JPS6262932A - Transportation channel of roving bobbin - Google Patents

Transportation channel of roving bobbin

Info

Publication number
JPS6262932A
JPS6262932A JP19919885A JP19919885A JPS6262932A JP S6262932 A JPS6262932 A JP S6262932A JP 19919885 A JP19919885 A JP 19919885A JP 19919885 A JP19919885 A JP 19919885A JP S6262932 A JPS6262932 A JP S6262932A
Authority
JP
Japan
Prior art keywords
rail
bobbin
roving
frame
spinning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP19919885A
Other languages
Japanese (ja)
Other versions
JPH0518925B2 (en
Inventor
Koichi Yamada
光一 山田
Kanehiro Ito
伊藤 兼広
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Howa Machinery Ltd
Original Assignee
Howa Machinery Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Howa Machinery Ltd filed Critical Howa Machinery Ltd
Priority to JP19919885A priority Critical patent/JPS6262932A/en
Publication of JPS6262932A publication Critical patent/JPS6262932A/en
Publication of JPH0518925B2 publication Critical patent/JPH0518925B2/ja
Granted legal-status Critical Current

Links

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H9/00Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
    • D01H9/18Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for supplying bobbins, cores, receptacles, or completed packages to, or transporting from, paying-out or take-up stations ; Arrangements to prevent unwinding of roving from roving bobbins

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
  • Spinning Or Twisting Of Yarns (AREA)

Abstract

PURPOSE:To improve the transportation efficiency of roving bobbin, by providing a by-pass rail to the main rail connecting a fine spinning frame and a roving frame, by-passing and reserving empty bobbin to treat the residual yarn and transporting full bobbin to the fine spinning frame. CONSTITUTION:A spare rail 102 and a doffing rail 103 are branched from a main rail 101 and a by-pass rail 104 is provided. The by-pass rail is furnished with an automatic residual sliver peeling apparatus A.R.S. The empty bobbin delivered from the fine spinning frames SF1, SF2...SFn is by-passed for the treatment of residual yarn and reserved. The full bobbin doffed from the roving frames RM1, RM2 are transported to the fine spinning frame while reserving the empty bobbin on the by-pass rail.

Description

【発明の詳細な説明】 産業上の利用分野 本願は、精紡機と粗紡機間に架設される粗糸ボビンの搬
送路に係り、1本のメーンレールとメーンレールから精
紡機と粗紡機に向って分岐する予備レール及びドツフィ
ングレールと、更に残篠自動剥取装置を有するバイパス
レールとからなる開回路の移送路により、効果的な粗糸
ボビンの搬送を行なわんとするものである。
[Detailed Description of the Invention] Industrial Application Field The present application relates to a conveyance path for roving bobbins installed between a spinning frame and a roving frame, and a conveyance path for roving bobbins installed between a spinning frame and a roving frame. The roving bobbin is effectively transported by an open-circuit transport path consisting of a spare rail and a dotting rail that branch out at the same time as the main line, and a bypass rail that is further equipped with an automatic residue stripping device.

従来の技術とその問題点 近年紡績機械の自動化が進み、粗紡機で自動的に玉揚げ
された粗糸ボビンを所定の搬送路によって精紡機に運び
、精紡機で自動的に篠交換を行ない精紡機から取り出さ
れた空ボビンを粗紡機に搬送し、自動的な連続作業が広
く行なわれ、精紡機と粗紡機間の粗糸ボビンの搬送路、
又該搬送路を走行し粗糸ボビンを搬送する搬送具が数多
く提案されており、本出願人も先に特開昭60−673
68号「粗糸ボビンの搬送装置」として出願を行なって
いる。
Conventional technology and its problems In recent years, the automation of spinning machines has progressed, and the roving bobbin, which is automatically doffed by the roving machine, is transported to the spinning machine via a predetermined conveyance path, and the spinning machine automatically exchanges the yarn. The empty bobbin taken out from the spinning machine is conveyed to the roving frame, and automatic continuous operation is widely carried out.
In addition, many conveyance tools have been proposed that run on the conveyance path and convey the roving bobbin, and the present applicant also previously proposed Japanese Patent Application Laid-Open No. 60-673.
No. 68 "Roving bobbin conveying device" has been filed.

而して上記出願に係る装置の、主及び分岐レールからな
る搬送路を検討するに、】、本のメーンレールとこれか
ら分岐する分岐レールを全て開回路としており、順環路
によるサイクルタイムの延長、往、復路用の2本のメー
ンレールを使用することによるレール全長が長くなるこ
とや、制御の複雑さを除いた点で一応評価し得る。然し
ながら上記した従来装置は、精紡機から出た搬送具が粗
紡機に又その逆と云うように、搬送具がスタートしてか
ら完全にゴールするまでは、次の作業が一切行ない得な
いのでサイクルタイムにロスがあり、このロスはメーン
レールの延長が長くなると無視できない。又上記従来装
置はサイクルタイム中最大の時間を要する残糸処理、即
ち空ボビンに残っている残篠を自動的に剥ぎ取る処理を
、メーンレール」二で行なわんとしサイクルタイムを更
に延長する大きな欠点を有している。
Considering the conveyance route consisting of the main and branch rails of the device related to the above application, the main rail and the branch rails branching from it are all open circuits, and the cycle time is extended by the circular route. , the overall length of the rails becomes longer due to the use of two main rails for the outbound and return trips, and the complexity of the control is eliminated. However, with the above-mentioned conventional device, the next operation cannot be performed at all from the time the conveyor starts until it completely reaches the goal, such as when the conveyor from the spinning frame is transferred to the roving frame and vice versa. There is a loss in time, and this loss cannot be ignored as the main rail length increases. Furthermore, in the conventional device described above, the process of processing the remaining yarn, which takes the longest time during the cycle time, that is, the process of automatically stripping off the yarn remaining on the empty bobbin, is not carried out on the main rail 2, which further extends the cycle time. It has its drawbacks.

問題点を解決するための手段 本願は上記した従来装置に鑑み、精紡機から粗紡機に至
るメーンレールに、残篠自動剥取装置(以下A、R,S
と称す)を有するバイパスレールを設け、精紡機より引
き取った空ボビンをバイパスさせて残糸処理を行なうと
ともに一種のりザーブレールの作用を行なわせ、この間
に粗紡機で玉揚げされた満ボビンを精紡機に搬送するこ
とにより、上記従来装置の欠点を除いたものである。
Means for Solving the Problems In view of the above-mentioned conventional devices, the present application provides automatic residue stripping devices (hereinafter referred to as A, R, and S) on the main rails from spinning machines to roving machines.
A bypass rail is installed to bypass the empty bobbins taken from the spinning frame to dispose of the remaining yarn, and also to act as a kind of gluing rail.During this time, the full bobbins doffed by the roving frame are transferred to the spinning frame. This eliminates the drawbacks of the conventional device described above.

実施例 以下本願を、図面に示す実施例によって詳細に説明する
。第1図において1台又は複数台の粗紡機RMI、RM
2と、これに対応する多数台の精紡機SFI、SF2、
SFnが並設されている。
EXAMPLES The present invention will be explained in detail below using examples shown in the drawings. In Figure 1, one or more roving machines RMI, RM
2, and a large number of corresponding spinning machines SFI, SF2,
SFn are arranged in parallel.

尚、粗紡機RM”1、RM2の玉揚は周知のように一斉
換方式と、ワゴン方式のグループ揚方式が採用されてい
るが、−斉換方式の場合は機台前面に一斉管換装置と、
図中A点にボビンの移換装置とリフターが取付けられて
いるが、これ等は本願の要旨ではないので省略する。
As is well known, the doffing of the roving machines RM"1 and RM2 uses the simultaneous changeover system and the wagon-type group doffing system. In the case of the simultaneous changeover system, there is a simultaneous pipe changeover device on the front of the machine. and,
A bobbin transfer device and a lifter are attached at point A in the figure, but these are not the gist of the present application and will therefore be omitted.

以上のように並設された粗、精紡機間に、本願の要部を
なす搬送路100が地上より所定の高さを持って架設さ
れるが、該搬送路100は次の如くである。精紡機SF
I、SF2、SFnと粗紡ll!!RM 1、RM2の
機台側端面に沿いその長手方向と略平行する如くに、開
回路の1本のメーンレール101が設けられている。次
に102はメーンレール101から分岐した予備レール
で、精紡機SFI、SF2、SFnのR,L側面側に機
台前面に沿って延び精紡機上部に設けたボビンクリール
の上方に位置している。更に103はメーンレール10
1より分岐したドツフィングレールで。
A conveyance path 100, which constitutes the essential part of the present application, is constructed at a predetermined height above the ground between the coarse and fine spinning machines arranged in parallel as described above, and the conveyance path 100 is as follows. Spinning machine SF
I, SF2, SFn and Rovell! ! One open-circuit main rail 101 is provided along the machine side end surfaces of RM 1 and RM 2 so as to be substantially parallel to the longitudinal direction thereof. Next, reference numeral 102 is a spare rail branched from the main rail 101, which extends along the front side of the R and L sides of the spinning machines SFI, SF2, and SFn, and is located above the bobbin creel provided at the top of the spinning machine. . Furthermore, 103 is main rail 10
Dotufin rail branched from 1.

粗紡機RMI、RM2の機台後方から前方側に至り、略
機台を取り囲むようにしているが、これは−斉管換を使
用する場合で、グループ揚の場合は後方側は必要でなく
直接機台前方に分岐させればよい。最後に104はバイ
パスレールで、上記精紡機S F l、SF2、SFn
と粗紡機RMI、RM2間のメーンレール101をバイ
パスする如くに分岐して配設され、而してその全長は、
後記する一搬送単位即ち、粗紡機RMI、RM2より玉
揚げされた粗糸ボビンを運搬するボビンキャレージの長
さより、少なくとも二倍以上の長さを有し、略その中間
点付近にA、R,Sが取付けられている。
The rovers RMI and RM2 extend from the rear of the machine frame to the front side, almost surrounding the machine frame, but this is only when using simultaneous control, and in the case of group lifting, the rear side is not necessary and it is directly connected to the machine frame. Just branch it to the front of the machine. Finally, 104 is a bypass rail, which is used for the spinning machines S F l, SF2, SFn.
The main rail 101 between the rovers RMI and RM2 is bypassed, and the total length thereof is as follows.
It has a length at least twice as long as the length of the bobbin carriage that conveys the roving bobbins doffed from the roving machines RMI and RM2, which will be described later, and there are A and R near the midpoint. , S are attached.

上記搬送路100を構成する各レールlot、102.
103.104は、その断面形状が第2図に示すように
下部を開口した中空矩形状に形成され、このレールには
、下記に詳記するボビンキャレージ15が走行可能に懸
装される。而してボビンキャレージ15は次の如くであ
る。11は保持板でその下面には、所定の等ピッチPに
て複数個のボビンハンガー12が吊設されその上面には
車輪9が取付けられいる。この保持板11は複数枚連設
され、粗紡機RMI、RM2の錘数とボビンハンガー1
2の数を同数としてボビンキャレージ15が構成され、
このボビンキャレージ15の長さを持って一搬送単位と
されている。而してボビンキャレージ15は、上記車輪
9をレールの中空断面内に嵌挿することにより、各レー
ルに沿って走行自在となっている。
Each rail lot forming the transport path 100, 102.
103 and 104 have a hollow rectangular cross-sectional shape with an open bottom as shown in FIG. 2, and a bobbin carriage 15, which will be described in detail below, is movably suspended on this rail. The bobbin carriage 15 is as follows. Reference numeral 11 denotes a holding plate, and a plurality of bobbin hangers 12 are suspended from the lower surface of the holding plate at a predetermined equal pitch P, and wheels 9 are attached to the upper surface of the holding plate. A plurality of holding plates 11 are arranged in series, and the number of spindles of the roving frames RMI and RM2 and the number of bobbin hangers 1 are
The bobbin carriages 15 are configured with the same number of 2,
The length of this bobbin carriage 15 is defined as one transport unit. The bobbin carriage 15 is movable along each rail by fitting the wheels 9 into the hollow sections of the rails.

次いで、この搬送路100のレールに懸装した走行可能
なボビンキャレージ〕−5を、精紡機SFと粗紡機RM
間でリレ一式に移送するための移送装置16が第1図に
示すように搬送路100の所定の位置に設けられ、而し
てその設置間隔は、上記ピンキャレージ15の全長より
も短い間隔を保って複数組配備されている。このボビン
キャレージ15の移送装置16は、第4図から第6図に
示すように、各レール101.102.103.104
の一方の側面に軸線の垂直な軸受17が固着され、その
軸受17に軸支した竪軸18の下端に、外周面19aが
保持板11の側面11aに接する積極駆動の回転円板1
9が固着され、その竪軸18の上部にはスプリング20
によって上方へ付勢した円錐摩擦車21が取付けられ、
この円錐摩擦車21−が、各搬送レールに沿って水平方
向に軸支した伝動軸22A、22B若しくは23よ(第
1図において省略)に固定され摩擦部を合成ゴム等によ
って成形した円錐摩擦車24に圧接されている。また1
、上記の軸受17を固着した各レール101.102.
103.104の他側には該レール101,102,1
03.104に固着したブラケット25に一端をピン連
結して水平方向に揺動可能に枢支した軸受26が配備さ
れ、この軸受26に垂直方向に軸支した竪軸27の下端
に、外周面28aが保持板11の側面11bと対応する
消極駆動の回転円板28が固着され、更に、水平方向に
揺動可能に枢支した前記の軸受26がスプリング29に
よって前記の軸受17側へ付勢され、かつ、ス)〜ソバ
30によって左右の回転円板19と28間の最小ゲージ
が保持板11の幅寸法より僅かに狭くなるように位置決
めされ、この左・右の回転円板19と28によって保持
板11をその幅方向から挟持してボビンキャレージ15
を長手方向に送るようになっており、この移送装置16
は図示を省略して駆動装置により、正逆回動するように
なされている。
Next, the movable bobbin carriage]-5 suspended on the rail of this conveyance path 100 is transferred to the spinning frame SF and the roving frame RM.
As shown in FIG. 1, a transfer device 16 for transferring a set of relays between pins is provided at a predetermined position on the conveyance path 100, and the installation interval is kept shorter than the overall length of the pin carriage 15. Multiple sets are deployed. As shown in FIGS. 4 to 6, the transfer device 16 for the bobbin carriage 15 is arranged on each rail 101, 102, 103, 104.
A bearing 17 whose axis is perpendicular is fixed to one side surface of the rotary disk 1, and a positively driven rotary disk 1 whose outer circumferential surface 19a is in contact with the side surface 11a of the holding plate 11 is attached to the lower end of a vertical shaft 18 which is rotatably supported by the bearing 17.
9 is fixed, and a spring 20 is attached to the upper part of the vertical shaft 18.
A conical friction wheel 21 is attached which is biased upward by
This conical friction wheel 21- is fixed to a transmission shaft 22A, 22B, or 23 (omitted in Fig. 1) which is horizontally supported along each conveyance rail, and the friction portion is formed of synthetic rubber or the like. 24. Also 1
, each rail 101.102. to which the above-mentioned bearing 17 is fixed.
103. On the other side of 104, the rails 101, 102, 1
A bearing 26 is provided, one end of which is connected with a pin to a bracket 25 fixed to the 03.104 and pivoted so as to be able to swing in the horizontal direction. A passively driven rotary disk 28 whose 28a corresponds to the side surface 11b of the holding plate 11 is fixed, and the bearing 26, which is pivotally supported so as to be swingable in the horizontal direction, is urged toward the bearing 17 by a spring 29. The left and right rotating discs 19 and 28 are positioned so that the minimum gauge between the left and right rotating discs 19 and 28 is slightly narrower than the width of the holding plate 11. The holding plate 11 is held in the width direction by the bobbin carriage 15.
This transfer device 16
is configured to rotate forward and backward by a drive device (not shown).

次に、メーンレール101より分岐している予備ドツフ
ィング、バイパスレール102,1.03104の各分
岐点の夫々に切換装置34が取付けられ、ボビンキャレ
ージ15の運行を制御する。
Next, a switching device 34 is attached to each branch point of the preliminary doffing and bypass rails 102 and 1.03104 branching from the main rail 101 to control the operation of the bobbin carriage 15.

而してこの切換装置34は、その取付位置によって図面
においてR,L若しくは」二下方向が逆になるが、構成
作用は同一なので精紡機SF1、SF2、SFnに取付
けた1個についてのみ説明する。
Although the R, L, or lower direction of this switching device 34 is reversed in the drawings depending on its mounting position, the configuration and function are the same, so only the one mounted on the spinning machines SF1, SF2, and SFn will be explained. .

この精紡機側の切換装置34は、第7図に示すようにメ
ーンレール101と精紡機側の予備レール102の分岐
点に、垂直方向に軸支した支軸38を中心に水平方向に
揺動する搬路切換板39が配置され、その支軸38の上
端に取付けた揺動腕40の先端にエアーシリンダ41が
連結され、更に、揺動腕40の中間部にピン連結した連
杆42の他端が、前記伝動軸23上の円錐摩擦車32と
一端が係合した揺動可能なシフタレバー43の他端にピ
ン連結され、エアーシリンダ41の作動により、搬路切
換板39が支軸38を中心に揺動してメーンレール10
1の搬送路と、精紡機側の予備レール102の搬送路を
断続すると同時に伝動軸23上の円錐摩擦車32を、伝
動軸22Bの円錐摩擦車32と係脱するようになってい
る。
As shown in FIG. 7, this switching device 34 on the spinning machine side swings horizontally around a support shaft 38 that is vertically supported at the branch point between the main rail 101 and the spare rail 102 on the spinning machine side. An air cylinder 41 is connected to the tip of a swinging arm 40 attached to the upper end of the support shaft 38, and a connecting rod 42 is connected to the middle part of the swinging arm 40 with a pin. The other end is pin-connected to the other end of a swingable shifter lever 43, one end of which is engaged with the conical friction wheel 32 on the transmission shaft 23. Main rail 10 swings around
At the same time, the conical friction wheel 32 on the transmission shaft 23 is engaged with and disengaged from the conical friction wheel 32 on the transmission shaft 22B.

以上の如く構成された本願実施例において以下その作用
を説明するが2以上の実施例において搬送路100の構
成以外、ボビンキャレージ15、移送装置16及び切換
装置34等の構成は全て本出願人が先に出願した特開昭
60−67368号の構成を採用している。然しながら
本願においてこれ等の構成は以上に限定されるものでな
く、−搬送単位の粗糸ボビンを、以下に詳記する如くに
して精、粗紡機間を搬送し得るものであれば、従来公知
のどの装置を採用してもよくその構成を問わない。
The functions of the embodiments of the present invention constructed as described above will be explained below, but in two or more embodiments, the structures of the bobbin carriage 15, the transfer device 16, the switching device 34, etc., other than the structure of the conveyance path 100, were all made by the present applicant. The structure of Japanese Patent Application Laid-Open No. 60-67368, which was previously filed by JP-A-60-67368, is adopted. However, in the present application, these configurations are not limited to the above, and any conventionally known configurations may be used as long as the roving bobbin of the conveying unit can be conveyed between the fine and roving frames as detailed below. Any device may be used and its configuration does not matter.

尚搬送路100による粗糸ボビンの搬送は、連続作業で
あり状況が常に変化するが、説明の基準として図中精紡
機SFIの予備レール102は空の状fmで満ボビンF
Bを要求しており、精紡機SF2の予備レール】02に
は空ボビンEBを(残糸が巻付いた処理前のもの)吊下
した、ボビンキャレージ15が装架されて空ボビンの引
き取りを要求し、又粗紡機RMI (RM2でも可)の
ドツフィングレール103には、満ボビンFBを吊下し
た、ボビンキャレージ15が待機している状1ル、即ち
粗紡機と精紡機が1=2の対応を基準として説明を行な
う。
The conveyance of the roving bobbin by the conveyance path 100 is a continuous operation and the situation always changes, but as a reference for explanation, the spare rail 102 of the spinning frame SFI in the figure is empty fm and full bobbin F.
A bobbin carriage 15 is mounted on the spare rail of the spinning frame SF2 and the bobbin carriage 15 suspends the empty bobbin EB (unprocessed with residual yarn wound around it) and takes over the empty bobbin. In addition, the bobbin carriage 15 with full bobbins FB suspended from the dotting rail 103 of the roving frame RMI (RM2 is also acceptable) is waiting, that is, the roving frame and the spinning frame are 1. The explanation will be based on the correspondence of =2.

精紡機SFIの満ボビンFB要求及び精紡機SF2の引
き取り要求により、精紡機S、 F 2のR側のボビン
キャレージ15が、移送装置16の作用により搬送が開
始され、この時精紡機SF2のR側の予備レール102
の分岐点から、バイパスレール104の分岐点迄の切換
装置34の全ては、搬送されて来るボビンキャレージ1
5をバイパスレール104に案内する如くに作用し、こ
の間のメーンレール101は全て開放されている。従っ
て空ボビンEB吊下したボビンキャレージ15は、途中
に設けられた移送装置16に順次リレーされてバイパス
レール104に入り、A、R,Sに至って残糸処理が行
なわれ、完全に処理が終了するとボビンキャレージ15
は第1図にA、R,Sの右側に移行するが、バイパスレ
ール104は前記の寸法に設定されているので残糸処理
の前後を問わずメーンレール101にはみ出して他の搬
送を妨げることがない。
In response to a full bobbin FB request from spinning frame SFI and a take-over request from spinning frame SF2, the bobbin carriages 15 on the R side of spinning frames S and F2 start to be transported by the action of the transfer device 16, and at this time, the bobbin carriages 15 on the R side of spinning frames S and F2 start to be conveyed. Spare rail 102 on the R side
All of the switching devices 34 from the branching point of the bypass rail 104 to the branching point of the bypass rail 104
5 to the bypass rail 104, and the main rail 101 during this time is entirely open. Therefore, the bobbin carriage 15 hanging the empty bobbin EB is sequentially relayed to the transfer device 16 provided on the way, enters the bypass rail 104, reaches A, R, and S, where the remaining yarn is processed and completely processed. When finished, bobbin carriage 15
moves to the right side of A, R, and S in Fig. 1, but since the bypass rail 104 is set to the above-mentioned dimensions, it does not protrude onto the main rail 101 and obstruct other conveyance regardless of whether before or after residual yarn processing. There is no.

以上の如くに、精紡機SF2のR側から空ボビンEBを
吊下したボビンキャレージ15が発進しA、R,Sに至
ると1次いで粗紡機RMIのドツフィングレール103
上に待機していた、満ボビンFBを吊下したボビンキャ
レージ15が先に満ボビン要求を出している精紡機SF
IのR側の予備レール102に向い、上記の如く途中に
設けられた移送装置16に順次リレーされて搬送が行な
われ、この特番分岐点に設けられた切換装置34は全て
はメーンレール101を開放し、粗紡機RM1から発進
したボビンキャレージ15を精紡機SFIのR側の予備
レール102に案内する如くに搬送する。この間にA、
R,Sによる残糸処理が行なわれ、全部の処理が終ると
処理済の空ボビンEBを吊下したボビンキャレージ15
は、バイパスレール104を出て粗紡機RMIのドツフ
ィングレール103に搬送されるが、当然にこの時切換
装置34は、バイパスレール104から粗紡機RMIの
ドツフィングレール103間のメインレール101を開
放するように作用している。
As described above, when the bobbin carriage 15 with the empty bobbin EB suspended from the R side of the spinning frame SF2 starts and reaches A, R, and S, it first moves to the dotting rail 103 of the spinning frame RMI.
Bobbin carriage 15 with full bobbin FB hanging there, which was waiting at the top, first issued a full bobbin request in spinning machine SF.
It faces the spare rail 102 on the R side of I, and is sequentially relayed to the transfer device 16 provided on the way as described above to carry out the transfer, and all the switching devices 34 provided at this special number branch point are connected to the main rail 101. The bobbin carriage 15 that has been opened and started from the roving frame RM1 is transported so as to be guided to the spare rail 102 on the R side of the spinning frame SFI. During this time, A
Remaining yarn processing is performed by R and S, and when all processing is completed, the bobbin carriage 15 suspends the processed empty bobbin EB.
exits the bypass rail 104 and is conveyed to the dotting rail 103 of the roving frame RMI, but naturally at this time the switching device 34 opens the main rail 101 between the bypass rail 104 and the dotting rail 103 of the roving frame RMI. It is working to do so.

以上において、精紡機SFI、SF2夫々のR側への満
ボビンFBの供給と、空ボビンEBの引取りが終了し、
粗紡機RM2で玉揚が行なわれ満ボビンFBを吊下した
ボビンキャレージ15が、粗紡機RM2のドツフィング
レール103上に待機すると(尚この場合粗紡機の巻揚
速度が精紡機の粗糸の使用速度より格段に早いので、R
M2を使用することなく、粗紡機RMIが次の玉揚を行
なう迄まっていても能力的には充分である。)。
With the above, the supply of full bobbins FB to the R side of spinning machines SFI and SF2, and the taking back of empty bobbins EB, have been completed.
When the bobbin carriage 15 on which doffing is performed on the roving frame RM2 and a full bobbin FB is suspended is waiting on the doffing rail 103 of the roving frame RM2 (in this case, the winding speed of the roving frame is set to the roving speed of the spinning frame). It is much faster than the usage speed of R.
Even if the roving frame RMI does not use M2 until it performs the next doffing, it is sufficient in terms of capacity. ).

上記したと同様の順序にて精紡機SF2のL側から空ボ
ビンEBを引き取り、精紡機SFIのL側に満ボビンF
Bを供給し、−サイクルの搬送作業が完了する。而して
上記において満ボビンFBが供給された精紡機SFIに
おいて篠換が行なわれ、空ボビンEBが予備レール10
2上に取り出されると、上記と逆に精紡機SFIが空ボ
ビン引取り要求を、SF2が満ボビン要求を出して満空
ボビンの引取り及び供給が行なわれる。
In the same order as above, take the empty bobbin EB from the L side of the spinning frame SF2, and transfer the full bobbin F to the L side of the spinning frame SFI.
B is supplied, and the -cycle conveyance work is completed. Then, in the spinning machine SFI to which the full bobbin FB was supplied, a replacement is performed, and the empty bobbin EB is transferred to the spare rail 10.
When the bobbin is taken out onto the bobbin 2, the spinning machine SFI issues an empty bobbin take-up request, and the spinning frame SF2 issues a full bobbin request, conversely to the above, and the full bobbin is taken and supplied.

次に粗紡機RMI、RM2のドツフィングレール103
について説明する。図面においてドツフィングレール1
03は、メーンレール101から分岐した後粗紡機後側
を通りU字状に折り曲って機台前面に至っているが、こ
れは−斉玉揚を行なう際に、A点に設けた移換装置、リ
フターによりボビンキャレージ15が運んで来た空ボビ
ンEBを一斉換装置に移し換え、−斉換装置が粗紡機か
ら取り出した満ボビンFBをボビンキャレージ15のボ
ビンハンガー12に装着する際にのみ必要なもので、ワ
ゴン式のグループ揚の場合は、機台前面に直接位置する
如くに分岐させればよい。
Next, the dotting rail 103 of the roving machine RMI, RM2
I will explain about it. Dotfin rail 1 in the drawing
03 branches from the main rail 101, passes through the rear side of the roving frame, bends into a U-shape, and reaches the front of the machine frame. , the empty bobbins EB carried by the bobbin carriage 15 are transferred to the simultaneous transfer device by the lifter, and - when the simultaneous transfer device attaches the full bobbins FB taken out from the roving frame to the bobbin hanger 12 of the bobbin carriage 15. In the case of a wagon-type group lift, it is only necessary to branch out so that it is located directly in front of the machine.

以上における実施例の説明は、粗紡機と精紡機を1=2
の割合で対応させた最小の作業単位について説明したが
、実際の操業においては粗紡機と精紡機の能力を勘案し
、複数台の粗紡機と多数台の精紡機を接続し、夫々所定
の制御手段によって制御して作業を行なうものであるが
、これは本願の要旨ではないので省略する。
In the above description of the embodiment, the roving frame and the fine spinning frame are 1=2.
Although we have explained the minimum unit of work that corresponds to the ratio of Although the work is controlled by means, this is not the gist of the present application and will therefore be omitted.

次に、第8図に示した他の実施例について説明する。第
8図の実施例は、バイパスレール104に平行させてス
トレージレール104aを設けたもので、このレールに
残糸処理済の空ボビンEBを待機させ、上記の如く精紡
機SFから引き取った空ボビンEBがバイパスレール1
04に入り、粗紡機RMから満ボビンFBの発進が行な
われると、バイパスレール104上の空ボビンEBの残
糸処理を待つことなくストレージレール104aに待機
している空ボビンEBを、粗紡機に送り込むことにより
サイクルタイムの短縮を図ることができる。
Next, another embodiment shown in FIG. 8 will be described. In the embodiment shown in FIG. 8, a storage rail 104a is provided parallel to the bypass rail 104, and an empty bobbin EB that has been processed with residual yarn is placed on standby on this rail, and an empty bobbin EB taken from the spinning frame SF as described above is placed on standby. EB is bypass rail 1
04, when the full bobbin FB is started from the roving frame RM, the empty bobbin EB waiting on the storage rail 104a is sent to the roving frame without waiting for the remaining yarn processing of the empty bobbin EB on the bypass rail 104. As a result, cycle time can be shortened.

又上記実施例においてバイパスレール104及びAR8
は1組のみであるが、これを複数組設けることによりサ
イクルタイムの短縮を図るのみならず、原綿が違う製品
の紡出を行なうに際し、特定の精紡機から引き取った空
ボビンを特定のバイパスレールに搬送して残糸処理を行
なった後、空ボビンを特定の粗紡機に送り込み更に、該
粗紡機より特定の精紡機に満ボビンを送り込むようにす
ることにより、多品種少量生産の場合の品質管理を容易
に行ない得るとともに、剥ぎ取った残糸の利用度を高め
る。
Furthermore, in the above embodiment, the bypass rail 104 and the AR8
Although there is only one set of these, by providing multiple sets, it is possible not only to shorten the cycle time, but also to transfer empty bobbins taken from a specific spinning machine to a specific bypass rail when spinning products using different raw cotton. After conveying the yarn to a machine and processing the remaining yarn, the empty bobbin is sent to a specific roving frame, and then the full bobbin is sent from the roving frame to a specific spinning frame, thereby improving quality in the case of high-mix, low-volume production. To facilitate management and increase the utilization of stripped yarn.

発明の効果 本願は以上に詳記したように、1本のメーンレールより
予備レールとドツフィングレールを分岐するとともにバ
イパスレールを設け、全体の搬送路を開路とした簡単な
構成により満、空ボビンの搬送を行なうようにしたこと
により、搬送効率を格段に向上させ得るばかりでなく、
安価な設備費用にて大規模な粗、精紡機群間の搬送が可
能となり、製造する製品の多様化にも対応し得る等、従
来装置の欠点を除いて自動化作業に資する処極めて大な
る発明である。
Effects of the Invention As described in detail above, the present application has a simple structure in which a spare rail and a dosing rail are branched from one main rail, a bypass rail is provided, and the entire conveyance path is open, so that full and empty bobbins can be handled easily. Not only can the conveyance efficiency be greatly improved, but also
This is an extremely significant invention that contributes to automated work by eliminating the shortcomings of conventional equipment, such as making it possible to transport large-scale spinning and spinning machines between groups at low equipment costs, and responding to the diversification of manufactured products. It is.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本願実施例を示し、第1図は配置図、第2図はボ
ビンキャレージを装架したレールの断面図、第3図は第
2図の側面図、第4図は移送装置の正面図、第5図は第
4図の側面図、第6図は第4図の平面図、第7図は切換
装置の平面図である。 SFI、SF2、S F n −精紡機、 RMI。 RM2・・・粗紡機、 A、R,S・・・残篠自動剥取
装置、  100・・・搬送路51o1・・・メーンレ
ール、102・・・予備レール、  103・・・ドツ
フィングレール、  104・・・バイパスレール、 
 104a・・・ストレージレール 特許出願人   豊和工業株式会社 第4図 LltJjバIIJ4ノ 第5図 11j        1ソ          1’
/第6図 第7図
The drawings show the embodiment of the present application, and Fig. 1 is a layout diagram, Fig. 2 is a sectional view of a rail on which a bobbin carriage is mounted, Fig. 3 is a side view of Fig. 2, and Fig. 4 is a front view of the transfer device. 5 is a side view of FIG. 4, FIG. 6 is a plan view of FIG. 4, and FIG. 7 is a plan view of the switching device. SFI, SF2, SF n-spinning machine, RMI. RM2... Roving machine, A, R, S... Residue automatic stripping device, 100... Conveyance path 51o1... Main rail, 102... Spare rail, 103... Dotting rail, 104...Bypass rail,
104a...Storage rail Patent applicant Howa Kogyo Co., Ltd. Figure 4 LltJj IIJ4 Figure 5 11j 1 So 1'
/Figure 6Figure 7

Claims (1)

【特許請求の範囲】[Claims] 1、所定錘数の粗糸ボビンを搬送の1単位とし、これを
ボビンキャレージのボビンハンガーに吊下げて粗糸ボビ
ンの搬送を行なうボビン搬送において、精紡機群と粗紡
機群との間に1本のメーンレールを配設し、該メーンレ
ールより精紡機のR、L側の機台前面に位置する予備レ
ールと、粗紡機の前面に至るドッフィングレールを分岐
させるとともに、1搬送単位のボビンキャレージの長さ
より少なくとも2倍以上の長さを有し、略中間点付近に
残篠自動剥取装置を有しメーンレールをバイパスするバ
イパスレールをメーンレールに取付け、全ての搬送レー
ルが開路となっている粗糸ボビンの搬送路。
1. In bobbin transport, in which roving bobbins with a predetermined number of spindles are used as one unit of transport, and the roving bobbins are transported by hanging them from the bobbin hanger of the bobbin carriage, there is no space between the spinning frame group and the roving frame group. A single main rail is provided, and a spare rail located at the front of the R and L sides of the spinning frame and a doffing rail leading to the front of the spinning frame are branched from the main rail, and Attach a bypass rail to the main rail that is at least twice as long as the length of the bobbin carriage, has an automatic residue stripping device near the midpoint, and bypasses the main rail, and all conveyance rails are opened. The transport path for the roving bobbin.
JP19919885A 1985-09-09 1985-09-09 Transportation channel of roving bobbin Granted JPS6262932A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19919885A JPS6262932A (en) 1985-09-09 1985-09-09 Transportation channel of roving bobbin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19919885A JPS6262932A (en) 1985-09-09 1985-09-09 Transportation channel of roving bobbin

Publications (2)

Publication Number Publication Date
JPS6262932A true JPS6262932A (en) 1987-03-19
JPH0518925B2 JPH0518925B2 (en) 1993-03-15

Family

ID=16403771

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19919885A Granted JPS6262932A (en) 1985-09-09 1985-09-09 Transportation channel of roving bobbin

Country Status (1)

Country Link
JP (1) JPS6262932A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6414329A (en) * 1987-07-06 1989-01-18 Toyoda Automatic Loom Works Roving bobbin-carrying system
JPS6461520A (en) * 1987-08-29 1989-03-08 Howa Machinery Ltd Carrying system for roving bobbin
JPS6469477A (en) * 1987-09-11 1989-03-15 Toyoda Automatic Loom Works Residual roving treating rail in roving carrying system
JPH03122053U (en) * 1990-03-28 1991-12-12
JPH04118478U (en) * 1991-03-28 1992-10-22 豊和工業株式会社 Bobbin carriage transfer device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6414329A (en) * 1987-07-06 1989-01-18 Toyoda Automatic Loom Works Roving bobbin-carrying system
JPS6461520A (en) * 1987-08-29 1989-03-08 Howa Machinery Ltd Carrying system for roving bobbin
JPS6469477A (en) * 1987-09-11 1989-03-15 Toyoda Automatic Loom Works Residual roving treating rail in roving carrying system
JPH03122053U (en) * 1990-03-28 1991-12-12
JPH04118478U (en) * 1991-03-28 1992-10-22 豊和工業株式会社 Bobbin carriage transfer device

Also Published As

Publication number Publication date
JPH0518925B2 (en) 1993-03-15

Similar Documents

Publication Publication Date Title
US4023339A (en) Automatic loading, unloading and transfer device on spinning machines
US11060210B2 (en) Method for operating a service unit
US5365728A (en) Rail conveyor system for roving bobbins in a spinning mill
US5222350A (en) Roving frame and method
JPS6262932A (en) Transportation channel of roving bobbin
US5987866A (en) Spinning process utilizing roving frames and ring-spinning frames
KR20020062167A (en) Bobbin changing device of roving frame
EP0452687A1 (en) Method for the automatic feed of cans of sliver to textile machines, and apparatus which employs such method
US4944146A (en) Method to convey roving packages with the roving prepositioned
JPH07310245A (en) Roving bobbin conveyer
JPH04222238A (en) Apparatus for automatically exchanging roving bobbin, which ends fine spinning work, fornew roving bobbin in creel of ring spinning frame
US5347803A (en) Spinning machine and a process for changing blocks of sliver cans on a spinning machine
JPH0551844A (en) System for feeding weft to weaving machine
JP2531347Y2 (en) Roving yarn transport system
JPS6329016B2 (en)
JP2660977B2 (en) Roving conveyor
JP2725007B2 (en) Roving bobbin conveyor
JP2508633B2 (en) Working machine carrier for spinning machine
CN212334243U (en) Full-automatic comber intelligence commodity circulation production line
CN213538215U (en) Spun yarn cop in spun yarn production is collected and is used guider
JPH043017Y2 (en)
JPS6262931A (en) Transportation of roving bobbin
JP2534478Y2 (en) Bobbin carriage storage device in roving bobbin transport device
JPS5860030A (en) Cheese-bobbin exchanger
JPS61145082A (en) Lap feeding apparatus

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees