JPS6067332A - Continuous loading machine - Google Patents
Continuous loading machineInfo
- Publication number
- JPS6067332A JPS6067332A JP15753184A JP15753184A JPS6067332A JP S6067332 A JPS6067332 A JP S6067332A JP 15753184 A JP15753184 A JP 15753184A JP 15753184 A JP15753184 A JP 15753184A JP S6067332 A JPS6067332 A JP S6067332A
- Authority
- JP
- Japan
- Prior art keywords
- rod
- sprocket
- bucket
- loading
- bulk materials
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G67/00—Loading or unloading vehicles
- B65G67/60—Loading or unloading ships
- B65G67/606—Loading or unloading ships using devices specially adapted for bulk material
Landscapes
- Engineering & Computer Science (AREA)
- Ocean & Marine Engineering (AREA)
- Aviation & Aerospace Engineering (AREA)
- Mechanical Engineering (AREA)
- Ship Loading And Unloading (AREA)
Abstract
Description
【発明の詳細な説明】
〔発明の利用分野〕
本発明は、ばら物月1の連続式荷投機械に関するもので
ある。DETAILED DESCRIPTION OF THE INVENTION [Field of Application of the Invention] The present invention relates to a continuous load dumping machine for bulk materials.
ばら物用の連続式荷投機械は、ばら物全・効率良くかつ
大能力用として、1j7川船を対象として利用されるこ
とが多い。(特開昭48−7396H−弓矢す14)例
えば、バージIil+1を対象とじrこ場合、ハツチが
一つである時に最も荷役効率が商い。しかし、パージ船
を対象とし1こ場合でも、パージ+1Ijtが太きくな
ると)IH)の強度」二の問題から船f¥に隔壁ケ設け
る必要がある。このようにすると、隔!1、旬y+を分
での掘削部昇降動作が必要で、また取扱物の取り+yし
かあるため、荷役効率の低下ケ来f二している。Continuous loading machines for bulk materials are often used on 1J7 riverboats to handle bulk materials efficiently and with large capacity. (Japanese Unexamined Patent Publication No. 48-7396H-Yumiyasu 14) For example, when targeting barge Iil+1, the cargo handling efficiency is highest when there is only one hatch. However, even in the case of a purge ship, if purge+1Ijt becomes thicker, it is necessary to install a bulkhead on the ship f\ due to the problem of the strength of IH). If you do this, you will get a gap! 1. It is necessary to move up and down the excavation part every 100 minutes, and the cargo handling efficiency is reduced because there is only 10 minutes to pick up the material to be handled.
特に、++yり残されrこはら物をかき集める作業は、
人力によるかまたはブルドーザ等’F I;fil内に
搬入して行うfコめ、荷疫効率低下の十ノ1:〔因とな
っている。In particular, the work of raking up the little things left behind is
Carrying out the work manually or by using a bulldozer or the like is one of the reasons for the decline in cargo efficiency.
本発明は、連続式荷投機械の荷役効率の向−J:、 ’
e1−=1的としTこものである。The present invention aims to improve the cargo handling efficiency of continuous loading machines.
It is assumed that e1-=1.
本発明は、パケットを案内する掘削部のスプロケットを
アームから2本の伸縮自在なロツドケ介して支持し、2
本の当該ロッドの1111 a−i 1こより」−1尼
スブロケソトケ仕急の4r7’、 iiTに設定するよ
うにしfこもので゛ある。In the present invention, the sprocket of the excavation part that guides the packet is supported from the arm via two telescopic rods, and
From 1111 a-i 1 of this rod of the book, it is necessary to set it to 4r7', iiT of the 1st part of the book.
以下、本発明を図面にJ□(つい−C説明する。第1図
は、本発明の一実施例の止面図/i2,1< u、第2
1ズ1は、第1図の(シη断面図を小しfこものである
。図において、ガーダJ上を横行するトロリー2からピ
ン3を介して回転自由に取付けたアーム4に、パケット
5がスプロケット6、7 、8 、9 ’e案内とじて
配置されたチェーン10を介して取付けられている。(
k11100スプロケット(3は、アーム4の先端部か
ら2本の伸縮自在なロッドII 、 12’、r介して
取付けられ、ロッド11および12の両端はおのおのピ
ン13 、14 、15および16にてアーム4および
スプロケット6の支持部材に回転目111にuv付(j
られている。Hereinafter, the present invention will be explained with reference to the drawings. Fig. 1 is a top view of one embodiment of the present invention /i2,1<u, second
1. The frame 1 is a small cross-sectional view of FIG. The sprockets 6, 7, 8, 9'e are attached via a chain 10 arranged together with the guide.
k11100 sprocket (3 is attached to the tip of arm 4 via two telescopic rods II, 12', r, and both ends of rods 11 and 12 are connected to arm 4 by pins 13, 14, 15 and 16, respectively). And on the support member of the sprocket 6, the rotating eye 111 is marked with UV (j
It is being
第2図に示すように、バージtilil 170)一つ
のI+i!i (イ内のほら物18を荷役中は、ばら物
18の掘削面のくずれiんちを防出するfこめロッドI
2ヲ伸ばし、一方ロッド117F縮めてパケット5の刃
先の掘削時の軌跡が図のな1区ゆるやかになるようにす
る1、この状態でスプロケット8金回1匠駆動すること
により、はら物18は図中矢印の方向−・運ばれて)ム
111シコンベヤ19に払出さALる、。As shown in Figure 2, the barge tilil 170) one I+i! i (During the loading and unloading of the loose objects 18 in
2. Extend the rod 117F, and shorten the rod 117F so that the trajectory of the cutting edge of the packet 5 when digging becomes gentle by 1 section as shown in the diagram. In the direction of the arrow in the figure, the ram 111 is delivered to the conveyor 19.
イ11f役力旬(みパージ:+liS!7の隔壁2旧こ
近つくと、第3図にボすη1区ロッド12をセf1め一
方、ロッド11ケ伸ばすことによりスプロケット67i
=先方に押し出し、掘削面でのパケット5の刃先の軌跡
が垂直になるようにすれば、隔壁21)而でσ月Jら物
18も始んど採取することがIjl fi目となる。When approaching the bulkhead 2 of +liS! 7, move the rod 12 of the 11th section shown in Fig.
= If you push it forward so that the trajectory of the cutting edge of the packet 5 on the excavation surface becomes perpendicular, then the bulkhead 21) and the σ month Jara material 18 will also be collected from the beginning.
」−述の如く本発明によれば、l(+;・j 11.%
のゐる人)!、リハージ船を対象とし1こ場合でも、1
6か:、i:H、yl(でθ矧V、 47&物の取り残
しが極めて少なくなる1こめ楠役効率の向上が図られ、
荷役設備そのものもににInにできるという効県がI)
る。”-As mentioned above, according to the present invention, l(+;・j 11.%
Noi person)! , even if the target is a rehabilitation ship, 1
6?:, i:H, yl (at θ 矧V, 47& The efficiency of the 1-kome Kusunoki role is improved by extremely reducing the number of items left behind,
The advantage is that the cargo handling equipment itself can be easily integrated.
Ru.
図面のlfi’i甲、な説明
第1図は本発明の一実施例の市面図、第2図はそのわ’
/+断面図、第;3図は隔A(1旬テ1りでの抹11V
状況を小す(1°l’i 14Ji面図である。Explanation of the drawings: Figure 1 is a city view of one embodiment of the present invention, and Figure 2 is a diagram of the same.
/+ Sectional view, Figure 3 is interval A (11V in 1st season)
Reduce the situation (1°l'i 14Ji side view).
1・・カーク 2・トロリー 4山ア 125・ハクー
ツト(i〜0 スブロケ、1・1()・・チェーン 1
1〜12・・ロッド17・・・バージ1沿 18 ばら
′向19・・・払出しコンベヤ 20・・・1(1“、
、、) sr;<代理人 弁理士 商 槁 明 夫
り図
6 /7
12図
?
−二1...Kirk 2.Trolley 4 mounts
1 to 12... Rod 17... Along barge 1 18 Bulk' direction 19... Unloading conveyor 20... 1 (1",
,,) sr; −2
Claims (1)
を案内する掘削部のスブロケットヲアームから2本の伸
縮自在なロッドを介して支持し、2本の当該ロッドの伸
1tiiにより上記スプロケットを任意の位置に設定す
るようにしrこことを特徴とする連続式荷投機械。1. In a continuous loading machine that handles bulk materials, the sprocket of the excavation part that guides the packet is supported via two telescopic rods from the arm, and the sprocket can be arbitrarily moved by the extension of the two rods. A continuous loading machine characterized by the following features:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15753184A JPS6067332A (en) | 1984-07-30 | 1984-07-30 | Continuous loading machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15753184A JPS6067332A (en) | 1984-07-30 | 1984-07-30 | Continuous loading machine |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS6067332A true JPS6067332A (en) | 1985-04-17 |
Family
ID=15651703
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP15753184A Pending JPS6067332A (en) | 1984-07-30 | 1984-07-30 | Continuous loading machine |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS6067332A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106005270A (en) * | 2016-07-28 | 2016-10-12 | 许后伟 | Bulk material collecting and discharging ship |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS525753A (en) * | 1975-07-01 | 1977-01-17 | Sumitomo Chem Co Ltd | Process for preparation of novel bicyclo(2,2,1)heptene derivatives |
-
1984
- 1984-07-30 JP JP15753184A patent/JPS6067332A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS525753A (en) * | 1975-07-01 | 1977-01-17 | Sumitomo Chem Co Ltd | Process for preparation of novel bicyclo(2,2,1)heptene derivatives |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106005270A (en) * | 2016-07-28 | 2016-10-12 | 许后伟 | Bulk material collecting and discharging ship |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS6067332A (en) | Continuous loading machine | |
US4889467A (en) | Tooling assembly for rod material | |
GB2004830A (en) | Apparatus for shovelling up and conveying bulk materials | |
JPS58167326A (en) | Carry-out device with bucket wheel for bulk load deposited | |
NO128859B (en) | ||
US3756369A (en) | Apparatus for stacking and reclaiming bulk material | |
JPH1144182A (en) | Moving frame and belt conveyor | |
US3155432A (en) | Digging machine | |
JP2607095B2 (en) | How to dig potatoes | |
JPH0797021A (en) | Soil and sand carrier equipment | |
JP2878662B2 (en) | Root crop harvester | |
JPS61221018A (en) | Excavating and cargo lifting device | |
AU2018200061A1 (en) | Bridge reclaimer | |
US1293132A (en) | Shoveling and loading apparatus. | |
US3107002A (en) | Conveyor system for large material removal areas | |
JP2934566B2 (en) | Harvester | |
JPS63112321A (en) | Conveyor loader | |
SU1752712A1 (en) | Grab bucket for loose materials | |
JPS595119Y2 (en) | Tunnel excavation soil removal device | |
JP2919222B2 (en) | Root cropper | |
RU2043012C1 (en) | Timber loading and unloading machine | |
JPH0647917B2 (en) | Segment feeder | |
JPS60223729A (en) | Bulk cargo yard | |
GB2078664A (en) | Silage supply truck | |
JPH05248195A (en) | Segment supply method of shield method |