JPS6059228A - Steel sheet pile sheathing work using stay steel sheet pile - Google Patents

Steel sheet pile sheathing work using stay steel sheet pile

Info

Publication number
JPS6059228A
JPS6059228A JP16650483A JP16650483A JPS6059228A JP S6059228 A JPS6059228 A JP S6059228A JP 16650483 A JP16650483 A JP 16650483A JP 16650483 A JP16650483 A JP 16650483A JP S6059228 A JPS6059228 A JP S6059228A
Authority
JP
Japan
Prior art keywords
steel sheet
sheet piles
driven
sheet pile
stay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP16650483A
Other languages
Japanese (ja)
Inventor
Yoshito Kimura
木村 好人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hazama Ando Corp
Original Assignee
Hazama Gumi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hazama Gumi Ltd filed Critical Hazama Gumi Ltd
Priority to JP16650483A priority Critical patent/JPS6059228A/en
Publication of JPS6059228A publication Critical patent/JPS6059228A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Abstract

PURPOSE:To perform sheathing work more simply and at lower cost than the other methods by a method in which steel sheet piles are driven in a circular from at given intervals, stay steel sheet piles are connectedly driven from the crossing points of circular arcs, anchors are provided on the final end, and the front of the circular steel sheet piles is excavated. CONSTITUTION:Steel sheet piles 1 for sheathing are connectedly driven in a circular form at given intervals in such a way as to extend the sheet piles toward the excavation side. Steel sheet piles 1 as stay steel piles 2 are driven connectedly from crossing points of the circular arcs. Anchor metals 3 are attached to the final ends of the stay steel sheet piles 2 and driven to the back of the active degradation angle, and then excavation is made to given subsoil. The load of the sheathing is offset by the tensile force of the steel sheet piles, and the tensile strength can be increased by the friction force of the surrounding ground.

Description

【発明の詳細な説明】 この発明は、土留工において所定間隔に掘削側に張り出
すように円孤状に土留鋼矢板として直線鋼矢板を連結し
打込み、各円弧の交点部より反対側に控え鋼矢板として
直線鋼矢板を連結して最終端部にアンカー金具を固着し
て一体に打込んだ後、所定地盤まで根切り施工する鋼矢
板土留工法に関する。
Detailed Description of the Invention In earth retaining work, straight steel sheet piles are connected and driven as earth retaining steel sheet piles at predetermined intervals so as to protrude toward the excavation side. This invention relates to a steel sheet pile earth retaining method in which straight steel sheet piles are connected as steel sheet piles, anchor fittings are fixed to the final ends, and the anchor fittings are fixed and driven into one piece, and then root cutting is carried out to a predetermined ground level.

従来、土留工における土留壁の安定には、腹起し、切梁
または土留アンカーを建込んで行われているが、この切
梁または土留アンカーの設置は、切梁またはアンカー設
置位置が施工できる位置まで&!切りを行ってから切梁
またはアンカーを行って土留壁の安定を図っている。こ
の場合、切梁またはアンカーを設置して、さらに切梁ま
たは土留アンカー設置位置下を掘削すると土留壁には掘
削にしたがって変形し、切梁または土留アンカーの荷重
が増加したり地表面の変形が大きくなる欠点があった。
Conventionally, the stabilization of earth retaining walls in earth retaining works has been carried out by raising the slope, installing struts or earth retaining anchors, but the installation of these struts or earth retaining anchors can be done at the position where the struts or anchors are installed. To the position &! After cutting, struts or anchors are installed to stabilize the retaining wall. In this case, if you install a strut or anchor and then excavate below the location where the strut or earth retaining anchor is installed, the earth retaining wall will deform due to the excavation, and the load on the strut or earth retaining anchor will increase and the ground surface will deform. There was a drawback to growing up.

この発明は、−上述の欠点を解決して掘削側に張り出す
ように円孤状の土留鋼矢板及び控え鋼矢板として直線鋼
矢板を連結して、その最終端部にアンカー金具を取付け
て打込む土留工法を提供するものである。
This invention solves the above-mentioned drawbacks and connects straight steel sheet piles as circular arc-shaped earth retaining steel sheet piles and bracing steel sheet piles so as to protrude toward the excavation side, and attaches anchor fittings to the final ends of the straight steel sheet piles. This method provides an earth retaining method that can be used in a variety of ways.

次に、この発明の実施例を図面に基づいて説明する。第
1図は、この発明の平面図、第2図は縦断面図、第3図
は控え鋼矢板とアンカー金具の取付は詳細図である。図
において、地盤左向に所定間隔に土留鋼矢板/として直
線Wi矢板を掘削側に張り出すように円孤状に連結して
打込み、各円弧の交点部乙から控え鋼矢板−として直線
鋼矢板を主働崩壊角の背面A−A線まで連結し打込み、
かつ控え鋼矢板2の最端部に平板状または凹形状のアン
カー金具3を固着して、(必要あれば補強M&を図示の
ように取付ける)一体として所定深さまで地盤Sに4〕
込む鋼矢板土留工法である。
Next, embodiments of the present invention will be described based on the drawings. FIG. 1 is a plan view of the present invention, FIG. 2 is a longitudinal sectional view, and FIG. 3 is a detailed view of the installation of the steel sheet pile and anchor fittings. In the figure, the straight Wi sheet piles are connected and driven in a circular arc so as to project toward the excavation side at predetermined intervals to the left of the ground as earth retaining steel sheet piles, and the straight steel sheet piles as retaining steel sheet piles are driven from the intersection point B of each arc. Connect and drive to the back A-A line of the active collapse angle,
In addition, a flat or concave anchor metal fitting 3 is fixed to the end of the steel sheet pile 2, and the anchor metal fittings 3 are fixed to the ground S to a predetermined depth (if necessary, reinforcement M& is installed as shown).
This is a steel sheet pile earth retaining method.

したがって、土留鋼矢板/が円孤状に連結、打込むこと
により背面からの荷重を土留鋼矢板/の引張力で抵抗さ
せることができ、また、控え鋼矢板2の最端部にアンカ
ー金具3を取付けることにより周面土との摩擦力により
引張抵抗力を増大させることが可能となり、一度に所定
深さまで地盤Sを掘削することができる。
Therefore, by connecting and driving the earth-retaining steel sheet piles in an arc shape, the load from the back can be resisted by the tensile force of the earth-retaining steel sheet piles. By attaching it, it becomes possible to increase the tensile resistance force due to the frictional force with the surrounding soil, and the ground S can be excavated to a predetermined depth at one time.

上述の通り、この発明は従来の鋼矢板アースアンカー工
法や鋼矢板二重締切工法に比して、工期的に有利となり
、土留工林料の転用も可能となり、工費の低順が期待さ
れる。
As mentioned above, compared to the conventional steel sheet pile earth anchor construction method and steel sheet pile double cofferdam construction method, this invention is advantageous in terms of construction period, enables the diversion of earth retaining materials, and is expected to lower construction costs. .

【図面の簡単な説明】 第1図は、この発明の平面図、第2図は縦断面図、第3
図は控え鋼矢板とアンカー金具の取付は詳細図である。 /:ニに情調矢板 2:控え鋼矢板 3、アンカー金具 Il:補 強材 S:地 盤 乙:交 点 部
[Brief Description of the Drawings] Fig. 1 is a plan view of the present invention, Fig. 2 is a longitudinal sectional view, and Fig. 3 is a longitudinal sectional view of the present invention.
The figure shows a detailed view of the installation of the steel sheet pile and anchor fittings. /: 2nd floor sheet pile 2: Steel sheet pile 3, anchor metal fittings Il: Reinforcement material S: Ground O: Intersection part

Claims (1)

【特許請求の範囲】[Claims] 土留工において、所定間隔を設けて土留鋼矢板として直
線鋼矢板を掘削側に張り出すように円弧状に直結して打
込み、各円弧の交点部より反対側に控え鋼矢板として直
線鋼矢板を連結して、直線鋼矢板の最終端部にアンカー
金具を固着して一体として主慟崩壊角の背面まで打込ん
だ後、所定地盤まで根切り施工することを特徴とする控
え鋼矢板による鋼矢板土留工法
In earth retaining work, straight steel sheet piles as earth retaining steel sheet piles are directly connected and driven in an arc shape so as to project toward the excavation side at specified intervals, and the straight steel sheet piles are connected as backing steel sheet piles on the opposite side from the intersection of each arc. The steel sheet pile earth retaining method is characterized in that the anchor fittings are fixed to the final end of the straight steel sheet piles, and the anchor fittings are driven as one piece to the back of the main slope collapse angle, and then the roots are cut to a specified ground level. construction method
JP16650483A 1983-09-12 1983-09-12 Steel sheet pile sheathing work using stay steel sheet pile Pending JPS6059228A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16650483A JPS6059228A (en) 1983-09-12 1983-09-12 Steel sheet pile sheathing work using stay steel sheet pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16650483A JPS6059228A (en) 1983-09-12 1983-09-12 Steel sheet pile sheathing work using stay steel sheet pile

Publications (1)

Publication Number Publication Date
JPS6059228A true JPS6059228A (en) 1985-04-05

Family

ID=15832579

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16650483A Pending JPS6059228A (en) 1983-09-12 1983-09-12 Steel sheet pile sheathing work using stay steel sheet pile

Country Status (1)

Country Link
JP (1) JPS6059228A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7946791B2 (en) * 2005-08-09 2011-05-24 Pilepro, Llc Arrangement of sheet-pile components
US9657454B2 (en) * 2000-07-28 2017-05-23 Pnd Engineers, Inc. Earth retaining system such as a sheet pile wall with integral soil anchors
US10094088B1 (en) * 2017-10-31 2018-10-09 Earth, Inc. Sheet pile retaining wall system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9657454B2 (en) * 2000-07-28 2017-05-23 Pnd Engineers, Inc. Earth retaining system such as a sheet pile wall with integral soil anchors
US10287741B2 (en) 2000-07-28 2019-05-14 Pnd Engineers, Inc. Earth retaining system such as a sheet pile wall with integral soil anchors
US7946791B2 (en) * 2005-08-09 2011-05-24 Pilepro, Llc Arrangement of sheet-pile components
KR101085041B1 (en) * 2005-08-09 2011-11-22 파일프로 엘엘씨 Arrangement of sheet-pile wall components
US10094088B1 (en) * 2017-10-31 2018-10-09 Earth, Inc. Sheet pile retaining wall system

Similar Documents

Publication Publication Date Title
JPS6059228A (en) Steel sheet pile sheathing work using stay steel sheet pile
JPH11303087A (en) Retaining wall using corrosion-resistant structure anchor
JPH0542524B2 (en)
JPH02289718A (en) Drilling method of expanded head pile hole, constructing method of expanded head pile and pile hole drill
KR102195496B1 (en) Pile for earth self-retaining wall using cast in place concrete pile with double I beam
KR102194381B1 (en) Pile for Earth self-retaining wall using double I beam
JP3633326B2 (en) Ground reinforcement method
JP3244324B2 (en) Mountain retaining method
JP2000017647A (en) Installation method of underwater structure
JPH04115024A (en) Sheathing method
JP2523234B2 (en) Anchor retaining wall
JP3012896B2 (en) Reverse cutting method combined with advance cutting
JP2893422B2 (en) Construction method of underground structure
JPH0634041U (en) Multi-blade conical steel pile
JP2785828B2 (en) Steep slope construction method for existing embankment slope
CN209620032U (en) Active inclination double-row pile foundation pit support structure
JP2628150B2 (en) Shovel anchor
JPS6043495B2 (en) How to build a retaining wall
JPH05125723A (en) Simple construction method of underground structure
JPS6272817A (en) Construction of retaining wall concurrently serving as sheathing
JPH06173284A (en) Construction method for self-standing continuous wall
JP3362961B2 (en) How to build large underground structures
JPS6051226A (en) Steel sheet pile sheathing work using stay steel sheet pile
JP2006016774A (en) Method for using diameter-enlarged pipe pile
JPS6221090B2 (en)