制御パターンに基づいて前記空調設備を制御し、制御した空調設備稼働情報を生成する空調設備制御部と、
前記今後の所定時間の間に前記照明設備が必要とする前記照明必要電力を、目標照度を満たす照明調光点灯パターンの候補ごとに生成された照度予測情報に基づいて予測して、目標照度との乖離が最も少なく、かつ最小の照明必要電力を前記電力分配部に通知し、前記電力分配部から指示された照明分配電力で運用される照明調光点灯パターンを照明調光点灯制御パターンとして指示する照明電力予測部と、
前記照明電力予測部から指示された照明調光点灯制御パターンに基づいて前記照明設備を制御する照明設備制御部と、
前記空調設備制御部が生成した前記空調設備稼働情報を空調設備稼働履歴として記録する空調設備稼働履歴記録部と、
前記空調設備稼働履歴記録部が記録した空調設備稼働履歴から建物の蓄熱特性を算出し、算出した建物の蓄熱特性と前記空調電力予測部から得た目標室温を満たす空調運転パターンと外気温の変化予想情報とに基づいて、今後の室温変化を予測した前記室温変化予測情報を生成する熱負荷予測部と、
前記照明電力予測部から得た目標照度を満たす照明調光点灯パターンに基づいて、室内の照度を予測した前記照度予測情報を生成する照度予測部と
を備えた需要家内電力分配システム。
Receive an upper limit value of consumable power that can be consumed in the consumer for a predetermined time in the future, as instructed by the power supplier or the energy management system that controls the usage of the electricity in the consumer, Air conditioning distribution power and illumination distribution to be distributed to the air conditioning facility and the lighting facility based on the upper limit value of the consumable power, the air conditioning required power and the lighting required power notified corresponding to the air conditioning facility and the lighting facility. A power distribution unit for instructing power;
Predicting the required air conditioning power required by the air conditioning equipment for the future predetermined time based on room temperature change prediction information generated for each candidate air conditioning operation pattern that satisfies the target room temperature, The air conditioning power prediction unit that notifies the power distribution unit of the minimum required air conditioning power with the smallest deviation and instructs the air conditioning operation pattern operated by the air conditioning distribution power instructed from the power distribution unit as the air conditioning operation control pattern. When,
An air conditioning facility control unit that controls the air conditioning facility based on an air conditioning operation control pattern instructed by the air conditioning power prediction unit, and generates controlled air conditioning facility operation information;
Predicting the required illumination power required by the lighting equipment during the future predetermined time based on the illumination prediction information generated for each candidate of the lighting dimming lighting pattern that satisfies the target illumination, The power distribution unit is notified of the minimum required illumination power and the lighting dimming lighting pattern operated with the lighting distribution power instructed from the power distributing unit is indicated as the lighting dimming lighting control pattern. Lighting power prediction unit to
A lighting equipment control unit that controls the lighting equipment based on a lighting dimming lighting control pattern instructed by the lighting power prediction unit;
An air conditioner operation history recording unit that records the air conditioner operation information generated by the air conditioner control unit as an air conditioner operation history;
The building heat storage characteristic is calculated from the air conditioner operation history recorded by the air conditioner operation history recording unit, and the air conditioner operation pattern that satisfies the target room temperature obtained from the calculated heat storage characteristic of the building and the air conditioning power prediction unit and changes in the outside temperature A thermal load prediction unit that generates the room temperature change prediction information that predicts a future room temperature change based on the prediction information;
An in-customer power distribution system comprising: an illuminance prediction unit that generates the illuminance prediction information that predicts the illuminance in the room based on an illumination dimming lighting pattern that satisfies the target illuminance obtained from the illumination power prediction unit.
電力を供給する側、もしくは需要家内の電力の使用量をコントロールするエネルギー管理システムから指示される、今後の所定時間の間に需要家内で消費してもよい消費可能電力の上限値を受け取るステップと、
需要家内の複数の負荷設備のそれぞれに対応して、当該負荷設備が前記今後の所定時間の間に必要とする必要電力を、当該負荷設備の目標指標値を満たす運用パターンの候補ごとに予測して、最小の必要電力を通知するステップと、
前記消費可能電力の上限値と前記負荷設備のそれぞれに対応して通知された各負荷設備の前記必要電力とに基づいて、それぞれの負荷設備に対して分配する分配電力を指示するステップと、
前記負荷設備のそれぞれに対応して指示された分配電力で運用される運用パターンを当該負荷設備の運用制御パターンとして指示するステップと、
前記負荷設備のそれぞれに対応して指示された運用制御パターンに基づいて当該負荷設備を制御するステップと
を有する需要家内電力分配方法。
Receiving an upper limit value of consumable power that may be consumed in the consumer during a predetermined time in the future, instructed by an energy management system that controls the amount of power used in the consumer or in the consumer; and ,
Corresponding to each of the plurality of load facilities in the consumer, the required power required by the load facility during the predetermined time in the future is predicted for each candidate operation pattern that satisfies the target index value of the load facility. Notifying the minimum required power,
Instructing the distributed power to be distributed to each load facility based on the upper limit value of the consumable power and the required power of each load facility notified corresponding to each of the load facilities;
Instructing an operation pattern operated with the distributed power instructed corresponding to each of the load facilities as an operation control pattern of the load facility;
A method for distributing power within a consumer, comprising: controlling the load facility based on an operation control pattern instructed corresponding to each of the load facilities.
電力を供給する側、もしくは需要家内の電力の使用量をコントロールするエネルギー管理システムから指示される、今後の所定時間の間に需要家内で消費してもよい消費可能電力の上限値を受け取るステップと、
前記今後の所定時間の間に空調設備が必要とする前記空調必要電力を、目標室温を満たす空調運転パターンの候補ごとに予測して、最小の空調必要電力を前記電力分配部に通知ステップと、
前記今後の所定時間の間に照明設備が必要とする前記照明必要電力を、目標照度を満たす照明調光点灯パターンの候補ごとに予測して、最小の照明必要電力を前記電力分配部に通知するステップと、
前記消費可能電力の上限値と前記空調設備および前記照明設備に対応して通知された前記空調必要電力および前記照明必要電力とに基づいて、前記空調設備と前記照明設備に対して分配する空調分配電力と照明分配電力を指示するステップと、
指示された空調分配電力で運用される空調運転パターンを空調運転制御パターンとして指示するステップと、
指示された空調運転制御パターンに基づいて前記空調設備を制御するステップと、
指示された照明分配電力で運用される照明調光点灯パターンを照明調光点灯制御パターンとして指示するステップと、
指示された照明調光点灯制御パターンに基づいて前記照明設備を制御するステップと
を有する需要家内電力分配方法。
Receiving an upper limit value of consumable power that may be consumed in the consumer during a predetermined time in the future, instructed by an energy management system that controls the amount of power used in the consumer or in the consumer; and ,
Predicting the air-conditioning required power required by the air-conditioning equipment during the future predetermined time for each candidate of an air-conditioning operation pattern that satisfies a target room temperature, and notifying the power distribution unit of the minimum required air-conditioning power;
Predicting the required illumination power required by the lighting equipment for the predetermined time in the future for each candidate of the lighting dimming lighting pattern that satisfies the target illuminance, and notifies the power distribution unit of the minimum required illumination power Steps,
Air conditioning distribution to be distributed to the air conditioning facility and the lighting facility based on the upper limit value of the consumable power, the air conditioning facility power and the lighting required power notified in correspondence with the air conditioning facility and the lighting facility Directing power and illumination distribution power;
Instructing an air conditioning operation pattern operated with the instructed air conditioning distribution power as an air conditioning operation control pattern;
Controlling the air conditioning equipment based on the instructed air conditioning operation control pattern;
Instructing an illumination dimming lighting pattern operated with the instructed illumination distribution power as an illumination dimming lighting control pattern;
A power distribution method in a consumer, comprising: controlling the lighting equipment based on an instructed lighting dimming / lighting control pattern.
電力を供給する側、もしくは需要家内の電力の使用量をコントロールするエネルギー管理システムから指示される、今後の所定時間の間に需要家内で消費してもよい消費可能電力の上限値を受け取るステップと、
記憶手段に記録された空調設備稼働履歴から建物の蓄熱特性を算出し、算出した建物の蓄熱特性と目標室温を満たす空調運転パターンと外気温の変化予想情報とに基づいて、今後の室温変化を予測した室温変化予測情報を生成するステップと、
前記今後の所定時間の間に空調設備が必要とする前記空調必要電力を、目標室温を満たす空調運転パターンの候補ごとに生成された前記室温変化予測情報に基づいて予測して、前記目標室温との乖離が最も少なく、かつ最小の空調必要電力を前記電力分配部に通知するステップと、
目標照度を満たす照明調光点灯パターンに基づいて、室内の照度を予測した照度予測情報を生成するステップと、
前記今後の所定時間の間に照明設備が必要とする前記照明必要電力を、目標照度を満たす照明調光点灯パターンの候補ごとに生成された前記照度予測情報に基づいて予測して、前記目標照度との乖離が最も少なく、かつ最小の照明必要電力を通知するステップと、
消費可能電力の上限値と前記空調設備および前記照明設備に対応して通知された空調必要電力および照明必要電力とに基づいて、前記空調設備と前記照明設備に対して分配する空調分配電力と照明分配電力を指示するステップと、
指示された空調分配電力で運用される空調運転パターンを空調運転制御パターンとして指示するステップと、
指示された空調運転制御パターンに基づいて前記空調設備を制御し、制御した空調設備稼働情報を生成するステップと、
生成された前記空調設備稼働情報を空調設備稼働履歴として前記記憶手段に記録するステップと、
指示された照明分配電力で運用される照明調光点灯パターンを照明調光点灯制御パターンとして指示するステップと、
指示された照明調光点灯制御パターンに基づいて前記照明設備を制御するステップと
を有する需要家内電力分配方法。
Receiving an upper limit value of consumable power that may be consumed in the consumer during a predetermined time in the future, instructed by an energy management system that controls the amount of power used in the consumer or in the consumer; and ,
Calculate the building's heat storage characteristics from the air conditioner operation history recorded in the storage means, and calculate the future room temperature change based on the calculated heat storage characteristics of the building, the air conditioning operation pattern that satisfies the target room temperature, and the predicted change in outside air temperature. Generating predicted room temperature change prediction information;
Predicting the required air conditioning power required by the air conditioning facility during the future predetermined time based on the room temperature change prediction information generated for each candidate air conditioning operation pattern that satisfies the target room temperature, A step of notifying the power distribution unit of the minimum required air conditioning power and
Generating illuminance prediction information that predicts the illuminance in the room based on an illumination dimming lighting pattern that satisfies the target illuminance;
The target illumination intensity is predicted based on the illumination intensity prediction information generated for each candidate of the lighting dimming lighting pattern that satisfies the target illumination intensity, and the required illumination power required by the lighting equipment during the future predetermined time A step of notifying the minimum required power for lighting with the least deviation from
Air conditioning distribution power and illumination distributed to the air conditioning facility and the lighting facility based on the upper limit of consumable power, the air conditioning requirement power and the illumination required power notified in correspondence with the air conditioning facility and the lighting facility Instructing the distributed power;
Instructing an air conditioning operation pattern operated with the instructed air conditioning distribution power as an air conditioning operation control pattern;
Controlling the air conditioning equipment based on the instructed air conditioning operation control pattern, and generating controlled air conditioning equipment operation information;
Recording the generated air conditioning equipment operation information in the storage means as an air conditioning equipment operation history;
Instructing an illumination dimming lighting pattern operated with the instructed illumination distribution power as an illumination dimming lighting control pattern;
A power distribution method in a consumer, comprising: controlling the lighting equipment based on an instructed lighting dimming / lighting control pattern.
JP2014500069A 2012-02-15 2013-01-23 Consumer power distribution system and consumer power distribution method Expired - Fee Related JP5800979B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014500069A JP5800979B2 (en) 2012-02-15 2013-01-23 Consumer power distribution system and consumer power distribution method

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2012030675 2012-02-15
JP2012030675 2012-02-15
PCT/JP2013/000299 WO2013121700A1 (en) 2012-02-15 2013-01-23 Power distribution system in demand source and method for distributing power in demand source
JP2014500069A JP5800979B2 (en) 2012-02-15 2013-01-23 Consumer power distribution system and consumer power distribution method

Publications (2)

Publication Number Publication Date
JPWO2013121700A1 true JPWO2013121700A1 (en) 2015-05-11
JP5800979B2 JP5800979B2 (en) 2015-10-28

Family

ID=48983842

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014500069A Expired - Fee Related JP5800979B2 (en) 2012-02-15 2013-01-23 Consumer power distribution system and consumer power distribution method

Country Status (3)

Country Link
JP (1) JP5800979B2 (en)
CN (1) CN104126260B (en)
WO (1) WO2013121700A1 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014185149A1 (en) * 2013-05-16 2014-11-20 三菱電機株式会社 Consumer power control system and consumer power control method
JP6446256B2 (en) * 2014-12-17 2018-12-26 株式会社ピューズ Demand power control apparatus and demand power control method
TW201713106A (en) 2015-09-24 2017-04-01 晶睿通訊股份有限公司 Network camera system and illumination device thereof
WO2020003427A1 (en) 2018-06-27 2020-01-02 三菱電機株式会社 Power level setting device, power level setting method, and program
CN109347094B (en) * 2018-10-24 2020-10-09 珠海格力电器股份有限公司 Converter, method and device for distributing electric energy by converter and electric energy distribution system
JP7487704B2 (en) 2021-04-28 2024-05-21 横河電機株式会社 EVALUATION APPARATUS, EVALUATION METHOD, EVALUATION PROGRAM, CONTROL APPARATUS, AND CONTROL PROGRAM
WO2024009354A1 (en) * 2022-07-04 2024-01-11 日本電信電話株式会社 Power amount control device, power amount control method, and program
CN115167589B (en) * 2022-09-07 2022-11-18 南京国荣环保科技有限公司 Intelligent control system for assembled toilet

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08322147A (en) * 1995-05-25 1996-12-03 Hitachi Ltd Demand prediction system
JPH11178247A (en) * 1997-12-11 1999-07-02 Matsushita Electric Ind Co Ltd Power consumption management system
JP2002051463A (en) * 2000-08-01 2002-02-15 Hitachi Ltd Power load control system
JP2005151745A (en) * 2003-11-18 2005-06-09 Matsushita Electric Ind Co Ltd Remote control device
JP2005323438A (en) * 2004-05-07 2005-11-17 Inter Db:Kk Power control system
JP2008017665A (en) * 2006-07-07 2008-01-24 Daikin Ind Ltd Electric energy controller
JP2009153336A (en) * 2007-12-21 2009-07-09 Panasonic Electric Works Co Ltd Distribution system
JP2009165249A (en) * 2007-12-28 2009-07-23 Panasonic Electric Works Co Ltd Power supply system
JP2009240054A (en) * 2008-03-26 2009-10-15 Panasonic Electric Works Co Ltd Demand control system, demand control method
WO2011030200A1 (en) * 2009-09-09 2011-03-17 パナソニック電工株式会社 Power control system
JP2011152043A (en) * 2007-03-19 2011-08-04 Sanyo Electric Co Ltd Device for control of cold storage equipment
JP2011214794A (en) * 2010-04-01 2011-10-27 Mitsubishi Electric Corp Air conditioning system control device
WO2011148647A1 (en) * 2010-05-28 2011-12-01 パトックス.ジャパン株式会社 Control management system for energy conversion device
JP2013169039A (en) * 2012-02-14 2013-08-29 Ntt Facilities Inc Demand power amount control system, demand power amount control method, and program

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4910020B2 (en) * 2009-08-05 2012-04-04 株式会社日立製作所 Consumer energy management system
JP2011061992A (en) * 2009-09-10 2011-03-24 Panasonic Electric Works Co Ltd Power control system and electric apparatus
JP5645244B2 (en) * 2010-02-05 2014-12-24 パナソニックIpマネジメント株式会社 Energy supply and demand control system
JP5062273B2 (en) * 2010-03-12 2012-10-31 ダイキン工業株式会社 Energy management system

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08322147A (en) * 1995-05-25 1996-12-03 Hitachi Ltd Demand prediction system
JPH11178247A (en) * 1997-12-11 1999-07-02 Matsushita Electric Ind Co Ltd Power consumption management system
JP2002051463A (en) * 2000-08-01 2002-02-15 Hitachi Ltd Power load control system
JP2005151745A (en) * 2003-11-18 2005-06-09 Matsushita Electric Ind Co Ltd Remote control device
JP2005323438A (en) * 2004-05-07 2005-11-17 Inter Db:Kk Power control system
JP2008017665A (en) * 2006-07-07 2008-01-24 Daikin Ind Ltd Electric energy controller
JP2011152043A (en) * 2007-03-19 2011-08-04 Sanyo Electric Co Ltd Device for control of cold storage equipment
JP2009153336A (en) * 2007-12-21 2009-07-09 Panasonic Electric Works Co Ltd Distribution system
JP2009165249A (en) * 2007-12-28 2009-07-23 Panasonic Electric Works Co Ltd Power supply system
JP2009240054A (en) * 2008-03-26 2009-10-15 Panasonic Electric Works Co Ltd Demand control system, demand control method
WO2011030200A1 (en) * 2009-09-09 2011-03-17 パナソニック電工株式会社 Power control system
JP2011214794A (en) * 2010-04-01 2011-10-27 Mitsubishi Electric Corp Air conditioning system control device
WO2011148647A1 (en) * 2010-05-28 2011-12-01 パトックス.ジャパン株式会社 Control management system for energy conversion device
JP2013169039A (en) * 2012-02-14 2013-08-29 Ntt Facilities Inc Demand power amount control system, demand power amount control method, and program

Also Published As

Publication number Publication date
CN104126260B (en) 2017-03-01
WO2013121700A1 (en) 2013-08-22
JP5800979B2 (en) 2015-10-28
CN104126260A (en) 2014-10-29

Similar Documents

Publication Publication Date Title
JP5800979B2 (en) Consumer power distribution system and consumer power distribution method
JP5908302B2 (en) Storage energy storage optimization device, optimization method and optimization program
US20170159955A1 (en) Air-conditioning controller, air-conditioning control method and air-conditioning control program
JP5887549B2 (en) Energy management device, energy management method, program
JP5945851B2 (en) Energy management device, energy management system
JP2014502138A (en) Electric energy distribution device
JP5656921B2 (en) Power accommodation apparatus, power accommodation system, power accommodation method and program
JP5389618B2 (en) Air conditioner control system
WO2014192849A1 (en) Air-conditioner control device, air-conditioner control method, and program
JP5826714B2 (en) Power control system and power monitoring device
JP6116970B2 (en) Energy management system, energy management apparatus, and energy management method
JP6668615B2 (en) Power consumption suppression optimization method, demand response control optimization method, air conditioning system controller
JP5113568B2 (en) Environmental control system
JP2012007835A (en) Air conditioner group controller and air conditioning system
JP6331073B2 (en) Information processing apparatus and information processing system
JP2013169039A (en) Demand power amount control system, demand power amount control method, and program
US10122170B2 (en) Load adjustment sharing system and method
US20160241033A1 (en) Control device, control method, and program
JP2013015922A (en) Equipment controlling device
JP6949224B2 (en) Electric energy setting device, electric energy setting method, and program
JP2004118366A (en) Energy saving control system, energy saving control method and presentation acceptance device
JP2017112780A (en) Power management device, power management program and power management method
JP6548175B2 (en) POWER MANAGEMENT DEVICE, POWER MANAGEMENT SYSTEM, AND PROGRAM
JP6490218B2 (en) Energy management apparatus, energy management method, and program
US11329485B2 (en) Method for controlling building power consumption

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150317

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150512

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150728

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150825

R150 Certificate of patent or registration of utility model

Ref document number: 5800979

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees