JPS63241233A - Joint method of pillar and beam - Google Patents

Joint method of pillar and beam

Info

Publication number
JPS63241233A
JPS63241233A JP7450787A JP7450787A JPS63241233A JP S63241233 A JPS63241233 A JP S63241233A JP 7450787 A JP7450787 A JP 7450787A JP 7450787 A JP7450787 A JP 7450787A JP S63241233 A JPS63241233 A JP S63241233A
Authority
JP
Japan
Prior art keywords
concrete
column
beams
steel
columns
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7450787A
Other languages
Japanese (ja)
Inventor
中畠 宏能
菊川 和俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Construction Co Ltd
Original Assignee
Mitsubishi Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Construction Co Ltd filed Critical Mitsubishi Construction Co Ltd
Priority to JP7450787A priority Critical patent/JPS63241233A/en
Publication of JPS63241233A publication Critical patent/JPS63241233A/en
Pending legal-status Critical Current

Links

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は鉄筋コンクリート柱と鉄骨梁とよりなる構造物
における柱梁の仕口構法に係るものである。
DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to a column-beam joint construction method in a structure consisting of reinforced concrete columns and steel beams.

(従来の技術) 従来この種の工法として、特開昭59−179946号
公報に示すように、端部に太柄筋材が固定された鉄骨梁
を、同太納筋材が柱主筋及び帯筋間に位置するように支
持し、この状態で柱の型枠を組付け、コンクリートを打
設する施工方法が提案されている。
(Prior art) As shown in Japanese Unexamined Patent Publication No. 59-179946, as a conventional construction method of this type, a steel beam with thick reinforcing bars fixed at the end, and the thick reinforcing bars attached to the column main reinforcement and band A construction method has been proposed in which the column is supported between the reinforcements, the formwork of the column is assembled in this state, and concrete is poured.

(発明が解決しようとする問題点) 前記従来の施工方法においては柱梁の仕口部の配筋が複
雑で、コンクリート打設前において太柄筋が配設された
鉄骨梁の端部の納tシが複雑であり、また同鉄骨梁の重
量の支持が困難である。
(Problems to be Solved by the Invention) In the conventional construction method described above, the reinforcement arrangement at the joints of columns and beams is complicated, and the end portions of steel beams with thick handle reinforcements must be placed in place before concrete pouring. The structure is complicated, and it is difficult to support the weight of the steel beams.

更に柱梁の仕口部の剛性が不足するため、鉄骨梁と鉄筋
コンクリート柱の応力伝達の際に、鉄骨梁が変形し易く
、同鉄骨梁の変形に伴ってその端部とコンクリート部と
の接触面で、コンクリートの剥離を生起し易い。
Furthermore, because the joints of the columns and beams lack rigidity, the steel beams are easily deformed when stress is transferred between the steel beams and the reinforced concrete columns, and as the steel beams deform, their ends may come into contact with the concrete. Concrete tends to peel off on surfaces.

(問題点を解決するための手段) 本発明はこのような問題点を解決するために提案された
もので、鉄筋コンクリート柱を梁下までコンクリートを
打設し、次いで相隣る同柱間に、スタット9ボルト、ま
たはシャー鉄筋が植立された鉄骨梁を横架したのち、同
梁の端部と柱頭部とに跨って補強鉄筋を配筋し、次いで
鉄筋で補強された鉄骨梁端部と前記柱頭部とに跨ってコ
ンクリートを打設し、剛性の高いキャピタル部を構築す
ることを特徴とする柱 梁の仕口構法に係るものである
(Means for Solving the Problems) The present invention was proposed to solve these problems, and involves pouring concrete into reinforced concrete columns up to the bottom of the beams, and then placing concrete between adjacent columns. After a steel beam with stud 9 bolts or shear reinforcing bars is installed horizontally, reinforcing bars are placed across the end of the beam and the column head, and then the end of the steel beam reinforced with the reinforcing bars and This relates to the column and beam joint construction method, which is characterized by pouring concrete across the column head to construct a highly rigid capital section.

(作用) 本発明においては前記したように、鉄筋コンクリート柱
のコンクリートを梁下まで打設し、柱主筋が上方に突設
された状態で、端部にスタッドボルトまたはシャー鉄筋
が植立された鉄骨梁の端部をコンクリート天端に載架す
ることによって、同鉄骨梁を相隣る柱間にサポートを要
することなく横架し、しかるのち同鉄骨梁の端部と柱頭
部とに跨って補強鉄筋を配筋し、同鉄骨梁の補強端部と
柱頭部とに跨ってコンクリートを打設することによって
剛性の高いキャピタル部を構築するものである。従って
前記鉄筋コンクリート柱と鉄骨梁とは剛性の高いキャピ
タル部を介して一体に接合され、柱、梁間の応力伝達が
確実に行なわれ、且つ梁端部の変形が抑止され、同梁端
部にシャー鉄筋が植立されて剪断耐力が増大されたこと
と相俟って、柱梁間の応力伝達時における鉄骨梁端部と
コンクリート面との接触面でコンクリートの剥離が生起
することがない。
(Function) As described above, in the present invention, concrete for a reinforced concrete column is poured to the bottom of the beam, and with the column main reinforcement projecting upward, the steel frame has stud bolts or shear reinforcing bars planted at the end. By placing the end of the beam on the concrete top, the steel beam can be hung horizontally between adjacent columns without requiring support, and then reinforced by straddling the end of the steel beam and the column head. A highly rigid capital section is constructed by arranging reinforcing bars and pouring concrete across the reinforced end of the steel beam and the column head. Therefore, the reinforced concrete column and the steel beam are integrally connected through the highly rigid capital section, and stress transmission between the column and the beam is ensured, deformation of the beam end is suppressed, and shear is applied to the beam end. Coupled with the fact that the reinforcing bars are installed and the shear strength is increased, concrete separation does not occur at the contact surface between the steel beam end and the concrete surface when stress is transmitted between the columns and beams.

(発明の効果) このように本発明によれば、梁下までコンクリートが打
設された鉄筋コンクリート柱の柱頭部に鉄骨梁端部を載
架することによって、鉄骨梁の柱に対するセットをサポ
ートを要することなく簡単に遂行しうるものであシ、更
に現場配筋によってコンクリートを打設して柱頭部に剛
性の高いキャピタル部を構築し、同キャピタル部を介し
て柱梁間の応力伝達を確実ならしめるとともに、前記梁
端部に植立したスタッドボルトまたはシャー鉄筋によシ
剪断耐力を増大して応力伝達時における鉄骨梁端部にお
けるコンクリートの剥離を防止するものである。
(Effects of the Invention) According to the present invention, by mounting the end of a steel beam on the head of a reinforced concrete column in which concrete has been cast to the bottom of the beam, it is possible to set the steel beam to the column without requiring support. This is something that can be easily carried out without much effort, and in addition, concrete is poured using on-site reinforcement to construct a highly rigid capital section at the column head, and the stress transmission between the columns and beams is ensured through the capital section. At the same time, the shear strength is increased by the stud bolts or shear reinforcing bars installed at the ends of the beams to prevent concrete from peeling off at the ends of the steel beams when stress is transmitted.

更にまた本発明は、鉄筋コンクリート柱のコンクリート
を梁下まで打設し、間柱の柱頭部に鉄骨梁をセットし、
キャピタル部のみ型枠を取付けて現場打ちコンクリート
を打設するといり単純な作業を反覆して1層宛柱、梁を
組上げることによって、作業を著しく単純化しうるもの
である。
Furthermore, the present invention includes pouring concrete for a reinforced concrete column to the bottom of the beam, setting a steel beam at the head of the stud,
The work can be significantly simplified by assembling columns and beams in one layer by repeating the simple work of attaching formwork only to the capital section and pouring cast-in-place concrete.

(実施例) 以下本発明を図示の実施例によって説明する。(Example) The present invention will be explained below with reference to illustrated embodiments.

鉄筋コンクリート柱(A)のコンクリートを梁下まで打
設し、(第1図参照)次いでスタッドボルト(1)また
はシャー鉄筋が植立されたH型鋼等の鉄骨梁中)を、柱
主筋(2)が上方に突出した柱頭部間に横架する。図中
(3)は柱頭に設置された梁受けである。
Concrete for the reinforced concrete column (A) is poured to the bottom of the beam (see Figure 1), and then stud bolts (1) or steel beams such as H-beams with shear reinforcing bars are placed in the main reinforcement of the column (2). The pillars are suspended horizontally between the capitals that protrude upward. (3) in the figure is a beam support installed at the capital of the column.

(第2図参照) 次いで前記梁(至)の端部と柱頭部とく亘りて、端部に
フックを有する下端主筋(4)を取付けたのち、柱主筋
(2)間に帯筋(5)を落し込み、更に端部にフックを
有する上端主筋(4′)を梁端部と柱頭部とに亘って取
付け、しかるのち上下端主筋(4) (4)間に助筋(
6)を配筋する。(第3図参照) 次いで柱梁仕口部の型枠(力を設置するとともに、床型
枠(図示せず)を設置する。(第4図参照)次いで前記
仕口部のコンク9−) (8)及び床コンクリ−) (
9)を打設し、かくして構築された断面積が大で剛性の
高いキャピタル部α1を介して、柱梁を一体に接合する
。(第5図、第6図及び第7図参照)なお図中(qは小
梁を示す。
(See Figure 2) Next, after attaching the lower end main reinforcement (4) with a hook at the end across the end of the beam (to) and the column head, tie bars (5) are installed between the column main reinforcements (2). Further, the upper main reinforcement (4') with a hook at the end is installed across the beam end and the column head, and then the auxiliary reinforcement (4') is installed between the upper and lower end main reinforcement (4) (4).
6) Arrange reinforcement. (See Figure 3) Next, install the formwork (force) for the column and beam joints, and install the floor formwork (not shown). (See Figure 4) Next, install the formwork for the joints 9-) (8) and floor concrete) (
9), and the columns and beams are integrally joined via the thus constructed capital portion α1 having a large cross-sectional area and high rigidity. (See Figures 5, 6, and 7) In the figures, q indicates a small beam.

このように前記実施例によれば、鉄筋コンクリート柱(
A)を梁下まで打設し、間柱(A)の柱頭部に鉄骨梁の
)をセットし、キャピタル部αQのみ型枠(7ンを取付
けて現場打ちコンクリートを打設するという単純作業を
反覆して、1層宛柱、梁を組上げることによシ、作業を
著しく単純化できる。
In this way, according to the embodiment, the reinforced concrete column (
Repeat the simple work of pouring A) to the bottom of the beam, setting the steel beam () on the head of the stud (A), attaching formwork (7) only to the capital part αQ, and pouring cast-in-place concrete. By assembling columns and beams in one layer, the work can be significantly simplified.

また本発明によれば、前記柱頭部に鉄骨梁CB)の端部
を載架することによって、同鉄骨梁(至)の柱(A)に
対するセットをサポートを要することなく簡単に符なう
ことができ、更に現場配筋によりてコンクリートを打設
して、柱頭部に断面積が大で剛性の高いキャピタル部a
〔を構築し、同キャピタル部a1によって柱(匈梁の)
を一体的に接合して、柱梁間の応力の伝達をよ<シ、且
つ前記梁に植立されたスタット9ボルト(1)によって
剪断耐力を増大し、応力伝達時における鉄骨梁端部にお
けるコンクリートの剥離を防止するものである。
Further, according to the present invention, by mounting the end of the steel beam CB on the column head, the steel beam can be easily set to the column A without requiring any support. The capital part a with a large cross-sectional area and high rigidity is created at the column head by placing concrete using on-site reinforcement.
Build the pillar (of the beam) by the same capital part a1
are integrally connected to facilitate the transmission of stress between the columns and beams, and the shear strength is increased by the stud 9 bolts (1) installed in the beams, and the concrete at the ends of the steel beams is This prevents the peeling off.

第8図及び第9図は本発明の他の実施例を示し。8 and 9 show other embodiments of the invention.

キャピタル部顛を8角形千回形状に構成して、柱梁仕口
部の剛性をよυ増大せしめたものである。
The capital section is constructed in an octagonal 1,000-fold shape to greatly increase the rigidity of the column and beam joints.

図中前記実施例と均等部分には同一符号が附されている
In the figure, parts equivalent to those of the above embodiment are given the same reference numerals.

【図面の簡単な説明】[Brief explanation of drawings]

第1図乃至第5図は本発明に係る柱梁の仕口構法の一実
施例の工程を示す側面図、第6図は同施工法によって構
成された柱梁の仕口部を示す横断平面図、第7図は同仕
口部を有する構造物の部分斜面図、第8図は本発明に係
る構法の他の実施例によって構成された柱梁の仕口部の
横断平面図、第9図は同仕口部を有する構造物の部分斜
面図である。 (5)・・・鉄筋コンクリート柱、(B)・・・鉄骨梁
、(1)・・・スタッドボルト、(2)・・・柱主筋、
(4)・・・下端主筋、(4)・・・上端主筋、(6)
・・・助筋、(8)・・・仕口部コンクリート、α〔・
・・Φヤピタル部。 第3図 第5図 第6図
Figures 1 to 5 are side views showing the steps of an embodiment of the joint construction method for columns and beams according to the present invention, and Figure 6 is a cross-sectional plane showing the joint section of the columns and beams constructed by the same construction method. 7 is a partial slope view of a structure having a joint section, FIG. 8 is a cross-sectional plan view of a joint section of a column and beam constructed according to another embodiment of the construction method according to the present invention, and FIG. The figure is a partial perspective view of a structure having the same joint section. (5)...Reinforced concrete column, (B)...Steel beam, (1)...Stud bolt, (2)...Column main reinforcement,
(4)...Lower end main reinforcement, (4)...Upper end main reinforcement, (6)
... Auxiliary reinforcement, (8) ... Joint section concrete, α [・
・Φ Yapital Department. Figure 3 Figure 5 Figure 6

Claims (1)

【特許請求の範囲】[Claims] 鉄筋コンクリート柱と鉄骨梁とよりなる構造物において
、鉄筋コンクリート柱を梁下までコンクリートを打設し
、次いで相隣る同柱間に、スタッドボルト、またはシャ
ー鉄筋が植立された鉄骨梁を横架したのち、同梁の端部
と柱頭部とに跨って補強鉄筋を配筋し、次いで鉄筋で補
強された鉄骨梁端部と前記柱頭部とに跨ってコンクリー
トを打設し、剛性の高いキャピタル部を構築することを
特徴とする柱梁の仕口構法。
In a structure consisting of reinforced concrete columns and steel beams, concrete is poured to the bottom of the reinforced concrete columns, and then steel beams with stud bolts or shear reinforcing bars are placed horizontally between adjacent columns. Afterwards, reinforcing reinforcing bars are placed across the end of the beam and the column head, and then concrete is poured across the end of the steel beam reinforced with reinforcing bars and the column head to create a highly rigid capital section. Shiguchi construction method of pillars and beams.
JP7450787A 1987-03-30 1987-03-30 Joint method of pillar and beam Pending JPS63241233A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7450787A JPS63241233A (en) 1987-03-30 1987-03-30 Joint method of pillar and beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7450787A JPS63241233A (en) 1987-03-30 1987-03-30 Joint method of pillar and beam

Publications (1)

Publication Number Publication Date
JPS63241233A true JPS63241233A (en) 1988-10-06

Family

ID=13549305

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7450787A Pending JPS63241233A (en) 1987-03-30 1987-03-30 Joint method of pillar and beam

Country Status (1)

Country Link
JP (1) JPS63241233A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02144433A (en) * 1988-11-28 1990-06-04 Mitsubishi Kensetsu Kk Constructing connection for column-girder
JPH0393505U (en) * 1990-01-11 1991-09-24
JP2014031613A (en) * 2012-08-01 2014-02-20 Taisei Corp Composite structural beam

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61233147A (en) * 1985-04-10 1986-10-17 大成建設株式会社 Beam wherein end part is made of reinforced concrete and central part is made of reinforcing bar

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61233147A (en) * 1985-04-10 1986-10-17 大成建設株式会社 Beam wherein end part is made of reinforced concrete and central part is made of reinforcing bar

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02144433A (en) * 1988-11-28 1990-06-04 Mitsubishi Kensetsu Kk Constructing connection for column-girder
JPH0393505U (en) * 1990-01-11 1991-09-24
JP2014031613A (en) * 2012-08-01 2014-02-20 Taisei Corp Composite structural beam

Similar Documents

Publication Publication Date Title
JPS63241233A (en) Joint method of pillar and beam
JPH0348977B2 (en)
JPH06272311A (en) Connecting structure of precast concrete column and steel framed beam
JPH05287801A (en) Bar arrangement structure of beam in rigid-frame structure made of precast iron reinforcing concrete
JP2522708B2 (en) Reinforcing bar tip assembly beam with formwork and reinforcing bar tip assembly method with formwork
JP3322701B2 (en) Prefabricated piers and concrete blocks for piers
JP2688613B2 (en) Stringed beam floor structure
JPH02144433A (en) Constructing connection for column-girder
JPH0788686B2 (en) Front cross beam method
JPS63251542A (en) Connection structure of pillar and beam
JPS62178634A (en) Framework construction method of structure
JPS63210321A (en) Pillar/beam connection structure
JPH076338U (en) PC beam
JP2729132B2 (en) How to join columns and precast concrete beams
JPH084107A (en) Connecting method for column/beam connection
JPH06306935A (en) Connection structure of column and beam of rc structure and its construction
JP2900171B2 (en) Construction method of flat slab
JPH0830360B2 (en) Connection method for columns and beams
JP2758203B2 (en) Connection method between columns and steel beams
JPH0746653Y2 (en) Precast concrete beams
JPS63241234A (en) Joint method of pillar and beam
JPH03275832A (en) Joint construction of column and beam
JPS59122653A (en) Construction of flat slab
JPH09317000A (en) Connection method and structure of column and beam
JPS6286241A (en) Connection of pillar and beam