JPS62133237A - Precast structural member - Google Patents
Precast structural memberInfo
- Publication number
- JPS62133237A JPS62133237A JP27423585A JP27423585A JPS62133237A JP S62133237 A JPS62133237 A JP S62133237A JP 27423585 A JP27423585 A JP 27423585A JP 27423585 A JP27423585 A JP 27423585A JP S62133237 A JPS62133237 A JP S62133237A
- Authority
- JP
- Japan
- Prior art keywords
- core member
- precast
- precast block
- core
- members
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
「産業上の利用分野」
この発明は、建築物の注や梁として用いられるプレキャ
スト構造部材に関するものである。DETAILED DESCRIPTION OF THE INVENTION "Field of Industrial Application" This invention relates to precast structural members used as beams and beams in buildings.
「従来の技術」
建築物の骨組みを+ilt成する構造部材すなわち梁や
柱として、プレキャストコンクリート部材を用いること
が従来より行なわれている。これによれば、工場におい
てオートクレーブ養生により高強度の部材を製造でき、
この部材を現場に搬入して組み立てることで、骨組を構
築することができる。"Prior Art" Precast concrete members have traditionally been used as structural members, ie, beams and columns, that form the framework of buildings. According to this, high-strength parts can be manufactured by autoclave curing in factories,
The framework can be constructed by transporting these members to the site and assembling them.
「発明が解決しようとする問題点」
ところで、従来のプレキャストコンクリート部材は、梁
であればスパンの長さ、柱であれば階高の長さに予め一
体成型されるから、一般には数メートルの長さとなり、
また重量も大きいから、これらの運搬作業や現場での揚
重作業には大型のトラックやクレーンを必要とし、また
、取り扱いが大変であるという問題があった。``Problems to be solved by the invention'' By the way, conventional precast concrete members are integrally molded in advance to the length of the span for beams, and the length of the floor height for columns, so generally the length of several meters is becomes the length,
In addition, since they are heavy, large trucks and cranes are required for transporting them and lifting them on site, and they are difficult to handle.
この発明は、上記の事情に鑑みてなされたもので、従来
のプレキャスト部材と同様に高強度を有し、かつ、容易
に取り扱うことのできるプレキャスト部材を提供するこ
とを目的とする。This invention was made in view of the above circumstances, and an object of the present invention is to provide a precast member that has high strength like conventional precast members and can be easily handled.
「問題点を解決するための手段」
この発明は、梁や住の芯となる芯部材と、この芯部材の
長さ方向に並へて取り付けられた複数のプレキャストブ
ロック組とからなり、而記各プレキャストブロック組は
、複数の単位ブロックを前記芯部す才を取り囲むように
連結したものであり、さらに、前記芯部材の長さ方向に
並ぶ一連のプレキャストブロック組には、プレストレス
が導入されていることを特徴としている。"Means for Solving the Problems" This invention consists of a core member that serves as the core of a beam or house, and a plurality of precast block sets attached in parallel in the length direction of this core member. Each precast block set is made by connecting a plurality of unit blocks so as to surround the core member, and prestress is introduced into the series of precast block sets arranged in the length direction of the core member. It is characterized by
「実施例J
以下、この発明の実施例を図面を参照しながら説明する
。Embodiment J An embodiment of the present invention will be described below with reference to the drawings.
第1図ないし第4図は、この発明のプレキャスト構造部
材を梁に適用した場合の実施例を示すもので、第1図お
よび第2図はこの梁部材Iの概略構成図、第3図および
第4図はこの梁部材lを用いて建築物の骨組を構築する
施工手順を示す図である。1 to 4 show an example in which the precast structural member of the present invention is applied to a beam, and FIGS. 1 and 2 are schematic configuration diagrams of this beam member I, and FIGS. FIG. 4 is a diagram showing the construction procedure for constructing the framework of a building using this beam member l.
これらの図において符号2は■形鋼の芯部材である。こ
の芯部材2は、第3図に示すように、その両端を柱C1
Cに接合され、その柱C1C間に架は渡されて用いられ
るが、構造部材としての強度は必要でなく、梁部材1自
体の自重を支え得る程度の剛性を有する断面の小さなも
ので良い。In these figures, the reference numeral 2 represents a core member made of square steel. As shown in FIG. 3, this core member 2 has both ends connected to pillars C1.
The beam member 1 is connected to the beam member 1, and the frame is used by being passed between the columns C1C, but it does not need to have sufficient strength as a structural member, and may have a small cross section with enough rigidity to support the weight of the beam member 1 itself.
この芯部材2には、その長さ方向に、複数のプレキャス
トブロック組3・・・が隙間なく並べられて取り付けら
れている。これらのプレキャストブロック組3・・・は
、それぞれ、二つの単位ブロック4゜4が芯部材2を取
り囲んで、複数(この実施例では、単位ブロック4の上
部および下部に各4本、中央部に2本の計lO本)のボ
ルト5・・により連結されたものである。単位ブロック
4には凹部4aが形成されており、芯部材2をこの凹部
4aに位置させて互いに対向配置されるようになってい
る。A plurality of precast block sets 3 are attached to the core member 2 in a manner that they are lined up without gaps in the longitudinal direction thereof. Each of these precast block sets 3... has two unit blocks 4゜4 surrounding the core member 2, and a plurality of (in this embodiment, four each at the top and bottom of the unit block 4, and four at the center). They are connected by two bolts 5 (total of 10). A recess 4a is formed in the unit block 4, and the core members 2 are positioned in this recess 4a and are arranged to face each other.
なお、中央部の2つのボルト5は、芯部材2に形成され
ている孔2a・・・を挿通するようにされている。そし
て、上記単位ブロック4の凹部4aにはモルタル等のグ
ラウト6が充填され、このグラウト6により、芯部材2
とプレキャストブロック組3とは一体となっている。な
お、上記の単位ブロック4は、工場においてオートクレ
ーブ養生により製作されたもので、通常のコンクリート
より圧縮強度が格段に高いものである。The two bolts 5 at the center are inserted through holes 2a formed in the core member 2. Then, the recess 4a of the unit block 4 is filled with grout 6 such as mortar, and this grout 6 allows the core member 2 to
and precast block set 3 are integrated. The above unit block 4 is manufactured by autoclave curing in a factory, and has a much higher compressive strength than ordinary concrete.
また、上記単位ブロック4にはそれぞれ複数個(この実
施例では上部および下部に各2つ)のPC鋼線挿通孔7
・・・が設けられており、このPC鋼線挿通孔7・・・
にPC鋼線8・・・か通されて、上記のように並べられ
一連となっているプレキャストブロック組3・・はこの
梁部材lの長さ方向に互いに連結されている。このPC
鋼線8・・・は緊張されて両端を定着され、これにより
一連のプレキャストブロック組3・・・にはプレストレ
スが導入されている。In addition, each of the unit blocks 4 has a plurality of PC steel wire insertion holes 7 (in this embodiment, two each in the upper and lower parts).
... is provided, and this PC steel wire insertion hole 7...
PC steel wires 8 are passed through the precast block sets 3, which are arranged in series as described above, and are connected to each other in the length direction of the beam member l. This PC
The steel wires 8 are tensioned and fixed at both ends, thereby introducing prestress into the series of precast block sets 3.
以上の構成のもとにこの梁部材Iは、現場において単位
ブロック4を芯部材2に取り付けることにより形成でき
、したがって、従来の一体成型されたプレキャスト部材
を用いる場合に比して、運搬や揚重作業は極めて容易で
ある。また、組み立てられた後には、従来のプレストレ
ストプレキャスト梁と同様に、きわめて高い剛性を存す
る。さらに、単位ブロック4の寸法を規洛化して大量生
産し、梁の長さに応じてプレキャストブロック組3の数
を増減するようにすれば、この梁部材lを安価なものと
できる。Based on the above configuration, this beam member I can be formed by attaching the unit block 4 to the core member 2 on site, and therefore, it is easier to transport and lift than when using a conventional integrally molded precast member. Heavy work is extremely easy. Also, once assembled, it has extremely high rigidity, similar to conventional prestressed precast beams. Furthermore, if the dimensions of the unit blocks 4 are standardized and mass-produced, and the number of precast block sets 3 is increased or decreased depending on the length of the beam, the beam member l can be made inexpensive.
次に、上記の構成からなる梁部材lを用いて、建築物の
骨組みを構築する手順について第3図および第4図を参
照して説明する。まず、第3図に示すように所定位置に
H形鋼による柱C1Cを立設し、この柱C1Cの梁が接
合される位置に芯部材2を架は渡す。この柱Cのフラン
ジCIにはPC鋼線8を通すための孔9・・・を予めあ
けておく。Next, the procedure for constructing the framework of a building using the beam member I having the above-mentioned configuration will be explained with reference to FIGS. 3 and 4. First, as shown in FIG. 3, a column C1C made of H-shaped steel is erected at a predetermined position, and the core member 2 is passed over the frame at a position where the beam of this column C1C is to be joined. A hole 9 for passing the PC steel wire 8 is pre-drilled in the flange CI of this column C.
そして、第4図に示すように、二つずつの合い対する単
位ブロック4を、芯部材2を内包するように抱き合わせ
てボルト5・・・により連結するとともに、単位ブロッ
ク4のPC鋼線挿通孔7・・にPC鋼線8・・・を通し
ていく。あるいは、全てのプレキャストブロック組3を
芯部材2の全長にわたって取り付けてからPC鋼線8を
挿通させるようにしても良い。このようにして、芯部材
2の全長にわたってプレキャストブロック組3を取り付
けたら、PCM線8をその端部から緊張(−次緊張)し
、単位ブロック4の凹部4aすなイっち芯部材2の周囲
にグラウト6を充填する。このグラウト6を充填するた
めには、所定の単位ブロック4または柱CのフランジC
Iにグラウト注入孔をあけておくこととすれば良い。そ
れから、さらにPC鋼線8を緊張(二次緊張)し、緊張
力を調整して往CのフランジC3に定着させた後、PC
B線挿通挿通孔7内ラウトを注入して、PC鋼線8とP
CM線挿通挿通孔7間の間隙を埋める。これにより梁部
材1は往Cに剛に接合され、ラーメン架構が構築される
ことになる。Then, as shown in FIG. 4, two matching unit blocks 4 are tied together so as to enclose the core member 2 and connected by bolts 5..., and the PC steel wire insertion holes of the unit blocks 4 are connected. Pass the PC steel wire 8... through 7.... Alternatively, the PC steel wire 8 may be inserted after all the precast block sets 3 are attached over the entire length of the core member 2. After the precast block set 3 is attached over the entire length of the core member 2 in this way, the PCM wire 8 is tensioned (-next tensioned) from its end, and the recess 4a of the unit block 4 is Fill the surrounding area with grout 6. In order to fill this grout 6, the flange C of the predetermined unit block 4 or column C is
A grout injection hole may be made in I. Then, the PC steel wire 8 is further tensioned (secondary tension), the tension is adjusted, and the PC steel wire 8 is fixed to the flange C3.
Inject the B wire insertion hole 7 into the routing and connect the PC steel wire 8 and P.
Fill the gap between the CM wire insertion holes 7. As a result, the beam member 1 is rigidly joined to the support member C, and a rigid frame structure is constructed.
その後、図示は省略したが、紙面に直交する方向に対し
ても以上と同様の手順で梁部材を取り付け、さらに、上
階に対しても順次取り付けていけば、骨組み全体が構築
できる。After that, although not shown in the drawings, the beam members are attached in the same manner as above in the direction perpendicular to the plane of the paper, and the beam members are also attached to the upper floors in sequence, so that the entire frame can be constructed.
なお、上記では各梁部材lごとにその両端部でPC1i
i線8を定着することとしたが、PC鋼線8を一連の梁
部材1・・・に通して、建築物の外壁部にて定着するよ
うにしても良い。また、柱CはH形鋼に限るものではな
い。In addition, in the above, PC1i is set at both ends of each beam member l.
Although the i-line 8 is fixed, the PC steel wire 8 may be passed through a series of beam members 1 and fixed on the outer wall of the building. Moreover, the column C is not limited to H-beam steel.
以上、この発明の一実施例について説明したが、この発
明は上記実施例に限定されるものではない。Although one embodiment of the present invention has been described above, the present invention is not limited to the above embodiment.
たとえば、芯部材2は■形鋼に限らず適宜の形状の形鋼
や、あるいは第5図に示すように鉄板であってら良く、
さらに、芯部打2を第6図L ]すように二つあるいは
それ以上用いても良い。また、各プレキャストブロック
組3を二つ以上の単位ブローツクを連結することにより
構成しても良い。For example, the core member 2 is not limited to the shape steel, but may be a shape steel of an appropriate shape, or a steel plate as shown in FIG.
Furthermore, two or more core parts 2 may be used as shown in FIG. 6L. Furthermore, each precast block set 3 may be constructed by connecting two or more unit blocks.
また、以上の説明は梁に適用した場合についてしたが、
柱に対しても第7図に示すよう1こ、同様に適用するこ
とができることは勿論である。Also, the above explanation was applied to beams, but
Of course, the same method as shown in FIG. 7 can be applied to columns as well.
「発明の効果」
以上詳細に説明したように、この発明によれば、芯部材
を取り囲むように単位ブロックを連結ずろようにしたの
で、現場における揚重作業や組立作業を容易に行うこと
ができ、また、プレストレスを導入することとしたので
、充分に剛性の高い部材とすることができるという効果
を奏する。``Effects of the Invention'' As explained in detail above, according to the present invention, since the unit blocks are connected and staggered so as to surround the core member, lifting work and assembly work can be easily performed on site. Furthermore, since prestress is introduced, it is possible to obtain a member with sufficiently high rigidity.
第1図ないし第7図はこの発明の実施例を示す図である
。第1図および第2図は、この発明を梁部材に適用した
場合の実施例の概略構成を示し、第1図は斜視図、第2
図は側断面図である。第3図および第4図はこの実施例
の梁部材を用いた施工手順を説明するための図であって
、第3図は柱間に芯部材を取り付けた状態を示し、この
うち(イ)は立面図、(ロ)は平面図、第4図は芯部材
にプレキャストブロック組を取り付けた状態を示し、こ
のうち(イ)は立面図、(ロ)は平面図である。第5図
および第6図は、梁に適用した場合の他の構成例をそれ
ぞれ示す側断面図である。第7図は柱に適用した場合の
構成例を示す平断面図である。
1・・・・梁部材(プレキャスト構造部材)、2・・・
・・・芯部材、3・・・・・プレキャストブロック組、
4・・・・・・単位ブロック、8・・・・・・PC鋼線
。
4a4a’8
第3図
(伺
(ロ)
第4図
(イ)
第5図1 to 7 are diagrams showing embodiments of the present invention. 1 and 2 show a schematic configuration of an embodiment in which the present invention is applied to a beam member, and FIG. 1 is a perspective view, and FIG.
The figure is a side sectional view. Figures 3 and 4 are diagrams for explaining the construction procedure using the beam members of this example, and Figure 3 shows the state in which the core members are attached between the pillars. 4 is an elevational view, (b) is a plan view, and FIG. 4 shows a state in which the precast block assembly is attached to the core member, of which (a) is an elevational view and (b) is a plan view. FIGS. 5 and 6 are side sectional views respectively showing other configuration examples when applied to a beam. FIG. 7 is a plan sectional view showing an example of the configuration when applied to a column. 1... Beam member (precast structural member), 2...
...Core member, 3...Precast block assembly,
4...Unit block, 8...PC steel wire. 4a4a'8 Figure 3 (B) Figure 4 (A) Figure 5
Claims (1)
べて取り付けられた複数のプレキャストブロック組とか
らなり、前記各プレキャストブロック組は、複数の単位
ブロックを前記芯部材を取り囲むように連結したもので
あり、さらに、前記芯部材の長さ方向に並ぶ一連のプレ
キャストブロック組には、プレストレスが導入されてい
ることを特徴とするプレキャスト構造部材。It consists of a core member that serves as the core of a beam or column, and a plurality of precast block sets installed in line in the length direction of this core member, and each precast block set has a plurality of unit blocks surrounding the core member. A precast structural member, characterized in that the precast block assembly is connected to the core member in a longitudinal direction thereof, and a prestress is introduced into a series of precast block sets arranged in the length direction of the core member.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP27423585A JPH066823B2 (en) | 1985-12-05 | 1985-12-05 | Precast structural members |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP27423585A JPH066823B2 (en) | 1985-12-05 | 1985-12-05 | Precast structural members |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS62133237A true JPS62133237A (en) | 1987-06-16 |
JPH066823B2 JPH066823B2 (en) | 1994-01-26 |
Family
ID=17538885
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP27423585A Expired - Lifetime JPH066823B2 (en) | 1985-12-05 | 1985-12-05 | Precast structural members |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH066823B2 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0270850A (en) * | 1988-09-06 | 1990-03-09 | Taisei Corp | Pc coupled beam and execution of construction using same |
JPH0711734A (en) * | 1993-06-28 | 1995-01-13 | Kajima Corp | Prestressed concrete beam |
JP2007211552A (en) * | 2006-02-13 | 2007-08-23 | Sumitomo Mitsui Construction Co Ltd | Continuous viaduct |
-
1985
- 1985-12-05 JP JP27423585A patent/JPH066823B2/en not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0270850A (en) * | 1988-09-06 | 1990-03-09 | Taisei Corp | Pc coupled beam and execution of construction using same |
JPH0711734A (en) * | 1993-06-28 | 1995-01-13 | Kajima Corp | Prestressed concrete beam |
JP2007211552A (en) * | 2006-02-13 | 2007-08-23 | Sumitomo Mitsui Construction Co Ltd | Continuous viaduct |
JP4607785B2 (en) * | 2006-02-13 | 2011-01-05 | 三井住友建設株式会社 | Continuous viaduct |
Also Published As
Publication number | Publication date |
---|---|
JPH066823B2 (en) | 1994-01-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH1096263A (en) | Precast concrete support and assembling method of slab | |
JPS62133237A (en) | Precast structural member | |
JPH0882002A (en) | Rc structure and its constructing method | |
JPS6314937A (en) | Reinforcing bar composite pillar | |
JPS6020541B2 (en) | Reinforcement assembly method for reinforced concrete frame structures | |
JP2977367B2 (en) | Precast concrete block foundation for modular buildings | |
JPH0270850A (en) | Pc coupled beam and execution of construction using same | |
JP2564732B2 (en) | Precast concrete block foundation for unit building | |
JP2004076336A (en) | Precast concrete (pc) column, beam-column connection structure, and method for connecting beam and column | |
JP2659329B2 (en) | Construction method of PC structure | |
JP3162699B2 (en) | Column-beam joint structure of concrete members | |
JPS62264230A (en) | Construction of body of multistairs building | |
JPS61196035A (en) | Construction of concrete building | |
JPS6255377A (en) | Steel bar assembling construction method of reinforced concrete structure | |
JPS61225448A (en) | Reinforcing bar composite pillar | |
JPS5824044A (en) | Construction of prestressed concrete building | |
JPS61229001A (en) | Prestressed synthetic box beam | |
JPS62146333A (en) | Construction of prefabricated concrete ramen housing | |
JPS63268833A (en) | Method for constructing body of multi-storied building | |
JPS5829954A (en) | Structure of joint part of metal pipe | |
JPH0711171B2 (en) | Reinforced steel composite column | |
JPS59106645A (en) | Structure | |
JPS6278339A (en) | Unbond pc small beam | |
JPS611749A (en) | Construction of concrete shell structure by precast concretepiece and structure of precast concrete piece | |
JPS6217246A (en) | Reinforced concrete structure |