Work conveyor

Info

Publication number
JPS62157857A
JPS62157857A JP60298430A JP29843085A JPS62157857A JP S62157857 A JPS62157857 A JP S62157857A JP 60298430 A JP60298430 A JP 60298430A JP 29843085 A JP29843085 A JP 29843085A JP S62157857 A JPS62157857 A JP S62157857A
Authority
JP
Japan
Prior art keywords
path
hanger
end portion
starting end
workpiece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP60298430A
Other languages
Japanese (ja)
Other versions
JPH0418588B2 (en
Inventor
清志 熊谷
浩 奥山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Honda Motor Co Ltd
Original Assignee
Honda Motor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Honda Motor Co Ltd filed Critical Honda Motor Co Ltd
Priority to JP60298430A priority Critical patent/JPS62157857A/en
Publication of JPS62157857A publication Critical patent/JPS62157857A/en
Publication of JPH0418588B2 publication Critical patent/JPH0418588B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Automobile Manufacture Line, Endless Track Vehicle, Trailer (AREA)
  • Intermediate Stations On Conveyors (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、主として自動車のサイドパネル等の大型の板
金製ワークを加工ラインの終端の移載ステーションから
その先方の払出しステーションにハンガーに吊持して搬
送するのに適用されるワーク搬送装置に関する。
Detailed Description of the Invention (Industrial Application Field) The present invention mainly relates to a method for suspending large sheet metal workpieces, such as automobile side panels, from a transfer station at the end of a processing line to a discharging station at the end of the processing line on a hanger. The present invention relates to a workpiece conveyance device that is applied to convey a workpiece.

(従来の技術) 従来、移載ステーションと払出しステーションとの間隔
が比較的長い場合、1個の/・ンガーを両ステーション
間に往復動させていたのでは、ハンガーの往復動にダす
る時間及び払出しステーションでのワークの払出しに要
する時間の会計がカロエライ/でのタクトタイムよシ長
くなって、タイムロスによる生産性の低下を生ずるtめ
、両ステーション會通るループ状のハンガー搬送路を設
け、該搬送路に沿って複数のノ・ンガーを循環させて、
ワーク搬送を行うようにしている。
(Prior Art) Conventionally, when the distance between the transfer station and the dispensing station is relatively long, moving one hanger back and forth between the two stations would reduce the amount of time and time required for the reciprocating movement of the hanger. Since the time required for unloading workpieces at the unloading station is longer than the takt time at the unloading station, productivity is reduced due to time loss, so a loop-shaped hanger conveyance path passing through both stations is provided. By circulating multiple nozzles along the conveyance path,
I am trying to transport the workpiece.

(発明が解決しようとする問題点」 サイドパネル等の大型のワークを412送する場合、ハ
ンガーも大型になる友め、上記したループ状の搬送路の
両端のターン部分で)・ンガーが支えないように、ター
ン部分の曲率音大きく取る必委全生じ、搬送路の配置ス
ペースが広くなシ、又搬送路の周長が長くなり、この場
合ノ・ンガーの間隔は、移載ステーションでのハンガー
へのワークの移載と、払出しステーショ/でのワークの
払出しとを同時に行う上で両ステーションの間隔より長
くすることはできず、搬送路の周長が長くなる分ハンガ
ーの使用個数が増して、設備費が嵩む問題がある。
(Problem to be solved by the invention) When transporting large workpieces such as side panels, the hangers also become large, and the hangers do not support them at the turns at both ends of the loop-shaped conveyance path mentioned above. In this case, the curvature of the turn part makes it necessary to make a large noise, and the space for placing the transfer path is wide, and the circumference of the transfer path becomes long. In order to transfer the workpiece to the unloading station and unload the workpiece at the unloading station at the same time, it is not possible to make the interval longer than the distance between both stations, and as the circumference of the transport path increases, the number of hangers used increases. , there is a problem of increased equipment costs.

本発明は、かかる問題点を解決すべく、搬送路の配置ス
ペースを狭め且つ少数のハンガーで能率良くワーク搬送
を行い得られるようにしt装置6ft−提供することを
その目的とする。
SUMMARY OF THE INVENTION In order to solve these problems, it is an object of the present invention to provide a 6ft device that reduces the space for disposing a conveyance path and enables efficient workpiece conveyance with a small number of hangers.

(問題点を解決するため手段〉 本発明では、上記目的を達成すべく、ワーク全加工ライ
ンの終端の移載ステーションからその先方の払出しステ
ーションにハンガーに吊持して搬送するものにおいて、
ハンガーの搬送路の中間部分を往路と復路とに分離し、
該移載ステーション上に位置する該搬送路の始端部分に
対する該往路と該復路の分岐部に、該始端部分から該復
路へのハンガーの逆行を阻止するポイント部材と、該払
出しステーション上に位置する該搬送路の終端部分に対
する該往路と該復路の分岐部に、該終端部分から該往路
への)1ンガーの逆行を阻止するポイント部材とを設け
て、複数のハンガー金線始端部分から該往路金倉して該
終端部分と、該終端部分から該復路を介して該始端部分
とに搬送するようにした。
(Means for Solving the Problems) In order to achieve the above object, the present invention includes the following steps:
The middle part of the hanger conveyance path is separated into an outgoing path and a return path,
A point member located on the transfer station, at a branching point of the outbound path and the return path with respect to the starting end portion of the conveyance path, for preventing the hanger from moving backward from the starting end portion to the return path; and a point member located on the dispensing station. A point member is provided at the branching part of the outgoing path and the incoming path with respect to the terminal end of the conveyance path to prevent the reverse movement of one finger from the terminal end to the outgoing path, and the point member is provided to prevent the forward path from the starting end of the plurality of hanger gold wires. The material is conveyed from the terminal end portion to the starting end portion via the return route.

(作用] 移載ステーションにおいて加工済みのワークを搬送路の
始端部分に存するノ・ンガーに吊持すると共に、払出し
ステーションにおいて搬送路の終端部分に存するハンガ
ーからワークを取外し、次いでワークを吊持し次ハンガ
ー金該始端部分から往路を介して該終端部分と、空のノ
ーンガーを該終端部分から復路を介して該始端部分とに
搬送し、次のワーク搬送に備える。
(Function) At the transfer station, the processed workpiece is suspended on a hanger located at the starting end of the conveyance path, and at the unloading station, the workpiece is removed from the hanger at the end of the conveyance path, and then the workpiece is suspended. The next hanger metal is transported from the starting end portion to the terminal end portion via the outward path, and the empty nounger is transported from the terminal end portion to the starting end portion via the return path, in preparation for the next workpiece conveyance.

この際、該始端部分に対する往路と復路の分岐部に設け
たポイント部材によシ、ワークを吊持したハンガーの復
路への逆行が阻止されると共に、該終端部分に対する往
路と復路の分岐部に設けたポイント部材によシ、空の/
Sンガーの往路への逆行が阻止され、結局各ノ・/ガー
は始端部分→往路→終端部分→復路→始端部分の糸路で
移載ステーションと払出ロスチージョンとの間に往復動
されることになる。
At this time, the point member provided at the branching point between the outgoing and returning paths to the starting end portion prevents the hanger holding the workpiece from returning to the returning path, and the point member provided at the branching point between the outgoing path and the returning path to the terminal portion. According to the point member provided, empty /
The reverse movement of the S yarner to the outward path is prevented, and each yarn is eventually moved back and forth between the transfer station and the unloading loss section along the yarn path of the starting end → outgoing path → terminal end → returning path → starting end. Become.

従来のループ状搬送路は、本発明における始端部分と終
端部分との各外端に連るループ部分を設けて往路と復路
を結ぶ構造になっておシ、このループ部分の存在により
、上記の如くスペース増の問題を生じているが、本発明
ではループ部分が存在しない几め、搬送路の配置スペー
スを大巾に削減することができる。
The conventional loop-shaped conveyance path according to the present invention has a structure in which a loop portion is provided at each outer end of the starting end portion and the terminal end portion to connect the outgoing path and the returning path. However, in the present invention, since there is no loop portion, the space for arranging the conveyance path can be greatly reduced.

(実施列ン 第1図及び第21金参照して、Slはワークたる自動車
のサイドパネルWのカロエラインLの終端に設けた移載
ステーション、S2はその先方の払出しステーション全
示し、サイド/ゼネルW全該移載ステーションS1にお
いて加工ライ/Lでのワーク搬送を行うハンガー1から
払出し用のハンガー2に移載して、該ハンガー2により
該払出しステーションS2に搬送するようにした。
(Referring to Figure 1 and No. 21, S1 indicates the transfer station installed at the end of the Karoe line L of the side panel W of the car that is the workpiece, S2 indicates all the discharging stations beyond that, and the side/zenel W At the transfer station S1, the workpiece is transferred from the hanger 1 for transporting the workpiece in the machining lie/L to the hanger 2 for unloading, and then transported by the hanger 2 to the unloading station S2.

該払出しステーションS2は、第3図に示す如く、自動
単車体の組立ステーションS3の側方に配置されており
、該払出しステーションs2の下部に設けた移載装置N
に該ハンガー2からサイドパネルWを受渡し、これをB
移載装置入からフIJセット治具Bf介して該組立ステ
ーションS3に設は友溶接治具Cに受渡し、該組立ステ
ーションS5の中央部に搬入されるフロアとルーフとに
該溶接治具0によシサイドAネルwt−m接するように
した。
As shown in FIG. 3, the payout station S2 is placed on the side of the automatic motorcycle body assembly station S3, and the transfer device N provided at the bottom of the payout station s2
Transfer the side panel W from the hanger 2 to B.
The equipment is transferred from the transfer device input to the assembly station S3 via the IJ setting jig Bf to the companion welding jig C, and then transferred to the welding jig 0 for the floor and roof carried into the center of the assembly station S5. I made it so that it is in contact with Yoshiside A channel wt-m.

該ハンガー2は、感4図及び第5図に明示する如く、圧
右1対のレールから成る搬送路3に前後1対のトロリー
4a、4aを介して吊設し九前後方向に長手の支持ノ々
−4と、該支持パー4の下側に上端の軸5aで横方向に
揺動自在に軸設した前後1対のアーム5.5と、該両ア
ーム5.5の下端に枢着し友フック6.6とで構成され
るもので、移載ステーションS1上に位置する該搬送路
3の始端部分3aに該ハンガー2を搬入すると共に、該
ハンガー2の横方向−側即ち第5図で左側の対向位置に
前記ハンガー1を搬送した状態で、該両アーム5,5を
左方に揺動させて、該両フック6.6をその枢軸6aを
中心にした該各アーム5に対する反時計方向への揺動で
水平姿勢に保持したままハンガー1に吊持されるサイド
ノゼネルWのドア開口等の開口縁の直下に臨む第5図に
仮想線で示すワーク受取シ位置に移動させ、次いでハン
ガー1の7ツクlai下降させて該両フック6.6にサ
イドノゼネルWを受取らせt後、該両アーム5,5を第
5図に実線で示す下方の原位置に揺動復帰させて、該ハ
ンガー2にサイドパネルW全移載するようにした。又、
払出しステーションS2上に位置する該搬送路3の終端
部分3bi、第6因及び第7図に明示する如く、その上
側の機枠7に前後1対の昇降シリンダ8,8によシ昇降
自在に支持させ、該終端部分3bK該ハンガー2を搬入
した後、該終端部分3b金下降させて該ハンガー2ごと
サイドパネルwl下降させ、サイドパネルWを前記移載
装置に受取らせた後、両アーム5.5を上記とは逆方向
即ち第7図で右方に揺動させて該終端部分3bを上方の
原位置に上昇復帰させ、サイドパネルWの払出しを行う
ようにし、この場合各フック6が各アーム5と一体に右
上方に揺動されるよう、該各アーム5の下端に該各フッ
ク60時計方向への揺動を阻止するストツノセビン6b
を設けた。尚、該両アーム5,5の移載ステーション8
1における左方への揺動は、後方のアーム5の右側面に
突設したレバー9に前記始端部分3aの該レノ々−9の
対向位置に取付けたシリンダ1oに連動するブツシュロ
ーラ10a’ii当接させることにょシ行い、又該両ア
ーム5.5の払出しステーションS2における右方への
揺動は、前方のアーム5の左側面に突設したし、:!9
/に前記終端部分3bの該レノ々−9′の対向位置に取
付けたシリンダ10′に連動するブツシュローラ10a
”iz当接させることによシ行うようにした。
As clearly shown in Figures 4 and 5, the hanger 2 is suspended from a conveyance path 3 consisting of a pair of rails via a pair of front and rear trolleys 4a, 4a, and is supported longitudinally in the front and back direction. No. 4, a pair of front and rear arms 5.5 which are pivoted on the lower side of the support par 4 so as to be able to swing laterally around the upper end shaft 5a, and are pivotally connected to the lower ends of both arms 5.5. The hanger 2 is carried into the starting end portion 3a of the conveyance path 3 located on the transfer station S1, and the lateral side of the hanger 2, that is, the fifth With the hanger 1 transported to the opposing position on the left side in the figure, both arms 5, 5 are swung to the left, and both hooks 6.6 are attached to each arm 5 about its pivot 6a. While holding it in a horizontal position by swinging in the counterclockwise direction, move it to the workpiece receiving position shown by the imaginary line in FIG. Next, the hanger 1 is lowered seven times to allow the hooks 6 and 6 to receive the side nose bolts W, and then the arms 5 and 5 are swung back to their original positions below as shown by solid lines in FIG. The entire side panel W was transferred to the hanger 2. or,
As clearly shown in the sixth factor and FIG. 7, the terminal end portion 3bi of the conveyance path 3 located above the payout station S2 is provided with a pair of front and rear lifting cylinders 8, 8 on the upper machine frame 7 so as to be freely raised and lowered. After supporting the end portion 3bK and carrying in the hanger 2, the end portion 3b is lowered and the side panel wl is lowered together with the hanger 2. After the side panel W is received by the transfer device, both arms 5 .5 is swung in the opposite direction to the above, that is, to the right in FIG. The hook 60 is attached to the lower end of each arm 5 so that it can be swung upwardly to the right together with each arm 5.
has been established. In addition, the transfer station 8 for both arms 5, 5
The leftward swinging in 1 is caused by a bushing roller 10a'ii which is linked to a cylinder 1o attached to a lever 9 protruding from the right side of the rear arm 5 at a position opposite to the levers 9 of the starting end portion 3a. The two arms 5.5 were brought into contact with each other, and the rightward swinging of the two arms 5.5 at the dispensing station S2 was provided by protruding from the left side of the front arm 5. 9
a bushing roller 10a interlocked with a cylinder 10' mounted at a position opposite to the cylinders 9' of the terminal end portion 3b;
``I tried to do this by making them come into contact with each other.

そして、本発明の特徴とするところに従い、前記搬送路
3の中間部分全往路3cと復路3dとに分離し、前記始
端部分3aに対する該往路3cと該復路3dの分岐部に
該始端部分3aから該復路3dへのハンガー2の侵入を
阻止する第1のポイント部材111ヲ設けると共に、前
記終端部分3bに対する該往路3cと該復路3dの分岐
部に該終端部分3bから該往路3dへのハンガー2の侵
入を阻止する第2のポイント部材11□を設けるものと
し、以上の如く構成され次該搬送路3に複数例えば2個
のハンガー2゜2を設けて、これらハンガー2,2を該
始端部分3aから該往路3cを介して該終端部分3bと
、該終端部分3bから該復路3dffi介して該始端部
分3aとに搬送するようにした。
According to the characteristics of the present invention, the entire intermediate portion of the conveyance path 3 is separated into an outgoing path 3c and a returning path 3d, and a branching portion of the outgoing path 3c and the returning path 3d with respect to the starting end portion 3a is separated from the starting end portion 3a. A first point member 111 is provided to prevent the hanger 2 from entering the return path 3d, and a hanger 2 from the end portion 3b to the outbound path 3d is provided at a branch point between the outbound path 3c and the return path 3d relative to the terminal end portion 3b. A second point member 11□ is provided to prevent the intrusion of 3a to the terminal end portion 3b via the outward path 3c, and from the terminal end portion 3b to the starting end portion 3a via the return path 3dffi.

該第1のポイント部材111は、第8図及び第9図に明
示する如く、前記始端部分3aに同って先細のプレート
から成シ、該ポイント部材111ヲその尾端部に・固定
した軸支筒11aにおいて往路3cと復路3bの分岐部
中間に立設した支軸ttbに軸支して、該始端部分3a
と該往路3cとを連結する一ツリの往動位置と、該始端
部分3aと該復路aC+、!:を連結する他側の復動位
置とに揺動自在とし、該ポイント部材111を常時はば
ねllcによシ該往動位置に付勢して、該始端位置3a
から該復路3dへのハンガー2の侵入、即ち該ハンガー
2の支持ノ々−4上に設は次前記トロ’J −4aの該
復路3dへの侵入を阻止し得るようにし、該ハンガー2
の該復路3dから該始端部分3aへの復動に際しては、
該ポイント部材111が該トロリー4aに押されてばね
llcに抗して復動位置に揺動され、該ハンガー2の該
始端部分3aへの復動が許容されるようにした。
As clearly shown in FIGS. 8 and 9, the first point member 111 is made of a tapered plate similar to the starting end portion 3a, and has a shaft fixed to the tail end of the point member 111. The starting end portion 3a is supported in the support tube 11a on a support shaft ttb that is erected between the branching part of the outgoing path 3c and the incoming path 3b.
and one forward movement position connecting the outgoing path 3c, the starting end portion 3a and the incoming path aC+,! The point member 111 is normally urged by a spring llc to the forward movement position, and the starting end position 3a is
The hanger 2 is installed on the support holes 4 of the hanger 2 to prevent the hanger 2 from entering the return path 3d from the hanger 2.
When returning from the return path 3d to the starting end portion 3a,
The point member 111 is pushed by the trolley 4a and swung to the return position against the spring llc, allowing the hanger 2 to return to the starting end portion 3a.

前記第2のポイント部材112は、上記第1のポイント
部材111と方向が逆になっているだけで構造自体は異
らず、常時は前記終端部分3bと復路3dとを連結する
復動位置に付勢されて、ハンガー2の該終端部分3bか
ら往路3cへの侵入を阻止するが、該往路3cから該終
端部分3bへのハンガー2の往動に際しては、該終端部
分3bと該往路3cとを連結する往動位置に揺動して、
該ハンガー2の該終端部分3bへの往動を許容すべく機
能する。
The second point member 112 has the same structure as the first point member 111 except that it is opposite in direction, and is normally in a return position connecting the terminal end portion 3b and the return path 3d. The hanger 2 is biased to prevent the hanger 2 from entering the outward path 3c from the terminal end portion 3b, but when the hanger 2 moves forward from the outward path 3c to the terminal end portion 3b, the terminal end portion 3b and the outward path 3c are oscillates to the forward position where it connects the
It functions to allow forward movement of the hanger 2 to the end portion 3b.

ここで、前記トロ!J −4aは、支持パー4の上面に
旋回自在に軸設し九トロリ一本体4b上に前後1対の爪
片4c、4c’i突設し、該谷爪片4cに左右1対の走
行ローラ4dと、下部中央のガイドロー、746とを取
付けて取るもので、該支持パー4上の前後1対の該谷ト
ロI)4av、夫々該走行ローラ4dにおいて搬送路3
を構成する五石1対のレールに転勤自在に支持させると
共に、該ガイドローラ4d’5該両レール間に挿入して
慣振れを防止するようにし友。
Here, said Toro! J-4a is pivotably installed on the upper surface of the support par 4, and has a pair of front and rear claws 4c, 4c'i protruding from nine trolley main bodies 4b, and a pair of right and left running claws on the valley claws 4c. The roller 4d and the guide row 746 at the center of the lower part are attached and removed.
The guide roller 4d'5 is supported by a pair of five-stone rails constituting the rail, and the guide roller 4d'5 is inserted between the two rails to prevent run-in.

又、各ハンガー2の搬送機構として、往路3c上と復路
3d上とに夫々ハンガー搬送用の第1と第2のコンベア
チェーン121.12□を設けると共に、始端部分3a
と終端部分3bとに夫々ハンガー2を該各部分3a、3
bから該往路3cと該復路3dとに出入れする往復動自
在の第1と第2の搬送部材131.13□を設けた。
In addition, as a conveyance mechanism for each hanger 2, first and second conveyor chains 121.12□ for conveying hangers are provided on the forward path 3c and the backward path 3d, respectively, and the starting end portion 3a
The hanger 2 is attached to the end portion 3b and the respective portions 3a, 3.
First and second conveying members 131.13□ are provided which can freely move in and out of the outgoing path 3c and the incoming path 3d from b.

該各コンベアチェーン121,122は、往路3c及び
復路3dの後端部上方に設けた第10図に示す如きモー
タ12aで駆動されるドライブスプロケット12bと、
往路3c及び復路3dの前端部上方に設けた第9図に示
す如きドリブンスプロケット12cとの間に、該往路3
c及び該復路3dの上側に設けたガイドレールt2dに
沿って循環されるもので、該各コンベアチェーン121
.12□に垂設した各搬送フック12e’i前記各ト0
 ’J −4aの爪片4cに係合させてハンガー2を搬
送するようにした。図面で12fはガイドレール12d
上を走行するチェーン吊持部訂を示す。
Each of the conveyor chains 121, 122 includes a drive sprocket 12b driven by a motor 12a as shown in FIG.
Between the driven sprocket 12c as shown in FIG. 9 provided above the front end of the outgoing path 3c and the incoming path 3d,
c and the guide rail t2d provided above the return path 3d, and each conveyor chain 121
.. Each transport hook 12e'i installed vertically on 12□
The hanger 2 is conveyed by being engaged with the claw piece 4c of the J-4a. 12f in the drawing is guide rail 12d
This shows the chain lifting section running above.

前記各搬送部材131,132は、第4図乃至第7図に
示す如く、始端部分3a及び終端部分3bの上1111
1に設は几走行V−ル13aに沿って該V−/L/13
aの長手方向外方に設けたシリンダ13bにより往復動
される台車13cと、該台車1’ 3 cに上下動自在
に支持させた係合ピン13dとで構成されるもので、始
端部分3aに設けた第1搬送部材131の係合ビン13
d金ハンガー2の後端側のトロ!J −4aにその前後
1対爪片4c 、4c間において上方から挿入係合させ
次状態で台車13c’iH往復動させることによシ、ハ
ンガー2を始端部分3aから往路3cに押出すと共に、
復路3dから始端部分3aにハンガー2を引込むように
し、又後端部分3bに設けた第2搬送部材13□の係合
ビア13 d’iハンガー2の前端側のトロ!J −4
aに上記の如く係合させた状態で台車13cを往復動さ
せることによシ、ハンガー2を後端部分3bから復路3
dに押出すと共に、往c1!!r3 cから後端部分3
bにハンガー2を引込れるようにした。
As shown in FIG. 4 to FIG. 7, each of the conveying members 131 and 132 has a
1, the V-/L/13 is set along the V-L/13a.
It is composed of a truck 13c that is reciprocated by a cylinder 13b provided outside in the longitudinal direction of a, and an engagement pin 13d supported by the truck 1'3c so as to be able to move up and down. Engagement bin 13 of the provided first conveying member 131
Toro on the rear end side of d gold hanger 2! By inserting and engaging J-4a from above between the pair of front and rear claw pieces 4c, 4c and reciprocating the trolley 13c'iH in the next state, the hanger 2 is pushed out from the starting end portion 3a to the outgoing path 3c,
The hanger 2 is pulled in from the return path 3d to the starting end portion 3a, and the engagement via 13 of the second conveyance member 13□ provided at the rear end portion 3b is inserted into the front end side of the hanger 2! J-4
By reciprocating the cart 13c in the state in which it is engaged with the hanger 2 as described above, the hanger 2 can be moved from the rear end portion 3b to the return path 3.
As well as extruding to d, go c1! ! r3 c to rear end part 3
Hanger 2 can be pulled into b.

ここで、該係合ビン13dは、その上端部両側に取付は
次ローラ13e、13eにおいて前記走行レール13a
の上面に下方に抜は洛ちないように支持されるものとし
、該走行レール13aの長手方向所定位置に該ローラL
3e’i介して該係合ビン13d’を持上げるカム13
ft設け、ハンガー2が第2図に仮想線で示す所定の押
出し位置に搬送されたとき、該カムt3fによる該係合
ビン13dの上動で該係合ビン13dと前記各トロ’J
 −4a即ちハンガー2との係合が解かれるようにした
Here, the engaging bin 13d is attached to the upper end of both sides of the running rail 13a at the next rollers 13e, 13e.
The roller L is supported on the upper surface so as not to fall downward, and the roller L is placed at a predetermined position in the longitudinal direction of the traveling rail 13a.
cam 13 that lifts the engagement bin 13d' via 3e'i
ft is provided, and when the hanger 2 is conveyed to the predetermined pushing position shown by the imaginary line in FIG.
-4a, that is, the engagement with the hanger 2 is released.

次いで上記した実施fitの全体的な作動を説明するに
、移載ステーションS1において、搬送路3の始端部分
3aに存する一方のノ・ンガー2に加工ラインLでのワ
ーク搬送を行うハンガー1からサイドノゼネルW全移載
すると共に、払出しステーション8□において、搬送路
3の終端部分3bに存する他方のハンガー1からそのエ
アの移載装置へにサイドパネルWを払出し、次いで第1
搬送部材13.と第24M送部材132とを夫々前方と
後方とに往動させ、各ハンガー2を夫々所定の押出し位
置まで搬送する。
Next, to explain the overall operation of the above-mentioned implementation, at the transfer station S1, a side nozzle is transferred from the hanger 1 for transporting the work in the processing line L to one of the nozzles 2 located at the starting end portion 3a of the transport path 3. At the same time, at the discharging station 8
Conveying member 13. and the 24th M feeding member 132 are moved forward and backward, respectively, to convey each hanger 2 to a predetermined extrusion position.

この場合、一方のハンガー2の前端側のトロ’) −4
aが第1ポイント部材111t−通って往路3cと、他
方のハンガー2の後端側のトロリー4aが第2ポイント
部材11□を通って復路3dとに押出されると共に、各
搬送部″u13.,132と各ハンガー2との係合がカ
ム13fによる係合ビン13dの上動で解かれ、次いで
第1と第2の各コンベアチェーン121.tz2t−i
aすれば、先ず該一方のハンガー2の前端側のトロリー
48の前後の爪片4c 、4c間と該他方のハンガー2
の後端側のトロ’) −4aの前後の爪片4c、4c間
とに該各コンベアチェーン121+122に吊設した搬
送フック12eが夫々搬送方向後方の爪片4cを乗越え
て挿入係合され、該谷ハンガー2が往路3cと復路3d
とに引込まれ、該一方のハンガー2の後端側のトロIJ
−48と該他方のハンガー2の前端側のトロIJ−4a
とが夫々往路3cと復路3dに入ったところで該各トロ
リー4a、4aに該各コンベアチェーン121.12□
の次の搬送フック12dが係合し、この状態で該一方の
ハンガー2は往路3Cに沿って前方に搬送され、該他方
のハンガー2は復路3dに沿って後方に搬送される。
In this case, the front end side of one hanger 2') -4
a passes through the first point member 111t and is pushed out to the outward path 3c, and the trolley 4a on the rear end side of the other hanger 2 passes through the second point member 11□ and is pushed out to the return path 3d. , 132 and each hanger 2 are released by the upward movement of the engagement bin 13d by the cam 13f, and then each of the first and second conveyor chains 121.tz2t-i
a, first, between the front and rear claw pieces 4c of the trolley 48 on the front end side of the one hanger 2 and the other hanger 2.
The conveyor hooks 12e suspended from the respective conveyor chains 121+122 are inserted and engaged between the front and rear claw pieces 4c, 4c of the rear end side Toro')-4a, passing over the respective rear claw pieces 4c in the conveyance direction, The valley hanger 2 is on the outbound trip 3c and the return trip 3d.
and the Toro IJ on the rear end side of the one hanger 2.
-48 and Toro IJ-4a on the front end side of the other hanger 2
When the conveyor chains 121, 12□ are attached to the respective trolleys 4a and 4a when they enter the outward route 3c and return route 3d, respectively.
The next conveyance hook 12d is engaged, and in this state, the one hanger 2 is conveyed forward along the outward path 3C, and the other hanger 2 is conveyed backward along the backward path 3d.

そして、該一方のハンガー2は、往路3cの前端のドラ
イブスプロケット12bの配置部において後端側のトロ
!J −4aから搬送フック12eが離脱した後、慣性
力によシ終端部分3bに前進し、又該他方のハンガー2
は、復路3dの後端のドリブンスプロケット12cの配
置部において前端側のトロ’J −4aから搬送フック
12eが離脱した後、上記と同様に慣性力で始端部分4
aに後進する。
The one hanger 2 is located on the rear end side at the location where the drive sprocket 12b is located at the front end of the outgoing path 3c. After the transport hook 12e is detached from J-4a, it moves forward to the terminal end portion 3b due to inertia, and the other hanger 2
After the transport hook 12e is detached from the front end side Toro'J-4a at the location of the driven sprocket 12c at the rear end of the return path 3d, the starting end portion 4 is moved by inertia force in the same manner as above.
Move backwards to a.

次いで、第1搬送部材131と第2搬送部材132とを
夫々後方と前方とに復動させるもので、これによれば該
第2搬送部材132の復動途中でその係合ビン13dが
該一方のハンガー2の前端側のトロ!J −4aの後側
の爪片4cを乗越えて前側の爪片4cとの間に挿入係合
され、引続く該搬送部材132の後動で該一方のハンガ
ー2が終端部分3bに完全に引込まれて定位置に位置決
めされると共に、該第1搬送部材131の復動途中でそ
の係合ビン13dが該他方のハンガー2の後端側のトロ
、’) −4aの前後の爪片4c、4cに上記と同様に
挿入係合され、始端部分3aに該他方のハンガー2が引
込まれて定位置に位置決めされる。
Next, the first conveying member 131 and the second conveying member 132 are moved backward and forward, respectively. According to this, during the backward movement of the second conveying member 132, the engaging bin 13d is moved back to the one side. Toro on the front end side of hanger 2! J-4a is inserted and engaged between the rear claw piece 4c and the front claw piece 4c, and the one hanger 2 is completely retracted into the terminal end portion 3b by the subsequent backward movement of the conveying member 132. At the same time, during the return movement of the first conveying member 131, the engagement pin 13d is moved to the rear end side of the other hanger 2. 4c is inserted and engaged in the same manner as described above, and the other hanger 2 is pulled into the starting end portion 3a and positioned at a fixed position.

その後、該一方のハンガー2に吊持されるサイトノぐネ
ルWの払出しと、該他方のハンガー2への次のサイドパ
ネルWの移載とを行い、次いで上記と同様の作動で該一
方のハンガー2を終端部分3bから復路3dを介して始
端部分3鳳と、該他方のハンガー2を始端部分3aがら
往路3cQ介して終端部分3bとに搬送する。そして以
上の作動を繰返し、一方のハンガー2と他方のハンガー
2とで交互にサイドパネルw2移載ステーショy81か
ら払出しステーションs2に搬送する。
Thereafter, the site nozzle W suspended on the one hanger 2 is taken out and the next side panel W is transferred to the other hanger 2, and then the one hanger is moved in the same manner as above. 2 is conveyed from the terminal end portion 3b to the starting end portion 3b via the return path 3d, and the other hanger 2 is conveyed from the starting end portion 3a to the terminal end portion 3b via the outward path 3cQ. Then, the above operation is repeated, and one hanger 2 and the other hanger 2 are alternately transported from the side panel w2 transfer station y81 to the payout station s2.

(発明の効果J 以上の如く本発明によるときは、ハンガーの搬送路の配
置スペースが従来のようなループ状搬送路に比し大巾に
削減され、工場スペースの有効利用を図れ、且つハンガ
ーの使用個数も少なくて済み、設備費の削減を図れる効
果を有する。
(Effect of the invention J As described above, according to the present invention, the space for arranging the hanger conveyance path is greatly reduced compared to the conventional loop-shaped conveyance path, and the factory space can be used effectively. The number of units used can be reduced, which has the effect of reducing equipment costs.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明装置の1列の側面図、第2図はその平面
図、第3図は第2図のIn −III線で裁断した横断
面図、第4図は第2図のIV−IV線から見た移載ステ
ーションの要部の拡大側j面図、第5図は第2図のv−
viで裁断した横断面図、第6図は第2図のvt−vt
iから見た払出しステーションの要部の拡大側面図、第
7図は第6図の■−■線で裁断した横断面図、第8図は
始端部分側の分岐部の拡大裁断平面図、第9図は第8図
のIX−IX巌で裁断した横断面図、第101スは第2
図のX−X線で裁断した拡大截断側面図である。 L・・・加工ライン   Sl・・・移載ステーション
S2・・・払出しステーションW・・・サイドパネル(
ワーク]2・・・ハンガー    3・・・搬送路3a
・・・始端部分     3b・・・終端部分3c・・
・往路       3d・・・復路11 、 、11
□・・・ ポイント部材121,122・・・ コンベ
アチェーン131.132・・・ 搬送部材 13a・
・・走行レール13b・・・シリンダ   13c・・
・台車13d・・・係合e/ t3f・・・カム特許出
願人 不田技研工業株式会社 2″、:・−1 代   理   人  北   村   欣   −−
4、。 J 外2名 手続ネili正書(方式) 昭和65L・4..248
FIG. 1 is a side view of one row of the device of the present invention, FIG. 2 is a plan view thereof, FIG. 3 is a cross-sectional view taken along line In-III in FIG. 2, and FIG. - An enlarged side J-side view of the main parts of the transfer station seen from the IV line, Figure 5 is the v- of Figure 2.
A cross-sectional view cut at vi, Figure 6 is the vt-vt diagram in Figure 2.
FIG. 7 is an enlarged side view of the main part of the dispensing station as seen from i, FIG. 7 is a cross-sectional view cut along the line ■-■ in FIG. 6, FIG. Figure 9 is a cross-sectional view cut along IX-IX Iwao in Figure 8, and No. 101 is a cross-sectional view of No. 2.
FIG. 3 is an enlarged cross-sectional side view taken along line XX in the figure. L...Processing line Sl...Transfer station S2...Unloading station W...Side panel (
Work] 2... Hanger 3... Conveyance path 3a
...Starting end portion 3b...Ending end portion 3c...
・Outbound trip 3d...Return trip 11, , 11
□... Point members 121, 122... Conveyor chain 131, 132... Conveyance member 13a.
...Traveling rail 13b...Cylinder 13c...
・Bogie 13d...Engagement e/t3f...Cam Patent applicant Fuda Giken Kogyo Co., Ltd. 2″:・-1 Agent Kin Kitamura ---
4. J 2-person procedure Neili official book (method) Showa 65L/4. .. 248

Claims (1)

【特許請求の範囲】 1、ワークを加工ラインの終端の移載ステーションから
その先方の払出しステーションにハンガーに吊持して搬
送するものにおいて、ハンガーの搬送路の中間部分を往
路と復路とに分離し、該移載ステーション上に位置する
該搬送路の始端部分に対する該往路と該復路の分岐部に
、該始端部分から該復路へのハンガーの逆行を阻止する
ポイント部材と、該払出しステーション上に位置する該
搬送路の終端部分に対する該往路と該復路の分岐部に、
該終端部分から該往路へのハンガーの逆行を阻止するポ
イント部材とを設けて、複数のハンガーを該始端部分か
ら該往路を介して該終端部分と、該終端部分から該復路
を介して該始端部分とに搬送するようにしたことを特徴
とするワーク搬送装置。 2、該往路上と該復路上とに夫々ハンガー搬送用のコン
ベアチェーンを設けると共に、該始端部分と該終端部分
とに夫々ハンガーを該各部分から該往路と該復路とに出
入れする往復動自在の搬送部材を設けたことを特徴とす
る特許請求の範囲第1項記載のワーク搬送装置。 3、該搬送部材は、該始端部分や該終端部分の上側の走
行レールに沿つてシリンダにより往復動される台車と、
該台車に上下動自在に支持させたハンガーに係脱自在の
係合ピンとで構成され、該走行レールの上面の長手方向
所定位置に該係合ピンを持上げてハンガーとの係合を解
くカムを設けたことを特徴とする特許請求の範囲第2項
記載のワーク搬送装置。
[Claims] 1. In a system in which workpieces are transported from a transfer station at the end of a processing line to a payout station at the end of the processing line by being suspended on a hanger, the intermediate portion of the transport path of the hanger is separated into an outgoing path and a return path. a point member for preventing the hanger from moving backward from the starting end portion to the returning path at a branching point of the outgoing path and the returning path with respect to the starting end portion of the conveyance path located on the transfer station; At the branching point of the outbound path and the return path with respect to the terminal end of the conveyance path,
A point member is provided to prevent the hanger from moving backwards from the terminal end portion to the outward path, and the plurality of hangers are connected from the starting end portion to the terminal portion via the outward path, and from the terminal portion to the returning path to the starting end. A workpiece conveyance device characterized in that the workpiece is conveyed between parts. 2. A conveyor chain for transporting hangers is provided on each of the outgoing path and the incoming path, and a reciprocating motion is provided to move the hanger in and out of the outgoing path and the incoming path from each of the starting end portion and the terminal end portion, respectively. 2. The workpiece conveying device according to claim 1, further comprising a freely movable conveying member. 3. The conveyance member includes a cart that is reciprocated by a cylinder along a running rail above the starting end portion and the ending end portion;
It consists of an engagement pin that can be freely engaged and detached from a hanger that is supported by the trolley in a vertically movable manner, and a cam that lifts the engagement pin to a predetermined position in the longitudinal direction of the upper surface of the traveling rail to disengage it from the hanger. 3. A workpiece conveyance device according to claim 2, further comprising: a workpiece conveyance device.
JP60298430A 1985-12-28 1985-12-28 Work conveyor Granted JPS62157857A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP60298430A JPS62157857A (en) 1985-12-28 1985-12-28 Work conveyor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP60298430A JPS62157857A (en) 1985-12-28 1985-12-28 Work conveyor

Publications (2)

Publication Number Publication Date
JPS62157857A true JPS62157857A (en) 1987-07-13
JPH0418588B2 JPH0418588B2 (en) 1992-03-27

Family

ID=17859600

Family Applications (1)

Application Number Title Priority Date Filing Date
JP60298430A Granted JPS62157857A (en) 1985-12-28 1985-12-28 Work conveyor

Country Status (1)

Country Link
JP (1) JPS62157857A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5857335A (en) * 1981-10-02 1983-04-05 Mitsui Petrochem Ind Ltd Preparation of 2-(1-indanoyl)acetic acid

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5857335A (en) * 1981-10-02 1983-04-05 Mitsui Petrochem Ind Ltd Preparation of 2-(1-indanoyl)acetic acid

Also Published As

Publication number Publication date
JPH0418588B2 (en) 1992-03-27

Similar Documents

Publication Publication Date Title
US6799673B2 (en) Versaroll overhead conveyor system
JPH09511695A (en) Modular flow work equipment
JPH0424273B2 (en)
US2868354A (en) Trolley conveyor incorporating automatic load transfer
US5297483A (en) Work conveyor
JP3008220B2 (en) Vehicle assembly equipment
JPS62157857A (en) Work conveyor
JP2817539B2 (en) Load handling equipment using mobile objects
JPH03159886A (en) Door transport device
JPH01317881A (en) Method for transferring door between lines to produce automobile
JPH0613370B2 (en) Work transfer method
JP2009227185A (en) Door carrying device and door carrying method in vehicle assembly line
JPH03106719A (en) Article conveying device for article production line
JPS6322425A (en) Transport equipment
JPH0275475A (en) Method for conveying car body of car body welding line
JP2588755B2 (en) Conveyor conveyor device
JP2765297B2 (en) Door transfer equipment
JP2002193096A (en) Carrying device
JP3752065B2 (en) Hot rolled coil transfer device
JP2946292B2 (en) Shuttle trolley type transfer device
JP2002096777A (en) Assembly method for side panel for automobile
KR100191619B1 (en) Delivery device for body assembly
JPH07144749A (en) Carrying equipment by using hanger device
JPH0266300A (en) Segment supply equipment
JP2765279B2 (en) Transport equipment using moving objects

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees