- CN206667256U CN206667256U CN201621378043.4U CN201621378043U CN206667256U CN 206667256 U CN206667256 U CN 206667256U CN 201621378043 U CN201621378043 U CN 201621378043U CN 206667256 U CN206667256 U CN 206667256U
- Authority
- CN
- China
- Prior art keywords
- drilling pipe
- steel wire
- boulder
- concrete pile
- cleaning device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Earth Drilling (AREA)
Abstract
The utility model discloses bored concrete pile boulder rapid cleaning device,Including drilling pipe and steel wire broach,Top plate is provided with above drilling pipe,Adpting flange two among top plate,Connection force rod among the flange two,Grout hole is provided among the force rod,Pass through the jointed rod of flange one above force rod,Down extended to below force rod inside drilling pipe,Floor is provided between top plate side and drilling pipe inwall,Drilling pipe bottom is provided with 4 10 alloy bits,The steel wire broach is arranged on the lower section inside drilling pipe,Steel wire broach is divided into two layers up and down,Every layer of steel wire broach is made up of 10 30 steel wire ropes,Dress stone hole is formed among steel wire broach,The utility model can quickly clear up boulder,Especially to small volume,The few boulder of quantity has significant effect,And manufacturing cost is low,It is easy to operate,Due to using when be not required to change rig,Only need to change drilling pipe,Pore-forming efficiency is substantially increased compared with punching piling machine,Duration shortens,Efficiency improves,It is practical.
Description
Technical field
The utility model belongs to poured pile base technical field in architectural engineering, and in particular to bored concrete pile boulder quickly clears up dress
Put.
Background technology
During the Wharf Construction of riverside, access bridge root needs several bent foundations of arranging, access bridge perpendicular to embankment simultaneously
Drop-over, access bridge part bored concrete pile region are in the range of embankment along the Yangtze dumped rocks protecting foundation, and riprap layer thickness about in 5m or so, fills
It is long from 40-54m to note stake stake, is both needed to penetrate existing embankment riprap layer during drilling construction, before bored concrete pile putting up platform waterborne, makes
Construction of removing obstacles is carried out to the jackstone of grout pile position near zone with grab bucket dredger, depth of removing obstacles is more than 5m, jackstone
Remove obstacles and use DZ60 vibration hammer sinking steel φ 1300mm casings after construction, sinking steel protecting canister construction smoothly, all steel pile castings under
Sink to position.
But putting up platform is completed on the water, convolution rig starts to find still have at the bored concrete pile hole position of part during drilling construction
Boulder is present, depth 10m or so about under mud face, size about 50cm or so, and common GPS type convolution rig can not be penetrated or broken
Broken boulder, other method drilling and forming hole need to be used, in this case, conventional use of is punching piling machine pore-forming, and punching is beaten
Stake machine is to lift block stamp to eminence using hoist engine, then reaches block stamp by boulder by boulder in freely falling body impact opening
Extruding treats that gaining rotary drill machine machine after huge stone handling again continues to creep into the purpose on hole wall after broken.
But it is bored concrete pile waterborne because engineering bored concrete pile is most of, does not consider that punching is beaten at the beginning of bored concrete pile Platform Designing waterborne
Stake machine load, if so using punching pile driving equipment, need to carry out consolidation process to existing bored concrete pile platform, it is necessary to expend a large amount of
Manually, material cost and duration need to lengthen, and for bored concrete pile using convolution rig in the case of being influenceed without boulder, the pore-forming time is about 20
Hour or so, if the use of the punching piling machine pore-forming time being about 70 hours or so after meeting boulder, single stake pore-forming is beaten using punching
Stake machine rubble need to increase the processing time of 50 hours, do not meet the construction period of engineering, also considerably increase cost of labor and set
Standby lease expenses.So it is badly in need of finding a kind of new boulder liquidating plan.
Utility model content
To solve the above problems, the utility model discloses bored concrete pile boulder rapid cleaning device, rational in infrastructure, user
Just, it is practical without using piling machine, short time limit, low cost.
To reach above-mentioned purpose, the technical solution of the utility model is as follows:
Bored concrete pile boulder rapid cleaning device, it is characterised in that:Including drilling pipe and steel wire broach, the drilling pipe is opened for both ends
The cylindrical structural of mouth, drilling pipe top are provided with top plate, top plate centre adpting flange two, and the centre of flange two connects force rod,
Grout hole is provided among the force rod, force rod top down extends to brill by the jointed rod of flange one, force rod lower section
Cylinder is internal, floor is provided between top plate side and drilling pipe inwall, drilling pipe bottom is provided with 4-10 alloy bit, the wire comb
Tooth is arranged on the lower section inside drilling pipe, and steel wire broach is divided into two layers up and down, and every layer of steel wire broach is made up of 10-30 root steel wire ropes,
All steel wire rope afterbodys are uniformly arranged on drilling pipe inwall, and the head of steel wire rope is directed at drilling pipe axis, and rope capacity is less than
Drilling pipe radius, steel wire broach centre form dress stone hole.
As a kind of improvement of the present utility model, the alloy bit of the drilling pipe bottom is highly 3cm.
As a kind of improvement of the present utility model, the every wirerope diameter is 32mm.
As a kind of improvement of the present utility model, the top plate crosses anchor bolts with flange two-way.
As a kind of improvement of the present utility model, the grout hole internal diameter is 180mm.
As a kind of improvement of the present utility model, a diameter of 150mm in the dress stone hole.
As a kind of improvement of the present utility model, the top plate is cydariform.
The beneficial effects of the utility model are:
Bored concrete pile boulder rapid cleaning device described in the utility model, can quickly clear up boulder, especially to small volume,
The few boulder of quantity has significant effect, and it is fast and effective to grab stone, and its equipment manufacturing costs is low, easy to operate, due to using
Shi Buxu changes rig, it is only necessary to changes drilling pipe, substantially increases pore-forming efficiency compared with punching piling machine, the pore-forming time is about 20
Hour or so, shorten about 50 hours compared with the punching piling machine pore-forming time, the duration shortens, and efficiency improves, practical.
Brief description of the drawings
Fig. 1 is alien invasion figure of the present utility model.
Fig. 2 is sectional view of the present utility model.
Fig. 3 is top view of the present utility model.
Fig. 4 is steel wire broach plan described in the utility model.
Fig. 5 Fig. 6 is that drilling pipe of the present invention clears up schematic diagram before and after stone.
Fig. 7-10 is working condition schematic diagram of the present invention.
Reference numerals list:
1st, drilling pipe, 2, steel wire broach, 3, top plate, 4, flange two, 5, force rod, 6, flange one, 7, floor, 8, alloy bores
Head, 9, steel wire rope, 10, dress stone hole, 11, crab-bolt, 12, grout hole.
Embodiment
With reference to the accompanying drawings and detailed description, the utility model is furtherd elucidate, it should be understood that following specific embodiment parties
Formula is merely to illustrate the utility model rather than limitation the scope of the utility model.It should be noted that make below in description
Word "front", "rear", "left", "right", "up" and "down" refer to the direction in accompanying drawing, and word " interior " and " outer " refer to respectively
Be directed towards or the direction away from particular elements geometric centers.
As illustrated, bored concrete pile boulder rapid cleaning device described in the utility model, including drilling pipe 1 and steel wire broach 2,
The drilling pipe 1 is the cylindrical structural of both ends open, and the top of drilling pipe 1 is provided with top plate 3, top plate centre adpting flange 24, the method
Connection force rod 5 among orchid 24, the centre of force rod 5 are provided with grout hole 12, and the top of force rod 5 is connected by flange 1 bores
Bar, the lower section of force rod 5 are down extended to inside drilling pipe 1, and floor 7, the bottom of drilling pipe 1 are provided between the side of top plate 3 and the inwall of drilling pipe 1
4-10 alloy bit 8 is provided with, the steel wire broach is arranged on the lower section inside drilling pipe, and steel wire broach 2 divides for upper and lower two layers,
Every layer of steel wire broach 2 is made up of 10-30 root steel wire ropes, and all afterbodys of steel wire rope 9 are uniformly arranged on drilling pipe inwall, the steel wire
Restrict 9 heads alignment drilling pipe axis, the length of steel wire rope 9 is less than the radius of drilling pipe 1, is formed among steel wire broach 2 and fill stone hole 10.
Bored concrete pile boulder rapid cleaning device described in the utility model, a diameter of 1.2m of drilling pipe 1, high 1.2m, using δ
16mm steel plates are process, and bottom is disposed with 6 high alloy bits of 3cm, for crushing larger block stone, the side wall of drilling pipe 1
Two layers of steel wire rope broach of φ 32 for amounting to 38 root long 0.5m is welded with, one block of δ 35mm steel plate is welded as top plate in top, with brill
Bar is connected by flange and fastened, and drilling rod and drilling pipe is connected as into entirety, floor 7 plays a part of reinforcement, it is ensured that drilling pipe is in work
Do not fall apart, increase the service life on work;Drilling pipe is filled to former convolution drill bit of drilling machine position by ring flange during work, is driven by mill
For drilling rod so as to allow drilling pipe to rotate rotary digging, convolution rig applies pressure to drilling equipment, and the boulder of bottom hole is from the friction jewel of dress stone hole 10
In cylinder 1, steel wire broach has blocked boulder toward falling when brill is carried, so as to serve the effect that stone is drawn from bottom hole.
Top plate 3 described in the utility model is connected with flange 24 by crab-bolt 11, stable connection, securely and reliably.
The internal diameter of grout hole 12 described in the utility model is 180mm, and grouting facilitates rapid.
Top plate 3 described in the utility model is cydariform, and there is gap on both sides, supplement drilling pipe internal and external pressure balance.
Bored concrete pile boulder rapid cleaning device described in the utility model, boulder can be quickly cleared up, fill the straight of stone hole 10
Footpath is 150mm, and boulder especially few to small volume, quantity has significant effect, and it is fast and effective to grab stone, and its device fabrication into
This is low, easy to operate, due to using when be not required to change rig, it is only necessary to change drilling pipe, substantially increased compared with punching piling machine
Pore-forming efficiency, pore-forming time are about 20 hours or so, shorten about 50 hours compared with the punching piling machine pore-forming time, and the duration shortens, effect
Rate improves, practical.
Technological means disclosed in the utility model is not limited only to the technological means disclosed in above-mentioned embodiment, also
Including being combined formed technical scheme by above technical characteristic.
Claims (7)
1. bored concrete pile boulder rapid cleaning device, it is characterised in that:Including drilling pipe and steel wire broach, the drilling pipe is both ends open
Cylindrical structural, be provided with top plate above drilling pipe, adpting flange two among top plate, connect force rod, institute among the flange two
State and grout hole is provided among force rod, drilling pipe is down extended to by the jointed rod of flange one, force rod lower section above force rod
Inside, is provided with floor between top plate side and drilling pipe inwall, drilling pipe bottom is provided with 4-10 alloy bit, the steel wire broach
The lower section being arranged on inside drilling pipe, steel wire broach are divided into two layers up and down, and every layer of steel wire broach is made up of 10-30 root steel wire ropes, institute
There is steel wire rope afterbody to be uniformly arranged on drilling pipe inwall, the head of steel wire rope is directed at drilling pipe axis, and rope capacity, which is less than, bores
Cylinder radius, steel wire broach centre form dress stone hole.
2. bored concrete pile boulder rapid cleaning device according to claim 1, it is characterised in that:The alloy of the drilling pipe bottom
Crown height is 3cm.
3. bored concrete pile boulder rapid cleaning device according to claim 1, it is characterised in that:The every wirerope diameter
For 32mm.
4. bored concrete pile boulder rapid cleaning device according to claim 1, it is characterised in that:The top plate and flange two-way
Cross anchor bolts.
5. bored concrete pile boulder rapid cleaning device according to claim 1, it is characterised in that:The grout hole internal diameter is
180mm。
6. bored concrete pile boulder rapid cleaning device according to claim 1, it is characterised in that:It is described to fill a diameter of of stone hole
150mm。
7. bored concrete pile boulder rapid cleaning device according to claim 1, it is characterised in that:The top plate is cydariform.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621378043.4U CN206667256U (en) | 2017-03-30 | 2017-03-30 | Bored concrete pile boulder rapid cleaning device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621378043.4U CN206667256U (en) | 2017-03-30 | 2017-03-30 | Bored concrete pile boulder rapid cleaning device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206667256U true CN206667256U (en) | 2017-11-24 |
Family
ID=60357868
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621378043.4U Active CN206667256U (en) | 2017-03-30 | 2017-03-30 | Bored concrete pile boulder rapid cleaning device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206667256U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106677185A (en) * | 2017-03-30 | 2017-05-17 | 中交第三航务工程局有限公司南京分公司 | Quick cleaning device for boulders in cast-in-place pile and construction process thereof |
CN109989405A (en) * | 2017-12-30 | 2019-07-09 | 广州协安建设工程有限公司 | Base pit stand construction under boulder site condition |
-
2017
- 2017-03-30 CN CN201621378043.4U patent/CN206667256U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106677185A (en) * | 2017-03-30 | 2017-05-17 | 中交第三航务工程局有限公司南京分公司 | Quick cleaning device for boulders in cast-in-place pile and construction process thereof |
CN109989405A (en) * | 2017-12-30 | 2019-07-09 | 广州协安建设工程有限公司 | Base pit stand construction under boulder site condition |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106677185A (en) | Quick cleaning device for boulders in cast-in-place pile and construction process thereof | |
CN108914931A (en) | A kind of ring-like foundation pile of the vertical shield of assembled and construction method | |
CN102733378B (en) | Construction method of concrete pile | |
CN104612179B (en) | Through the construction method of the diaphram wall of super thick silty sand ground | |
CN113174961B (en) | Foundation pit slope supporting method | |
CN213450269U (en) | Rectangular slide-resistant pile mechanical construction device | |
CN103422510A (en) | Steel pipe frame type cofferdam structure and construction method | |
CN112195924A (en) | Method for reinforcing foundation pit base of silt silty clay layer | |
CN206667256U (en) | Bored concrete pile boulder rapid cleaning device | |
CN102808407B (en) | Construction method of soft-foundation reinforced concrete cast-in-place pile | |
CN112144514A (en) | Simple method for forming hole and pile in sand and pebble stratum easy to collapse during rotary drilling machine | |
CN113356190B (en) | Pile forming method for cast-in-place pile in karst development area | |
CN114045854A (en) | Bridge pile foundation composite construction method under complex geological condition | |
CN105386462A (en) | Integral construction type small and medium-sized basement and construction method thereof | |
CN102677657A (en) | Construction method of row cast thin-walled concrete compound pile wall and special hole forming device thereof | |
CN211573450U (en) | Obstacle clearing drilling bucket for rotary drilling rig | |
CN210856971U (en) | Pile foundation erodees reinforced structure | |
CN106930274A (en) | The a full set of cylinder rotatory boring castinplace pile construction method that a kind of reinforcing bar cage location is fixed | |
CN114961336B (en) | Protective demolition construction method for foundation pile of basement close to existing subway line | |
WO2020211286A1 (en) | Method for constructing full-casing full-rotary internal-ramming pile | |
CN207004431U (en) | Soft soil foundation exciting drilling device | |
CN110258558B (en) | Anti-overturning mechanism arranged on drilling machine | |
CN206928296U (en) | Pile pulling system | |
CN113309129B (en) | Construction method of integral construction type basement for region with plastic soil | |
CN108457279A (en) | A kind of foundation pit enclosure structure cast-in-situ bored pile collapse hole in-situ treatment method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |