JPS62258014A - Method for setting off-shore platform - Google Patents
Method for setting off-shore platformInfo
- Publication number
- JPS62258014A JPS62258014A JP10070686A JP10070686A JPS62258014A JP S62258014 A JPS62258014 A JP S62258014A JP 10070686 A JP10070686 A JP 10070686A JP 10070686 A JP10070686 A JP 10070686A JP S62258014 A JPS62258014 A JP S62258014A
- Authority
- JP
- Japan
- Prior art keywords
- lower jacket
- jacket
- hull
- setting
- sea
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 9
- 238000009434 installation Methods 0.000 claims description 21
- 230000001105 regulatory effect Effects 0.000 abstract 1
- 238000005553 drilling Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 208000003028 Stuttering Diseases 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Abstract
Description
【発明の詳細な説明】
(産業上の利用分野)
この発明は海中に構築した下部ジャケットに対して、石
油・ガス掘削及び生産用のオフショアプラットホームを
据付ける方法に関するものである。DETAILED DESCRIPTION OF THE INVENTION Field of the Invention This invention relates to a method of installing an offshore platform for oil and gas drilling and production onto a subsea constructed lower jacket.
(従来の技術)
洋上に設置される石油・ガス掘削及び生産用のオフショ
アプラットホームは、海中に構築された下部ジャケット
に対して、以下のような据付方法で据付けられる。すな
わち、現在は殆んどが前記プラットホームを1000〜
2000 トン以下のブロックに分割建造し、この各ブ
ロックをリフトバージ等で据付場所まで輸送し、この据
付場所で大型のデリックバージ(起m*を装備した作業
船)により各ブロックを順に吊上げて、下部ジャケット
の上に順次に据付けている。(Prior Art) An offshore platform for oil and gas drilling and production installed offshore is installed on a lower jacket constructed under the sea by the following installation method. That is, currently most of the platforms are 1000~
The construction will be divided into blocks of 2,000 tons or less, each block will be transported by lift barge etc. to the installation site, and each block will be lifted in sequence by a large derrick barge (a work boat equipped with a lift barge) at the installation site. They are installed sequentially on top of the lower jacket.
(発明が解決しようとする問題点)
前記従来の据付方法においては、大型のデリックバージ
を据付現場で使用するため、据付期間が長くなり、また
据付費用が高くなる問題があった。(Problems to be Solved by the Invention) In the conventional installation method, since a large derrick barge is used at the installation site, there are problems in that the installation period becomes long and the installation cost increases.
(問題点を解決するための手段)
この発明は前記従来の問題点を解決するために、海中に
構築される下部ジャケットをその頂部が海面下に没する
構成としたこと、オフショアブラットホーム(一体構造
物として建造される)の下部にコラムを介してバラスト
調整可能なロワーハルを取付けた上部構造体を陸上例え
ばドックにて組立製作すること、この上部構造体をロワ
ーハルの浮力により海上に浮かせた状態で、下部ジャケ
ットが構築されている据付場所まで曳航すること、この
曳航構造体を下部ジャケット上に位置させた後、ロワー
ハルのバラスト調整を行なって、下部ジャケット上に上
部構造体を着座させること、この上部構造体の着座後に
ロワーハル着座部分を下部ジャケットに固定して据付け
ることを特徴とする。(Means for Solving the Problems) In order to solve the above-mentioned conventional problems, the present invention provides a structure in which a lower jacket constructed under the sea is constructed such that its top part is submerged under the sea surface, and an offshore platform (integrated A superstructure with a lower hull with adjustable ballast attached to the bottom of a structure (built as a structure) via a column is assembled and manufactured on land, for example at a dock, and this superstructure is floated on the sea by the buoyancy of the lower hull. towing the towed structure to the installation location where the lower jacket is constructed; after positioning the towed structure on the lower jacket, ballasting the lower hull and seating the superstructure on the lower jacket; After the upper structure is seated, the lower hull seating portion is fixed and installed on the lower jacket.
(作用)
オフショアプラットホームを含む上部構造体はすべて陸
上にて組立製作され、この上部構造体を海上に浮かせた
状態で曳航してそのまま据付けるので、大型のデリック
バージを据付現場で使用する必要はなく、据付期間の短
縮と据付費用の低減を計ることができる。(Operation) All the superstructures including the offshore platform are assembled on land, and the superstructures are floated on the sea and then towed and installed, so there is no need to use a large derrick barge at the installation site. Therefore, it is possible to shorten the installation period and reduce installation costs.
(実施例)
以下、この発明の実施例を図面に従い説明すると、図中
1は海中にガス井・油井等の横手として構築した下部ジ
ャケットで、この下部ジャケット1の頂部受は座2は海
面下に所定の深さHをもって没している。このジャケッ
ト頂部受は座2の海面下に没する深さHは、後述する上
部構造体3のロワーハル6が海上に浮いた状態で着底し
ない水深とされる。(Example) Hereinafter, an example of the present invention will be described with reference to the drawings. In the figure, 1 is a lower jacket constructed under the sea as a side of a gas well, an oil well, etc. It is sunk to a predetermined depth H. The depth H at which this jacket top support sinks below the sea surface of the seat 2 is a water depth at which the lower hull 6 of the upper structure 3, which will be described later, does not touch the bottom while floating on the sea.
前記下部ジャケット1の上に据付けられる上部構造体3
は、陸上例えばドックにて組立製作されるもので、一体
構造物として建造されたオフショアプラットホーム4と
、このオフショアプラットホーム4の下部にコラム5を
介して取付けられたバラスト調整可能なロワーハル6と
から構成されている。なお、このロワーハル6は内部区
画した図示省略のバラストタンクを有し、このバラスト
タンクのバラスト調整によりトリム、ヒール(傾斜)及
び吃水の調整が可能とされている。an upper structure 3 installed on the lower jacket 1;
is assembled and manufactured on land, for example, at a dock, and consists of an offshore platform 4 built as an integral structure, and a lower hull 6 with adjustable ballast attached to the bottom of the offshore platform 4 via a column 5. has been done. The lower hull 6 has an internally partitioned ballast tank (not shown), and trim, heel (inclination), and stuttering can be adjusted by adjusting the ballast of this ballast tank.
而して、この発明のオフショアプラットホームの据付方
法は、陸上にて組立製作された上部構造体3をロワーハ
ル6の浮力により海上に浮かせた状態とし、タグボート
(図示せず)で引張って下部ジャケット1が構築されて
いる据付現場まで曳航する。そして、前記構造体3を下
部ジャケット1の上に第1図想像線で示すように位置さ
せた後、ロワーハル6のバラスト調整(浮力を減じ上部
構造体3を全体的に沈降させる調整)を行なって、下部
ジャケット1の頂部受は座2の上に上部構造体3(ロワ
ーハル6)を第2図の如く着座させ、この上部構造体3
の着座後にロワーハル6の着座部分を下部ジャケット1
の頂部受は座2に固定して据付けるものである。The offshore platform installation method of the present invention involves floating the upper structure 3 assembled on land on the sea by the buoyancy of the lower hull 6, and pulling it with a tugboat (not shown) to attach the lower jacket 1. be towed to the installation site where it is being constructed. Then, after positioning the structure 3 on the lower jacket 1 as shown by the imaginary line in Figure 1, the ballast adjustment of the lower hull 6 (adjustment to reduce the buoyancy and sink the upper structure 3 as a whole) is performed. Then, the top support of the lower jacket 1 seats the upper structure 3 (lower hull 6) on the seat 2 as shown in FIG.
After seating, attach the seating part of the lower hull 6 to the lower jacket 1.
The top support is fixedly installed on the seat 2.
なお、前記ロワーハル6のバラストタンクは据付後にお
いて各種の貯蔵タンクとして使用される。Note that the ballast tank of the lower hull 6 is used as various storage tanks after installation.
(発明の効果)
この発明のオフショアプラットホームの据付方法は前記
のようなものであるから、オフショアプラットホームの
下部にコラムを介してロワーハルを取付けた上部構造体
を海上に浮かせて曳航し、下部ジャケットの上に容易に
据付けることができ、据付現場での大型デリックバージ
等の使用が不要となることから、据付期間の短縮と据付
費用の低減を計ることができる。(Effects of the Invention) Since the offshore platform installation method of the present invention is as described above, the upper structure with the lower hull attached to the lower part of the offshore platform via the column is floated on the sea and towed. Since it can be easily installed on top of the roof and does not require the use of large derrick barges at the installation site, it is possible to shorten the installation period and reduce installation costs.
第1図は本発明の一実施例によるオフショアプラットホ
ームの据付方法を上部構造体の海上曳航状態で示した説
明図、第2図は下部ジャケットの上に上部構造体を着座
させ固定した据付状態図である。
1・・・下部ジャケット、2・・・頂部受は座、H・・
・頂部受は座の海面下に没する深さ、3・・・上部構造
体、4・・・オフショアプラットホーム、5・・・コラ
ム、6・・・ロワーハル。Fig. 1 is an explanatory diagram showing an installation method of an offshore platform according to an embodiment of the present invention with the upper structure being towed at sea, and Fig. 2 is an illustration of the installation state in which the upper structure is seated and fixed on the lower jacket. It is. 1...Lower jacket, 2...Top support is seat, H...
・The depth of the top support is below the sea surface of the seat, 3...superstructure, 4...offshore platform, 5...column, 6...lower hull.
Claims (1)
、オフショアプラットホームの下部にコラムを介してバ
ラスト調整可能なロワーハルを取付けた陸上にて組立製
作される上部構造体とを有し、この上部構造体をロワー
ハルの浮力により海上に浮かせた状態で据付場所まで曳
航して、下部ジャケット上に位置させた後、ロワーハル
のバラスト調整を行なって、下部ジャケット上に上部構
造体を着座させ、この上部構造体のロワーハル着座部分
を下部ジャケットに固定して据付けることを特徴とする
オフショアプラットホームの据付方法。This superstructure consists of a lower jacket built in the sea, the top of which is submerged below the sea surface, and an upper structure assembled and manufactured on land, with a lower hull with adjustable ballast attached to the bottom of the offshore platform via a column. After the body is floated on the sea by the buoyancy of the lower hull and towed to the installation site and positioned on the lower jacket, the ballast of the lower hull is adjusted and the upper structure is seated on the lower jacket. A method for installing an offshore platform, characterized in that the lower hull seating part of the body is fixed to the lower jacket.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10070686A JPS62258014A (en) | 1986-04-30 | 1986-04-30 | Method for setting off-shore platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10070686A JPS62258014A (en) | 1986-04-30 | 1986-04-30 | Method for setting off-shore platform |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS62258014A true JPS62258014A (en) | 1987-11-10 |
Family
ID=14281131
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP10070686A Pending JPS62258014A (en) | 1986-04-30 | 1986-04-30 | Method for setting off-shore platform |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS62258014A (en) |
-
1986
- 1986-04-30 JP JP10070686A patent/JPS62258014A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2012279291B2 (en) | Offshore platform with outset columns | |
US5609442A (en) | Offshore apparatus and method for oil operations | |
US5791819A (en) | Buoyant platform | |
US8707882B2 (en) | Offshore platform with outset columns | |
CN100567079C (en) | End jack-up platform and using method thereof are sat in split | |
US20040115006A1 (en) | System and method for converting a floating drilling rig to a bottom supported drilling rig | |
US8696291B2 (en) | Spar hull load out method | |
US3616773A (en) | Twin hull variable draft drilling vessel | |
AU719838B2 (en) | Transportation system and installation method | |
US20080014024A1 (en) | Method for fabricating a reduced-heave floating structure | |
GB2327449A (en) | Method of transporting and installing a substructure | |
WO1996040549A1 (en) | Buoyant platform | |
JPS62258014A (en) | Method for setting off-shore platform | |
JPS61155509A (en) | Installation of large-size marine structure | |
JPS63165609A (en) | Setting of offshore platform | |
AU2002335802B2 (en) | Achieving hydrostatic stability of a floating structure | |
US7104730B2 (en) | Achieving hydrostatic stability of a floating structure | |
JP2589629B2 (en) | Installation method of caisson by work boat | |
WO2003078243A9 (en) | A device and a method of a mooring buoy | |
JPS6335766B2 (en) | ||
GB2335221A (en) | Method of forming a substructure for an offshore platform | |
GB2323619A (en) | Substructure for an offshore platform and method of installation | |
KR20060039871A (en) | Method for fabricating a reduced-heave floating structure | |
JPS5976307A (en) | Multiple pillar semi-submerged type offshore excavator | |
JPS59177414A (en) | Installation of marine structure |