JPS6033197Y2 - Tunnel support assembly equipment - Google Patents

Tunnel support assembly equipment

Info

Publication number
JPS6033197Y2
JPS6033197Y2 JP11222480U JP11222480U JPS6033197Y2 JP S6033197 Y2 JPS6033197 Y2 JP S6033197Y2 JP 11222480 U JP11222480 U JP 11222480U JP 11222480 U JP11222480 U JP 11222480U JP S6033197 Y2 JPS6033197 Y2 JP S6033197Y2
Authority
JP
Japan
Prior art keywords
support
parallel link
shoring
attached
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP11222480U
Other languages
Japanese (ja)
Other versions
JPS5738900U (en
Inventor
正信 岩田
拓志 加登
幸雄 内瀬戸
Original Assignee
五洋建設株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 五洋建設株式会社 filed Critical 五洋建設株式会社
Priority to JP11222480U priority Critical patent/JPS6033197Y2/en
Publication of JPS5738900U publication Critical patent/JPS5738900U/ja
Application granted granted Critical
Publication of JPS6033197Y2 publication Critical patent/JPS6033197Y2/en
Expired legal-status Critical Current

Links

Description

【考案の詳細な説明】 本考案はトンネル掘削工事において支保工をセットする
際にトラクターショベル等の汎用機械に取り付けて使用
するトンネル内支保工組立装置に関する。
[Detailed Description of the Invention] The present invention relates to an in-tunnel support assembly device that is used by being attached to a general-purpose machine such as a tractor shovel when setting support in tunnel excavation work.

一般にトンネル工事においてトンネル掘削後、アーチ型
の支保工を組み、その支保工の外側とトンネル内面間に
土留板を挿し込むようにしている。
Generally, in tunnel construction, after tunnel excavation, arch-shaped supports are erected, and retaining plates are inserted between the outside of the supports and the inner surface of the tunnel.

かかる作業において、従来はりフタプル台車、クローラ
−ドリル付エレクタ−あるいはエアーウィンチ等を使用
していたが、これらの装置は切破でのスペースを取りす
ぎたり、作業に危険が伴ったり、更には装置の製作費が
高価である等の問題があった。
Traditionally, beam-lid pull carts, crawler drill erectors, air winches, etc. have been used for such work, but these devices take up too much space for cutting, are dangerous, and even damage the equipment. There were problems such as high production costs.

本考案は上述の如き問題にかんがみ、トラクターショベ
ル等の汎用機械のアームに取り付けする専用機を提供し
て装置の簡略、低廉化を図り、かつ作業の安全性と高能
率化を図ることを目的としたものであり、その要旨とす
るところはトラクターショベル等の汎用機のアタチメン
ト支持アームの先端に縦配置に取り付は自在な支持基板
を備え該支持基板の前面に上下配置の平行リンクの一端
を枢着するとともに該平行リンクの先端に支保工押し上
げ台を取り付けし、前記平行リンクと支持基板間に平行
リンク上下駆動用の油圧シリンダーを備え、かつ前記支
持基板の前面両側部に足場用の水平杆を突設し、該水平
杆に対し、出入自在に作業用足場を支持させてなるトン
ネル内支保工輯立装置に存する。
In view of the above-mentioned problems, the purpose of this invention is to provide a special machine that can be attached to the arm of a general-purpose machine such as a tractor shovel, thereby simplifying the device and reducing its cost, as well as improving work safety and efficiency. The gist of this is that there is a support board that can be freely installed vertically at the tip of the attachment support arm of a general-purpose machine such as a tractor excavator, and one end of a parallel link that is arranged vertically on the front of the support board. At the same time, a support lift platform is attached to the tip of the parallel link, and a hydraulic cylinder for vertically driving the parallel link is provided between the parallel link and the support board, and scaffolding supports are installed on both sides of the front side of the support board. The present invention resides in a tunnel support erection device in which a horizontal rod is provided in a protruding manner, and a working scaffold is supported so as to be able to move in and out of the horizontal rod.

次に本考案の実施の一例を図面について説明する。Next, an example of implementation of the present invention will be described with reference to the drawings.

図中1は支持基板である。In the figure, 1 is a support substrate.

この支持基板1の背面には上下配置に取り付は用ブラケ
ット2a、2bが突設され、そのブラケット2a、2b
にトラクターショベル3のアタチメント支持アーム4a
、4bの先端がピン20 a、 20 bをもって枢着
されるようにしている。
Mounting brackets 2a, 2b are protruded from the back side of the support board 1 in a vertical arrangement, and the brackets 2a, 2b
Attachment support arm 4a of tractor excavator 3
, 4b are pivotally attached using pins 20a and 20b.

トラクターショベル3は通常使用しているショベル(図
示せず)を取り外し、ショベルの代りに、前記支持基板
1を取り付けるようにしている。
The tractor shovel 3 has a normally used shovel (not shown) removed, and the support substrate 1 is attached in place of the shovel.

支持基板1の前面の中央上部には上下配置に一対のリン
ク取り付は用ブラケット5a、5bが突設され、そのブ
ラケット5a、5bに上下配置の平行リンク6ay6b
の基端が枢着されている。
A pair of vertically arranged link mounting brackets 5a and 5b are protruded from the upper center of the front surface of the support board 1, and parallel links 6ay6b are mounted vertically on the brackets 5a and 5b.
The proximal end of is pivotally attached.

この平行リンク6a、6bの先端は支保工押し上げ台7
のブラケット8a*8bに枢着され、平行リンク6a、
6bの上下回動により支保工押し上げ台7が水平姿勢を
維持しつつ上下動されるようにしている。
The tips of these parallel links 6a and 6b are the shoring push-up platform 7
The parallel links 6a,
By the vertical movement of 6b, the shoring push-up platform 7 is moved up and down while maintaining its horizontal position.

そして平行リンク6bと支持基板1との間には平行リン
ク回動用の油圧シリンダー9が取り付けされ、その駆動
により平行リンク6a、6bが、上下に回動されるよう
にしている。
A hydraulic cylinder 9 for rotating the parallel link is installed between the parallel link 6b and the support substrate 1, and the parallel links 6a and 6b are rotated up and down by the drive of the hydraulic cylinder 9.

支保工押し上げ台7の上面に一対の回転自在なローラー
10.10が互いに平行配置に前後方向に向けて取り付
けられている。
A pair of rotatable rollers 10.10 are attached to the upper surface of the shoring push-up table 7 in parallel to each other and facing in the front-rear direction.

また、支持基板1の前面には平行リンク6a、6bの両
側部に足場用の水平杆11.11が突設されている。
Further, on the front surface of the support substrate 1, horizontal rods 11.11 for scaffolding are provided protruding from both sides of the parallel links 6a and 6b.

この水平杆11.11は平行リンク6a、6bより短く
形成され、その水平杆11,11に作業用足場12が出
入自在に取り付けられている。
This horizontal rod 11.11 is formed shorter than the parallel links 6a, 6b, and a working scaffold 12 is attached to the horizontal rods 11, 11 so as to be able to move in and out.

この足場12は方形状に枠組され、笹3図に示すように
その両側部が水平杆it、’rtの対向面に形成した凹
溝11a、11a内に長手力向にスライド自在に嵌み合
わされている。
This scaffold 12 is framed in a rectangular shape, and as shown in Fig. 3, both sides of the scaffold 12 are fitted into grooves 11a, 11a formed on the opposing surfaces of the horizontal rods it, 'rt so as to be slidable in the longitudinal direction. ing.

そしてその足場12はその上面にエキスバンドメタル1
3が張設されているとともに側部及び前端部に連続させ
て手摺り14が突設されている。
And the scaffold 12 has an extract band metal 1 on its top surface.
3 is extended, and a handrail 14 is provided continuously and protrudes from the side and front end.

図中15は水平杆補強枠である。In the figure, 15 is a horizontal rod reinforcement frame.

このように構成される支保工組立装置の使用に際しては
、アタチメント支持アーム4a、4biこ通常取り付け
されているショベル等(図示せず)を取り外し、そのア
タチメント支持アーム4a。
When using the shoring assembly apparatus constructed in this manner, the shovel or the like (not shown) to which the attachment support arms 4a and 4bi are normally attached is removed, and the attachment support arms 4a and 4bi are removed.

4bの先端に前述した支持基板1を取り付けして使用す
るものであり、第4図、第5図に示すように二分割形状
に形成した一対の支保工材16,16の基端部をトンネ
ルAの底面側部に位置決めし、その先端側を支保工押し
上げ台7のローラー10.10上に互い違いに載せ、こ
の状態で油圧シリンダー9を押し上げ駆動させるととも
にショベル支持アーム4a、4bを上昇駆動させて支保
工押し上げ台7を上方に押し上げる。
It is used by attaching the support substrate 1 described above to the tip of the supporting board 4b, and as shown in FIGS. A, the tip sides are placed alternately on the rollers 10 and 10 of the shoring lifting platform 7, and in this state, the hydraulic cylinder 9 is driven upward and the shovel support arms 4a and 4b are driven upward. to push the shoring push-up platform 7 upward.

支保工材16.16の先端を所望の高さまで押し上げた
後、その先晩間を互いに突き合わせ、従来と同様両立保
工間をそのトップジヨイントプレートを突き合わせ、ボ
ルト17をもって連結する。
After pushing up the ends of the shoring materials 16 and 16 to a desired height, the ends of the shoring materials 16 and 16 are butted against each other, and the top joint plates of the shoring materials are butted against each other as in the conventional method, and the bolts 17 are used to connect them.

このようにして組み立てた支保工材16.16とトンネ
ル内面間に土留板1B、18を順次押し込み支保工の組
立てを行う。
The earth retaining plates 1B and 18 are successively pushed between the thus assembled shoring materials 16 and 16 and the inner surface of the tunnel to assemble the shoring.

そして、ボルト17による連結及び高位置の土留板1B
、1Bの押し込みは作業足場12.12上に作業員が搭
乗して行う。
Then, the connection with bolts 17 and the earth retaining plate 1B at a high position
, 1B are pushed in by a worker riding on the work scaffold 12.12.

尚図中19はタイロッドである。In addition, 19 in the figure is a tie rod.

本考案のトンネル内支保工組立装置は上述のように構成
され、例えばトラクターショベルのショベルに代えて取
り換え使用できるようにしたため、従来の専用機に比べ
て廉価にて製造でき、また装置自体も軽量で小型となっ
て作業上有利となり、更にまた支保工押し上げ台ととも
に上昇する専用の作業足場を設けたことにより、安全で
しかも能率の良い作業がなし得られる等、種々の効果が
あり、トンネル工事においてその効用は甚だ大なるもの
がある。
The in-tunnel shoring assembly device of the present invention is configured as described above, and can be used as a replacement for a tractor shovel, for example, so it can be manufactured at a lower cost than conventional dedicated machines, and the device itself is also lightweight. It is compact, which is advantageous for work, and by installing a special work scaffold that rises with the shoring platform, it has various effects such as safe and efficient work, and is suitable for tunnel construction. Its effectiveness is enormous.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本考案の実施の一例を示すもので第1図は側面図
、第2図は要部の平面図、第3図は作業台の断面図、第
4図は使用状態の側面図、第5図は同正面図である。 1・・・・・・支持基板、3・・・・・・トラクターシ
ョベル、4a、4b・・・・・・アタチメント支持アー
ム、6a。 6b・・・・・・平行リンク、7・・・・・・支保工押
し上げ台、9・・・・・・油圧シリンダー、11・・・
・・・水平杆、12・・・・・・作業用足場、16・・
・・・・支保工材、17・・・・・・ボルト、18・・
・・・・土留板。
The drawings show an example of the implementation of the present invention, and FIG. 1 is a side view, FIG. 2 is a plan view of the main parts, FIG. 3 is a sectional view of the workbench, FIG. 4 is a side view of the device in use, and FIG. Figure 5 is a front view of the same. DESCRIPTION OF SYMBOLS 1... Support board, 3... Tractor shovel, 4a, 4b... Attachment support arm, 6a. 6b...Parallel link, 7...Shoring push-up platform, 9...Hydraulic cylinder, 11...
...Horizontal rod, 12...Work scaffolding, 16...
...Shoring material, 17...Bolt, 18...
... Earth retaining board.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] トラクターショベル等の汎用機のアタチメント支持アー
ムの先端に縦配置に取り付は自在な支持基板を備え該支
持基板の前面に上下配置の平行リンクの一端を枢着する
とともに該平行リンクの先端に支保工押し上げ台を取り
付けし、前記平行リンクと支持基板間に平行リンク上下
駆動用の油圧シリンダーを備え、かつ前記支持基板の前
面両側部に足場用の水平杆を突設し、該水平杆に対し出
入自在に作業足場を支持させてなるトンネル内支工保組
立装置。
A support board is provided that can be freely installed vertically at the tip of an attachment support arm of a general-purpose machine such as a tractor excavator, and one end of a vertically arranged parallel link is pivoted to the front of the support board, and a support is attached to the tip of the parallel link. A work lifting platform is attached, a hydraulic cylinder for driving the parallel link up and down is provided between the parallel link and the support substrate, and horizontal rods for scaffolding are protruded from both sides of the front side of the support substrate, and An in-tunnel support assembly device that supports work scaffolding so that it can be moved in and out.
JP11222480U 1980-08-09 1980-08-09 Tunnel support assembly equipment Expired JPS6033197Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11222480U JPS6033197Y2 (en) 1980-08-09 1980-08-09 Tunnel support assembly equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11222480U JPS6033197Y2 (en) 1980-08-09 1980-08-09 Tunnel support assembly equipment

Publications (2)

Publication Number Publication Date
JPS5738900U JPS5738900U (en) 1982-03-02
JPS6033197Y2 true JPS6033197Y2 (en) 1985-10-03

Family

ID=29473287

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11222480U Expired JPS6033197Y2 (en) 1980-08-09 1980-08-09 Tunnel support assembly equipment

Country Status (1)

Country Link
JP (1) JPS6033197Y2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5938500A (en) * 1982-08-26 1984-03-02 山内工業株式会社 Building vehicle
JPWO2021215235A1 (en) * 2020-04-20 2021-10-28

Also Published As

Publication number Publication date
JPS5738900U (en) 1982-03-02

Similar Documents

Publication Publication Date Title
JP3699266B2 (en) Attitude holding device for working device used for front device for construction machine
JP2012012835A (en) Construction method of work floor for high altitude work
CN112983507A (en) Novel mechanical device for roadway assembled support and operation method thereof
CN114704096A (en) Climbing formula quick detach concrete spreader in pit shaft
JPS6033197Y2 (en) Tunnel support assembly equipment
JP2524537Y2 (en) Multifunctional tunnel construction equipment
WO2022056968A1 (en) Operation platform for pulling piles, pile pulling device and pile pulling method
JPH0768877B2 (en) Construction method and removal method of earth retaining frame in lateral construction
CN210500860U (en) Secondary structure constructional column top bar planting assistor
JP4042907B2 (en) Work equipment front device and work equipment
CN114182964B (en) Pipe truss hoisting and positioning construction method
CN217500966U (en) A construction platform for construction of municipal administration piping lane steel sheet pile
US2987890A (en) Method and apparatus for constructing and setting trench cribbing
JP3325156B2 (en) Soil support method and structure in excavation trench
JP3570933B2 (en) Casing driver working scaffold
CN214836420U (en) Preliminary bracing back-to-top platform truck after tunnel face excavation
CN114412203B (en) Auxiliary device for hoisting and positioning prefabricated wall components
CN211569989U (en) Pier type foundation dynamic and static equipment in-place tool
JP7410832B2 (en) How to jack up construction machinery and the vehicle body of construction machinery
CN212639754U (en) Movable prestressing force stretch-draw jack suspension
CN218862530U (en) Crawler-type lifting platform
CN220451885U (en) Quick workbench setting device
JPH0452273Y2 (en)
JPS5923831Y2 (en) Drilling rig with working scaffolding
JPS6134454Y2 (en)