JPS63161219A - Foundation pile and its construction - Google Patents

Foundation pile and its construction

Info

Publication number
JPS63161219A
JPS63161219A JP30602186A JP30602186A JPS63161219A JP S63161219 A JPS63161219 A JP S63161219A JP 30602186 A JP30602186 A JP 30602186A JP 30602186 A JP30602186 A JP 30602186A JP S63161219 A JPS63161219 A JP S63161219A
Authority
JP
Japan
Prior art keywords
pile
foundation
tip
ground
blade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP30602186A
Other languages
Japanese (ja)
Inventor
Mikio Umeoka
美喜男 梅岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP30602186A priority Critical patent/JPS63161219A/en
Publication of JPS63161219A publication Critical patent/JPS63161219A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To construct a foundation pile without causing noise and vibration by a method in which a foundation pile having excavating screwed blades on its tip and periphery is rotationally inserted into the ground until the tip of the pile reaches the bearing ground, and the foot of the pile is fixed as it is. CONSTITUTION:The tip of a foundation pile 1 is shaped into a conical drill form, and a screwed excavating blade 2 is integrally formed on the periphery of the pile 1. A screwed portion 4 to be connected with attachment is provided for the basal end 1b of the pile 1, and a cement-milk outlet 3 is provided slightly upwards in the opposite direction of the turning direction on the head 1a of the pile 1. The end 1 is connected with the rotary driver and rotationally inserted into the ground, and when the head 1a reaches the bearing ground, the rotation of the pile 1 is stopped and cement milk 7 is injected through an injection tube 6 from the end 1b into the pipe of the pile 1 and hardened. The blade 2 serves as a friction plate after being driven and can exhibit its stable bearing force.

Description

【発明の詳細な説明】 イ 産業上の利用分野 本発明は、地盤の補強対策として基礎地盤内へ建て込み
する基礎杭、及びその基礎杭の建て込み方法に関するも
のである。
DETAILED DESCRIPTION OF THE INVENTION A. Field of Industrial Application The present invention relates to a foundation pile that is built into the foundation ground as a soil reinforcement measure, and a method for erecting the foundation pile.

口 従来技術 基礎地盤を補強するため軟弱地盤へ建て込まれる基礎杭
は、従来例えばコンクリートパイルの如き基礎杭を直接
地中へ打ち込んだり、オーガスクリユー等によって穴を
穿ち、その中へコンクリートや鋼管製の基礎杭を挿通し
て埋め込む等していた。
Conventional technology Foundation piles that are built into soft ground to reinforce the foundation ground are conventionally used, for example, by driving foundation piles such as concrete piles directly into the ground, or by drilling holes using an auger screw, etc., and then inserting concrete or steel pipes into the holes. Foundation piles made of steel were inserted and embedded.

ハ 発明が解決しようとする問題点 コンクリートパイルを地中へ直接打ち込む方法は、強烈
な振動と騒音を伴い、住宅密集地では周囲の建物や器物
に被害を与え、住民にも多大な迷惑を及ぼすばかりか、
大規模な打ち込み装置を必要とする。又予め穴を穿ち、
その中−統を挿通する方法は、挿通用の穴を穿つ機械と
、基礎杭を挿通するための機械の異なる二種類の大型機
械を要し、而も挿通後にセメントミルクを注入して根止
めする場合は、そのセメントミルクがオーバーフローす
ると後処理が非常に面倒であった。又杭自体は、全長に
亘り外周面が均一径のため、支持力が乏しいといった欠
点があった。
C. Problems that the invention aims to solve: The method of directly driving concrete piles into the ground is accompanied by strong vibrations and noise, which can damage surrounding buildings and property in densely populated residential areas and cause a great deal of inconvenience to residents. Not only,
Requires large-scale driving equipment. Also, drill a hole in advance,
The method of inserting the center pile requires two different types of large machines: one to drill the hole for insertion and the other to insert the foundation pile. In this case, the cement milk overflowed and the post-processing was very troublesome. In addition, the pile itself has a disadvantage in that its supporting capacity is poor because the outer peripheral surface has a uniform diameter over its entire length.

二 問題を解決するための手段 本発明は、基礎杭を建て込むに際して生じていた上記従
来の欠点に鑑み、無振動、無騒音且つ一種類の機械のみ
で建て込み作業を完了させることができ、その土建て込
まれた基礎杭は、摩擦杭に匹敵する高い支持力を発揮し
、住宅密集の地域でも支障なく作業を行うことを可能と
するもので、第1の発明は、縦長の鋼管より成る杭本体
の先端及び外周に、長手方向へ連続的又は断続的にスク
リュー羽根状の掘削刃を一体的に設けたことにあり、第
2の発明は先端及び外周にスクリュー羽根状の掘設刃が
一体的に設けられた基礎杭を基礎地盤上に起立させ、こ
れを回転して地中へ下降せしめ、先端が支持地盤に達し
たらそのままの状態で根止めする基礎杭の建て込み方法
にある。
2. Means for solving the problem In view of the above-mentioned conventional drawbacks that occurred when erecting foundation piles, the present invention enables the erecting work to be completed without vibration or noise and with only one type of machine. The foundation piles built in the earth exhibit high bearing capacity comparable to friction piles, and can be used without any problems even in densely populated areas. The second invention consists in that a screw blade-shaped digging blade is provided continuously or intermittently in the longitudinal direction on the tip and outer periphery of the pile main body, and the second invention is provided with a screw blade-shaped digging blade on the tip and outer periphery. A method of building foundation piles in which a foundation pile that is integrally installed is erected on the foundation ground, rotated and lowered into the ground, and when the tip reaches the supporting ground, it is anchored in that state. .

ホ 作用 先端及び外周にスクリュー羽根状の掘設刃が一体的に設
けられているため、先端を真下に向けて回転を与えるこ
とにより、基礎杭は基礎地盤内へスムーズにねじ込まれ
る。又建て込まれた基礎杭は、外周方向へ拡がったスク
リュー羽根状の掘削刃が地盤に喰い込んで、摩擦板の如
くアンカーとしての作用を果し、その摩擦力により充分
な支持力が確保される。
E. Since a screw blade-like digging blade is integrally provided at the working tip and outer periphery, the foundation pile is screwed into the foundation ground smoothly by applying rotation with the tip facing straight down. Furthermore, the erected foundation piles have screw blade-like digging blades that spread toward the outer periphery and bite into the ground, acting as an anchor like a friction plate, and the frictional force ensures sufficient supporting force. Ru.

へ 実施例 先ず本発明に係る基礎杭を図面に基づいて説明すると、
基礎杭本体1は、内部が中空で全面に亜鉛メッキの施さ
れた鋼管製であり、先端は閉塞された円錐形のキリ状に
形成され、その外周にはスクリュー羽根状の掘設刃2が
一体的に設けられている。又ヘッド部1aより若干上方
には、セメントミルクの流出孔3.3が、鋼管内壁の接
線に対し、回転付与方向と逆方向へ向は穿設されている
。この流出孔3は、若干上向きに設け、掘設中に詰まり
にくくすることが望ましい。更に杭本体1の周面には、
略50cm毎断続的に二巻きづつスクリュー羽根状の掘
設刃2a、2b・eeが基端側へいくほど次第に太径と
なるよう設けられている。基端部1bには、各種アタッ
チメント接続用の螺刻部4が形成されている。
Example First, the foundation pile according to the present invention will be explained based on the drawings.
The foundation pile main body 1 is made of a steel pipe that is hollow inside and galvanized on the entire surface, and the tip is formed in the shape of a closed conical drill, and a screw blade-shaped digging blade 2 is provided on the outer periphery. It is integrated. Slightly above the head portion 1a, a cement milk outflow hole 3.3 is bored in a direction opposite to the direction of rotation with respect to a tangent to the inner wall of the steel pipe. It is desirable that the outflow hole 3 be provided slightly upward to prevent clogging during excavation. Furthermore, on the circumferential surface of the pile body 1,
Screw blade-shaped digging blades 2a, 2b and ee are provided intermittently with two turns at approximately every 50 cm so that the diameter gradually becomes larger toward the base end side. A threaded portion 4 for connecting various attachments is formed on the base end portion 1b.

このように構成された基礎杭を建て込むには、バックオ
ーガー、トラックオーガー、パイリングマシン等を利用
し、その回転駆動部5と基礎杭の基端部1bとをアタッ
チメントにて連結して基礎地盤上へ起立させ、続いて回
転を付与する。それによって基礎杭は、ヘッド部1aの
周囲に設けられた掘削刃2により土中へねじ込まれるよ
うに潜り込み、自重によりそのまま下降する。そして5
0cm程下降したところでその上方に位置する掘削刃2
aが地盤表面に接し、前記ヘッド部1aに設けられた掘
削刃2によって穿たれた穴より太径の掘設刃2aは、同
じく回転することにより螺線状に掘設し、穴を拡げ乍ら
潜り込み力を更に増加させて下降を続行する。更にその
上方に位置する掘削刃2b、2c・・によって掘り下げ
られ、掘り下げられるに従って径は段階的に拡げられる
。ヘッド部1aが基礎地盤に達したら回転を止め、基端
部1bを回転駆動部5から外して代りにセメントミルク
注入管6を接続し、セメントミルクを管体内へ圧入する
。圧入されたセメントミルク7は、先端の注出孔から流
出し、基礎杭の周囲を包み込み乍ら過剰分は」二方へ押
し上げられる。基礎杭の周囲空間部が全てセメントミル
ク7で満たされたことを確認したら、セメントミルクの
注入を停止して固化を待つ。
In order to erect the foundation pile configured in this way, a back auger, track auger, piling machine, etc. is used, and the rotary drive unit 5 and the base end 1b of the foundation pile are connected with an attachment to erect the foundation ground. Stand up and then apply rotation. As a result, the foundation pile is screwed into the soil by the digging blade 2 provided around the head portion 1a, and descends under its own weight. and 5
After descending about 0cm, the drilling blade 2 is located above it.
The digging blade 2a, which is in contact with the ground surface and has a larger diameter than the hole drilled by the digging blade 2 provided on the head portion 1a, also rotates to dig in a spiral shape and expand the hole. Further increase the diving force and continue descending. Furthermore, the excavating blades 2b, 2c, etc. located above the excavating blades 2b, 2c, etc., dig down, and the diameter gradually increases as the excavating blades 2b, 2c, . . . When the head part 1a reaches the foundation ground, the rotation is stopped, the base end part 1b is removed from the rotary drive part 5, a cement milk injection pipe 6 is connected instead, and cement milk is forced into the pipe body. The press-fitted cement milk 7 flows out from the spout hole at the tip and wraps around the foundation pile, while the excess is pushed up in two directions. After confirming that the entire surrounding space of the foundation pile is filled with cement milk 7, the injection of cement milk is stopped and solidification is waited.

このようにして根止めを終え、建て込み作業は完了する
In this way, the rooting is completed and the erection work is completed.

建て込まれた基礎杭は、断続的に設けられた掘削刃2.
2a、2b、・・が摩擦板としてアンカーの役割を果す
と共に、注入されたセメントミルク7が地盤の土中へ浸
み込み固化して大きな支持力が確保される。而も建て込
みに際しては、基礎杭に回転を付与するだけであるから
大規模な機械を導入する必要がなく、振動、騒音も発生
しない。又杭自体は打ち放し方式と変りないから、掘削
刃は一回限りの使用に耐え得れば充分で、消耗品として
の安価な材質で形成すればよく、オーガースクリューの
如き器材も不要となる。
The erected foundation piles are intermittently provided with excavation blades 2.
2a, 2b, . . . play the role of anchors as friction plates, and the injected cement milk 7 permeates into the soil of the ground and solidifies, thereby ensuring a large supporting force. Moreover, during construction, since the foundation piles are simply rotated, there is no need to introduce large-scale machinery, and no vibration or noise is generated. In addition, since the pile itself is no different from the free-standing type, the excavation blade only needs to be able to withstand one-time use, and it can be made of an inexpensive material as a consumable item, and equipment such as an auger screw is not required.

本実施例においては、建て込む際セメントミルクを注入
する場合について説明したが、地盤の状況に応じてセメ
ントミルクは必ずしも注入する必要はなく、注入しない
場合には、セメントミルク流出孔は必要ない。又杭本体
は亜鉛メッキして耐久力を高めると共に、掘削刃を断続
的に設けてコストダウンを図っているが、亜鉛メッキさ
れていなくても、又第6図示の如く、掘削刃2を基端側
まで連続的に設けても良いし、その掘削刃の径を一定に
することもできる。
In this embodiment, a case has been described in which cement milk is injected during construction, but it is not necessarily necessary to inject cement milk depending on the ground condition, and if it is not injected, a cement milk outflow hole is not required. In addition, the pile body is galvanized to increase its durability, and digging blades are provided intermittently to reduce costs. It may be provided continuously up to the end side, or the diameter of the cutting blade may be made constant.

要は杭本体の外周にスクリュー羽根状の掘削刃を設け、
それによって杭自体が回転により地盤へ沈設され、沈設
後はその掘削刃が周囲へ張り出し、それにより安定した
支持力が確保できることにあって、掘削刃の大きさ、ピ
ッチ、強度、杭の太さ、長さ等は地盤の状況に応じて適
宜定められる。
In short, a screw blade-like digging blade is installed on the outer periphery of the pile body.
As a result, the pile itself is sunk into the ground by rotation, and after being sunk, the digging blade extends out to the surrounding area, thereby ensuring stable supporting capacity. , length etc. will be determined as appropriate depending on the ground conditions.

ト 効果 本発明によれば、無振動且つ無騒音にて基礎杭の建て込
み作業ができ、而もその作業は回転付与のみの簡単な操
作で完了できる。その上掘削に使用される掘削刃が建て
込み後は摩擦板として働き、摩擦杭に匹敵する大きく安
定した支持力を発揮する。
G. Effects According to the present invention, foundation piles can be erected without vibration and noise, and the work can be completed with a simple operation of applying rotation. Furthermore, the excavation blade used for excavation acts as a friction plate after erection, providing a large and stable supporting force comparable to friction piles.

よって住宅密集地でも安心して使用できるし、安価で信
頼性の高い作業を実施する上においてもたらされる実益
は多大である。
Therefore, it can be used safely even in densely populated areas, and the practical benefits of carrying out work at low cost and with high reliability are great.

【図面の簡単な説明】[Brief explanation of the drawing]

第1 +4は本発明の基礎杭を示す斜視図、第2図は同
基礎杭の先端部を示す斜視図、第3図はその先端部にお
けるA−A線断面図、第4図は建て込み作業の説明図、
第5図はセメントミルクが注入された地盤の状態を示し
た説明図、第6図は基礎杭の変更例を示す説明図である
。 1・・杭本体、1a・・ヘッド部、1b・e基端部 2
.2a、2b、2c・・撫切刃、3・・流出孔、4・―
螺刻部、5−・回転駆動部、6・拳セメントミルク注入
管、7・赤セメントミルク
1+4 is a perspective view showing the foundation pile of the present invention, FIG. 2 is a perspective view showing the tip of the foundation pile, FIG. 3 is a sectional view taken along line A-A at the tip, and FIG. 4 is the construction Illustration of the work,
FIG. 5 is an explanatory diagram showing the state of the ground into which cement milk has been poured, and FIG. 6 is an explanatory diagram showing an example of a modification of the foundation pile. 1...Pile body, 1a...Head part, 1b/e base end part 2
.. 2a, 2b, 2c...Flash cutting blade, 3...Outflow hole, 4...
Threaded part, 5-Rotation drive part, 6-Fist cement milk injection tube, 7-Red cement milk

Claims (1)

【特許請求の範囲】 1 縦長の鋼管より成る杭本体の先端及び外周に、長手
方向へ連続的又は断続的にスクリュー羽根状の掘削刃を
一体的に設けたことを特徴とする基礎杭。 2 前記掘削刃が、杭本体の先端から基端側へいくにつ
れ次第に太径となっている特許請求の範囲第1項に記載
の基礎杭。 3 先端及び外周にスクリュー羽根状の掘設刃が一体的
に設けられた基礎杭を基礎地盤上に起立し、これを回転
して地中へ下降せしめ、先端が支持地盤に達したらその
ままの状態で根止めすることを特徴とする基礎杭の建て
込み方法。 4 前記根止めが、基礎杭の基端部より注入したセメン
トミルクを先端部から流出させ、杭の周囲を取り巻くよ
うに充填して固化するものである特許請求の範囲第3項
に記載の基礎杭の建て込み方法。
[Claims] 1. A foundation pile, characterized in that a screw blade-like excavation blade is integrally provided on the tip and outer circumference of a pile body made of a vertically long steel pipe, either continuously or intermittently in the longitudinal direction. 2. The foundation pile according to claim 1, wherein the diameter of the excavation blade gradually increases from the tip to the base end of the pile body. 3. A foundation pile with a screw blade-like digging blade integrally installed on the tip and outer periphery is erected on the foundation ground, rotated and lowered into the ground, and when the tip reaches the supporting ground, it remains as it is. A method for erecting foundation piles characterized by anchoring them with roots. 4. The foundation according to claim 3, wherein the root stopper causes the cement milk injected from the base end of the foundation pile to flow out from the tip, fill it so as to surround the pile, and solidify. How to erect piles.
JP30602186A 1986-12-22 1986-12-22 Foundation pile and its construction Pending JPS63161219A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP30602186A JPS63161219A (en) 1986-12-22 1986-12-22 Foundation pile and its construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP30602186A JPS63161219A (en) 1986-12-22 1986-12-22 Foundation pile and its construction

Publications (1)

Publication Number Publication Date
JPS63161219A true JPS63161219A (en) 1988-07-04

Family

ID=17952120

Family Applications (1)

Application Number Title Priority Date Filing Date
JP30602186A Pending JPS63161219A (en) 1986-12-22 1986-12-22 Foundation pile and its construction

Country Status (1)

Country Link
JP (1) JPS63161219A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02255333A (en) * 1989-03-30 1990-10-16 Nippon Steel Corp Deoxidation functional laminated body excellent in adhesive property and production thereof
JPH0318238U (en) * 1989-07-05 1991-02-22
US6815649B2 (en) 2001-07-25 2004-11-09 I.A.S. Induktions-Anlagen + Service Gmbh & Co. Kg. Device and method for inductive billet heating with a billet-heating coil
JP2013253406A (en) * 2012-06-06 2013-12-19 West Holdings Corp Pile for underground installation
KR20190106116A (en) * 2018-03-07 2019-09-18 백규호 Construction apparatus of Cylindrical type pile and Construction apparatus of Taper type pile and Construction method of Taper type pile

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5194615A (en) * 1975-02-17 1976-08-19
JPS534308A (en) * 1976-06-30 1978-01-14 Satoru Tagami Pile for foundation work
JPS5726445B2 (en) * 1976-08-11 1982-06-04

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5194615A (en) * 1975-02-17 1976-08-19
JPS534308A (en) * 1976-06-30 1978-01-14 Satoru Tagami Pile for foundation work
JPS5726445B2 (en) * 1976-08-11 1982-06-04

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02255333A (en) * 1989-03-30 1990-10-16 Nippon Steel Corp Deoxidation functional laminated body excellent in adhesive property and production thereof
JPH0318238U (en) * 1989-07-05 1991-02-22
US6815649B2 (en) 2001-07-25 2004-11-09 I.A.S. Induktions-Anlagen + Service Gmbh & Co. Kg. Device and method for inductive billet heating with a billet-heating coil
JP2013253406A (en) * 2012-06-06 2013-12-19 West Holdings Corp Pile for underground installation
KR20190106116A (en) * 2018-03-07 2019-09-18 백규호 Construction apparatus of Cylindrical type pile and Construction apparatus of Taper type pile and Construction method of Taper type pile

Similar Documents

Publication Publication Date Title
US5575593A (en) Method and apparatus for installing a helical pier with pressurized grouting
US5934836A (en) Ground anchor device
JP2002155530A (en) Embedding method and tip metal fitting of existing pile
JPS5985028A (en) Steel pipe pile and laying work thereof
US20070286686A1 (en) Method For Installing A Solidifying Material Pier Anchorage System
JPS63161219A (en) Foundation pile and its construction
JPH0542524B2 (en)
JPH11350473A (en) Execution method for steel pipe pile
RU72986U1 (en) PILE
JP3989224B2 (en) Pile burial equipment
JP3514183B2 (en) Embedded pile and its construction method
JPH06316927A (en) Installation of open section pile in large diameter
AU723991B2 (en) Methods of and apparatus for forming in-ground columns
JPS6221089B2 (en)
JP2001073367A (en) Embedding construction method for steel pipe pile
JPS60119818A (en) Construction work of custom-made pile
JP3170604B2 (en) Steel pipe construction method by medium digging method
JPH0240152Y2 (en)
JPH0711132B2 (en) Ground stabilization method
JPS6131246B2 (en)
JPS62202118A (en) Burying work of pile
JPH07103558B2 (en) Foundation pile burying device
JP2711357B2 (en) Improvement method of construction ground and its drilling equipment.
JP2006063526A (en) Expansive foot protection method using friction pile
JPS6124491B2 (en)