Prior art keywords
steel
assembled
frame
steel frames
frame unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP8839082A
Other languages
Japanese (ja)
Other versions
JPS58204245A (en
Inventor
Shigeru Nikai
Takeshi Kojima
Kenzo Mizuhara
Noboru Fujii
Keiji Himi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP8839082A priority Critical patent/JPS58204245A/en
Publication of JPS58204245A publication Critical patent/JPS58204245A/en
Publication of JPS645133B2 publication Critical patent/JPS645133B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Shafts, Cranks, Connecting Bars, And Related Bearings (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は鉄骨鉄筋コンクリート構造物におけ
る軸組の組立て方法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] This invention relates to a method of assembling a frame in a steel reinforced concrete structure.

〔従来の技術〕[Conventional technology]

一般に、鉄骨鉄筋コンクリート構造物の軸組は
H形鋼等の鉄骨の柱部分及び梁部分が構成され、
且つ柱部分及び梁部分の鉄骨の回りにこれらの長
手方向に添つて複数本の主筋が配筋され、更に柱
部分の鉄骨の回りにはフープ筋が、梁部分の鉄骨
の回りにはスターラツプ筋がそれぞれ配筋されて
いる。
In general, the frame of a steel-framed reinforced concrete structure is composed of steel columns and beams such as H-beams.
In addition, multiple main reinforcements are arranged around the steel frames of the columns and beams in the longitudinal direction, and furthermore, hoop reinforcements are placed around the steel frames of the columns, and stirrup reinforcements are placed around the steel frames of the beams. are each reinforced.

そして、その組立て方法は、先ず、鉄骨柱を一
本一本建て付け、続いて鉄骨梁間に鉄骨梁を架設
することにより鉄骨のみの軸組を構成し、続い
て、鉄骨柱及び鉄骨梁の回りに主筋と剪断補強筋
を配筋するのが一般的である。
The assembly method is as follows: First, the steel columns are erected one by one, then the steel beams are erected between the steel beams to form a framework made of only steel frames, and then the surroundings of the steel columns and steel beams are It is common to place main reinforcement and shear reinforcing bars in the steel.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

しかし、このような組立て方法では、柱及び梁
部分の鉄骨及び補強筋を一本一本設置する必要が
あり、又柱と梁との仕口部に於ける鉄筋の配筋は
鉄筋どうしが複雑に入れ乱れる為、配筋作業が極
めて面倒になりやすい。然も軸組の組立て完了後
に鉄筋の配筋作業を行う為、工期が大幅に長引く
ことが免れない。
However, with this assembly method, it is necessary to install the steel frames and reinforcing bars for columns and beams one by one, and the arrangement of reinforcing bars at the joints between columns and beams is complicated. The reinforcement work tends to be extremely troublesome because the reinforcement is mixed up. However, since reinforcing bars will be placed after the frame assembly is completed, the construction period will be significantly longer.

更に、これらの作業の殆どが高いところで行わ
れる為、墜落事故や飛散事故等の危険に晒され、
安全上問題がある。
Furthermore, since most of these tasks are performed at high places, they are exposed to risks such as falling accidents and scattering accidents.
There is a safety issue.

この発明はこのような前記従来の問題点を解決
する為に提案されたもので、組立て作業を簡単に
且つ短期間で然も安全に行うことができる鉄骨鉄
筋コンクリート構造物における軸組の組立て方法
を提供することを目的とする。
This invention was proposed in order to solve the above-mentioned conventional problems, and provides a method for assembling frames in steel-framed reinforced concrete structures that allows assembly work to be performed easily, quickly, and safely. The purpose is to provide.

〔課題を解決する為の手段〕[Means to solve problems]

この発明は鉄骨鉄筋コンクリート構造物におけ
る軸組の組み立て方法に関するもので、複数本の
鉄骨を井桁状若しくは格子状に組み立て、当該鉄
骨の回りに主筋と剪断補強筋を配筋して構築され
る鉄骨鉄筋コンクリート構造物の柱部分及び梁部
分を一体とした軸組ユニツトを構成し、当該軸組
ユニツトを上階方向及びスパン方向に鉄骨どうし
は連結プレートとボルトナツトによつて、主筋ど
うしはジヨイント金具によつてそれぞれ連結しつ
つ組立てる構成とすることにより前記目的を達成
するものである。
This invention relates to a method for assembling frames in steel-framed reinforced concrete structures, in which steel-framed reinforced concrete is constructed by assembling a plurality of steel frames in a cross-shaped or lattice shape and arranging main bars and shear reinforcing bars around the steel frames. A frame unit is formed by integrating the column and beam parts of the structure, and the frame unit is connected to each other in the upper floor direction and span direction by connecting plates and bolts and nuts, and the main reinforcements are connected to each other by joint fittings. The above object is achieved by constructing a structure in which they are assembled while being connected to each other.

〔実施例〕〔Example〕

以下、この発明に係る鉄骨軸組の組立て方法を
図示する一実施例によつて説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a method of assembling a steel frame according to the present invention will be explained with reference to an illustrative embodiment.

先ず、建設現場の軸組ヤードに於いて、軸組
ユニツト1を組み立てる。
First, the frame unit 1 is assembled in a frame yard at a construction site.

軸組ユニツト1は複数本の鉄骨を井桁状若し
くは格子状に組み立て、且つ柱部分2及び梁部
分3の鉄骨の回りにこれらの部材の長手方向に
沿つて複数本の主筋4を配筋し、更にその回り
に、柱部分2あつてはフープ筋5を、梁部分3
にあつてはスターラツプ筋6を配筋することに
より構成する。
The frame unit 1 is constructed by assembling a plurality of steel frames in a parallel or lattice shape, and arranging a plurality of main reinforcements 4 around the steel frames of the column portions 2 and beam portions 3 along the longitudinal direction of these members, Furthermore, around it, the hoop reinforcement 5 is placed on the column part 2, and the beam part 3 is placed on the column part 2.
In this case, it is constructed by arranging stirrup muscles 6.

又、柱部分2及び梁部分3の両端部には、複
数個のボルト孔7を形成する。
Further, a plurality of bolt holes 7 are formed at both ends of the column portion 2 and the beam portion 3.

柱部分2及び梁部分3のは、単一H形鋼やI
形鋼或いは組立てH形鋼やI形鋼等の鉄骨によ
つて組み立てる。
The column part 2 and beam part 3 are made of single H-beam steel or I
It is assembled using steel frames such as shaped steel or assembled H-shaped steel and I-shaped steel.

係る場合、何れの鉄骨を使用するかは、建物
の規模によつて決める。
In such cases, the type of steel frame to be used will be determined depending on the scale of the building.

第2図〜第7図は軸組ユニツトの種類を示し
たもので、このうち第2図は井桁状に組み立て
た軸組ユニツトを示したものであり、第3図は
2スパン分を同時に組み立てられるように格子
状に組み立てた軸組ユニツトを示したものであ
り、第4図は4階分を同時に組み立てられるよ
うに組み立てた軸組ユニツトを示したものであ
り、第5図は2スパン及び3階分を同時に組み
立てられるように組み立てた軸組ユニツトを示
したものであり、第6図は4階分を同時に組み
立てられるように組み立てた軸組ユニツトをふ
示したものであり、そして、第7図は4階分及
び2スパン分を同時に組み立てられるように組
み立てた軸組ユニツトを示したものである。
Figures 2 to 7 show the types of frame units, of which Figure 2 shows a frame unit assembled in a cross-shaped structure, and Figure 3 shows two spans assembled at the same time. Figure 4 shows a frame unit assembled in a lattice shape so that four floors can be assembled at the same time, and Figure 5 shows a frame unit assembled in a lattice shape so that four floors can be assembled at the same time. Figure 6 shows a frame unit assembled so that three floors can be assembled at the same time, and Figure 6 shows a frame unit assembled so that four floors can be assembled at the same time. Figure 7 shows a frame unit assembled so that four floors and two spans can be assembled at the same time.

このようにして組み立てられた軸組ユニツト
の何れを採用するかは構築しようとする建物の
形状や規模,クレーンの稼働能力等施工条件を
考慮して決めるものとする。
Which of the frame units assembled in this manner is to be adopted shall be determined by taking into account construction conditions such as the shape and scale of the building to be constructed, and the operating capacity of the crane.

続いて、軸組ユニツト1をクレーンによつて
吊り上げ、構築される構造物の上階方向及びス
パン方向に連結しつつ組み立てる。
Subsequently, the frame unit 1 is lifted up by a crane and assembled while being connected in the upper story direction and the span direction of the structure to be constructed.

柱部分2及び梁部分3の連結は柱部分2及び
梁部分3の鉄骨端部を突き合わせ、当該鉄骨の
端部双方に連結プレート8を添わせると共にこ
の連結プレート8と鉄骨とをボルトナツト9で
締めつける。
To connect the column part 2 and the beam part 3, the steel frame ends of the column part 2 and the beam part 3 are butted together, a connection plate 8 is attached to both ends of the steel frame, and the connection plate 8 and the steel frame are tightened with bolts and nuts 9. .

又、主筋4,4どうしはスクイズジヨイント
やグリツプジヨイント等の継手金具によつて連
結する。
Further, the main reinforcing bars 4, 4 are connected to each other by a joint fitting such as a squeeze joint or a grip joint.

尚、主筋どうしの連結はこれに限定されるも
のでなく、ガスて圧接や溶接によつて接合して
も良い。
Note that the connection of the main reinforcements is not limited to this, and may be joined by gas pressure welding or welding.

又、柱部分2及び梁部分3の継手部分にもフ
ープ筋5とスターラツプ筋6を配筋する。
Hoop reinforcements 5 and stirrup reinforcements 6 are also arranged at the joint portions of the column portions 2 and beam portions 3.

〔発明の効果〕〔Effect of the invention〕

この発明は以上の構成からなるので、以下の効
果を有する。
Since the present invention has the above configuration, it has the following effects.

軸組ユニツトを組み立てる場合に、地上におい
ては、単に柱用鉄骨と梁用鉄骨に主筋と剪断補強
筋を配筋するまででなく、鉄骨を井桁状若しくは
格子状に組み立て、且つ鉄骨の回りに剪断補強筋
を配筋するまでおこなう為、鉄骨の建て付けに際
し、複数階部分及ぶ複数スパン部分を同時に組み
立てることができ、且つ連結作業が著しく少なく
なる。然も柱部分及び梁部分の鉄骨どうしは全て
連結容易な連結プレートとボルトナツトによつて
連結し、主筋どうしは継手金具によつて連結する
為、これらの部材間の連結も著しく簡単にでき
る。
When assembling a frame unit, on the ground, it is not enough to simply arrange the main reinforcement and shear reinforcing bars on the steel frames for the columns and the steel frames for the beams, but also to assemble the steel frames in a cross-shaped or lattice shape, and to shear around the steel frames. Since the work is carried out up to the point of arranging reinforcing bars, it is possible to assemble multiple floors and multiple span sections at the same time when constructing the steel frame, and the connection work is significantly reduced. Moreover, since the steel frames of the column and beam sections are all connected by easy-to-connect connecting plates and bolts and nuts, and the main reinforcements are connected by joint fittings, the connection between these members can be made extremely simple.

従つて、組立て作業の作業性が著しく向上す
る。
Therefore, the efficiency of assembly work is significantly improved.

又、柱部分及び梁部分は地上で変形しにくいよ
うに井桁状若しくは格子状に組み立てる為、クレ
ーンでの吊り上げ中若しくは組み立て中に軸組ユ
ニツトが分解するといつた危険を回避でき、作業
の安全性も図れる。
In addition, the pillars and beams are assembled in a parallel or lattice shape to prevent deformation on the ground, so it is possible to avoid the danger of the frame unit disassembling during lifting or assembly by a crane, improving work safety. You can also plan.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図〜第7図はこの発明の一実施例を示した
もので、第1図は鉄骨鉄筋コンクリート構造物の
軸組の組み立て方法を示す軸組図、第2図〜第7
図は軸組ユニツトの正面図である。 1……軸組ユニツト、2……柱部分、3……梁
部分、4……主筋、5……フープ筋、6……スタ
ーラツプ筋、7……ボルト孔、8……連結プレー
ト、9……ボルトナツト。
Figures 1 to 7 show an embodiment of the present invention. Figure 1 is a frame diagram showing a method of assembling a frame of a steel-framed reinforced concrete structure, and Figures 2 to 7 are
The figure is a front view of the frame unit. 1... Frame unit, 2... Column part, 3... Beam part, 4... Main reinforcement, 5... Hoop reinforcement, 6... Starlap reinforcement, 7... Bolt hole, 8... Connection plate, 9... ...Boruto Natsuto.

Claims (1)

【特許請求の範囲】[Claims] 1 複数本の鉄骨を井桁状若しくは格子状に組み
立て、当該鉄骨の回りに主筋と剪断補強筋を配筋
して構築される鉄骨鉄筋コンクリート構造物の柱
部分及び梁部分を一体とした軸組ユニツトを構成
し、当該軸組ユニツトを上階方向及びスパン方向
に鉄骨どうしは連結プレートとボルトナツトによ
つて、主筋どうしは継手金具によつてそれぞれ連
結しつつ組み立てることを特徴とする鉄骨鉄筋コ
ンクリート構造物における軸組の組立て方法。
1 A frame unit that integrates the column and beam parts of a steel-framed reinforced concrete structure constructed by assembling multiple steel frames in a grid or lattice shape and arranging main reinforcement and shear reinforcing bars around the steel frames. A shaft in a steel-framed reinforced concrete structure, characterized in that the shaft unit is assembled in the upper story direction and the span direction, with the steel frames connected to each other by connecting plates and bolt nuts, and the main bars connected to each other by joint fittings. How to assemble the set.
JP8839082A 1982-05-25 1982-05-25 Assembling of shaft assembly in reinforced concrete structure Granted JPS58204245A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8839082A JPS58204245A (en) 1982-05-25 1982-05-25 Assembling of shaft assembly in reinforced concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8839082A JPS58204245A (en) 1982-05-25 1982-05-25 Assembling of shaft assembly in reinforced concrete structure

Publications (2)

Publication Number Publication Date
JPS58204245A JPS58204245A (en) 1983-11-28
JPS645133B2 true JPS645133B2 (en) 1989-01-27

Family

ID=13941461

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8839082A Granted JPS58204245A (en) 1982-05-25 1982-05-25 Assembling of shaft assembly in reinforced concrete structure

Country Status (1)

Country Link
JP (1) JPS58204245A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62260967A (en) * 1986-05-07 1987-11-13 鹿島建設株式会社 Method for assembling reinforcement for reinforced concrete structure

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5146324B2 (en) * 1972-04-22 1976-12-08
JPS512206B2 (en) * 1972-05-18 1976-01-23
JPS5238331A (en) * 1975-09-23 1977-03-24 Nippon Beet Sugar Mfg Attitude control device for farm machinery

Also Published As

Publication number Publication date
JPS58204245A (en) 1983-11-28

Similar Documents

Publication Publication Date Title
JPS6349776B2 (en)
JPS645133B2 (en)
JPH09273318A (en) Earthquakeproof reinforcing structure for beam-column joint in existing reinforced concrete or steel-concrete composite structure
JP2706552B2 (en) Beam-column joint structure in steel reinforced concrete construction
JPH0412348B2 (en)
JP2797023B2 (en) Construction method of beam
JP2534160Y2 (en) Beam-column connection structure
JPH06287998A (en) Constructing method for preliminary assembling of reinforced concrete composite beam
JP2868135B2 (en) Construction method of unsupported space truss structure
JPS645134B2 (en)
JPH07279247A (en) Skeleton of building consisting of concrete core wall and structural steel frame
JPS6141857Y2 (en)
JPH0694700B2 (en) Reinforced steel composite column
JPH02236328A (en) Construction method for super-highrice building
JPS6139457B2 (en)
JPS6234903B2 (en)
JPS61269947A (en) Construction method for reinforcing bar structure
JP2023146343A (en) Building and its construction method
JPH0533606Y2 (en)
JPH0742805B2 (en) Steel bar truss built-in rebar concrete column
JPH0361804B2 (en)
JPH0410954B2 (en)
JPS61207765A (en) Construction of building skeletal composed of reinforcement bars
JPS645135B2 (en)
Kratena et al. Collapse of a warehouse and its repair