CN206667256U - Bored concrete pile boulder rapid cleaning device - Google Patents

Bored concrete pile boulder rapid cleaning device Download PDF

Info

Publication number
CN206667256U
CN206667256U CN201621378043.4U CN201621378043U CN206667256U CN 206667256 U CN206667256 U CN 206667256U CN 201621378043 U CN201621378043 U CN 201621378043U CN 206667256 U CN206667256 U CN 206667256U
Authority
CN
China
Prior art keywords
drilling pipe
steel wire
boulder
concrete pile
cleaning device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621378043.4U
Other languages
Chinese (zh)
Inventor
顾晓彬
戴志培
钟宇明
孙发荣
张福春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA COMMUNICATIONS THIRD NAVIGATIONAL BUREAU 2ND ENGINEERING Co Ltd
CCCC THIRD HARBOR ENGINEERING Co Ltd NANJING BRANCH
Original Assignee
CHINA COMMUNICATIONS THIRD NAVIGATIONAL BUREAU 2ND ENGINEERING Co Ltd
CCCC THIRD HARBOR ENGINEERING Co Ltd NANJING BRANCH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA COMMUNICATIONS THIRD NAVIGATIONAL BUREAU 2ND ENGINEERING Co Ltd, CCCC THIRD HARBOR ENGINEERING Co Ltd NANJING BRANCH filed Critical CHINA COMMUNICATIONS THIRD NAVIGATIONAL BUREAU 2ND ENGINEERING Co Ltd
Priority to CN201621378043.4U priority Critical patent/CN206667256U/en
Application granted granted Critical
Publication of CN206667256U publication Critical patent/CN206667256U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Earth Drilling (AREA)

Abstract

The utility model discloses bored concrete pile boulder rapid cleaning device,Including drilling pipe and steel wire broach,Top plate is provided with above drilling pipe,Adpting flange two among top plate,Connection force rod among the flange two,Grout hole is provided among the force rod,Pass through the jointed rod of flange one above force rod,Down extended to below force rod inside drilling pipe,Floor is provided between top plate side and drilling pipe inwall,Drilling pipe bottom is provided with 4 10 alloy bits,The steel wire broach is arranged on the lower section inside drilling pipe,Steel wire broach is divided into two layers up and down,Every layer of steel wire broach is made up of 10 30 steel wire ropes,Dress stone hole is formed among steel wire broach,The utility model can quickly clear up boulder,Especially to small volume,The few boulder of quantity has significant effect,And manufacturing cost is low,It is easy to operate,Due to using when be not required to change rig,Only need to change drilling pipe,Pore-forming efficiency is substantially increased compared with punching piling machine,Duration shortens,Efficiency improves,It is practical.

Description

Bored concrete pile boulder rapid cleaning device
Technical field
The utility model belongs to poured pile base technical field in architectural engineering, and in particular to bored concrete pile boulder quickly clears up dress Put.
Background technology
During the Wharf Construction of riverside, access bridge root needs several bent foundations of arranging, access bridge perpendicular to embankment simultaneously Drop-over, access bridge part bored concrete pile region are in the range of embankment along the Yangtze dumped rocks protecting foundation, and riprap layer thickness about in 5m or so, fills It is long from 40-54m to note stake stake, is both needed to penetrate existing embankment riprap layer during drilling construction, before bored concrete pile putting up platform waterborne, makes Construction of removing obstacles is carried out to the jackstone of grout pile position near zone with grab bucket dredger, depth of removing obstacles is more than 5m, jackstone Remove obstacles and use DZ60 vibration hammer sinking steel φ 1300mm casings after construction, sinking steel protecting canister construction smoothly, all steel pile castings under Sink to position.
But putting up platform is completed on the water, convolution rig starts to find still have at the bored concrete pile hole position of part during drilling construction Boulder is present, depth 10m or so about under mud face, size about 50cm or so, and common GPS type convolution rig can not be penetrated or broken Broken boulder, other method drilling and forming hole need to be used, in this case, conventional use of is punching piling machine pore-forming, and punching is beaten Stake machine is to lift block stamp to eminence using hoist engine, then reaches block stamp by boulder by boulder in freely falling body impact opening Extruding treats that gaining rotary drill machine machine after huge stone handling again continues to creep into the purpose on hole wall after broken.
But it is bored concrete pile waterborne because engineering bored concrete pile is most of, does not consider that punching is beaten at the beginning of bored concrete pile Platform Designing waterborne Stake machine load, if so using punching pile driving equipment, need to carry out consolidation process to existing bored concrete pile platform, it is necessary to expend a large amount of Manually, material cost and duration need to lengthen, and for bored concrete pile using convolution rig in the case of being influenceed without boulder, the pore-forming time is about 20 Hour or so, if the use of the punching piling machine pore-forming time being about 70 hours or so after meeting boulder, single stake pore-forming is beaten using punching Stake machine rubble need to increase the processing time of 50 hours, do not meet the construction period of engineering, also considerably increase cost of labor and set Standby lease expenses.So it is badly in need of finding a kind of new boulder liquidating plan.
Utility model content
To solve the above problems, the utility model discloses bored concrete pile boulder rapid cleaning device, rational in infrastructure, user Just, it is practical without using piling machine, short time limit, low cost.
To reach above-mentioned purpose, the technical solution of the utility model is as follows:
Bored concrete pile boulder rapid cleaning device, it is characterised in that:Including drilling pipe and steel wire broach, the drilling pipe is opened for both ends The cylindrical structural of mouth, drilling pipe top are provided with top plate, top plate centre adpting flange two, and the centre of flange two connects force rod, Grout hole is provided among the force rod, force rod top down extends to brill by the jointed rod of flange one, force rod lower section Cylinder is internal, floor is provided between top plate side and drilling pipe inwall, drilling pipe bottom is provided with 4-10 alloy bit, the wire comb Tooth is arranged on the lower section inside drilling pipe, and steel wire broach is divided into two layers up and down, and every layer of steel wire broach is made up of 10-30 root steel wire ropes, All steel wire rope afterbodys are uniformly arranged on drilling pipe inwall, and the head of steel wire rope is directed at drilling pipe axis, and rope capacity is less than Drilling pipe radius, steel wire broach centre form dress stone hole.
As a kind of improvement of the present utility model, the alloy bit of the drilling pipe bottom is highly 3cm.
As a kind of improvement of the present utility model, the every wirerope diameter is 32mm.
As a kind of improvement of the present utility model, the top plate crosses anchor bolts with flange two-way.
As a kind of improvement of the present utility model, the grout hole internal diameter is 180mm.
As a kind of improvement of the present utility model, a diameter of 150mm in the dress stone hole.
As a kind of improvement of the present utility model, the top plate is cydariform.
The beneficial effects of the utility model are:
Bored concrete pile boulder rapid cleaning device described in the utility model, can quickly clear up boulder, especially to small volume, The few boulder of quantity has significant effect, and it is fast and effective to grab stone, and its equipment manufacturing costs is low, easy to operate, due to using Shi Buxu changes rig, it is only necessary to changes drilling pipe, substantially increases pore-forming efficiency compared with punching piling machine, the pore-forming time is about 20 Hour or so, shorten about 50 hours compared with the punching piling machine pore-forming time, the duration shortens, and efficiency improves, practical.
Brief description of the drawings
Fig. 1 is alien invasion figure of the present utility model.
Fig. 2 is sectional view of the present utility model.
Fig. 3 is top view of the present utility model.
Fig. 4 is steel wire broach plan described in the utility model.
Fig. 5 Fig. 6 is that drilling pipe of the present invention clears up schematic diagram before and after stone.
Fig. 7-10 is working condition schematic diagram of the present invention.
Reference numerals list:
1st, drilling pipe, 2, steel wire broach, 3, top plate, 4, flange two, 5, force rod, 6, flange one, 7, floor, 8, alloy bores Head, 9, steel wire rope, 10, dress stone hole, 11, crab-bolt, 12, grout hole.
Embodiment
With reference to the accompanying drawings and detailed description, the utility model is furtherd elucidate, it should be understood that following specific embodiment parties Formula is merely to illustrate the utility model rather than limitation the scope of the utility model.It should be noted that make below in description Word "front", "rear", "left", "right", "up" and "down" refer to the direction in accompanying drawing, and word " interior " and " outer " refer to respectively Be directed towards or the direction away from particular elements geometric centers.
As illustrated, bored concrete pile boulder rapid cleaning device described in the utility model, including drilling pipe 1 and steel wire broach 2, The drilling pipe 1 is the cylindrical structural of both ends open, and the top of drilling pipe 1 is provided with top plate 3, top plate centre adpting flange 24, the method Connection force rod 5 among orchid 24, the centre of force rod 5 are provided with grout hole 12, and the top of force rod 5 is connected by flange 1 bores Bar, the lower section of force rod 5 are down extended to inside drilling pipe 1, and floor 7, the bottom of drilling pipe 1 are provided between the side of top plate 3 and the inwall of drilling pipe 1 4-10 alloy bit 8 is provided with, the steel wire broach is arranged on the lower section inside drilling pipe, and steel wire broach 2 divides for upper and lower two layers, Every layer of steel wire broach 2 is made up of 10-30 root steel wire ropes, and all afterbodys of steel wire rope 9 are uniformly arranged on drilling pipe inwall, the steel wire Restrict 9 heads alignment drilling pipe axis, the length of steel wire rope 9 is less than the radius of drilling pipe 1, is formed among steel wire broach 2 and fill stone hole 10.
Bored concrete pile boulder rapid cleaning device described in the utility model, a diameter of 1.2m of drilling pipe 1, high 1.2m, using δ 16mm steel plates are process, and bottom is disposed with 6 high alloy bits of 3cm, for crushing larger block stone, the side wall of drilling pipe 1 Two layers of steel wire rope broach of φ 32 for amounting to 38 root long 0.5m is welded with, one block of δ 35mm steel plate is welded as top plate in top, with brill Bar is connected by flange and fastened, and drilling rod and drilling pipe is connected as into entirety, floor 7 plays a part of reinforcement, it is ensured that drilling pipe is in work Do not fall apart, increase the service life on work;Drilling pipe is filled to former convolution drill bit of drilling machine position by ring flange during work, is driven by mill For drilling rod so as to allow drilling pipe to rotate rotary digging, convolution rig applies pressure to drilling equipment, and the boulder of bottom hole is from the friction jewel of dress stone hole 10 In cylinder 1, steel wire broach has blocked boulder toward falling when brill is carried, so as to serve the effect that stone is drawn from bottom hole.
Top plate 3 described in the utility model is connected with flange 24 by crab-bolt 11, stable connection, securely and reliably.
The internal diameter of grout hole 12 described in the utility model is 180mm, and grouting facilitates rapid.
Top plate 3 described in the utility model is cydariform, and there is gap on both sides, supplement drilling pipe internal and external pressure balance.
Bored concrete pile boulder rapid cleaning device described in the utility model, boulder can be quickly cleared up, fill the straight of stone hole 10 Footpath is 150mm, and boulder especially few to small volume, quantity has significant effect, and it is fast and effective to grab stone, and its device fabrication into This is low, easy to operate, due to using when be not required to change rig, it is only necessary to change drilling pipe, substantially increased compared with punching piling machine Pore-forming efficiency, pore-forming time are about 20 hours or so, shorten about 50 hours compared with the punching piling machine pore-forming time, and the duration shortens, effect Rate improves, practical.
Technological means disclosed in the utility model is not limited only to the technological means disclosed in above-mentioned embodiment, also Including being combined formed technical scheme by above technical characteristic.

Claims (7)

1. bored concrete pile boulder rapid cleaning device, it is characterised in that:Including drilling pipe and steel wire broach, the drilling pipe is both ends open Cylindrical structural, be provided with top plate above drilling pipe, adpting flange two among top plate, connect force rod, institute among the flange two State and grout hole is provided among force rod, drilling pipe is down extended to by the jointed rod of flange one, force rod lower section above force rod Inside, is provided with floor between top plate side and drilling pipe inwall, drilling pipe bottom is provided with 4-10 alloy bit, the steel wire broach The lower section being arranged on inside drilling pipe, steel wire broach are divided into two layers up and down, and every layer of steel wire broach is made up of 10-30 root steel wire ropes, institute There is steel wire rope afterbody to be uniformly arranged on drilling pipe inwall, the head of steel wire rope is directed at drilling pipe axis, and rope capacity, which is less than, bores Cylinder radius, steel wire broach centre form dress stone hole.
2. bored concrete pile boulder rapid cleaning device according to claim 1, it is characterised in that:The alloy of the drilling pipe bottom Crown height is 3cm.
3. bored concrete pile boulder rapid cleaning device according to claim 1, it is characterised in that:The every wirerope diameter For 32mm.
4. bored concrete pile boulder rapid cleaning device according to claim 1, it is characterised in that:The top plate and flange two-way Cross anchor bolts.
5. bored concrete pile boulder rapid cleaning device according to claim 1, it is characterised in that:The grout hole internal diameter is 180mm。
6. bored concrete pile boulder rapid cleaning device according to claim 1, it is characterised in that:It is described to fill a diameter of of stone hole 150mm。
7. bored concrete pile boulder rapid cleaning device according to claim 1, it is characterised in that:The top plate is cydariform.
CN201621378043.4U 2017-03-30 2017-03-30 Bored concrete pile boulder rapid cleaning device Active CN206667256U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621378043.4U CN206667256U (en) 2017-03-30 2017-03-30 Bored concrete pile boulder rapid cleaning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621378043.4U CN206667256U (en) 2017-03-30 2017-03-30 Bored concrete pile boulder rapid cleaning device

Publications (1)

Publication Number Publication Date
CN206667256U true CN206667256U (en) 2017-11-24

Family

ID=60357868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621378043.4U Active CN206667256U (en) 2017-03-30 2017-03-30 Bored concrete pile boulder rapid cleaning device

Country Status (1)

Country Link
CN (1) CN206667256U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677185A (en) * 2017-03-30 2017-05-17 中交第三航务工程局有限公司南京分公司 Quick cleaning device for boulders in cast-in-place pile and construction process thereof
CN109989405A (en) * 2017-12-30 2019-07-09 广州协安建设工程有限公司 Base pit stand construction under boulder site condition

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677185A (en) * 2017-03-30 2017-05-17 中交第三航务工程局有限公司南京分公司 Quick cleaning device for boulders in cast-in-place pile and construction process thereof
CN109989405A (en) * 2017-12-30 2019-07-09 广州协安建设工程有限公司 Base pit stand construction under boulder site condition

Similar Documents

Publication Publication Date Title
CN106677185A (en) Quick cleaning device for boulders in cast-in-place pile and construction process thereof
CN108914931A (en) A kind of ring-like foundation pile of the vertical shield of assembled and construction method
CN102733378B (en) Construction method of concrete pile
CN104612179B (en) Through the construction method of the diaphram wall of super thick silty sand ground
CN113174961B (en) Foundation pit slope supporting method
CN213450269U (en) Rectangular slide-resistant pile mechanical construction device
CN103422510A (en) Steel pipe frame type cofferdam structure and construction method
CN112195924A (en) Method for reinforcing foundation pit base of silt silty clay layer
CN206667256U (en) Bored concrete pile boulder rapid cleaning device
CN102808407B (en) Construction method of soft-foundation reinforced concrete cast-in-place pile
CN112144514A (en) Simple method for forming hole and pile in sand and pebble stratum easy to collapse during rotary drilling machine
CN113356190B (en) Pile forming method for cast-in-place pile in karst development area
CN114045854A (en) Bridge pile foundation composite construction method under complex geological condition
CN105386462A (en) Integral construction type small and medium-sized basement and construction method thereof
CN102677657A (en) Construction method of row cast thin-walled concrete compound pile wall and special hole forming device thereof
CN211573450U (en) Obstacle clearing drilling bucket for rotary drilling rig
CN210856971U (en) Pile foundation erodees reinforced structure
CN106930274A (en) The a full set of cylinder rotatory boring castinplace pile construction method that a kind of reinforcing bar cage location is fixed
CN114961336B (en) Protective demolition construction method for foundation pile of basement close to existing subway line
WO2020211286A1 (en) Method for constructing full-casing full-rotary internal-ramming pile
CN207004431U (en) Soft soil foundation exciting drilling device
CN110258558B (en) Anti-overturning mechanism arranged on drilling machine
CN206928296U (en) Pile pulling system
CN113309129B (en) Construction method of integral construction type basement for region with plastic soil
CN108457279A (en) A kind of foundation pit enclosure structure cast-in-situ bored pile collapse hole in-situ treatment method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant