JPS63136793A - Remote measuring instrument - Google Patents
Remote measuring instrumentInfo
- Publication number
- JPS63136793A JPS63136793A JP28193386A JP28193386A JPS63136793A JP S63136793 A JPS63136793 A JP S63136793A JP 28193386 A JP28193386 A JP 28193386A JP 28193386 A JP28193386 A JP 28193386A JP S63136793 A JPS63136793 A JP S63136793A
- Authority
- JP
- Japan
- Prior art keywords
- computer
- measured data
- measurement data
- master station
- selection signal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005259 measurement Methods 0.000 claims description 55
- 230000008676 import Effects 0.000 claims description 3
- 238000012544 monitoring process Methods 0.000 claims description 3
- 230000005540 biological transmission Effects 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 2
- 238000000691 measurement method Methods 0.000 description 1
- BWBONKHPVHMQHE-UHFFFAOYSA-N tiocarlide Chemical compound C1=CC(OCCC(C)C)=CC=C1NC(=S)NC1=CC=C(OCCC(C)C)C=C1 BWBONKHPVHMQHE-UHFFFAOYSA-N 0.000 description 1
- 229960002171 tiocarlide Drugs 0.000 description 1
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Selective Calling Equipment (AREA)
Abstract
Description
【発明の詳細な説明】
〔発明の目的〕
(産業上の利用分野)
本発明は、計測データを遠方で計測するための遠隔測定
装置に関する。DETAILED DESCRIPTION OF THE INVENTION [Object of the Invention] (Industrial Application Field) The present invention relates to a telemetry device for measuring measurement data at a distance.
(従来の技術)
遠隔地に存在する複数の被測定データを送板計測機能が
付加されている遠方監視側、御装置(以下遠制装置と称
す)を用いて伝送し、計算機に取込むシステムにおいて
は、計算機から被測定データに対応した選択信号を遠制
装置に渡すことにより、計測データを得る選択計測方式
が一般に使用されている。(Prior technology) A system that transmits multiple pieces of measured data at a remote location using a remote monitoring and control device (hereinafter referred to as a remote control device) equipped with a feeding plate measurement function, and imports the data into a computer. In general, a selective measurement method is used in which measurement data is obtained by passing a selection signal corresponding to the data to be measured from a computer to a remote control device.
計測データを得ようとするとき、計算機から計測データ
に対応する選択信号を遠制装置の親局に渡し、この選択
信号は伝送回線を介して遠制装置の子局に伝送され、遠
制装置の子局は送られてきた選択信号に対応する計測デ
ータを選択して、遠制装置の親局へ伝送する。更にこの
計測データは親局から計算機へ渡されている。When trying to obtain measurement data, the computer passes a selection signal corresponding to the measurement data to the remote control device's master station, and this selection signal is transmitted to the remote control device's slave station via the transmission line, and the remote control device The slave station selects the measurement data corresponding to the sent selection signal and transmits it to the master station of the remote control device. Furthermore, this measurement data is passed from the master station to the computer.
(発明が解決しようとする問題点)
計算機が複数の°計測データを必要とするときは、計算
機から選択信号を順次送出することによって得ようとす
る複数の計測データを計算機に取込むことができる。(Problem to be Solved by the Invention) When a computer requires a plurality of ° measurement data, the plurality of measurement data to be obtained can be imported into the computer by sequentially sending selection signals from the computer. .
しかし、計測データの数が多い場合には、連続的に選択
信号を送出しなければならない。特に、一定時間内に多
くの計測データを計算機に取込む場合は選択信号の送出
間隔を短かくする必要がある。However, when there is a large amount of measurement data, selection signals must be sent out continuously. In particular, when a large amount of measurement data is to be input into a computer within a certain period of time, it is necessary to shorten the interval at which the selection signal is sent.
このような状態においては、計算機の選択信号を出力す
る処理が短かい周期で起動されることになり、計算機の
負荷が重くなるため、計算機の性能を著しく損うことに
なる。In such a state, the process of outputting the selection signal of the computer is started at short intervals, which increases the load on the computer and significantly impairs the performance of the computer.
本発明は前項で示したように多量の計測データを計算機
に取込む際、計算機に負荷がかからないよれうな方法を
提供するものである。The present invention provides a method that does not impose a load on the computer when a large amount of measurement data is imported into the computer as described in the previous section.
(問題点を解決するための手段)
本発明は複数の選択計測データを計算機に取込むために
、選択信号を一定周期で順次遠方監視制御装置へ出力す
る出力機能と、得られた計測データを前記計算機に渡す
常時選択計測機能とを具備した遠隔測定装置であり、従
来の構成に選択信号を送出するための常時選択計測装置
が付加されている。(Means for Solving the Problems) In order to import a plurality of selected measurement data into a computer, the present invention provides an output function that sequentially outputs selection signals to a remote monitoring and control device at a constant cycle, and a This is a remote measuring device equipped with a constant selection measurement function to pass the selection signal to the computer, and a constant selection measurement device for sending out a selection signal is added to the conventional configuration.
(作 用)
n個の計測データを機算機に取込む場合、常時選択計測
装置から一定周期で選択信号を送出する。(Function) When importing n pieces of measurement data into a computer, a selection signal is sent out at regular intervals from the constantly selected measurement device.
選択信号は第1の計測データから始まり順次送出し、第
nの計測データに対応する信号を送り終るとまた、第1
の計測データにもどり、これを繰り返すことによりサイ
クリックにn個の計測データに対応する選択信号を遠制
装置の親局に送り続ける。The selection signal is sent out sequentially starting from the first measurement data, and when the signal corresponding to the n-th measurement data has been sent, the selection signal is sent out sequentially starting from the first measurement data.
By repeating this process, the selection signal corresponding to the n measurement data continues to be cyclically sent to the master station of the remote control device.
サイクリックに送られてくる選択信号は伝送回線を介し
て子局に伝送される。子局においては送られてきた選択
信号にもとすいて計測データを選択し、これを親局に伝
送する。選択信号が順次出力されるので、計測データも
選択信号に対応して順次親局に送られてくる。この計測
データは、親局から常時選択計測装置に渡され、更に計
算機に入力される。従って従来計算機が処理していた選
択信号の出力は、常時選択計測装置が遂行するため計算
機の負荷は重くならない。The selection signal sent cyclically is transmitted to the slave station via the transmission line. The slave station selects measurement data based on the sent selection signal and transmits it to the master station. Since the selection signals are sequentially output, measurement data is also sequentially sent to the master station in correspondence with the selection signals. This measurement data is constantly passed from the master station to the selected measurement device, and further input into the computer. Therefore, the output of the selection signal, which was conventionally processed by a computer, is always performed by the selection measuring device, so that the load on the computer does not become heavy.
(実施例)
図面は本発明を使用した一実施例を示す遠隔測定装置の
構成図である。複数の遠隔地に存在している計測データ
は、遠制装置(II!局、子局)を介して常時選択計測
装置に渡され、更に計算機に取込まれる。(Embodiment) The drawing is a configuration diagram of a telemetry device showing an embodiment using the present invention. Measurement data existing at a plurality of remote locations is constantly passed to a selected measurement device via a remote control device (II! station, slave station), and is further imported into a computer.
常時選択計測装置から各親局に対して並列信号が出力さ
れるがこのとき、親局11の8個の計測データに順次選
択信号を出力し、終ってから次に親局21に対して同様
に選択信号を出力するという方法では全計測データをひ
ととおり計測するための時間が長くなり、これでは計測
データの更新時間が長くなってしまう。従って、複数の
親局に対して選択信号を同時に出力することにより、n
個の親局から同時に計測データが得られるようにし、計
測データの更新時間を最短に保つ。Parallel signals are always output from the selection measuring device to each master station, but at this time, the selection signal is outputted sequentially to the eight measurement data of the master station 11, and then the same is output to the next master station 21. In the method of outputting a selection signal at the same time, it takes a long time to measure all the measurement data at once, and this increases the time it takes to update the measurement data. Therefore, by simultaneously outputting selection signals to multiple master stations, n
To keep measurement data update time to the shortest possible time by allowing measurement data to be obtained from individual master stations at the same time.
常時選択計測装置から同時に親局11の計測データ11
1.親局21の計測データ211.親局n1の計測デー
タnilに対応する選択信号を出力する。n個の遠制装
置はそれぞれ独立して機能するため、各々の親局からそ
れぞれの計測データに対応した選択信号6が子局に伝送
され、当該計測データが子局から親局へ伝送回線7を使
用して伝送される。Measurement data 11 of the master station 11 from the constantly selected measurement device at the same time
1. Measurement data 211 of the master station 21. A selection signal corresponding to the measurement data nil of the master station n1 is output. Since the n remote control devices each function independently, a selection signal 6 corresponding to each measurement data is transmitted from each master station to the slave station, and the measurement data is transmitted from the slave station to the master station via the transmission line 7. transmitted using.
常時選択計測装置は各々の親局から計測データ3を受け
とり、更に計測データ4を計算機へ渡す。The constantly selected measurement device receives measurement data 3 from each master station, and further passes measurement data 4 to the computer.
次に、常時選択計測装置2がら各親局へ次の計測データ
121.計測データ221.計測データn21に対応す
る選択信号を出力し、前回と同様に当該計測データが計
算機に取込まれる。Next, the constantly selected measurement device 2 sends the next measurement data 121 to each master station. Measurement data 221. A selection signal corresponding to the measurement data n21 is output, and the measurement data is taken into the computer in the same way as last time.
この処理を繰り返すことにより一定周期で全ての計測デ
ータを計算機に取込む。By repeating this process, all measurement data is imported into the computer at regular intervals.
[発明の効果]
計測データが多量にあっても選択信号の出力処理は常時
選択計測装置が行うため、計算機の負荷が重くなるよう
なことはない。計算機から見れば、常に一定周期で計測
データが得られるので計測データの取込み処理を簡素に
することができる。[Effects of the Invention] Even if there is a large amount of measurement data, the selection signal output processing is always performed by the selection measurement device, so the load on the computer does not become heavy. From the computer's point of view, measurement data can always be obtained at regular intervals, which simplifies the process of acquiring measurement data.
図面は本発明の一実施例を示した遠隔測定装置の構成図
である。
1・・・計算機、 2・・・常時選択計測装
置、11・・・親局、 12・・・子局。
111・・・計測データ。
代理人 弁理士 則 近 憲 佑
同 二俣弘文The drawing is a configuration diagram of a telemetry device showing an embodiment of the present invention. DESCRIPTION OF SYMBOLS 1...Computer, 2...Always selected measuring device, 11...Master station, 12...Slave station. 111...Measurement data. Agent Patent Attorney Nori Chika Yudo Hirofumi Futamata
Claims (1)
号を一定周期で順次遠方監視制御装置へ出力する出力機
能と、得られた計測データを前記計算機に渡す常時選択
計測機能とを具備した遠隔測定装置。In order to import a plurality of selected measurement data into the computer, a remote controller is equipped with an output function that sequentially outputs selection signals to a remote monitoring and control device at regular intervals, and a constant selection measurement function that passes the obtained measurement data to the computer. measuring device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP28193386A JPS63136793A (en) | 1986-11-28 | 1986-11-28 | Remote measuring instrument |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP28193386A JPS63136793A (en) | 1986-11-28 | 1986-11-28 | Remote measuring instrument |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS63136793A true JPS63136793A (en) | 1988-06-08 |
Family
ID=17645959
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP28193386A Pending JPS63136793A (en) | 1986-11-28 | 1986-11-28 | Remote measuring instrument |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS63136793A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5408176A (en) * | 1988-03-21 | 1995-04-18 | Blatt; David W. E. | Monitoring and fault protection of high voltage switch yards |
-
1986
- 1986-11-28 JP JP28193386A patent/JPS63136793A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5408176A (en) * | 1988-03-21 | 1995-04-18 | Blatt; David W. E. | Monitoring and fault protection of high voltage switch yards |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6002996A (en) | Networked sensor system | |
CN104913806B (en) | Measurement apparatus | |
JPS60502058A (en) | Method and device for simultaneously monitoring yarn quality at multiple similar monitoring points in a textile machine | |
JP2024073458A (en) | Bus synchronization system | |
JPS63136793A (en) | Remote measuring instrument | |
JPS63104193A (en) | Data collecting system | |
SU1346083A1 (en) | Incubator control system | |
SU966723A1 (en) | Remote measurement system monitored station device | |
JPS62160564A (en) | Pipeline control system | |
SU432499A1 (en) | DEVICE FOR MANAGING THE MULTICHANNEL MEASURING SYSTEM | |
SU481899A1 (en) | Information processing device | |
GB1278597A (en) | Improvements in data-processing system | |
JPH01140397A (en) | Method for transmitting measured data | |
SU830403A1 (en) | Device for determining characteristics of information process | |
SU862147A2 (en) | Device for checking and recording information on treated textile materials lots | |
SU1259277A1 (en) | Interface for linking processors in pipeline computer system | |
JP2002116805A (en) | Distribution type control system | |
JPH04301722A (en) | Distributed measuring device | |
JPH08314868A (en) | Data transmitter | |
JPH0923239A (en) | Data transmitter | |
JPH08265876A (en) | Setting value information transmitter | |
JPH08235086A (en) | Time information transmitter | |
JPH0325634A (en) | System for measuring on-line response time | |
JPH02128596A (en) | Data collecting system for remote supervisory system | |