JPS62185938A - Construction of reinforcement in building - Google Patents

Construction of reinforcement in building

Info

Publication number
JPS62185938A
JPS62185938A JP2748386A JP2748386A JPS62185938A JP S62185938 A JPS62185938 A JP S62185938A JP 2748386 A JP2748386 A JP 2748386A JP 2748386 A JP2748386 A JP 2748386A JP S62185938 A JPS62185938 A JP S62185938A
Authority
JP
Japan
Prior art keywords
building
steel frame
steel
construction
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2748386A
Other languages
Japanese (ja)
Inventor
慎一郎 八木
聡 荒木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Construction Co Ltd
Original Assignee
Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Construction Co Ltd filed Critical Mitsui Construction Co Ltd
Priority to JP2748386A priority Critical patent/JPS62185938A/en
Publication of JPS62185938A publication Critical patent/JPS62185938A/en
Pending legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 (a)、産業上の利用分野 本発明は、溶接ひずみの発生が少くな(、シかも建て入
れひずみを修正しやすい、建築物における鉄骨の構築方
法に関する。
DETAILED DESCRIPTION OF THE INVENTION (a) Field of Industrial Application The present invention relates to a method of constructing a steel frame for a building in which welding distortion is less likely to occur (and erection distortion can be easily corrected).

(b)、従来の技術 第3図は従来の建築物における鉄骨の構築方法を示す図
である。
(b), Prior Art FIG. 3 is a diagram showing a conventional method of constructing a steel frame in a building.

従来、この種の鉄骨の構築に際しては、第3図に示すよ
うに、鉄骨1の接続部1c、tctt!同一層で溶接に
より接続していた。
Conventionally, when constructing this type of steel frame, as shown in FIG. 3, the connecting portion 1c of the steel frame 1, tctt! They were connected by welding on the same layer.

(C)0発明が解決しようとする問題点しかし、こうし
た方法では、鉄骨lが接続される層が特定の層にかたよ
り、溶接ひずみが当該溶接を行った層に集中してしてま
い、何らかの対策を施す必要が生じる不都合が有った。
(C) 0 Problems to be Solved by the Invention However, in such a method, the layers to which the steel frame l is connected are biased toward a specific layer, and the welding strain is concentrated in the layer where the welding is performed. There was an inconvenience that required some kind of countermeasure to be taken.

また、鉄骨1の建て入れ時のひずみの修正も、建て入れ
られた鉄骨1が、第3図に示すように、同一水平レベル
で並ぶので、隣接する鉄骨1同士が干渉し、その修正に
手間が掛かる不都合が生じる。
In addition, when correcting the strain during erection of the steel frames 1, since the steel frames 1 that have been erected are lined up at the same horizontal level as shown in Figure 3, adjacent steel frames 1 interfere with each other, making corrections difficult. This will cause the inconvenience that it will take.

本発明は、前述の欠点を解消すべく、溶接ひずみが特定
の層に集中することが無(、シかも建て入れひずみの修
正が容易な建築物における鉄骨の構築方法を提供するこ
とを目的とするものである。
In order to eliminate the above-mentioned drawbacks, the present invention aims to provide a method for constructing a steel frame in a building in which welding strain is not concentrated in a specific layer and construction strain can be easily corrected. It is something to do.

(d)0問題点を解決するための手段 即ち、本発明は、左右に隣接する鉄骨(1)の接続部(
IC)が、同一層に配置されないようにして建て込んで
構成される。
(d) Means for solving the zero problem, that is, the present invention provides a connecting portion (
ICs) are built in such a way that they are not placed on the same layer.

なお、括弧内の番号等は、図面における対応する要素を
示す、便宜的なものであり、従って、本記述は図面上の
記載に限定拘束されるものではない。以下のr (el
 、作用」の欄についても同様である。
Note that the numbers in parentheses are for convenience and indicate corresponding elements in the drawings, and therefore, this description is not limited to the descriptions on the drawings. The following r (el
The same applies to the column ``, action''.

(e)0作用 上記した構成により、本発明は、鉄骨(1)の接続部(
1c)が各層に分散されるので、溶接ひずみも各層に分
散され、更に建て込まれた鉄骨(1)の先端部が他の鉄
骨(1)に“拘束されない状態となり、建て入れひずみ
の修正も容易に行うことが出来るように作用する。
(e) 0 effect With the above-described configuration, the present invention provides the connection portion (
1c) is distributed to each layer, the welding strain is also distributed to each layer, and the tip of the erected steel frame (1) is not restrained by other steel frames (1), making it possible to correct the erected strain. It works so that it can be done easily.

(f)、実施例 以下、本発明の実施例を図面に基づき説明する。(f), Example Embodiments of the present invention will be described below based on the drawings.

第1図は本発明による鉄骨の構築方法の一実施例が適用
された建築物の一例を示す図、第2図は本発明の別の実
施例を示す図である。
FIG. 1 is a diagram showing an example of a building to which an embodiment of the method for constructing a steel frame according to the present invention is applied, and FIG. 2 is a diagram showing another embodiment of the present invention.

建築物2ば、第1図に示すように、建て込まれた複数の
鉄骨lを有しており、鉄骨1は棒状の柱構成部1a及び
該柱構成部1aに対して直角に形成された梁構酸部1b
を有している。各鉄骨1の柱構成部1aの上下両端には
、鉄骨1相互を溶接により上下方向に接続するための接
続部1cが設けられており、更に建て込まれた鉄骨1は
、左右に隣接する鉄骨1同士の接続部1cが同一層に配
置されないように、互い違いになる形で組み上げられて
いる。なお、第1図において、記号CL1、Cl3、C
l3は建築物2における各層を表わす。
As shown in Fig. 1, the building 2 has a plurality of built-in steel frames 1, and the steel frame 1 has a rod-shaped column component 1a and is formed at right angles to the column component 1a. Beam structural part 1b
have. Connecting parts 1c for vertically connecting the steel frames 1 by welding are provided at both upper and lower ends of the column component 1a of each steel frame 1. The connecting parts 1c are assembled in a staggered manner so that the connecting parts 1c are not arranged on the same layer. In addition, in FIG. 1, symbols CL1, Cl3, C
l3 represents each layer in the building 2.

(g)0発明の効果 以上、説明したように、本発明によれば、左右に隣接す
る鉄骨1の接続部ICが、同一層に配置されないように
建て込んで構成したので、鉄骨1の接続に際して生じる
溶接ひずみが各層に分散゛ され、特定の層に集中して
生じることが無くなり、溶接ひずみを除去するための特
別の対策が不要となる。更に、新たに建て込まれる鉄骨
1の先端部1dは、第1図に示すように、各接続部IC
の配置ずれによ咳、隣接する既設の他の鉄骨1に拘束さ
れない状態となっているので、建て入れひずみの修正も
容易に行うことが出来る。
(g) 0 Effects of the Invention As explained above, according to the present invention, since the connection ICs of the steel frames 1 adjacent to the left and right are constructed so as not to be placed on the same layer, the connections of the steel frames 1 The welding strain that occurs during welding is dispersed in each layer, and is no longer concentrated in a specific layer, making it unnecessary to take special measures to remove welding strain. Furthermore, as shown in FIG. 1, the tip 1d of the newly constructed steel frame 1 is
Since the steel frame 1 is not constrained by other existing steel frames 1 due to misalignment of the steel frame, it is possible to easily correct the distortion caused by construction.

なお、上述の実施例は、鉄骨1に梁構酸部1bが予め設
けられている場合について述べたが、梁構酸部1bは必
ずしも必要では無く、例えば、第2図に示すように、先
に柱構成部1aのみを建て込み、その後に梁鉄骨3を接
続する方法でもよいことは勿論である。また、柱構成部
1aに設けられる梁構酸部1bの数も、第1図に示した
2層1節の構成の他に、3層1節等どのような構成でも
よい。
In addition, although the above-mentioned example described the case where the beam structure part 1b was previously provided on the steel frame 1, the beam structure part 1b is not necessarily necessary, and for example, as shown in FIG. Of course, it is also possible to erect only the column component 1a and then connect the beam steel frame 3. Further, the number of beam structural parts 1b provided in the column forming part 1a may be any structure such as three layers and one section, in addition to the two-layer, one-section structure shown in FIG.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明による鉄骨の構築方法の一実施例が適用
された建築物の一例を示す図、第2図は本発明の別の実
施例を示す図、第3図は従来の建築物における鉄骨の構
築方法を示す図である。 l・・・・・・鉄骨 IC・・・・・・接続部 2・・・・・・建築物 出願人     三井建設株式会社 代理人   弁理士  相1)伸二 (ほか1名)
Fig. 1 is a diagram showing an example of a building to which an embodiment of the method for constructing a steel frame according to the present invention is applied, Fig. 2 is a diagram showing another embodiment of the invention, and Fig. 3 is a diagram of a conventional building. It is a figure showing the construction method of the steel frame in. l...Steel IC...Connection part 2...Building applicant Mitsui Construction Co., Ltd. agent Patent attorney Phase 1) Shinji (and 1 other person)

Claims (1)

【特許請求の範囲】 鉄骨を接続部を介して溶接接続して上下方 向に建て込んでゆく鉄骨の構築方法において、左右に隣
接する鉄骨の前記接続部が、同一 層に配置されないようにして建て込んで構成した建築物
における鉄骨の構築方法。
[Claims] In a method of constructing a steel frame in which steel frames are welded together through joints and erected vertically, the joints of adjacent steel frames on the left and right are constructed so that they are not placed on the same layer. A method of constructing steel frames in complex buildings.
JP2748386A 1986-02-10 1986-02-10 Construction of reinforcement in building Pending JPS62185938A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2748386A JPS62185938A (en) 1986-02-10 1986-02-10 Construction of reinforcement in building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2748386A JPS62185938A (en) 1986-02-10 1986-02-10 Construction of reinforcement in building

Publications (1)

Publication Number Publication Date
JPS62185938A true JPS62185938A (en) 1987-08-14

Family

ID=12222376

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2748386A Pending JPS62185938A (en) 1986-02-10 1986-02-10 Construction of reinforcement in building

Country Status (1)

Country Link
JP (1) JPS62185938A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04228739A (en) * 1991-04-09 1992-08-18 Ohbayashi Corp Construction device

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS547376A (en) * 1977-06-17 1979-01-20 Seiko Instr & Electronics Ltd Digital electronic watch

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS547376A (en) * 1977-06-17 1979-01-20 Seiko Instr & Electronics Ltd Digital electronic watch

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04228739A (en) * 1991-04-09 1992-08-18 Ohbayashi Corp Construction device

Similar Documents

Publication Publication Date Title
JPS62185938A (en) Construction of reinforcement in building
US4743141A (en) Offshore truss work type tower structure
JPH11159001A (en) Joining method of column and beam
JPS6237466A (en) Method for casting concrete
JPS62125133A (en) Method for connecting pillar
JPS63197777A (en) Earthquake resistant wall made of precast reinforced concrete
JP2633149B2 (en) Trapezoidal unit
JPH02104831A (en) Execution method of steel framed construction
JPH0514969Y2 (en)
JPH09137633A (en) Power-transmission line steel tower reconstruction method
JP2511321B2 (en) Steel structure in high-rise building
JP2575800Y2 (en) Hoop muscle hanging jig
JP2992580B2 (en) Building construction method
JPH04353170A (en) Panel type structural body
JPS6146623B2 (en)
JPH1018432A (en) Unit building and method for constructing the same
JPS62101737A (en) Reinforcement unit of steel bar frame
JPS61130563A (en) Building of reinforcing bar
JPS59456A (en) Wire arranging structure of pillar reinforcing iron wire
JPS60102444A (en) Precast skeletal of building
JPS62164973A (en) Method for temporarily constructing iron tower support type chimney
JPS59154250A (en) Joint construction of reinforcing wire
JPS62112840A (en) Skeletal structure of house
JPH07224463A (en) Reinforcing structure of trass dome
JPS61160386A (en) Construction method of double bottom hull block