JPS61235264A - Railway schedule contradiction detection system - Google Patents

Railway schedule contradiction detection system

Info

Publication number
JPS61235264A
JPS61235264A JP60077011A JP7701185A JPS61235264A JP S61235264 A JPS61235264 A JP S61235264A JP 60077011 A JP60077011 A JP 60077011A JP 7701185 A JP7701185 A JP 7701185A JP S61235264 A JPS61235264 A JP S61235264A
Authority
JP
Japan
Prior art keywords
train
graph
schedule
train schedule
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP60077011A
Other languages
Japanese (ja)
Inventor
恵介 安部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP60077011A priority Critical patent/JPS61235264A/en
Publication of JPS61235264A publication Critical patent/JPS61235264A/en
Pending legal-status Critical Current

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、列車ダイヤで規定されている情報のうち列
車出発順序、番線使用順序、車両運用等の位相的関係に
おける矛盾、および1時間的情報である列車着発時刻の
運転条件に対する矛盾を検出することにより、列車ダイ
ヤのうち、実行不可能な部分を検出するための列車ダイ
ヤ矛盾検出方式%式% 〔従来の技術〕 従来の列車ダイヤ矛盾検出方式は、デッドロック検出を
目的として1列車ダイヤのうち1列車出発順序1番線使
用順序等のスケジュールにおける矛盾を検出する方式と
、実行不可能な列車着発時刻を検出するために、列車ダ
イヤの着発時刻の運転条件に対する矛盾を検出する方式
とに大別される。
[Detailed Description of the Invention] [Field of Industrial Application] This invention is intended to solve the problem of inconsistencies in topological relationships such as train departure order, track usage order, vehicle operation, etc. among the information specified in the train schedule, and hourly Train schedule discrepancy detection method for detecting infeasible parts of a train schedule by detecting discrepancies with operating conditions such as train arrival/departure time information [Prior art] Conventional train schedule Inconsistency detection methods include a method that detects inconsistencies in schedules such as the departure order of one train in a train diagram and the order in which the first track is used for the purpose of deadlock detection; There are two main types of methods: methods that detect discrepancies between the arrival and departure times of the timetable and operating conditions.

前者の方式では、列車走行を移動体の設備使用の連続と
してとらえており、列車ダイヤ変更に注目して、変更に
よる矛盾発生を検出する方式とがある。
The former method considers train travel as a series of equipment usage by moving objects, and there is a method that focuses on changes in train schedules and detects inconsistencies due to changes.

列車ダイヤ全体に対する方式は、設備使用系列における
循環を検出するアルゴリズムによりデッドロック検出を
行なうものであり、ダイヤ変更に対する方式は、スケジ
ュールをグラフ表現し、グラフにおいて変更部分を含む
サイクルを検出することにより、ダイヤ変更により発生
するデッドロックを検出するものである。
The method for the entire train schedule detects deadlocks using an algorithm that detects cycles in the equipment usage series, and the method for train schedule changes uses a graph to represent the schedule and detect cycles that include changed parts in the graph. , to detect deadlocks that occur due to timetable changes.

また、後者の方式は、個々の運転条件に対し、逐次、列
車ダイヤの着発時刻をチェックするものである。
Furthermore, the latter method sequentially checks the arrival and departure times of the train schedule for each operating condition.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

しかしながら、従来の列車ダイヤ矛盾検出方式は、列車
ダイヤにおける因果関係の矛盾と時間的矛盾を側別に検
出するものであり、両方を統一的に扱えるものではなく
、また処理方法も繁雑めあり、大規模なダイヤに対する
リアリタイム使用において有効なものとするためにはよ
り体系化、効率化が必要であるという問題点を有してい
る。
However, the conventional train schedule contradiction detection method detects causal contradictions and temporal contradictions in train diagrams separately, and cannot handle both in a unified manner, and the processing method is complicated and requires a large amount of effort. In order to be effective in real-time use for large-scale diamonds, there is a problem in that more systemization and efficiency are required.

〔問題点を解決するための手段〕[Means for solving problems]

従って、この発明による列車ダイヤ矛盾検出方式は1列
車ダイヤに関する情報をすべてグラフを用いて表現する
第1の手段とこの第1の手段によって作成されたグラフ
に対しトポロジカルソートによりサイクルを検出する第
2の手段と、さらにグラフの枝として運転条件も表現し
、グラフ上の1点から各点までの最長経路を求める第3
の手段とを設けたものである。
Therefore, the train schedule contradiction detection method according to the present invention includes a first means for expressing all information regarding one train schedule using a graph, and a second means for detecting cycles by topological sorting on the graph created by this first means. The third method expresses the operating conditions as branches of the graph and calculates the longest route from one point to each point on the graph.
This means that the

〔作用〕[Effect]

この様に構成された列車ダイヤ矛盾検出方式においては
、第1の手段において列車ダイヤがグラフとして表現さ
れる。そして第2の手段においては、列車ダイヤ上の因
果関係の矛盾がグラフ上のサイクルとして、トポロジカ
ルソートにより効率的に検出される。さらに第3の手段
においては、運転条件もグラフの枝として表現されるこ
とにより、列車ダイヤの列車着発時刻の運転条件に対す
る矛盾もグラフ上の1点から各点までの最長経路探索に
より効率的に求められることになる。
In the train schedule contradiction detection method configured in this way, the first means expresses the train schedule as a graph. In the second means, contradictions in causal relationships on the train schedule are efficiently detected as cycles on the graph by topological sorting. Furthermore, in the third method, since the operating conditions are also expressed as branches of the graph, inconsistencies with the operating conditions of train arrival and departure times in the train schedule can be resolved more efficiently by searching for the longest route from one point on the graph to each point. will be required.

〔実施例〕〔Example〕

図はこの発明による列車ダイヤ矛盾検出方式の一実施例
を示す処理概要図であり、マンマシンによる列車ダイヤ
矛盾修正に適用した場合を示し。
The figure is a processing outline diagram showing an embodiment of the train schedule contradiction detection method according to the present invention, and shows a case where the method is applied to train schedule contradiction correction by a man-machine.

ステップ51〜ステツプS2は列車ダイヤ情報をグラフ
表示する第1の手段を表示するもの、である、まずステ
ップSlにおいて列車ダイヤ、運転条件等のデータを計
算機に入力し、次これらのデータを用いてステップS2
において列車運行を表現するグラフを作成する。このグ
ラフに対し、ステップ53〜ステツプS7より構成され
る第2の手段のトポロジカルソートによるサイクル検出
方法で、先ず、ステップS3でトポロジカルソートによ
゛るサイクル検出を行ない、ステップS4においてサイ
クルが存在する場合はデッドロック発生として、ステッ
プs5でサイクルを構成する枝を調べることにより、デ
ッドロックの原因となるダイヤ上の矛盾を提示し、ステ
ップS8でその矛盾を解消すべくダイヤ修正が行なわれ
る。そしてダイヤ修正に対し、ステップS7でグラフを
修正しステップS3に戻る。また、ステップS4でサイ
クルが存在しなくて、トロポジカルソートが正常終了し
た場合はステップ58〜ステツプSllより成る第3の
手段の最長経路探索方法を用い、先ずステップS8でグ
ラフ上の最長経路探索を行ない、ステップS8で各点の
最長経路長と列車ダイヤの着発時刻を照合することによ
り、着発時刻の運転条件に対する矛盾検出を行ない、ス
テップ510において矛盾箇所がある場合は、ステップ
Sllでその矛盾箇所を提示し、ステップS12に行き
矛盾を解消すべきダイヤ修正が行なわれる。そしてステ
シブS13でダイヤ修正に対しグラフを修正し、ステッ
プS8に戻る。またステップSIGで矛盾暗所がない場
合は、列車ダイヤに矛盾がなく実行可能性が保証された
ことになるので処理終了となる。
Steps 51 to S2 are for displaying the first means of graphically displaying train schedule information. First, in step Sl, data such as train schedules and operating conditions are input into the computer, and then these data are used to Step S2
Create a graph that represents train operation. With respect to this graph, in the cycle detection method using topological sorting of the second means consisting of steps 53 to S7, first, cycle detection is performed by topological sorting in step S3, and in step S4 it is determined that a cycle exists. If so, it is assumed that a deadlock has occurred, and in step s5, the branches constituting the cycle are examined to present a contradiction on the schedule that causes the deadlock, and in step S8, the schedule is revised to eliminate the contradiction. Then, in response to the diamond correction, the graph is corrected in step S7 and the process returns to step S3. If no cycle exists in step S4 and the tropological sort ends normally, the longest path search method of the third means consisting of steps 58 to Sll is used, and first, in step S8, the longest path search on the graph is performed. By comparing the longest route length at each point with the arrival/departure time of the train diagram in step S8, a contradiction with the operating conditions of the arrival/departure time is detected. If there is a contradiction in step 510, in step Sll The inconsistency is presented, and the process goes to step S12, where the timetable is revised to eliminate the inconsistency. Then, in step S13, the graph is corrected in response to the diamond correction, and the process returns to step S8. Further, if there is no contradiction in step SIG, it means that there is no contradiction in the train schedule and the possibility of execution is guaranteed, and the process ends.

以下、この発明による列車ダイケヤ矛盾検出方式の動作
を詳細に説明する。この列車ダイヤ矛盾検出方式では、
列車運行をグラフによって表現し、シミュレーションを
グラフとの最長経路探索として行なう、まず、列車運行
のグラフ表現方法について説明し、次にグラフとのトポ
ロジカルソートによりダイヤ、Hの因果関係の矛盾を検
出する方法と、グラフ上で1点から各点までの最長経路
を求めることにより列車着発時刻の矛盾を検出する方法
を説明する。
Hereinafter, the operation of the train dynamic contradiction detection method according to the present invention will be explained in detail. In this train schedule contradiction detection method,
Train operation is represented by a graph, and the simulation is performed as a search for the longest route with the graph. First, we will explain how to represent train operation in a graph, and then we will detect contradictions in the causal relationships between timetables and H by topological sorting with the graph. A method for detecting discrepancies in train arrival and departure times by finding the longest route from one point to each point on a graph will be explained.

■0列車運行のグラフ表現 列*連行の制約条件は次の様になる。■Graphic representation of 0 train operation The constraint conditions for column * entrainment are as follows.

く列車ダイヤ〉 (1)各駅着発時刻、使用番線 (2)各駅出発順序、番線使用順序 (3)*両運用 く運転条件〉 (1)駅間最小走行時間 (2)各駅最小停車時間(3
)各駅最小進入・進出時隔 (4)駅間許容列車豹(5)最小折返し時間ここで。
Train schedule> (1) Arrival/departure time at each station, track number used (2) Order of departure from each station, order number track used (3) * Operating conditions for two-way operation> (1) Minimum running time between stations (2) Minimum stopping time at each station ( 3
) Minimum approach/exit time interval for each station (4) Allowable train distance between stations (5) Minimum turnaround time Here.

a (i、j): i駅での3列車の列部時刻d (i
、j): i駅での3列車の出発時刻A(i、j):列
車ダイヤ上でのigj列車到着時刻D(i、j):列車
ダイヤ上でのi駅j列車出発時刻Rri、I):i w
 i+1駅間の交楢列車の最小走行時間S (i、l)
:i IRでの1種列車の最小走行時間文(j):3列
車の種別 ha C11,!;L2): #別11列束に続いて種
別文2列車が到着する場合の時隔パターン hd (交1.Q2):種1?111列車に続いて種別
122列車出発する場合の時隔パターン hb (又l9文2)二種別fL1列車に続いて種別Q
22列車同一#線を使用する場合の時隔パターンH(i
、h): i駅での時隔パターンhの時の最小時隔ja
(i、j)=j列車の直前にi駅に到着する列車jd(
i、j):3列車の直前にi駅を発車する列車jb(i
、j): 3列車の直前に3列車のi駅到着番線を使用
した列車 K(i); i〜1◆l駅間許容列車数jk(i、j、
k): 3列車のに木前にi駅を出発した列車U (交
1.Q2.n1.n2): n 1両の11種別列車が
n2両のfL2種別列車につながる時の折返しパターン
n (j)二j列車の編成両数 1u(j): 3列車の前運用列車 U (i、u): i駅でのパターンUの最小折返し時
間とする。
a (i, j): Queue time d (i
, j): Departure time of the 3 trains at station i A(i, j): Arrival time of igj train on the train schedule D(i, j): Departure time of train j at i station on the train diagram Rri, I ): i w
Minimum running time S (i, l) for exchange trains between i+1 stations
:i Minimum running time for Class 1 trains in IR (j): Class 3 trains ha C11,! ;L2): Time interval pattern when a type 2 train arrives following a #11 train bundle hd (interval 1.Q2): Time interval pattern when a type 122 train departs following a class 1?111 train hb (also l9 sentence 2) 2nd type fL1 train followed by type Q
Time interval pattern H(i
, h): Minimum time interval ja at time interval pattern h at station i
(i, j) = train jd(
i, j): Train jb(i
, j): Train K(i) that used the i station arrival number of 3 trains immediately before the 3 trains; Allowable number of trains between i~1◆l stations jk(i, j,
k): Train U departed from i station in front of Kimae in 3 trains (traffic 1.Q2.n1.n2): n Turnaround pattern when a 1-car 11-class train connects to an n2-car fL2-class train n ( j) Number of cars in the formation of 2 j trains 1u (j): 3 trains in advance of operation U (i, u): Minimum turnaround time for pattern U at station i.

列車の駅到着、出発という各イベントを点で表わし、制
約条件により規定されるイベント間の関係を枝で表現す
ることにより1列車運行を有向グラフで表現する。
One train operation is expressed as a directed graph by representing each event such as a train's arrival and departure from a station as a point, and by representing the relationship between events defined by constraint conditions as an edge.

グラフの改を マa(i、jf):j列車がi駅に到着するというイベ
ントマd(i、jf):3列車がi駅に出発するという
イベントとする七、制約条件は次の様に有向枝で表現す
ることができる。
Let the graph change be the event that a (i, jf): j train arrives at i station, and the event that ma (i, jf): 3 train departs from i station.7.The constraint conditions are as follows. can be expressed as a directed branch.

走行時間、停車時間に関する条件は、列車ダイヤで規定
される列車の走行ルートを表わす次の走行ルート枝で表
現される。
Conditions regarding running time and stopping time are expressed by the following running route branch representing the train running route defined by the train diagram.

枝(vd(i、j)、va(i+1.j) ) 、重み
R(i、1(j) )枝(va(i、j)、vd(i、
j) ) 、 kみS (i、fLU) )また、ダイ
ヤ上の着発時刻により制約はダミーの基準点マ0を設定
することにより次の基準時刻枝枝(マ0.マd(i、D
) 、重みD(i、j、)枝(マ0.マa(i、j))
 、重みA (i、j、)で表わされる。ざらに時隔に
よる制約は出発(到:i)順序枝 枝(マd(i、jd(i、j)) 、マd(i、j))
重みH(i、hd(交(jd(i、j))、文(jl)
)枝(マa(i、ja(i、j)) 、マa(i、j)
)重みH(i、ha(1(ja(i、j))、交(j)
))枝(マd(i、jb(i、jD 、va(i、j)
)屯みH(i、hb(1(jb(i、j))、u U)
))で表わされる。また、駅間許容列*数による制約は
次の駅間列車数校 枝(va(i+1.jk(i、j、k(i)))、vd
(i、j))  、重みOで表わされ、(4)式の折返
し時間に関する制約は1次の車両運用枝 枝(マari、ju(D) 、マd(i、j))セみU
 (i、u(31(ju(D)、交rj)、n(ju(
j))、n(jN)で衷わされる。
Edge (vd(i,j), va(i+1.j)), weight R(i,1(j)) edge(va(i,j), vd(i,
j)), kmiS (i, fLU)) Also, by setting a dummy reference point Ma0, the constraints are set according to the arrival and departure times on the timetable, so that the next reference time branch (Ma0.Mad(i, D
), weight D(i, j,) branch (ma0.maa(i,j))
, weight A (i, j,). Roughly speaking, the constraints due to time intervals are: departure (arrival: i) order branch (ma d (i, j d (i, j)), ma d (i, j))
Weight H(i, hd(intersection(jd(i,j)), sentence(jl)
) branch (ma(i, ja(i, j)), ma(i, j)
) weight H(i, ha(1(ja(i,j)), intersection(j)
)) branch(ma d(i, jb(i, jD , va(i, j)
) H(i, hb(1(jb(i,j)), u U)
)). In addition, the constraint based on the number of permissible rows between stations is the following number of trains between stations (va (i + 1.
(i, j)), weight O, and the constraint on the return time in equation (4) is expressed by the first-order vehicle operation branch (maari, ju(D), mad(i, j)). U
(i, u(31(ju(D), intersection rj), n(ju(
j)), n(jN).

2、矛盾検出方式 列車ダイヤにおける各列車の着発時刻が運転条件を満た
しているならば、h記グラフにおいて基準点から各市ま
での最長経路を求めた時、各点の最長経路長は1列車ダ
イヤにおける着発時刻に一致する。したがって、&準へ
から各点までの最長経路長を求め、それを列車ダ・Cヤ
の着発時刻と照合することにより、運転条件に対する矛
盾箇所を検出することができる。
2. Conflict detection method If the arrival and departure times of each train in the train schedule satisfy the operating conditions, then when finding the longest route from the reference point to each city on the graph in h, the longest route length at each point is one train. Matches the arrival and departure times in the timetable. Therefore, by finding the longest route length from & to each point and comparing it with the arrival and departure times of trains DA and C, it is possible to detect inconsistencies with the operating conditions.

最長経路を求める際にはまずグラフのトボロジカルソー
トが行なわれる。グラフにサイクルが存在中る場合は、
列車ダイヤにおける因果関係に矛盾があり、列車走行に
デッドロックが発生することを意味する。これはトポロ
ジカルソートの際に検出され サイクルを構成する枝に
より、デッド口・νりの原因であるダイヤ上の矛盾箇所
が検出される。
When finding the longest path, a tobological sort of the graph is first performed. If there are cycles in the graph,
This means that there is a contradiction in the cause-and-effect relationships in the train schedule, resulting in a deadlock in train operation. This is detected during topological sorting, and the branches that make up the cycle detect contradictory points on the diagram that are the cause of dead ends and curves.

この時、一旦処理を中+トし、まず矛盾箇所を修正し、
その結果アサイクリックグラフとなり、トポロジカルソ
ートが終了したならば、次に各点の最長経路長を求める
。なお、ダイヤ上の因果関係の矛盾検出のみを目的とす
る場合は、これで処理終了であり、また、グラフも枝の
重みは必要なく、接続関係のみで良い。
At this time, once the process is turned down, first correct the inconsistencies,
The result is an acyclic graph, and once the topological sorting is completed, the longest path length of each point is then determined. Note that if the purpose is only to detect contradictions in causal relationships on the diagram, the process is finished, and edge weights are not necessary for the graph, and only connection relationships are sufficient.

各点の最長経路長はトポロジカルオーダーを用いること
により容易に求められる。最長経路を求める計算量は、
トポロジカルソートも含めて、0 (IVl+ IE 
l) である(V:点の集合、E:枝の集合)。
The longest path length of each point can be easily determined by using topological order. The amount of calculation to find the longest route is
Including topological sort, 0 (IVl+ IE
l) (V: set of points, E: set of edges).

なお、上記実施例では、マンマシンで対話形式を使用す
る場合について述べたが、他の計算機プログラムの一部
として、自動的に使用してもよい、また、H記実施例で
は、トポロジカルソートと最長経路探索を続けて行なう
ことにより、列車ダイヤにおける因果的矛盾と時間的矛
盾の両方を検出子る場合について述べたが、一方のみに
適用することもできる。
In addition, although the above embodiment describes the case where the interactive format is used in a man-machine, it may also be used automatically as part of another computer program. Although we have described a case in which both causal contradictions and temporal contradictions in a train schedule are detected by continuously searching for the longest route, it is also possible to apply this method to only one of them.

〔発明の効果〕〔Effect of the invention〕

以上のように、この発明によれば、列車運行をグラフに
表現し、グラフにおけるトポロジカルソートと最長経路
探索を行なうことにより、列車ダイヤにおける因果的矛
盾と時間的矛盾を体系的にかつ効率的に検出することが
できるという効果がある。
As described above, according to the present invention, by representing train operations in a graph and performing topological sorting and longest route search on the graph, causal contradictions and temporal contradictions in train schedules can be systematically and efficiently resolved. This has the effect of being able to be detected.

【図面の簡単な説明】[Brief explanation of the drawing]

図はこの発明の一実施例による列車のダイヤ矛盾検出方
式の処理概要図である。 Aはlslの手段、Bは第2の手段、Cは第3の手段で
ある。 A:11め季挾 B;唱2の8投 C:唱3の◆没 手続補正書。CI自発?’ 13 昭和  年  月  日 2、発明の名称 列車ダイヤ矛盾検出方式 3、補正をする者 事件との関係 特許出願人 住 所    東京都千代田区丸の内二丁目2番3号名
 称  (601)三菱電機株式会社代表者志岐守哉 4、代理人 住 所     東京都千代田区丸の内二丁目2番3号
5、補正の対象 明細書の発明の詳細な説明の欄、及び図面の簡単な説明
の欄。 6、補正の内容 (1)明細書第2頁第13行の「とらえており、タ雫車
ダイヤ変更」という記載を次の通り補正する。 [とらえており、列車ダイヤ全体に対し矛盾検出を行な
う方式と、列車ダイヤ変更」 (2)明細書第3頁第10行の「繁雑めあ」という記載
を「繁雑であ」と補正する。 (3)明細書第3頁第11行の「リアルタイム」という
記載を「リアルタイム」と補正する。 (0明細書第6頁w49行の「列車ダイケヤ」という記
載を「列車ダイヤ」と補正する。 (5)明細書第9頁第1行及び第2行のr jfJとい
う記載をそれぞれ「j」と補正する。 (6)明細書第9頁第2行の「i駅に出発」という記載
を「i駅を出発」と補正する。 (7)明細書第9頁第1O行の「時刻により」という記
載を「時刻による」と補正する。 (8)明細書第1O頁第6行の「(0式の」という記載
を削除する。 (8)明細書第12頁第1行の「を使用する」という記
載を「において使用する」と補正する。 (10)明細書第12頁第18行の[列車のダイヤ」と
いう記載を「列車ダイヤ」と補正する。 以  上
The figure is a processing outline diagram of a train timetable contradiction detection method according to an embodiment of the present invention. A is the lsl means, B is the second means, and C is the third means. A: 11th Mekisen B; Sho 2's 8 Throw C: Sho 3's ◆Death Procedures Amendment. CI spontaneously? ' 13 Showa Year, Month, Day 2, Invention Name Train Schedule Inconsistency Detection Method 3, Relationship with the Amendment Person Case Patent Applicant Address 2-2-3 Marunouchi, Chiyoda-ku, Tokyo Name (601) Mitsubishi Electric Stock Company representative Moriya Shiki 4, agent address 2-2-3-5 Marunouchi, Chiyoda-ku, Tokyo, detailed description of the invention and brief description of the drawings in the specification to be amended. 6. Contents of the amendment (1) The statement ``We are catching up and the drop-down car schedule has been changed'' on page 2, line 13 of the specification will be amended as follows. [A system that detects contradictions on the entire train schedule and changes to train schedules] (2) The statement ``complex'' on page 3, line 10 of the specification is corrected to ``complicated.'' (3) The statement "real time" on page 3, line 11 of the specification is corrected to "real time." (0) Correct the description “Train Daikeya” on page 6, line w49 of the specification to “train schedule.” (6) The statement "departs from i station" on page 9, line 2 of the specification is amended to "departs from i station". (7) "Departs from i station" on page 9, line 1 O of the specification. ” is corrected to “depending on the time.” (8) The statement “(of formula 0”) on page 10, line 6 of the specification is deleted. (8) The statement “(of formula 0)” on page 12, line 1 of the specification is amended. (10) The statement "Train schedule" on page 12, line 18 of the specification is amended to "Train schedule."

Claims (1)

【特許請求の範囲】[Claims] 列車ダイヤに関する情報を有向グラフによって表現する
第1の手段と、この第1の手段において作成された有向
グラフに対するトポロジカルソートを行なってグラフ上
のサイクルを検出する第2の手段を設けて列車ダイヤの
矛盾を検出するとともに、運転条件をグラフの枝として
表現しグラフの1点から各点までの最長経路長を求める
第3の手段を設けることにより、運転条件に矛盾した列
車ダイヤ時刻を検出することを特徴とする列車ダイヤ矛
盾検出方式。
A first means for expressing information regarding the train schedule by a digraph, and a second means for detecting cycles on the graph by performing topological sorting on the digraph created in the first means are provided to eliminate inconsistencies in the train schedule. In addition, by providing a third means to express the operating conditions as branches of the graph and find the longest route length from one point to each point on the graph, it is possible to detect train schedule times that are inconsistent with the operating conditions. A method for detecting train schedule discrepancies.
JP60077011A 1985-04-11 1985-04-11 Railway schedule contradiction detection system Pending JPS61235264A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP60077011A JPS61235264A (en) 1985-04-11 1985-04-11 Railway schedule contradiction detection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP60077011A JPS61235264A (en) 1985-04-11 1985-04-11 Railway schedule contradiction detection system

Publications (1)

Publication Number Publication Date
JPS61235264A true JPS61235264A (en) 1986-10-20

Family

ID=13621813

Family Applications (1)

Application Number Title Priority Date Filing Date
JP60077011A Pending JPS61235264A (en) 1985-04-11 1985-04-11 Railway schedule contradiction detection system

Country Status (1)

Country Link
JP (1) JPS61235264A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007196880A (en) * 2006-01-27 2007-08-09 Toshiba Corp Yard work planning system, method and program

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007196880A (en) * 2006-01-27 2007-08-09 Toshiba Corp Yard work planning system, method and program

Similar Documents

Publication Publication Date Title
Nash et al. Railroad simulation using OpenTrack
Liu et al. Scheduling trains as a blocking parallel-machine job shop scheduling problem
Aripov et al. Simulation modeling of train traffic based on GIS technologies
JP5044021B2 (en) Driving arrangement support system and method
Giacco et al. Short-term rail rolling stock rostering and maintenance scheduling
Dessouky et al. A simulation modeling methodology for analyzing large complex rail networks
Radtke et al. Automated planning of timetables in large railway networks using a microscopic data basis and railway simulation techniques
US20160210884A1 (en) Reorganizing display of a railway timetable diagram
Kang et al. Decisions on train rescheduling and locomotive assignment during the COVID-19 outbreak: A case of the Beijing-Tianjin intercity railway
Baugher Simulation of yard and terminal operations
Yıldırım et al. Scheduling of the shuttle freight train services for dry ports using multimethod simulation–optimization approach
JPS61235264A (en) Railway schedule contradiction detection system
Thulasi et al. State of the Art of Dynamic Value Stream Mapping in the Manufacturing Industry
Pater et al. The use of a template-based methodology in the simulation of a new cargo track from Rotterdam harbor to Germany
JP5386438B2 (en) Track conflict detection device
Kavička et al. Analysis and optimization of railway nodes using simulation techniques
JPS61138343A (en) Event simulation system
Alwadood et al. Mathematical rescheduling models for railway services
Bocewicz et al. Reduction of congestion in transport networks with a fractal structure
JP2864708B2 (en) Train diagram making equipment
JPH0764257B2 (en) Train rescheduling plan creation device
Tolujew et al. Dynamic model of the passenger flow on Rail Baltica
JP6889130B2 (en) Operation control support system and operation control support method
JP2814865B2 (en) Diamond creation support system
JPH07182177A (en) Support system for acquisition of knowledge