JPS6073915A - Method of mounting dowel of offshore concrete platform - Google Patents

Method of mounting dowel of offshore concrete platform

Info

Publication number
JPS6073915A
JPS6073915A JP17997283A JP17997283A JPS6073915A JP S6073915 A JPS6073915 A JP S6073915A JP 17997283 A JP17997283 A JP 17997283A JP 17997283 A JP17997283 A JP 17997283A JP S6073915 A JPS6073915 A JP S6073915A
Authority
JP
Japan
Prior art keywords
dowel
platform
dock
guide
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP17997283A
Other languages
Japanese (ja)
Inventor
Masanao Sakate
坂手 正直
Shigeru Arai
茂 新井
Satoshi Takatani
高谷 智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Penta Ocean Construction Co Ltd
Original Assignee
Shimizu Construction Co Ltd
Penta Ocean Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Penta Ocean Construction Co Ltd filed Critical Shimizu Construction Co Ltd
Priority to JP17997283A priority Critical patent/JPS6073915A/en
Publication of JPS6073915A publication Critical patent/JPS6073915A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/02Caissons able to be floated on water and to be lowered into water in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)

Abstract

PURPOSE:To build a platform in a dock of a shallow draft, by a method wherein a platform having a dowel-mounting guide is built within a dock, and the dowel is secured to the platform outside the dock. CONSTITUTION:In a dick, a platform B, formed with a floor plate 2, a bottom plate 3, side walls 4, reinforcing walls 5, a skirt 6, and a dowel-mounting guide 9 having a hollow part 9a vertically extending from the floor plate 2 to the bottom plate 3, is built. Thereafter, after the platform B is pulled out of a dock, a dowel 10 made of concrete, having a packer 11 serving as a sealing member for preventing leak of mortar, is inserted into a guide 9. After the dowel is positioned in a condition that it is projected by a given length from the bottom plate 3, a space between the guide 9 and the dowel 10 is filled with mortar 12 having unshrinkability to secure the dowel 10 to the guide 9. This, since the dowel 10 is secured to the platform B outside the dock, permits building of the platform in a dock of a shallow draft.

Description

【発明の詳細な説明】 この発明は、石油掘削用等のコンクリ−) +ti7海
洋プラットフォームにおいて、海底に貫入されてアンカ
ーとなるダウェルをプラットフォームに取付ける方法に
関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for attaching a dowel, which penetrates into the seabed and serves as an anchor, to the platform in a concrete offshore platform for oil drilling and the like.

コンクリート製海洋プラットフォームの据付は方法の1
つとして、従来、@1図(イ)、(ロ)に示す如きダウ
ェル1を用いる方法がある。プラットフォームの<X造
は通常ドライドツクで鳴工されるが、従来のプラットフ
ォームlet、床版3、側壁4、開法めに用いる棒状の
ダウェルlもまた、ドック内において底版3と一体に形
成されていた。
Installation of concrete offshore platform is method 1
One of the conventional methods is to use a dowel 1 as shown in Figures 1 (a) and (b). The <X structure of the platform is usually constructed with a dry dock, but the conventional platform let, floor slab 3, side walls 4, and rod-shaped dowel l used for opening the deck are also formed integrally with the bottom slab 3 inside the dock. Ta.

このようにドック内においてダウェル1が取り付けられ
たプラットフォームAの据付けは、プラットフォーム人
をドックからり1き出し、船で引いスト水7を注入して
その重量によりダウェルlを海底8に若干貫入して、プ
ラットフォームAを161定し、次いで、プラットフォ
ームAが正規の位置にあることを確′詔した彼、第1図
(ロ)の如く、バラスト水7をさらに注入してプラット
フォームへの沈設据付けな行うものである。
In order to install the platform A with the dowel 1 attached inside the dock, the platform person is removed from the dock, and the ship injects evacuated water 7, which causes the dowel 1 to penetrate slightly into the seabed 8 due to its weight. Then, after confirming that platform A was in the correct position, he injected more ballast water 7 and installed it on the platform, as shown in Figure 1 (b). It is something to do.

前記の如〈従来は、ドック内においてダウェル1をプラ
ットフォームAK取り付けていたので、ダウェル1によ
る高さ増加分だけドックの必要水深が深くなること、底
版2借、築の支保工が大規模となること等の欠点があっ
た。また、ドックから引き出した後に洋上でダウェル1
を底版2に取り付けることは、潜水作業が伴うためその
施工は困難である。
As mentioned above, in the past, the dowel 1 was attached to the platform AK inside the dock, so the required water depth of the dock became deeper by the height increase due to the dowel 1, and the need for 2 bottom slabs and a large-scale construction shoring was required. There were some drawbacks. In addition, after pulling out from the dock, the dowel 1
Attachment to the bottom plate 2 is difficult because it involves diving work.

この発明は1上記事情に鑑みてなされたもので、ダウェ
ルをドック内でプラットフォームに取り付けることを要
せず、かつ、潜水作業を伴うことなく行うことが可能で
、ダウェル取付は啼工を著しく簡略化したコンクリート
製海洋プラットフォ゛−ムのダウェル取付は方法を提供
することを目的とするもので、その特徴とするところは
、ドック内において、コンクリート製のプラットフォー
ムにプラットフォームを上下に貫j通する筒状中空部を
持つダウェル取付は用ガイドを形成し、このプラットフ
ォームをドックから引き出した後に、前記ダウェル取付
は用ガイドの筒状中空部にアンカーとなる棒状のダウェ
ルを挿入し、このダウェルをプラットフォームに取り付
けるところにある。
This invention was made in view of the above-mentioned circumstances.It is not necessary to attach the dowel to the platform in the dock, and it can be done without diving work, and the dowel installation significantly simplifies the construction work. Dowell Installation of Concrete Marine Platforms is intended to provide a method for dowel mounting of concrete offshore platforms, which features: A dowel mounting having a cylindrical hollow part forms a guide, and after pulling out this platform from the dock, the dowel mounting inserts a rod-shaped dowel serving as an anchor into the cylindrical hollow part of the dowel guide, and then attaches this dowell to the platform. It is located where it is attached.

以下、本発明の実施例を第2図以下の図面に従って説明
する。
Embodiments of the present invention will be described below with reference to the drawings from FIG. 2 onwards.

第2図において、第1図と共通する部分には同じ記号を
付して説明すると、本発明におけるプラットフォームB
J−j、プラットフォームBを床版2から底版3まで上
下に貫通する中空部9&を持つダウェル取付は用ガイド
9を備えている。このダウェル取付は用ガイド9は、ド
ライドツク内において、床版2、底版3、側壁4、補強
壁5、スカート6とともに、鉄筋コンクリートで一体に
形成する。
In FIG. 2, parts common to those in FIG. 1 are designated by the same symbols. Platform B in the present invention
J-j, the dowel mounting guide 9 is provided with a hollow part 9 & which vertically passes through the platform B from the floor slab 2 to the bottom slab 3. The dowel mounting guide 9 is integrally formed with the floor slab 2, bottom slab 3, side wall 4, reinforcing wall 5, and skirt 6 from reinforced concrete in the dry dock.

ダウェル取付は用ガイド9を形成したt)tI記プラッ
トフォームBをドックから引き出した後、プラットフォ
ームBの高さより所要の長さだけ長い鋼管製のダウェル
10をクレーン船のクレーンで吊って、これを前記ダウ
ェル取付は用ガイド9内に挿入し、かつ、底版3から所
要の長さだけ突出するようにダウェル1oを位置決めす
る。なお、この際、ダウェル10には、モルタル漏洩防
止のためのシール部材であるバッカー11をあらかじめ
取り付けておき、このバッカー11がダウェル取付は用
ガイドOの内面とダウェル10の外面との間隙の底版3
付近を塞閉するようにしておく。次いで、ダウェル取付
は用ガイド9とダウェル10との間隙に無収縮モルタル
12を充填し、ダウェル10をダウェル取付は用ガイド
9に固定する。
The dowel installation was carried out using a guide 9. t) After pulling out the platform B from the dock, a dowel 10 made of steel pipe that is longer than the height of the platform B by the required length was hung by a crane on a crane ship, and then To attach the dowel, the dowel 1o is inserted into the guide 9 and positioned so that it protrudes from the bottom plate 3 by a required length. At this time, a backer 11, which is a sealing member for preventing mortar leakage, is attached to the dowel 10 in advance. 3
Make sure to block off the area. Next, the gap between the dowel mounting guide 9 and the dowel 10 is filled with non-shrinkage mortar 12, and the dowel 10 is fixed to the dowel mounting guide 9.

上記プラットフォームBの据付は方法は、第1図(イ)
、(ロ)で説明した方法と同様に行うことができる。す
なわち、洋上の据付は現場まで船で運び、測量によシブ
ラットフオームBの位置決めをし、iI図(イ)と同様
に、バラスト水を注入してその重量によりダウェル10
を海底に若干貫入してプラットフォームBを固定し、次
いで、1プラツトフオームBが正規の位置にあるーこと
を確認した徒、第1図(ロ)と同様にバラスト水をさら
に注入してプラットフォームBの沈設据付けを行う。
The method for installing the platform B above is shown in Figure 1 (a).
This can be done in the same way as the method described in (b). In other words, for installation at sea, the Sibrat Form B is transported to the site by ship, the position of Siblat Form B is determined by surveying, and as in Figure II (a), ballast water is injected and the dowel 10 is
After confirming that platform B is in the correct position, inject more ballast water into the platform as shown in Figure 1 (b). Perform submerged installation of B.

なお、ダウェル10のダウェル取付は用ガイド9への固
定は、通常はドックから引き出した段階にて行うが、据
付は現場迄の水深が浅くてダウェルIOの突出が移動に
支障となる場合には、据付は現場にて行うことも可能で
ある。
Note that the dowel 10 is usually fixed to the dowel guide 9 when it is pulled out from the dock, but installation may be done in cases where the depth of the water to the site is shallow and the protrusion of the dowel IO poses an obstacle to movement. , installation can also be done on-site.

また、ダウェル10の長さは、ダウェル取付はガイド9
への同定作業が可能であれば、実嘱例のものより短くし
てもよい。
Also, the length of the dowel 10 is the same as the guide 9 when installing the dowel.
If the identification work is possible, it may be shorter than the actual example.

第3図はモルタル充填を行わない他の実施例を示すもの
で、前述のプラットフォームBをドックから引き出した
徒に、同じくクレーン船により鋼管のダウェル10をダ
ウェル取付は用ガイド9に挿入するが、この実施例の場
合、モルタル充填の代わりに、例えば、ベノトエ法にお
けるJJ動■装として用いる油圧ジヤツキ13を床版2
に固定し、この油圧ジヤツキ13でダウェル10を掴ん
で、ダウェル10をプラットフォームBに取り付けるも
のである。
Fig. 3 shows another embodiment in which mortar filling is not performed, in which the aforementioned platform B is pulled out from the dock and a steel pipe dowel 10 is inserted into the dowel installation guide 9 using the same crane ship. In the case of this embodiment, instead of filling mortar, for example, a hydraulic jack 13 used as a JJ moving device in the Benotoe method is used to fill the floor slab 2.
The dowel 10 is fixed to the platform B by gripping the dowel 10 with this hydraulic jack 13.

この実施例の場合、モルタル充填を行わないので、ダウ
ェル10を所望の突出長にする作業を任意の段階できわ
めて容易に行うことができる。したがって、プラットフ
ォームBの据付は方法としては、プラットフォームBを
ドックからσ1き出した段階では、第3図に実線で示す
如くダウェル10を底版3から突出しない状態で油圧ジ
ヤツキ13で保持し、据付は現場に移動した後、油圧ジ
ヤツキ13により降下させて2点f?2Ijlで示す如
く所要の底版3からの突出長に位置決めし、その後前述
の実施例と同様に(したがって、第1図(イ)、および
第1図(ロ)の手順と同様にコして、プラットフォーム
Bを沈設据付けることができる。なお、据付は後は油田
ジヤツキ13によるダウェル10の掴みを解放しても支
障はない。
In the case of this embodiment, since no mortar filling is performed, the work of making the dowel 10 have a desired protrusion length can be carried out very easily at any stage. Therefore, the method for installing platform B is to hold the dowel 10 with the hydraulic jack 13 in a state in which it does not protrude from the bottom plate 3, as shown by the solid line in FIG. After moving to the site, it was lowered using the hydraulic jack 13 to reach 2 points f? 2Ijl, position it at the required protrusion length from the bottom plate 3, and then follow the same steps as in the previous embodiment (therefore, the same steps as in FIG. 1(A) and FIG. 1(B)). The platform B can be installed by submerging it.In addition, there is no problem even if the grip of the dowel 10 by the oil field jack 13 is released after the installation.

したがって、据付は現場迄の水深が浅くて、ダウェル1
0を突出させていたら移動に支障がある場合に、きわめ
て有効である。なお、第2図の実施例の場合でも据付は
現場でダウェルlOを床版3から突出固定することも可
能であるが、この実施例では油圧ジヤツキ13を用いる
ので、ダウェル10を挿入し降下位置決めするためのク
レーン船を据付は現場で必要とせず、作業がより能率的
である。
Therefore, the water depth to the site was shallow and the installation was carried out in dowel 1.
This is extremely effective in cases where having the 0 protruding would impede movement. In the case of the embodiment shown in Fig. 2, it is also possible to install the dowel 10 on site by protruding and fixing it from the floor slab 3, but in this embodiment, the hydraulic jack 13 is used, so the dowel 10 is inserted and lowered into position. There is no need to install a crane ship on site for the purpose, making the work more efficient.

また、バラスト水を注入してダウェル10を若干m海底
に貫入する位置決め(すなわち、第1図(イ)の如き状
態)が正規の位U′7になされなかった場合には、油圧
ジヤツキ13でダウェル10を引き抜くことができるの
で、再度位11!決めを行う作¥3がきわめて容易で、
何回でも行うことができる。
In addition, if the dowel 10 is not positioned at the correct position U'7 by injecting ballast water and penetrating the seabed for a few meters (that is, the state shown in FIG. 1 (a)), the hydraulic jack 13 Since you can pull out Dowell 10, it's 11 again! The task of making decisions is extremely easy,
You can do this as many times as you like.

また、上記据付は手順において、バラスト水の注入を行
わずにプラットフォームBを浮かした伏DJ4にて、油
圧ジヤツキ13によりダウェル10を降下させてダウェ
ル10を海底に若干量R人し、プラットフォームBが正
規の位置にあることを確認した後、バラスト水を注入し
てプラットフォームBを沈設据付けることもできる。こ
の場合(は、バラスト水を2段階に分けて注入すること
を要しないので、据付は作業が能率的となる。
In addition, in the above installation procedure, the dowel 10 is lowered by the hydraulic jack 13 with the DJ 4 floating the platform B without injecting ballast water, and the dowel 10 is placed slightly on the seabed. After confirming that it is in the correct position, ballast water can be injected and platform B can be submerged and installed. In this case, it is not necessary to inject ballast water in two stages, making the installation process more efficient.

なお、実施例のプラットフォームは石油掘削用のもので
あるが、他の用途の海洋プラットフォームにも適用でき
ること番ま勿t)亀である。
Note that although the platform in this embodiment is for oil drilling, it is of course applicable to offshore platforms for other uses as well.

以上説明したように未発明の方法は、ドック内において
プラットフォームに筒状のダウェル取付は用ガイドを形
成し、このプラットフォームをドックから引き出した後
に、前記ダウェル取付は用ガイド内にダウェルを挿入し
、プラットフォームに取り付けるものもあるから、従来
の如くドック内でダウェルをプラットフォームと一体に
形成するものと具なり、ドック内で建造するプラットフ
ォームの高さが無用に高くならず、したがって、従来よ
り浅い水深のドックで建造することができ、かつ、底版
横座のための支保工が従来より小規模で済み、プラット
フォーム建造が著しく容易となり、工数削減、工期短縮
、コスト低減が大幅に実現された。また、プラットフォ
ーム据付は現場迄の水深が浪い場合には、据付は現場に
移動した後にダウェルをプラットフォームに取り付ける
ことが可能であり、かつ、そのダウェル取付は作業は潜
水作業を伴わずに行うことができ、水深が浅い場合の対
策が著しく fij略化された。
As explained above, the uninvented method forms a cylindrical dowel mounting guide on the platform in the dock, and after pulling out the platform from the dock, inserting the dowel into the dowel mounting guide, Since some of the dowels are attached to the platform, the dowells are formed integrally with the platform inside the dock as in the past, and the height of the platform built inside the dock does not become unnecessarily high. It can be built on a dock, and the shoring for the bottom slab is required on a smaller scale than before, making platform construction much easier, and significantly reducing the number of man-hours, construction period, and cost. In addition, if the water depth to the platform installation site is large, it is possible to install a dowel on the platform after moving to the site, and the dowel installation must be performed without diving work. This greatly simplified the measures to be taken when the water is shallow.

【図面の簡単な説明】[Brief explanation of the drawing]

第1閃(イ)、(ロ)は従来のダウェル取付は方法によ
るプラットフォームの据付は方法説明m、第21aは本
発明の一実施例を示すプラットフォームの断面図、第3
図は他の実施例を示すプラットフォームの断面図である
。 B・・・・・プラットフォーム、2・・・・・床版、3
・・・・・底版、4・・・・・側壁、6・・・・・ ス
カート、9・・・・・ダウェル取付は用ガイド、9&・
・・・・中空部、10・・・・・ダウェル、11・・・
・・バッカー、12・・・・・無収縮モルタル、13・
・・・・油圧ジヤツキ。 第1゜ (ろ) 図 (8ン
1st flashes (a) and (b) are explanations of the method for installing the platform using the conventional dowel mounting method, 21a is a sectional view of the platform showing an embodiment of the present invention, and 3rd flash is
The figure is a sectional view of a platform showing another embodiment. B... Platform, 2... Floor slab, 3
...Bottom plate, 4...Side wall, 6...Skirt, 9...Dowell installation guide, 9 &...
...Hollow part, 10...Dowell, 11...
...Backer, 12...Non-shrinkage mortar, 13.
...Hydraulic jack. 1st °(ro) Figure (8n)

Claims (1)

【特許請求の範囲】 ドック内において、コンクリート製のプラットフォーム
にプラットフォームを上下に貫通する筒状中空部を持つ
ダウェル取付は用ガイドを形成し、このプラットフォー
ムをドックから引き出した後に、前記ダウェル取付は用
ガイドの筒状中空部にアンカーとなる棒状のダウェルを
挿入し、このダウェルをプラットフォームに取り付ける
ことを特徴とするコ〉/クリート製海洋プラットフォー
ムの。 ダウェル取付は方法。
[Claims] In a dock, a dowel mounting on a concrete platform having a cylindrical hollow part passing through the platform above and below forms a service guide, and after the platform is pulled out from the dock, the dowel mounting is installed on a concrete platform for use. A marine platform made of cleat, characterized in that a rod-shaped dowel serving as an anchor is inserted into the cylindrical hollow part of the guide, and the dowel is attached to the platform. Dowel installation method.
JP17997283A 1983-09-28 1983-09-28 Method of mounting dowel of offshore concrete platform Pending JPS6073915A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17997283A JPS6073915A (en) 1983-09-28 1983-09-28 Method of mounting dowel of offshore concrete platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17997283A JPS6073915A (en) 1983-09-28 1983-09-28 Method of mounting dowel of offshore concrete platform

Publications (1)

Publication Number Publication Date
JPS6073915A true JPS6073915A (en) 1985-04-26

Family

ID=16075196

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17997283A Pending JPS6073915A (en) 1983-09-28 1983-09-28 Method of mounting dowel of offshore concrete platform

Country Status (1)

Country Link
JP (1) JPS6073915A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02240318A (en) * 1989-03-13 1990-09-25 Yasunobu Tomoto Artificial ground construction to be constructed on water surface

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5428223A (en) * 1977-08-04 1979-03-02 Nippon Chiyuutetsukan Kk Method of filling filler into small holes formed on mold flask for casting
JPS5611803A (en) * 1979-07-10 1981-02-05 Tokyo Electric Co Ltd Lamp fixture

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5428223A (en) * 1977-08-04 1979-03-02 Nippon Chiyuutetsukan Kk Method of filling filler into small holes formed on mold flask for casting
JPS5611803A (en) * 1979-07-10 1981-02-05 Tokyo Electric Co Ltd Lamp fixture

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02240318A (en) * 1989-03-13 1990-09-25 Yasunobu Tomoto Artificial ground construction to be constructed on water surface
JPH0423049B2 (en) * 1989-03-13 1992-04-21 Yasunobu Tomoto

Similar Documents

Publication Publication Date Title
US3987636A (en) Methods and apparatus for anchoring a submerged structure to a waterbed
US3483708A (en) Method of anchoring marine structures
JP2008208533A (en) Caisson and its construction method
JPS6073915A (en) Method of mounting dowel of offshore concrete platform
JP4311676B2 (en) Construction method using casing
JP2838324B2 (en) Shaft bottom water stoppage method
RU2180028C2 (en) Method of reconstruction of berthing facilities
JPH09209361A (en) Pilingh method in pit structure
JP2697558B2 (en) Independent mountain retaining wall method
JPH047780B2 (en)
JPH0285089A (en) Anchor for anchoring vessel and fixing construction for anchor onto sea bottom
CN114319320B (en) Temporary pier steel pipe pile and floating installation method thereof
JPH0323689B2 (en)
JP3378982B2 (en) Basic structure of underwater tunnel
JP2953823B2 (en) Construction method of offshore substructure
JP2855156B2 (en) How to build underground structures
JPH0340169B2 (en)
JP2008223391A (en) Repair reinforcement method for existing quay wall and its repair reinforcement structure
JP3132846B2 (en) Construction method of pile type offshore structure
SU1229264A1 (en) Method of constructing pile foundation
JPS6335767B2 (en)
SU947292A1 (en) Method of constructing an underwater foundation
ATE429545T1 (en) METHOD FOR CREATING AN ANCHORAGE UNDER AN EXISTING BUILDING
JPH10237875A (en) Method for installing caisson
JP2005030132A (en) Underwater foundation structure and underwater foundation construction method