JPS6374885A JP21719386A JP21719386A JPS6374885A JP S6374885 A JPS6374885 A JP S6374885A JP 21719386 A JP21719386 A JP 21719386A JP 21719386 A JP21719386 A JP 21719386A JP S6374885 A JPS6374885 A JP S6374885A
Authority
JP
Japan
Prior art keywords
temporary
car
existing
elevator
machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP21719386A
Other languages
Japanese (ja)
Other versions
JPH057310B2 (en
Inventor
大迫 昭一
郷古 洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Elevator Engineering and Service Co Ltd
Original Assignee
Hitachi Elevator Engineering and Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Elevator Engineering and Service Co Ltd filed Critical Hitachi Elevator Engineering and Service Co Ltd
Priority to JP21719386A priority Critical patent/JPS6374885A/en
Publication of JPS6374885A publication Critical patent/JPS6374885A/en
Publication of JPH057310B2 publication Critical patent/JPH057310B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Abstract] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、既設エレベータを改造して新規のエレベー
タにするエレベータの改造方法に関する。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to an elevator remodeling method for remodeling an existing elevator into a new elevator.

〔従来の技術〕[Conventional technology]

エレベータはビル内の移動手段として重要視され、5階
建以上のピル全てに取付けられている。
Elevators are considered important as a means of transportation within buildings, and are installed in all buildings with five or more floors.

このエレベータが長年稼動している間に、乗かごに傷み
が生じたり、性能の低下やデザインの陳腐化を来たし之
り、あるいは新しいニーズ、例えばスピードの向上や省
エネ化への対応が求められる等の理由によりエレベータ
の改造が行なわれることがある。従来、この改造を実施
するために、エレベータをある期間、例えば1ケ月位、
完全に止めて、この期間に既設の乗かご、巻上機、出入
口部品等を撤去した後、新設の乗かご、巻上機、出入口
部品等の組立てを行なっていた。しかしながらこの方法
では、エレベータが2台以上併設されているビルは1台
休止させ実施できるのでそれ程問題ないが、小規模ビル
のように1台だけのエレベータの場合、改造のために長
期に亘ってエレベータが使えず、利用者に対し多大の迷
惑を掛けるという問題があった。
While the elevator has been in operation for many years, the cars may become damaged, performance may deteriorate, the design may become obsolete, or new needs may arise, such as increased speed or energy savings. Elevators are sometimes remodeled for these reasons. Conventionally, in order to carry out this modification, the elevator was kept for a certain period of time, for example, about one month.
During this period, the existing car, hoisting machine, doorway parts, etc. were removed, and the new car, hoisting machine, doorway parts, etc. were being assembled. However, this method does not pose much of a problem in buildings with two or more elevators because one elevator can be shut down, but in the case of a small building with only one elevator, it may take a long time for remodeling. There was a problem in that the elevators could not be used, causing a great deal of inconvenience to users.

このため、近時、土、日曜日の休日だけを利用し、部分
的に改造を行なうというものが提案されているが、土、
日曜日が休日となる事務所ビル等には適用できても、ア
パート等の休日のないビルには適用できないという問題
があった。また、土、日曜日の休日作業には作業者の確
保が難しいという問題もあった。
For this reason, it has recently been proposed to use only Saturdays and Sundays as holidays for partial remodeling.
Although it can be applied to office buildings where Sunday is a holiday, it cannot be applied to buildings with no holidays such as apartment buildings. Another problem was that it was difficult to secure workers for Saturday and Sunday holiday work.

これらの問題を解決する方法として、既設の昇降路上層
階に仮設の巻上機を備えた仮設機械室を設け、この仮設
巻上機によって既設又は仮設の乗かごを昇降させてサー
ビスさせ、このサービス期間中に新設の巻上機や乗かと
を組立てるというものが提案されている。この方法であ
れば、仮設巻上機と乗かごの据付け、又、これらの撤去
時等の限られた期間のみエレベータを休止すればよく、
利用者への迷惑を掛ける期間を短縮できるという効果が
ある。
As a way to solve these problems, a temporary machine room equipped with a temporary hoist is installed on the upper floor of the existing hoistway, and the temporary hoist is used to raise and lower the existing or temporary car for service. It has been proposed that a new hoisting machine and passenger car be assembled during the service period. With this method, the elevator only needs to be shut down for a limited period of time, such as during the installation and removal of the temporary hoist and car.
This has the effect of shortening the period of inconvenience to users.

なお、この種の改造方法として関連するものには、例え
ば、特開昭61−64686号、特開昭61−6468
7号等が挙げられる。
Incidentally, related methods of this type of modification include, for example, JP-A-61-64686 and JP-A-61-6468.
Examples include No. 7.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

上記提案されたものでは、昇降路の最上階に近い階床に
仮設の巻上機などからなる仮設機械室を設置する作業が
必要であった。従って、小規模ビル等の場合、その搬入
、搬出に多大の労力を要するばかりか、狭い場所での作
業のため作業性や安全性の面でも問題があった。
In the above proposal, it was necessary to install a temporary machine room containing a temporary hoist on a floor near the top floor of the hoistway. Therefore, in the case of a small-scale building, etc., not only does it require a great deal of labor to carry it in and out, but it also poses problems in terms of workability and safety because the work must be carried out in a narrow space.

本発明の目的は、昇降路最上部での仮設機株室の設置、
撤去作業を屏し、この作業に伴う作業性や安全性の改善
を図ることにある。
The purpose of the present invention is to install a temporary machine stock room at the top of the hoistway;
The objective is to oversee the removal work and improve workability and safety associated with this work.

〔問題点を解決するための手段〕[Means for solving problems]

上記目的は、既設エレベータの少なくとも最上階を除く
昇降路上部に、滑車を枢着した仮設機械台を設け、この
機械台の滑車に仮設乗かごに連結され喪主ロープを巻掛
け、一方、前記昇降路下部階床に、ロープの他端を巻取
り、巻戻す仮設巻胴式巻上機を設け、しかる後、この仮
設巻胴式巻上機によって前記仮設乗かとを昇降させてサ
ービスさせ、このサービス期間中に前記既設エレベータ
の巻上機を新設の巻上機に変更すると共に、前記仮設機
械台上部で新設の乗かごの組立てを行ない、この後、前
記の仮設機械台、仮設巻胴式巻上機、仮設乗かごを取除
くことにより、達成される。
The above purpose is to provide a temporary machine platform with a pulley pivotally attached above the hoistway of the existing elevator, excluding at least the top floor, connect the pulley of this machine platform to a temporary car, and wrap the mourner's rope around it. A temporary winding-truck type winding machine is installed on the lower floor of the road to wind up and unwind the other end of the rope, and then the temporary carriage is raised and lowered by this temporary winding-truck type winding machine for service. During the service period, the hoisting machine of the existing elevator will be replaced with a new hoisting machine, and a new car will be assembled on the upper part of the temporary machine platform. This is achieved by removing the hoist and temporary car.

〔作用〕[Effect]

昇降路下部階床に仮設巻胴式巻上機を設け、この巻胴式
巻上機によって仮設乗かごが運転され、改造作業中のサ
ービスを行なう。
A temporary hoisting machine is installed on the lower floor of the hoistway, and the temporary car is operated by this hoisting machine to provide services during the remodeling work.

従って、改造が要用いても利用者にそれ程の問題を生じ
させないばかりか、仮設巻胴式巻上機が昇降路下部階床
に取付けられるため、この搬入、搬出が容易であり、作
業性や安全性の向上を図ることができる。
Therefore, even if modifications are required, it will not cause much of a problem for users, and since the temporary winding drum type hoist is installed on the lower floor of the hoistway, it is easy to carry it in and out, which improves work efficiency. Safety can be improved.

〔実施例〕〔Example〕

以下、本発明の一実施例を第1図により説明する。第1
図において、1は昇降路で、この昇降路1の上部には機
械室2が形成され、機械台4を介して巻上機3、そらせ
車5、巻上機3を制御する制御盤6が設けられている。
An embodiment of the present invention will be described below with reference to FIG. 1st
In the figure, 1 is a hoistway, and a machine room 2 is formed in the upper part of this hoistway 1. A hoisting machine 3, a deflection wheel 5, and a control panel 6 for controlling the hoisting machine 3 are installed via a machine platform 4. It is provided.

7は昇降路1に立設されたつり合いおもり用ガイドレー
ル、8は来かご用ガイドレール、9は乗場敷居、10は
乗場の戸、11は三方枠、12は昇降路最上部13で組
立てられている新設のかごである。14は一端が8階の
床15に置かれ、他端が昇降路1の正面壁に当接された
仮設の機械台、16は仮設の機械台14に枢着された滑
車、17は仮設の機械台14を固定しているブラケット
である。既設の乗かと18とつり合いおもり19は、滑
車16に巻掛けられた仮設用の主ロープ美により吊られ
ており、この既設の米かと18でサービスするために、
昇降路最下部階床(この実施例では1階の階床)に設置
された仮設の巻胴式巻上機nの巻111423とつり合
いおもり19を第2のロープ肌によ結 り連漣している。δは仮設の巻胴式巻上機四を制御する
ための仮設の?UIJ御盤、26と釘はピットに設けら
れた緩衝器である。
7 is a guide rail for the counterweight installed vertically on the hoistway 1, 8 is a guide rail for the next car, 9 is a landing threshold, 10 is a landing door, 11 is a three-sided frame, and 12 is assembled at the top of the hoistway 13. This is a newly installed basket. 14 is a temporary machine stand whose one end is placed on the floor 15 of the 8th floor and the other end is in contact with the front wall of the hoistway 1; 16 is a pulley pivoted to the temporary machine stand 14; and 17 is a temporary machine stand. This is a bracket that fixes the machine stand 14. The existing rider lever 18 and counterweight 19 are suspended by a temporary main rope wrapped around the pulley 16, and in order to be serviced by the existing rider lever 18,
The counterweight 19 is tied to the winding 111423 of a temporary winding drum type winding machine n installed on the lowest floor of the hoistway (the first floor in this embodiment) by a second rope skin. ing. δ is a temporary winding machine for controlling the temporary winding drum type winding machine 4? UIJ Goban, 26 and the nail are buffers installed in the pit.

しかして今、本発明の改造方法について説明する。エレ
ベータ改造前は、周知のように既設の乗かご18とつり
合いおもり19は、巻上機3に取付けられたシープとそ
らせ車5に巻掛けられた既設の主ロープで吊られている
。そこで、既設の乗かと18を最上階である9階まで上
昇させ、次いでチェーンブロック(図示せず)により9
階階床より多少上の位置まで吊上げ、つり合いおもり1
9を下げて緩衝器nで支持させると共に、既設の主ロー
プを取外す。次に、チェーンブロックを操作して、既設
の乗かと18を下げて6階階床より多少上の位置で保持
する。そして、滑車16の枢着した仮設の機械台14を
、一端を8階の床15に、他端を昇降路1の正面壁にブ
ラケット17ヲ介して固定する。その後、仮設の主ロー
プ加を滑車16に巻掛け、既設の乗かと18とつり合い
おもり19と連結する。このつり合いおもり19は、h
L設乗かご18の重量より軽くなるように調節する。新
設の乗かと12を組立てるための作業床を仮設の機械台
14に取付ける。欠に、巻胴おの取付けられた仮設の巻
胴式巻上機22と仮設の制御盤5を1階の階床21に設
置した後、つり合いおもり19に連結した第2のロープ
冴の片端を巻胴おに連結する。さらに、既設の乗かご1
8から吊るされた通信用ケーブル、各1砦床の呼び釦や
位置表示灯のケーブル等(図示せず)を仮設の制御盤5
に接続し、仮設エレベータの準備が完了する。
Now, the modification method of the present invention will be explained. Before remodeling the elevator, as is well known, the existing car 18 and counterweight 19 are suspended by the existing main rope wrapped around the sheep attached to the hoist 3 and the deflection wheel 5. Therefore, the existing passenger car 18 was raised to the 9th floor, which is the top floor, and then a chain block (not shown) was used to raise the 9th floor.
Lift it to a position slightly above the floor level, and use a counterweight 1.
9 to be supported by the shock absorber n, and remove the existing main rope. Next, operate the chain block to lower the existing carriage 18 and hold it at a position slightly above the 6th floor. Then, the temporary machine stand 14 to which the pulley 16 is pivoted is fixed at one end to the floor 15 of the 8th floor and at the other end to the front wall of the hoistway 1 via a bracket 17. Thereafter, a temporary main rope is wound around the pulley 16 and connected to the existing ride heel 18 and counterweight 19. This counterweight 19 is h
Adjust the weight so that it is lighter than the weight of the L car 18. A work floor for assembling the newly installed passenger car 12 is attached to the temporary machine stand 14. After installing a temporary winding drum hoist 22 with a winding drum attached and a temporary control panel 5 on the first floor floor 21, one end of the second rope was connected to the counterweight 19. Connect to the winding drum. In addition, the existing passenger car 1
Communication cables suspended from 8, cables for call buttons and position indicator lights (not shown) on each fort floor are connected to a temporary control panel 5.
The temporary elevator is now ready.

これにより、上記仮設エレベータによるサービスと並行
して改造作業が実b1される。すなわち、t−、A械室
2において、仮設エレベータの運転に関係なく、機械台
4、巻上機3、そらせ車5、制御盤6を既設より新設の
ものに改造できる。一方、新設の乗かと12については
、仮設の機械台14に取付けられた作業床に作業者が来
って組立作業を行なう。なお、仮設エレベータの直上で
改造作業が行なわれるが、仕切床を兼ねた作業床により
工具等の落下事故を防止する。
As a result, the remodeling work b1 is carried out in parallel with the service using the temporary elevator. That is, in the t- and A machine rooms 2, the machine platform 4, hoist 3, deflection wheel 5, and control panel 6 can be modified from existing ones to new ones, regardless of the operation of the temporary elevator. On the other hand, regarding the newly installed passenger car 12, a worker comes to a work floor attached to a temporary machine stand 14 and performs assembly work. Although the remodeling work will be carried out directly above the temporary elevator, a work floor that also serves as a partition floor will prevent accidents such as falling tools.

このようにして機誠室2内の改造及び新設の乗かご12
の組立てが完了したならば、既設の栄かと18を7階で
停止させ、機緘室2に取付けたチェーンプロツ゛りによ
り7階階床より多少上まで吊上げて保持する。この時、
つり合いおもり19は緩衝器nにより支持される。この
状態で、仮設の主ロープ美、作業床、滑車16、仮設の
機械台14等を取外す。ソノ後、チェーンブロックを操
作して、既設の乗かと18を1階まで吊下げて取外し、
仮設の巻胴式巻上機n、制御盤5も取外す。
In this way, the interior of the machine room 2 was remodeled and the new passenger car 12 was installed.
Once the assembly is completed, the existing Sakae 18 will be stopped at the 7th floor, and the chain prop installed in the machine room 2 will be used to lift and hold it a little above the 7th floor. At this time,
The counterweight 19 is supported by a buffer n. In this state, the temporary main rope, work floor, pulley 16, temporary machine stand 14, etc. are removed. After the sono, operate the chain block to suspend the existing passenger car 18 to the first floor and remove it.
The temporary winding drum hoist n and control panel 5 are also removed.

そして、新設の主ロープ(図示せず)を新設の巻上機3
に取付けられたシーブとそらせ車5に巻掛けて、新設の
乗かご12と見合った重量に調節されたつり合いおもり
19を吊る。取外された既設部品と仮設部品を外部に搬
出することにより改造作業が完了する。
Then, connect the newly installed main rope (not shown) to the newly installed hoist 3.
A counterweight 19 adjusted to a weight commensurate with the newly installed car 12 is hung around the sheave and deflection wheel 5 attached to the car. The remodeling work will be completed by transporting the removed existing parts and temporary parts outside.

上記一実施例によれば、昇降路下部階床に設けられた仮
設巻胴式巻上機によって、既設の乗かごを昇降させるこ
とができる。このため、最上階付近では滑車16を有す
る機械台14の取付けだけですみ、最上階付近まで巻上
機を持上げたり、これらを組立て、取外す必要がなく、
作業性や安全性の面で優れたものを提供できろ。
According to the above-mentioned embodiment, the existing car can be raised and lowered by the temporary winding drum hoist provided on the lower floor of the hoistway. Therefore, it is only necessary to install the machine stand 14 with the pulley 16 near the top floor, and there is no need to lift the hoist to the top floor or assemble and remove them.
We can provide products that are superior in terms of workability and safety.

なお、上記実施例では、既設の乗かごを仮設用の来かご
に用いたが、この既設乗かごは取外し、仮設専用の乗か
ごを組込み利用するようにしても良い。又、既設のつり
合いおもりを用いたか、必要によっては、この既設つり
合いおもりを用いず、直接主ロープ加の一端を巻胴ツに
連結するようにしても良い。さらに、巻胴式巻上機を1
1WI床に設けたが、心安に応じ、地下哨床あるいは2
階床に設けても良い。
In the above embodiment, an existing car is used as a temporary car, but the existing car may be removed and a temporary car built in may be used. Alternatively, an existing counterweight may be used, or if necessary, one end of the main rope link may be directly connected to the winding trunk without using the existing counterweight. In addition, one winding drum type winding machine is installed.
It was installed on the 1WI floor, but depending on the safety, an underground sentry or 2
It may also be installed on the floor.

〔発明の効果〕〔Effect of the invention〕

本発明によれば、昇降路の最上階付近に、滑車を備え念
仮設機械台、昇降路下部階床に仮設巻胴式巻上機を設け
るようにしたため、これらの据付け、撤去作業を安全に
、しかも効率良く行なうことができる。又、仮設巻胴式
巻上機を階床(C取付けるようにしたため、既設エレベ
ータを休止させる以前に据付は作業を行なうこともでき
、エレベータの休止日数を少なくできる。
According to the present invention, a temporary machine platform equipped with a pulley is provided near the top floor of the hoistway, and a temporary winding-truck hoist is provided on the lower floor of the hoistway, making it possible to safely install and remove these machines. , and can be done efficiently. Furthermore, since the temporary winding drum hoist is installed on the floor (C), the installation work can be done before the existing elevator is shut down, and the number of days the elevator is out of service can be reduced.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の一実施例になるエレベータの改造方法
を用いて改造作業中の状態を示すエレベータの全体縦断
面図である。 l・・・・・・昇降路、3・・・・・・巻上機、12・
・・・・・新設乗かご、13・・・・・・昇降路上部、
14・・・・・・仮設の機械台、16・・・・・・滑車
、18・・・・・・既設束かご、19・・・・・・つり
合いおもり、加・・・・・・仮設主ロープ、21・・・
・・・昇降路下部階床、n・・・・・・仮設巻上機、n
・・・・・・巻胴、夙・・・・・・第2のロープ。 第1図
FIG. 1 is an overall vertical sectional view of an elevator showing a state in which remodeling work is being performed using an elevator remodeling method according to an embodiment of the present invention. l...Hoistway, 3...Hoisting machine, 12.
...Newly installed car, 13...Top of hoistway,
14...Temporary machine stand, 16...Pulley, 18...Existing bundle basket, 19...Counterweight, addition...Temporary Main rope, 21...
...Lower floor of the hoistway, n...Temporary hoisting machine, n
・・・・・・Makidou, 夙・・・Second rope. Figure 1

Claims (3)

【特許請求の範囲】[Claims] (1)既設エレベータの乗かごと巻上機とを、新設の乗
かごと巻上機とに改造するものにおいて、前記既設エレ
ベータの少なくとも最上階を除く昇降路上部に、滑車を
枢着した仮設機械台を設け、この機械台の滑車に、仮設
乗かごに連結された主ロープを巻掛け、一方、前記昇降
路下部階床に、ロープの他端を巻取り、巻戻す仮設巻胴
式巻上機を設け、しかる後、この仮設巻胴式巻上機によ
つて前記仮設乗かごを昇降させてサービスさせ、このサ
ービス期間中に前記既設エレベータの巻上機を新設の巻
上機に変更すると共に、前記仮設機械台上部で新設の乗
かごの組立てを行ない、この後、前記仮設機械台、前記
仮設巻胴式巻上機、前記仮設乗かごを取除くようにした
ことを特徴とするエレベータの改造方法。
(1) In the case of converting an existing elevator car and hoisting machine into a new car and hoisting machine, a temporary structure with a pulley pivoted above the hoistway of the existing elevator excluding at least the top floor A machine stand is provided, and the main rope connected to the temporary car is wound around the pulley of this machine stand, while the other end of the rope is wound and unwound on the lower floor of the hoistway. An upper machine is installed, and then the temporary car is raised and lowered by this temporary winding drum type hoist for service, and during this service period, the hoisting machine of the existing elevator is replaced with a newly installed hoisting machine. At the same time, a newly installed car is assembled on the upper part of the temporary machine stand, and then the temporary machine stand, the temporary winding drum hoist, and the temporary car are removed. How to remodel an elevator.
(2)前記仮設乗かごは、既設の乗かごであることを特
徴とする特許請求の範囲第(1)項記載のエレベータの
改造方法。
(2) The method for remodeling an elevator according to claim (1), wherein the temporary car is an existing car.
(3)前記主ロープの一端を仮設の乗かごに、他端を既
設のつり合いおもりに連結すると共に、このつり合いお
もりの重量を前記仮設乗かごの重量より軽くし、かつ、
前記既設つり合いおもりに、前記仮設巻胴式巻上機によ
り巻取り、巻戻される第2のロープを連結したことを特
徴とする特許請求の範囲第(1)項記載のエレベータの
改造方法。
(3) Connect one end of the main rope to a temporary car and the other end to an existing counterweight, and make the weight of this counterweight lighter than the weight of the temporary car, and
A method for remodeling an elevator according to claim 1, characterized in that a second rope that is wound and rewound by the temporary winding drum hoist is connected to the existing counterweight.
JP21719386A 1986-09-17 1986-09-17 Method of remodeling elevator Granted JPS6374885A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21719386A JPS6374885A (en) 1986-09-17 1986-09-17 Method of remodeling elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21719386A JPS6374885A (en) 1986-09-17 1986-09-17 Method of remodeling elevator

Publications (2)

Publication Number Publication Date
JPS6374885A true JPS6374885A (en) 1988-04-05
JPH057310B2 JPH057310B2 (en) 1993-01-28

Family

ID=16700314

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21719386A Granted JPS6374885A (en) 1986-09-17 1986-09-17 Method of remodeling elevator

Country Status (1)

Country Link
JP (1) JPS6374885A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6155079A (en) * 1984-08-28 1986-03-19 三菱電機株式会社 Temporarily installed elevator

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6155079A (en) * 1984-08-28 1986-03-19 三菱電機株式会社 Temporarily installed elevator

Also Published As

Publication number Publication date
JPH057310B2 (en) 1993-01-28

Similar Documents

Publication Publication Date Title
JP6813123B2 (en) How to apply elevator lift extension technology
JPH0829904B2 (en) Elevator installation method
JPH1081463A (en) Side fork type elevator
JP2000177949A (en) Elevator
JPS5935822B2 (en) Construction elevator installation method
JPS6374885A (en) Method of remodeling elevator
JPH07237847A (en) Installation method of elevator
JPS6374883A (en) Method of remodeling elevator
JP3872833B2 (en) Elevator repair method
JP2000226169A (en) Elevator erection method
JPH0234873B2 (en)
JPS6164686A (en) Temporarily installed elevator
JP2930911B2 (en) Elevator installation method
JPH057309B2 (en)
JP2549726Y2 (en) Construction lift
JP2877593B2 (en) Elevator installation method
JPH0336184A (en) Home elevator
JPH02300081A (en) Installation work method for elevator
JPH05201648A (en) Installation of elevator
JPH04116079A (en) Installation method for elevator
JPH0776473A (en) Apparatus and method for installing elevator
JPH02271B2 (en)
JPH0597345A (en) Modification of elevator
JPS62295887A (en) Method of remodeling elevator cage
JPH0672663A (en) Construction method for linking main rope of elevator