Prior art keywords
excavator
tail
earth
jack
connecting member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP29870185A
Other languages
Japanese (ja)
Other versions
JPS61165494A (en
Inventor
Koichi Uemura
Makoto Uemura
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP29870185A priority Critical patent/JPS61165494A/en
Publication of JPS61165494A publication Critical patent/JPS61165494A/en
Publication of JPS6349039B2 publication Critical patent/JPS6349039B2/ja
Granted legal-status Critical Current

Links

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、上面を開口した掘進機であるオープ
ンシールド掘進機に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Field of Application] The present invention relates to an open shield excavator, which is an excavator with an open top surface.

〔従来技術とその問題点〕[Prior art and its problems]

在来のオープンシールド工法、オープン式推進
工法、オープン式けん引工法、オープン式自走前
進工法等のオープン式工法に用いる1体式又は分
割式掘進機は推進ジヤツキにより前進させるため
に推進機の長さが長くなり、方向修正が難しく、
急カーブ施工ができない欠点がある。
For single-unit or split-type excavators used in open construction methods such as the conventional open shield construction method, open propulsion construction method, open traction construction method, and open self-propelled advance construction method, the length of the propulsion machine must be adjusted to allow it to move forward using a propulsion jack. becomes longer, making it difficult to correct the direction.
The disadvantage is that it cannot be used to construct sharp curves.

ところで、実開昭54−63904号(実願昭52−
137804号)にはカーブ推進が円滑に行われるもの
として、フロント部、第1テール部、第2テール
部の三分割されたオープンシールド掘進機が示さ
れているが、この例ではそれぞれ油圧ジヤツキで
相互に連結される。これでは、前記のごとく掘進
機全体の長さは長いままであり、また分割数が多
いので推進ジヤツキの数も多くなり、しかも前進
工程はかなり複雑な作業が要求される。
By the way, Utility Model No. 63904 (1983)
No. 137804) shows an open shield tunneling machine that is divided into three sections, the front section, the first tail section, and the second tail section, to ensure smooth curve propulsion, but in this example, each section is operated by a hydraulic jack. interconnected. In this case, as mentioned above, the length of the entire excavator remains long, and since there are many divisions, the number of propulsion jacks also increases, and the forwarding process requires quite complicated work.

本発明の目的は前記従来例の不都合を解消し、
分割体を2個として部材数や作業手順を簡素化す
るとともに特に分割体のうちテール掘進機を短く
でき、しかも掘削機後部の側方土砂の崩壊をも防
げるオープンシールド掘進機を提供することにあ
る。
The purpose of the present invention is to eliminate the disadvantages of the conventional example,
To provide an open shield excavator that simplifies the number of parts and work procedures by using two divided bodies, particularly allows the tail excavator to be shortened among the divided bodies, and also prevents collapse of lateral earth and sand at the rear of the excavator. be.

〔問題点を解決するための手段〕[Means for solving problems]

本発明は前記目的を達成するため、上部に開口
部を有するフロント掘進機とテール掘進機とを摺
動自在に嵌合させ、フロント掘進機には後方に向
けてジヤツキ前進設備を配設するとともに、両掘
進機間に連結部材と連結部材へ着脱自在な定着具
及びけん引ジヤツキ設備よりなるけん引設備を配
設し、テール掘進機の側板上部を後方に伸長させ
たことを要旨とするものである。
In order to achieve the above object, the present invention includes a front excavator having an opening at the upper part and a tail excavator that are slidably fitted together, and the front excavator is provided with a jacking advance facility toward the rear. , the gist is that a connecting member, a traction device consisting of a removable fixing device and a traction jack device are installed between the two tunneling machines, and the upper part of the side plate of the tail tunneling machine is extended rearward. .

〔作用〕[Effect]

本発明によれば、テール掘進機はけん引されて
前進するものであり、推進ジヤツキで押出す場合
と比べて短いものですみ、曲がりに対しても充分
対応できる。また、このようにテール掘進機は全
体としては短いが、その上部側板は後方に伸長さ
れ、この部分で掘進機後部の側方土砂の崩壊を防
げる。また、この伸長部分があることにより埋戻
覆土した土砂は掘進機内に侵入しても安息角にな
り、掘進機内に深く侵入することはない。
According to the present invention, the tail excavator moves forward by being towed, and the tail excavator only needs to be shorter than the case where it is pushed out by a propulsion jack, and can sufficiently cope with bending. Furthermore, although the tail tunneling machine is short as a whole, its upper side plate is extended rearward, and this part prevents the lateral earth and sand from collapsing at the rear of the tunneling machine. In addition, because of this extended portion, even if the backfilled and covered earth and sand enters the inside of the excavator, the angle of repose will be maintained, and the earth and sand will not penetrate deeply into the excavator.

〔実施例〕〔Example〕

以下、図面について本発明の実施例を詳細に説
明する。
Embodiments of the present invention will be described in detail below with reference to the drawings.

第1図は本発明のオープンシールド掘進機の第
1実施例を示す側面図、第2図は同上正面図で、
地中に前進させる上面を開口した掘進機2を前部
のフロント掘進機21と後部のテール掘進機22
二分割してそれぞれの長さを短くし、両者21
2を摺動自在に嵌合させ、フロント掘進機21
は前進用のジヤツキ前進設備6を後方に向けて配
設するとともに、フロント掘進機21とテール掘
進機22間に鋼線などによる前進用の連結部材8
と、該連結部材8に着脱自在に定着するコーン形
式の定着具9と、センターホール式で連結部材8
が慣通し定着具9を介してこの連結部材8をけん
引するけん引ジヤツキ設備7により構成するけん
引設備を配設した。そして、テール掘進機22
上部側板31は後方に伸長させ、伸長部32を形成
する。
FIG. 1 is a side view showing a first embodiment of the open shield excavator of the present invention, and FIG. 2 is a front view of the same.
The excavator 2, which is to be advanced underground and has an open top, is divided into two parts, a front excavator 21 and a tail excavator 22 , each having a shorter length.
2 2 are slidably fitted together, and the front excavator 2 1 is provided with a jack advance device 6 for forward movement toward the rear, and a steel wire is installed between the front excavator 2 1 and the tail excavator 2 2 . Connecting member 8 for forward movement by etc.
, a cone-type fixing device 9 that is removably fixed to the connecting member 8, and a center-hole type connecting member 8.
A towing facility consisting of a towing jack facility 7 for towing the connecting member 8 via a conventional fixing device 9 was provided. Then, the upper side plate 3 1 of the tail tunneling machine 2 2 is extended rearward to form an extended portion 3 2 .

さらに、他の実施例として第3図に示すように
掘進機2の上部側板31の後部で、前記伸長部3
,32間に、掘進機2と分離かつ可動に、又一体
的に土留配設11を配設した。この土留設備11
は仕切壁のごときもので、分離かつ可動の場合は
前記伸長部32へボルトでかつ任意の位置へ固定
できるものとし、一体的の場合は溶接すればよ
い。
Furthermore, as another embodiment, as shown in FIG .
Between 2 and 3 2 , an earth retaining arrangement 11 is provided, which is separate and movable from the excavator 2, and also integrally with the excavator 2. This earth retaining equipment 11
is like a partition wall, and if it is separate and movable, it can be fixed to the extension part 32 at any desired position with bolts; if it is integral, it can be welded.

次に使用法及び動作について説明すると、フロ
ント掘進機21の前進方法は第1図に示すように
連結部材8の定着具9を解放し、テール掘進機2
内の地中構造物1を反力に用いてジヤツキ前進
設備6を作動してフロント掘進機を前進させる。
方向修正が必要な時は、上下左右のジヤツキ前進
設備6を調整して上下左右の方向修正をする。
Next, how to use and operate the front excavator 2 1 is advanced. As shown in FIG.
Using the underground structure 1 in 2 as a reaction force, the jack advance equipment 6 is operated to advance the front excavator.
When a direction correction is necessary, the vertical and horizontal direction adjustment is performed by adjusting the vertical and horizontal jack forwarding equipment 6.

テール掘進機22の前進方法は、定着具9を連
結部材8に定着してけん引ジヤツキ設備7を作動
し、テール掘進機22をけん引するようにして前
進させる。この時の前進反力はジヤツキ前進設備
6を介するテール掘進機22に後続する地中構造
物1群とフロント掘進機21の双方を反力に用い
る。又、上下左右のけん引ジヤツキの設備7の操
作によりテール掘進機22の上下左右の方向を修
正する。
The method for advancing the tail excavator 2 2 is to fix the fixing device 9 to the connecting member 8 and operate the traction jack equipment 7 to move the tail excavator 2 2 forward by towing it. The forward reaction force at this time uses both the group of underground structures 1 following the tail excavator 2 2 via the jack advance equipment 6 and the front excavator 2 1 as a reaction force. Further, the vertical and horizontal directions of the tail excavator 22 are corrected by operating the vertical and horizontal traction jack equipment 7.

切羽土砂の排土方法は第1図に示すように地上
のクラムシエル22等によりフロント掘進機21
上面の開口部より排土する。
The method for removing earth and sand from the face is as shown in Fig .
Discharge soil from the opening on the top.

地中構造物1のテール掘進機22内への配設は、
図示は省略するが発進基地内に吊下しセツトした
地中構造物1をジヤツキ等で地中に推進してテー
ル掘進機22内へ前進させる。
The arrangement of the underground structure 1 inside the tail excavator 2 2 is as follows:
Although not shown, the underground structure 1 suspended and set within the starting base is propelled into the ground by a jack or the like and advanced into the tail excavator 22 .

また、地中構造物1上には埋戻覆土23を適宜
施していく。
Further, backfilling soil 23 is applied on the underground structure 1 as appropriate.

この場合、テール掘進機22の上部側板31の伸
長部32は、掘進機後部の側方土砂の崩壊を防ぐ
とともに、埋戻覆土23とした土砂はその前端部
分が前記伸長部32があるため安息角になつてテ
ール掘進機22内に侵入し、大きくなだれ込むこ
とはない。
In this case, the extension portion 3 2 of the upper side plate 3 1 of the tail excavator 2 2 prevents the lateral earth and sand from collapsing at the rear of the excavator, and the front end portion of the earth and sand that has been used as the backfill cover soil 23 is the extension portion 3 2 . Because of the angle of repose, it does not enter the tail excavator 2 2 and slump significantly.

さらに、土留設備11がある場合は、これが埋
戻覆土23した土砂が掘進機2内に侵入するのを
防ぐ。
Furthermore, if there is earth retaining equipment 11, this prevents the earth and sand covered with backfilling soil 23 from entering into the excavator 2.

以下、前述のようにフロント掘進機前進→テー
ル掘進機前進→切羽土砂排土→地中構造物前進を
繰返して地中に掘進機を前進させるものである。
Thereafter, as described above, the front excavator is advanced, the tail excavator is advanced, the face earth is removed, and the underground structure is advanced by repeating the steps to advance the excavator into the ground.

また、図示は省略するが排土方法は前記のごと
くクラムシエル22を用いる他、スクリユーオー
ガー設備を利用してもよく、フロント掘進機21
内に隔壁を設けスクリユーオーガー設備でこの隔
壁の後方へ排土するようにしてもよい。さらに、
フロント掘進機21内に配設した隔壁を貫通する
撹拌軸の前部には撹拌刃を、後部には撹拌機を配
設し、隔壁前部の土砂を給水撹拌し、排土パイプ
により泥水排土するか、サンドポンプ等により排
土することもある。
Further, although not shown in the drawings, the earth removal method may be performed by using the clam shell 22 as described above, or by using screw auger equipment .
A partition wall may be provided inside and the earth may be discharged behind this partition wall using screw auger equipment. moreover,
Front excavator 2 A stirring shaft that penetrates the bulkhead installed in 1 is equipped with a stirring blade at the front and a stirrer at the rear. The earth may be removed or removed using a sand pump, etc.

一方、テール掘進機22内に配設する地中構造
物は、テール掘進機22内に次々に組立てる支保
工、セグメント等の組立式地中構造物を組立て配
設するものとするか、テール掘進機22内に地上
から吊下して配設する吊下セツト式地中構造物と
してもよい。
On the other hand, the underground structures to be installed inside the tail excavator 2 2 shall be constructed by assembling underground structures such as shoring and segments that are assembled one after another inside the tail excavator 2 2 , or It may also be a suspended set-type underground structure that is suspended from the ground within the tail excavator 22 .

〔発明の効果〕〔Effect of the invention〕

以上述べたように本発明のオープンシールド掘
進機は、地中に前進させる上面を開口した掘進機
を分割して個々の掘進機の長さを短くして上下左
右の方向修正を容易にし、特にテール掘進機内に
ジヤツキ設備を配設しないので、テール掘進機の
長さをジヤツキ長さとそのストローク長さ分を短
くできるので方向修正が容易になる利点ががあ
る。
As described above, the open shield excavator of the present invention divides the excavator with an open top to advance into the ground, shortens the length of each excavator, and facilitates vertical and horizontal direction correction. Since no jacking equipment is provided in the tail tunneling machine, the length of the tail tunneling machine can be shortened by the length of the jacking and its stroke length, which has the advantage of facilitating direction correction.

さらに、切羽土砂の排土は地上の掘削機により
フロント掘進機上面に排土できるので排土が容易
で工期を短縮でき、経済的である。又、掘進機を
前後に短く分割して前進させることにより個々の
掘進機の前進設備は小さくてよく、経済的であ
り、且つ巨大な前進反力設備を必要とせず、さら
に経済的である。
Furthermore, the earth and sand from the face can be removed onto the top surface of the front excavator using an excavator on the ground, making it easy to remove the earth, shorten the construction period, and be economical. Further, by dividing the tunneling machine into short sections in the front and back and moving it forward, the advancement equipment for each tunneling machine can be small, which is economical, and there is no need for huge forward reaction force equipment, which is even more economical.

また、このようにテール掘進機の長さを全体と
しては短くしてカーブ等の動作が容易にできるよ
うにするとともに、その後方に伸長部を形成し、
これで埋戻覆土する土砂の侵入や掘進機後部の側
方土砂の崩壊をも防ぐように配慮できるものであ
る。
In addition, the length of the tail excavator is shortened as a whole to make it easier to perform movements such as curves, and an extension part is formed at the rear of the tail excavator.
This can be done to prevent the intrusion of backfilling earth and sand and the collapse of lateral earth and sand at the rear of the excavator.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明のオープンシールド掘進機の実
施例を示す正面図、第2図は同上正面図、第3図
は同上他の実施例を示す側面図である。 1…地中構造物、2…掘進機、21…フロント
掘進機、22…テール掘進機、31…上部側板、3
…伸長部、6…ジヤツキ前進設備、7…けん引
式ジヤツキ設備、8…連結部材、9…定着具、1
1…土留設備、22…クラムシエル、23…埋戻
覆土。
FIG. 1 is a front view showing an embodiment of the open shield excavator of the present invention, FIG. 2 is a front view of the same, and FIG. 3 is a side view showing another embodiment of the same. DESCRIPTION OF SYMBOLS 1... Underground structure, 2... Excavation machine, 2 1 ... Front excavation machine, 2 2 ... Tail excavation machine, 3 1 ... Upper side plate, 3
2 ... Extension part, 6... Jacket advancement equipment, 7... Traction type jacking equipment, 8... Connecting member, 9... Fixing tool, 1
1...Earth retaining equipment, 22...Cram shell, 23...Backfilling and covering.

Claims (1)

【特許請求の範囲】[Claims] 1 上部に開口部を有するフロント掘進機とテー
ル掘進機とを摺動自在に嵌合させ、フロント掘進
機には後方に向けてジヤツキ前進設備を配設する
とともに、両掘進機間に連結部材と連結部材へ着
脱自在な定着具及びけん引ジヤツキ設備よりなる
けん引設備を配設し、テール掘進機の側板上部を
後方に伸長させたことを特徴とするオープンシー
ルド掘進機。
1 A front tunneling machine and a tail tunneling machine having an opening at the top are slidably fitted together, and the front tunneling machine is provided with a jack advance device facing rearward, and a connecting member and a connecting member are installed between the two tunneling machines. An open shield excavator characterized in that a traction device consisting of a detachable fixing device and a traction jack device is disposed on a connecting member, and the upper side plate of the tail excavator is extended rearward.
JP29870185A 1985-12-28 1985-12-28 Open-shielding excavator Granted JPS61165494A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP29870185A JPS61165494A (en) 1985-12-28 1985-12-28 Open-shielding excavator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP29870185A JPS61165494A (en) 1985-12-28 1985-12-28 Open-shielding excavator

Publications (2)

Publication Number Publication Date
JPS61165494A JPS61165494A (en) 1986-07-26
JPS6349039B2 true JPS6349039B2 (en) 1988-10-03

Family

ID=17863163

Family Applications (1)

Application Number Title Priority Date Filing Date
JP29870185A Granted JPS61165494A (en) 1985-12-28 1985-12-28 Open-shielding excavator

Country Status (1)

Country Link
JP (1) JPS61165494A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0359219A (en) * 1989-07-25 1991-03-14 Aisawa Kogyo Kk Open shield machine capable of burying two stage up and down
JP7128233B2 (en) * 2020-06-12 2022-08-30 誠 植村 open shield machine

Also Published As

Publication number Publication date
JPS61165494A (en) 1986-07-26

Similar Documents

Publication Publication Date Title
JP2022026691A (en) Press bar for open shield construction method
JPS6349039B2 (en)
JPH0462230A (en) Setting construction for underground structure
JPH0357248B2 (en)
JP2648051B2 (en) Construction method of arch shell in tunnel precedent
JPH0243494A (en) Shield tunneling method and shield tunneling excavator
JP2005307544A (en) Laying method and removal method for covering plate for open shield method
JP2668648B2 (en) Construction method of underground structure and starting pit used for it
JP2657731B2 (en) Open shield method and open shield machine
JPS6154918B2 (en)
JP6989483B2 (en) Open shield machine removal method
JP2759445B2 (en) How to build underground structures
JPH0524287B2 (en)
JPH08338022A (en) Method for movable type cut and cover earth-retaining construction and device therefor
JPH1046579A (en) Earth retaining work execution device and earth retaining method
JPH07180485A (en) Construction method and construction device for underground structure
JPS6117102Y2 (en)
JPH0357249B2 (en)
JP2657732B2 (en) Open shield method and open shield machine
JP2573697Y2 (en) Shield machine
JPS621075B2 (en)
JPH0332658B2 (en)
JPH0988480A (en) Combined box culvert body for open shield tunnelling method
JPS584027A (en) Method and apparatus for constructing take-down type sheathing wall
JP2553002B2 (en) Pile press-in / pull-out machine