JPS6134548B2 - - Google Patents

Info

Publication number
JPS6134548B2
JPS6134548B2 JP7402382A JP7402382A JPS6134548B2 JP S6134548 B2 JPS6134548 B2 JP S6134548B2 JP 7402382 A JP7402382 A JP 7402382A JP 7402382 A JP7402382 A JP 7402382A JP S6134548 B2 JPS6134548 B2 JP S6134548B2
Authority
JP
Japan
Prior art keywords
steel frame
wall
beam steel
upper beam
rotating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP7402382A
Other languages
Japanese (ja)
Other versions
JPS58191841A (en
Inventor
Juji Morimura
Tamotsu Kameo
Kojiro Nakajima
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP7402382A priority Critical patent/JPS58191841A/en
Publication of JPS58191841A publication Critical patent/JPS58191841A/en
Publication of JPS6134548B2 publication Critical patent/JPS6134548B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】 本発明は建築工事でPC(プレキヤストコンク
リート)壁板の建込方法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for erecting PC (precast concrete) wall boards in construction work.

従来、鉄骨間にPC構造の耐震壁板、たとえば
内部に適宜にスリツトを設けたスリツト壁板(特
公昭48−11135号参照)などを建込むには、鉄骨
建方→建入計測修正→デツキプレート仮敷→高力
ボルト本締め→柱継手溶接→PC壁板取付という
手順で行なわれており、該PC壁板は既に組まれ
た柱、梁鉄骨間に上下梁鉄骨に平行に対応するよ
うに建込まれるものである。従つてこのPC壁板
の建込みは位置決めが困難で時間と手数を要す
る。
Conventionally, in order to erect earthquake-resistant wall boards of PC structure between steel frames, such as slit wall boards with appropriate slits inside (see Japanese Patent Publication No. 11135/1983), the following steps were required: steel frame construction → correction of construction measurements → decking. The process is as follows: temporary laying of plates → final tightening of high-strength bolts → welding of column joints → installation of PC wall plates. It will be built in Therefore, positioning the PC wall panels is difficult and requires time and effort.

また、かかるPC壁板取付時には、鉄骨建方が
3節近く先行するため荷降し用のダメ開口が必要
であり、更に、鉄骨建方最上階より40m近い下層
階での作業となり安全面でも問題があつた。
In addition, when installing such PC wall panels, the steel frame erection precedes the steel frame by nearly three sections, so a rough opening for unloading is required.Furthermore, the work must be done on a floor approximately 40 meters below the top floor of the steel frame structure, which is a safety issue. There was a problem.

本発明の目的は上記従来例の不都合を解消し、
梁鉄骨と一体に建込めるので簡易迅速かつ安全に
建込み作業を行なうことができ、しかも柱の溶接
等柱回りの関連作業を行なうためのスペースを充
分確保できるとともに取付中の壁板が風よけにも
なり、また壁板の取付け精度も高い建築物におけ
る壁板建込方法を提供することにある。
The purpose of the present invention is to solve the above-mentioned disadvantages of the conventional example,
Since it can be erected integrally with the beam steel frame, construction work can be carried out easily, quickly and safely.In addition, sufficient space can be secured for related work around the columns, such as welding the columns, and the wall panels being installed are protected from wind. To provide a method for installing wall boards in a building that is easy to use, and also provides high accuracy in installing wall boards.

しかしてこの目的は本発明によれば、予め相係
合する回転金物を設けた上部梁鉄骨とPC壁板と
を仮設的に平行結合して、一体的に吊り上げ、建
築物の取付所定位置で前記上部梁鉄骨両端をあら
かじめ立設した柱に接合しかつPC壁板下部に取
付けた回転金物を下部梁鉄骨上の回転金物に係合
させ、ついで上部梁鉄骨とPC壁板との仮設的平
行結合を解除して該PC壁板を半回転させ、柱回
りの他の関連作業終了後にこの壁板を元のように
梁鉄骨と平行に直して柱梁架構内に本付けするこ
とにより達成される。
However, according to the present invention, the purpose of the lever is to temporarily connect the upper beam steel frame and the PC wall plate, which are provided with rotating metal fittings that engage with each other in advance, in parallel, and to lift them up integrally and place them at a predetermined location on the building. Both ends of the upper beam steel frame are connected to columns that have been erected in advance, and the rotating hardware attached to the lower part of the PC wall board is engaged with the rotating hardware on the lower beam steel frame, and then the upper beam steel frame and the PC wall board are temporarily parallel to each other. This was achieved by releasing the connection, rotating the PC wall plate half a turn, and after completing other related work around the column, returning the wall plate to parallel to the beam steel frame and finally attaching it to the column and beam frame. Ru.

以下、図面について本発明方法で使用する実施
例を詳細に説明する。
Hereinafter, embodiments used in the method of the present invention will be described in detail with reference to the drawings.

先に、本発明の装置を第1図、第2図について
説明すると、図中1aは上部梁鉄骨1の下フラン
ジ、2aは下部梁鉄骨2の上フランジ、3はPC
壁板である。このPC壁板3の上下中央には突出
する雌部4を有する回転金物5,5′を取付け
る。
First, the device of the present invention will be explained with reference to FIGS. 1 and 2. In the figures, 1a is the lower flange of the upper beam steel frame 1, 2a is the upper flange of the lower beam steel frame 2, and 3 is the PC
It is a wall board. Rotary hardware 5, 5' having a protruding female portion 4 is attached to the upper and lower center of this PC wall plate 3.

この雌部4はプレート6の面上に形成した軸受
けからなり、上記回転金物5,5′は該プレート
6の両端にボルト7でPC壁取付アングル8,
8′を結合しこれらプレート6及びアングル8,
8′のコ字形部分でPC壁板3を挾み込みかつアン
グル8,8′にPC壁板3を貫通するPC壁取付ボ
ルト9及びナツト10を設けている。
This female part 4 consists of a bearing formed on the surface of the plate 6, and the rotating hardware 5, 5' is connected to the PC wall mounting angle 8, which is attached to both ends of the plate 6 by bolts 7.
8' to connect these plates 6 and angles 8,
A PC wall mounting bolt 9 and a nut 10 are provided at the angles 8 and 8', which insert the PC wall board 3 at the U-shaped portion 8' and pass through the PC wall board 3.

図中、26は角座金でまた特にPC壁板3の下
部に取付ける回転金物5′のアングル8,8′には
高さ調整の際に取付ボルト9が移動できるような
長孔12を形成する。
In the figure, reference numeral 26 denotes a square washer, and in particular, an elongated hole 12 is formed in the angles 8 and 8' of the rotating hardware 5' to be attached to the lower part of the PC wall plate 3 so that the mounting bolt 9 can be moved during height adjustment. .

一方、上記上部梁鉄骨1の下フランジ1aと下
部梁鉄骨2の上フランジ2aとに雄部13を有す
る回転金物14,14′を取付けるが、この雄部
13は上記回転金物5,5′の雌部4に対応する
軸からなり、回転金物14は雄部13を突設した
プレート11の両端にフランジ1aの左右縁に係
止するフツク15,15′をボルト16で固定で
固定しこれらプレート11及び両フツク15,1
5′でフランジ1aを左右から挾み込むようにし
たものである。
On the other hand, rotating metal parts 14 and 14' having male parts 13 are attached to the lower flange 1a of the upper beam steel frame 1 and the upper flange 2a of the lower beam steel frame 2, and this male part 13 is connected to the rotating metal parts 5 and 5'. The rotating hardware 14 consists of a shaft corresponding to the female part 4, and hooks 15, 15' that engage the left and right edges of the flange 1a are fixed to both ends of the plate 11 on which the male part 13 is protruded, with bolts 16. 11 and both hooks 15,1
5', the flange 1a is inserted from the left and right sides.

なお回転金物14自体のガタツキを防止するた
めにプレート11の雄部13の反対側に押上げピ
ン17を設けこれをフランジ1aの面上に当接さ
せる。並列するフツク15,15及び15′,1
5′は横プレート18で相互に連結する。
In order to prevent rattling of the rotating hardware 14 itself, a push-up pin 17 is provided on the opposite side of the male portion 13 of the plate 11 and brought into contact with the surface of the flange 1a. Parallel hooks 15, 15 and 15', 1
5' are interconnected by a horizontal plate 18.

回転金物14′は雄部13を突設したプレート
19を下梁鉄骨2の上フランジ2a上に固定した
ベースプレート20にボルト21で止めるように
したものである。
The rotating hardware 14' has a plate 19 with a male portion 13 projecting thereon which is fixed to a base plate 20 fixed on the upper flange 2a of the lower beam steel frame 2 with bolts 21.

このようにして回転金物5,5′はボルト9及
びナツト10によりPC壁板3の上下に着脱自在
に取付けることができ、また回転金物14,1
4′もそれぞれ上部梁鉄骨1の下フランジ1aと
下部梁鉄骨2の上フランジ2aに着脱自在に取付
けられ、本発明の壁板建込装置はこれら回転金物
5,5′と14,14′との組合せで構成する。
In this way, the rotating hardware 5, 5' can be removably attached to the top and bottom of the PC wall board 3 using the bolts 9 and nuts 10, and the rotating hardware 14, 1
4' are also removably attached to the lower flange 1a of the upper beam steel frame 1 and the upper flange 2a of the lower beam steel frame 2, respectively. Consists of a combination of

次に本発明の壁板建込方法について説明する。 Next, the wall board erection method of the present invention will be explained.

上記PC壁板3は現場のストツクヤードに並べ
て置かれるが第3図に示すようにPC壁板3の上
に上部梁鉄骨1を置き、これら上部梁鉄骨1と
PC壁板3より出ているスチフナー22を仮設ボ
ルトで接合して両者を仮設的に平行に結合してお
く。また上部梁鉄骨1には上記回転金物14を、
PC壁板3の上下には回転金物5,5′を予めセツ
トしておき、さらに図示しないが既に建物中に組
まれている下部梁鉄骨2の上部フランジ2aには
回転金物14′を取付けておく。第3図中23は
PC壁板3から上部梁鉄骨1にかける補助ワイヤ
ー、24は鉄骨1に取付けた玉掛け用のピースで
ある。
The above-mentioned PC wall plates 3 are placed side by side in the stockyard at the site, but as shown in Fig. 3, the upper beam steel frame 1 is placed on top of the PC wall plate 3, and these upper beam steel frames 1 and
The stiffeners 22 protruding from the PC wall plate 3 are joined with temporary bolts to temporarily connect them in parallel. In addition, the above-mentioned rotating hardware 14 is attached to the upper beam steel frame 1.
Rotating hardware 5, 5' are set in advance on the top and bottom of the PC wall plate 3, and furthermore, although not shown, a rotating hardware 14' is attached to the upper flange 2a of the lower beam steel frame 2 already assembled in the building. put. 23 in Figure 3 is
Auxiliary wires are hung from the PC wall plate 3 to the upper beam steel frame 1, and 24 is a sling piece attached to the steel frame 1.

該ピース24に台付ワイヤーを玉掛けして上部
梁鉄骨1とPC壁板3とを一体的に吊り上げ第4
図に示すように、取付所定位置で上部梁鉄骨1の
端部を柱鉄骨25等に接合する。
A mounting wire is hung on the piece 24 to integrally lift the upper beam steel frame 1 and the PC wall board 3.
As shown in the figure, the end of the upper beam steel frame 1 is joined to the column steel frame 25 and the like at a predetermined installation position.

その際、PC壁板3の下部の回転金物5′の雌部
4に下部梁鉄骨2の回転金物14′の雄部13を
係合させる。なお、上記回転金物5′はストツク
ヤードで設けずにPC壁板3を建込む際に取付け
るようにしてもよい。
At this time, the male part 13 of the rotating hardware 14' of the lower beam steel frame 2 is engaged with the female part 4 of the rotating hardware 5' at the bottom of the PC wall plate 3. Note that the rotating hardware 5' may not be provided in the stockyard, but may be attached when the PC wall board 3 is erected.

次いでストツクヤードで取り付けた仮設ボルト
を外して上部梁鉄骨1とPC壁板3との仮設的平
行結合を解除して、PC壁板3の端部を押せば該
壁板3は雄部13を軸として半回転し、柱25の
周囲には空間が形成される。
Next, remove the temporary bolts attached at the stockyard to release the temporary parallel connection between the upper beam steel frame 1 and the PC wall board 3, and push the end of the PC wall board 3, so that the wall board 3 pivots around the male part 13. The pillar 25 rotates half a turn, and a space is formed around the pillar 25.

半回転した壁板3は仮設金物等で固定してお
き、上記空間を利用して柱25回りでの柱25の
ジヨイント溶接及び高力ボルトの本締作業等他の
関連作業を行なう。
The half-rotated wall plate 3 is fixed with temporary hardware, etc., and other related work such as joint welding of the pillar 25 around the pillar 25 and final tightening of high-strength bolts is performed using the above space.

特に溶接を行なう場合には上下梁鉄骨1,2と
直交する形に壁板3が位置するので、この壁板3
が風よけの役目をなす。
In particular, when welding, the wall plate 3 is located perpendicular to the upper and lower beam steel frames 1 and 2, so this wall plate 3
serves as a windbreak.

関係作業が終止したならば、第5図に示すよう
に速やかに壁板3を回転させて元のように梁鉄骨
1,2と平行に位置させ、壁板3のスチフナー2
2と鉄骨1,2とを本締めする。また、回転金物
5,5′,14,14′は取外して他所へ転用す
る。なお、前記回転金物5は場合によつては埋殺
してもよい。
When the related work is completed, as shown in Fig. 5, quickly rotate the wall plate 3 to position it parallel to the beam steel frames 1 and 2 as before, and then tighten the stiffener 2 of the wall plate 3.
2 and steel frames 1 and 2 are fully tightened. Further, the rotating hardware 5, 5', 14, 14' are removed and used elsewhere. Note that the rotating hardware 5 may be buried as the case may be.

以上述べたように本発明の建築物における壁板
建込方法は、PC壁板を鉄骨間に建込むについて
上部梁鉄骨と一体に吊り込むので揚重の手数は一
度ですみ、簡易、迅速かつ安全に作業を行なうこ
とができるものである。
As described above, the method of erecting wall panels in a building according to the present invention is simple, quick, and easy, as the PC wall panels are erected between the steel frames and are suspended integrally with the upper beam steel frame, so that only one lifting effort is required. The work can be done safely.

また建込んだPC壁板はこれを回転させて柱回
りに関連作業用の空間を確保し、作業能率を上げ
ることができ、さらに壁板が風よけにもなる。加
えて、上部梁鉄骨のセツトとともに壁板建込の位
置決めもほぼ完了し、壁板の取付け精度も高まる
ものである。
Additionally, the installed PC wallboards can be rotated to create space around the pillars for related work, increasing work efficiency, and the wallboards also serve as windbreaks. In addition, along with the setting of the upper beam steel frame, the positioning of the wall panels has almost been completed, increasing the accuracy of wall panel installation.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明方法で使用する建込装置の実施
例を示す一部切欠いた側面図、第2図は同上正面
図、第3図は本発明方法の手順を示す正面図、第
4図は次の手順を示す斜視図、第5図は更に次の
手順を示す正面図である。 1……上部梁鉄骨、1a……下フランジ、2…
…下部梁鉄骨、2a……上フランジ、3……PC
壁板、4……雌部、5,5′……回転金物、6…
…プレート、7……ボルト、8,8′……PC壁取
付アングル、9……PC壁取付ボルト、10……
ナツト、11……プレート、12……長孔、13
……雄部、14,14′……回転金物、15,1
5′……フツク、16……ボルト、17……押上
げピン、18……横プレート、19……プレー
ト、20……ベースプレート、21……ボルト、
22……スチフナー、23……補助ワイヤー、2
4……玉掛け用ピース、25……柱鉄骨、26…
…角座金。
Fig. 1 is a partially cutaway side view showing an embodiment of the construction equipment used in the method of the present invention, Fig. 2 is a front view of the same as above, Fig. 3 is a front view showing the procedure of the method of the present invention, and Fig. 4 5 is a perspective view showing the next step, and FIG. 5 is a front view showing the next step. 1... Upper beam steel frame, 1a... Lower flange, 2...
...Lower beam steel frame, 2a...Upper flange, 3...PC
Wall plate, 4... Female part, 5, 5'... Rotating hardware, 6...
...Plate, 7...Bolt, 8, 8'...PC wall mounting angle, 9...PC wall mounting bolt, 10...
Nut, 11...Plate, 12...Long hole, 13
... Male part, 14,14' ... Rotating hardware, 15,1
5'...Hook, 16...Bolt, 17...Push-up pin, 18...Horizontal plate, 19...Plate, 20...Base plate, 21...Bolt,
22... Stiffener, 23... Auxiliary wire, 2
4... Sling piece, 25... Pillar steel frame, 26...
...Square washer.

Claims (1)

【特許請求の範囲】[Claims] 1 予め相係合する回転金物を設けた上部梁鉄骨
とPC壁板とを仮設的に平行結合して一体に吊り
上げ、建築物の取付所定位置で前記上部梁鉄骨両
端を予め立設した柱に接合しかつPC壁板下部に
取付けた回転金物を下部梁鉄骨上の回転金物に係
合させ、ついで上部梁鉄骨とPC壁板との仮設的
平行結合を解除して該PC壁板を半回転させ柱回
りの他の関連作業終了後にこの壁板を元のように
梁鉄骨と平行に直して柱梁架構内に本付けするこ
とを特徴とした建築物における壁板建込方法。
1. Temporarily connect the upper beam steel frame and the PC wall plate, which are provided with rotating metal fittings that engage with each other in advance, in parallel and hang them together, and then attach both ends of the upper beam steel frame to the pre-erected pillars at the predetermined installation position of the building. The rotating hardware connected and attached to the lower part of the PC wall board is engaged with the rotating hardware on the lower beam steel frame, and then the temporary parallel connection between the upper beam steel frame and the PC wall board is released, and the PC wall board is rotated by half a rotation. A method for erecting wall boards in a building, which is characterized in that after other related work around the pillars is completed, the wall boards are returned to their original state parallel to the beam steel frame and permanently attached within the pillar-beam frame.
JP7402382A 1982-05-01 1982-05-01 Method and apparatus for constructing wall panel of building Granted JPS58191841A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7402382A JPS58191841A (en) 1982-05-01 1982-05-01 Method and apparatus for constructing wall panel of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7402382A JPS58191841A (en) 1982-05-01 1982-05-01 Method and apparatus for constructing wall panel of building

Publications (2)

Publication Number Publication Date
JPS58191841A JPS58191841A (en) 1983-11-09
JPS6134548B2 true JPS6134548B2 (en) 1986-08-08

Family

ID=13535103

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7402382A Granted JPS58191841A (en) 1982-05-01 1982-05-01 Method and apparatus for constructing wall panel of building

Country Status (1)

Country Link
JP (1) JPS58191841A (en)

Also Published As

Publication number Publication date
JPS58191841A (en) 1983-11-09

Similar Documents

Publication Publication Date Title
US4074487A (en) Multi-story wall framing system and method
US4378664A (en) System for constructing a building
JPH06200625A (en) Frame method of arch truss construction
JPS6134548B2 (en)
JPH0346620B2 (en)
JPS6350502B2 (en)
JP2543954Y2 (en) Overhang scaffolding bracket
JPH04106267A (en) Form device of column
JP2603722Y2 (en) Scaffolding wall fittings
JPH0447300Y2 (en)
JPS6134315Y2 (en)
JPH037471Y2 (en)
JP3001841B2 (en) Frame bolting structure and its bracket
JPH0755202Y2 (en) Unit house connection structure
JP2705517B2 (en) Concrete wall construction method using external scaffold
JPH0354265Y2 (en)
JP3997080B2 (en) Scaffolding platform
JPH049801Y2 (en)
JP2642839B2 (en) Column fixed structure in wooden prefabricated building
JPH0578731U (en) Wall panel mounting structure
JPH0745705Y2 (en) Large formwork device
JP2819366B2 (en) Assembly scaffolding equipment
JP2549053B2 (en) Curtain wall panel support structure and curtain wall construction method using the panel support structure
JPH0745706Y2 (en) Large formwork device
JPH0327166Y2 (en)