JPS6221930A - Method and apparatus for reinforcing pile head - Google Patents

Method and apparatus for reinforcing pile head

Info

Publication number
JPS6221930A
JPS6221930A JP16112485A JP16112485A JPS6221930A JP S6221930 A JPS6221930 A JP S6221930A JP 16112485 A JP16112485 A JP 16112485A JP 16112485 A JP16112485 A JP 16112485A JP S6221930 A JPS6221930 A JP S6221930A
Authority
JP
Japan
Prior art keywords
concrete
pile
hollow
formwork
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP16112485A
Other languages
Japanese (ja)
Inventor
Seikichi Ishihara
石原 清吉
Hiroshi Suzuki
弘 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP16112485A priority Critical patent/JPS6221930A/en
Publication of JPS6221930A publication Critical patent/JPS6221930A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To provide a treatment to give sufficient adhesion and strength for the pile head by a method in which a reinforcing bar cage of a outside diameter large than that of the pile head is combined with a formwork, the formwork is attached to the periphery of the pile head, and concrete is placed. CONSTITUTION:Main reinforcing bar 4 is combined with banded reinforcing bars 5 to form a reinforcing bar cage 2 of a larger outside diameter than that of the pile head. The cage 2 is set in a concrete formwork 3, the formwork 3 is attached to the periphery of the head 11 of a hollow concrete pile 1, and the hollow 11 of the pile 1 is closed by a concrete receiving tray 8. Under the condition, concrete is placed into the spaces between the formwork 3 and the pile head 11, the hollow portion above tray 8, and the footing portion. The pile head having a greater strength than hollow concrete piles can thus be obtained by this treatment.

Description

【発明の詳細な説明】 〈産業上の利用分野〉 本発明は、中空コンクリート杭における杭頭の補強工法
および杭頭補強装置に関する発明である。
DETAILED DESCRIPTION OF THE INVENTION <Industrial Application Field> The present invention relates to a method for reinforcing a pile cap in a hollow concrete pile and a pile cap reinforcing device.

〈従来の技術〉 中空コンクリート杭の枕頭を補強する技術として、種々
の技術が存在する。
<Prior Art> Various techniques exist for reinforcing the head of a hollow concrete pile.

例えば、中空コンクリート杭の中空孔に鉄筋を挿入しコ
ンクリートを打設して枕頭を補強する技術が利用されて
いる。
For example, a technique is used to reinforce the sleeper head by inserting reinforcing bars into the hollow holes of hollow concrete piles and pouring concrete.

く本発明が解決しようとする問題点〉 上記技術には、次のような問題点が存在する。Problems to be solved by the present invention> The above technology has the following problems.

(イ)成形時には中空コンクリート杭の中空孔のコンク
リート面に、ノロが必ず生じている。
(b) During forming, slag always occurs on the concrete surface of the hollow hole of the hollow concrete pile.

このため、中空コンクリート杭の中空孔に鉄筋を挿入し
コンクリートを打設しても充分な付着が期待できない。
For this reason, even if reinforcing bars are inserted into the hollow holes of hollow concrete piles and concrete is poured, sufficient adhesion cannot be expected.

(ロ)中空コンクリート杭の中空孔に鉄筋を挿入する工
法なので鉄筋の外径が中空コンクリート杭の外径より小
さく、曲げ抵抗が小さい。
(b) Since the method involves inserting reinforcing bars into the hollow holes of hollow concrete piles, the outer diameter of the reinforcing bars is smaller than the outer diameter of the hollow concrete piles, resulting in low bending resistance.

(ハ)中空コンクリート杭の頭部を切断した場合は、杭
上部のプレスト・レスが解放されてしまう。
(c) If the head of a hollow concrete pile is cut off, the prestress at the top of the pile will be released.

従って、本来なら杭本体がもつべき曲げ抵抗が極端に小
さくなってしまい設計強度を確保することができない。
Therefore, the bending resistance that the pile body should originally have becomes extremely small, making it impossible to ensure the designed strength.

く本発明の目的〉 本発明は、以上のような問題点を解決するためになされ
′たもので、充分な付着と大きな曲げ抵抗と中空コンク
リート抗以上の強度を有する、中空コンクリート杭の枕
頭の補強工法および杭頭補強装置を提供することを目的
とする。
OBJECTS OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and it provides a pillow head for hollow concrete piles that has sufficient adhesion, large bending resistance, and strength greater than that of hollow concrete piles. The purpose is to provide a reinforcement method and a pile cap reinforcement device.

〈実施例〉 本発明は、次のような中空コンクリート杭1に実施する
もので、枕頭の補強工法には第2〜3図のような枕頭補
強装置を使用する。
<Example> The present invention is implemented on the following hollow concrete pile 1, and a sleep head reinforcing device as shown in Figs. 2 and 3 is used for the sleep head reinforcement method.

なお、枕頭補強装置は、鉄筋籠2にコンクリート型枠3
を組み合わせたものである。
In addition, the sleep head reinforcing device consists of a concrete formwork 3 on a reinforcing bar cage 2.
It is a combination of

(イ)中空コンクリート杭 中空コンクリート杭1は、中空孔11を有する既製杭で
あり、例えば遠心カブレストレスコンクリート杭等があ
る。
(A) Hollow Concrete Pile The hollow concrete pile 1 is a ready-made pile having a hollow hole 11, such as a centrifugal turn stress concrete pile.

(ロ)鉄筋籠 鉄筋籠2は、中空コンクリート杭1の外径より大きい外
径になるように配置した主鉄筋4を、帯鉄筋5やスパイ
ラル51等を使用して結合した範状の筒体であり、中空
コンクリート杭1の杭頭に取り付けることができるよう
に、例えば主鉄筋4間に受鉄筋6を位置させる。
(b) Reinforcing bar cage The reinforcing bar cage 2 is a paradigm-shaped cylindrical body in which main reinforcing bars 4 arranged to have an outer diameter larger than the outer diameter of the hollow concrete pile 1 are connected using band reinforcing bars 5, spirals 51, etc. For example, the receiving reinforcing bars 6 are positioned between the main reinforcing bars 4 so that they can be attached to the pile cap of the hollow concrete pile 1.

このようにすれば、中空コンクリート杭1の枕頭に受鉄
筋6が引っ掛かり位置が固定されるので、鉄筋籠2等を
中空コンクリート杭1の抗頭に被せるようにするだけで
、中空コンクリート杭1の杭頭に鉄筋籠2等が取り付け
られる。
In this way, the receiving reinforcing bars 6 will be caught on the head of the hollow concrete pile 1 and the position will be fixed, so simply by placing the reinforcing bar cage 2 etc. on the head of the hollow concrete pile 1. Rebar cage 2, etc. is attached to the pile head.

この鉄筋籠2等の中心には、吊り下げ鉄筋7等を使用し
て、中空コンクリート杭1の中空孔11ともできる。
A hanging reinforcing bar 7 or the like is used at the center of the reinforcing bar cage 2, etc., so that the hollow hole 11 of the hollow concrete pile 1 can also be formed.

コンクリート受皿8は、柔軟性のあるプラスチック等で
形成すれば中空孔11より多少大きくても挿入すること
ができる。
If the concrete tray 8 is made of flexible plastic or the like, it can be inserted even if it is somewhat larger than the hollow hole 11.

なお、鉄筋籠2等に使用する鉄筋の本数は、補強強度に
応じた数の鉄筋を・使用することができる。
Note that the number of reinforcing bars used for the reinforcing bar cage 2 and the like can be determined according to the reinforcement strength.

さらに、使用する材料も必要に応じて異形や丸鋼等の種
々の鉄筋、および鉄骨等を使用することもでき、使用場
所も中空コンクリート杭1の外側だけに限らない。
Furthermore, various types of reinforcing bars such as deformed steel bars, round steel bars, and steel frames can be used as required, and the location of use is not limited to the outside of the hollow concrete pile 1.

(ハ)コンクリート型枠 コンクリート型枠3は、例えば幅止筋9等を使用して鉄
筋籠2等に組み合わせて使用する型枠であり、ナマコ板
、ボイド板、プラスチック板等を採用することができる
(c) Concrete formwork The concrete formwork 3 is a formwork that is used in combination with the reinforcing bar cage 2, etc. using, for example, stop bars 9, etc., and can be made of sea cucumber board, void board, plastic board, etc. can.

次に、中空コンクリート杭1の杭頭の補強工法について
図面を参照しながら説明する。
Next, a method for reinforcing the pile cap of the hollow concrete pile 1 will be explained with reference to the drawings.

く1〉杭頭補強装置の用意 あらかじめ、補強条件に合わせた杭頭補強装置を用意す
る。
1> Preparation of pile cap reinforcing device Prepare a pile cap reinforcing device that matches the reinforcement conditions in advance.

枕頭補強装置は、鉄筋i!2とコンクリート型枠3を組
み合わせたもので、鉄筋籠2の外径が中空コンクリート
抗1の外径より大きく、中空孔11とほぼ等しい径のコ
ンクリート受皿8を有するものを用意する。
The pillow head reinforcement device is made of reinforcing bars i! 2 and a concrete formwork 3, the outer diameter of the reinforcing bar cage 2 is larger than the outer diameter of the hollow concrete shaft 1, and a concrete receiving tray 8 having a diameter almost equal to that of the hollow hole 11 is prepared.

く2〉枕頭補強装置の取り付は 杭頭補強装置を中空コンクリート杭1の枕頭に取り付け
る。
2> Attach the pile head reinforcing device to the head of the hollow concrete pile 1.

取り付けは、中空コンクリート杭1の中空孔11にコン
クリート受皿8を挿入することで、受鉄筋6によって枕
頭補強装置の位置が固定されるため、簡単に行うことが
できる。
Attachment can be easily carried out by inserting the concrete receiving plate 8 into the hollow hole 11 of the hollow concrete pile 1, since the position of the bed head reinforcing device is fixed by the receiving reinforcing bars 6.

く3〉コンクリートの打設 枕頭補強装置の取り付けが終わったら、コンクリートを
打設する。
3) Concrete pouring After the installation of the sleep head reinforcing device is complete, concrete is poured.

また、打設前に型枠まわりの埋土を行うことも可能であ
る。
It is also possible to fill soil around the formwork before pouring.

枕頭補強装置には、予めコンクリート型枠3も組み合わ
されているので、取り付けが終了すれば型枠も同時にセ
ットされることになり、直ちにコンクリートを打設する
ことができる。
Since the concrete formwork 3 is also combined with the bedhead reinforcing device in advance, once the installation is completed, the formwork is also set at the same time, and concrete can be poured immediately.

く4〉中空コンクリート杭の杭頭の補強の完了コンクリ
ート打設後は型枠を解体する必要らなく、中空コンクリ
ート杭1と打設したコンクリートが一体となって、中空
コンクリート杭1の抗頭の補強が完了する。
4> Completion of reinforcing the pile head of the hollow concrete pile After pouring the concrete, there is no need to dismantle the formwork, and the hollow concrete pile 1 and the poured concrete are integrated, and the head of the hollow concrete pile 1 is reinforced. Reinforcement is complete.

く本発明の効果〉 本発明は以上説明したようになるから、次のような効果
を期待することができる。
Effects of the Present Invention> Since the present invention is as described above, the following effects can be expected.

(イ)中空コンクリート杭の外側に存在する泥等の不純
物を完全に取り除くことは容易であり、その不純物を除
去してから中空コンクリート枕頭補強装置を取り付はコ
ンクリートを打設することができるので、充分に付着さ
せることができる。
(b) It is easy to completely remove impurities such as mud that exist on the outside of hollow concrete piles, and after removing these impurities, the hollow concrete bed head reinforcing device can be installed and concrete can be poured. , sufficient adhesion can be achieved.

このため、水平抵抗力が大きい。Therefore, the horizontal resistance force is large.

(ロ)中空コンクリート杭の外径よりフーチング接合部
の寸法が大きいので、曲げ抵抗が大きい。
(b) Since the dimensions of the footing joint are larger than the outer diameter of the hollow concrete pile, the bending resistance is large.

しかも、中空コンクリート杭以上の強度を確保すること
も可能である。
Moreover, it is also possible to ensure strength greater than that of hollow concrete piles.

(ハ)中空コンクリート杭の枕頭補強装置は鉄筋能とコ
ンクリート型枠が組み合わされているので、中空コンク
リート杭に取り付けるだけで、コンクリートを打設する
ことができ、しかも、型枠を解体する必要がない。
(c) The head reinforcing device for hollow concrete piles combines reinforcing steel and concrete formwork, so concrete can be poured just by attaching it to the hollow concrete pile, and there is no need to dismantle the formwork. do not have.

従って、熟練工や特殊な機械類は一切不要であり、簡単
に施工することができる◎ (ニ)中空コンクリートの枕頭を切断した場合、プレス
トレスが切断部より数100m解放されても、それより
下部まで本装置をセットすることにより杭と一体となっ
て充分な補強をすることができる。
Therefore, no skilled labor or special machinery is required, and the construction is easy. By setting this device up to this point, it can be integrated with the pile and provide sufficient reinforcement.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図:本発明の詳細な説明図 第2〜3図工本発明の中空コンクリート杭頭補強装置の
説明図 1:中空コンクリート杭 2:鉄筋能 3:コンクリート型枠 4:主鉄筋 6:受鉄筋第 1
Figure 1: Detailed explanatory diagram of the present invention Figures 2 and 3: Explanatory diagram of the hollow concrete pile cap reinforcing device of the present invention Figure 1: Hollow concrete pile 2: Reinforcement capacity 3: Concrete formwork 4: Main reinforcing bar 6: Receiving reinforcing bar 1st
figure

Claims (2)

【特許請求の範囲】[Claims] (1)中空コンクリート杭の杭頭の外径より大きい外径
を有する鉄筋籠に、 コンクリート型枠を組み合わせ、中空コンクリート杭の
杭頭に取り付け、 コンクリートを打設して行う、杭頭の補強工法
(1) Pile cap reinforcement method in which a concrete formwork is combined with a reinforcing bar cage having an outer diameter larger than the outer diameter of the pile cap of a hollow concrete pile, attached to the pile cap of a hollow concrete pile, and concrete is poured.
(2)中空コンクリート杭の杭頭の外径より大きい外径
を有する鉄筋籠に、 コンクリート型枠を組み合わせた、杭頭補強装置
(2) A pile cap reinforcement device that combines a concrete formwork with a reinforcing bar cage that has an outer diameter larger than the outer diameter of the pile cap of a hollow concrete pile.
JP16112485A 1985-07-23 1985-07-23 Method and apparatus for reinforcing pile head Pending JPS6221930A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16112485A JPS6221930A (en) 1985-07-23 1985-07-23 Method and apparatus for reinforcing pile head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16112485A JPS6221930A (en) 1985-07-23 1985-07-23 Method and apparatus for reinforcing pile head

Publications (1)

Publication Number Publication Date
JPS6221930A true JPS6221930A (en) 1987-01-30

Family

ID=15729058

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16112485A Pending JPS6221930A (en) 1985-07-23 1985-07-23 Method and apparatus for reinforcing pile head

Country Status (1)

Country Link
JP (1) JPS6221930A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0453831U (en) * 1990-09-13 1992-05-08
JP2009013652A (en) * 2007-07-04 2009-01-22 Taiyo:Kk Pile head reinforcing bar, and construction method of concrete foundation using the pile head reinforcing bar
JP4499888B2 (en) * 2000-06-28 2010-07-07 勝寛 田中 Pile head joint structure between pile with steel pipe and foundation slab
JP2014005595A (en) * 2012-06-21 2014-01-16 Kajima Corp Pc ring unit for joining pile head and foundation and method for manufacturing pc ring using the same
US9359741B2 (en) * 2014-06-25 2016-06-07 Powerchina Huadong Engineering Corporation Limited Wind turbine generator foundation with pressure-dispersive high strength pre-stressed anchors

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0453831U (en) * 1990-09-13 1992-05-08
JP4499888B2 (en) * 2000-06-28 2010-07-07 勝寛 田中 Pile head joint structure between pile with steel pipe and foundation slab
JP2009013652A (en) * 2007-07-04 2009-01-22 Taiyo:Kk Pile head reinforcing bar, and construction method of concrete foundation using the pile head reinforcing bar
JP2014005595A (en) * 2012-06-21 2014-01-16 Kajima Corp Pc ring unit for joining pile head and foundation and method for manufacturing pc ring using the same
US9359741B2 (en) * 2014-06-25 2016-06-07 Powerchina Huadong Engineering Corporation Limited Wind turbine generator foundation with pressure-dispersive high strength pre-stressed anchors

Similar Documents

Publication Publication Date Title
JP2576755B2 (en) Pile head treatment method for ready-made prestressed concrete pile
JPS6221930A (en) Method and apparatus for reinforcing pile head
JPS6156393B2 (en)
CN206110489U (en) Building steel reinforcement cage subassembly for post
JPS6047119A (en) Vibration and noise-free breaking of head of cast-in-place pile
JPH05118036A (en) Waling material
JPH1018424A (en) Root wrapping reinforcing structure of column base of steel post or the like
JPH0291315A (en) Pile head reinforcing method for cylindrical stick pile
JP3959509B2 (en) Knotted pile and method for manufacturing knotted pile
JPH08105053A (en) Slope protection construction method
JPH0377325B2 (en)
JP3697525B2 (en) Pipeline repair and rehabilitation method
JPH0529238Y2 (en)
JPH03275806A (en) Method of making knotting pile
JP2576757B2 (en) Pile head treatment method for ready-made prestressed concrete pile
JPH0819828B2 (en) Concrete segment
JP2792968B2 (en) Self-supporting soil cement retaining wall and its construction method
JPS63289145A (en) Method for fixing anchor bolt
JPS6313490B2 (en)
JPS63201208A (en) Foundation consolidation work for embedded pile
JPS621310Y2 (en)
JPS58113418A (en) Pile head treatment work
JPH0565652B2 (en)
JP2004107928A (en) Pile head reinforcing construction method for pc pile
JPS6059223A (en) Treatment of head of cast-in-place pile