JPS63258377A - Device for unwinding punch winding - Google Patents
Device for unwinding punch windingInfo
- Publication number
- JPS63258377A JPS63258377A JP9101987A JP9101987A JPS63258377A JP S63258377 A JPS63258377 A JP S63258377A JP 9101987 A JP9101987 A JP 9101987A JP 9101987 A JP9101987 A JP 9101987A JP S63258377 A JPS63258377 A JP S63258377A
- Authority
- JP
- Japan
- Prior art keywords
- thread
- winding
- bobbin
- bunch
- roller
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004804 winding Methods 0.000 title claims abstract description 101
- 238000002360 preparation method Methods 0.000 claims abstract description 25
- 238000000034 method Methods 0.000 abstract description 2
- 230000006835 compression Effects 0.000 description 17
- 238000007906 compression Methods 0.000 description 17
- 238000003825 pressing Methods 0.000 description 10
- 238000003780 insertion Methods 0.000 description 3
- 230000037431 insertion Effects 0.000 description 3
- 238000012546 transfer Methods 0.000 description 3
- 241000257465 Echinoidea Species 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000009987 spinning Methods 0.000 description 1
Landscapes
- Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
- Spinning Or Twisting Of Yarns (AREA)
Abstract
Description
【発明の詳細な説明】
[産業上の利用分野]
本発明は、ボビン端にバンチ巻きを行なったのち本巻き
を行なって形成したパッケージのバンチ巻き解除装置に
関するものである。DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a bunch winding release device for a package formed by performing bunch winding on the end of a bobbin and then performing main winding.
[従来の技術]
紡糸巻取機において、連続的に紡出される糸を巻取り、
@%きになったパッケージは、所望の次]二稈へ搬送さ
れるか、あるいは製品として出荷される。[Prior art] In a take-up machine, a yarn that is continuously spun is wound up,
The finished package is transported to the desired next stage or shipped as a product.
このパッケージは、第14図、第゛15図に示すように
ボビンBの端部に、糸の始端をバンチ巻ぎ1したのち、
ボビンBに本巻きを行なってパッケージPとし、さらに
そのパッケージPの外周に糸を所定長ざ棒巻き2したの
ち製品として出荷している。In this package, as shown in Figs. 14 and 15, after the starting end of the thread is bunch-wound around the end of the bobbin B,
The bobbin B is fully wound to form a package P, and a predetermined length of thread is wound 2 around the outer periphery of the package P before being shipped as a product.
[発明が解決しようとする問題点]
ところで、ボビンBにバンチ巻き1を施すには、ボビン
Bの周方向にスリン1〜を形成し、そのスリットに糸の
始端を掛は止めたのち、その糸をボビンBの端部に巻き
付けてバンチ巻き1を行なったのち、本巻きを行なうよ
うにしている。[Problems to be Solved by the Invention] By the way, in order to perform bunch winding 1 on the bobbin B, it is necessary to form a sling 1 in the circumferential direction of the bobbin B, and after hooking and stopping the starting end of the thread in the slit, After winding the thread around the end of the bobbin B and performing bunch winding 1, the main winding is performed.
しかしながら、このバンチ巻きの糸の始端を、他のパッ
ケージと糸結びを行なうべく取り出そうとしても、上述
のように糸の始端はバンチ巻きの最下層に位置し、しか
もスリット内に強固に入っている場合には、その始端を
容易に取り出すことがで、きない。However, even if you try to take out the starting end of this bunch-wound thread in order to tie it to another package, the starting end of the thread will be located at the bottom layer of the bunch-wound as described above, and will be firmly inside the slit. If there is, the starting end cannot be easily removed.
本発明は、パッケージのボビン端に形成したバンチ巻き
を解除できるバンチ巻き解除装置を提供することを目的
とする。SUMMARY OF THE INVENTION An object of the present invention is to provide a bunch winding release device that can release bunch winding formed on the bobbin end of a package.
[問題点を解決するための手段及び作用]本発明は、上
記の目的を達成するために、ボビン端にバンチ巻きを施
すと共に本巻きを行なったパッケージのバンチ巻き解除
装置において、バンチ巻きが施されたボビンの周面と当
接しながらそのバンチ巻きの巻方向と逆方向に公転する
と共に、バンチ巻きから本巻きに移るニップ点近くのバ
ンチ巻きの糸から順次パッケージ側に糸を移動しその下
層の糸の始端をボビン表面に露出させるためのバンチ巻
ぎ解除準備ローラと、バンチ巻きの糸の始端近くのボビ
ンと当接しながらバンチ巻き方向に公転され、その始端
側の糸を緩めながら糸を引き寄せるバンチ巻き解除ロー
ラと、その引き寄せた糸を吸引してバンチ巻き糸を除去
する糸吸引手段とを備えたもので、先ずバンチ巻き解除
ローラでバンチ巻きの最外層の糸をパッケージ側に移動
させることで、下層の糸をボビン表面に露出させること
でバンチ巻きの糸の始端が取り出しやすくなり、バンチ
巻き解除ローラでバンチ巻ぎ方向に公転させながらその
移動した糸を緩めると共に、糸吸引手段で緩めた糸を吸
引することでバンチ巻きを解除できるようにしたもので
ある。[Means and operations for solving the problems] In order to achieve the above object, the present invention provides a bunch winding release device for a package in which bunch winding is performed on the bobbin end and main winding is performed. The thread revolves in the direction opposite to the winding direction of the bunch winding while coming into contact with the circumferential surface of the bobbin, and the thread is sequentially moved from the bunch winding yarn near the nip point where it changes from bunch winding to main winding to the package side, and the lower layer is moved to the package side. A bunch winding release preparation roller is used to expose the starting end of the thread on the bobbin surface, and the roller revolves in the bunch winding direction while contacting the bobbin near the starting end of the bunch-wound thread, and unwinds the thread while loosening the thread on the starting end side. It is equipped with a bunch winding release roller that pulls the yarn and a thread suction means that removes the bunched yarn by suctioning the pulled yarn. First, the bunch winding release roller moves the outermost layer of the bunched yarn to the package side. This exposes the lower layer of yarn to the bobbin surface, making it easier to take out the starting end of the bunch-wound yarn.The bunch-winding release roller rotates the yarn in the bunch-winding direction and loosens the moved yarn, and the yarn suction means removes the yarn. Bunch winding can be released by suctioning the loosened thread.
[実施例]
以下、本発明のバンチ巻き解除装置の好適一実施例を添
付図面に基づいて説明する。[Embodiment] Hereinafter, a preferred embodiment of the bunch winding release device of the present invention will be described based on the accompanying drawings.
先ず、パッケージは第14図、第15図に示した状態か
ら棒巻き2が解除され、王のパッケージPの外周に棒巻
き2の除去後の本巻きの糸で糸結びが行なわれ、またバ
ンチ巻き1が除去されたのち、そのバンチ巻ぎ1から本
巻きに移るニップ点Nから所定の長さの糸がボビンBの
端部に巻き付けられるように処理される。First, the package is in the state shown in FIGS. 14 and 15, and the bar winding 2 is released, and a yarn knot is tied around the outer periphery of the main package P with the thread of the main winding after the bar winding 2 has been removed. After the winding 1 is removed, a predetermined length of yarn is wound around the end of the bobbin B from the nip point N where the bunch winding 1 is transferred to the main winding.
このパッケージの糸処理装置を第12図、第13図によ
り説明する。The yarn processing device of this package will be explained with reference to FIGS. 12 and 13.
第12図、第13図において、ローラコンベアなどの移
送路3上を移送されるベグ4付のトレイ5に・は、紡糸
巻取機で玉揚されたパッケージPが挿着支持されて移送
され、上記移送路3の途次において、トレイ即ちパッケ
ージPが3位置P1゜P2 、P3に位置決めされて、
各位置において、後述する糸端の処理が施される。上記
パッケージの3位置を第12図の右から順に第1ステー
ジST1、第2ステージST2、第3ステージST3と
称す。In FIGS. 12 and 13, a package P doffed by a spinning winder is inserted and supported on a tray 5 with a bag 4 that is transferred on a transfer path 3 such as a roller conveyor. , in the middle of the transfer path 3, trays or packages P are positioned at three positions P1, P2, P3,
At each position, the yarn ends are processed to be described later. The three positions of the package are referred to as a first stage ST1, a second stage ST2, and a third stage ST3 in order from the right in FIG. 12.
上記第1ステージST1には、パッケージの最外層の糸
端をパッケージの周面に巻付けて固定するための糸結び
装置6が設置される。第2ステージST2には、バンチ
巻き糸の解除装置7、第3ステージST3には糸端の巻
付は固定装置8が設置される。The first stage ST1 is provided with a thread knotting device 6 for wrapping and fixing the thread end of the outermost layer of the package around the circumferential surface of the package. The second stage ST2 is provided with a bunch winding yarn release device 7, and the third stage ST3 is provided with a yarn end winding fixing device 8.
第1ステージST1においては、糸結び装置6による糸
結び動作と共にバンチ巻き解除の準備がなされ、また第
2ステージST2においては、そのバンチ巻き解除が完
了される。この第1及び第2ステージST1 、Sr1
において本発明のバンチ巻き解除装置が用いられる。In the first stage ST1, the thread tying device 6 performs a thread tying operation and preparations are made to release the bunch winding, and in the second stage ST2, the bunch winding release is completed. These first and second stages ST1, Sr1
The bunch unwinding device of the present invention is used in the following.
先ず、第1ステージST1でのバンチ巻き解除の準備を
行なう装置を第1図、第2図、第3図により説明する。First, a device for preparing for bunch winding release at the first stage ST1 will be explained with reference to FIGS. 1, 2, and 3.
第1図においいて、10はスライドフレームで、第12
図に示すように本体フレーム9に移動自在に設けられ、
図示の点線の待機位置から、第1図に示したパッケージ
P1の支持位置まで往復移動し得るようになっている。In Fig. 1, 10 is a slide frame, and 12th
As shown in the figure, it is movably provided on the main body frame 9,
It is designed to be able to reciprocate from the standby position indicated by the dotted line in the figure to the support position for the package P1 shown in FIG.
このスライドフレーム10には、ボビンB1を支持する
ための支持体11が設けられる。この支持体11の詳細
を第1図、第3図により説明する。This slide frame 10 is provided with a support body 11 for supporting the bobbin B1. Details of this support 11 will be explained with reference to FIGS. 1 and 3.
スライドフレーム゛10を貫通して中空シャフト12が
軸受13により回転自在に支持される。中空シャフト1
2の孔内にはロッド14が、その軸方向に移動可能に嵌
挿され、そのパッケージP1側の先端に設けた円板15
には、第1可動チャック体16が、ねじ固定17され、
その後方には、第2可動チヤツク休18が、中空シャフ
ト12にスライド自在に挿着され、さらにその後方に固
定チャック体1つが、中空シャフト12に固定されて設
゛けられる。A hollow shaft 12 is rotatably supported by a bearing 13 passing through the slide frame 10. hollow shaft 1
A rod 14 is fitted into the hole 2 so as to be movable in the axial direction, and a disk 15 is provided at the tip of the rod 14 on the package P1 side.
A first movable chuck body 16 is fixed with a screw 17,
Behind that, a second movable chuck rest 18 is slidably inserted into the hollow shaft 12, and further behind it, one fixed chuck body is provided fixed to the hollow shaft 12.
第1可動ヂヤツク体15と第2可動チャック体18とは
、圧縮スプリング20により互いに離れるよう付勢され
、また第2可動チャック体18と固定チャック体19と
は圧縮スプリング21により第2可動チャック体18が
固定チャック体19に対して離れるよう付勢される。The first movable chuck body 15 and the second movable chuck body 18 are biased apart from each other by a compression spring 20, and the second movable chuck body 18 and the fixed chuck body 19 are biased apart from each other by a compression spring 21. 18 is urged away from the fixed chuck body 19.
他方、ロッド14の後端は、中空シャフト12の後端及
びスライドフレーム10から突出し、その後端にナツト
体22が螺合され、そのナツト体22と中空シャフト1
2の後端間に、圧縮スプリング23が設けられる。この
圧縮スプリング23は、各チャック体16,18.19
間に設けられる圧縮スプリング20.21のバネ力より
も大きなバネ力を有し、従ってロッド14は、圧縮スプ
リング23により常時右方向に移動するように付勢され
、その状態で各チャック体16.18゜19が、第1図
に示したよう互いに密@するようにされる。On the other hand, the rear end of the rod 14 protrudes from the rear end of the hollow shaft 12 and the slide frame 10, and a nut body 22 is screwed onto the rear end, and the nut body 22 and the hollow shaft 1
A compression spring 23 is provided between the rear ends of the two. This compression spring 23 is connected to each chuck body 16, 18, 19.
The rod 14 has a spring force greater than that of the compression springs 20, 21 provided therebetween, so that the rod 14 is always urged to move rightward by the compression spring 23, and in this state, each chuck body 16. 18° and 19 are placed closely together as shown in FIG.
スライドフレーム10には、支持枠24を介してロッド
14を圧縮スプリング23のバネ力に抗して左方向に押
圧移動する把持用シリンダ25が設けられる。この把持
用シリンダ25は、そのピストンロッド26が伸縮して
ナツト体22と当接し、ロッド14を圧縮スプリング2
3に抗して左方向に移動する。The slide frame 10 is provided with a gripping cylinder 25 that presses and moves the rod 14 to the left through the support frame 24 against the spring force of the compression spring 23. This gripping cylinder 25 has a piston rod 26 that expands and contracts to come into contact with the nut body 22, and the rod 14 is compressed by the compression spring 22.
Move to the left against 3.
各チャック体16.18.19の隣接プる外周縁には傾
斜部が形成され、その間に谷部27が形成され、この谷
部27.27に、コイルスプリングをリング状に形成し
た押接リング28.28が嵌挿される。An inclined portion is formed on the outer peripheral edge of each chuck body 16, 18, 19 adjacent to each other, and a trough portion 27 is formed therebetween, and a pressing ring in which a coil spring is formed in a ring shape is provided in the trough portion 27.27. 28.28 is inserted.
押接リング28.28は、各チャック体16゜’18.
19が第1図に示すように互いに密着した際には、その
谷部27.27によりボビンB1の内径よりわずかに大
きくなる径に拡経し、また第2図に示すようチャック体
16.18.19が互いに離間すると、ボビンB1の内
径より小さくなるよう縮径する。The pressing ring 28.28 is attached to each chuck body 16°'18.
19 are brought into close contact with each other as shown in FIG. 1, the troughs 27.27 expand to a diameter slightly larger than the inner diameter of the bobbin B1, and the chuck body 16.18 as shown in FIG. .19 are separated from each other, the diameter is reduced to be smaller than the inner diameter of the bobbin B1.
固定チャック体1つの後方の中空シャフト12には、回
転筒体29が回転自在に設けられ、その回転・筒体29
の筒部29aに、一体にプーリー44が設けられ、その
プーリー44に連結された回転装@(図示せず)により
回転筒体29が中空シャフト12の廻りに回転する。A rotary cylinder body 29 is rotatably provided on the hollow shaft 12 at the rear of one fixed chuck body.
A pulley 44 is integrally provided in the cylindrical portion 29a, and the rotating cylindrical body 29 rotates around the hollow shaft 12 by a rotating device (not shown) connected to the pulley 44.
支持体11は、以上のように構成され、この支持体11
に圧接1段30をfF してバンチ巻きの解除の準備を
行なう解除準備ローラ31が設けられる。The support body 11 is constructed as described above, and this support body 11
A release preparation roller 31 is provided which prepares for releasing the bunch winding by fF the first stage 30 of pressure contact.
圧接手段30は、支持体11がボビンB1に挿入される
前には、第2図に示すように解除準備ローラ31がボビ
ンB1から離れるよう支持し、挿入後は第1図に示すよ
うボビンB1に圧接するように支持する。The pressing means 30 supports the release preparation roller 31 so as to separate from the bobbin B1 as shown in FIG. 2 before the support body 11 is inserted into the bobbin B1, and after the support body 11 is inserted into the bobbin B1 as shown in FIG. Support it so that it comes into pressure contact with the
一〇−
この圧接手段30及び解除準備ローラ31の構成を第1
〜3図により説明する。10- The configuration of this pressure contact means 30 and release preparation roller 31 is
This will be explained with reference to Figures.
支持体11の回転筒体29の筒部29aには、ブラケッ
ト32が取り付けられ、そのブラケット32にピン33
を介して逆り字状の揺動レバー34が連結される。A bracket 32 is attached to the cylindrical portion 29a of the rotating cylindrical body 29 of the support body 11, and a pin 33 is attached to the bracket 32.
An inverted-shaped swinging lever 34 is connected via.
この揺動レバー34には、準備ローラ31を回転自在に
支持する支持軸35が取り付けられる。A support shaft 35 that rotatably supports the preparation roller 31 is attached to the swing lever 34 .
準備ローラ31は、支持軸35に回転自在に、かつその
軸方向に沿って移動できるように設けられ、圧縮スプリ
ング36にて支持軸35の下端のス1〜ツバ片37と当
接するよう付勢されている。揺動レバ−340基部は、
作動ピン38に連結され、ロッド14の移動にて作動ビ
ン38が操作され揺動レバー34が揺動されるようにな
っている。The preparation roller 31 is provided on the support shaft 35 so as to be rotatable and movable along its axial direction, and is biased by a compression spring 36 so as to come into contact with the collar piece 37 at the lower end of the support shaft 35. has been done. The base of the swing lever 340 is
It is connected to an operating pin 38, and as the rod 14 moves, the operating pin 38 is operated and the swing lever 34 is swung.
すなわち、第3図に示すようにロッド14の先端の円板
15には複数本の位置決めピン39が設けられ、そのピ
ン3つが、第2可動ヂヤツク体18と固定チャック体’
I Oの孔4oを挿通して回転筒体29側に延びて設け
られ、他方、作動ビン−10=
38は、回転筒体29を挿通して円盤体41に連結され
る。この円盤体39は、圧縮スプリング42により常時
左方向に移動するよう付勢されると共に、他方の面が、
位置決めビン39の先端39aと当接し、その位置が規
制されると共に、位置決めビン39の先端39aと当接
しながら回転し得るようになっている。That is, as shown in FIG. 3, a plurality of positioning pins 39 are provided on the disc 15 at the tip of the rod 14, and three of the pins are connected to the second movable jack body 18 and the fixed chuck body'.
It is inserted through the hole 4o of the IO and extends toward the rotary cylinder 29. On the other hand, the operating bin 10=38 is inserted through the rotary cylinder 29 and connected to the disc body 41. This disk body 39 is always urged to move leftward by a compression spring 42, and the other surface is
It comes into contact with the tip 39a of the positioning bin 39, and its position is regulated, and can rotate while making contact with the tip 39a of the positioning bin 39.
ま・た、解除準備ローラ31を支持する支持軸35は、
第2図に示すように、その軸線35aがボビンB1の軸
芯Osに対してズした関係となるよう傾斜され、かつロ
ーラ31の回転方向43に対して先端側が下方に傾斜す
るように設けられている。Additionally, the support shaft 35 that supports the release preparation roller 31 is
As shown in FIG. 2, the roller 31 is provided so that its axis 35a is inclined with respect to the axis Os of the bobbin B1, and its tip side is inclined downward with respect to the rotational direction 43 of the roller 31. ing.
次にこの第1ステージST1でのバンチ巻き解除準備動
作を説明する。Next, the bunch winding release preparation operation at the first stage ST1 will be explained.
先ず第12図に示すようにパッケージPはペグ4に挿着
され、そのトレイ5が移送路3上を移送されて第1ステ
ージST1 (第13図)に位置される。First, as shown in FIG. 12, the package P is inserted into the peg 4, and its tray 5 is transferred on the transfer path 3 and positioned on the first stage ST1 (FIG. 13).
この状態でスライドフレーム10が図示の点線位置から
パッケージP側に移動し、その支持体11がパッケージ
PのボビンBを支持することとなる。In this state, the slide frame 10 moves from the dotted line position shown in the figure toward the package P, and its support 11 supports the bobbin B of the package P.
これを第1図、第3図により説明する。This will be explained with reference to FIGS. 1 and 3.
先ず、スライドフレーム10が移動し、支持体11がボ
ビンB1に近づくと、第3図に示すよう先ず把持用シリ
ンダ25が作動し、そのピストンロッド26が伸長して
ナツト体22を介し、圧縮スプリング23の力に抗して
ロッド14を左方向に移動する。このロッド14の移動
により第1可動チャック体16が左方向に移動し、各チ
ャック体16.18.19間の圧縮スプリング20゜2
1のバネ力により、第2可動チャック体17が移動され
、第3図に示すように、各チャック体16、’18.1
9間に隙間が生じる、この結果、その各チャック体16
.18.19間の谷部27゜27に嵌め込まれた押接リ
ング28.28が縮径し、ボビンB1の内径より小さく
なり、第3図のように、そのままチャック体16.18
.19がボビンB1内にスムーズに挿入できる状態とな
る。First, when the slide frame 10 moves and the support body 11 approaches the bobbin B1, the gripping cylinder 25 is activated as shown in FIG. The rod 14 is moved to the left against the force of 23. This movement of the rod 14 causes the first movable chuck body 16 to move to the left, and the compression spring 20° 2 between each chuck body 16, 18, 19
The second movable chuck body 17 is moved by the spring force of 1, and as shown in FIG.
As a result, a gap is created between each chuck body 16.
.. The pressing ring 28.28 fitted into the valley 27°27 between the holes 18.19 is reduced in diameter and becomes smaller than the inner diameter of the bobbin B1, and as shown in FIG.
.. 19 can be smoothly inserted into the bobbin B1.
また、第1可動チャック体16の左方向の移動と共に、
そのチャック体16に連結された位置決めビン39が左
方向に移動し、その先端39aと当接する円盤体41が
、圧縮スプリング42により先端39aに追従して移動
するため、作動ビン38が左方向に移動する。この結果
、揺動レバ34は、第3図に示すように、その準備ロー
ラ31゛がボビンB1から離れる方向に回動され、チャ
ック体16,18.19の挿入時に、ローラ31がボビ
ンB1に当って挿入できなくなることを防止する。Additionally, along with the leftward movement of the first movable chuck body 16,
The positioning bin 39 connected to the chuck body 16 moves to the left, and the disk body 41 that comes into contact with the tip 39a moves following the tip 39a by the compression spring 42, so the operating bin 38 moves to the left. Moving. As a result, as shown in FIG. 3, the swing lever 34 rotates its preparation roller 31' in the direction away from the bobbin B1, and when the chuck bodies 16, 18, 19 are inserted, the roller 31 moves toward the bobbin B1. This prevents the object from hitting the object and becoming unable to insert the object.
スライドフレーム10が、支持位置まで移動されるとチ
ャック体16.18.19がボビンB1内に完全に嵌り
込み、その後把持用シリンダ25のビス1〜ンロツド2
6が収縮されると、ロッド14は、圧縮スプリング23
の力により右方向に移動され、各チャック体16.18
.19が、その間の圧縮スプリング20.21に抗して
密着されるため、谷部27に嵌め込まれた押接リング2
8が拡径し、第゛1図に示すようにボビンB1を支持す
ることとなる。When the slide frame 10 is moved to the supporting position, the chuck body 16, 18, 19 is completely fitted into the bobbin B1, and then the screws 1 to 2 of the gripping cylinder 25 are removed.
6 is retracted, the rod 14 is compressed by the compression spring 23
Each chuck body 16.18 is moved to the right by the force of
.. 19 is in close contact against the compression springs 20 and 21 between them, so that the push ring 2 fitted into the valley 27
8 expands in diameter and supports the bobbin B1 as shown in FIG.
また、同時に第1可動チャック体゛16の右方向の移動
により位置決めビン39の先端39aが、円盤体41を
その圧縮スプリング42の力に抗し−(右方向に移動さ
せるため、揺動レバ34が回動され、ローラ31がボビ
ンB1の周面と接触するようにされる。この場合準備ロ
ーラ31はその圧縮スプリング36の弾性力でボビンB
1に圧接されることとなる。At the same time, due to the rightward movement of the first movable chuck body 16, the tip 39a of the positioning pin 39 moves the disk body 41 against the force of its compression spring 42. is rotated so that the roller 31 is brought into contact with the circumferential surface of the bobbin B1.In this case, the preparation roller 31 is moved against the bobbin B by the elastic force of its compression spring 36.
1.
この第1図の状態で、プーリー44が回転され、回転筒
体29、ブラケット32、揺動レバー34及び支持棒3
5を介して準備ローラ31がボビンB1の端部のバンチ
巻きの解除準備のための糸移動を行なうこととなる。In this state shown in FIG.
5, the preparation roller 31 moves the yarn in preparation for releasing the bunch winding at the end of the bobbin B1.
このバンチ巻き解除のための糸移動は後でさらに詳しく
説明する。The yarn movement for releasing the bunch winding will be explained in more detail later.
以上のように、バンチ巻きの解除のための準備が終り、
またパッケージP1の糸結びが完了されたならば、パッ
ケージP1は第13図に示すように、その第1ステージ
ST1から第2ステージST2に移送され、その第2ス
テージS丁2で、バンチ巻き解除装置7にて完全に解除
される。この第2ステージST2のバンチ巻き解除装置
を第4〜6図により詳しく説明する。As mentioned above, the preparation for releasing the bunch winding is completed,
Further, once the thread tying of the package P1 is completed, the package P1 is transferred from the first stage ST1 to the second stage ST2, as shown in FIG. It is completely released by the device 7. The bunch winding release device of the second stage ST2 will be explained in detail with reference to FIGS. 4 to 6.
第4図に示すように本体フレーム9には、第2ステージ
の所定位置に位置決め固定されたパッケージP2のボビ
ンB2の端面に向って進出・後退する′旋回レバー50
が支持具51を介して回動自在に設けられる。As shown in FIG. 4, a pivot lever 50 is provided on the main body frame 9 and moves forward and backward toward the end surface of the bobbin B2 of the package P2, which is positioned and fixed at a predetermined position on the second stage.
is rotatably provided via a support 51.
この旋回レバー50の下端にはボビンB2内に挿入して
ボビンB2を支持づる支持体52が設けられ、その支持
体52に圧接手段53を介してバンチ巻き解除ローラ5
4が設けられ、その支持体52にローラ54で引き寄せ
た糸を吸引除去する糸吸引手段45が設けられる。A support body 52 that is inserted into the bobbin B2 and supports the bobbin B2 is provided at the lower end of the swing lever 50.
4 is provided, and a thread suction means 45 for suctioning and removing the thread drawn by the roller 54 is provided on the support body 52.
先ず、支持体52は、第5図に示すように旋回レバー5
0にボス55を介して後述する吸引手段45を構成する
パイプ5Gが固定され、イのパイプ56にベアリング5
7を介して回転体58が回転自在に設けられ、そのパイ
プ56の先端に、ボビンB2に挿入される円錐台状の固
定支持体59が設けられて構成される。First, the support body 52 is attached to the pivot lever 5 as shown in FIG.
A pipe 5G constituting a suction means 45 (described later) is fixed to A through a boss 55, and a bearing 5 is fixed to a pipe 56 of A.
A rotating body 58 is rotatably provided via a pipe 56, and a truncated conical fixed support 59 is provided at the tip of the pipe 56 to be inserted into the bobbin B2.
この円錐台状の固定支持体5つには、パイプ56に連が
る吸引口60が形成されバンチ巻き解除時の糸が、この
吸引【」60から吸引除去されるようになっている。ま
た回転体58にはプーリー72が形成され、ぞのプーリ
ー72にベル1〜73を介して駆動プーリー75が連結
され、モータ74で駆動プーリー75を回転することで
回転体58が回転される」;うになっている。A suction port 60 connected to the pipe 56 is formed in these five truncated conical fixed supports, and the yarn is suctioned and removed from the suction port 60 when the bunch winding is released. Further, a pulley 72 is formed on the rotating body 58, and a driving pulley 75 is connected to each pulley 72 via bells 1 to 73, and the rotating body 58 is rotated by rotating the driving pulley 75 with a motor 74. ;It's turning into a sea urchin.
次に、バンチ巻き解除[コーラ57Iを、支持体52の
挿入if1ボビンB2から離れるよう、また挿入後ボビ
ンB2に圧接するよう支持プる圧接手段53を、第5図
、第6図により説明する。Next, the bunch winding release [pressing means 53 for supporting and pulling the cola 57I away from the bobbin B2 after insertion of the support 52 and for pressing the cola 57I against the bobbin B2 after insertion will be explained with reference to FIGS. 5 and 6. .
先ず回転体58に、支持ビン6’1.61を介して支持
ヨーク62が、揺動自在に取り付けられ、その支持〕−
り62の底板62aから延長プレート63がプーリー7
2を挿通して挿入体52の軸方向に延出されると共に、
そのプレー1−63にロッド64が取り付(プられ、そ
のロッド64に支持プレー1−65が設けられると共に
、その支持プレート65に解除ローラ54を回転自在に
支持する支持棒66が設けられる。First, the support yoke 62 is swingably attached to the rotating body 58 via the support pin 6'1.61, and its support]-
The extension plate 63 connects to the pulley 7 from the bottom plate 62a of the pulley 62.
2 and extends in the axial direction of the insert body 52,
A rod 64 is attached to the play 1-63, a support play 1-65 is provided on the rod 64, and a support rod 66 that rotatably supports the release roller 54 is provided on the support plate 65.
また支持ヨーク62の底板62aには、カムローラ67
が取り付けられ、このカムローラ67が旋回レバー50
に対して移動自在に設【)られた押圧板68と当接し、
その押圧板68により支持ビン6゛1を中心に支持ヨー
ク62が揺動され、解除ローラ54が、第5図のように
ボビンB2に圧接したり或いは離れたりする。Further, a cam roller 67 is provided on the bottom plate 62a of the support yoke 62.
is attached, and this cam roller 67 is connected to the turning lever 50.
abuts against a pressing plate 68 movably provided against the
The support yoke 62 is swung around the support bin 6'1 by the pressing plate 68, and the release roller 54 comes into pressure contact with the bobbin B2 or moves away from it as shown in FIG.
押圧板68は、旋回レバー50を挿通づる作動ビン69
に連結し、その作動ビン69が、圧縮スプリング70に
より常時は、押圧板68が旋回レバー50に密接Jるよ
う付勢され、その状態で解除ローラ54がボビンB2か
ら離れるようにされ、また第5図に示したように、糸押
えレバー71により作動ビン69が圧縮スプリング70
に抗して押圧されたときにボビンB2に解除ローラ54
が圧接した状態に保持される。The pressing plate 68 has an operating pin 69 through which the turning lever 50 is inserted.
The operating pin 69 is normally biased by a compression spring 70 so that the pressing plate 68 is brought into close contact with the turning lever 50, and in this state the release roller 54 is separated from the bobbin B2. As shown in FIG.
When the release roller 54 is pressed against the bobbin B2
are held in a pressed state.
以上においても第1へ一第3図で説明したように、支持
体52がボビンB2に挿入される前には、圧接手段53
によりバンチ巻き解除ローラ54がボビンB2から離れ
た状態に支持され、挿入後はボビンB2に圧接するよう
にされる。In the above, as explained in the first to third figures, before the support body 52 is inserted into the bobbin B2, the pressure contact means 53
Accordingly, the bunch winding release roller 54 is supported in a state separated from the bobbin B2, and is brought into pressure contact with the bobbin B2 after insertion.
この状態でモータ74が回転され、駆動プーリー75、
ベルト73を介してプーリー72が回転され、回転体5
8が回転されると、バンチ巻き解除ローラ54がボビン
B2の廻りに回転()て、そのバンチ巻きを緩め、緩め
た糸を吸引口60からパイプ56を通して吸引してバン
チ巻きを解除する。In this state, the motor 74 is rotated, and the drive pulley 75,
The pulley 72 is rotated via the belt 73, and the rotating body 5
8 is rotated, the bunch winding release roller 54 rotates around the bobbin B2, loosens the bunch winding, and sucks the loosened thread through the pipe 56 from the suction port 60 to release the bunch winding.
吸引手段45は、第4図に示づように、支持体52内の
パイプ56に吸引管46が接続され、その途中に圧縮空
気供給管47が接続されて構成され、圧縮空気供給管4
7からの圧気が吸引管4Gに流れることで、パイプ56
及びその吸引口60に吸引作用が生じる。As shown in FIG. 4, the suction means 45 includes a suction pipe 46 connected to a pipe 56 in the support 52, and a compressed air supply pipe 47 connected in the middle of the suction pipe 46.
7 flows into the suction pipe 4G, the pipe 56
And a suction action occurs at the suction port 60.
次に第1〜3図で説明したローラ31によるバンチ巻き
解除準備動作と、第4〜・6図で説明した解除[]−ラ
B5によるバンチ巻さ″解除afりを第7〜11図によ
り説明する。Next, the bunch winding release preparation operation by the roller 31 explained in Figs. explain.
先ず、バンチ巻き解除の準備を行なう解除準備ローラ3
1の動作を第7〜9図により説明する。First, the release preparation roller 3 prepares for releasing the bunch winding.
1 will be explained with reference to FIGS. 7 to 9.
パッケージP1のボビンB1にバンチ巻き1された糸は
、第7図に示すように、そのニップ点Nが最外層となり
、最下層の糸始端81はボビンB1に形成されたスリッ
トS(第9図)に嵌入してい゛る。このため解除準備ロ
ーラ31は、そのスリットS上に巻き付けられたバンチ
巻き1の糸Y1 をそのニップ点Nに近い糸から順次パ
ッケージ側1側に移動させるように動作する。As shown in FIG. 7, the yarn bunch-wound on the bobbin B1 of the package P1 has its nip point N at the outermost layer, and the yarn starting end 81 at the bottom layer is located at the slit S formed on the bobbin B1 (FIG. 9). ). Therefore, the release preparation roller 31 operates to sequentially move the yarn Y1 of the bunch winding 1 wound onto the slit S toward the package side 1 starting from the yarn closest to the nip point N.
すなわち、準備ローラ31の先端31aは、第7図に示
すように、バンチ巻き1とニップ点N間のボビンB1の
周面と接触し、その状態でバンチ巻き1の巻き方向と逆
方向に図示の矢印8oのように公転される。このように
準備ローラ31が公転されると、その先端31aが、ニ
ップ点Nからバンチ巻き1に延びる糸YN を捕捉し、
その糸Yl、I を、その先端31aの位置まで、第8
図のように順次移動させる。このように準備ローラ31
でバンチ巻き1を、その最外層の糸から順次ニップ点N
側(パッケージ側)へバンチ巻き1の糸を移動させるこ
とで、第9図に示すようにスリットSに嵌め込まれた糸
の始端81を、そのボビンB1の表面に露出させること
ができる。That is, the tip 31a of the preparation roller 31 contacts the circumferential surface of the bobbin B1 between the bunch winding 1 and the nip point N, as shown in FIG. It revolves as shown by arrow 8o. When the preparation roller 31 is revolved in this way, its tip 31a captures the yarn YN extending from the nip point N to the bunch winding 1,
8th thread Yl, I to the position of the tip 31a.
Move sequentially as shown in the figure. In this way, the preparation roller 31
Bunch winding 1 is carried out sequentially from the outermost layer of yarn to the nip point N.
By moving the yarn of the bunch winding 1 to the side (package side), the starting end 81 of the yarn fitted into the slit S can be exposed on the surface of the bobbin B1, as shown in FIG.
このように糸の始端81をボビンB1の表面に露出させ
たならば、始端81は容易にスリットSから取り出すこ
とが可能となる。If the starting end 81 of the thread is exposed on the surface of the bobbin B1 in this way, the starting end 81 can be easily taken out from the slit S.
このバンチ巻き解除の準備が終えたならば、パッケージ
Pは第2ステージST2に移送され、バンチ巻き解除ロ
ーラ54で、そのバンチ巻きの糸が取り出されることと
なる。When this preparation for bunch winding cancellation is completed, the package P is transferred to the second stage ST2, and the bunch winding yarn is taken out by the bunch winding release roller 54.
これを第10図、第11図により説明する。This will be explained with reference to FIGS. 10 and 11.
先ず、バンチ巻き解除ローラ54の先端54aは、第1
0図に示すように、スリットS近くのボビンB2に接触
し、その状態でバンチ巻きの巻き方向に図示の矢印82
方向に公転される。First, the tip 54a of the bunch winding release roller 54 is
As shown in FIG.
revolved in the direction.
このように、解除ローラ54が公転されると、そのロー
ラ54が糸の始端81より糸を緩めて行き、第11図に
示すように、ボビンB2に挿入している支持体52内の
糸吸引手段45を構成する吸引口60よりバンチ巻きの
糸Y1を吸引し、順次ボビンB2に巻かれたバンチ巻き
の糸を吸引除去して行く。In this way, when the release roller 54 revolves, the roller 54 loosens the thread from the starting end 81 of the thread, and as shown in FIG. The bunch-wound thread Y1 is suctioned through the suction port 60 constituting the bobbin B2, and the bunch-wound threads wound around the bobbin B2 are successively removed by suction.
このようにバンチ巻きが解除されたならば、その解除し
た糸の引き出し操作が行なわれ、第3ステージST3
(第13図参照)でニップ点からの所定・長さのバン
チ巻きの糸が切断されると共に、その糸が再度ボビンB
1に巻き付けられた作業が完了する。Once the bunch winding is released in this way, the released thread is pulled out, and the thread is pulled out in the third stage ST3.
(See Figure 13), the predetermined length of the bunch-wound thread from the nip point is cut, and the thread is transferred to the bobbin B again.
The work wrapped around 1 is completed.
この第2ステージST2におけるバンチ巻き解除後の糸
の引き出す操作を第4図により説明する。The operation of pulling out the thread after the bunch winding is released in the second stage ST2 will be explained with reference to FIG.
先ず、旋回レバー50は、流体シリンダ90にて図示の
二点鎖線で示す待機位置50aから実線の位置まで回動
される。この旋回レバー50をバンチ巻き解除後、図示
の待機位置50aから中間位@50bまで数回往復動さ
せることで、図示のようにニップ点からバンチ巻きの糸
Y1を引き出すことができる。First, the swing lever 50 is rotated by the fluid cylinder 90 from the standby position 50a shown by the two-dot chain line in the figure to the position shown by the solid line. After the bunch winding is released, the turning lever 50 is reciprocated several times from the illustrated standby position 50a to the intermediate position @50b, thereby making it possible to pull out the bunch-wound yarn Y1 from the nip point as illustrated.
この場合糸の引き出しをより確実にするため、待機位置
50aに来たとぎ、糸押えレバー71のの糸押え面91
が、支持体52の先端面52aと接触させるようにする
ことで、その糸押えを確実にする。In this case, in order to ensure that the thread is pulled out more reliably, when the thread has reached the standby position 50a, the thread presser surface 91 of the thread presser lever 71
However, by bringing it into contact with the tip end surface 52a of the support body 52, the thread can be held securely.
この糸押えレバー71は、旋回レバー50に設けた軸9
2を中心に旋回動され、その軸92にレバー93が連結
されると共に、そのレバー93が、ロッド94及びそれ
に連結された揺動プレート95で回動されるようになっ
ている。This thread presser lever 71 is connected to a shaft 9 provided on the pivot lever 50.
A lever 93 is connected to the shaft 92, and the lever 93 is rotated by a rod 94 and a swing plate 95 connected thereto.
揺動プレート95は、旋回レバー50に設けた軸96を
中心に揺動自在にされ、その両側にカムローラ97.9
8が設けられ、スプリング99により、その糸押えレバ
ー71が図示の実線で示したように、その糸押え面91
が挿入体52から離れるように付勢される。またこの内
外のカムローラ97.98の回動軌跡上には、カムロー
ラ97゜98を介して揺動プレート95を揺動させ、ロ
ッド94及びレバー93を介して糸押えレバー71を回
動させるためのカム片100. 101が設けられる。The swing plate 95 is swingable around a shaft 96 provided on the swing lever 50, and has cam rollers 97.9 on both sides thereof.
8 is provided, and a spring 99 causes the thread presser lever 71 to press the thread presser surface 91 as shown by the solid line in the figure.
is urged away from the insert 52. Also, on the rotation locus of the inner and outer cam rollers 97 and 98, there is a mechanism for swinging the swing plate 95 via the cam rollers 97 and 98, and rotating the thread presser lever 71 via the rod 94 and the lever 93. Cam piece 100. 101 is provided.
すなわち、揺動プレート95の外側カムローラ98は、
旋回レバー50の回動で待機位置50aまで回動される
と外側カム片101と当り、揺動プレート95を時計用
りに揺動させてロッド94、レバー93を介して糸押え
レバー71を回動し、その糸押え而91が挿入体52の
先端面52aに接触するJ:うに糸押えレバー71を回
動する。また内側カムローラ97は、内側カム片100
″と当り、支持体52をボビンB2に挿入される際に、
糸押えレバー71の糸押え面91を図示の実線で示すよ
うに、その支持体52がら確実に離すように糸押えレバ
ー71を回動させる。That is, the outer cam roller 98 of the swing plate 95 is
When the swing lever 50 is rotated to the standby position 50a, it comes into contact with the outer cam piece 101, causing the swing plate 95 to swing clockwise to rotate the thread presser lever 71 via the rod 94 and lever 93. J: The sea urchin thread presser lever 71 is rotated so that the thread presser lever 71 comes into contact with the distal end surface 52a of the insert body 52. Further, the inner cam roller 97 is connected to the inner cam piece 100.
'' and when inserting the support body 52 into the bobbin B2,
The thread presser lever 71 is rotated to ensure that the thread presser surface 91 of the thread presser lever 71 is separated from the support 52 as shown by the solid line in the figure.
以上において、バンチ巻きが、そのバンチ巻き解除ロー
ラ54で第10図、第11図で説明したように解除され
たのち、旋回レバー5oを図示の実線から待機位置50
aまで旋回させると、その支持体52の吸引060(及
びパイプ56)内に吸引さた糸が引き出される。この場
合、糸押えレバー71は、外側カムローラ98がカム片
101と当るため、その糸押え而91が挿入体52の先
端面52aに当接し、その糸Y1の保持を確実とし、未
だバンチ巻きが完全に解除されていないときや、スリッ
トS内に糸の始端が強固に嵌め込まれている場合でも、
これらの糸を引き出しニップ点から所定の長さの糸が確
実に引き出されるようにする。In the above, after the bunch winding is released by the bunch winding release roller 54 as explained in FIGS. 10 and 11, the swing lever 5o is moved from the solid line shown in the figure to the standby position 5
When the yarn is turned to a point a, the suctioned yarn is pulled out into the suction 060 (and pipe 56) of the support 52. In this case, since the outer cam roller 98 comes into contact with the cam piece 101, the thread presser lever 71 comes into contact with the tip end surface 52a of the inserter 52, ensuring the holding of the thread Y1, and still prevents bunch winding. Even when the thread is not completely released or the starting end of the thread is firmly inserted into the slit S,
These threads are pulled out to ensure that a predetermined length of thread is pulled out from the nip point.
この旋回レバー50を、中間位置50bど待機位置50
a間を数回往復動させれば、上述の操作は確実に行なわ
れることとなる。This turning lever 50 is moved to the intermediate position 50b or the standby position 50.
By reciprocating between a and a several times, the above operation will be performed reliably.
なお、第4図において、104はこの糸Y1が引き出さ
れたことを検出するセンサである。In addition, in FIG. 4, 104 is a sensor that detects that this thread Y1 is pulled out.
この糸の引き出しが行なわれたのちは、パッケージP2
は第3ステージST3に移送され、その引き出された糸
を所定長さに切断すると共に、その糸をボビンBに巻き
付は固定することとなる。After this thread is drawn out, package P2
is transferred to the third stage ST3, and the drawn thread is cut to a predetermined length, and the thread is wound and fixed around the bobbin B.
[発明の効果]
以上説明したことから明らかなように、本発明によれば
次のごとき優れた効果を発揮する。[Effects of the Invention] As is clear from the above explanation, the present invention exhibits the following excellent effects.
(1) ボビン周面と接し、そのバンチ巻きの糸をパ
ッケージ側に移動して下層の糸をボビン表面に露出させ
るバンチ巻き解除ローラと、その移動した糸を緩めるバ
ンチ巻解除ローラと、その緩めた糸を吸引する糸吸引手
段を設けたので、バンチ巻きの糸を途中から切ることな
く、その始端の糸からバンチ巻きを解除できる。(1) A bunch winding release roller that contacts the circumferential surface of the bobbin and moves the bunched thread toward the package to expose the lower layer of thread on the bobbin surface; a bunch winding release roller that loosens the moved thread; and the bunch winding release roller that loosens the moved thread. Since a yarn suction means for suctioning the yarn is provided, bunch winding can be released from the starting end of the yarn without cutting the bunch winding yarn from the middle.
(2) バンチ巻きを解除することで他のパッケージ
との糸結びなどの作業が容易となる。(2) By releasing the bunch winding, work such as tying threads with other packages becomes easier.
第1図は本発明の一実施例を示す断面図、第2゛図は第
1図においてボビンと解除ip−備ローラの関係を示す
図、第3図は第1図において支持体をボビンに挿入する
直前の状態を示す断面図、第4図は本発明の他の実施例
を示す側面図、第5図は第4図の要部断面図、第6図は
第5図の右側面図、第7図、第8図、第9図、第10図
及び第11図はそれぞれバンチ巻きを解除する]−程を
示す図、第゛12図は本発明が使用されるパッケージ糸
処理装置の側面図、第13図は第12図の正面図、第1
4図、第15図は糸処理を行なうパッケージを示す図で
ある。
図中、31はバンチ巻き解除準備ローラ、45は糸吸引
手段、54はバンチ巻き解除ローラ、Bはボビン、Pは
パッケージである。
特許出願人 村田機械株式会社
代理人弁理士 絹 谷 信 雄
=26=
第11図Fig. 1 is a sectional view showing one embodiment of the present invention, Fig. 2 is a view showing the relationship between the bobbin and the releasing IP roller in Fig. 1, and Fig. 3 is a view showing the relationship between the bobbin and the release IP roller in Fig. 4 is a side view showing another embodiment of the present invention, FIG. 5 is a sectional view of the main part of FIG. 4, and FIG. 6 is a right side view of FIG. 5. , FIG. 7, FIG. 8, FIG. 9, FIG. 10, and FIG. 11 are diagrams showing the process of releasing bunch winding, respectively, and FIG. The side view, Figure 13 is the front view of Figure 12, and the first
4 and 15 are diagrams showing a package for yarn processing. In the figure, 31 is a bunch winding release preparation roller, 45 is a yarn suction means, 54 is a bunch winding release roller, B is a bobbin, and P is a package. Patent applicant: Murata Machinery Co., Ltd. Representative patent attorney: Nobuo Kinuya = 26 = Figure 11
Claims (1)
ッケージのバンチ巻き解除装置において、バンチ巻きが
施されたボビンの周面と当接しながらそのバンチ巻きの
巻方向と逆方向に公転すると共に、バンチ巻きから本巻
きに移るニップ点近くのバンチ巻きの糸から順次パッケ
ージ側に糸を移動しその下層の糸の始端をボビン表面に
露出させるためのバンチ巻き解除準備ローラと、バンチ
巻きの糸の始端近くのボビンと当接しながらバンチ巻き
方向に公転され、その始端側の糸を緩めながら糸を引き
寄せるバンチ巻き解除ローラと、その引き寄せた糸を吸
引してバンチ巻き糸を除去する糸吸引手段とを備えたこ
とを特徴とするバンチ巻き解除装置。In a bunch winding release device for a package that has been subjected to bunch winding and main winding at the end of the bobbin, the device revolves in a direction opposite to the winding direction of the bunch winding while contacting the circumferential surface of the bobbin where bunch winding has been performed. A bunch winding release preparation roller for sequentially moving the yarn from the bunch-wound yarn near the nip point where the winding is transferred to the main winding to the package side and exposing the starting end of the lower layer of yarn on the bobbin surface, and the starting end of the bunch-wound yarn. A bunch winding release roller revolves in the bunch winding direction while contacting a nearby bobbin, and pulls the thread while loosening the thread on the starting end side, and a thread suction means removes the bunch winding thread by sucking the drawn thread. A bunch winding release device characterized by comprising:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP9101987A JPH0717317B2 (en) | 1987-04-15 | 1987-04-15 | Bunch unwinding device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP9101987A JPH0717317B2 (en) | 1987-04-15 | 1987-04-15 | Bunch unwinding device |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS63258377A true JPS63258377A (en) | 1988-10-25 |
JPH0717317B2 JPH0717317B2 (en) | 1995-03-01 |
Family
ID=14014847
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP9101987A Expired - Lifetime JPH0717317B2 (en) | 1987-04-15 | 1987-04-15 | Bunch unwinding device |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0717317B2 (en) |
-
1987
- 1987-04-15 JP JP9101987A patent/JPH0717317B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH0717317B2 (en) | 1995-03-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS6031740B2 (en) | How to doff yarn package | |
JP2006341994A (en) | Doffing device for automatic winder | |
JPS62185682A (en) | Waywinding bobbin production unit with driving device which can travel | |
US3136494A (en) | Method and means for preparing spinning cops for rewinding | |
JPH0729728B2 (en) | Package yarn processing device | |
GB2048970A (en) | Thread draw-off apparatus | |
JPS63258377A (en) | Device for unwinding punch winding | |
JPH11106134A (en) | Method and device for forming thread package | |
JPS63258378A (en) | Device for drawing out punch winding thread | |
JPS63258376A (en) | Package retention device | |
JP2006521981A (en) | Thread bobbin positioning and unloading device for textile machinery | |
JPS6112936A (en) | Device for pulling out starting yarn of cop of fine spinning | |
JPS646104B2 (en) | ||
US3153513A (en) | Apparatus for readying the yarn end portion of bobbins in textile machines | |
JPS63277176A (en) | Winding and locking device for yarn end of package | |
JPH0344777Y2 (en) | ||
JP2017077949A (en) | Thread winding device | |
JPH09240924A (en) | Yarn tying method and yarn tying device of package | |
US3059865A (en) | Apparatus for readying the thread coming from a supply coil in rewinding machines | |
JPS63219636A (en) | Yarn binding apparatus | |
JPS5823316B2 (en) | New-machine thread end unwinding device | |
JPH0634376Y2 (en) | Actuator of winding foiler wire for doffing in Mull spinning machine | |
JPH045501Y2 (en) | ||
JPS59207371A (en) | Method of drawing out yarn end of package | |
JPS5849476B2 (en) | Kanshino Itohashiyori Sochi |