JPS63316626A - Method of editing record of consumer power interruption - Google Patents

Method of editing record of consumer power interruption

Info

Publication number
JPS63316626A
JPS63316626A JP62152842A JP15284287A JPS63316626A JP S63316626 A JPS63316626 A JP S63316626A JP 62152842 A JP62152842 A JP 62152842A JP 15284287 A JP15284287 A JP 15284287A JP S63316626 A JPS63316626 A JP S63316626A
Authority
JP
Japan
Prior art keywords
transmission line
power interruption
time
state
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP62152842A
Other languages
Japanese (ja)
Other versions
JP2599719B2 (en
Inventor
Tsugio Takeda
武田 次男
Motoo Tsuchimochi
土持 元男
Mamoru Ho
方 守
Masahiro Tanaka
正博 田中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Hitachi Ltd
Mitsubishi Electric Corp
Tokyo Electric Power Co Holdings Inc
Original Assignee
Toshiba Corp
Tokyo Electric Power Co Inc
Hitachi Ltd
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Tokyo Electric Power Co Inc, Hitachi Ltd, Mitsubishi Electric Corp filed Critical Toshiba Corp
Priority to JP62152842A priority Critical patent/JP2599719B2/en
Publication of JPS63316626A publication Critical patent/JPS63316626A/en
Application granted granted Critical
Publication of JP2599719B2 publication Critical patent/JP2599719B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PURPOSE:To facilitate accurate edition of consumer power interruption time and the like, by logically judging power interruption time and charging time based on charging/interrupting condition of transmission line, when open/close information of a combined transmission line can not be obtained, then editing aforementioned times. CONSTITUTION:In a combination transmission system where a plurality of transmission lines 4-1, 4-2 are connected through switchgears (disconnector 2-1, circuit breaker 3-1) with a common bus 1-1, open/close condition of the switchgear is taken in real time so as to edit power interruption time and charging time of consumer. When there is an interval where open/close condition data can not be obtained, charging/interrupting condition of transmission line and edited power interruption time are retrieved so as to judge the power interruption time of consumer logically and edit the power interruption time. Consequently, power interruption time of consumer can be edit accurately even when the combined transmission line is interrupted temporarily.

Description

【発明の詳細な説明】 この発明は、電力系統における需要家の停止実績データ
を編集する方法に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for editing customer outage record data in an electric power system.

従来、この釉の方法は、そnぞれ開閉器を介して共通の
母線に接続された送電線(以下、このような送電線を抱
合せ送電線という。ンエリ給電さnる需要家の停電時刻
及び充電時刻をリアル・タイムで編集する場合に、開閉
器の開閉状態(データ)がリアル・タイムで得ら扛ない
場合は、操作終了時点で当該開閉器の状態を操作終了後
の開閉状態に変え、当該抱合せ送電線の元停電状態を判
断して需要家の停止実績の編集を行なうことを必要とし
た。
Conventionally, this glazing method was applied to transmission lines connected to a common bus through switches (hereinafter, such transmission lines are referred to as combined transmission lines). When editing the charging time and charging time in real time, if the open/closed status (data) of the switch cannot be obtained in real time, the status of the switch will be changed to the open/closed status after the operation is completed at the end of the operation. It became necessary to edit the customer's outage history by determining the original power outage status of the tied transmission line.

第1図を用いてこの=うな従来方法を説明する。This conventional method will be explained using FIG.

第1図は、電力系統における抱合せ送電線の接続図を示
し、1−1〜1−3は母線、2−1〜2−5は断路器、
3−1〜3−3は遮断器、4−1〜4−2は送電線を表
わしている。このような電力系統において、送電線4−
1を作業停止するための停止操作手順は第2図に示すよ
うな手順で実行されす止操作手扉イI/cおいて、aは
操作手順開始前の状態、bは遮断器3−1を開にした後
の状態。
Figure 1 shows a connection diagram of combined power transmission lines in the power system, with 1-1 to 1-3 representing bus bars, 2-1 to 2-5 representing disconnectors,
3-1 to 3-3 represent circuit breakers, and 4-1 to 4-2 represent power transmission lines. In such a power system, the power transmission line 4-
The stop operation procedure for stopping operation of circuit breaker 3-1 is executed as shown in Fig. 2. In the stop operation door I/c, a is the state before the operation procedure starts, and b is the state before the start of the operation procedure. The state after opening.

Cは断路器2〜2を開にした後の状態、dは遮断器3−
1を閉にしに後の状態、eは操作が終了したときの状態
を表わしている。第2図口は送電線4−1の使用操作手
順を示す。fは操作開始前の状態1gは趣断器3−1を
開にした状態、hに断路器2−2を閉にした状態、iは
遮断器3−1を閉にした状態、jは操作が終了したとき
の状態を表わしている。図中、○1口Cd閉状態を示し
C is the state after opening the circuit breaker 2-2, d is the state after opening the circuit breaker 3-
1 represents the state after closing, and e represents the state when the operation is completed. Figure 2 shows the procedure for using the power transmission line 4-1. f is the state before the start of operation; 1g is the state in which the circuit breaker 3-1 is open; h is the state in which the circuit breaker 2-2 is closed; i is the state in which the circuit breaker 3-1 is closed; and j is the state in which the circuit breaker 3-1 is closed. It represents the state when the process ends. In the figure, ○1 indicates the Cd closed state.

X印は開状態を示す。The X mark indicates an open state.

第3図は、送電線4−1及び4−2の元停電状態を示す
タイム・チャートである。
FIG. 3 is a time chart showing the original power outage state of the power transmission lines 4-1 and 4-2.

1ず、断路器2−2の開閉状態がオン・ライン情報とし
て検出できない場合を第3図a、bを参照して説明する
。断路器2−2は第3図口に示す工うに、第2図の状態
cにおいて開となるが、その開状態は第3図すに示すよ
うに状態eになって初めて検出さn、し刀1も停止操作
中に停電した送電線4−1は、状態dにおいて一時的に
光電したと検出さnる。なお、図中、ハイ・レベルは停
電状態を示し、ロー・レベルは充電状態を示す。
First, a case where the open/closed state of the disconnector 2-2 cannot be detected as online information will be described with reference to FIGS. 3a and 3b. The disconnector 2-2 is opened in state c of FIG. 2, as shown in the opening of FIG. 3, but the open state is not detected until it is in state e, as shown in FIG. The power transmission line 4-1, which experienced a power outage during the stop operation of the sword 1, is detected to have been temporarily photoelectronized in state d. In addition, in the figure, a high level indicates a power outage state, and a low level indicates a charging state.

矢に、断路器2−2.J断器3−1の開閉状態がオン・
ライン情報として検出できない場合を第3図dを参照し
て説明する。断路器2−2Fi第2図の状態Cにおいて
開となるが、その開状態は第3図dK示″jように状態
eで初めて検出さnる。
On the arrow, disconnector 2-2. The open/close state of J disconnector 3-1 is on/off.
A case where line information cannot be detected will be explained with reference to FIG. 3d. The disconnector 2-2Fi is opened in state C in FIG. 2, but the open state is first detected in state e as shown in FIG. 3 dK.

このため、第2図イに示すように状態b + cにおい
て送電線4−2が一時的に停電してもこれを検出できな
い。1に、第2図口に示すように、断路器2−2は状態
りで閉状態となるが、これは第3図dに示す工うに状態
jで初めて検出さnる。このため、状態g、hにおいて
一時的に送電線4−2が一時的に停電してもこれを検出
できない。
Therefore, even if the power transmission line 4-2 temporarily loses power in state b+c as shown in FIG. 2A, this cannot be detected. 1, as shown in Figure 2, the disconnector 2-2 is in the closed state, but this is first detected in state j as shown in Figure 3d. Therefore, even if the power transmission line 4-2 temporarily loses power in states g and h, this cannot be detected.

この工うに従来編集方法は、開閉器の開閉情報をオン・
ラインで得ら扛ない場合に1度の停電を2度の停電とし
て編集したり、停電を検出できずに停止実績の編集を行
わないなど、不正確となる欠点があった。
This conventional editing method turns on/off information of the switch.
There were drawbacks that resulted in inaccuracies, such as editing one power outage as two power outages when no power was detected on the line, or not editing outage results because a power outage could not be detected.

この発明は、上記のような従来のものの欠点を除去する
ためになさnたもので、抱合せ送電線の光停電状態及び
既に編集済の停止実績を検索することにエリ、一時的力
1つ従属的に停電する需要家の受電線の停電時刻、充電
時刻を正確に@集できる編集方法を提供することを目的
としている。
This invention was made in order to eliminate the drawbacks of the conventional ones as described above. The purpose of this invention is to provide an editing method that can accurately collect power outage times and charging times for power receiving lines of customers experiencing power outages.

以下、この発明の一実施例を第4図に示すフローチャー
トにエリ説明する。第4図において、処理P1は抱合せ
送電線の元停電状態の変化を検出する。判断D1け、光
停電状態が変化した抱合せ送電線に接続する需要家の充
電時刻は元停電状態の変化検出時刻刀)ら一定時間以内
か否かを判定する。処理P2は判断D1でイエスとなっ
た結果の処理であり、需要家の停止実績を修正する。判
断D2は、光停電状態が変化した送電線の抱合せの相手
側送電線の停電状態を判定するものである。
An embodiment of the present invention will be explained below with reference to a flowchart shown in FIG. In FIG. 4, process P1 detects a change in the original power outage state of the combined power transmission line. In judgment D1, it is determined whether the charging time of the customer connected to the combined transmission line in which the optical power outage state has changed is within a certain period of time from the time when the change in the original power outage state was detected. Process P2 is a process resulting from a YES decision in D1, and corrects the customer's outage history. Judgment D2 is for determining the power outage state of the power transmission line on the other side to which the power transmission line whose optical power outage state has changed is connected.

処理3は判断D2がイエスとなったときに抱合せの相手
側の送電線に接続する需要メの停止実績を一律に編集す
る。処理4は判断D2がノーとなったときに抱合せの相
手側送電線に接続する需要家の停止実績を一律に編集す
る。
Process 3 uniformly edits the outage records of the demand lines connected to the power transmission line of the other party when the decision D2 is YES. Processing 4 uniformly edits the outage records of consumers connected to the other party's power transmission line when the decision D2 is negative.

久に、動作の流nに従って第4図を説明する。4 will now be explained according to the flow of operation.

処理P1において、抱合せ送電線の元停電状態の変化を
検出する。ここで、検出対象の設備は、第1図の送電線
4−1及び4−2である。判断D1において、処理P1
で元停電状態の変化が検出さn7を送電線に接続さnる
需要家の充電時刻は、光停電状態の変化を検出した時刻
から一定時間内か合力)を判定し、イエス(ト)の場合
は処理P2に入る。
In process P1, a change in the original power outage state of the combined power transmission line is detected. Here, the equipment to be detected is the power transmission lines 4-1 and 4-2 in FIG. In judgment D1, processing P1
When a change in the original power outage state is detected at If so, the process goes to P2.

ノー軸の場合は判断D2に入る。処理P2では、処理P
1で検出した充停電状態が変化した送電線に接続する需
要家の既に編集済の停止時刻及び充電時刻のうち、充電
時刻を未編集状態とすることにエリ、当該需要家が継続
して停止中とする。
In the case of no axis, judgment D2 is entered. In process P2, process P
Of the already edited outage times and charging times of the customer connected to the transmission line whose charging/outage status detected in step 1 has changed, it is possible to leave the charging time in an unedited state, and if the customer continues to be out of service. Medium.

判断D2は、処理P1で検出した光停電状態が変化した
送電線の抱合せの相手側送電線(例えば。
Judgment D2 is based on the power transmission line on the other side of the power transmission line (for example, the power transmission line that is connected to the power transmission line in which the optical power outage state detected in process P1 has changed).

第1図における送電線4−11C対する送電線4−2)
が停電状態か否かを判定する。イエス(Y)′のときは
シーフェンスは終了となり、ノーのとき即ち充電中のと
きは処理P1で検出し7?:元停電状態が変化した送電
線は停電状態か合力)を判断し、イエス(Y)のときは
処理P3に進み、ノー(N)のときは処理P4に進む。
Transmission line 4-2) for power transmission line 4-11C in Figure 1
Determine whether or not there is a power outage. If YES (Y)', Sea Fence ends, and if NO, that is, charging is in progress, it is detected in process P1 and 7? : It is determined whether the power transmission line whose original power outage state has changed is in a power outage state (or resultant power), and if yes (Y), proceed to process P3, and if no (N), proceed to process P4.

穴だし、抱合せ送電線の相方の送電線が同時に光電した
ときもシーフェンスは終了となる。
Sea fencing is also terminated when a hole is exposed or the transmission line on the other side of a tying transmission line is photovoltaic at the same time.

処理P3は、抱合せの相手側送電線が停電検出時刻より
一足時間、停電し7(%のに対する処理であり、停電時
刻が送電線の停電検出時刻、充電時刻が停電時刻エリ一
定時間後として当該送電線に接続する需要家の停止実績
を編集する。
Process P3 is a process for when the transmission line on the other side of the tie is out of power for one hour after the power outage detection time (7%). Edit the outage history of customers connected to the power transmission line.

処理P4は、抱合せの相手側送電線が充電検出時刻エリ
一定時間前から当該充電検出時刻1での間、停電したも
のに対する処理であり、停止時刻を送電線の充電時刻エ
リ一定時間前、充電時刻を送電線の充電時刻として当該
送電線に接続する需要家の停止実績を編集する。ただし
、当該需要家の停止実績が既に編集さnている場合は、
当該充電時刻が、送電線の充電時刻から一定時間内の時
Process P4 is a process for a power outage in the transmission line on the other side of the tie from a certain time before the charging detection time to the charging detection time 1, and the stop time is set to a certain time before the charging time of the transmission line. Edit the outage history of customers connected to the transmission line using the time as the charging time of the transmission line. However, if the customer's outage history has already been edited,
When the relevant charging time is within a certain period of time from the charging time of the power transmission line.

当該需要家の停止実績を新しく編集した停電時刻。The power outage time when the customer's outage history was newly edited.

充電時刻に修正する。Correct the charging time.

本処理にエリ補正される抱合せ送電線の元停電状態のタ
イム・チャートを第3図Cueに示す。
A time chart of the original power outage state of the combined power transmission line that is corrected in this process is shown in FIG. 3 (Cue).

以上の工うに、この発明に工nば抱合せ送電線の作業停
止操作に工り一時的かつ従属的に停電することがあって
も需要家の停止実績を正確に編集できる効果がある。
As described above, the present invention has the effect that even if there is a temporary and dependent power outage due to the work stoppage operation of the combined power transmission line, the customer's outage history can be edited accurately.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は抱合せ送電線の系統図、第2図は抱合せ送電線
の作業停止操作及び使用操作時の開閉器の操作手順を示
す図、第3図は抱合せ送電線の作業停止に伴う抱合せ送
電線の光停電状態のタイム・チャート、第4図は本発明
の方法による手順のフロー・チャートである。
Figure 1 is a system diagram of the tied power transmission line, Figure 2 is a diagram showing the operation procedure of the switch when the tied power transmission line is stopped and used, and Figure 3 is the tied transmission line diagram when the tied power transmission line is stopped. FIG. 4 is a time chart of a photointerruption state of a power line, and is a flow chart of the procedure according to the method of the present invention.

Claims (1)

【特許請求の範囲】[Claims] 特定の母線に接続された開閉器と、上記母線に上記開閉
器を介してそれぞれ接続される複数の送電線との開閉状
態をリアル・タイムに入力して上記各送電線を介して受
電している各需要家の停電時刻及び充電時刻を編集する
と共に、上記開閉状態が得られない期間があるときは上
記送電線の充停電状態に基づき当該期間における上記停
電時刻及び充電時刻を論理的に判断して編集するように
した需要家停止実績の編集方法。
The system inputs in real time the open/close states of a switch connected to a specific bus and multiple power transmission lines connected to the bus through the switches, and receives power through each of the transmission lines. In addition to editing the power outage time and charging time for each customer, if there is a period in which the above-mentioned open/close state cannot be obtained, logically determine the power outage time and charging time for that period based on the charging/outage state of the power transmission line. How to edit customer outage records.
JP62152842A 1987-06-19 1987-06-19 How to edit customer stop record Expired - Lifetime JP2599719B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62152842A JP2599719B2 (en) 1987-06-19 1987-06-19 How to edit customer stop record

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62152842A JP2599719B2 (en) 1987-06-19 1987-06-19 How to edit customer stop record

Publications (2)

Publication Number Publication Date
JPS63316626A true JPS63316626A (en) 1988-12-23
JP2599719B2 JP2599719B2 (en) 1997-04-16

Family

ID=15549321

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62152842A Expired - Lifetime JP2599719B2 (en) 1987-06-19 1987-06-19 How to edit customer stop record

Country Status (1)

Country Link
JP (1) JP2599719B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7043452B2 (en) * 2002-05-15 2006-05-09 Neil Barry Rothfarb Lock-and-key consumer billing data protection system having data encryption capability
US8521647B2 (en) 2002-03-26 2013-08-27 Nebard Software Foundation L.L.C. Lock-and-key consumer billing data protection for telemarketing

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58172931A (en) * 1982-03-31 1983-10-11 東京電力株式会社 Power distribution system monitoring system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58172931A (en) * 1982-03-31 1983-10-11 東京電力株式会社 Power distribution system monitoring system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8521647B2 (en) 2002-03-26 2013-08-27 Nebard Software Foundation L.L.C. Lock-and-key consumer billing data protection for telemarketing
US7043452B2 (en) * 2002-05-15 2006-05-09 Neil Barry Rothfarb Lock-and-key consumer billing data protection system having data encryption capability
USRE43845E1 (en) 2002-05-15 2012-12-04 Nebarb Software Foundation L.L.C. Lock-and-key consumer billing data protection system having data encryption capability

Also Published As

Publication number Publication date
JP2599719B2 (en) 1997-04-16

Similar Documents

Publication Publication Date Title
US11128127B2 (en) FLISR without communication
US20080224546A1 (en) Method to analyze system reconfiguration for automated isolation of disturbances to the power distribution system
CN108206522A (en) A kind of status of electric power monitoring method and system
Billinton et al. Reliability evaluation in distribution and transmission systems
JPS63316626A (en) Method of editing record of consumer power interruption
KR100524371B1 (en) Recloser for separating failure section from distribution line and method for operating the secloser, medium recording program for operating the method
JPH1075525A (en) Leak detecting/removing method
CN113702736B (en) Method, device and system for scheduled inspection of spare power automatic switching device and computer equipment
CN104852360B (en) Mixed type line fault processing method and device
CN114024367B (en) Low-voltage area fault processing method and equipment based on edge calculation
JPH067731B2 (en) Automatic creation method of system operation command procedure in electric power system
Millner Fundamentals of Main Tie Main schemes and state machines
JP3227761B2 (en) Temporary procedure pre-created automatic recovery method
JP2001016766A (en) Power system failure section decision method
JPH0327716A (en) Method and apparatus for reclosing of transmission system
JP2001078354A (en) Fault determination method for power distribution wire
JP2623091B2 (en) Automatic recovery system in case of power system accident
JPS5937844A (en) Switch operation order deciding system for power system
JP2577394B2 (en) Power system accident equipment judgment device
JPH0740771B2 (en) Automatic judgment equipment for blackout facilities
CN113690898A (en) Anti-error method and device for identifying load line hanging bus under low-frequency load shedding
Koner et al. A Software solution for distribution sags and reliability
CN117175520A (en) Micro-grid current and voltage protection method and system adopting grid side short-circuit current constraint
JPH0236727A (en) High speed separation/recovery system of distribution line fault
JP2825640B2 (en) Distribution system control system

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080109

Year of fee payment: 11