- JPS621311Y2 JPS621311Y2 JP1981193646U JP19364681U JPS621311Y2 JP S621311 Y2 JPS621311 Y2 JP S621311Y2 JP 1981193646 U JP1981193646 U JP 1981193646U JP 19364681 U JP19364681 U JP 19364681U JP S621311 Y2 JPS621311 Y2 JP S621311Y2
- Authority
- JP
- Japan
- Prior art keywords
- steel
- concrete
- steel material
- wire
- steel wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 51
- 239000010959 steel Substances 0.000 claims description 51
- 239000004567 concrete Substances 0.000 claims description 30
- 239000000463 material Substances 0.000 claims description 20
- 239000011513 prestressed concrete Substances 0.000 claims description 13
- 230000002093 peripheral effect Effects 0.000 claims description 2
- 238000004804 winding Methods 0.000 description 4
- 238000005452 bending Methods 0.000 description 2
- 230000008602 contraction Effects 0.000 description 2
- 230000006866 deterioration Effects 0.000 description 1
- 229920006332 epoxy adhesive Polymers 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Description
【考案の詳細な説明】
この考案は、杭の一端部を破砕した場合に、前
記破砕部に近接した部分のストレスの低下を防止
することを目的としたプレストレストコンクリー
ト杭に関するものである。[Detailed Description of the Invention] This invention relates to a prestressed concrete pile whose purpose is to prevent a decrease in stress in a portion close to the fractured portion when one end of the pile is fractured.
従来ピーシー鋼棒、ピーシー鋼線、ピーシー鋼
の撚り線等のピーシー鋼材に所要の引張力を与え
ておいてコンクリートを打ち、そのコンクリート
の硬化後にピーシー鋼材に対する引張力を解い
て、硬化コンクリートにプレストレスを導入させ
たプリテンシヨン方式によつて作製されたプレス
トレストコンクリート杭は、他の(プレストレス
を導入していない)既製コンクリート杭に比べて
優れた強度特性を有している。 Conventionally, concrete is poured by applying the required tensile force to PC steel materials such as PC steel rods, PC steel wires, and stranded PC steel wires, and after the concrete has hardened, the tensile force on the PC steel materials is released and the hardened concrete is pre-filled. Prestressed concrete piles manufactured by a pretension method that introduces stress have superior strength characteristics compared to other ready-made concrete piles (that do not introduce prestress).
しかし乍ら、上記プレストレストコンクリート
杭を用いる基礎工事においては、プレストレスト
コンクリート杭と基礎フーチングとを一体にする
ために、プレストレストコンクリート杭の杭頭コ
ンクリート部分を1m程度はつり取つてプレスト
レストコンクリート杭の主筋であるピーシー鋼材
を取り出し、これを基礎フーチングへの定着筋と
して利用する杭頭処理工法を採用するのが普通で
ある。しかし乍らこのとき、杭頭コンクリート部
分のはつり取りによつてピーシー鋼材とコンクリ
ートとの付着が剥れてプレストレスが解放される
ことになり、杭頭処理部近傍におけるコンクリー
ト部分の曲げ抵抗並びに剪断抵抗等が著しく低下
する強度上の問題を伴う欠点があつた。 However, in the foundation work using the prestressed concrete piles mentioned above, in order to integrate the prestressed concrete piles and the foundation footing, the concrete pile head portion of the prestressed concrete piles is suspended by about 1 m and the main reinforcement of the prestressed concrete piles is removed. It is common to use a pile head processing method in which PC steel is extracted and used as anchorage for the foundation footing. However, at this time, by peeling off the concrete part of the pile head, the adhesion between the PC steel material and the concrete comes off and the prestress is released, which reduces the bending resistance and shear of the concrete part near the pile head treatment area. It had the disadvantage of having strength problems such as a significant decrease in resistance.
しかるにこの考案は、ピーシー鋼材に鋼線を螺
線状に巻き付け固着するとともに、該鋼線のピー
シー鋼材に当接しない側縁に所定間隔を置いてス
リツトを設けたので、ピーシー鋼材とコンクリー
トとの付着力が強くなり、杭頭コンクリート部を
破砕した場合にこれに近接したコンクリート端は
ピーシー鋼材によるストレスが解除され難くな
り、前記従来の問題点を解決したものである。 However, in this invention, a steel wire is spirally wound around the PC steel material and fixed, and slits are provided at a predetermined interval on the side edge of the steel wire that does not contact the PC steel material, so that the contact between the PC steel material and the concrete is prevented. The adhesion force is strengthened, and when the concrete pile head part is crushed, the stress caused by the PC steel material is difficult to be released from the concrete end adjacent to it, thus solving the above-mentioned conventional problems.
以下この考案を図面に示す実施例に基づいて説
明する。ピーシー鋼材として複数本のピーシー撚
り線1を適宜配置し(第2図)、その両端1a,
1b間で引張り前記ピーシー撚り線1に所定の引
張力を与えた状態でコンクリート2を打設し、そ
の硬化後ピーシー撚り線1に対する引張力を解除
してコンクリート2にプレストレスを導入してプ
レストレストコンクリート杭3を構成する。前記
ピーシー撚り線1の杭頭3a側の周壁にピーシー
撚り線1の頭部1aより適宜の長さL(直線距
離)に亘り、断面正方形のスチールテープ4が螺
線状に巻き付けてあり、前記撚り線1とスチール
テープ4とはエポキシ系接着剤で固着してある。
なお、スチールテープ4は、ピーシー撚り線1に
当接しない側の側縁に所定間隔を置いてスリツト
4bを形成する。 This invention will be explained below based on embodiments shown in the drawings. A plurality of PC twisted wires 1 are appropriately arranged as a PC steel material (Fig. 2), and both ends 1a,
Concrete 2 is poured with a predetermined tensile force applied to the PC strands 1 pulled between 1b and 1b, and after the concrete 2 is cured, the tensile force on the PC strands 1 is released and prestress is introduced into the concrete 2, thereby prestressing. This constitutes a concrete pile 3. A steel tape 4 having a square cross section is spirally wound around the peripheral wall of the PC stranded wire 1 on the side of the pile head 3a over an appropriate length L (straight line distance) from the head 1a of the PC stranded wire 1. The twisted wire 1 and the steel tape 4 are fixed together with an epoxy adhesive.
The steel tape 4 has slits 4b formed at a predetermined interval on the side edge of the steel tape 4 that does not come into contact with the PC strands 1.
前記においてスチールテープ4の巻き付け長さ
は、杭頭部3aのコンクリート2をはつり取つた
際に、ピーシー撚り線1とコンクリート2との付
着が剥れるおそれのない長さ(例えば1m)必要
であり、必要に応じてピーシー撚り線1の全長に
亘つて巻き付けてもよい。またスチールテープ4
の螺線ピツチPは、ピーシー鋼材の種類によつて
異なるずり込み(コンクリート2に対する収縮側
への移動)を考慮して適宜選定するものである。
尚スチールテープ4の支圧面4aとピーシー撚り
線1の中心軸心との傾斜角θは余り小さく設定し
ない方がよい。 In the above, the winding length of the steel tape 4 must be such a length (for example, 1 m) that there is no risk that the adhesion between the PC strands 1 and the concrete 2 will come off when the concrete 2 is lifted off the pile head 3a. , the PC strands 1 may be wound over the entire length as required. Also steel tape 4
The spiral pitch P is appropriately selected in consideration of the slippage (movement toward the contraction side relative to the concrete 2) that differs depending on the type of PC steel material.
Incidentally, the angle of inclination θ between the bearing surface 4a of the steel tape 4 and the central axis of the PC twisted wire 1 should not be set too small.
上記実施例によればプレストレストコンクリー
ト杭3を埋設後杭頭コンクリート部分をはつり取
つた場合においても、ピーシー撚り線1とコンク
リート3との付着が強いのでピーシー撚り線1が
ずり込むことがなくストレスが解除されるおそれ
がない。また全ての撚り線1にスチールテープ4
を巻き付け固着したが、必ずしも全てに巻き付け
る必要はなく、例えば1本おきに巻き付けてもよ
い。 According to the above embodiment, even when the concrete portion of the pile head is lifted off after burying the prestressed concrete pile 3, the adhesion between the PC strands 1 and the concrete 3 is strong, so the PC strands 1 do not slide down and stress is reduced. There is no risk of it being canceled. Also, steel tape 4 is attached to all strands 1.
Although the wires are wrapped and fixed, it is not necessary to wrap them all around, for example, it may be wrapped around every other wire.
第4図はこの考案のプレストレストコンクリー
ト杭に用いるピーシー鋼材の他の実施例を示すも
のであつて、ピーシー鋼線5の外壁に断面長方形
のスチールテープ6を螺線状に巻き付け固着する
と共に、前記スチールテープ6の外側縁に多数の
スリツト7を等間隔で設けたものである。この鋼
材を用いればスリツト7とコンクリートとの掛止
により大きな付着力、特に回転方向への付着力、
が得られる。 FIG. 4 shows another embodiment of the PC steel material used in the prestressed concrete pile of this invention. A large number of slits 7 are provided at equal intervals on the outer edge of the steel tape 6. If this steel material is used, the slit 7 and the concrete will be hooked together, resulting in a large adhesion force, especially in the direction of rotation.
is obtained.
尚ピーシー鋼材としてはピーシー撚り線、ピー
シー鋼線の他ピーシー鋼棒を用いることもでき、
異形ピーシー鋼棒を用い、その螺線溝に螺線溝の
深さよりも大きな厚さを有するスチールテープを
嵌着かしめ止めすることもできる。 In addition to PC stranded wire and PC steel wire, PC steel bars can also be used as the PC steel material.
It is also possible to use a deformed PC steel rod and caulk it by fitting a steel tape having a thickness greater than the depth of the spiral groove into the spiral groove.
すなわちこの考案によれば、プレストレストコ
ンクリートに埋設するピーシー鋼材に鋼線を螺線
状に巻き付け固着するとともに、鋼線のピーシー
鋼材に当接しない側縁に所定間隔を置いてスリツ
トを設けたので、この部分において杭頭コンクリ
ートをはつり取れば、このはつり取りによつて杭
頭処理近傍部のピーシー鋼材とコンクリートとの
付着が剥離しても、ピーシー鋼材のコンクリート
に対する収縮側への移動を鋼線の支圧面によつて
確実に阻止でき、プレストレスの解放を効果的に
防止できる。これによつて杭頭処理部近傍におけ
るコンクリート部分の曲げ抵抗並びに剪断抵抗等
の強度低下を伴わせないようにすることができ
る。 That is, according to this invention, a steel wire is spirally wound and fixed to the PC steel material buried in prestressed concrete, and slits are provided at a predetermined interval on the side edge of the steel wire that does not contact the PC steel material. If the pile cap concrete is removed in this area, even if the adhesion between the PC steel material and the concrete in the vicinity of the pile cap treatment peels off, the steel wire will prevent the PC steel material from moving toward the contraction side relative to the concrete. This can be reliably prevented by the bearing surface, and the release of prestress can be effectively prevented. Thereby, it is possible to avoid deterioration in strength such as bending resistance and shear resistance of the concrete portion near the pile head processing portion.
しかも、鋼線を螺旋状に巻き付け固着してある
ため、その支圧面が連続的にコンクリート中に位
置しており、どの箇所でコンクリートをはつり取
つてもプレストレスの解放を最小限に抑えること
ができ、このことは、杭頭コンクリート部分のは
つり取り長さを変更したり、その長さに多少の狂
いがあつてもそれを吸収させたりすることを可能
にするもので、汎用性に富むと共に旋工も容易に
なる等の利点を有する。 Moreover, since the steel wire is wound and fixed in a spiral, its bearing surface is located continuously in the concrete, making it possible to minimize the release of prestress no matter where the concrete is removed. This makes it possible to change the length of the concrete pile head and to absorb slight deviations in the length, making it highly versatile and It has advantages such as easier turning.
第1図はこの考案実施例の一部を破切した正面
図、第2図は同じく配筋状態の正面図、第3図は
同じく鋼線巻き付け部の拡大正面図、第4図は同
じく鋼線巻き付け部の他の実施例を示す拡大正面
図である。
1…ピーシー撚り線、2…コンクリート、3…
プレストレストコンクリート杭、4,6…スチー
ルテープ、5…ピーシー杭線、7…スリツト。
Fig. 1 is a partially cutaway front view of the embodiment of this invention, Fig. 2 is a front view of the reinforcing state, Fig. 3 is an enlarged front view of the steel wire winding section, and Fig. 4 is the same steel wire winding section. FIG. 7 is an enlarged front view showing another embodiment of the wire winding section. 1...PC stranded wire, 2...concrete, 3...
Prestressed concrete pile, 4, 6...Steel tape, 5...PC pile line, 7...Slit.
Claims (1)
ート杭であつて、前記ピーシー鋼材の周壁には
鋼線が螺旋状に巻き付け固着されており、前記
鋼線は、ピーシー鋼材に当接しない側縁に所定
間隔を置いてスリツトが設けられていることを
特徴とするプレストレストコンクリート杭。 2 鋼線は断面方形のスチールテープとした実用
新案登録請求の範囲第1項記載のプレストレス
トコンクリート杭。 3 ピーシー鋼材は、その一部又は全長に亘り鋼
線が巻き付けられた実用新案登録請求の範囲第
1項又は第2項記載のプレストレストコンクリ
ート杭。[Claims for Utility Model Registration] 1. A concrete pile in which stress is introduced using PC steel material, in which a steel wire is spirally wound and fixed to the peripheral wall of the PC steel material, and the steel wire is attached to the PC steel material. A prestressed concrete pile characterized in that slits are provided at predetermined intervals on side edges that do not touch each other. 2. The prestressed concrete pile according to claim 1, in which the steel wire is a steel tape with a square cross section. 3. The prestressed concrete pile according to claim 1 or 2 of the utility model registration claim, in which the PC steel material is partially or entirely wrapped with steel wire.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP19364681U JPS58103221U (en) | 1981-12-28 | 1981-12-28 | Prestressed concrete pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP19364681U JPS58103221U (en) | 1981-12-28 | 1981-12-28 | Prestressed concrete pile |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS58103221U JPS58103221U (en) | 1983-07-13 |
JPS621311Y2 true JPS621311Y2 (en) | 1987-01-13 |
Family
ID=30106994
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP19364681U Granted JPS58103221U (en) | 1981-12-28 | 1981-12-28 | Prestressed concrete pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS58103221U (en) |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS522398A (en) * | 1975-06-24 | 1977-01-10 | Tokai Kagaku Kogyo Kk | Alarm-cenral-monitoring device |
-
1981
- 1981-12-28 JP JP19364681U patent/JPS58103221U/en active Granted
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS522398A (en) * | 1975-06-24 | 1977-01-10 | Tokai Kagaku Kogyo Kk | Alarm-cenral-monitoring device |
Also Published As
Publication number | Publication date |
---|---|
JPS58103221U (en) | 1983-07-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5079879A (en) | Anti-corrosive post-tensioning anchorage system | |
US4821474A (en) | Post-tensioning anchor | |
EP0494099A2 (en) | Wall reinforcement | |
US5024032A (en) | Post-tensioning anchor | |
US5671582A (en) | Floor to wall tie method of construction | |
EP1471192B1 (en) | Connecting device for concrete components | |
JPS621311Y2 (en) | ||
JP4432597B2 (en) | Joint structure of foundation pile head and upper foundation | |
JP3350447B2 (en) | Fiber sheet for reinforcement and repair | |
JPS6363698B2 (en) | ||
JP3065966B2 (en) | Basket | |
JP3038298B2 (en) | High strength structure | |
JP3049287B2 (en) | Strengthening method of existing concrete column | |
JPH055019B2 (en) | ||
JPH0326175Y2 (en) | ||
JPS5830449B2 (en) | PC stake | |
JPH0118740Y2 (en) | ||
JP2578627B2 (en) | Half PCa board | |
JP2813806B2 (en) | Unbonded tendon | |
JPH0714423Y2 (en) | Anchor bond sheath | |
JP2538357Y2 (en) | Anchor tensile material | |
JP2685728B2 (en) | Slope concrete block and method of manufacturing the same | |
JP2919775B2 (en) | Corrosion-resistant movable anchor device for pretension girder | |
JPH0742766B2 (en) | Reinforcement method near the fixing part of prestressed concrete | |
JPH057381Y2 (en) |