JPS61257600A - Method and device for executing lock bolt, etc. - Google Patents
Method and device for executing lock bolt, etc.Info
- Publication number
- JPS61257600A JPS61257600A JP9800885A JP9800885A JPS61257600A JP S61257600 A JPS61257600 A JP S61257600A JP 9800885 A JP9800885 A JP 9800885A JP 9800885 A JP9800885 A JP 9800885A JP S61257600 A JPS61257600 A JP S61257600A
- Authority
- JP
- Japan
- Prior art keywords
- hole
- mortar
- bolt
- rock
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Gripping Jigs, Holding Jigs, And Positioning Jigs (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
〈産業上の利用分野〉
本発明はロックボルト等の施工方法と装置に関するもの
である。DETAILED DESCRIPTION OF THE INVENTION <Industrial Application Field> The present invention relates to a method and apparatus for constructing rock bolts and the like.
〈従来の技術〉
岩盤に削孔し、内部にモルタルを充填した後、ボルトを
圧入する工法が存在する。<Conventional technology> There is a method of drilling holes in rock, filling the inside with mortar, and then press-fitting bolts.
く本発明が解決しようとする問題点〉
従来のロックボルト工法では、特に上向きに削孔した場
合に次のような問題点が存在する。Problems to be Solved by the Present Invention The conventional rock bolt construction method has the following problems, especially when drilling upwards.
くイ〉内部のモルタルがたれ下がって孔外へ露出してき
やすい。〉The mortar inside tends to sag and be exposed outside the hole.
く口〉その結果、孔内のモルタルが充分に充填されない
ことになる。As a result, the mortar in the hole will not be filled sufficiently.
充填が不充分であると、ボルトと岩盤との付着強度が不
足して岩盤固定の目的が達成できない。If the filling is insufficient, the adhesion strength between the bolt and the rock will be insufficient and the purpose of fixing the bolt to the rock will not be achieved.
くハ〉上向き削孔であるとモルタルのたれ下がりだけで
はなく、内部に挿入したボルトも脱落しやす(、予定ど
うりの深度にボルトを固定できない。Kuha> If the hole is drilled upward, not only will the mortar sag, but the bolts inserted inside will also tend to fall out (and the bolts cannot be fixed at the planned depth.
く本発明の目的〉
本発明は、上記の点を改善するためになされたもので、
次のような工法と装置を提供することを目的とする。Purpose of the present invention The present invention has been made to improve the above points,
The purpose is to provide the following construction methods and equipment.
〈イ〉上向きの孔であっても、内部に充填したモルタル
がたれ下がって来ることのないロックボルト工法と装置
く口〉孔内のモルタルの充填不足が発生せず、設定どう
りの強度を発揮することのできるロックボルト工法と装
置
くハ〉孔内に挿入したボルト等も脱落して来ることのな
いロックボルト工法と装置
く本発明の構成〉
次に本発明の一実施例について説明する。<B> Rock bolt construction method and device that prevent the mortar filled inside from dripping even if the hole is facing upwards> This prevents insufficient filling of mortar in the hole and maintains the strength as specified. Structure of the present invention: A rock bolt construction method and device that can achieve the desired effect. Structure of the present invention: A rock bolt construction method and device that prevent bolts inserted into holes from falling out. Next, an embodiment of the present invention will be described. .
くイ〉孔閉塞具(第7図)
削孔したアンカ一孔の入口を閉塞するために1第7図の
ような閉塞具を使用する。1. Hole closing tool (Fig. 7) A closing tool as shown in Fig. 7 is used to close the entrance of the drilled anchor hole.
この閉塞具1は、プレート11の表面にバイブ12を直
角に溶接して構成する。This obturator 1 is constructed by welding a vibrator 12 to the surface of a plate 11 at right angles.
プレート11の面積は後述するアンカ一孔の断面積より
も大きい鋼製の板体であり、その中央、すなわちパイプ
12中夫にはボルト挿入口14を開孔する。The plate 11 is a steel plate whose area is larger than the cross-sectional area of one anchor hole, which will be described later, and a bolt insertion hole 14 is formed in the center of the plate 11, that is, in the center of the pipe 12.
このボルト挿入口14の内径は、ボルト外径よりわずか
に太き(構成する。The inner diameter of this bolt insertion port 14 is slightly larger than the bolt outer diameter.
一方、パイプ12はアンカ一孔の内径よりも多少率さい
外径を有する鋼製のパイプである。On the other hand, the pipe 12 is a steel pipe having an outer diameter slightly larger than the inner diameter of the anchor hole.
そして、このバイブ12の外周には逆止翼13を設ける
。A checker blade 13 is provided on the outer periphery of the vibrator 12.
この逆止翼13は、例えば弾性を有する短冊状の鋼板を
複数枚パイプ外周に、プレート11側を外向きにひろげ
た状態で固定して構成する。The check blade 13 is constructed by fixing, for example, a plurality of elastic strip-shaped steel plates to the outer periphery of the pipe with the plate 11 side spread outward.
この実施例の形状に限らず、その他の公知の逆止構造で
あれば広く利用できる。Not limited to the shape of this embodiment, any other known check structure can be widely used.
く施工方法〉
次に、本発明の施工方法の一実施例をロックボルトの施
工について説明するが、アンカーボルトその他にも利用
できることは勿論である。Construction Method> Next, an embodiment of the construction method of the present invention will be described for construction of rock bolts, but it goes without saying that it can also be used for anchor bolts and other applications.
く1)削孔(第1図) 公知の方法によって、岩盤にアンカ一孔2を削孔する。1) Drilling holes (Fig. 1) An anchor hole 2 is drilled in the rock by a known method.
く2〉閉塞具の取り付け(第2図)
アンカー2の孔口に、前記した閉塞具1をたたき込んで
閉塞してしまう。2> Attaching the obturator (Fig. 2) The above-mentioned obturator 1 is inserted into the hole of the anchor 2 to occlude it.
く3〉モルタル注入(第3図)
閉塞具1のプレート11に、開口したボルト挿入孔14
にモルタル注入管3を挿入する。3> Mortar injection (Fig. 3) Bolt insertion hole 14 opened in plate 11 of obturator 1
Insert the mortar injection pipe 3 into.
そして、モルタル注入管3の先端からモルタル4をアン
カ一孔2の深部へ注入し、順々に抜き出しながらアンカ
一孔2に充填する。Then, mortar 4 is injected into the deep part of the anchor hole 2 from the tip of the mortar injection tube 3, and is filled into the anchor hole 2 while being pulled out one after another.
アンカ一孔2の口元でさらにモルタルを注入すると、閉
塞具1の隙間からモルタルがはみ出して来るので、完全
に充填されたことが確認できる。When more mortar is injected at the mouth of the anchor hole 2, the mortar protrudes from the gap in the obturator 1, so it can be confirmed that it is completely filled.
(第4図)
く4〉ロックボルトの圧入
注入パイプ3を引き抜き、モルタル4が硬化する以前に
、ロックボルト5をボルト挿入孔14からモルタル4内
に打撃などの力で挿入する。(Fig. 4) 4> Pull out the injection pipe 3 for press-fitting the rock bolt, and before the mortar 4 hardens, insert the rock bolt 5 into the mortar 4 through the bolt insertion hole 14 by force such as impact.
く5〉ボルトの固定
モルタル4が硬化した後、ボルト5の露出部のナツト6
を締め付け、プレート11を岩盤に固定して完成する。5> After the bolt fixing mortar 4 has hardened, tighten the nut 6 on the exposed part of the bolt 5.
Tighten and fix the plate 11 to the rock to complete.
く本発明の効果〉
本発明は、上記したようになるから次のような効果を期
待できる。Effects of the present invention> Since the present invention is as described above, the following effects can be expected.
〈イ°〉上向きのアンカ一孔であっても、孔内に完全に
モルタルを充填できる。<A> Even if there is only one hole in the anchor pointing upward, the hole can be completely filled with mortar.
く口〉孔底まで完全に充填しであるから、モルタルの抜
は出し、充填不足などによる強度不足の不安がなく、信
頼性の高いロックボルトの施工を行うことができる。Since the hole is completely filled to the bottom of the hole, there is no need to worry about the mortar being drawn out or lack of strength due to insufficient filling, allowing for highly reliable rock bolt construction.
くハ〉ロックボルト用のボルト自体も上向きに挿入した
場合にも脱落することがな(、孔底まで完全に挿入した
まま固定することができる。Kuha> The bolt for the lock bolt itself will not fall off even when inserted upward (and can be fixed while being inserted completely to the bottom of the hole.
第1図〜第6図二本発明の施工方法の一実施例の説明図
第7図:本発明の施工に使用する閉塞具の一実施例の説
明図
1:閉塞具 13:逆止翼 4:モルタル第3図
第4図 第5図
、第6図
ルトFigures 1 to 6 2 Explanatory diagram of an embodiment of the construction method of the present invention Figure 7: Explanation of an embodiment of the obturator used in the construction of the present invention 1: Obturator 13: Check blade 4 :Mortar Figure 3 Figure 4 Figure 5, Figure 6 Root
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP9800885A JPS61257600A (en) | 1985-05-10 | 1985-05-10 | Method and device for executing lock bolt, etc. |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP9800885A JPS61257600A (en) | 1985-05-10 | 1985-05-10 | Method and device for executing lock bolt, etc. |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS61257600A true JPS61257600A (en) | 1986-11-15 |
JPH0522039B2 JPH0522039B2 (en) | 1993-03-26 |
Family
ID=14207705
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP9800885A Granted JPS61257600A (en) | 1985-05-10 | 1985-05-10 | Method and device for executing lock bolt, etc. |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS61257600A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100383451B1 (en) * | 2000-07-19 | 2003-05-12 | 서동산업 주식회사 | Rock Bolt Working Method by Fixture |
KR100383453B1 (en) * | 2000-07-19 | 2003-05-14 | 주식회사 삼보기술단 | Fixture for Rock Bolt |
KR100489937B1 (en) * | 2002-03-08 | 2005-05-17 | 김유신 | Anchor for Engineering works |
JP2008174996A (en) * | 2007-01-19 | 2008-07-31 | Topy Jitsugyo Kk | Grout outflow prevention tool |
KR101397949B1 (en) * | 2012-11-29 | 2014-05-27 | 서동산업(주) | A rock bolt |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS55161198A (en) * | 1979-06-01 | 1980-12-15 | Const Dou Materieru Dou Mine S | Equipment for preparing and injecting sealant filler of cement |
-
1985
- 1985-05-10 JP JP9800885A patent/JPS61257600A/en active Granted
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS55161198A (en) * | 1979-06-01 | 1980-12-15 | Const Dou Materieru Dou Mine S | Equipment for preparing and injecting sealant filler of cement |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100383451B1 (en) * | 2000-07-19 | 2003-05-12 | 서동산업 주식회사 | Rock Bolt Working Method by Fixture |
KR100383453B1 (en) * | 2000-07-19 | 2003-05-14 | 주식회사 삼보기술단 | Fixture for Rock Bolt |
KR100489937B1 (en) * | 2002-03-08 | 2005-05-17 | 김유신 | Anchor for Engineering works |
JP2008174996A (en) * | 2007-01-19 | 2008-07-31 | Topy Jitsugyo Kk | Grout outflow prevention tool |
KR101397949B1 (en) * | 2012-11-29 | 2014-05-27 | 서동산업(주) | A rock bolt |
Also Published As
Publication number | Publication date |
---|---|
JPH0522039B2 (en) | 1993-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS61257600A (en) | Method and device for executing lock bolt, etc. | |
JP2020172746A (en) | Horizontal hole open-cut machine for anchor bolt | |
JPS5820850A (en) | Embedding of anchor bolt | |
JP2023074281A (en) | side grip anchor | |
JPH1077800A (en) | Anchoring material filling method and seal unit | |
JPS622083B2 (en) | ||
JP2627540B2 (en) | Additional structure of concrete skeleton | |
JPS58101971A (en) | Pinning method using hollow pipe | |
JPS60175665A (en) | Repairing of outer wall of building | |
JPS62211464A (en) | Construction method of anchor | |
JPS5648431A (en) | Anchoring method | |
JPS5838842U (en) | Tensile material for earth anchors filled with water-stopping agent | |
JPS63315747A (en) | Method for fixing adhesive systempost-execution anchor | |
JPH037800B2 (en) | ||
JP4296238B2 (en) | Rock bolt construction method, drilling length measuring device after completion of construction and construction method using this material | |
JPS61257599A (en) | Method of executing lock bolt, etc. | |
JPS61191721A (en) | Method of forming earth anchor | |
JPS5849240Y2 (en) | Grout type prestressed anchor device | |
JP2002285551A (en) | Tension member inserting method | |
AU696114B2 (en) | Chemically-set anchor stud system | |
JP2510502Y2 (en) | Chemical injection tube | |
JP2002081300A (en) | Lock bolt fixing method of mountain tunnel and water stop packing therefor | |
JPH0521533Y2 (en) | ||
JPS59420A (en) | Construction of pile reduced negative friction force | |
JPS58194299U (en) | Lock bolt structure for tunnel construction |