JPS6250515A - Treatment work for head of in-site concrete pile - Google Patents

Treatment work for head of in-site concrete pile

Info

Publication number
JPS6250515A
JPS6250515A JP18909585A JP18909585A JPS6250515A JP S6250515 A JPS6250515 A JP S6250515A JP 18909585 A JP18909585 A JP 18909585A JP 18909585 A JP18909585 A JP 18909585A JP S6250515 A JPS6250515 A JP S6250515A
Authority
JP
Japan
Prior art keywords
bucket
concrete
hole
pile
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP18909585A
Other languages
Japanese (ja)
Inventor
Atsumi Maeda
前田 篤美
Shozo Yoshida
吉田 正三
Toshio Nishida
西田 寿夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Konoike Construction Co Ltd
Original Assignee
Konoike Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Konoike Construction Co Ltd filed Critical Konoike Construction Co Ltd
Priority to JP18909585A priority Critical patent/JPS6250515A/en
Publication of JPS6250515A publication Critical patent/JPS6250515A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE:To make the treatment work of pile head easier by a method in which a bucket is attached to the inside pile head portion of a reinforcing bar cage, extra-banking concrete is poured from the hole of the bottom plate of the bucket into the bucket, and when the concrete becomes semi-hardened, the bucket is lifted up to discharge the concrete. CONSTITUTION:A reinforcing bar cage 2 is erected in an excavated pit 1, and a bucket 3 having a lubricant film of resin emulsion on its inner and outer faces is installed on the pile head 4. A tremie tube 7 is inserted through the hole 6 of the bottom plate 5 of the bucket 3 and concrete 8 is placed through the tube 7. When the top of the concrete 8 rises up to the bottom plate 5 of the bucket 3, the concrete 8 flows through the gap between the hole 6 and the tube 7 into the bucket 3 and partly goes up the surrounding of the cage 2, where the concrete 8 is placed up to the level of about 70cm or more from the pile head 4. When the concrete 8 becomes semi-hardened, the bucket 3 is lifted up to discharge the extra-banking concrete 8' to the ground's surface.

Description

【発明の詳細な説明】 産業上の利用分野 木発明は場所打ちコンクリート杭の杭頭の余盛リコンク
リートを、容易に除去するようになした杭頭処理工法に
関するものである。
DETAILED DESCRIPTION OF THE INVENTION Field of the Invention The present invention relates to a method for treating the pile head of a cast-in-place concrete pile by easily removing excess reconcrete from the pile head.

従来の技術とその問題点 一般に場所打ちコンクリート杭は根切り工事に先行して
施工されるが、設計杭頭が地中の深い位置にあり、また
泥水などの中でコンクリートを打設する場合が多く、杭
頭の確認が困難であることや杭頭のコンクリートがレイ
タンス、ス・ライム諺よび泥水などによって劣化するこ
とから、設計杭頭より50e11乃至/m程度高く余盛
りコンクリートを打役し、根切り工事後にブレーカ−や
チッパ−などを用いて祈り取る方法がとられていた。
Conventional technology and its problems Cast-in-place concrete piles are generally constructed prior to root cutting work, but the designed pile head is located deep underground, and there are cases where concrete is cast in muddy water. In many cases, it is difficult to confirm the pile cap, and the concrete at the pile cap deteriorates due to laitance, slime, and muddy water. After cutting the roots, a method was used to remove the roots using a breaker or chipper.

しかしこの時点では、コンクリートが完全に硬化してい
るので、工期や工費がかさむだけでな(、騒音、振動お
よび粉塵の発生などの問題点が多くあった。
However, by this point, the concrete had completely hardened, which not only increased construction time and costs, but also caused many problems such as noise, vibration, and dust generation.

そのため近年これらの問題点を解消する目的で種々の改
良工法が採用されている。その改良工法としては、余盛
りコンブ11−トを未硬化の状態において、バキューム
ポンプナトを用いて除去する方法(特開昭j(/−/J
jt/θ号公報)および、圧縮空気を噴射してエアリフ
トによって分離、堆壇させる方法(特公昭j1−Jul
lIr号公報)があるが。
Therefore, in recent years, various improved construction methods have been adopted for the purpose of solving these problems. An improved method is to remove excess kelp in an uncured state using a vacuum pump nut (JP-A-Shoj (/-/J)).
Jt/θ Publication) and a method of separating and stacking the bed using an air lift by injecting compressed air (Special Publication Sho J1-Jul
(Ir Publication).

コンクリート打検直後に行う必要があるので。This must be done immediately after concrete pouring.

夜業など作業時間の延長がともない、杭工事用以外の大
がかりな装置や機械を必要とするといった問題点がある
Problems include the need for large-scale equipment and machinery other than those for piling work, as the work hours are extended, including night work.

また別に、余儀りコンクリートを半硬化の決悪において
、ケ+1−バーの先端に袋着したバケットを用いて掘削
して除去する方法(特開昭5s−iorjiJ号公報)
があるが。
Separately, there is a method of excavating and removing forced concrete when it is semi-hardened using a bucket attached to the tip of a bar (Japanese Unexamined Patent Publication No. 5S-IORJIJ).
Although there is.

コンクリート打設後約コ時間経過してからj乃至72時
間以内に行う必要があるので、作業時間の延長がともな
い深夜業となる場合もある。またケリーバ−や底部を開
閉できるバケットを使用しない場所打ち杭工法の場合に
は、別にこれらの装置や機械を部端する必要があり、汎
用性に欠は経済性に問題がある。
Since it is necessary to carry out the work within 72 hours after concrete pouring, the work hours may be extended and the work may be late at night. Furthermore, in the case of a cast-in-place pile construction method that does not use a kelly bar or a bucket whose bottom can be opened and closed, it is necessary to separately install these devices and machines, and the lack of versatility causes problems in economic efficiency.

問題点を解決するための半没 本発明は余盛りコンクリートを半硬化の決悪に射いて、
バケットを用いて除去する工法であり、鉄筋篭の上部に
バケットを設け、このバケットの底板の孔から打設コン
クリート中に含まれるスライム等をこのバケット内へ侵
入させ、このスライム等を含んだコンクリートがバケッ
ト底孔より抜は落ちない埋置fまで硬化した早・期に、
バケットを引抜いて地上に吊り上げ、内部の余盛りコン
クリートを排除する。この作業を小さい力で容易に行え
るように、バケットの内外の鋼板表面に形成させた合成
樹脂エマルジョン電着塗膜その他の潤滑性被膜の効果に
よって、またバケットを底の方を小径としたテーパ状と
することによって若干コンクリートの硬化が進行しても
引抜き可能とする。
In order to solve the problem, the present invention aims at semi-hardening the surplus concrete,
This method uses a bucket to remove the slime, etc. contained in the poured concrete, which is removed by installing a bucket on the top of the reinforcing bar cage and allowing the slime, etc. contained in the poured concrete to enter the bucket through the holes in the bottom plate of the bucket. At the early stage when the material has hardened to the point where it cannot be removed from the bottom hole of the bucket,
Pull out the bucket, lift it to the ground, and remove the excess concrete inside. In order to make this work easier with less force, the bucket has a tapered shape with a smaller diameter at the bottom due to the effect of the synthetic resin emulsion electrodeposited coating and other lubricating coatings formed on the inner and outer steel plate surfaces of the bucket. By doing so, it is possible to pull out the concrete even if the concrete hardens slightly.

また余盛りコンクI+ −トのバケット内部への回収は
、打没時に最上部のレイタンスなどを4人したコンクl
l  )が、バケットの底板の孔トコンクI+ −ト打
没用のトレミー管との間を通って、自然に流入するよう
になす。
In addition, when collecting excess concrete I+-t into the bucket, four people should remove the top laitance etc.
1) flows naturally through the hole in the bottom plate of the bucket and the tremie tube for sinking.

実施例 本発明を川面に示す実施例にもとづいて説明する。Example The present invention will be explained based on an example shown in the drawing.

第1図は木工法のコンクリート打没終了時の縦断面図で
ある。場所打ち杭の掘削機を用いて所定の径および深さ
の掘削孔/を地中に形成し、地上で組立てた鉄筋篭Jを
建込む。
Figure 1 is a longitudinal cross-sectional view of the woodwork method at the end of concrete pouring. An excavation hole with a predetermined diameter and depth is formed in the ground using a cast-in-place pile excavator, and the reinforcing bar J assembled on the ground is erected.

次に予め内外面に樹脂エマルジョンの電着塗装によって
潤滑性被膜を形成させたバケットJを設計杭頭4の上に
据寸け、バケットの底@jに役けた直径JOW程度の孔
イを1してトレミー管7を挿入してコンクリートざを打
設する。コンクリートの天端が上昇してバケットの底板
jに達すると、レイタンスなどを混入した天端のコンク
リートは、孔gとトレミー管7の間を通ってバケットJ
の内部に自然に流入し、一部は鉄筋箋コの周囲を上昇し
、設計杭頭ゲから約70cm以上の高さまでコンクリー
トを打設する。
Next, the bucket J, whose inner and outer surfaces have been coated with a lubricating film by electrodepositing a resin emulsion, is installed on the designed pile cap 4, and a hole with a diameter of about JOW, which served as the bottom of the bucket, is made 1. Then, the tremie pipe 7 is inserted and a concrete groove is poured. When the top of the concrete rises and reaches the bottom plate j of the bucket, the concrete at the top mixed with laitance passes between the hole g and the tremie pipe 7 and reaches the bucket J.
Concrete will naturally flow into the interior of the pile, and some of it will rise around the reinforcing bar, and concrete will be poured to a height of approximately 70 cm or more from the designed pile cap.

第2図はバケット3を引抜いて地上に吊上げた時点の縦
断面図である。コンクリートが半硬化のfnになった時
点で、バケツ)Jを引抜いて吊上げ、地上で反転させて
余盛りコンクリートt′を排出する。杭頭部の鉄筋fi
コの周囲に残った余盛りコンクリートどは、根切り終了
時点で硬化した決悪において祈り取る。
FIG. 2 is a longitudinal cross-sectional view of the bucket 3 when it is pulled out and hoisted above the ground. When the concrete becomes semi-hardened fn, the bucket) J is pulled out and lifted up, turned over on the ground, and the excess concrete t' is discharged. Reinforcing bar fi at pile head
Any excess concrete remaining around the roots will be removed at the point where it has hardened at the end of the root cutting.

バケツ)Jの内外面の潤滑性塗膜は余盛りコンクリ−)
 C、、C射よびコンクリートtが付着するので、バケ
ットJを反復使用する当っては、その都度電着塗装を行
う。この電着塗装は従来の方法で行なう。
Bucket) The lubricating coating on the inside and outside surfaces of J is made of excess concrete)
C, C, C and concrete T will adhere to it, so if bucket J is used repeatedly, electrodeposition should be applied each time. This electrodeposition coating is carried out in a conventional manner.

第Jqは大口径(直径2m1l上)の場所打ち杭の場合
のコンクリート打設時の縦断面又である。使用するトレ
ミー管7の直径も少し太くなるのでバケツ)Jの底面J
に役けられる孔gの直径rもtoes程変となりバケッ
トJの直径を艮とすると λ−rがj 0tx以上とな
り、レイタンスやステイムなどを混入したコンクリート
が底板jの下に巻き込むおそれがあるので、嗜[jを図
示のように中央を外局部より盛り上げた形状(切頭円錐
形)にして、コンクI+ −) tが円滑に矢印の方向
にバケットJの内部に流入するようにする。この場合に
は根切り工事後の硬化した吠態で祈る余盛りコンクリー
トl′の量が増加する。
No. Jq is the vertical cross-section at the time of concrete placement in the case of a large diameter (2 ml or more in diameter) cast-in-place pile. The diameter of the tremie tube 7 to be used is also a little thicker, so the bottom surface of the bucket) J
The diameter r of the hole g used for this purpose will also vary by toes, and if the diameter of the bucket J is taken as the diameter of the bucket J, then λ-r will be more than j0tx, and there is a risk that concrete mixed with laitance or stime will get caught under the bottom plate j. As shown in the figure, make the bucket J into a shape (truncated conical shape) with the center raised from the outside part so that the conc I + -) t smoothly flows into the inside of the bucket J in the direction of the arrow. In this case, the amount of excess concrete l' that is in a hardened state after the root cutting work increases.

本発明を、杭直径/、 I m 、バケツ)Jの直径1
t−y、tm、e面5の孔tの直径y −j Ocs。
The present invention is applied to pile diameter/, I m , bucket) diameter of J
t-y, tm, diameter of hole t in e-plane 5 y −j Ocs.

余盛りコンクリートの高さ7σ備で実施した。This was carried out at a height of 7σ of excess concrete.

は第1図に示すような底面jを水平のものを使用した。used one with a horizontal bottom surface j as shown in FIG.

バケツ)Jを引抜いた後に底面jの下部の設計杭頭lの
コンクリートを祈り調査した結果によると、レイタンス
やスライムなどを巻込んだ形跡は全く認められず、コン
クリートtが底板jの孔tとトレミー管7の間を1山っ
て、円滑にバケット3の内部に流入し設計杭頭のコンク
リートの品質に問題のないことが確認された。
According to the results of a prayer investigation of the concrete of the designed pile cap l at the bottom of the bottom j after pulling out the bucket) J, there was no evidence of any entanglement of laitance or slime, and it was found that the concrete t was connected to the hole t of the bottom plate j. It was confirmed that the concrete flowed smoothly between the tremie pipes 7 and into the bucket 3, and that there was no problem with the quality of the concrete of the designed pile head.

バケットJを引抜く際に要した力は、コンクリート打設
後約/コ時間径過した実施例の場合約10tonであっ
た。この力はバケットJのg1壇0.7ton、バケッ
トJの内部の余盛リコンクII−トt′の@t−ZJt
on、バケット底板の孔4部分の直径j0c1mのコン
クリートの引張り抵抗a0ton(:+フl11−ト打
役/コ時間後の引張強覚を/4/−とする)およびバケ
ットJの外面とコンクリートt〃との付着抵抗グ、jt
on(潤滑性塗嘆を施した場合の付着強度をo、 / 
b /−とする)の合計5’、jtonにほぼ一致した
。したがって:+ンク13−)打検後/〜2日中にバケ
ット3の引抜きを実施すれば、杭工事用の唱重機によっ
て引抜き可能であるゆまた引抜いたバケット3を地上で
反転させ、内部の余盛りコンクI+ −) j’を排除
し小割りする作業も杭工事用の万能堀削機で可能である
The force required to pull out the bucket J was about 10 tons in the case of the example in which about 1 hour had elapsed after concrete pouring. This force is 0.7 ton for g1 of bucket J, and @t-ZJt for reconc.
on, the tensile resistance a0ton of the concrete with a diameter j0c1m at the hole 4 part of the bucket bottom plate (assuming the tensile strength after the impact time is /4/-), and the outer surface of the bucket J and the concrete t. Adhesion resistance with 〃, jt
on (adhesion strength when applying lubricant coating is o, /
b/-), the total 5' and jton almost matched. Therefore: +13-) If the bucket 3 is pulled out within 2 days after the inspection, it can be pulled out using a pile-driving machine. The work of removing surplus concrete I+ -) j' and dividing it into small pieces can also be done with a universal excavator for pile construction.

作業は杭工事用の機械および作業員で短時間に随時実施
できるので、径済的効果は優れている。
The work can be carried out at any time in a short period of time using pile construction machines and workers, resulting in excellent cost savings.

発明の効果 本発明による時は鉄筋籠最上邪にかつその籠の内側に底
が小径となしたバケットを挿入シ、コンクリ−)打&時
のレイタンスやスライムをバケット底孔とトレミー管と
の間よりバIr−1ト内へ予め侵入させ、コンクリート
の半硬化時にこのバケットを引き抜くようにしているた
め、余盛りコンクリートの祈りが大看に低減される。
Effects of the Invention According to the present invention, when a bucket with a small diameter bottom is inserted into the top of a reinforcing bar cage and inside the cage, laitance and slime are removed between the bucket bottom hole and the tremie pipe. Since the bucket is inserted into the bucket in advance and pulled out when the concrete is semi-hardened, the need for excess concrete is greatly reduced.

即ち、根切り工事後に硬化した決悪において祈り収る鉄
筋籠の周辺の余盛りコンクリート、7)(1は全余盛り
コンクI+−)の30〜<104に低減し、また内外両
面から祈り収ることができるため、工期は20〜JO%
に短縮され。
In other words, the excess concrete around the reinforcing steel cage that has hardened after root cutting work has been reduced to 30 to <104 (7) (1 is the total excess concrete I+-), and the concrete that has hardened after root cutting has been reduced to 30 to <104. construction period is 20~JO%.
It was shortened to .

杭の主筋を曲げたり台直しを行う必要がないので、コン
クリートや鉄筋の品質上でも優れている。
Since there is no need to bend or reposition the main reinforcement of the pile, it is also superior in terms of the quality of concrete and reinforcing steel.

さらに余盛りコンクII −ト徴の低減は省力化を閏る
ことができ、工期の短縮とともに騒音、振動、粉率の問
題をも・1減できる等の利点を存する。
Furthermore, the reduction of the excess concrete II-t characteristic can save labor, and has the advantage of shortening the construction period and reducing the problems of noise, vibration, and powder ratio by 1.

4 図面のIy2I11な晩期 1g1図乃至@3図は本発明の詳細な説明図であり、第
1図はコンクリート打設終了時の縦断面図、@コ鳴はバ
ケットを引き抜いた吠態の縦断面図、第JI’3]は大
口径場所打ちコンクリート杭の場合の、説明図である。
4 The Iy2I11 late stage 1g1 to @3 diagrams are detailed explanatory diagrams of the present invention. Figure 1 is a vertical cross-sectional view at the end of concrete pouring, and @Konari is a vertical cross-section of the barking state with the bucket pulled out. Fig. JI'3] is an explanatory diagram in the case of a large-diameter cast-in-place concrete pile.

/は掘削孔、 コは鉄fJ籠、  Jはバケット、4は
投計杭頭、 jはバケットの底板、 乙は孔、  7は
トレミー管、  rはコンクリート。
/ is the excavation hole, C is the iron fJ cage, J is the bucket, 4 is the pile head, j is the bottom plate of the bucket, O is the hole, 7 is the tremie pipe, and r is the concrete.

〆、fは余盛りコンクリート。〆, f is excess concrete.

第1図 第3図Figure 1 Figure 3

Claims (2)

【特許請求の範囲】[Claims] (1)場所打ちコンクリート杭の築造に際し、鉄筋籠の
内部に底板に孔を設けた鋼製のバケットを杭頭の所定の
高さに据付けておいて、コンクリート打設時に余盛りコ
ンクリートを、底板の孔からバケットの内部に流入させ
る。 コンクリートが半硬化状態になった時にバケットを杭頭
から引抜いて地上に吊り上げてバケット内から排除する
ことを特徴とする場所打ちコンクリート杭の杭頭処理工
法。
(1) When constructing cast-in-place concrete piles, a steel bucket with a hole in the bottom plate is installed inside the reinforcing bar cage at a predetermined height of the pile head, and when concrete is poured, extra concrete is poured into the bottom plate. It flows into the bucket through the hole. A pile cap processing method for cast-in-place concrete piles, which is characterized in that when the concrete is in a semi-hardened state, the bucket is pulled out from the pile cap, lifted to the ground, and removed from the bucket.
(2)バケットの引抜きおよびバケットからのコンクリ
ートの排除を容易にするため、バケットの上部直径を底
部より少し大きくするとともに、バケットの内外の鋼板
表面に合成樹脂エマルジョンの電着塗膜などの潤滑性被
膜を形成させることを特徴とする特許請求の範囲第1項
記載の場所打ちコンクリート杭の杭頭処理工法。
(2) In order to make it easier to pull out the bucket and remove concrete from the bucket, the diameter of the top of the bucket is slightly larger than that of the bottom, and the surfaces of the steel plates inside and outside the bucket are coated with lubrication, such as an electrodeposited film of synthetic resin emulsion. A method for treating the head of a cast-in-place concrete pile according to claim 1, which comprises forming a coating.
JP18909585A 1985-08-27 1985-08-27 Treatment work for head of in-site concrete pile Pending JPS6250515A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18909585A JPS6250515A (en) 1985-08-27 1985-08-27 Treatment work for head of in-site concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18909585A JPS6250515A (en) 1985-08-27 1985-08-27 Treatment work for head of in-site concrete pile

Publications (1)

Publication Number Publication Date
JPS6250515A true JPS6250515A (en) 1987-03-05

Family

ID=16235255

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18909585A Pending JPS6250515A (en) 1985-08-27 1985-08-27 Treatment work for head of in-site concrete pile

Country Status (1)

Country Link
JP (1) JPS6250515A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH051711U (en) * 1991-06-25 1993-01-14 石川島播磨重工業株式会社 Automatic warehouse shelf equipment
JPH0564111U (en) * 1992-01-30 1993-08-24 村田機械株式会社 Rack device components

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56139307A (en) * 1980-03-28 1981-10-30 Fujita Corp Execution of foundation pile

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56139307A (en) * 1980-03-28 1981-10-30 Fujita Corp Execution of foundation pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH051711U (en) * 1991-06-25 1993-01-14 石川島播磨重工業株式会社 Automatic warehouse shelf equipment
JPH0564111U (en) * 1992-01-30 1993-08-24 村田機械株式会社 Rack device components

Similar Documents

Publication Publication Date Title
JP6010070B2 (en) Temporary closing method for existing underwater structures
CN108914931A (en) A kind of ring-like foundation pile of the vertical shield of assembled and construction method
CN110042844A (en) A kind of construction method of cast-in-place major diameter foundation pit support pipe pile
CN111364444A (en) Shallow-buried rock stratum section diaphragm wall grooving construction method
CN105862862B (en) A kind of large diameter pile buries hammer Refloatation method
JPS6250515A (en) Treatment work for head of in-site concrete pile
CN1072746C (en) Head and side grouting method for cast-in-situ pile
CN111535298A (en) Seepage-proofing construction method for underground diaphragm wall
CN110847217A (en) Composite foundation with piles distributed in cylinder-cylinder offshore wind power foundation and construction method
CN206667256U (en) Bored concrete pile boulder rapid cleaning device
JPH08105054A (en) Construction of shaft
CN105421446A (en) Mixed soil extruded and cured precast pile for soft foundation treatment as well as construction method
CN105926635B (en) A kind of vertical rectangular prefabricated components construction equipment, assembly and construction method
CN104988981B (en) A kind of well construction method of riding on present situation operation shield method drainage pipeline
CN212405167U (en) Drainage structures that engineering underground structure strutted is built in room
JP3219993B2 (en) Piling method in pit structure
CN211228839U (en) Inclined integrated pump station with cleaning device
CN103452368B (en) A kind of slurry accident pool and construction method thereof
CN2311520Y (en) Bulkhead apparatus for continuous digging bored concrete pile hole
DE102014015801A1 (en) suction anchors
CN211547791U (en) Weather-resistant high-strength steel foundation steel pipe pile for power pole
CN113585237B (en) Diaphragm wall joint and diaphragm wall construction method
CN212052702U (en) Improved construction foundation sinking pile structure
CN212248261U (en) Foundation pit supporting structure utilizing steel sheet piles and concrete precast piles
CN217870425U (en) Semicircular manual hole digging pile structure